{"id":106894,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/oracle-fusion-cloud\/ghid-de-integrare\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"ghid-de-integrare","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/oracle-fusion-cloud\/ghid-de-integrare\/","title":{"rendered":"Ghid de integrare Oracle Fusion Cloud pentru programarea produc\u021biei cu SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ Oracle Fusion Cloud<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Ghid de integrare Oracle Fusion Cloud <span class=\"hl\">pentru programarea produc\u021biei cu SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Acest ghid de integrare Oracle Fusion Cloud le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze Oracle Fusion Cloud Manufacturing la SkyPlanner APS. Integrarea dintre SkyPlanner \u0219i Oracle Fusion Cloud este bidirec\u021bional\u0103 \u0219i folose\u0219te resursele REST proprii Oracle:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u00cen SkyPlanner sunt preluate comenzile de produc\u021bie \u0219i opera\u021biile acestora, defini\u021biile de fabrica\u021bie, centrele de lucru, resursele de produc\u021bie, calendarele, articolele, structurile de articole, stocurile disponibile \u0219i comenzile de achizi\u021bie.<\/li>\n\n\n<li>Datele planificate de \u00eenceput \u0219i de finalizare sunt trimise \u00eenapoi pentru fiecare opera\u021bie a comenzii de produc\u021bie.<\/li>\n\n\n<li>Confirm\u0103rile operatorilor sunt transmise \u00eenapoi \u00een Oracle \u0219i \u00eenregistrate ca tranzac\u021bii de opera\u021bii \u0219i de resurse.<\/li>\n\n\n<li>Webhook-urile SkyPlanner transmit modific\u0103rile programului pe m\u0103sur\u0103 ce apar.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 Oracle Fusion Cloud \u00een etapa de implementare \u0219i asigur\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een func\u021biune. Acest ghid se adreseaz\u0103 partenerilor \u0219i dezvoltatorilor care doresc s\u0103 participe la integrare sau s\u0103 dezvolte singuri solu\u021bii folosind REST API documentat al SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"oracle-fusion-cloud-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Interfe\u021bele de integrare Oracle Fusion Cloud<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Oracle Fusion Cloud ofer\u0103 unui sistem extern de programare a produc\u021biei trei c\u0103i de transfer al datelor:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>REST API pentru Oracle Fusion Cloud SCM.<\/strong> Calea de baz\u0103 este <code>\/fscmRestApi\/resources\/11.13.18.05\/<\/code>. Un sistem de programare a produc\u021biei folose\u0219te resursele <code>workOrders<\/code> (cu resursele subordonate <code>WorkOrderOperation<\/code>, <code>WorkOrderOperationResource<\/code> \u0219i <code>WorkOrderOperationMaterial<\/code>), <code>processWorkOrders<\/code>, <code>workDefinitions<\/code>, <code>workCenters<\/code>, <code>productionResources<\/code>, <code>calendars<\/code>, <code>itemsV2<\/code>, <code>itemStructures<\/code> \u0219i <code>inventoryOnhandBalances<\/code>. Progresul este \u00eenregistrat prin <code>operationTransactions<\/code>, <code>resourceTransactions<\/code> \u0219i <code>materialTransactions<\/code>. Comenzile de achizi\u021bie sunt preluate din <code>purchaseOrders<\/code>, prin Procurement REST API. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fasrp\/rest-endpoints.html\">Endpointuri REST<\/a>)<\/li>\n\n\n<li><strong>File-Based Data Import (FBDI).<\/strong> Procesul Import Work Orders creeaz\u0103 sau actualizeaz\u0103 comenzile de produc\u021bie, \u00eempreun\u0103 cu opera\u021biile \u0219i resursele aferente, pe baza unui \u0219ablon, iar Import Work Order Resource Transactions \u00eencarc\u0103 \u00eenregistr\u0103rile de resurse. Oracle precizeaz\u0103 clar limita privind timpul de import: &#8220;This option isn&#8217;t suitable for importing manufacturing data on a real-time basis.&#8221; (Aceast\u0103 op\u021biune nu este potrivit\u0103 pentru importul datelor de produc\u021bie \u00een timp real.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/faips\/mfg-file-based-data-import-fbdi.html\">surs\u0103<\/a>)<\/li>\n\n\n<li><strong>Oracle Integration (OIC).<\/strong> Platforma de integrare Oracle gestioneaz\u0103 fluxurile dintre Fusion \u0219i alte sisteme. O re\u021bet\u0103 de integrare Oracle Integration urm\u0103re\u0219te evenimentul Work Order Status Change din Oracle Fusion Cloud Manufacturing (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/paas\/integration-cloud\/sync-kanban-scm\/index.html\">surs\u0103<\/a>). Folosi\u021bi aceast\u0103 variant\u0103 dac\u0103 firma dumneavoastr\u0103 utilizeaz\u0103 deja OIC.<\/li>\n\n<\/ol>\n\n\n<p>Pentru programarea produc\u021biei \u00een timp real, REST este calea principal\u0103. FBDI este potrivit pentru \u00eenc\u0103rcarea ini\u021bial\u0103 a nomenclatoarelor.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentificare \u0219i acces<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Securitatea Oracle REST.<\/strong> &#8220;Fusion Applications REST APIs use a global Oracle Web Services Manager (OWSM) security policy called Multi Token Over SSL RESTful Service Policy.&#8221; (Interfe\u021bele REST API din Fusion Applications folosesc o politic\u0103 global\u0103 de securitate Oracle Web Services Manager (OWSM), numit\u0103 Multi Token Over SSL RESTful Service Policy.) Aceasta accept\u0103 autentificarea Basic prin SSL \u0219i autentificarea pe baz\u0103 de token, de exemplu cu un token bearer SAML 2.0. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fasrp\/Quick_Start.html\">Ghid de pornire rapid\u0103<\/a>)<\/li>\n\n\n<li><strong>Utilizator pentru integrare.<\/strong> Crea\u021bi un utilizator Oracle dedicat integr\u0103rii, cu roluri care acord\u0103 drepturile necesare pentru comenzile de produc\u021bie, defini\u021biile de fabrica\u021bie, stocuri \u0219i tranzac\u021bii. Limita\u021bi accesul la organiza\u021biile de produc\u021bie incluse \u00een proiect.<\/li>\n\n\n<li><strong>Paginare.<\/strong> Oracle limiteaz\u0103 num\u0103rul de \u00eenregistr\u0103ri returnate de un singur apel SCM REST. Citi\u021bi datele folosind <code>limit<\/code> \u0219i <code>offset<\/code> \u0219i filtra\u021bi dup\u0103 organiza\u021bie \u0219i stare (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/faips\/scm-rest-services.html\">surs\u0103<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>\u00cen SkyPlanner, autentificarea la REST API se face cu un token API transmis \u00een antetul <code>Authorization-Token<\/code> (SkyPlanner Settings &gt; API), iar documenta\u021bia este disponibil\u0103 \u00een Swagger\/OpenAPI. <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">Tutorialul de integrare<\/a> explic\u0103 pas cu pas primele apeluri.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Evenimente \u0219i interog\u0103ri periodice<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Datele din Oracle sunt preluate prin interog\u0103ri periodice. Interog\u0103rile REST filtrate preiau comenzile de produc\u021bie noi \u0219i modificate, trecerile la starea de lansare, stocurile disponibile \u0219i comenzile de achizi\u021bie. Frecven\u021ba se stabile\u0219te pentru fiecare fabric\u0103: de la c\u00e2teva minute pentru comenzile de produc\u021bie la o or\u0103 pentru stocuri. Dac\u0103 utiliza\u021bi Oracle Integration, evenimentul Work Order Status Change poate declan\u0219a o citire imediat\u0103.<\/p>\n\n\n<p>SkyPlanner trimite webhookuri c\u00e2nd se modific\u0103 starea sau programul de produc\u021bie, astfel c\u0103 transmiterea datelor \u00eenapoi este declan\u0219at\u0103 de evenimente.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Maparea datelor<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Obiect Oracle Fusion Cloud (resurs\u0103 REST)<\/th><th>Obiect SkyPlanner<\/th><th>Direc\u021bie<\/th><th>Frecven\u021b\u0103<\/th><\/tr><\/thead><tbody><tr><td>Articole (<code>itemsV2<\/code>), unit\u0103\u021bi de m\u0103sur\u0103<\/td><td>Produse \u0219i materiale<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi interog\u0103ri periodice<\/td><\/tr><tr><td>Structuri de articole (<code>itemStructures<\/code>)<\/td><td>Structura produsului, subproduse, materiale pentru fiecare produs<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td>Defini\u021bii de fabrica\u021bie (<code>workDefinitions<\/code>): opera\u021bii, resursele opera\u021biilor, consum, Basis Type<\/td><td>Etape de proces cu durate, timpi de preg\u0103tire \u0219i de \u00eencheiere<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td>Centre de lucru (<code>workCenters<\/code>), resurse de produc\u021bie (<code>productionResources<\/code>) pentru utilaje \u0219i for\u021b\u0103 de munc\u0103<\/td><td>Centre de lucru, grupuri de centre de lucru, personal, coeficien\u021bi de eficien\u021b\u0103<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, rareori ulterior<\/td><\/tr><tr><td>Calendare \u0219i schimburi (<code>calendars<\/code>, excep\u021bii de la programul schimburilor)<\/td><td>Schimburi \u0219i zile nelucr\u0103toare<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Zilnic sau gestionarea schimburilor \u00een SkyPlanner<\/td><\/tr><tr><td>Organiza\u021bii de produc\u021bie<\/td><td>Grupuri de centre de lucru pentru fiecare fabric\u0103<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103<\/td><\/tr><tr><td>Comenzi de produc\u021bie (<code>workOrders<\/code>, <code>processWorkOrders<\/code>) cu <code>WorkOrderOperation<\/code> \u0219i <code>WorkOrderOperationMaterial<\/code><\/td><td>Comenzi \u0219i opera\u021bii cu termene \u0219i necesar de materiale<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Interog\u0103ri la fiecare c\u00e2teva minute<\/td><\/tr><tr><td>Stocuri disponibile (<code>inventoryOnhandBalances<\/code>)<\/td><td>Stocuri<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Interog\u0103ri la fiecare or\u0103 sau la generarea programului de produc\u021bie<\/td><\/tr><tr><td>Comenzi de achizi\u021bie (<code>purchaseOrders<\/code>) cu date de livrare promise<\/td><td>Comenzi de achizi\u021bie, materiale de primit \u00een func\u021bie de data livr\u0103rii<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Interog\u0103ri la fiecare or\u0103 sau la generarea programului de produc\u021bie<\/td><\/tr><tr><td><code>WorkOrderOperation<\/code> <code>PlannedStartDate<\/code>, <code>PlannedCompletionDate<\/code> (PATCH)<\/td><td>\u00cenceputul \u0219i sf\u00e2r\u0219itul planificate pentru fiecare opera\u021bie<\/td><td>SkyPlanner \u2192 Oracle<\/td><td>La modificarea programului, prin webhook SkyPlanner<\/td><\/tr><tr><td>Datele din <code>WorkOrderOperationResource<\/code> (PATCH)<\/td><td>Alocarea resurselor pentru fiecare opera\u021bie<\/td><td>SkyPlanner \u2192 Oracle<\/td><td>La modificarea programului, dac\u0103 se alege aceast\u0103 op\u021biune<\/td><\/tr><tr><td><code>operationTransactions<\/code> (POST)<\/td><td>Cantit\u0103\u021bi finalizate pentru fiecare opera\u021bie<\/td><td>SkyPlanner \u2192 Oracle<\/td><td>La fiecare confirmare<\/td><\/tr><tr><td><code>resourceTransactions<\/code> (POST)<\/td><td>\u00cenregistr\u0103ri de timp: timp de munc\u0103 \u0219i timp de func\u021bionare a utilajelor<\/td><td>SkyPlanner \u2192 Oracle<\/td><td>La fiecare confirmare sau schimb, dac\u0103 se alege aceast\u0103 op\u021biune<\/td><\/tr><tr><td>Nu exist\u0103 \u00een Oracle Fusion Cloud<\/td><td>Matricea timpilor de preg\u0103tire, scule ca resurse cu capacitate finit\u0103, utilaje \u0219i personal alternativ<\/td><td>Gestionate \u00een SkyPlanner<\/td><td>Configurate \u00een etapa de implementare<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Modele de integrare<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00cenc\u0103rcarea ini\u021bial\u0103 a nomenclatoarelor.<\/strong> Citi\u021bi articolele, structurile de articole, defini\u021biile de fabrica\u021bie, centrele de lucru, resursele de produc\u021bie \u0219i calendarele prin REST sau \u00eenc\u0103rca\u021bi-le o singur\u0103 dat\u0103 din extrase FBDI. Stabili\u021bi cu aten\u021bie maparea centrelor de lucru: un centru de lucru cu patru utilaje asociate aceleia\u0219i resurse devine un grup de centre de lucru sau patru centre de lucru. Fiecare organiza\u021bie de produc\u021bie devine un grup de centre de lucru, astfel \u00eenc\u00e2t toate fabricile sunt cuprinse \u00eentr-un singur plan.<\/p>\n\n\n<p><strong>2. Sincronizarea comenzilor de produc\u021bie.<\/strong> Citi\u021bi comenzile de produc\u021bie lansate \u0219i nelansate, cu opera\u021biile \u0219i materialele aferente, precum \u0219i comenzile de achizi\u021bie deschise. SkyPlanner consider\u0103 materialul comandat disponibil la data de livrare a comenzii de achizi\u021bie \u0219i actualizeaz\u0103 stocul c\u00e2nd aceasta este marcat\u0103 cu starea Delivered.<\/p>\n\n\n<p>Programa\u021bi comenzile de produc\u021bie, nu comenzile planificate din Supply Planning. Comenzile planificate trebuie mai \u00eent\u00e2i transformate \u00een comenzi de produc\u021bie \u00een Oracle.<\/p>\n\n\n<p><strong>3. Scrierea programului \u00eenapoi \u00een Oracle.<\/strong> C\u00e2nd motorul programeaz\u0103 sau mut\u0103 o opera\u021bie, un webhook SkyPlanner declan\u0219eaz\u0103 un apel PATCH pe <code>workOrders\/{WorkOrderId}\/child\/WorkOrderOperation\/{WorkOrderOperationId}<\/code>, cu <code>PlannedStartDate<\/code> \u0219i <code>PlannedCompletionDate<\/code>. Se aplic\u0103 regula Oracle: &#8220;The planned start date must not occur before the start date of the work order or after the finish date of the work order.&#8221; (Data planificat\u0103 de \u00eenceput nu poate fi anterioar\u0103 datei de \u00eenceput a comenzii de produc\u021bie sau ulterioar\u0103 datei de finalizare a acesteia.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fasrp\/op-workorders-workorderid-child-workorderoperation-workorderoperationid-patch.html\">surs\u0103<\/a>) Prin urmare, c\u00e2nd noul program dep\u0103\u0219e\u0219te aceste limite, integrarea actualizeaz\u0103 prin PATCH mai \u00eent\u00e2i datele din antetul comenzii de produc\u021bie, apoi datele opera\u021biilor.<\/p>\n\n\n<p><strong>4. Confirm\u0103ri din produc\u021bie.<\/strong> Operatorii \u00ee\u0219i \u00eenregistreaz\u0103 activitatea cu SkyPlanner Mobile Confirmations sau Production Timer, iar \u00eenregistr\u0103rile de timp men\u021bin programul la zi. Cantit\u0103\u021bile finalizate sunt \u00eenregistrate prin <code>operationTransactions<\/code>, iar timpul de munc\u0103 \u0219i timpul de func\u021bionare a utilajelor, prin <code>resourceTransactions<\/code>. Dac\u0103 fabrica dumneavoastr\u0103 raporteaz\u0103 deja \u00een Oracle, SkyPlanner preia progresul de acolo.<\/p>\n\n\n<p><strong>5. Responsabilitatea pentru date \u0219i regulile de solu\u021bionare a conflictelor.<\/strong> Documenta\u021bi-le \u00eenainte de punerea \u00een produc\u021bie:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Date<\/th><th>Sistem responsabil<\/th><\/tr><\/thead><tbody><tr><td>Articole, structuri de articole, defini\u021bii de fabrica\u021bie, cantit\u0103\u021bi, starea comenzilor de produc\u021bie<\/td><td>Oracle Fusion Cloud<\/td><\/tr><tr><td>Succesiunea opera\u021biilor, momentele de \u00eenceput \u0219i de finalizare, alocarea resurselor<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matricea timpilor de preg\u0103tire \u0219i tranzi\u021bie, necesarul de scule \u0219i operatori, resurse alternative<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Schimburi \u0219i zile nelucr\u0103toare<\/td><td>Un singur sistem, ales la definirea domeniului<\/td><\/tr><tr><td>Tranzac\u021bii de resurse, opera\u021bii \u0219i materiale<\/td><td>Oracle, cu introducere direct\u0103 sau preluare din \u00eenregistr\u0103rile de timp SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Alege\u021bi un singur sistem care s\u0103 scrie datele opera\u021biilor. SkyPlanner nu are nevoie de un spa\u021biu de lucru pentru programare \u00een Oracle, a\u0219adar \u00eenlocuie\u0219te Production Scheduling la scrierea datelor planificate. Dac\u0103 Production Scheduling continu\u0103 s\u0103 lanseze programe de produc\u021bie, p\u0103stra\u021bi organiza\u021biile sale separate de cele programate de SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapele obi\u0219nuite ale proiectului<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementarea se finalizeaz\u0103 de regul\u0103 \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea procesului de configurare ini\u021bial\u0103, chiar \u0219i \u00een companiile mari. \u00cenainte de aceasta, valida\u021bi programul de produc\u021bie \u00een perioada de prob\u0103 gratuit\u0103 de 30 de zile, folosind centre de lucru, defini\u021bii de fabrica\u021bie \u0219i comenzi de produc\u021bie deschise, exportate din Oracle \u00een format CSV sau Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapare.<\/strong> Stabili\u021bi tabelul de coresponden\u021b\u0103, regulile privind sistemul responsabil de fiecare categorie de date, organiza\u021biile incluse, frecven\u021bele de sincronizare \u0219i dac\u0103 tranzac\u021biile vor fi trimise \u00eenapoi.<\/li>\n\n\n<li><strong>Acces la Oracle.<\/strong> Crea\u021bi utilizatorul \u0219i rolurile pentru integrare. Testa\u021bi mai \u00eent\u00e2i \u00eentr-un mediu Oracle care nu este de produc\u021bie.<\/li>\n\n\n<li><strong>\u00cenc\u0103rcare ini\u021bial\u0103.<\/strong> Articole, structuri de articole, defini\u021bii de fabrica\u021bie, centre de lucru, resurse de produc\u021bie, calendare.<\/li>\n\n\n<li><strong>Sincronizarea comenzilor de produc\u021bie \u0219i de achizi\u021bie.<\/strong> Interogare periodic\u0103, cu filtre, paginare \u0219i re\u00eencerc\u0103ri.<\/li>\n\n\n<li><strong>Configurarea constr\u00e2ngerilor \u00een SkyPlanner.<\/strong> Matricea timpilor de preg\u0103tire \u0219i tranzi\u021bie, sculele, num\u0103rul de operatori pentru fiecare opera\u021bie \u0219i utilajele sau personalul alternativ.<\/li>\n\n\n<li><strong>Scrierea programului \u00eenapoi \u00een Oracle.<\/strong> Cereri PATCH declan\u0219ate de webhookurile SkyPlanner, plus tranzac\u021bii, dac\u0103 se opteaz\u0103 pentru acestea.<\/li>\n\n\n<li><strong>Testare \u00een paralel.<\/strong> Rula\u021bi SkyPlanner \u00een paralel cu planul actual, compara\u021bi datele calendaristice \u0219i corecta\u021bi nomenclatoarele.<\/li>\n\n\n<li><strong>Punere \u00een produc\u021bie.<\/strong> Activa\u021bi transferul datelor din SkyPlanner c\u0103tre Oracle, fabric\u0103 cu fabric\u0103, dup\u0103 ce datele corespund.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-an-oracle-fusion-cloud-integ\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce trebuie s\u0103 ave\u021bi \u00een vedere la integrarea cu Oracle Fusion Cloud<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Comportamentul implicit al motorului de programare.<\/strong> Motorul Oracle f\u0103r\u0103 constr\u00e2ngeri ruleaz\u0103 la creare \u0219i la &#8220;certain update actions&#8221; (anumite ac\u021biuni de actualizare). Testa\u021bi \u00een mediul dumneavoastr\u0103 ce actualiz\u0103ri recalculeaz\u0103 datele \u0219i asigura\u021bi-v\u0103 c\u0103 SkyPlanner r\u0103m\u00e2ne ultimul sistem care scrie datele opera\u021biilor.<\/li>\n\n\n<li><strong>Intervalele comenzilor de produc\u021bie.<\/strong> Datele opera\u021biilor trebuie s\u0103 se \u00eencadreze \u00eentre data de \u00eenceput \u0219i cea de finalizare a comenzii de produc\u021bie. Actualiza\u021bi mai \u00eent\u00e2i antetul prin PATCH.<\/li>\n\n\n<li><strong>Basis Type.<\/strong> Consumul de resurse este exprimat pe unitate doar c\u00e2nd Basis Type este Variable. Valoarea Fixed indic\u0103 un timp fix pe opera\u021bie. Face\u021bi conversia la import; altfel, toate duratele vor fi gre\u0219ite.<\/li>\n\n\n<li><strong>Produc\u021bie discret\u0103 \u0219i de proces.<\/strong> Fabricile cu produc\u021bie discret\u0103 folosesc <code>workOrders<\/code>, iar cele cu produc\u021bie de proces folosesc <code>processWorkOrders<\/code>. Mapa\u021bi ambele resurse dac\u0103 utiliza\u021bi ambele tipuri de produc\u021bie.<\/li>\n\n\n<li><strong>Paginare.<\/strong> Oracle limiteaz\u0103 num\u0103rul de \u00eenregistr\u0103ri returnate la fiecare apel REST. Folosi\u021bi paginarea la fiecare interogare \u0219i filtra\u021bi dup\u0103 organiza\u021bie \u0219i stare.<\/li>\n\n\n<li><strong>Actualiz\u0103ri trimestriale.<\/strong> Oracle actualizeaz\u0103 Fusion \u00een fiecare trimestru. Fixa\u021bi versiunea REST \u00een calea de acces \u0219i repeta\u021bi testele dup\u0103 fiecare actualizare.<\/li>\n\n\n<li><strong>Reguli privind st\u0103rile.<\/strong> Comenzile de produc\u021bie cu starea Pending Approval sau \u00eenchise nu ar trebui s\u0103 primeasc\u0103 date calendaristice noi. Exclude\u021bi-le prin filtrare la citire.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-oracle-fusion-cl\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cine configureaz\u0103 \u0219i asigur\u0103 asisten\u021ba pentru integrarea cu Oracle Fusion Cloud<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Echipa SkyPlanner configureaz\u0103 integrarea \u00een etapa ini\u021bial\u0103 \u0219i asigur\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een produc\u021bie,<\/strong> pentru resursele REST \u0219i organiza\u021biile convenite. Fiecare fabric\u0103 folose\u0219te Oracle Fusion Cloud diferit, iar aceste cuno\u0219tin\u021be sunt valorificate \u00een configurarea integr\u0103rii.<\/li>\n\n\n<li><strong>Partenerul dumneavoastr\u0103 Oracle poate participa.<\/strong> Acesta v\u0103 cunoa\u0219te organiza\u021biile, rolurile \u0219i extensiile \u0219i poate configura utilizatorul de integrare, rolurile \u0219i eventualele fluxuri Oracle Integration al\u0103turi de echipa SkyPlanner.<\/li>\n\n\n<li><strong>Dezvoltatorii dumneavoastr\u0103 pot extinde integrarea<\/strong> folosind REST API al SkyPlanner \u0219i un token API. Pentru a \u00eencepe este suficient un token API, iar echipa SkyPlanner ofer\u0103 asisten\u021b\u0103 la nevoie. Consulta\u021bi <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">documenta\u021bia de integrare SkyPlanner<\/a> pentru detalii despre integrare.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse \u0219i facturare lunar\u0103. Oferta pentru integrare este stabilit\u0103 de la \u00eenceput, \u00een func\u021bie de procesele \u0219i nevoile dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul. Consulta\u021bi <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a>, pagina despre <a href=\"\/ro\/integrari\/erp\/oracle-fusion-cloud\/cu-capacitate-finita\/\">programarea cu capacitate finit\u0103 pentru Oracle Fusion Cloud<\/a>, <a href=\"\/ro\/integrari\/erp\/oracle-fusion-cloud\/\">pagina Oracle Fusion Cloud<\/a> \u0219i <a href=\"\/ro\/integrari\/erp\/\">sec\u021biunea de integr\u0103ri ERP<\/a>. Folosi\u021bi NetSuite? Consulta\u021bi <a href=\"\/ro\/integrari\/erp\/netsuite\/ghid-de-integrare\/\">ghidul de integrare cu NetSuite<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi proba gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een hala de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi m\u0103rturia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021ba produc\u021biei<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba produc\u021biei a crescut cu 90%, iar elaborarea unui plan optimizat pe trei luni pentru toate centrele de lucru dureaz\u0103 sub 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi m\u0103rturia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Vedere aerian\u0103 a fabricii Piristeel de sisteme de siguran\u021b\u0103 pentru acoperi\u0219uri din Kauhava\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>respectarea termenelor de livrare<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ne-a oferit vizibilitatea necesar\u0103 pentru a identifica blocajele \u0219i a adus mai mult\u0103 claritate \u00een gestionarea produc\u021biei.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, director de produc\u021bie<\/b><br>Piristeel \u00b7 Sisteme de siguran\u021b\u0103 pentru acoperi\u0219uri \u0219i sisteme pluviale<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a ajuns la 99,2% anul acesta, iar programarea produc\u021biei economise\u0219te p\u00e2n\u0103 la patru ore de lucru pe zi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/piristeel\/\">Citi\u021bi m\u0103rturia Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, director general al Mamec, \u00een hala de produc\u021bie a companiei din Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Mii (1.000+)<\/b><span> de comenzi de produc\u021bie programate automat<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eAvem un alt nivel de control asupra produc\u021biei, iar \u00een\u021belegerea capacit\u0103\u021bii noastre este la un nivel complet diferit.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, director general<\/b><br>Mamec \u00b7 Mixere industriale, pompe \u0219i produc\u021bie la comand\u0103 de \u00eenalt\u0103 tehnologie<\/p>\n\n\n<p class=\"ind-cust__result\">Mii de comenzi de produc\u021bie sunt programate automat, iar \u00eentreaga organiza\u021bie are o imagine \u00een timp real asupra produc\u021biei.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/mamec\/\">Citi\u021bi m\u0103rturia Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Oracle Fusion Cloud are un API pentru comenzile de produc\u021bie?<\/summary>\n<p class=\"sp-faq__a\">Da. REST API pentru Oracle Fusion Cloud SCM include <code>workOrders<\/code>, cu resurse subordonate pentru opera\u021bii, resurse \u0219i materiale, precum \u0219i <code>processWorkOrders<\/code> pentru produc\u021bia de proces. Sunt acceptate metodele GET, POST \u0219i PATCH.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum sunt transferate datele planificate din SkyPlanner \u00een Oracle Fusion Cloud?<\/summary>\n<p class=\"sp-faq__a\">Printr-o cerere PATCH asupra resursei <code>WorkOrderOperation<\/code> subordonate comenzii de produc\u021bie, care seteaz\u0103 <code>PlannedStartDate<\/code> \u0219i <code>PlannedCompletionDate<\/code>. Datele opera\u021biilor trebuie s\u0103 r\u0103m\u00e2n\u0103 \u00een intervalul comenzii de produc\u021bie, a\u0219a c\u0103 antetul este actualizat mai \u00eent\u00e2i prin PATCH, atunci c\u00e2nd este necesar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum ajung confirm\u0103rile operatorilor \u00een Oracle?<\/summary>\n<p class=\"sp-faq__a\">Cantit\u0103\u021bile finalizate sunt trimise c\u0103tre <code>operationTransactions<\/code>, iar timpul de lucru al personalului \u0219i al utilajelor c\u0103tre <code>resourceTransactions<\/code>. Ambele sunt resurse REST care accept\u0103 POST \u00een Fusion Manufacturing.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Oracle Fusion Cloud accept\u0103 webhookuri?<\/summary>\n<p class=\"sp-faq__a\">Fusion public\u0103 evenimente de business precum Work Order Status Change, la care Oracle Integration se poate abona. F\u0103r\u0103 Oracle Integration, integrarea interogheaz\u0103 periodic REST API la intervale stabilite pentru fiecare fabric\u0103. Webhookurile proprii SkyPlanner transmit modific\u0103rile programului de produc\u021bie pe m\u0103sur\u0103 ce apar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ce ar trebui s\u0103 propun\u0103 un partener Oracle: Oracle Production Scheduling sau SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, atunci c\u00e2nd clientul dore\u0219te un program unic pentru toate fabricile, care s\u0103 respecte capacitatea disponibil\u0103 \u0219i s\u0103 se men\u021bin\u0103 automat la zi. Production Scheduling se activeaz\u0103 \u00een cadrul ofertei Supply Chain Planning, calculeaz\u0103 programul separat pentru fiecare organiza\u021bie de programare \u0219i aplic\u0103 regulile de schimbare de fabrica\u021bie numai echipamentelor cu o singur\u0103 unitate (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/changeover-rules.html\">documenta\u021bia Oracle<\/a>). SkyPlanner se conecteaz\u0103 prin SCM REST API, reprogrameaz\u0103 automat produc\u021bia, planific\u0103 schimb\u0103rile de fabrica\u021bie, sculele, echipele \u0219i materialele \u0219i permite un num\u0103r nelimitat de utilizatori, de la 199 \u20ac pe lun\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de a dezvolta integrarea?<\/summary>\n<p class=\"sp-faq__a\">Da. Perioada de prob\u0103 gratuit\u0103 de 30 de zile permite utilizarea a p\u00e2n\u0103 la 20 de centre de lucru, cu importuri CSV sau Excel din Oracle, f\u0103r\u0103 a fi necesar un card de credit. <a href=\"\/ro\/proba\/\">\u00cencepe\u021bi proba gratuit\u0103<\/a> sau <a href=\"\/ro\/contact-vanzari\/\">discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a> pentru definirea domeniului integr\u0103rii.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ Oracle Fusion Cloud Ghid de integrare Oracle Fusion Cloud pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare Oracle Fusion Cloud le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze Oracle Fusion Cloud Manufacturing la SkyPlanner APS. Integrarea dintre SkyPlanner \u0219i Oracle Fusion Cloud este bidirec\u021bional\u0103 \u0219i folose\u0219te resursele REST &#8230; <a title=\"Ghid de integrare Oracle Fusion Cloud pentru programarea produc\u021biei cu SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/oracle-fusion-cloud\/ghid-de-integrare\/\" aria-label=\"Read more about Ghid de integrare Oracle Fusion Cloud pentru programarea produc\u021biei cu SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106169,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106894","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Oracle Cloud: ghid de integrare APS pentru programarea produc\u021biei<\/title>\n<meta name=\"description\" content=\"Oracle Fusion Cloud\u2013SkyPlanner APS: SCM REST API, workOrders PATCH pentru datele opera\u021biilor, tranzac\u021bii de opera\u021bii \u0219i resurse, mapare, sfaturi de proiect.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/oracle-fusion-cloud\/ghid-de-integrare\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ghid de integrare Oracle Fusion Cloud pentru programarea produc\u021biei cu SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Oracle Fusion Cloud\u2013SkyPlanner APS: SCM REST API, workOrders PATCH pentru datele opera\u021biilor, tranzac\u021bii de opera\u021bii \u0219i resurse, mapare, sfaturi de proiect.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/oracle-fusion-cloud\/ghid-de-integrare\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/oracle-fusion-cloud\\\/ghid-de-integrare\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/oracle-fusion-cloud\\\/ghid-de-integrare\\\/\",\"name\":\"Oracle Cloud: ghid de integrare APS pentru programarea produc\u021biei\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Oracle Fusion Cloud\u2013SkyPlanner APS: SCM REST API, workOrders PATCH pentru datele opera\u021biilor, tranzac\u021bii de opera\u021bii \u0219i resurse, mapare, sfaturi de proiect.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/oracle-fusion-cloud\\\/ghid-de-integrare\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/oracle-fusion-cloud\\\/ghid-de-integrare\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/oracle-fusion-cloud\\\/ghid-de-integrare\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru Oracle Fusion Cloud: programarea produc\u021biei cu capacitate finit\u0103\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/oracle-fusion-cloud\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Ghid de integrare Oracle Fusion Cloud pentru programarea produc\u021biei cu SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Oracle Cloud: ghid de integrare APS pentru programarea produc\u021biei","description":"Oracle Fusion Cloud\u2013SkyPlanner APS: SCM REST API, workOrders PATCH pentru datele opera\u021biilor, tranzac\u021bii de opera\u021bii \u0219i resurse, mapare, sfaturi de proiect.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/oracle-fusion-cloud\/ghid-de-integrare\/","og_locale":"ro_RO","og_type":"article","og_title":"Ghid de integrare Oracle Fusion Cloud pentru programarea produc\u021biei cu SkyPlanner APS","og_description":"Oracle Fusion Cloud\u2013SkyPlanner APS: SCM REST API, workOrders PATCH pentru datele opera\u021biilor, tranzac\u021bii de opera\u021bii \u0219i resurse, mapare, sfaturi de proiect.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/oracle-fusion-cloud\/ghid-de-integrare\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/oracle-fusion-cloud\/ghid-de-integrare\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/oracle-fusion-cloud\/ghid-de-integrare\/","name":"Oracle Cloud: ghid de integrare APS pentru programarea produc\u021biei","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Oracle Fusion Cloud\u2013SkyPlanner APS: SCM REST API, workOrders PATCH pentru datele opera\u021biilor, tranzac\u021bii de opera\u021bii \u0219i resurse, mapare, sfaturi de proiect.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/oracle-fusion-cloud\/ghid-de-integrare\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/oracle-fusion-cloud\/ghid-de-integrare\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/oracle-fusion-cloud\/ghid-de-integrare\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru Oracle Fusion Cloud: programarea produc\u021biei cu capacitate finit\u0103","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/oracle-fusion-cloud\/"},{"@type":"ListItem","position":5,"name":"Ghid de integrare Oracle Fusion Cloud pentru programarea produc\u021biei cu SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ Oracle Fusion Cloud Ghid de integrare Oracle Fusion Cloud pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare Oracle Fusion Cloud le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze Oracle Fusion Cloud Manufacturing la SkyPlanner APS. Integrarea dintre SkyPlanner \u0219i Oracle Fusion Cloud este bidirec\u021bional\u0103 \u0219i folose\u0219te resursele REST&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106894","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=106894"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106894\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106169"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=106894"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}