{"id":107068,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/applus\/ghid-de-integrare\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"ghid-de-integrare","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/applus\/ghid-de-integrare\/","title":{"rendered":"Ghid de integrare APplus pentru programarea produc\u021biei cu SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ APplus<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Ghid de integrare APplus <span class=\"hl\">pentru programarea produc\u021biei cu SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Acest ghid le arat\u0103 partenerilor APplus \u0219i echipelor IT cum s\u0103 conecteze APplus la SkyPlanner APS. Integrarea dintre SkyPlanner \u0219i APplus este bidirec\u021bional\u0103 \u0219i folose\u0219te interfe\u021bele proprii Asseco:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Sunt importate comenzile de produc\u021bie (Fertigungsauftr\u00e4ge) cu opera\u021biile aferente (Arbeitsg\u00e4nge), fi\u0219ele tehnologice (Arbeitspl\u00e4ne), listele de materiale (St\u00fccklisten), unit\u0103\u021bile de capacitate (Kapazit\u00e4tsstellen \u0219i Kapazit\u00e4tseinheiten), sculele (Betriebsmittel), stocurile \u0219i comenzile de achizi\u021bie.<\/li>\n\n\n<li>\u00cenceputul, sf\u00e2r\u0219itul \u0219i unitatea de capacitate planificate pentru fiecare opera\u021bie sunt transmise \u00eenapoi \u00een comanda de produc\u021bie.<\/li>\n\n\n<li>Dac\u0103 alege\u021bi aceast\u0103 op\u021biune, \u00eenregistr\u0103rile de timp ale operatorilor pot fi transmise \u00eenapoi ca mesaje BDE \u00een comand\u0103.<\/li>\n\n\n<li>Webhook-urile SkyPlanner transmit modific\u0103rile programului pe m\u0103sur\u0103 ce apar.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 APplus \u00een etapa de implementare ini\u021bial\u0103 \u0219i asigur\u0103 suport dup\u0103 punerea \u00een func\u021biune. Acest ghid se adreseaz\u0103 partenerilor \u0219i dezvoltatorilor care doresc s\u0103 participe sau s\u0103 dezvolte singuri solu\u021bii folosind REST API documentat al SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia de referin\u021b\u0103 API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"applus-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Interfe\u021be de integrare APplus<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>APplus ofer\u0103 urm\u0103toarele c\u0103i de conectare pentru un sistem extern de programare a produc\u021biei:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Serviciile web APplus.<\/strong> APplus are o arhitectur\u0103 bazat\u0103 pe servicii web. Potrivit Asseco, toate func\u021biile necesare pentru programarea produc\u021biei pot fi accesate direct prin internet \u0219i utilizate de sistemele IT ale clien\u021bilor \u0219i furnizorilor (<a href=\"https:\/\/www.applus-erp.de\/en\/solutions\/erp-features\/e-business\/\">Asseco<\/a>). Aceasta este principala cale pentru citirea datelor de produc\u021bie \u0219i scrierea datelor calendaristice planificate.<\/li>\n\n\n<li><strong>Business Integration Framework.<\/strong> \u00cencep\u00e2nd cu APplus 6.3, acest cadru conecteaz\u0103 sisteme ter\u021be f\u0103r\u0103 programare, prin structuri de date adaptive (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/it-business-2016-asseco-stellt-neue-produktversion-applus-63-vor\/\">Asseco<\/a>). Folosi\u021bi-l pentru a mapa obiectele APplus la REST API al SkyPlanner.<\/li>\n\n\n<li><strong>Universal Cloud Connector.<\/strong> Introdus \u00een APplus 7.1 pentru a conecta solu\u021biile partenerilor \u0219i ofertele SaaS la APplus, cu un nivel ridicat de securitate pentru datele transferate (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/asseco-veroeffentlicht-applus-71\/\">Asseco<\/a>).<\/li>\n\n<\/ol>\n\n\n<p>\u00cen APplus 10, Flow Mode porne\u0219te procese la momente definite sau la apari\u021bia anumitor evenimente, f\u0103r\u0103 interven\u021bii manuale (<a href=\"https:\/\/www.applus-erp.de\/en\/new-version\/\">Asseco<\/a>). Calea prin care este transferat fiecare obiect se stabile\u0219te la definirea domeniului integr\u0103rii, \u00een etapa de implementare ini\u021bial\u0103.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentificare \u0219i acces<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u00cen APplus.<\/strong> Integrarea ruleaz\u0103 cu un utilizator tehnic dedicat \u00een APplus, ale c\u0103rui drepturi se limiteaz\u0103 la obiectele pe care le cite\u0219te \u0219i le scrie. Partenerul dumneavoastr\u0103 APplus configureaz\u0103 utilizatorul \u0219i accesul la serviciile web.<\/li>\n\n\n<li><strong>Re\u021bea.<\/strong> APplus ruleaz\u0103 local sau \u00eentr-o versiune g\u0103zduit\u0103 (<a href=\"https:\/\/www.applus-erp.de\/en\/facts\/\">informa\u021bii despre APplus<\/a>). Integrarea se conecteaz\u0103 prin calea de acces permis\u0103 de echipa IT sau de furnizorul de g\u0103zduire.<\/li>\n\n\n<li><strong>\u00cen SkyPlanner.<\/strong> Autentificarea la REST API se face cu un token API transmis \u00een antetul <code>Authorization-Token<\/code> \u0219i creat \u00een Settings &gt; API. API-ul este documentat \u00een Swagger\/OpenAPI, iar <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">tutorialul de integrare<\/a> v\u0103 ghideaz\u0103 prin primele apeluri.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Evenimente \u0219i interogare periodic\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u00cen APplus, integrarea interogheaz\u0103 periodic serviciile web pentru a prelua comenzile de produc\u021bie deschise \u0219i modific\u0103rile recente sau Business Integration Framework trimite modific\u0103rile c\u0103tre SkyPlanner. Frecven\u021ba se stabile\u0219te pentru fiecare fabric\u0103: la c\u00e2teva minute pentru comenzi \u0219i o dat\u0103 pe or\u0103 pentru stocuri.<\/p>\n\n\n<p>SkyPlanner trimite notific\u0103ri webhook c\u00e2nd se modific\u0103 starea sau programul de produc\u021bie, astfel \u00eenc\u00e2t scrierea datelor \u00eenapoi \u00een APplus este declan\u0219at\u0103 de evenimente.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Maparea datelor<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Obiect APplus<\/th><th>Obiect SkyPlanner<\/th><th>Direc\u021bie<\/th><th>Frecven\u021b\u0103<\/th><\/tr><\/thead><tbody><tr><td>Articole (Artikel), unit\u0103\u021bi de m\u0103sur\u0103<\/td><td>Produse \u0219i materiale<\/td><td>APplus \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi interogare periodic\u0103<\/td><\/tr><tr><td>Liste de materiale (St\u00fccklisten, Strukturst\u00fccklisten)<\/td><td>Structura produsului, subproduse, materiale pentru fiecare produs<\/td><td>APplus \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td>Fi\u0219e tehnologice (Arbeitspl\u00e4ne) cu opera\u021bii, timpi de preg\u0103tire \u0219i de execu\u021bie<\/td><td>Etape de proces cu durate, timpi de preg\u0103tire \u0219i de demontare<\/td><td>APplus \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td>Puncte \u0219i unit\u0103\u021bi de capacitate (Kapazit\u00e4tsstellen, Kapazit\u00e4tseinheiten)<\/td><td>Grupuri de centre de lucru \u0219i centre de lucru, coeficien\u021bi de eficien\u021b\u0103<\/td><td>APplus \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi rareori<\/td><\/tr><tr><td>Capacitatea personalului<\/td><td>Personal cu schimburile aferente<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Zilnic sau schimburi gestionate direct \u00een SkyPlanner<\/td><\/tr><tr><td>Scule \u0219i dispozitive (Betriebsmittel)<\/td><td>Scule ca resurse comune cu capacitate limitat\u0103<\/td><td>APplus \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td>Comenzi de produc\u021bie (Fertigungsauftr\u00e4ge) cu opera\u021bii \u0219i materiale<\/td><td>Comenzi \u0219i opera\u021bii cu termene de finalizare \u0219i necesar de materiale<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Interogare la c\u00e2teva minute<\/td><\/tr><tr><td>Stoc existent<\/td><td>Solduri de stoc<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Interogare o dat\u0103 pe or\u0103 sau la rularea program\u0103rii<\/td><\/tr><tr><td>Comenzi de achizi\u021bie (Bestellungen) cu date de livrare<\/td><td>Comenzi de achizi\u021bie, materiale de primit \u00een func\u021bie de data livr\u0103rii<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Interogare o dat\u0103 pe or\u0103 sau la rularea program\u0103rii<\/td><\/tr><tr><td>\u00cenceputul, sf\u00e2r\u0219itul \u0219i unitatea de capacitate planificate pentru fiecare opera\u021bie a comenzii de produc\u021bie<\/td><td>\u00cenceputul \u0219i sf\u00e2r\u0219itul programate pentru fiecare opera\u021bie<\/td><td>SkyPlanner \u2192 APplus<\/td><td>La modificarea programului, prin webhook SkyPlanner<\/td><\/tr><tr><td>Mesaje BDE: timp \u0219i cantitate pe opera\u021bie, angajat<\/td><td>\u00cenregistr\u0103ri de timp \u0219i confirm\u0103ri ale operatorilor<\/td><td>SkyPlanner \u2192 APplus<\/td><td>La fiecare confirmare sau pe schimb, dac\u0103 se alege aceast\u0103 op\u021biune<\/td><\/tr><tr><td>Nu exist\u0103 \u00een APplus<\/td><td>Matricea timpilor de preg\u0103tire, num\u0103rul de operatori pentru fiecare opera\u021bie, utilaje alternative \u0219i personal alternativ<\/td><td>Gestionate \u00een SkyPlanner<\/td><td>Configurate \u00een etapa de implementare ini\u021bial\u0103<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Modele de integrare<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00cenc\u0103rcarea ini\u021bial\u0103 a nomenclatoarelor.<\/strong> Citi\u021bi articolele, listele de materiale, fi\u0219ele tehnologice, punctele \u0219i unit\u0103\u021bile de capacitate, Betriebsmittel \u0219i capacitatea personalului prin serviciile web APplus. Stabili\u021bi cu aten\u021bie coresponden\u021bele: o Kapazit\u00e4tsstelle cu patru Kapazit\u00e4tseinheiten devine un grup de centre de lucru cu patru centre de lucru.<\/p>\n\n\n<p><strong>2. Sincronizarea comenzilor.<\/strong> Citi\u021bi comenzile de produc\u021bie cu opera\u021biile \u0219i materialele aferente, precum \u0219i comenzile de achizi\u021bie deschise. SkyPlanner consider\u0103 materialul comandat disponibil la data de livrare a comenzii de achizi\u021bie \u0219i actualizeaz\u0103 stocul c\u00e2nd aceasta este marcat\u0103 ca Delivered. Propunerile de achizi\u021bie r\u0103m\u00e2n \u00een APplus Disposition p\u00e2n\u0103 c\u00e2nd devin comenzi.<\/p>\n\n\n<p><strong>3. Scrierea programului \u00eenapoi \u00een APplus.<\/strong> C\u00e2nd motorul de programare plaseaz\u0103 sau mut\u0103 o opera\u021bie, un webhook SkyPlanner declan\u0219eaz\u0103 actualizarea \u00een APplus prin calea convenit\u0103 la definirea domeniului integr\u0103rii (servicii web sau Business Integration Framework). Sunt setate \u00eenceputul planificat, sf\u00e2r\u0219itul planificat \u0219i unitatea de capacitate pentru opera\u021bia respectiv\u0103 \u00een comanda de produc\u021bie, astfel \u00eenc\u00e2t panoul de planificare din APplus s\u0103 afi\u0219eze succesiunea stabilit\u0103 de SkyPlanner.<\/p>\n\n\n<p><strong>4. Lansarea comenzilor de atelier.<\/strong> Planificatorul continu\u0103 s\u0103 lanseze comenzile de atelier (Werkstattauftr\u00e4ge) \u00een APplus, acum cu datele calendaristice stabilite de SkyPlanner. Comenzile lansate \u0219i st\u0103rile lor sunt preluate \u00een SkyPlanner la urm\u0103toarea sincronizare.<\/p>\n\n\n<p><strong>5. Confirm\u0103ri din atelier.<\/strong> Operatorii \u00eenregistreaz\u0103 activitatea cu SkyPlanner Mobile Confirmations sau Production Timer, iar \u00eenregistr\u0103rile de timp men\u021bin programul la zi. Dumneavoastr\u0103 alege\u021bi dac\u0103 timpii efectivi sunt transmi\u0219i \u00eenapoi. Dac\u0103 da, timpul \u0219i cantitatea sunt \u00eenregistrate pentru fiecare opera\u021bie ca mesaje BDE \u00een comand\u0103. Dac\u0103 se utilizeaz\u0103 \u00een continuare BDE cu coduri de bare, SkyPlanner cite\u0219te \u00een schimb mesajele din APplus.<\/p>\n\n\n<p><strong>6. Reguli privind responsabilitatea pentru date \u0219i conflictele.<\/strong> Documenta\u021bi-le \u00eenainte de punerea \u00een func\u021biune:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Date<\/th><th>Sistem responsabil<\/th><\/tr><\/thead><tbody><tr><td>Articole, liste de materiale, fi\u0219e tehnologice, cantit\u0103\u021bi, starea comenzilor, lansarea comenzilor de atelier<\/td><td>APplus<\/td><\/tr><tr><td>Succesiunea opera\u021biilor, momentele de \u00eenceput \u0219i de sf\u00e2r\u0219it, alocarea unit\u0103\u021bilor de capacitate<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matricea timpilor de preg\u0103tire, num\u0103rul de operatori, resurse alternative<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Nomenclatoare Betriebsmittel<\/td><td>APplus; disponibilitatea \u00een timp este planificat\u0103 \u00een SkyPlanner<\/td><\/tr><tr><td>Schimburi \u0219i zile nelucr\u0103toare<\/td><td>Un singur sistem, ales la definirea domeniului integr\u0103rii<\/td><\/tr><tr><td>Mesaje BDE, ie\u0219iri \u0219i intr\u0103ri de materiale<\/td><td>APplus, cu date introduse direct sau transmise din \u00eenregistr\u0103rile de timp SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Alege\u021bi un singur sistem care s\u0103 scrie datele calendaristice ale opera\u021biilor. Dac\u0103 ruleaz\u0103 programarea PPS sau dac\u0103 Feinplanung ori APplus APS scrie aceste date, dezactiva\u021bi func\u021bia respectiv\u0103 pentru comenzile programate de SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapele obi\u0219nuite ale proiectului<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementarea se finalizeaz\u0103 de obicei \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea etapei ini\u021biale. \u00cenainte de aceasta, valida\u021bi programul \u00een perioada de prob\u0103 gratuit\u0103 de 30 de zile, folosind unit\u0103\u021bi de capacitate, fi\u0219e tehnologice \u0219i comenzi de produc\u021bie deschise, exportate din APplus \u00een format CSV sau Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapare.<\/strong> Stabili\u021bi tabelul de mapare, regulile privind responsabilitatea pentru date, frecven\u021bele de sincronizare \u0219i dac\u0103 mesajele BDE sunt transmise \u00eenapoi.<\/li>\n\n\n<li><strong>Acces la APplus.<\/strong> Crea\u021bi utilizatorul tehnic, activa\u021bi serviciile web \u00eempreun\u0103 cu partenerul dumneavoastr\u0103 APplus \u0219i efectua\u021bi mai \u00eent\u00e2i verific\u0103rile \u00eentr-un sistem de testare.<\/li>\n\n\n<li><strong>\u00cenc\u0103rcare ini\u021bial\u0103.<\/strong> Articole, liste de materiale, fi\u0219e tehnologice, puncte \u0219i unit\u0103\u021bi de capacitate, Betriebsmittel, personal.<\/li>\n\n\n<li><strong>Sincronizarea comenzilor de produc\u021bie \u0219i de achizi\u021bie.<\/strong> Interogare periodic\u0103 cu filtre, paginare \u0219i re\u00eencerc\u0103ri sau transmitere prin Business Integration Framework.<\/li>\n\n\n<li><strong>Configurarea constr\u00e2ngerilor \u00een SkyPlanner.<\/strong> Matricea timpilor de preg\u0103tire, scule, num\u0103rul de operatori pe opera\u021bie \u0219i utilaje sau personal alternativ.<\/li>\n\n\n<li><strong>Retransmiterea programului.<\/strong> Datele opera\u021biilor primite prin webhook-urile SkyPlanner, plus mesaje BDE dac\u0103 opta\u021bi pentru acestea.<\/li>\n\n\n<li><strong>Testarea \u00een paralel.<\/strong> Folosi\u021bi SkyPlanner \u00een paralel cu panoul de planificare actual, compara\u021bi datele \u0219i corecta\u021bi nomenclatoarele.<\/li>\n\n\n<li><strong>Punerea \u00een produc\u021bie.<\/strong> Activa\u021bi retransmiterea datelor dup\u0103 ce acestea coincid.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-an-applus-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce trebuie s\u0103 ave\u021bi \u00een vedere la integrarea cu APplus<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Unit\u0103\u021bi cu capacitate limitat\u0103 \u0219i nelimitat\u0103.<\/strong> \u00cen APplus, unele unit\u0103\u021bi pot fi planificate cu capacitate nelimitat\u0103. \u00cen SkyPlanner, fiecare centru de lucru are capacitate finit\u0103, a\u0219a c\u0103 verifica\u021bi schimburile \u0219i randamentul fiec\u0103ruia la import.<\/li>\n\n\n<li><strong>Nivelurile de planificare utilizate.<\/strong> Verifica\u021bi dac\u0103 Feinplanung sau APplus APS are licen\u021b\u0103 \u0219i este \u00een uz \u0219i stabili\u021bi un singur sistem care s\u0103 scrie datele calendaristice.<\/li>\n\n\n<li><strong>Documente de atelier \u0219i coduri de bare.<\/strong> Mesajele BDE sunt \u00eenregistrate pe comenzile pentru care au fost tip\u0103rite documentele de atelier. Stabili\u021bi dac\u0103 lansarea \u0219i tip\u0103rirea r\u0103m\u00e2n \u00een APplus, ca \u00een prezent.<\/li>\n\n\n<li><strong>Unit\u0103\u021bile pentru timpii de preg\u0103tire \u0219i de execu\u021bie.<\/strong> La import, converti\u021bi timpii de preg\u0103tire \u0219i de execu\u021bie folosind unitatea \u0219i baza de calcul corecte; altfel, toate duratele vor fi gre\u0219ite.<\/li>\n\n\n<li><strong>Opera\u021bii externe.<\/strong> Opera\u021biile subcontractate se iau \u00een calcul prin durata lor, f\u0103r\u0103 s\u0103 consume capacitatea proprie. Modela\u021bi-le ca etape care au doar o durat\u0103.<\/li>\n\n\n<li><strong>Instal\u0103ri g\u0103zduite.<\/strong> Pentru versiunea g\u0103zduit\u0103, stabili\u021bi din timp cu furnizorul de g\u0103zduire ruta de re\u021bea c\u0103tre serviciile web.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-applus-integrati\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cine configureaz\u0103 integrarea cu APplus \u0219i asigur\u0103 asisten\u021ba<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Echipa SkyPlanner configureaz\u0103 integrarea \u00een etapa de implementare ini\u021bial\u0103 \u0219i ofer\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een produc\u021bie,<\/strong> pentru serviciile web \u0219i map\u0103rile convenite. Fiecare fabric\u0103 folose\u0219te APplus diferit, iar aceste cuno\u0219tin\u021be sunt valorificate aici.<\/li>\n\n\n<li><strong>Partenerul dumneavoastr\u0103 APplus poate participa.<\/strong> Acesta cunoa\u0219te personaliz\u0103rile, drepturile utilizatorilor \u0219i configura\u021bia Business Integration Framework \u0219i poate activa accesul \u00eempreun\u0103 cu echipa SkyPlanner.<\/li>\n\n\n<li><strong>Dezvoltatorii dumneavoastr\u0103 pot extinde integrarea<\/strong> folosind REST API din SkyPlanner \u0219i un token API. Un token API este suficient pentru a \u00eencepe, iar echipa SkyPlanner v\u0103 ajut\u0103 la nevoie. Consulta\u021bi <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">documenta\u021bia de integrare SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>Pre\u021bul SkyPlanner porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse \u0219i facturare lunar\u0103. Oferta pentru integrare se stabile\u0219te de la \u00eenceput, \u00een func\u021bie de procesele \u0219i nevoile dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul. Consulta\u021bi <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a>, <a href=\"\/ro\/integrari\/erp\/applus\/cu-capacitate-finita\/\">programarea cu capacitate finit\u0103 pentru APplus<\/a>, <a href=\"\/ro\/integrari\/erp\/applus\/\">pagina APplus<\/a> \u0219i <a href=\"\/ro\/integrari\/erp\/\">pagina integr\u0103rilor ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een hala de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi recenzia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate, la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui plan optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi recenzia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, manager de produc\u021bie la Fredman Operations, l\u00e2ng\u0103 o celul\u0103 robotizat\u0103 de paletizare din Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 luni<\/b><span>\u00een avans: echipa de v\u00e2nz\u0103ri vede capacitatea disponibil\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner pune bazele \u00eentregii planific\u0103ri a produc\u021biei \u0219i \u00eei asigur\u0103 fiabilitatea.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, manager de produc\u021bie<\/b><br>Fredman Operations \u00b7 H\u00e2rtie pentru ambalaje alimentare<\/p>\n\n\n<p class=\"ind-cust__result\">Echipa de v\u00e2nz\u0103ri vede capacitatea disponibil\u0103 cu \u0219ase luni \u00een avans, iar solicit\u0103rile de modificare a programului primesc acum r\u0103spuns \u00een c\u00e2teva secunde, fa\u021b\u0103 de o or\u0103 sau mai mult \u00eenainte.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/fredman-operations\/\">Citi\u021bi opinia Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Mai pu\u021bine<\/b><span>opriri cauzate de lipsa materialelor<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eValoarea pe care ne-o aduce SkyPlanner este c\u0103 func\u021bioneaz\u0103 \u00een activitatea de zi cu zi, mai ales la stabilirea termenelor de livrare.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, manager de planificare a produc\u021biei<\/b><br>Eskomatic \u00b7 Prelucr\u0103ri mecanice la comand\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Programarea automat\u0103 a \u00eenc\u0103rc\u0103rii resurselor ofer\u0103 termene de livrare mai precise, iar opririle produc\u021biei cauzate de lipsa materialelor s-au redus considerabil.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/eskomatic\/\">Citi\u021bi opinia Eskomatic<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>APplus are un API pentru comenzile de produc\u021bie?<\/summary>\n<p class=\"sp-faq__a\">Da. APplus se bazeaz\u0103 pe o arhitectur\u0103 de servicii web, iar Asseco afirm\u0103 c\u0103 func\u021biile sale de programare pot fi utilizate direct de sistemele IT ale clien\u021bilor \u0219i furnizorilor. Business Integration Framework conecteaz\u0103 sisteme ter\u021be prin structuri de date adaptive, iar Universal Cloud Connector conecteaz\u0103 solu\u021biile SaaS la APplus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum sunt retransmise datele planificate c\u0103tre APplus?<\/summary>\n<p class=\"sp-faq__a\">La fiecare modificare a programului, un webhook SkyPlanner declan\u0219eaz\u0103 actualizarea datei planificate de \u00eenceput, a datei planificate de sf\u00e2r\u0219it \u0219i a unit\u0103\u021bii de capacitate pentru fiecare opera\u021bie a comenzii de produc\u021bie. Actualizarea se face prin serviciile web APplus sau prin Business Integration Framework. Calea de integrare se stabile\u0219te la definirea domeniului proiectului, \u00een etapa de implementare ini\u021bial\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Poate SkyPlanner s\u0103 transmit\u0103 mesaje BDE c\u0103tre APplus?<\/summary>\n<p class=\"sp-faq__a\">Da, dac\u0103 opta\u021bi pentru aceasta. Pontajele operatorilor din SkyPlanner sunt transmise ca mesaje BDE, cu timpul \u0219i cantitatea pentru fiecare opera\u021bie din comand\u0103. \u00cen fabricile care p\u0103streaz\u0103 sistemul BDE cu coduri de bare, SkyPlanner cite\u0219te mesajele \u00een loc s\u0103 le transmit\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ce ar trebui s\u0103 propun\u0103 un partener APplus: APplus APS sau SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, c\u00e2nd clientul dore\u0219te ca, \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni, s\u0103 aib\u0103 un program de produc\u021bie utilizabil, care respect\u0103 capacitatea disponibil\u0103. APplus APS este un produs al unui partener, integrat \u00een APplus pentru matrice de preg\u0103tire care acoper\u0103 mai multe scule \u0219i pentru planificare cu resurse multiple (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/multiressourcenplanung-asseco-solutions-schliesst-partnerschaft-mit-dualis\/\">Asseco<\/a>). SkyPlanner acoper\u0103 aceste situa\u021bii, se conecteaz\u0103 prin serviciile web APplus, reprogrameaz\u0103 automat \u0219i permite un num\u0103r nelimitat de utilizatori, de la 199 \u20ac pe lun\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Integrarea func\u021bioneaz\u0103 cu versiunea g\u0103zduit\u0103 a APplus?<\/summary>\n<p class=\"sp-faq__a\">Da. APplus ruleaz\u0103 pe infrastructura proprie sau ca versiune g\u0103zduit\u0103, iar SkyPlanner se conecteaz\u0103 la ambele prin serviciile web. Ruta de re\u021bea se stabile\u0219te cu echipa dumneavoastr\u0103 IT sau cu furnizorul de g\u0103zduire \u00een etapa de definire a domeniului proiectului.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de a dezvolta integrarea?<\/summary>\n<p class=\"sp-faq__a\">Da. Perioada de testare gratuit\u0103 de 30 de zile permite utilizarea a p\u00e2n\u0103 la 20 de centre de lucru, cu importuri CSV sau Excel din APplus \u0219i toate func\u021biile Basic, f\u0103r\u0103 card de credit. <a href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea<\/a> sau <a href=\"\/ro\/contact-vanzari\/\">discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a> pentru definirea domeniului integr\u0103rii.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ APplus Ghid de integrare APplus pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid le arat\u0103 partenerilor APplus \u0219i echipelor IT cum s\u0103 conecteze APplus la SkyPlanner APS. Integrarea dintre SkyPlanner \u0219i APplus este bidirec\u021bional\u0103 \u0219i folose\u0219te interfe\u021bele proprii Asseco: skyplanner.ai \u00b7 Programarea produc\u021biei Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia &#8230; <a title=\"Ghid de integrare APplus pentru programarea produc\u021biei cu SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/applus\/ghid-de-integrare\/\" aria-label=\"Read more about Ghid de integrare APplus pentru programarea produc\u021biei cu SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106256,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107068","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integrare APplus APS: ghid pentru programarea produc\u021biei<\/title>\n<meta name=\"description\" content=\"APplus\u2013SkyPlanner APS: servicii web, Business Integration Framework, mesaje BDE, mapare, scrierea opera\u021biilor \u00eenapoi \u00een ERP \u0219i sfaturi de proiect.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/applus\/ghid-de-integrare\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ghid de integrare APplus pentru programarea produc\u021biei cu SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"APplus\u2013SkyPlanner APS: servicii web, Business Integration Framework, mesaje BDE, mapare, scrierea opera\u021biilor \u00eenapoi \u00een ERP \u0219i sfaturi de proiect.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/applus\/ghid-de-integrare\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/applus\\\/ghid-de-integrare\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/applus\\\/ghid-de-integrare\\\/\",\"name\":\"Integrare APplus APS: ghid pentru programarea produc\u021biei\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"APplus\u2013SkyPlanner APS: servicii web, Business Integration Framework, mesaje BDE, mapare, scrierea opera\u021biilor \u00eenapoi \u00een ERP \u0219i sfaturi de proiect.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/applus\\\/ghid-de-integrare\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/applus\\\/ghid-de-integrare\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/applus\\\/ghid-de-integrare\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru APplus: programarea produc\u021biei cu capacitate finit\u0103\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/applus\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Ghid de integrare APplus pentru programarea produc\u021biei cu SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integrare APplus APS: ghid pentru programarea produc\u021biei","description":"APplus\u2013SkyPlanner APS: servicii web, Business Integration Framework, mesaje BDE, mapare, scrierea opera\u021biilor \u00eenapoi \u00een ERP \u0219i sfaturi de proiect.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/applus\/ghid-de-integrare\/","og_locale":"ro_RO","og_type":"article","og_title":"Ghid de integrare APplus pentru programarea produc\u021biei cu SkyPlanner APS","og_description":"APplus\u2013SkyPlanner APS: servicii web, Business Integration Framework, mesaje BDE, mapare, scrierea opera\u021biilor \u00eenapoi \u00een ERP \u0219i sfaturi de proiect.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/applus\/ghid-de-integrare\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/applus\/ghid-de-integrare\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/applus\/ghid-de-integrare\/","name":"Integrare APplus APS: ghid pentru programarea produc\u021biei","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"APplus\u2013SkyPlanner APS: servicii web, Business Integration Framework, mesaje BDE, mapare, scrierea opera\u021biilor \u00eenapoi \u00een ERP \u0219i sfaturi de proiect.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/applus\/ghid-de-integrare\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/applus\/ghid-de-integrare\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/applus\/ghid-de-integrare\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru APplus: programarea produc\u021biei cu capacitate finit\u0103","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/applus\/"},{"@type":"ListItem","position":5,"name":"Ghid de integrare APplus pentru programarea produc\u021biei cu SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ APplus Ghid de integrare APplus pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid le arat\u0103 partenerilor APplus \u0219i echipelor IT cum s\u0103 conecteze APplus la SkyPlanner APS. Integrarea dintre SkyPlanner \u0219i APplus este bidirec\u021bional\u0103 \u0219i folose\u0219te interfe\u021bele proprii Asseco: skyplanner.ai \u00b7 Programarea produc\u021biei Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/107068","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=107068"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/107068\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106256"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=107068"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}