{"id":107358,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/cegid\/ghid-de-integrare\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"ghid-de-integrare","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/cegid\/ghid-de-integrare\/","title":{"rendered":"Ghid de integrare Cegid pentru programarea produc\u021biei cu SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ Cegid<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Ghid de integrare Cegid <span class=\"hl\">pentru programarea produc\u021biei cu SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Acest ghid de integrare Cegid le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze sistemele ERP Cegid pentru produc\u021bie la SkyPlanner APS: mai \u00eent\u00e2i Cegid PMI, apoi Cegid Primavera \u0219i Cegid Ekon. SkyPlanner se integreaz\u0103 bidirec\u021bional cu Cegid, prin interfe\u021bele proprii Cegid:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u00cen SkyPlanner sunt importate comenzile de fabrica\u021bie OF (ordres de fabrication, ordens de fabrico, \u00f3rdenes de fabricaci\u00f3n), \u00eempreun\u0103 cu opera\u021biile, gamele tehnologice, listele de materiale, centrele de lucru \u0219i utilajele aferente, precum \u0219i articolele, stocurile \u0219i comenzile c\u0103tre furnizori.<\/li>\n\n\n<li>Datele de \u00eenceput \u0219i de sf\u00e2r\u0219it planificate sunt transmise \u00eenapoi pentru fiecare opera\u021bie OF.<\/li>\n\n\n<li>Dac\u0103 dori\u021bi, timpul lucrat de operatori poate fi transmis \u00eenapoi ca pointages (PMI), Di\u00e1rios de Trabalho (Primavera) sau imputaciones (Ekon).<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagram\u0103 Gantt \u00een SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"cegid-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Interfe\u021bele de integrare Cegid<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>Cegid PMI.<\/strong> Cegid pune la dispozi\u021bie un Web API pentru PMI: &#8220;Facilitez les \u00e9changes s\u00e9curis\u00e9s avec vos applications externes gr\u00e2ce \u00e0 la mise \u00e0 disposition de Web API depuis votre gestion de production Cegid.&#8221; (Facilita\u021bi schimburile securizate cu aplica\u021biile externe prin Web API disponibile \u00een sistemul Cegid de gestiune a produc\u021biei.) Web API p\u0103streaz\u0103 intacte regulile de afaceri ale Manufacturing PMI \u00een aplica\u021biile externe (<a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Cegid PMI<\/a>). PMI ofer\u0103 \u0219i EDI, fi\u0219iere XML standardizate pentru datele tehnice din CAD \u0219i un generator de rapoarte cu export \u00een Excel. Exportul \u00een Excel este cea mai rapid\u0103 modalitate de a ob\u021bine date pentru testare.<\/p>\n\n\n<p><strong>Cegid Primavera.<\/strong> PRIMAVERA ERP V10 API &#8220;allows third party applications to perform both data query and writing operations&#8221; (permite aplica\u021biilor ter\u021be at\u00e2t s\u0103 interogheze, c\u00e2t \u0219i s\u0103 scrie date) \u0219i acoper\u0103 toate modulele produsului (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/api-documentation\/\">Documenta\u021bia V10 API<\/a>). Web API este documentat \u0219i poate fi apelat prin Swagger, separat pe module (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/resources\/web-api-en\/article\/swagger-na-web-api\/\">Swagger pentru Web API<\/a>). Modulul Produ\u00e7\u00e3o (GPR) acoper\u0103 fi\u0219ele tehnice, necesarul net, lansarea OF, Planeamento, \u00eenregistr\u0103rile de produc\u021bie \u0219i Di\u00e1rios de Trabalho (<a href=\"https:\/\/v10api.primaverabss.com\/html\/api\/producao\/toc.html\">Documenta\u021bia de referin\u021b\u0103 Produ\u00e7\u00e3o<\/a>). Serviciile principale pentru programare:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>IGprBSOrdensFabrico<\/strong> cite\u0219te comenzile de fabrica\u021bie \u0219i opera\u021biile acestora (GprBEOFOperacao).<\/li>\n\n\n<li><strong>IGprBSPlaneamento<\/strong> \u00eencarc\u0103 OF pentru planificare \u0219i actualizeaz\u0103 opera\u021biile planificate cu <strong>ActualizaPlaneamentoOperacao<\/strong>.<\/li>\n\n\n<li><strong>IGprBSCentrosTrabalho<\/strong>, <strong>IGprBSPostosTrabalho<\/strong>, <strong>IGprBSOperadores<\/strong> \u0219i <strong>IGprBSRoteiros<\/strong> citesc centrele de lucru, posturile, operatorii \u0219i gamele tehnologice.<\/li>\n\n\n<li><strong>IGprBSDiariosTrabalho<\/strong> \u00eenregistreaz\u0103 activitatea cu <strong>IniciaPicagem<\/strong> \u0219i <strong>TerminaPicagem<\/strong>.<\/li>\n\n<\/ul>\n\n\n<p><strong>Cegid Ekon XRP Industria.<\/strong> Cegid precizeaz\u0103 c\u0103 Ekon se conecteaz\u0103 cu celelalte sisteme de gestiune ale companiei (<a href=\"https:\/\/www.cegid.com\/ib\/es\/productos\/software-gestion-produccion-industrial\/erp-fabricacion\/\">Cegid Ekon<\/a>). Echipa SkyPlanner stabile\u0219te interfa\u021ba pentru instalarea dumneavoastr\u0103 Ekon \u00een etapa de definire a domeniului.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentificare \u0219i licen\u021biere<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Cegid PMI.<\/strong> Accesul la Web API pentru integrare este activat pentru instalarea dumneavoastr\u0103 PMI \u00een etapa de definire a domeniului, \u00eempreun\u0103 cu partenerul Cegid.<\/li>\n\n\n<li><strong>Cegid Primavera.<\/strong> Fiecare entitate Web API expune o metod\u0103 Login care returneaz\u0103 un token Bearer cu o cheie de sesiune. Tokenul este re\u00eennoit prin endpointul token (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/resources\/web-api-en\/article\/swagger-na-web-api\/\">Swagger pentru Web API<\/a>). Utilizatorul folosit pentru integrare are nevoie de licen\u021be Produ\u00e7\u00e3o pentru func\u021bionalit\u0103\u021bile pe care le apeleaz\u0103.<\/li>\n\n\n<li><strong>\u00cen SkyPlanner.<\/strong> Autentificarea la REST API se face cu un token API \u00een antetul Authorization-Token (SkyPlanner Settings &gt; API), iar documenta\u021bia este disponibil\u0103 \u00een Swagger\/OpenAPI. <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">Tutorialul de integrare<\/a> v\u0103 ghideaz\u0103 prin primele apeluri.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Evenimente \u0219i interog\u0103ri periodice<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Datele din Cegid sunt preluate prin interog\u0103ri periodice. Interog\u0103rile filtrate dup\u0103 OF deschise \u0219i modific\u0103ri recente preiau noile lucr\u0103ri. Frecven\u021ba se stabile\u0219te pentru fiecare fabric\u0103: de la c\u00e2teva minute pentru OF p\u00e2n\u0103 la o or\u0103 pentru stocuri.<\/p>\n\n\n<p>SkyPlanner trimite webhookuri c\u00e2nd se schimb\u0103 starea sau programul de produc\u021bie, astfel \u00eenc\u00e2t scrierea datelor \u00eenapoi \u00een Cegid este declan\u0219at\u0103 de evenimente.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Maparea datelor<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Obiect Cegid (PMI \/ Primavera)<\/th><th>Obiect SkyPlanner<\/th><th>Direc\u021bie<\/th><th>Frecven\u021b\u0103<\/th><\/tr><\/thead><tbody><tr><td>Articole (Articles \/ artigos)<\/td><td>Produse \u0219i materiale<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi interog\u0103ri periodice<\/td><\/tr><tr><td>Liste de materiale \/ fi\u0219e tehnice \u0219i componente (Nomenclatures \/ fichas t\u00e9cnicas, componentes)<\/td><td>Structura produsului, subproduse, materiale pe produs<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td>Game tehnologice \u0219i opera\u021bii (Gammes \/ roteiros, opera\u00e7\u00f5es)<\/td><td>Etape de proces cu durate, timpi de preg\u0103tire \u0219i de demontare<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td>Centre de lucru \u0219i utilaje \/ centre \u0219i posturi de lucru (Postes de charge \/ centros de trabalho, postos de trabalho)<\/td><td>Centre de lucru, grupuri de centre de lucru, coeficien\u021bi de eficien\u021b\u0103<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi rar<\/td><\/tr><tr><td>Angaja\u021bi \/ operatori (Salari\u00e9s \/ operadores)<\/td><td>Personal<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td>Calendare \/ excep\u021bii de capacitate (exce\u00e7\u00f5es de capacidade)<\/td><td>Schimburi \u0219i zile nelucr\u0103toare<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Zilnic sau schimburi gestionate direct \u00een SkyPlanner<\/td><\/tr><tr><td>Scule \u0219i matri\u021be (Ferramentas e moldes \u00een Primavera)<\/td><td>Scule tratate ca resurse cu capacitate finit\u0103<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td>OF ferme \u0219i previzionale \/ comenzi de fabrica\u021bie cu opera\u021bii (ordens de fabrico)<\/td><td>Comenzi \u0219i opera\u021bii cu termene \u0219i necesar de materiale<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Interogare la c\u00e2teva minute<\/td><\/tr><tr><td>Stoc pe articol \u0219i depozit<\/td><td>Solduri de stoc<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Interogare la fiecare or\u0103 sau la rularea program\u0103rii<\/td><\/tr><tr><td>Comenzi c\u0103tre furnizori cu date de livrare<\/td><td>Comenzi de achizi\u021bie, materiale de primit \u00een func\u021bie de data livr\u0103rii<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Interogare la fiecare or\u0103 sau la rularea program\u0103rii<\/td><\/tr><tr><td>\u00cenceputul \u0219i sf\u00e2r\u0219itul planificate pentru opera\u021bia OF \/ GprBEOFOperacao DataIniPrevista, DataFimPrevista prin ActualizaPlaneamentoOperacao<\/td><td>\u00cenceputul \u0219i sf\u00e2r\u0219itul planificate pe etap\u0103, centrul de lucru alocat<\/td><td>SkyPlanner \u2192 Cegid<\/td><td>La modificarea programului de produc\u021bie, prin webhook SkyPlanner<\/td><\/tr><tr><td>Pontaje (Pointages \/ Di\u00e1rios de Trabalho, prin IniciaPicagem, TerminaPicagem)<\/td><td>\u00cenregistr\u0103ri de timp \u0219i confirm\u0103ri ale operatorilor<\/td><td>SkyPlanner \u2192 Cegid<\/td><td>La fiecare confirmare sau pe schimb, dac\u0103 se alege aceast\u0103 op\u021biune<\/td><\/tr><tr><td>Nu exist\u0103 \u00een Cegid<\/td><td>Matricea timpilor de preg\u0103tire, scule ca resurse cu capacitate finit\u0103 (PMI), utilaje alternative \u0219i personal alternativ<\/td><td>Gestionate \u00een SkyPlanner<\/td><td>Configurate \u00een etapa de implementare ini\u021bial\u0103<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Modele de integrare<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00cenc\u0103rcarea ini\u021bial\u0103 a nomenclatoarelor.<\/strong> Citi\u021bi articolele, listele de materiale, gamele tehnologice, centrele de lucru, utilajele, operatorii \u0219i calendarele. Mapa\u021bi cu aten\u021bie centrele: un poste de charge cu patru utilaje devine un grup de centre de lucru cu patru centre de lucru.<\/p>\n\n\n<p><strong>2. Sincronizarea OF.<\/strong> Citi\u021bi OF ferme cu opera\u021biile \u0219i componentele lor, precum \u0219i comenzile deschise c\u0103tre furnizori. SkyPlanner consider\u0103 materialul comandat disponibil la data de livrare din comanda de achizi\u021bie \u0219i actualizeaz\u0103 stocul c\u00e2nd comanda este marcat\u0103 Delivered. Stabili\u021bi \u00een etapa de definire a domeniului dac\u0103 se programeaz\u0103 \u0219i OF previzionale (OF pr\u00e9visionnels) sau doar OF ferme.<\/p>\n\n\n<p><strong>3. Scrierea programului de produc\u021bie \u00eenapoi \u00een Cegid.<\/strong> C\u00e2nd motorul plaseaz\u0103 sau mut\u0103 o opera\u021bie, un webhook SkyPlanner declan\u0219eaz\u0103 scrierea \u00een Cegid. \u00cen PMI, datele de \u00eenceput \u0219i de sf\u00e2r\u0219it planificate sunt transmise opera\u021biilor OF prin Web API, cu respectarea regulilor de afaceri PMI. \u00cen Primavera, integrarea apeleaz\u0103 IGprBSPlaneamento.ActualizaPlaneamentoOperacao cu opera\u021bia, centrul de lucru \u0219i \u00eenceputul \u0219i sf\u00e2r\u0219itul planificate. Astfel sunt actualizate DataIniPrevista \u0219i DataFimPrevista pentru opera\u021bia comenzii de fabrica\u021bie.<\/p>\n\n\n<p><strong>4. Confirm\u0103ri din produc\u021bie.<\/strong> Operatorii \u00eenregistreaz\u0103 activitatea cu SkyPlanner Mobile Confirmations sau Production Timer, iar \u00eenregistr\u0103rile de timp men\u021bin programul de produc\u021bie la zi. Dumneavoastr\u0103 decide\u021bi dac\u0103 timpul este transmis \u00eenapoi \u00een Cegid. Dac\u0103 da, este \u00eenregistrat ca pointages \u00een PMI sau prin IniciaPicagem \u0219i TerminaPicagem \u00een Di\u00e1rios de Trabalho din Primavera. Dac\u0103 nu, timpul este \u00eenregistrat \u00een Cegid prin coduri de bare, ca p\u00e2n\u0103 acum.<\/p>\n\n\n<p><strong>5. Responsabilitatea pentru date \u0219i regulile de rezolvare a conflictelor.<\/strong> Documenta\u021bi-le \u00eenainte de punerea \u00een func\u021biune:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Date<\/th><th>Sistem responsabil<\/th><\/tr><\/thead><tbody><tr><td>Articole, liste de materiale, game tehnologice, cantit\u0103\u021bi \u0219i stare OF<\/td><td>Cegid<\/td><\/tr><tr><td>Succesiunea opera\u021biilor, orele de \u00eenceput \u0219i de sf\u00e2r\u0219it, alocarea utilajelor<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matricea timpilor de preg\u0103tire, necesarul de scule \u0219i operatori, resurse alternative<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Schimburi \u0219i zile nelucr\u0103toare<\/td><td>Un singur sistem, ales \u00een etapa de definire a domeniului<\/td><\/tr><tr><td>Timp lucrat, consumuri \u0219i finaliz\u0103ri<\/td><td>Cegid, cu date introduse direct sau transmise din \u00eenregistr\u0103rile de timp SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Stabili\u021bi un singur sistem responsabil de actualizarea datelor calendaristice ale OF. SkyPlanner stabile\u0219te \u0219i scrie datele planificate \u00een locul rul\u0103rilor de planificare din PMI \u0219i al algoritmului de planificare din Primavera. Nu mai executa\u021bi acele rul\u0103ri pentru OF programate de SkyPlanner, pentru ca sistemele s\u0103 nu \u00ee\u0219i suprascrie reciproc datele.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapele obi\u0219nuite ale proiectului<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementarea se finalizeaz\u0103, de regul\u0103, \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea procesului de configurare ini\u021bial\u0103. \u00cenainte de aceast\u0103 etap\u0103, valida\u021bi programul de produc\u021bie \u00een perioada de prob\u0103 gratuit\u0103 de 30 de zile, folosind centre de lucru (postes), game tehnologice (gammes) \u0219i OF deschise, exportate din Cegid \u00een format CSV sau Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Maparea datelor.<\/strong> Stabili\u021bi tabelul de coresponden\u021be, regulile privind sistemul care gestioneaz\u0103 fiecare tip de date, frecven\u021bele de sincronizare \u0219i dac\u0103 timpii se transmit \u00eenapoi \u00een Cegid.<\/li>\n\n\n<li><strong>Accesul la Cegid.<\/strong> Crea\u021bi utilizatorul pentru integrare \u0219i confirma\u021bi drepturile \u0219i licen\u021bele pentru obiectele de produc\u021bie. Testa\u021bi mai \u00eent\u00e2i \u00eentr-o societate de test.<\/li>\n\n\n<li><strong>\u00cenc\u0103rcarea ini\u021bial\u0103.<\/strong> Articole (Articles), liste de materiale (nomenclatures), game tehnologice (gammes), centre de lucru (postes de charge), utilaje, operatori \u0219i calendare.<\/li>\n\n\n<li><strong>Sincronizarea OF \u0219i a comenzilor c\u0103tre furnizori.<\/strong> Interog\u0103ri periodice cu filtre, paginare \u0219i re\u00eencerc\u0103ri.<\/li>\n\n\n<li><strong>Configurarea constr\u00e2ngerilor \u00een SkyPlanner.<\/strong> Matricea timpilor de preg\u0103tire, sculele, num\u0103rul de operatori pentru fiecare opera\u021bie \u0219i utilajele alternative sau personalul alternativ.<\/li>\n\n\n<li><strong>Transmiterea programului \u00eenapoi \u00een Cegid.<\/strong> Datele planificate ale opera\u021biilor, primite prin webhook-urile SkyPlanner, plus \u00eenregistrarea timpilor, dac\u0103 a\u021bi ales aceast\u0103 op\u021biune.<\/li>\n\n\n<li><strong>Testarea \u00een paralel.<\/strong> Rula\u021bi SkyPlanner \u00een paralel cu planul actual, compara\u021bi datele calendaristice \u0219i corecta\u021bi nomenclatoarele.<\/li>\n\n\n<li><strong>Punerea \u00een func\u021biune.<\/strong> Activa\u021bi transmiterea datelor \u00eenapoi \u00een Cegid dup\u0103 ce datele concord\u0103.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-to-plan-for-in-a-cegid-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce trebuie s\u0103 ave\u021bi \u00een vedere la integrarea cu Cegid<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>OF ferme \u0219i planificate.<\/strong> PMI le creeaz\u0103 pe ambele pe baza CBN. Programarea OF planificate arat\u0103 \u00eenc\u0103rcarea viitoare, dar transmite\u021bi datele calendaristice \u00eenapoi doar pentru OF ferme.<\/li>\n\n\n<li><strong>Opera\u021bii marcate ca excluse din planificare.<\/strong> \u00cen Primavera, o opera\u021bie poate fi marcat\u0103 ca nesupus\u0103 planific\u0103rii (NaoSujeitaPlaneamento). Exclude\u021bi aceste opera\u021bii c\u00e2nd transmite\u021bi datele \u00eenapoi.<\/li>\n\n\n<li><strong>Timpii utilajelor \u0219i ai operatorilor.<\/strong> Primavera p\u0103streaz\u0103 separat timpul utilajului \u0219i timpul operatorului pentru fiecare opera\u021bie. Mapa\u021bi-le pe ambele, astfel \u00eenc\u00e2t opera\u021biilor cu mai mul\u021bi operatori s\u0103 li se aloce echipa potrivit\u0103.<\/li>\n\n\n<li><strong>Suprapunerea opera\u021biilor.<\/strong> Opera\u021biile din Primavera au un coeficient de suprapunere. Mapa\u021bi-l la temporizarea etapelor din SkyPlanner; altfel, programul va prevedea timpi de a\u0219teptare mai mari dec\u00e2t cei din atelier.<\/li>\n\n\n<li><strong>Ce ERP Cegid folosi\u021bi.<\/strong> PMI, Primavera \u0219i Ekon folosesc interfe\u021be diferite. Confirma\u021bi mai \u00eent\u00e2i produsul \u0219i versiunea, iar pentru Cegid XRP Flex consulta\u021bi <a href=\"\/ro\/integrari\/erp\/acumatica\/ghid-de-integrare\/\">ghidul de integrare Acumatica<\/a>.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"who-configures-and-supports-the-cegid-integratio\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cine configureaz\u0103 integrarea cu Cegid \u0219i asigur\u0103 suportul<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Echipa SkyPlanner configureaz\u0103 integrarea \u00een etapa ini\u021bial\u0103 \u0219i asigur\u0103 suportul dup\u0103 punerea \u00een func\u021biune,<\/strong> pentru apelurile API Cegid convenite. Fiecare fabric\u0103 folose\u0219te Cegid \u00een mod diferit, iar aceste particularit\u0103\u021bi sunt luate \u00een calcul aici.<\/li>\n\n\n<li><strong>Partenerul dumneavoastr\u0103 Cegid poate participa.<\/strong> Acesta v\u0103 cunoa\u0219te configura\u021bia, personaliz\u0103rile \u0219i licen\u021bele \u0219i poate configura utilizatorul pentru integrare \u0219i accesul API al\u0103turi de echipa SkyPlanner.<\/li>\n\n\n<li><strong>Dezvoltatorii dumneavoastr\u0103 pot extinde integrarea<\/strong> folosind REST API din SkyPlanner \u0219i un token API. Un token API este suficient pentru a \u00eencepe, iar echipa SkyPlanner ofer\u0103 asisten\u021b\u0103 la nevoie. G\u0103si\u021bi documenta\u021bia \u00een <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">documenta\u021bia de integrare SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse \u0219i facturare lunar\u0103. Oferta pentru integrare este stabilit\u0103 de la \u00eenceput, \u00een func\u021bie de procesele \u0219i nevoile dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul ales. Consulta\u021bi <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a>, <a href=\"\/ro\/integrari\/erp\/cegid\/cu-capacitate-finita\/\">programarea cu capacitate finit\u0103 pentru Cegid<\/a>, <a href=\"\/ro\/integrari\/erp\/cegid\/\">pagina Cegid<\/a> \u0219i <a href=\"\/ro\/integrari\/erp\/\">sec\u021biunea de integr\u0103ri ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi proba gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een hala de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi m\u0103rturia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor din fabrica de produse farmaceutice Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui plan optimizat pe trei luni pentru toate centrele de lucru dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi m\u0103rturia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, director de produc\u021bie la Fredman Operations, l\u00e2ng\u0103 o celul\u0103 robotizat\u0103 de paletizare din Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 luni<\/b><span>\u00een avans: echipa de v\u00e2nz\u0103ri vede capacitatea disponibil\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ofer\u0103 o baz\u0103 solid\u0103 \u0219i siguran\u021b\u0103 pentru \u00eentreaga planificare a produc\u021biei.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, director de produc\u021bie<\/b><br>Fredman Operations \u00b7 H\u00e2rtie pentru ambalaje adecvate contactului cu alimentele<\/p>\n\n\n<p class=\"ind-cust__result\">Echipa de v\u00e2nz\u0103ri vede capacitatea disponibil\u0103 cu \u0219ase luni \u00een avans, iar solicit\u0103rile de modificare a programului, care \u00eenainte necesitau o or\u0103 sau mai mult, primesc r\u0103spuns \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/fredman-operations\/\">Citi\u021bi m\u0103rturia Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>respectarea termenelor de livrare din 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ne ofer\u0103 vizibilitate asupra capacit\u0103\u021bii \u0219i face planificarea predictibil\u0103.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Produc\u021bie chimic\u0103 \u0219i alimentar\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a fost de 100% pe \u00eentreaga perioad\u0103 de utilizare a SkyPlanner, din 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/opes-corporation\/\">Citi\u021bi m\u0103rturia Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cegid PMI are un API?<\/summary>\n<p class=\"sp-faq__a\">Da. Cegid ofer\u0103 un Web API pentru PMI, care permite schimburi securizate cu aplica\u021bii externe, p\u0103str\u00e2nd intacte regulile de business din Manufacturing PMI. SkyPlanner \u00eel folose\u0219te pentru a citi OF \u0219i a scrie datele planificate \u0219i pointages.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cegid Primavera are un API pentru comenzile de fabrica\u021bie?<\/summary>\n<p class=\"sp-faq__a\">Da. API-ul PRIMAVERA V10 permite citirea \u0219i scrierea \u00een toate modulele. Modulul Produ\u00e7\u00e3o pune la dispozi\u021bie ordens de fabrico, Planeamento cu ActualizaPlaneamentoOperacao \u0219i Di\u00e1rios de Trabalho.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum sunt transmise datele planificate \u00eenapoi \u00een Cegid?<\/summary>\n<p class=\"sp-faq__a\">\u00cen PMI, prin Web API, pentru fiecare opera\u021bie OF. \u00cen Primavera, prin IGprBSPlaneamento.ActualizaPlaneamentoOperacao, care stabile\u0219te datele planificate de \u00eenceput \u0219i de sf\u00e2r\u0219it ale opera\u021biei din ordem de fabrico.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cegid accept\u0103 webhook-uri?<\/summary>\n<p class=\"sp-faq__a\">Integrarea interogheaz\u0103 periodic Cegid, la intervale stabilite pentru fiecare fabric\u0103. Webhook-urile SkyPlanner transmit modific\u0103rile programului pe m\u0103sur\u0103 ce apar, astfel \u00eenc\u00e2t datele calendaristice ajung \u00een Cegid imediat dup\u0103 fiecare reprogramare.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Un partener Cegid ar trebui s\u0103 propun\u0103 planificarea integrat\u0103 \u00een Cegid sau SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, atunci c\u00e2nd constr\u00e2ngerile clientului nu se limiteaz\u0103 la utilaje \u0219i stocuri. Chiar Cegid recomand\u0103 conectarea unor instrumente de planificare avansat\u0103 pentru constr\u00e2ngeri suplimentare (<a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Cegid PMI<\/a>). SkyPlanner planific\u0103 operatorii, sculele, preg\u0103tirile \u0219i materialele, reprogrameaz\u0103 automat \u0219i permite un num\u0103r nelimitat de utilizatori, de la 199 \u20ac pe lun\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de a realiza integrarea?<\/summary>\n<p class=\"sp-faq__a\">Da. Proba gratuit\u0103 de 30 de zile permite utilizarea a p\u00e2n\u0103 la 20 de centre de lucru, cu importuri CSV sau Excel din Cegid, f\u0103r\u0103 card de credit. <a href=\"\/ro\/proba\/\">\u00cencepe\u021bi proba gratuit\u0103<\/a> sau <a href=\"\/ro\/contact-vanzari\/\">discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a> pentru definirea domeniului integr\u0103rii.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ Cegid Ghid de integrare Cegid pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare Cegid le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze sistemele ERP Cegid pentru produc\u021bie la SkyPlanner APS: mai \u00eent\u00e2i Cegid PMI, apoi Cegid Primavera \u0219i Cegid Ekon. SkyPlanner se integreaz\u0103 bidirec\u021bional cu Cegid, prin interfe\u021bele &#8230; <a title=\"Ghid de integrare Cegid pentru programarea produc\u021biei cu SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/cegid\/ghid-de-integrare\/\" aria-label=\"Read more about Ghid de integrare Cegid pentru programarea produc\u021biei cu SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106401,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107358","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ghid de integrare Cegid cu APS pentru programarea produc\u021biei<\/title>\n<meta name=\"description\" content=\"Cegid PMI \u0219i Primavera cu SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, scriere \u00een Planeamento, maparea datelor, interog\u0103ri periodice \u0219i sfaturi de proiect.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/cegid\/ghid-de-integrare\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ghid de integrare Cegid pentru programarea produc\u021biei cu SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Cegid PMI \u0219i Primavera cu SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, scriere \u00een Planeamento, maparea datelor, interog\u0103ri periodice \u0219i sfaturi de proiect.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/cegid\/ghid-de-integrare\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/cegid\\\/ghid-de-integrare\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/cegid\\\/ghid-de-integrare\\\/\",\"name\":\"Ghid de integrare Cegid cu APS pentru programarea produc\u021biei\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Cegid PMI \u0219i Primavera cu SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, scriere \u00een Planeamento, maparea datelor, interog\u0103ri periodice \u0219i sfaturi de proiect.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/cegid\\\/ghid-de-integrare\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/cegid\\\/ghid-de-integrare\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/cegid\\\/ghid-de-integrare\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru Cegid: programarea produc\u021biei cu capacitate finit\u0103\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/cegid\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Ghid de integrare Cegid pentru programarea produc\u021biei cu SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ghid de integrare Cegid cu APS pentru programarea produc\u021biei","description":"Cegid PMI \u0219i Primavera cu SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, scriere \u00een Planeamento, maparea datelor, interog\u0103ri periodice \u0219i sfaturi de proiect.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/cegid\/ghid-de-integrare\/","og_locale":"ro_RO","og_type":"article","og_title":"Ghid de integrare Cegid pentru programarea produc\u021biei cu SkyPlanner APS","og_description":"Cegid PMI \u0219i Primavera cu SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, scriere \u00een Planeamento, maparea datelor, interog\u0103ri periodice \u0219i sfaturi de proiect.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/cegid\/ghid-de-integrare\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/cegid\/ghid-de-integrare\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/cegid\/ghid-de-integrare\/","name":"Ghid de integrare Cegid cu APS pentru programarea produc\u021biei","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Cegid PMI \u0219i Primavera cu SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, scriere \u00een Planeamento, maparea datelor, interog\u0103ri periodice \u0219i sfaturi de proiect.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/cegid\/ghid-de-integrare\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/cegid\/ghid-de-integrare\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/cegid\/ghid-de-integrare\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru Cegid: programarea produc\u021biei cu capacitate finit\u0103","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/cegid\/"},{"@type":"ListItem","position":5,"name":"Ghid de integrare Cegid pentru programarea produc\u021biei cu SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ Cegid Ghid de integrare Cegid pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare Cegid le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze sistemele ERP Cegid pentru produc\u021bie la SkyPlanner APS: mai \u00eent\u00e2i Cegid PMI, apoi Cegid Primavera \u0219i Cegid Ekon. SkyPlanner se integreaz\u0103 bidirec\u021bional cu Cegid, prin interfe\u021bele&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/107358","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=107358"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/107358\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106401"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=107358"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}