{"id":107300,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/global-shop-solutions\/ghid-de-integrare\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"ghid-de-integrare","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/global-shop-solutions\/ghid-de-integrare\/","title":{"rendered":"Ghid de integrare Global Shop Solutions pentru programarea produc\u021biei cu SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ Global Shop Solutions<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Ghid de integrare Global Shop Solutions <span class=\"hl\">pentru programarea produc\u021biei cu SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Acest ghid de integrare Global Shop Solutions le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze sistemul ERP Global Shop Solutions la SkyPlanner APS. Integrarea SkyPlanner cu Global Shop este bidirec\u021bional\u0103:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u00cen SkyPlanner sunt preluate Parts, BOMs, Routers cu secven\u021bele lor, Workcenters \u0219i grupurile de lucru, calendarele de capacitate, angaja\u021bii, Work Orders deschise, necesarul de materiale \u0219i comenzile de achizi\u021bie.<\/li>\n\n\n<li>Pentru fiecare secven\u021b\u0103 a comenzii de produc\u021bie sunt retrimise momentele planificate de \u00eenceput \u0219i de sf\u00e2r\u0219it, \u00eempreun\u0103 cu Workcenter alocat de SkyPlanner.<\/li>\n\n\n<li>Dac\u0103 dori\u021bi, timpul operatorilor \u0219i cantit\u0103\u021bile pot fi retrimise \u0219i \u00eenregistrate ca manoper\u0103 pe comanda de produc\u021bie.<\/li>\n\n\n<li>Webhook-urile SkyPlanner transmit modific\u0103rile programului pe m\u0103sur\u0103 ce apar.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 Global Shop \u00een etapa de implementare ini\u021bial\u0103 \u0219i asigur\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een func\u021biune. Acest ghid se adreseaz\u0103 partenerilor, dezvoltatorilor Global Shop \u0219i echipelor IT care vor s\u0103 participe sau s\u0103 dezvolte singuri solu\u021bii folosind REST API documentat al SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"global-shop-s-integration-tools\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Instrumentele de integrare Global Shop<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Global Shop folose\u0219te propriile instrumente pentru extinderea \u0219i conectarea sistemului s\u0103u ERP, nu un REST API public:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Global Application Builder (GAB) SDK.<\/strong> &#8220;The Global Application Builder (GAB) SDK allows you to tailor screens and create applications specific to your manufacturing processes&#8221; (Global Application Builder (GAB) SDK v\u0103 permite s\u0103 adapta\u021bi ecranele \u0219i s\u0103 crea\u021bi aplica\u021bii specifice proceselor dumneavoastr\u0103 de fabrica\u021bie) (<a href=\"https:\/\/www.globalshopsolutions.com\/tailored-erp-software-for-manufacturing\">Global Shop<\/a>). Fi\u0219a produsului enumer\u0103 &#8220;Integrate with third-party APIs and office software suites&#8221; (integrare cu API-uri ter\u021be \u0219i suite de aplica\u021bii de birou), &#8220;Manage data flow&#8221; (gestionarea fluxului de date), &#8220;Automate processes&#8221; (automatizarea proceselor), &#8220;Schedule reporting&#8221; (programarea rapoartelor) \u0219i &#8220;Create custom ERP subsystems that integrate with the base package&#8221; (crearea de subsisteme ERP personalizate care se integreaz\u0103 cu pachetul de baz\u0103) (<a href=\"https:\/\/www.globalshopsolutions.com\/hubfs\/pdfs\/product-sheets\/tailored-erp.pdf\">fi\u0219a produsului GAB<\/a>). Global Shop adaug\u0103 c\u0103 &#8220;GAB&#8217;s innovative use of business data objects removes the risk normally associated with extending your ERP system&#8221; (modul inovator \u00een care GAB utilizeaz\u0103 obiectele de date de afaceri elimin\u0103 riscul asociat \u00een mod obi\u0219nuit cu extinderea sistemului ERP) (<a href=\"https:\/\/www.globalshopsolutions.com\/blog\/global-shop-solutions-erp-software-sdk-allows-you-to-customize-and-accessorize\">blogul Global Shop<\/a>). Aceasta este calea de integrare cu SkyPlanner.<\/li>\n\n\n<li><strong>Serviciile Global Shop.<\/strong> Global Shop ofer\u0103 &#8220;Development as a Service (DaaS)&#8221; (dezvoltare ca serviciu) \u0219i asisten\u021b\u0103 pentru &#8220;Add Third-Party Integrations, Applications, Automations &amp; Software&#8221; (ad\u0103ugarea de integr\u0103ri, aplica\u021bii, automatiz\u0103ri \u0219i software de la ter\u021bi) (<a href=\"https:\/\/www.globalshopsolutions.com\/hubfs\/website-pdfs\/whitepapers\/global-shop-solutions-info-pack.pdf\">pachet informativ<\/a>). Catalogul s\u0103u de integr\u0103ri invit\u0103 cump\u0103r\u0103torii s\u0103 discute despre &#8220;your specific integration needs&#8221; (nevoile dumneavoastr\u0103 specifice de integrare) (<a href=\"https:\/\/www.globalshopsolutions.com\/software-application-integrations\">integr\u0103ri<\/a>).<\/li>\n\n\n<li><strong>Excel \u0219i exporturi de fi\u0219iere.<\/strong> Microsoft Excel \u0219i Access apar \u00een catalogul de integr\u0103ri Global Shop, iar GAB poate programa executarea rapoartelor. Pentru a testa SkyPlanner, se folosesc fi\u0219iere exportate cu piese, Routers, Workcenters \u0219i comenzi de produc\u021bie deschise.<\/li>\n\n<\/ol>\n\n\n<p>\u00cen SkyPlanner, REST API permite citirea \u0219i scrierea comenzilor, produselor, materialelor, etapelor de proces, pontajelor \u0219i comenzilor de achizi\u021bie. Autentificarea se face cu un token API \u00een antetul <code>Authorization-Token<\/code> (SkyPlanner Settings &gt; API), iar documenta\u021bia este disponibil\u0103 \u00een Swagger\/OpenAPI. <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">Tutorialul de integrare<\/a> v\u0103 ghideaz\u0103 prin primele apeluri.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-the-pieces-connect\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum se conecteaz\u0103 componentele<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Date trimise din Global Shop.<\/strong> Un proces GAB programat cite\u0219te Work Orders, secven\u021bele Router \u0219i comenzile de achizi\u021bie modificate de la ultima sa rulare \u0219i le trimite c\u0103tre REST API al SkyPlanner. GAB poate &#8220;Schedule processes and reports to run at regular intervals,&#8221; (programa procesele \u0219i rapoartele s\u0103 ruleze la intervale regulate), astfel \u00eenc\u00e2t opera\u021biile se sincronizeaz\u0103 la fiecare c\u00e2teva minute, iar nomenclatoarele, la fiecare or\u0103 sau \u00een fiecare noapte.<\/li>\n\n\n<li><strong>Date primite \u00een Global Shop.<\/strong> SkyPlanner trimite un webhook c\u00e2nd se modific\u0103 programul, iar datele planificate sunt citite prin REST API al SkyPlanner. Un proces GAB scrie momentele de \u00eenceput \u0219i de sf\u00e2r\u0219it \u00een secven\u021bele corespunz\u0103toare ale comenzilor de produc\u021bie. \u00cen etapa de definire a domeniului implement\u0103rii se stabile\u0219te dac\u0103 GAB prime\u0219te direct webhook-ul sau preia modific\u0103rile la intervale scurte.<\/li>\n\n\n<li><strong>Sec\u021bia de produc\u021bie.<\/strong> Pontajele SkyPlanner sunt disponibile prin REST API sau prin webhook, iar GAB le \u00eenregistreaz\u0103 ca manoper\u0103 pe comanda de produc\u021bie, dac\u0103 alege\u021bi aceast\u0103 op\u021biune.<\/li>\n\n<\/ul>\n\n\n<p>Global Shop ruleaz\u0103 pe infrastructura proprie, \u00een Global Shop Cloud (furnizat de Amazon Web Services) sau ca SaaS. Mediul \u00een care ruleaz\u0103 procesul GAB \u0219i traseul de re\u021bea c\u0103tre SkyPlanner se stabilesc \u00eempreun\u0103 cu echipa dumneavoastr\u0103 IT sau cu Global Shop la definirea domeniului proiectului.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Maparea datelor<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Obiect Global Shop<\/th><th>Obiect SkyPlanner<\/th><th>Direc\u021bie<\/th><th>Frecven\u021b\u0103<\/th><\/tr><\/thead><tbody><tr><td>Parts (nomenclator de piese), BOMs, BOMs multinivel<\/td><td>Produse, materiale, structura produsului<\/td><td>Global Shop \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td>Routers: secven\u021be de manoper\u0103, materiale \u0219i servicii externe, cu Workcenter \u0219i timpi<\/td><td>Etape de proces cu durate \u0219i timpi de preg\u0103tire<\/td><td>Global Shop \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td>Workcenters \u0219i grupuri de lucru<\/td><td>Centre de lucru, grupuri de centre de lucru, centre de lucru alternative<\/td><td>Global Shop \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, rareori ulterior<\/td><\/tr><tr><td>Calendare de capacitate, angaja\u021bi, schimburi<\/td><td>Schimburi, calendare, personal<\/td><td>Global Shop \u2192 SkyPlanner<\/td><td>Zilnic sau gestionarea schimburilor \u00een SkyPlanner<\/td><\/tr><tr><td>Work Orders: pies\u0103, cantitate, termen, prioritate, comand\u0103 de v\u00e2nzare asociat\u0103<\/td><td>Comenzi cu termene \u0219i priorit\u0103\u021bi<\/td><td>Global Shop \u2192 SkyPlanner<\/td><td>Proces GAB la fiecare c\u00e2teva minute<\/td><\/tr><tr><td>Secven\u021bele comenzilor de produc\u021bie: stare, cantitate realizat\u0103, ore r\u0103mase<\/td><td>Opera\u021bii pentru fiecare etap\u0103 de proces<\/td><td>Global Shop \u2192 SkyPlanner<\/td><td>Proces GAB la fiecare c\u00e2teva minute<\/td><\/tr><tr><td>Necesar de materiale, comenzi de achizi\u021bie, comenzi de achizi\u021bie pentru prelucr\u0103ri externe<\/td><td>Necesar de materiale, comenzi de achizi\u021bie \u00een func\u021bie de data livr\u0103rii<\/td><td>Global Shop \u2192 SkyPlanner<\/td><td>La fiecare or\u0103 sau la generarea programului de produc\u021bie<\/td><\/tr><tr><td>\u00cenceputul \u0219i sf\u00e2r\u0219itul programate ale secven\u021bei comenzii de produc\u021bie, Workcenter<\/td><td>\u00cenceputul \u0219i sf\u00e2r\u0219itul planificate, utilajul \u0219i operatorul pentru fiecare etap\u0103<\/td><td>SkyPlanner \u2192 Global Shop<\/td><td>La modificarea programului, prin webhook SkyPlanner<\/td><\/tr><tr><td>Manoper\u0103: timp \u0219i cantit\u0103\u021bi pentru fiecare secven\u021b\u0103 a comenzii de produc\u021bie<\/td><td>Pontaje \u0219i confirm\u0103ri ale operatorilor<\/td><td>SkyPlanner \u2192 Global Shop<\/td><td>La fiecare confirmare sau pe schimb, dac\u0103 se alege aceast\u0103 op\u021biune<\/td><\/tr><tr><td>Reguli de programare SkyPlanner<\/td><td>Matricea timpilor de preg\u0103tire, scule ca resurse cu capacitate limitat\u0103, opera\u021bii cu mai mul\u021bi operatori<\/td><td>Gestionate \u00een SkyPlanner<\/td><td>Configurate \u00een etapa de implementare ini\u021bial\u0103<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Modele de integrare<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00cenc\u0103rcarea ini\u021bial\u0103 a nomenclatoarelor.<\/strong> Citi\u021bi Parts, BOMs, Routers, Workcenters, grupurile de lucru, calendarele de capacitate \u0219i angaja\u021bii. Stabili\u021bi cu aten\u021bie maparea pentru Workcenters: un Workcenter cu patru utilaje identice devine un grup de centre de lucru cu patru centre de lucru, astfel \u00eenc\u00e2t SkyPlanner s\u0103 stabileasc\u0103 succesiunea opera\u021biilor pe fiecare utilaj. Grupurile de lucru se mapeaz\u0103 la centre de lucru alternative.<\/p>\n\n\n<p><strong>2. Sincronizarea comenzilor de produc\u021bie.<\/strong> Citi\u021bi Work Orders deschise \u00eempreun\u0103 cu secven\u021bele lor, necesarul de materiale \u0219i comenzile de achizi\u021bie deschise. SkyPlanner consider\u0103 materialul comandat disponibil la data livr\u0103rii din comanda de achizi\u021bie \u0219i actualizeaz\u0103 stocul c\u00e2nd aceasta este marcat\u0103 Delivered. Secven\u021bele pentru servicii externe sunt reprezentate prin etape bazate doar pe timp, a c\u0103ror durat\u0103 este dat\u0103 de lead time.<\/p>\n\n\n<p><strong>3. Retrimiterea programului.<\/strong> C\u00e2nd motorul programeaz\u0103 sau mut\u0103 o secven\u021b\u0103, un webhook SkyPlanner declan\u0219eaz\u0103 GAB. GAB scrie \u00eenceputul \u0219i sf\u00e2r\u0219itul planificate \u00een secven\u021ba respectiv\u0103 a comenzii de produc\u021bie, precum \u0219i Workcenter dac\u0103 SkyPlanner a mutat lucrarea pe alt utilaj. Listele de lansare \u00een execu\u021bie \u0219i vizualiz\u0103rile APS afi\u0219eaz\u0103 apoi succesiunea stabilit\u0103 de SkyPlanner.<\/p>\n\n\n<p><strong>4. Confirm\u0103ri din sec\u021bia de produc\u021bie.<\/strong> Operatorii \u00eenregistreaz\u0103 activitatea folosind SkyPlanner Mobile Confirmations sau Production Timer, iar pontajele men\u021bin programul la zi. Dumneavoastr\u0103 decide\u021bi dac\u0103 timpul efectiv este retrimis \u00een Global Shop. Dac\u0103 da, fiecare confirmare este \u00eenregistrat\u0103 ca manoper\u0103 pe secven\u021ba comenzii de produc\u021bie. Dac\u0103 nu, Shop Floor Data Collection r\u0103m\u00e2ne neschimbat, iar SkyPlanner cite\u0219te progresul din secven\u021bele comenzilor de produc\u021bie.<\/p>\n\n\n<p><strong>5. Responsabilitatea pentru date \u0219i regulile de solu\u021bionare a conflictelor.<\/strong> Documenta\u021bi-le \u00eenainte de punerea \u00een func\u021biune:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Date<\/th><th>Sistem responsabil<\/th><\/tr><\/thead><tbody><tr><td>Parts, BOMs, Routers, cantit\u0103\u021bi, termene, starea comenzilor de produc\u021bie<\/td><td>Global Shop<\/td><\/tr><tr><td>Ordinea secven\u021belor, momentele de \u00eenceput \u0219i de sf\u00e2r\u0219it, utilajul \u0219i operatorul pentru fiecare secven\u021b\u0103<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matricea timpilor de preg\u0103tire, necesarul de scule \u0219i operatori, resurse alternative<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Calendare de capacitate \u0219i schimburi<\/td><td>Un singur sistem, ales la definirea domeniului proiectului<\/td><\/tr><tr><td>Manoper\u0103, eliber\u0103ri de materiale, recep\u021bii, calculul costurilor<\/td><td>Global Shop, cu date introduse direct sau \u00eenregistrate din pontajele SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Alege\u021bi un singur sistem care s\u0103 scrie datele secven\u021belor. Planificatorii mut\u0103 opera\u021biile \u00een SkyPlanner, iar datele sunt transmise c\u0103tre Global Shop. Pentru comenzile de produc\u021bie programate de SkyPlanner, trebuie oprite reprogram\u0103rile globale \u0219i mut\u0103rile prin glisare \u0219i fixare \u00een Global Shop APS; altfel, cele dou\u0103 programe ajung s\u0103 difere.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapele obi\u0219nuite ale proiectului<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementarea se finalizeaz\u0103, de regul\u0103, \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea etapei de configurare ini\u021bial\u0103. \u00cenainte de aceasta, valida\u021bi programul \u00een perioada de prob\u0103 gratuit\u0103 de 30 de zile, folosind Workcenters, Routers \u0219i comenzi de produc\u021bie deschise, exportate din Global Shop \u00een format Excel sau CSV.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Definirea domeniului.<\/strong> Stabili\u021bi tabelul de mapare, regulile privind responsabilitatea pentru date, intervalele de sincronizare \u0219i dac\u0103 manopera este retrimis\u0103. Confirma\u021bi mediul de instalare (infrastructur\u0103 proprie, Cloud sau SaaS) \u0219i cine dezvolt\u0103 componenta GAB.<\/li>\n\n\n<li><strong>Acces.<\/strong> Crea\u021bi tokenul API SkyPlanner \u0219i stabili\u021bi traseul de re\u021bea pentru conexiunile de ie\u0219ire ale GAB.<\/li>\n\n\n<li><strong>\u00cenc\u0103rcare ini\u021bial\u0103.<\/strong> Parts, BOMs, Routers, Workcenters, grupuri de lucru, calendare \u0219i angaja\u021bi.<\/li>\n\n\n<li><strong>Sincronizarea comenzilor de produc\u021bie \u0219i de achizi\u021bie.<\/strong> Procesul GAB programat, cu detectarea modific\u0103rilor, re\u00eencerc\u0103ri \u0219i jurnalizare.<\/li>\n\n\n<li><strong>Configurarea constr\u00e2ngerilor \u00een SkyPlanner.<\/strong> Matricea timpilor de preg\u0103tire, sculele, num\u0103rul de operatori pentru fiecare opera\u021bie \u0219i utilajele sau personalul alternativ.<\/li>\n\n\n<li><strong>Retrimiterea programului \u00een Global Shop.<\/strong> Actualiz\u0103ri ale secven\u021belor comenzilor de produc\u021bie declan\u0219ate de webhook-uri, plus \u00eenregistrarea manoperei, dac\u0103 alege\u021bi aceast\u0103 op\u021biune.<\/li>\n\n\n<li><strong>Testarea \u00een paralel.<\/strong> Rula\u021bi SkyPlanner \u00een paralel cu planul APS actual, compara\u021bi datele calendaristice \u0219i corecta\u021bi nomenclatoarele.<\/li>\n\n\n<li><strong>Punerea \u00een produc\u021bie.<\/strong> Activa\u021bi retrimiterea datelor c\u0103tre Global Shop dup\u0103 ce datele corespund \u0219i renun\u021ba\u021bi la reprogram\u0103rile manuale pentru lucr\u0103rile programate de SkyPlanner.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-to-plan-for-in-a-global-shop-solutions-inte\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce trebuie s\u0103 ave\u021bi \u00een vedere la integrarea cu Global Shop Solutions<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Workcenters \u0219i utilaje.<\/strong> Global Shop planific\u0103 pe Workcenter \u0219i grup de lucru. Stabili\u021bi care Workcenters cuprind mai multe utilaje \u0219i \u00eemp\u0103r\u021bi\u021bi-le \u00een centre de lucru \u00een SkyPlanner.<\/li>\n\n\n<li><strong>Trei tipuri de secven\u021be.<\/strong> Routers con\u021bin secven\u021be pentru materiale, manoper\u0103 \u0219i servicii externe. Doar secven\u021bele de manoper\u0103 v\u0103 consum\u0103 capacitatea. Secven\u021bele de materiale se transform\u0103 \u00een necesar de materiale, iar serviciile externe devin etape pentru care se ia \u00een calcul doar durata.<\/li>\n\n\n<li><strong>Timpii de preg\u0103tire \u0219i de execu\u021bie.<\/strong> Transfera\u021bi separat timpii de preg\u0103tire \u0219i de execu\u021bie, astfel \u00eenc\u00e2t matricea timpilor de preg\u0103tire s\u0103 poat\u0103 \u00eenlocui timpul fix de preg\u0103tire acolo unde ordinea opera\u021biilor conteaz\u0103.<\/li>\n\n\n<li><strong>Calendare.<\/strong> Global Shop p\u0103streaz\u0103 calendare de capacitate cu modific\u0103ri pentru anumite date. Desemna\u021bi un singur sistem responsabil de schimburi \u0219i zile libere; altfel, cele dou\u0103 planuri nu vor coincide.<\/li>\n\n\n<li><strong>Personalul pe centre de lucru.<\/strong> Global Shop programeaz\u0103 angaja\u021bii \u00een func\u021bie de competen\u021be. \u00cen etapa de definire a domeniului, conveni\u021bi cum va fi alocat personalul la centrele de lucru din SkyPlanner.<\/li>\n\n\n<li><strong>Marcajele de urgen\u021b\u0103 \u0219i priorit\u0103\u021bile.<\/strong> Corela\u021bi priorit\u0103\u021bile din Global Shop cu prioritatea din SkyPlanner \u0219i cu Fast Track, astfel \u00eenc\u00e2t lucr\u0103rile urgente s\u0103 \u00ee\u0219i p\u0103streze locul.<\/li>\n\n\n<li><strong>Actualiz\u0103ri.<\/strong> Global Shop Cloud include &#8220;Semi-annual upgrades.&#8221; (actualiz\u0103ri semestriale). Testa\u021bi din nou procesul GAB dup\u0103 fiecare actualizare.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"who-configures-and-supports-the-global-shop-inte\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cine configureaz\u0103 integrarea cu Global Shop \u0219i asigur\u0103 suportul<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Echipa SkyPlanner configureaz\u0103 integrarea \u00een etapa de implementare \u0219i asigur\u0103 suportul dup\u0103 punerea \u00een produc\u021bie,<\/strong> pentru obiectele \u0219i regulile de sincronizare convenite. Fiecare fabric\u0103 folose\u0219te Global Shop \u00een mod diferit, iar aceast\u0103 experien\u021b\u0103 practic\u0103 este valorificat\u0103 aici.<\/li>\n\n\n<li><strong>Poate participa \u0219i echipa de servicii Global Shop.<\/strong> Dezvoltatorii s\u0103i DaaS cunosc GAB \u0219i configura\u021bia dumneavoastr\u0103 \u0219i pot realiza partea din Global Shop \u00eempreun\u0103 cu echipa SkyPlanner.<\/li>\n\n\n<li><strong>Dezvoltatorii dumneavoastr\u0103 GAB pot extinde integrarea<\/strong> folosind REST API din SkyPlanner \u0219i un token API. Un token API este suficient pentru a \u00eencepe, iar echipa SkyPlanner v\u0103 ajut\u0103 la nevoie. Documenta\u021bia este disponibil\u0103 \u00een <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">ghidul de integrare SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse \u0219i facturare lunar\u0103. Oferta pentru integrare se stabile\u0219te de la \u00eenceput, \u00een func\u021bie de procesele \u0219i nevoile dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul. Consulta\u021bi <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a>, <a href=\"\/ro\/integrari\/erp\/global-shop-solutions\/cu-capacitate-finita\/\">programarea cu capacitate finit\u0103 pentru Global Shop Solutions<\/a>, <a href=\"\/ro\/integrari\/erp\/global-shop-solutions\/\">pagina Global Shop Solutions<\/a>, <a href=\"\/ro\/functionalitati\/\">func\u021bionalit\u0103\u021bile SkyPlanner<\/a> \u0219i <a href=\"\/ro\/integrari\/erp\/\">sec\u021biunea de integr\u0103ri ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Produc\u0103tori care folosesc SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een sec\u021bia de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de lucr\u0103ri ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi m\u0103rturia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate, la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar crearea unui plan optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi m\u0103rturia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Mai pu\u021bine<\/b><span>opriri din lips\u0103 de materiale<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eValoarea pe care ne-o aduce SkyPlanner este c\u0103 func\u021bioneaz\u0103 \u00een activitatea de zi cu zi, mai ales la stabilirea termenelor de livrare.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, manager de planificare a produc\u021biei<\/b><br>Eskomatic \u00b7 Prelucr\u0103ri mecanice \u00een regim de subcontractare<\/p>\n\n\n<p class=\"ind-cust__result\">Programarea automat\u0103 a \u00eenc\u0103rc\u0103rii resurselor ofer\u0103 termene de livrare mai precise, iar opririle produc\u021biei cauzate de lipsa materialelor s-au redus considerabil.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/eskomatic\/\">Citi\u021bi m\u0103rturia Eskomatic<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, director general al Mamec, \u00een hala de produc\u021bie a companiei din Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Peste 1.000<\/b><span>de comenzi de produc\u021bie programate automat<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eControl\u0103m produc\u021bia altfel, iar \u00een\u021belegerea capacit\u0103\u021bii noastre este la un cu totul alt nivel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, director general<\/b><br>Mamec \u00b7 Mixere industriale, pompe \u0219i produc\u021bie de \u00eenalt\u0103 tehnologie \u00een regim de subcontractare<\/p>\n\n\n<p class=\"ind-cust__result\">Mii de comenzi de produc\u021bie sunt programate automat, iar \u00eentreaga organiza\u021bie are o imagine \u00een timp real asupra produc\u021biei.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/mamec\/\">Citi\u021bi m\u0103rturia Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Global Shop Solutions are un API?<\/summary>\n<p class=\"sp-faq__a\">Global Shop se conecteaz\u0103 la alte sisteme prin SDK-ul Global Application Builder (GAB), care poate &#8220;integrate with third-party APIs,&#8221; (s\u0103 se integreze cu API-uri ter\u021be), precum \u0219i prin propriile servicii de integrare. Integrarea SkyPlanner folose\u0219te GAB pe partea Global Shop, respectiv REST API \u0219i webhook-urile SkyPlanner pe cealalt\u0103 parte.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ce este GAB \u00een Global Shop Solutions?<\/summary>\n<p class=\"sp-faq__a\">Global Application Builder este SDK-ul Global Shop pentru ecrane, aplica\u021bii \u0219i integr\u0103ri personalizate. Lucreaz\u0103 cu obiecte de date de business, poate gestiona fluxul de date \u0219i poate rula procese dup\u0103 un orar prestabilit.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum sunt actualizate datele planificate \u00een Global Shop?<\/summary>\n<p class=\"sp-faq__a\">La nivelul fiec\u0103rei secven\u021be a comenzii de produc\u021bie. Un webhook SkyPlanner declan\u0219eaz\u0103 GAB, care \u00eenscrie \u00een secven\u021b\u0103 \u00eenceputul \u0219i sf\u00e2r\u0219itul planificate, precum \u0219i Workcenter dac\u0103 SkyPlanner a mutat lucrarea pe alt utilaj.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Integrarea func\u021bioneaz\u0103 cu Global Shop Cloud \u0219i SaaS?<\/summary>\n<p class=\"sp-faq__a\">Da. SkyPlanner este o solu\u021bie SaaS \u00een cloud \u0219i se conecteaz\u0103 la Global Shop instalat local, \u00een Global Shop Cloud sau \u00een varianta SaaS. Mediul \u00een care ruleaz\u0103 componenta GAB \u0219i traseul de re\u021bea c\u0103tre SkyPlanner se stabilesc \u00eempreun\u0103 cu dumneavoastr\u0103 \u0219i Global Shop, la definirea domeniului \u00een etapa de implementare.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cine dezvolt\u0103 partea din Global Shop?<\/summary>\n<p class=\"sp-faq__a\">Echipa SkyPlanner configureaz\u0103 integrarea \u0219i asigur\u0103 suportul dup\u0103 punerea \u00een produc\u021bie. Echipa DaaS de la Global Shop sau dezvoltatorii dumneavoastr\u0103 GAB pot dezvolta ori extinde componenta GAB folosind API-ul documentat al SkyPlanner.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de a dezvolta integrarea?<\/summary>\n<p class=\"sp-faq__a\">Da. Perioada de testare gratuit\u0103 de 30 de zile permite utilizarea a p\u00e2n\u0103 la 20 de centre de lucru, cu importuri Excel sau CSV din Global Shop, f\u0103r\u0103 card bancar. <a href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea<\/a> sau <a href=\"\/ro\/contact-vanzari\/\">discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a> pentru definirea domeniului integr\u0103rii.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ Global Shop Solutions Ghid de integrare Global Shop Solutions pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare Global Shop Solutions le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze sistemul ERP Global Shop Solutions la SkyPlanner APS. Integrarea SkyPlanner cu Global Shop este bidirec\u021bional\u0103: skyplanner.ai \u00b7 Programarea produc\u021biei Echipa &#8230; <a title=\"Ghid de integrare Global Shop Solutions pentru programarea produc\u021biei cu SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/global-shop-solutions\/ghid-de-integrare\/\" aria-label=\"Read more about Ghid de integrare Global Shop Solutions pentru programarea produc\u021biei cu SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106372,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107300","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Global Shop: ghid de integrare APS pentru programarea produc\u021biei<\/title>\n<meta name=\"description\" content=\"Conecta\u021bi Global Shop Solutions la SkyPlanner APS: GAB SDK, REST API, webhooks, retur date secven\u021be comenzi, manoper\u0103, mapare date \u0219i sfaturi de proiect.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/global-shop-solutions\/ghid-de-integrare\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ghid de integrare Global Shop Solutions pentru programarea produc\u021biei cu SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Conecta\u021bi Global Shop Solutions la SkyPlanner APS: GAB SDK, REST API, webhooks, retur date secven\u021be comenzi, manoper\u0103, mapare date \u0219i sfaturi de proiect.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/global-shop-solutions\/ghid-de-integrare\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/global-shop-solutions\\\/ghid-de-integrare\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/global-shop-solutions\\\/ghid-de-integrare\\\/\",\"name\":\"Global Shop: ghid de integrare APS pentru programarea produc\u021biei\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Conecta\u021bi Global Shop Solutions la SkyPlanner APS: GAB SDK, REST API, webhooks, retur date secven\u021be comenzi, manoper\u0103, mapare date \u0219i sfaturi de proiect.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/global-shop-solutions\\\/ghid-de-integrare\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/global-shop-solutions\\\/ghid-de-integrare\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/global-shop-solutions\\\/ghid-de-integrare\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru Global Shop Solutions: programarea produc\u021biei cu capacitate finit\u0103\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/global-shop-solutions\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Ghid de integrare Global Shop Solutions pentru programarea produc\u021biei cu SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Global Shop: ghid de integrare APS pentru programarea produc\u021biei","description":"Conecta\u021bi Global Shop Solutions la SkyPlanner APS: GAB SDK, REST API, webhooks, retur date secven\u021be comenzi, manoper\u0103, mapare date \u0219i sfaturi de proiect.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/global-shop-solutions\/ghid-de-integrare\/","og_locale":"ro_RO","og_type":"article","og_title":"Ghid de integrare Global Shop Solutions pentru programarea produc\u021biei cu SkyPlanner APS","og_description":"Conecta\u021bi Global Shop Solutions la SkyPlanner APS: GAB SDK, REST API, webhooks, retur date secven\u021be comenzi, manoper\u0103, mapare date \u0219i sfaturi de proiect.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/global-shop-solutions\/ghid-de-integrare\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/global-shop-solutions\/ghid-de-integrare\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/global-shop-solutions\/ghid-de-integrare\/","name":"Global Shop: ghid de integrare APS pentru programarea produc\u021biei","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Conecta\u021bi Global Shop Solutions la SkyPlanner APS: GAB SDK, REST API, webhooks, retur date secven\u021be comenzi, manoper\u0103, mapare date \u0219i sfaturi de proiect.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/global-shop-solutions\/ghid-de-integrare\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/global-shop-solutions\/ghid-de-integrare\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/global-shop-solutions\/ghid-de-integrare\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru Global Shop Solutions: programarea produc\u021biei cu capacitate finit\u0103","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/global-shop-solutions\/"},{"@type":"ListItem","position":5,"name":"Ghid de integrare Global Shop Solutions pentru programarea produc\u021biei cu SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ Global Shop Solutions Ghid de integrare Global Shop Solutions pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare Global Shop Solutions le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze sistemul ERP Global Shop Solutions la SkyPlanner APS. Integrarea SkyPlanner cu Global Shop este bidirec\u021bional\u0103: skyplanner.ai \u00b7 Programarea produc\u021biei Echipa&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/107300","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=107300"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/107300\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106372"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=107300"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}