{"id":106952,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/qad-adaptive-erp\/ghid-de-integrare\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"ghid-de-integrare","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/qad-adaptive-erp\/ghid-de-integrare\/","title":{"rendered":"Ghid de integrare QAD Adaptive ERP pentru programarea produc\u021biei cu SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ QAD Adaptive ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Ghid de integrare QAD Adaptive ERP <span class=\"hl\">pentru programarea produc\u021biei cu SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Acest ghid de integrare QAD Adaptive ERP arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze QAD Adaptive ERP la SkyPlanner APS, inclusiv \u00een cazul instal\u0103rilor mai vechi QAD Enterprise Edition \u0219i MFG\/PRO. SkyPlanner se integreaz\u0103 bidirec\u021bional cu QAD Adaptive ERP, folosind interfe\u021bele proprii QAD:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u00cen SkyPlanner sunt importate comenzile de produc\u021bie \u0219i opera\u021biile acestora, articolele, structurile de produs, fluxurile tehnologice, centrele de lucru, calendarele de produc\u021bie, stocurile \u0219i comenzile de achizi\u021bie.<\/li>\n\n\n<li>Datele de lansare \u0219i termenele de finalizare stabilite prin programare sunt trimise \u00eenapoi \u00een Work Order Maintenance (16.1).<\/li>\n\n\n<li>Pontajele operatorilor sunt trimise \u00eenapoi prin Labor Feedback by Work Order (16.20.1), iar cantit\u0103\u021bile finalizate prin Work Order Receipt (16.11).<\/li>\n\n\n<li>Webhook-urile SkyPlanner transmit modific\u0103rile programului pe m\u0103sur\u0103 ce apar.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 QAD \u00een etapa de implementare \u0219i asigur\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een func\u021biune. Acest ghid se adreseaz\u0103 partenerilor \u0219i dezvoltatorilor care doresc s\u0103 participe sau s\u0103 dezvolte singuri solu\u021bii folosind REST API documentat al SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"qad-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Interfe\u021bele de integrare QAD<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>QAD ofer\u0103 trei c\u0103i de integrare pentru un sistem extern de programare a produc\u021biei:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>QAD QXtend Inbound (QXI).<\/strong> QAD \u00eel descrie astfel: &#8220;a Web services-based, SOAP-compliant, XML framework, enabling complete platform-independent access to QAD Enterprise Applications business functionality.&#8221; (un cadru XML bazat pe servicii web, compatibil SOAP, care ofer\u0103 acces complet la func\u021biile de business QAD Enterprise Applications, independent de platform\u0103). Fiecare cerere este un <strong>QDoc<\/strong> care execut\u0103 un program QAD cu acelea\u0219i valid\u0103ri ca \u00een interfa\u021ba acestuia \u0219i prime\u0219te un QDoc de r\u0103spuns. Printre QDocs disponibile se num\u0103r\u0103 <code>maintainItemMaster<\/code>, <code>maintainRouting<\/code> \u0219i <code>maintainPurchaseOrder<\/code>. Pentru programele f\u0103r\u0103 un QDoc disponibil, instrumentul <strong>QGen<\/strong> de la QAD mapeaz\u0103 programul din meniu: &#8220;QGen is used to map custom programs or QAD Enterprise Applications programs that do not have released QDoc schemas and events files.&#8221; (QGen este folosit pentru a mapa programe personalizate sau programe QAD Enterprise Applications pentru care nu sunt disponibile scheme QDoc \u0219i fi\u0219iere de evenimente). QAD folose\u0219te chiar aceast\u0103 cale: &#8220;QAD Production Scheduler uses QAD QXtend to update work orders.&#8221; (QAD Production Scheduler folose\u0219te QAD QXtend pentru a actualiza comenzile de produc\u021bie). (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/2370949\/Qxtend_UG_v0110.pdf\/093456b1-c885-de26-7e61-754987199fa7?t=1634559415409&amp;download=true\">Ghid QXtend<\/a>)<\/li>\n\n\n<li><strong>QAD QXtend Outbound (QXO).<\/strong> QXO &#8220;exports user-configurable business objects as XML QDocs out of QAD products.&#8221; (export\u0103 din produsele QAD obiecte de business configurabile de utilizator, sub form\u0103 de QDocs XML). Obiectele de business standard includ Item, Product Structure, Routing, Work Center, Department, Inventory Transaction \u0219i Inventory Status.<\/li>\n\n\n<li><strong>REST API pentru documente de business.<\/strong> \u00cencep\u00e2nd cu Adaptive ERP 2022.1, &#8220;Query REST APIs are now available for business documents,&#8221; (sunt disponibile REST API de interogare pentru documentele de business), cu filtrare, sortare, paginare \u0219i preluare par\u021bial\u0103 a datelor. Acestea sunt documentate \u00een Swagger pe instan\u021ba dumneavoastr\u0103 (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/159231649\/QAD_Adaptive_ERP_Web_UI_RN_v2022_1.pdf\/602f6b29-ef47-decd-4825-127b06b25b16?t=1670945442202&amp;download=true\">note de versiune<\/a>).<\/li>\n\n<\/ol>\n\n\n<p>Scrierile se fac prin QXtend. Citirile se fac prin QXO \u0219i REST API de interogare.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentificare \u0219i licen\u021biere<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>QXtend Inbound.<\/strong> C\u00e2nd op\u021biunea Require Authentication este activat\u0103 pe receptor, fiecare QDoc con\u021bine un Session ID sau un nume de utilizator \u0219i o parol\u0103 QAD. QXI verific\u0103 drepturile de acces ale utilizatorului la meniu \u00eenainte de a executa programul.<\/li>\n\n\n<li><strong>Utilizator de integrare.<\/strong> Crea\u021bi un utilizator QAD dedicat, cu acces strict la programele din meniu pe care le apeleaz\u0103 integrarea: Work Order Maintenance, Labor Feedback by Work Order, Work Order Receipt \u0219i programele pentru nomenclatoare.<\/li>\n\n\n<li><strong>Licen\u021ba QXtend.<\/strong> Licen\u021bierea QXtend se face \u00een func\u021bie de agen\u021bi \u0219i receptori. Ghidul QAD precizeaz\u0103 c\u0103 traficul prin servicii web c\u0103tre \u0219i dinspre o aplica\u021bie extern\u0103 nu este gratuit, a\u0219a c\u0103 verifica\u021bi licen\u021ba QXtend \u00eenainte de \u00eenceperea proiectului.<\/li>\n\n<\/ul>\n\n\n<p>\u00cen SkyPlanner, autentificarea pentru REST API se face cu un token API \u00een antetul <code>Authorization-Token<\/code> (SkyPlanner Settings &gt; API), iar documenta\u021bia este disponibil\u0103 \u00een Swagger\/OpenAPI. <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">Tutorialul de integrare<\/a> v\u0103 ghideaz\u0103 prin primele apeluri.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-change-data\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Evenimente \u0219i modific\u0103ri ale datelor<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>QXtend Outbound este mecanismul QAD pentru transmiterea modific\u0103rilor datelor. &#8220;A change occurs to watched data in QAD Enterprise Applications. Change notifications are written out to the qxevents database.&#8221; (C\u00e2nd se modific\u0103 datele monitorizate \u00een QAD Enterprise Applications, notific\u0103rile de modificare sunt scrise \u00een baza de date qxevents.) QXO construie\u0219te apoi documentele QDoc \u0219i le livreaz\u0103 &#8220;to a directory location where the subscriber polls for and picks up new QDocs,&#8221; (\u00eentr-un director pe care abonatul \u00eel verific\u0103 periodic pentru a prelua noile QDocs) sau c\u0103tre un serviciu web care ascult\u0103 la un URL.<\/p>\n\n\n<p>SkyPlanner se aboneaz\u0103 ca serviciu web la datele publicate de QXO \u0219i folose\u0219te interfe\u021bele REST API de interogare pentru a prelua periodic datele pe care QXO nu le acoper\u0103. Work Order nu se num\u0103r\u0103 printre obiectele de business standard QXO. Prin urmare, integrarea fie adaug\u0103 un obiect de business QXO bazat pe tabelele comenzilor de produc\u021bie (<code>wo_mstr<\/code>, <code>wr_route<\/code>), fie preia comenzile de produc\u021bie prin interfe\u021bele REST API de interogare la fiecare c\u00e2teva minute.<\/p>\n\n\n<p>SkyPlanner trimite webhook-uri c\u00e2nd se modific\u0103 starea sau programul de produc\u021bie, astfel c\u0103 scrierea \u00eenapoi \u00een QAD este declan\u0219at\u0103 de evenimente.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Coresponden\u021ba datelor<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Obiect QAD (program, interfa\u021b\u0103)<\/th><th>Obiect SkyPlanner<\/th><th>Sens<\/th><th>Frecven\u021b\u0103<\/th><\/tr><\/thead><tbody><tr><td>Articole (Item Master Maintenance 1.4.1; QXO Item)<\/td><td>Produse \u0219i materiale<\/td><td>QAD \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare prin QXO<\/td><\/tr><tr><td>Structuri de produs (13.5; QXO Product Structure)<\/td><td>Structura produsului, subproduse, materiale pentru fiecare produs<\/td><td>QAD \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare prin QXO<\/td><\/tr><tr><td>Fluxuri tehnologice (14.13.1; QXO Routing): timpi de a\u0219teptare la coad\u0103, preg\u0103tire, execu\u021bie, a\u0219teptare dup\u0103 execu\u021bie \u0219i transport<\/td><td>Etape de proces cu durate, timpi de preg\u0103tire \u0219i de demontare<\/td><td>QAD \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare prin QXO<\/td><\/tr><tr><td>Centre de lucru (14.5) \u0219i departamente (14.1; QXO Work Center, Department)<\/td><td>Centre de lucru, grupuri de centre de lucru, valori de eficien\u021b\u0103<\/td><td>QAD \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi rar<\/td><\/tr><tr><td>Calendarele de produc\u021bie \u0219i ale centrelor de lucru<\/td><td>Schimburi \u0219i zile nelucr\u0103toare<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Zilnic sau cu schimburi proprii definite \u00een SkyPlanner<\/td><\/tr><tr><td>Comenzi de produc\u021bie (16.1) cu fluxul tehnologic aferent (16.13.13) \u0219i componente<\/td><td>Comenzi \u0219i opera\u021bii cu termene \u0219i necesar de materiale<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Obiect QXO personalizat sau interogare periodic\u0103 prin REST la fiecare c\u00e2teva minute<\/td><\/tr><tr><td>Stocuri (QXO Inventory Status, Inventory Transaction)<\/td><td>Solduri de stoc<\/td><td>QAD \u2192 SkyPlanner<\/td><td>La modificare sau la fiecare or\u0103<\/td><\/tr><tr><td>Comenzi de achizi\u021bie cu termene de livrare<\/td><td>Comenzi de achizi\u021bie, materiale de primit \u00een func\u021bie de data livr\u0103rii<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Interogare la fiecare or\u0103 sau la generarea programului de produc\u021bie<\/td><\/tr><tr><td>Datele de lansare \u0219i termenele de finalizare ale comenzilor de produc\u021bie (Work Order Maintenance 16.1, QXtend Inbound QDoc)<\/td><td>Momentele planificate de \u00eenceput \u0219i de sf\u00e2r\u0219it pentru fiecare comand\u0103<\/td><td>SkyPlanner \u2192 QAD<\/td><td>La modificarea programului de produc\u021bie, printr-un webhook SkyPlanner<\/td><\/tr><tr><td>Labor Feedback by Work Order (16.20.1): timp de preg\u0103tire \u0219i de execu\u021bie pentru fiecare opera\u021bie<\/td><td>Pontaje \u0219i confirm\u0103ri ale operatorilor<\/td><td>SkyPlanner \u2192 QAD<\/td><td>La fiecare confirmare sau schimb, dac\u0103 se opteaz\u0103 pentru aceasta<\/td><\/tr><tr><td>Work Order Receipt (16.11)<\/td><td>Cantit\u0103\u021bi finalizate<\/td><td>SkyPlanner \u2192 QAD<\/td><td>La fiecare confirmare, dac\u0103 se opteaz\u0103 pentru aceasta<\/td><\/tr><tr><td>Nu exist\u0103 \u00een QAD<\/td><td>Matricea timpilor de preg\u0103tire, scule cu disponibilitate limitat\u0103, utilaje alternative \u0219i personal de \u00eenlocuire<\/td><td>Gestionate \u00een SkyPlanner<\/td><td>Configurate \u00een etapa de implementare ini\u021bial\u0103<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Modele de integrare<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00cenc\u0103rcarea ini\u021bial\u0103 a nomenclatoarelor.<\/strong> Prelua\u021bi articolele, structurile de produs, fluxurile tehnologice, centrele de lucru \u0219i calendarele prin QXO sau REST API de interogare. Stabili\u021bi cu aten\u021bie coresponden\u021ba centrelor de lucru: un centru de lucru cu patru utilaje devine un grup de centre de lucru sau patru centre de lucru. Liniile de produc\u021bie repetitiv\u0103 din Production Line Maintenance pot deveni \u0219i ele centre de lucru.<\/p>\n\n\n<p><strong>2. Sincronizarea comenzilor de produc\u021bie.<\/strong> Prelua\u021bi comenzile de produc\u021bie cu planificare ferm\u0103 \u0219i pe cele lansate, \u00eempreun\u0103 cu fluxurile tehnologice \u0219i componentele lor, precum \u0219i comenzile de achizi\u021bie deschise. SkyPlanner consider\u0103 materialul comandat disponibil la data de livrare din comanda de achizi\u021bie \u0219i actualizeaz\u0103 stocul c\u00e2nd aceasta este marcat\u0103 cu starea Delivered.<\/p>\n\n\n<p>Programa\u021bi comenzile de produc\u021bie, nu comenzile planificate de MRP. Mai \u00eent\u00e2i, comenzile planificate trebuie s\u0103 devin\u0103 \u00een QAD comenzi de produc\u021bie cu planificare ferm\u0103 sau comenzi lansate.<\/p>\n\n\n<p><strong>3. Scrierea programului de produc\u021bie \u00eenapoi \u00een QAD.<\/strong> C\u00e2nd motorul de programare plaseaz\u0103 sau mut\u0103 o comand\u0103, un webhook SkyPlanner declan\u0219eaz\u0103 un QDoc QXtend Inbound pentru Work Order Maintenance (16.1). Acesta seteaz\u0103 data de lansare la data primei opera\u021bii programate \u0219i termenul de finalizare la data ultimei opera\u021bii. QXtend execut\u0103 programul cu valid\u0103rile proprii QAD \u0219i returneaz\u0103 un QDoc de r\u0103spuns, pe care integrarea \u00eel verific\u0103.<\/p>\n\n\n<p>Succesiunea opera\u021biilor pe fiecare utilaj r\u0103m\u00e2ne \u00een SkyPlanner \u0219i ajunge la operatori prin Mobile Confirmations. Astfel, integrarea nu este afectat\u0103 de blocarea fluxului tehnologic \u00een QAD pentru comenzile lansate.<\/p>\n\n\n<p><strong>4. Confirm\u0103ri din produc\u021bie.<\/strong> Operatorii \u00eenregistreaz\u0103 activitatea cu SkyPlanner Mobile Confirmations sau Production Timer, iar pontajele men\u021bin programul de produc\u021bie la zi. Dumneavoastr\u0103 decide\u021bi dac\u0103 timpii efectivi sunt trimi\u0219i \u00eenapoi \u00een QAD. Dac\u0103 da, timpii de preg\u0103tire \u0219i de execu\u021bie sunt trimi\u0219i \u00een Labor Feedback by Work Order pentru fiecare opera\u021bie, iar cantit\u0103\u021bile finalizate \u00een Work Order Receipt. Dac\u0103 nu, manopera se introduce \u00een QAD ca \u00eenainte.<\/p>\n\n\n<p><strong>5. Responsabilitatea pentru date \u0219i regulile de solu\u021bionare a conflictelor.<\/strong> Documenta\u021bi-le \u00eenainte de punerea \u00een func\u021biune:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Date<\/th><th>Sistem responsabil<\/th><\/tr><\/thead><tbody><tr><td>Articole, structuri de produs, fluxuri tehnologice, cantit\u0103\u021bi, starea comenzilor de produc\u021bie<\/td><td>QAD<\/td><\/tr><tr><td>Succesiunea opera\u021biilor, momentele de \u00eenceput \u0219i de sf\u00e2r\u0219it, alocarea pe utilaje<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Datele de lansare \u0219i termenele de finalizare ale comenzilor de produc\u021bie<\/td><td>SkyPlanner scrie, QAD stocheaz\u0103<\/td><\/tr><tr><td>Matricea timpilor de preg\u0103tire, necesarul de scule \u0219i operatori, resurse alternative<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Schimburi \u0219i zile nelucr\u0103toare<\/td><td>Un singur sistem, ales la definirea domeniului<\/td><\/tr><tr><td>Manoper\u0103, ie\u0219iri de componente din stoc \u0219i recep\u021bii<\/td><td>QAD, prin introducere direct\u0103 sau preluare din pontajele SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Alege\u021bi un singur sistem care s\u0103 scrie datele calendaristice ale comenzilor de produc\u021bie. SkyPlanner nu necesit\u0103 niciun modul QAD de programare a produc\u021biei. Prin urmare, pentru comenzile pe care le programeaz\u0103, SkyPlanner preia scrierea datelor calendaristice de la instrumentele de programare existente sau de la alte sisteme de programare.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapele obi\u0219nuite ale proiectului<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u00cen mod normal, implementarea se finalizeaz\u0103 \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea configur\u0103rii ini\u021biale. \u00cenainte de aceasta, valida\u021bi programul de produc\u021bie \u00een perioada de prob\u0103 gratuit\u0103 de 30 de zile, folosind centre de lucru, fluxuri tehnologice \u0219i comenzi de produc\u021bie deschise, exportate din QAD \u00een format CSV sau Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapare.<\/strong> Stabili\u021bi tabelul de coresponden\u021b\u0103, regulile privind responsabilitatea pentru date, loca\u021biile \u0219i domeniile incluse \u00een proiect, frecven\u021bele de sincronizare \u0219i dac\u0103 manopera va fi trimis\u0103 \u00eenapoi \u00een QAD.<\/li>\n\n\n<li><strong>Acces QAD.<\/strong> Crea\u021bi utilizatorul de integrare, verifica\u021bi licen\u021bierea QXtend \u0219i configura\u021bi receptorul QXtend \u0219i abonatul QXO. Efectua\u021bi mai \u00eent\u00e2i verific\u0103rile \u00eentr-un domeniu de test.<\/li>\n\n\n<li><strong>Configurare QDoc.<\/strong> Folosi\u021bi QDocs disponibile acolo unde exist\u0103 \u0219i genera\u021bi cu QGen documentele QDoc pentru Work Order Maintenance, Labor Feedback by Work Order \u0219i Work Order Receipt, acolo unde este necesar.<\/li>\n\n\n<li><strong>\u00cenc\u0103rcare ini\u021bial\u0103.<\/strong> Articole, structuri de produs, fluxuri tehnologice, centre de lucru, calendare.<\/li>\n\n\n<li><strong>Sincronizarea comenzilor de produc\u021bie \u0219i de achizi\u021bie.<\/strong> Evenimente QXO sau interogare periodic\u0103 prin REST, cu filtre, paginare \u0219i re\u00eencerc\u0103ri.<\/li>\n\n\n<li><strong>Configurarea constr\u00e2ngerilor \u00een SkyPlanner.<\/strong> Matricea timpilor de preg\u0103tire, scule, num\u0103rul de operatori pentru fiecare opera\u021bie \u0219i utilaje sau personal alternativ.<\/li>\n\n\n<li><strong>Scrierea programului \u00eenapoi \u00een QAD \u0219i testarea \u00een paralel.<\/strong> Transmite\u021bi datele calendaristice ca r\u0103spuns la webhook-urile SkyPlanner, rula\u021bi programarea \u00een paralel cu planul curent, compara\u021bi datele \u0219i corecta\u021bi nomenclatoarele.<\/li>\n\n\n<li><strong>Punere \u00een func\u021biune.<\/strong> Activa\u021bi scrierea \u00eenapoi \u00een QAD dup\u0103 ce datele corespund.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-qad-adaptive-erp-integrati\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce trebuie s\u0103 ave\u021bi \u00een vedere la integrarea cu QAD Adaptive ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Rul\u0103rile repetate ale CRP.<\/strong> CRP reprogrameaz\u0103 toate opera\u021biile deschise ale comenzilor de produc\u021bie selectate. QAD p\u0103streaz\u0103 datele introduse manual numai c\u00e2nd \u201eyou also adjusted the work order release and due date to match,\u201d (a\u021bi ajustat \u0219i datele de lansare \u0219i de finalizare ale comenzii de produc\u021bie astfel \u00eenc\u00e2t s\u0103 corespund\u0103), ceea ce face \u0219i SkyPlanner la scrierea datelor. Rula\u021bi CRP dup\u0103 scrierea datelor \u00eenapoi \u00een QAD sau exclude\u021bi comenzile programate de SkyPlanner.<\/li>\n\n\n<li><strong>Fluxurile tehnologice lansate nu mai pot fi modificate.<\/strong> \u201eOnce the work order status is Exploded, Allocated, or Released, no more changes can be made to the routing.\u201d (Dup\u0103 ce comanda de produc\u021bie ajunge \u00een starea Exploded, Allocated sau Released, fluxul tehnologic nu mai poate fi modificat.) Citi\u021bi fluxul tehnologic la lansare \u0219i modifica\u021bi-l numai pentru comenzile planificate sau planificate ferm.<\/li>\n\n\n<li><strong>Unit\u0103\u021bile de timp din fluxul tehnologic.<\/strong> Timpii de preg\u0103tire \u0219i de execu\u021bie reprezint\u0103 \u00eenc\u0103rcare, \u00een timp ce \u201equeue, wait, and move times are excluded from load calculations.\u201d (timpii de stat la coad\u0103, de a\u0219teptare \u0219i de transport sunt exclu\u0219i din calculele de \u00eenc\u0103rcare). Modela\u021bi ace\u0219ti timpi \u00een SkyPlanner ca etape care au doar durat\u0103 \u0219i verifica\u021bi dac\u0103 timpul de execu\u021bie este definit pe unitate sau pe comand\u0103.<\/li>\n\n\n<li><strong>Capacitatea de procesare QXtend.<\/strong> QAD avertizeaz\u0103 c\u0103 \u201eUI API adapter performance may be unacceptable when processing high volumes of data or real-time transactions.\u201d (performan\u021ba adaptorului UI API poate fi inacceptabil\u0103 la procesarea unor volume mari de date sau a tranzac\u021biilor \u00een timp real). Trimite\u021bi \u00een loturi doar comenzile modificate \u0219i folosi\u021bi QDocs native acolo unde exist\u0103.<\/li>\n\n\n<li><strong>Domenii \u0219i unit\u0103\u021bi de produc\u021bie.<\/strong> Instal\u0103rile QAD cu mai multe domenii p\u0103streaz\u0103 centrele de lucru \u0219i comenzile de produc\u021bie separat, pe domeniu \u0219i unitate de produc\u021bie. Asocia\u021bi fiecare unitate inclus\u0103 \u00een proiect cu propriul grup de centre de lucru.<\/li>\n\n\n<li><strong>Produc\u021bie repetitiv\u0103 \u0219i discret\u0103 \u00een aceea\u0219i fabric\u0103.<\/strong> Liniile Advanced Repetitive folosesc programe de produc\u021bie repetitiv\u0103, nu comenzi de produc\u021bie. Stabili\u021bi \u00een etapa de definire a domeniului ce linii va programa SkyPlanner.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-qad-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cine configureaz\u0103 integrarea cu QAD \u0219i asigur\u0103 asisten\u021ba<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Echipa SkyPlanner configureaz\u0103 integrarea \u00een etapa de implementare \u0219i asigur\u0103 asisten\u021ba dup\u0103 punerea \u00een func\u021biune,<\/strong> pentru QDocs, abonamentele QXO \u0219i interog\u0103rile REST convenite. Fiecare fabric\u0103 folose\u0219te QAD \u00een felul s\u0103u, iar aceste particularit\u0103\u021bi sunt luate \u00een calcul aici.<\/li>\n\n\n<li><strong>Partenerul dumneavoastr\u0103 QAD poate participa.<\/strong> Acesta v\u0103 cunoa\u0219te domeniile, personaliz\u0103rile \u0219i condi\u021biile de licen\u021biere \u0219i poate configura QXtend, QGen QDocs \u0219i utilizatorul de integrare \u00eempreun\u0103 cu echipa SkyPlanner.<\/li>\n\n\n<li><strong>Dezvoltatorii dumneavoastr\u0103 pot extinde integrarea<\/strong> folosind interfa\u021ba REST API a SkyPlanner cu un token API. Un token API este suficient pentru a \u00eencepe, iar echipa SkyPlanner ofer\u0103 asisten\u021b\u0103 la nevoie. Consulta\u021bi <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">documenta\u021bia de integrare SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse \u0219i facturare lunar\u0103. Oferta pentru integrare este stabilit\u0103 de la \u00eenceput, \u00een func\u021bie de procesele \u0219i nevoile dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul. Consulta\u021bi <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a>, <a href=\"\/ro\/integrari\/erp\/qad-adaptive-erp\/cu-capacitate-finita\/\">programarea cu capacitate finit\u0103 pentru QAD Adaptive ERP<\/a>, <a href=\"\/ro\/integrari\/erp\/qad-adaptive-erp\/\">pagina QAD Adaptive ERP<\/a> \u0219i <a href=\"\/ro\/integrari\/erp\/\">sec\u021biunea de integr\u0103ri ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een hala de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de opera\u021bii ajunge pe linie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi m\u0103rturia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar un plan optimizat pe trei luni, pentru toate centrele de lucru, se realizeaz\u0103 \u00een mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi m\u0103rturia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, director general al Mamec, \u00een hala de produc\u021bie a companiei din Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Peste 1.000<\/b><span>de comenzi de produc\u021bie programate automat<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eAvem un cu totul alt control asupra produc\u021biei, iar capacitatea de produc\u021bie o \u00een\u021belegem la un nivel complet diferit.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, director general<\/b><br>Mamec \u00b7 Mixere industriale, pompe \u0219i produc\u021bie la comand\u0103 de \u00eenalt\u0103 tehnologie<\/p>\n\n\n<p class=\"ind-cust__result\">Mii de comenzi de produc\u021bie sunt programate automat, iar \u00eentreaga organiza\u021bie are o imagine \u00een timp real a produc\u021biei.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/mamec\/\">Citi\u021bi m\u0103rturia Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Vedere aerian\u0103 a fabricii Piristeel de sisteme de siguran\u021b\u0103 pentru acoperi\u0219uri din Kauhava\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>respectarea termenelor de livrare<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ne-a oferit vizibilitatea necesar\u0103 pentru a identifica blocajele \u0219i a adus mai mult\u0103 claritate \u00een gestionarea produc\u021biei.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, director de produc\u021bie<\/b><br>Piristeel \u00b7 Sisteme de siguran\u021b\u0103 pentru acoperi\u0219uri \u0219i sisteme pluviale<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a ajuns la 99,2% anul acesta, iar programarea economise\u0219te p\u00e2n\u0103 la patru ore de lucru pe zi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/piristeel\/\">Citi\u021bi m\u0103rturia Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>QAD Adaptive ERP are un API pentru comenzile de produc\u021bie?<\/summary>\n<p class=\"sp-faq__a\">Da. QXtend Inbound execut\u0103 Work Order Maintenance \u0219i programele din atelier prin SOAP \u0219i QDocs XML, generate cu QGen acolo unde nu exist\u0103 un QDoc publicat. API-urile REST pentru documente de afaceri ofer\u0103 \u00een plus acces la interog\u0103ri cu filtrare \u0219i paginare.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>QAD accept\u0103 webhook-uri?<\/summary>\n<p class=\"sp-faq__a\">Mecanismul QAD pentru transmiterea modific\u0103rilor de date este QXtend Outbound: declan\u0219atoarele din tabele \u00eenregistreaz\u0103 modific\u0103rile, iar QXO livreaz\u0103 QDocs la URL-ul unui serviciu web sau \u00eentr-un director verificat periodic. Webhook-urile proprii SkyPlanner transmit modific\u0103rile programului de produc\u021bie pe m\u0103sur\u0103 ce apar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum sunt transferate \u00eenapoi \u00een QAD datele din programul de produc\u021bie?<\/summary>\n<p class=\"sp-faq__a\">Printr-un QDoc QXtend Inbound pentru Work Order Maintenance (16.1), care stabile\u0219te datele de lansare \u0219i de finalizare ale comenzii de produc\u021bie pe baza programului SkyPlanner. QAD valideaz\u0103 QDoc folosind acelea\u0219i reguli ca \u00een interfa\u021b\u0103 \u0219i returneaz\u0103 un QDoc de r\u0103spuns.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum ajung confirm\u0103rile operatorilor \u00een QAD?<\/summary>\n<p class=\"sp-faq__a\">Timpii de preg\u0103tire \u0219i de execu\u021bie se \u00eenregistreaz\u0103 prin Labor Feedback by Work Order (16.20.1), iar cantit\u0103\u021bile finalizate prin Work Order Receipt (16.11), \u00een ambele cazuri sub form\u0103 de QDocs QXtend Inbound. Decizia de a trimite aceste date \u00eenapoi se ia \u00een etapa de definire a domeniului.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Un partener QAD ar trebui s\u0103 propun\u0103 QAD Advanced Scheduling sau SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, atunci c\u00e2nd clientul lucreaz\u0103 cu comenzi de produc\u021bie discret\u0103 \u0219i dore\u0219te un program func\u021bional cu capacitate finit\u0103 \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni. QAD descrie Advanced Scheduling ca pe un program pentru fiecare linie din fiecare fabric\u0103, prezentat al\u0103turi de DSCP Production Planning \u0219i Redzone (<a href=\"https:\/\/www.qad.com\/blog\/2024\/11\/supercharge-qad-redzone-with-production-planning-and-advanced-scheduling\">QAD<\/a>). SkyPlanner se conecteaz\u0103 prin QXtend, programeaz\u0103 fiecare utilaj, operator, unealt\u0103 \u0219i material, replanific\u0103 automat \u0219i permite un num\u0103r nelimitat de utilizatori, de la 199 \u20ac pe lun\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de a realiza integrarea?<\/summary>\n<p class=\"sp-faq__a\">Da. Perioada de testare gratuit\u0103 de 30 de zile permite utilizarea a p\u00e2n\u0103 la 20 de centre de lucru, cu importuri CSV sau Excel din QAD, f\u0103r\u0103 card bancar. <a href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea<\/a> sau <a href=\"\/ro\/contact-vanzari\/\">discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a> pentru definirea domeniului integr\u0103rii.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ QAD Adaptive ERP Ghid de integrare QAD Adaptive ERP pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare QAD Adaptive ERP arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze QAD Adaptive ERP la SkyPlanner APS, inclusiv \u00een cazul instal\u0103rilor mai vechi QAD Enterprise Edition \u0219i MFG\/PRO. SkyPlanner se integreaz\u0103 bidirec\u021bional &#8230; <a title=\"Ghid de integrare QAD Adaptive ERP pentru programarea produc\u021biei cu SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/qad-adaptive-erp\/ghid-de-integrare\/\" aria-label=\"Read more about Ghid de integrare QAD Adaptive ERP pentru programarea produc\u021biei cu SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106198,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106952","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ghid de integrare QAD APS pentru programarea produc\u021biei<\/title>\n<meta name=\"description\" content=\"QAD Adaptive ERP\u2013SkyPlanner APS: QXtend Inbound QDocs \u2192 Work Order Maintenance; evenimente QXtend Outbound, pontaje, mapare, sfaturi de proiect.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/qad-adaptive-erp\/ghid-de-integrare\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ghid de integrare QAD Adaptive ERP pentru programarea produc\u021biei cu SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"QAD Adaptive ERP\u2013SkyPlanner APS: QXtend Inbound QDocs \u2192 Work Order Maintenance; evenimente QXtend Outbound, pontaje, mapare, sfaturi de proiect.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/qad-adaptive-erp\/ghid-de-integrare\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/qad-adaptive-erp\\\/ghid-de-integrare\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/qad-adaptive-erp\\\/ghid-de-integrare\\\/\",\"name\":\"Ghid de integrare QAD APS pentru programarea produc\u021biei\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"QAD Adaptive ERP\u2013SkyPlanner APS: QXtend Inbound QDocs \u2192 Work Order Maintenance; evenimente QXtend Outbound, pontaje, mapare, sfaturi de proiect.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/qad-adaptive-erp\\\/ghid-de-integrare\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/qad-adaptive-erp\\\/ghid-de-integrare\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/qad-adaptive-erp\\\/ghid-de-integrare\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru QAD Adaptive ERP: programarea produc\u021biei cu capacitate finit\u0103\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/qad-adaptive-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Ghid de integrare QAD Adaptive ERP pentru programarea produc\u021biei cu SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ghid de integrare QAD APS pentru programarea produc\u021biei","description":"QAD Adaptive ERP\u2013SkyPlanner APS: QXtend Inbound QDocs \u2192 Work Order Maintenance; evenimente QXtend Outbound, pontaje, mapare, sfaturi de proiect.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/qad-adaptive-erp\/ghid-de-integrare\/","og_locale":"ro_RO","og_type":"article","og_title":"Ghid de integrare QAD Adaptive ERP pentru programarea produc\u021biei cu SkyPlanner APS","og_description":"QAD Adaptive ERP\u2013SkyPlanner APS: QXtend Inbound QDocs \u2192 Work Order Maintenance; evenimente QXtend Outbound, pontaje, mapare, sfaturi de proiect.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/qad-adaptive-erp\/ghid-de-integrare\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/qad-adaptive-erp\/ghid-de-integrare\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/qad-adaptive-erp\/ghid-de-integrare\/","name":"Ghid de integrare QAD APS pentru programarea produc\u021biei","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"QAD Adaptive ERP\u2013SkyPlanner APS: QXtend Inbound QDocs \u2192 Work Order Maintenance; evenimente QXtend Outbound, pontaje, mapare, sfaturi de proiect.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/qad-adaptive-erp\/ghid-de-integrare\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/qad-adaptive-erp\/ghid-de-integrare\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/qad-adaptive-erp\/ghid-de-integrare\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru QAD Adaptive ERP: programarea produc\u021biei cu capacitate finit\u0103","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/qad-adaptive-erp\/"},{"@type":"ListItem","position":5,"name":"Ghid de integrare QAD Adaptive ERP pentru programarea produc\u021biei cu SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ QAD Adaptive ERP Ghid de integrare QAD Adaptive ERP pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare QAD Adaptive ERP arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze QAD Adaptive ERP la SkyPlanner APS, inclusiv \u00een cazul instal\u0103rilor mai vechi QAD Enterprise Edition \u0219i MFG\/PRO. SkyPlanner se integreaz\u0103 bidirec\u021bional&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106952","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=106952"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106952\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106198"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=106952"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}