{"id":106633,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/sylob\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"sylob","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sylob\/","title":{"rendered":"SkyPlanner APS pentru Sylob ERP: programarea produc\u021biei cu capacitate finit\u0103"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ Sylob<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS pentru Sylob ERP: <span class=\"hl\">programarea produc\u021biei cu capacitate finit\u0103<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS este o extensie pentru Sylob ERP care asigur\u0103 programarea cu capacitate finit\u0103 a fiec\u0103rui utilaj, operator, fiec\u0103rei scule \u0219i fiec\u0103rui material. Vede\u021bi ce ordin de fabrica\u021bie (ordre de fabrication, OF) se execut\u0103, pe ce centru de lucru \u0219i c\u00e2nd, iar Autopilot reface automat programul c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner se integreaz\u0103 bidirec\u021bional cu Sylob ERP: preia ordinele de fabrica\u021bie OF cu opera\u021biile lor, rutele tehnologice (gammes), centrele de lucru (centres de charge), stocurile \u0219i comenzile de achizi\u021bie \u0219i trimite \u00eenapoi datele programate ale opera\u021biilor, centrele de lucru \u0219i raport\u0103rile operatorilor. Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 Sylob \u00een etapa de implementare ini\u021bial\u0103.<\/p>\n\n\n<p>Pre\u021bul porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, iar fiecare centru de lucru suplimentar cost\u0103 20 \u20ac pe lun\u0103. Perioada de testare gratuit\u0103 dureaz\u0103 30 de zile, cu p\u00e2n\u0103 la 20 de centre de lucru, f\u0103r\u0103 card de credit.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce se schimb\u0103 \u00een produc\u021bia dumneavoastr\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Capacitate finit\u0103 pentru toate resursele, simultan.<\/p>\n\n\n<p class=\"fx-pain__b\">Fiecare utilaj, persoan\u0103 \u0219i scul\u0103 are un program cu capacitate finit\u0103, care \u021bine cont de schimburile reale, absen\u021be \u0219i ore suplimentare. Un centru de lucru cu trei utilaje execut\u0103 trei opera\u021bii \u00een paralel, f\u0103r\u0103 ca vreun utilaj s\u0103 fie supra\u00eenc\u0103rcat. C\u00e2nd un utilaj este complet ocupat, opera\u021biile sunt transferate c\u0103tre un alt utilaj sau o alt\u0103 persoan\u0103.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Termene de livrare pe care vi le pute\u021bi asuma.<\/p>\n\n\n<p class=\"fx-pain__b\">Fiecare OF prime\u0219te o dat\u0103 de finalizare planificat\u0103 pe baza capacit\u0103\u021bii reale. Echipa de v\u00e2nz\u0103ri r\u0103spunde clien\u021bilor pe baza programului, nu a termenului cerut, folosit la programarea \u00een sens invers.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprogramare automat\u0103 c\u00e2nd apar schimb\u0103ri.<\/p>\n\n\n<p class=\"fx-pain__b\">C\u00e2nd un utilaj se opre\u0219te, sose\u0219te o comand\u0103 urgent\u0103 sau o opera\u021bie se \u00eencheie mai devreme, Autopilot reprogrameaz\u0103 automat. Bloc\u0103rile \u0219i priorit\u0103\u021bile stabilite de dumneavoastr\u0103 sunt respectate \u00een continuare.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Mai pu\u021bine schimb\u0103ri de fabrica\u021bie.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner cunoa\u0219te timpul de reglaj pentru trecerea de la un produs la altul, \u00een ambele sensuri. Trecerea de la albastru la ro\u0219u poate dura 30 de minute, iar de la ro\u0219u la albastru, 60. Motorul ordoneaz\u0103 opera\u021biile astfel \u00eenc\u00e2t s\u0103 se piard\u0103 c\u00e2t mai pu\u021bin timp.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Programare care \u021bine cont de sculele \u0219i echipele comune.<\/p>\n\n\n<p class=\"fx-pain__b\">O matri\u021b\u0103 sau un dispozitiv de fixare folosit pe un utilaj nu este niciodat\u0103 rezervat simultan pe altul. Pentru o opera\u021bie care necesit\u0103 trei operatori sunt alocate trei persoane disponibile \u00een schimburile respective.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materiale verificate \u00eenainte de \u00eenceperea lucrului.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner programeaz\u0103 opera\u021biile pe baza stocurilor \u0219i a comenzilor de achizi\u021bie deschise (commandes fournisseurs) din Sylob. O opera\u021bie care a\u0219teapt\u0103 o livrare de la furnizor este programat\u0103 dup\u0103 data livr\u0103rii, \u00een loc s\u0103 r\u0103m\u00e2n\u0103 blocat\u0103 la utilaj.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatorii \u00ee\u0219i v\u0103d lista de opera\u021bii.<\/p>\n\n\n<p class=\"fx-pain__b\">Fiecare operator vede pe telefon sau tablet\u0103 opera\u021biile care urmeaz\u0103 \u0219i \u00eenregistreaz\u0103 activitatea pe m\u0103sur\u0103 ce o execut\u0103. Personalul de la birou urm\u0103re\u0219te progresul \u00een timp real, iar raport\u0103rile sunt trimise \u00eenapoi \u00een Sylob.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een sec\u021bia de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Timpul de lucru dedicat planific\u0103rii produc\u021biei se reduce cu 2 ore \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de opera\u021bii ajunge pe linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi recenzia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui plan optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi recenzia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Un sudor KJH-Comp polizeaz\u0103 o structur\u0103 sudat\u0103 din o\u021bel la fabrica din Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>respectarea termenelor de livrare, \u00een cre\u0219tere de la aproximativ 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner joac\u0103 un rol decisiv \u00een men\u021binerea nivelului nostru de respectare a termenelor de livrare.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, director general<\/b><br>KJH-Comp \u00b7 Prelucrarea tablei \u0219i produc\u021bie \u00een regim de subcontractare<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a crescut de la aproximativ 50% p\u00e2n\u0103 la 98%, iar de programare se ocup\u0103 acum un singur responsabil de produc\u021bie, \u00een loc de doi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/kjh-comp\/\">Citi\u021bi m\u0103rturia KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Vedere aerian\u0103 a fabricii Piristeel din Kauhava, unde se produc sisteme de siguran\u021b\u0103 pentru acoperi\u0219uri\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>respectarea termenelor de livrare<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ne-a oferit vizibilitatea necesar\u0103 pentru a identifica blocajele \u0219i a adus mai mult\u0103 claritate \u00een gestionarea produc\u021biei.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, director de produc\u021bie<\/b><br>Piristeel \u00b7 Sisteme de siguran\u021b\u0103 pentru acoperi\u0219uri \u0219i sisteme pluviale<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a ajuns la 99,2% anul acesta, iar programarea economise\u0219te p\u00e2n\u0103 la patru ore de lucru pe zi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/piristeel\/\">Citi\u021bi m\u0103rturia Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-sylob-erp-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum func\u021bioneaz\u0103 integrarea cu Sylob ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Sylob transmite lucr\u0103rile de executat.<\/strong> Ordinele de fabrica\u021bie OF ferme sunt preluate \u00een SkyPlanner \u00eempreun\u0103 cu opera\u021biile, centrele de lucru, timpii de reglaj \u0219i de execu\u021bie, precum \u0219i cu stocurile \u0219i comenzile de achizi\u021bie.<\/li>\n\n\n<li><strong>SkyPlanner creeaz\u0103 programul \u0219i \u00eel men\u021bine la zi.<\/strong> Motorul Arcturus programeaz\u0103 \u00een c\u00e2teva secunde fiecare opera\u021bie pe fiecare centru de lucru \u0219i reface programul pe m\u0103sur\u0103 ce apar schimb\u0103ri \u00een produc\u021bie.<\/li>\n\n\n<li><strong>Datele \u0219i raport\u0103rile sunt trimise \u00eenapoi.<\/strong> Webhook-urile SkyPlanner transmit fiecare modificare a programului imediat ce apare. Pentru fiecare opera\u021bie a unui OF din Sylob sunt trimise \u00eenapoi \u00eenceputul \u0219i sf\u00e2r\u0219itul programate \u0219i centrul de lucru, iar \u00eenregistr\u0103rile de timp ale operatorilor devin raport\u0103ri de produc\u021bie (d\u00e9clarations de production).<\/li>\n\n<\/ol>\n\n\n<p>Integrarea folose\u0219te interfe\u021bele REST API publice ale Sylob. SkyPlanner cite\u0219te datele din Sylob prin interog\u0103ri salvate \u00een Syst\u00e8me d&#8217;information API \u0219i scrie datele \u00eenapoi prin ac\u021biuni din catalogul de ac\u021biuni Sylob, folosind Action API. Fiecare fabric\u0103 \u00ee\u0219i configureaz\u0103 diferit interog\u0103rile Sylob, rutele tehnologice \u0219i centrele de lucru, a\u0219a c\u0103 echipa SkyPlanner stabile\u0219te coresponden\u021bele dintre obiectele dumneavoastr\u0103 \u00een etapa de implementare ini\u021bial\u0103 \u0219i asigur\u0103 suportul pentru integrare dup\u0103 punerea \u00een func\u021biune. Primi\u021bi de la \u00eenceput o ofert\u0103 pentru integrare, adaptat\u0103 procesului \u0219i nevoilor dumneavoastr\u0103. Partenerul dumneavoastr\u0103 Sylob sau propriii dezvoltatori pot construi, de asemenea, o integrare folosind API-ul documentat al SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia API<\/a>).<\/p>\n\n\n<p>Interog\u0103rile, ac\u021biunile, autentificarea \u0219i coresponden\u021bele dintre c\u00e2mpuri sunt explicate \u00een <a href=\"\/ro\/integrari\/erp\/sylob\/ghid-de-integrare\/\">ghidul de integrare cu Sylob ERP pentru programarea produc\u021biei<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-sylob-erp-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce date se transfer\u0103 \u00eentre Sylob ERP \u0219i SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Sylob ERP<\/th><th>SkyPlanner<\/th><th>Sensul transferului<\/th><\/tr><\/thead><tbody><tr><td>Article (achizi\u021bionat sau fabricat)<\/td><td>Produse \u0219i materiale<\/td><td>Spre SkyPlanner<\/td><\/tr><tr><td>Nomenclature (BOM pe mai multe niveluri)<\/td><td>Structura produsului \u0219i materialele necesare pentru fiecare produs<\/td><td>Spre SkyPlanner<\/td><\/tr><tr><td>Gamme: opera\u021bii cu timpi de reglaj \u0219i de execu\u021bie<\/td><td>Etape de proces cu durate \u0219i timpi de reglaj<\/td><td>Spre SkyPlanner<\/td><\/tr><tr><td>Centre de charge: num\u0103rul de resurse, programul s\u0103pt\u0103m\u00e2nal standard (semaine type) \u0219i excep\u021biile<\/td><td>Centre de lucru, grupuri de centre de lucru, schimburi \u0219i absen\u021be<\/td><td>Spre SkyPlanner<\/td><\/tr><tr><td>Employ\u00e9s<\/td><td>Personalul \u0219i schimburile acestuia<\/td><td>Spre SkyPlanner<\/td><\/tr><tr><td>Ordre de fabrication (OF) cu cantitatea \u0219i termenul cerut<\/td><td>Comand\u0103 \u0219i opera\u021bii cu termen \u0219i prioritate<\/td><td>Spre SkyPlanner<\/td><\/tr><tr><td>Stoc pe loca\u021bii<\/td><td>Stoc de materiale<\/td><td>Spre SkyPlanner<\/td><\/tr><tr><td>Commande fournisseur cu data estimat\u0103 a recep\u021biei<\/td><td>Materiale de primit, disponibile la data livr\u0103rii<\/td><td>Spre SkyPlanner<\/td><\/tr><tr><td>Op\u00e9ration d&#8217;ordre de fabrication: \u00eenceputul \u0219i sf\u00e2r\u0219itul planificate, centrul de lucru<\/td><td>\u00cenceputul \u0219i sf\u00e2r\u0219itul programate \u0219i centrul de lucru pentru fiecare opera\u021bie<\/td><td>\u00cenapoi \u00een Sylob<\/td><\/tr><tr><td>D\u00e9claration de production: timp de reglaj, timp de execu\u021bie, cantitate realizat\u0103, rebuturi, opera\u021bie finalizat\u0103<\/td><td>Timpi \u0219i cantit\u0103\u021bi \u00eenregistrate de operatori<\/td><td>\u00cenapoi \u00een Sylob<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Matricele timpilor de preg\u0103tire \u0219i tranzi\u021bie, sculele ca resurse cu capacitate finit\u0103 \u0219i centrele de lucru alternative sunt gestionate \u00een SkyPlanner \u0219i configurate \u00een etapa de implementare ini\u021bial\u0103.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-sylob-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce programeaz\u0103 Sylob \u0219i ce aduce \u00een plus SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Sylob 9 acoper\u0103 mai multe niveluri de planificare: PIC, PDP, necesarul net (CBN), un plan de \u00eenc\u0103rcare pentru fiecare centru de lucru \u0219i programarea pe termen scurt. Documenta\u021bia Sylob descrie modul \u00een care este gestionat\u0103 capacitatea:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Tipul de capacitate al fiec\u0103rui centru de lucru.<\/strong> Fiecare centre de charge este configurat cu capacitate infinit\u0103 sau finit\u0103. \u00cen cazul capacit\u0103\u021bii infinite, opera\u021biile sunt plasate doar \u00een func\u021bie de datele necesare \u0219i mai multe se pot executa simultan. Supra\u00eenc\u0103rc\u0103rile apar astfel \u00een planul de \u00eenc\u0103rcare, pentru ca planificatorul s\u0103 le poat\u0103 echilibra. (<a href=\"https:\/\/forterro-fwe.atlassian.net\/wiki\/spaces\/S9KB\/pages\/31038889\/SUPFOR+-+Centres+de+charge\">Baza de cuno\u0219tin\u021be Forterro<\/a>)<\/li>\n\n\n<li><strong>O singur\u0103 opera\u021bie la un moment dat, \u00een cazul capacit\u0103\u021bii finite.<\/strong> &#8220;G\u00e9rer \u00e0 capacit\u00e9 finie implique qu&#8217;une seule op\u00e9ration est permise sur le centre de charge.&#8221; (Gestionarea cu capacitate finit\u0103 \u00eenseamn\u0103 c\u0103 este permis\u0103 o singur\u0103 opera\u021bie pe centrul de lucru.)<\/li>\n\n\n<li><strong>La \u00eenceput, capacitate infinit\u0103.<\/strong> \u00cen materialele de instruire, Sylob recomand\u0103 s\u0103 \u00eencepe\u021bi cu capacitate infinit\u0103, deoarece capacitatea finit\u0103 necesit\u0103 un planificator dedicat, date tehnice fiabile \u0219i raport\u0103ri de produc\u021bie c\u00e2t mai apropiate de timpul real.<\/li>\n\n\n<li><strong>Modific\u0103rile se aplic\u0103 dup\u0103 validare.<\/strong> \u00cen activit\u0103\u021bile de planificare, &#8220;Les modifications du planning sont r\u00e9percut\u00e9es en production uniquement lorsqu&#8217;elles sont valid\u00e9es.&#8221; (Modific\u0103rile programului ajung \u00een produc\u021bie numai dup\u0103 ce sunt validate de planificator.) (<a href=\"https:\/\/forterro-fwe.atlassian.net\/wiki\/spaces\/S9KB\/pages\/1549041665\/Nouvelle+interface+de+planification\">Forterro<\/a>)<\/li>\n\n\n<li><strong>Optimizare \u00eentr-un APS separat.<\/strong> Pentru programarea cu capacitate finit\u0103, cu respectarea constr\u00e2ngerilor \u0219i simularea scenariilor, Sylob ofer\u0103 CADPLAN, &#8220;qui s&#8217;interface parfaitement \u00e0 l&#8217;ERP Sylob et le compl\u00e8te&#8221; (care se integreaz\u0103 perfect cu Sylob ERP \u0219i \u00eel completeaz\u0103). (<a href=\"https:\/\/www.sylob.com\/fr\/fonctionnalites\/planification-aps\">Sylob<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>A\u0219adar, o fabric\u0103 ce dore\u0219te un singur program cu capacitate finit\u0103 pentru \u00eentreaga sec\u021bie de produc\u021bie are nevoie de un instrument dedicat de programare, al\u0103turi de Sylob. Fiecare pas este explicat \u00een articolul <a href=\"\/ro\/integrari\/erp\/sylob\/cu-capacitate-finita\/\">Sylob ERP ofer\u0103 programare cu capacitate finit\u0103?<\/a>, iar principiile metodei sunt prezentate \u00een <a href=\"\/ro\/resurse\/capacitate-finita\/\">ghidul nostru de programare cu capacitate finit\u0103<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"sylob-erp-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Sylob ERP \u00een prezent \u0219i al\u0103turi de SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Planificarea \u00een Sylob (plan de charge \u0219i centre de lucru cu capacitate finit\u0103)<\/th><th>Sylob ERP cu SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Capacitate<\/td><td>Infinit\u0103 \u00een mod implicit; centrele cu capacitate finit\u0103 execut\u0103 o singur\u0103 opera\u021bie la un moment dat<\/td><td>Capacitate finit\u0103 pentru fiecare utilaj, persoan\u0103 \u0219i scul\u0103, \u021bin\u00e2nd cont de schimburi<\/td><\/tr><tr><td>Program<\/td><td>Se calculeaz\u0103 \u00eenc\u0103rcarea, apoi planificatorul mut\u0103 \u0219i valideaz\u0103 opera\u021biile<\/td><td>Program detaliat pe opera\u021bii, \u00een c\u00e2teva secunde<\/td><\/tr><tr><td>Schimb\u0103ri de fabrica\u021bie<\/td><td>Timp de reglaj pentru fiecare opera\u021bie din ruta tehnologic\u0103<\/td><td>Opera\u021bii ordonate pentru un timp total de reglaj minim<\/td><\/tr><tr><td>Resurse<\/td><td>Num\u0103rul de resurse pentru fiecare centru de lucru<\/td><td>Scule cu capacitate finit\u0103; personal alocat opera\u021biilor care necesit\u0103 mai mul\u021bi operatori<\/td><\/tr><tr><td>Materiale<\/td><td>Constr\u00e2ngere op\u021bional\u0103 privind componentele critice \u00een programarea cu capacitate finit\u0103<\/td><td>Opera\u021biile \u00eencep c\u00e2nd materialele sunt \u00een stoc sau c\u00e2nd sosesc livr\u0103rile aferente comenzilor de achizi\u021bie<\/td><\/tr><tr><td>Modific\u0103ri<\/td><td>Recalcularea \u00eenc\u0103rc\u0103rii, apoi verificare \u0219i validare<\/td><td>Autopilot reface programul respect\u00e2nd priorit\u0103\u021bile dumneavoastr\u0103<\/td><\/tr><tr><td>Sec\u021bia de produc\u021bie<\/td><td>Raport\u0103ri \u00een Sylob sau Sylob Apps<\/td><td>Lista de opera\u021bii a operatorului \u0219i \u00eenregistrarea activit\u0103\u021bii pe telefon sau tablet\u0103, cu raport\u0103ri trimise \u00eenapoi \u00een Sylob<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"choose-skyplanner-over-cadplan-when\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">C\u00e2nd s\u0103 alege\u021bi SkyPlanner \u00een loc de CADPLAN<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>CADPLAN este modulul APS al Sylob. Instruirea Forterro pentru utilizatori acoper\u0103 datele tehnologice proprii modulului (repere fabricate, faze, rute tehnologice), definirea simul\u0103rilor cu selectarea ordinelor de fabrica\u021bie OF \u0219i a ipotezelor, euristicile standard \u0219i editarea interactiv\u0103 a rezultatului. (<a href=\"https:\/\/forterro-fwe.atlassian.net\/wiki\/spaces\/S9KB\/pages\/31033777\/Programmes+de+formation\">Programul de instruire Forterro<\/a>) Sylob nu public\u0103 un pre\u021b pentru acest modul. SkyPlanner programeaz\u0103 \u00eentreaga fabric\u0103 pe baza ordinelor de fabrica\u021bie OF din Sylob, reface singur programul \u0219i este disponibil \u0219i \u00een sec\u021bia de produc\u021bie, la un pre\u021b public.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Dori\u021bi un program func\u021bional \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni.<\/strong> SkyPlanner este un software cloud care func\u021bioneaz\u0103 al\u0103turi de Sylob ERP. \u00cel testa\u021bi cu propriile ordine de fabrica\u021bie OF \u00een perioada de prob\u0103 de 30 de zile, iar implementarea se finalizeaz\u0103, \u00een mod normal, \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea configur\u0103rii ini\u021biale.<\/li>\n\n\n<li><strong>Planul se schimb\u0103 \u00een fiecare zi.<\/strong> Autopilot reface automat programarea la fiecare schimbare semnificativ\u0103, f\u0103r\u0103 ca un planificator s\u0103 defineasc\u0103 \u0219i s\u0103 ruleze o simulare, iar noile date sunt trimise \u00eenapoi \u00een Sylob.<\/li>\n\n\n<li><strong>Schimb\u0103rile de fabrica\u021bie determin\u0103 c\u00e2t produce\u021bi.<\/strong> Matricea timpilor de reglaj stocheaz\u0103 timpii de schimbare de fabrica\u021bie \u00eentre produse, \u00een func\u021bie de sensul trecerii de la un produs la altul, \u0219i ordoneaz\u0103 opera\u021biile astfel \u00eenc\u00e2t timpul total de reglaj s\u0103 fie minim.<\/li>\n\n\n<li><strong>Sculele, echipele \u0219i materialele decid ce urmeaz\u0103 \u00een produc\u021bie.<\/strong> Programarea \u021bine cont de disponibilitatea limitat\u0103 a fiec\u0103rui utilaj, a fiec\u0103rei persoane, scule \u0219i a fiec\u0103rui material. Opera\u021biilor care necesit\u0103 mai mul\u021bi operatori li se aloc\u0103 personalul necesar, se folosesc centre de lucru alternative, iar opera\u021biile \u00eencep doar c\u00e2nd materialele sunt disponibile din stoc sau din comenzile de achizi\u021bie.<\/li>\n\n\n<li><strong>Operatorii trebuie s\u0103 lucreze conform planului.<\/strong> Mobile Confirmations afi\u0219eaz\u0103 lista de opera\u021bii a fiec\u0103rui operator pe telefon sau tablet\u0103, iar raport\u0103rile de produc\u021bie sunt trimise \u00eenapoi \u00een Sylob.<\/li>\n\n\n<li><strong>Vre\u021bi s\u0103 cunoa\u0219te\u021bi costul total de la \u00eenceput.<\/strong> De la 199 \u20ac pe lun\u0103, cu integrare bidirec\u021bional\u0103 configurat\u0103 \u0219i sus\u021binut\u0103 de echipa SkyPlanner.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum \u00eencepe\u021bi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u00cencepe\u021bi testarea gratuit\u0103.<\/strong> 30 de zile, p\u00e2n\u0103 la 20 de centre de lucru, toate func\u021biile Basic, f\u0103r\u0103 card bancar.<\/li>\n\n\n<li><strong>Modela\u021bi-v\u0103 produc\u021bia.<\/strong> Ad\u0103uga\u021bi utilajele, personalul \u0219i schimburile \u00een SkyPlanner sau importa\u021bi-le. Pute\u021bi beneficia de asisten\u021b\u0103 la configurarea ini\u021bial\u0103.<\/li>\n\n\n<li><strong>\u00cenc\u0103rca\u021bi comenzile de fabrica\u021bie (OF).<\/strong> Exporta\u021bi comenzile OF deschise \u0219i opera\u021biile acestora \u00een CSV sau Excel printr-o interogare Sylob, importa\u021bi-le \u0219i compara\u021bi programul generat de SkyPlanner cu planul actual.<\/li>\n\n\n<li><strong>Conecta\u021bi Sylob ERP.<\/strong> Echipa SkyPlanner configureaz\u0103 integrarea bidirec\u021bional\u0103 \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 Sylob \u0219i asigur\u0103 suportul dup\u0103 punerea \u00een func\u021biune.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u021buri.<\/strong> Abonamentele se factureaz\u0103 lunar, pe centru de lucru. Pute\u021bi ad\u0103uga sau elimina centre de lucru ori anula abonamentul oric\u00e2nd. Consulta\u021bi pagina de <a href=\"\/ro\/preturi\/\">pre\u021buri<\/a> pentru detalii, pagina despre <a href=\"\/ro\/resurse\/ce-este-programarea-productiei\/\">programarea produc\u021biei<\/a> pentru metoda de lucru \u0219i <a href=\"\/ro\/integrari\/erp\/\">sec\u021biunea de integr\u0103ri ERP<\/a> pentru alte sisteme ERP.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Contacta\u021bi echipa de v\u00e2nz\u0103ri<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Care este cea mai bun\u0103 extensie de programare a produc\u021biei pentru Sylob ERP?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS este o extensie de programare cu capacitate finit\u0103, cu integrare bidirec\u021bional\u0103 \u00een Sylob ERP: preia comenzile de fabrica\u021bie (OF), gamele tehnologice, centrele de lucru, stocurile \u0219i comenzile de achizi\u021bie \u0219i trimite \u00eenapoi datele planificate ale opera\u021biilor, centrele de lucru \u0219i raport\u0103rile de produc\u021bie. Programarea \u021bine cont de disponibilitatea limitat\u0103 a fiec\u0103rui utilaj, operator, a fiec\u0103rei scule \u0219i a fiec\u0103rui material. O matrice a timpilor de reglaj, care \u021bine cont de sensul trecerii de la un produs la altul, ordoneaz\u0103 opera\u021biile pentru a minimiza timpul de reglaj. Autopilot reface automat programarea c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie. Pre\u021burile pornesc de la 199 \u20ac pe lun\u0103, iar perioada de testare gratuit\u0103 dureaz\u0103 30 de zile.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ce software de programare a produc\u021biei se integreaz\u0103 cu Sylob ERP?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS se integreaz\u0103 cu Sylob ERP prin interfe\u021bele REST API publice ale Sylob. Cite\u0219te comenzile de fabrica\u021bie (OF), opera\u021biile, centrele de lucru, stocurile \u0219i comenzile de achizi\u021bie din interog\u0103ri salvate \u0219i trimite \u00eenapoi datele planificate \u0219i raport\u0103rile prin catalogul de ac\u021biuni Sylob. Modulul APS propriu al Sylob este CADPLAN. Echipa SkyPlanner configureaz\u0103 integrarea \u00een etapa ini\u021bial\u0103 de implementare. Alternativ, partenerul dumneavoastr\u0103 Sylob sau dezvoltatorii o pot realiza folosind interfa\u021ba REST API a SkyPlanner.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Sylob ERP ofer\u0103 programare cu capacitate finit\u0103?<\/summary>\n<p class=\"sp-faq__a\">Da, la nivel de centru de lucru. Un centru de lucru poate fi configurat cu capacitate finit\u0103, caz \u00een care pe acesta se execut\u0103 o singur\u0103 opera\u021bie la un moment dat. Sylob recomand\u0103 s\u0103 \u00eencepe\u021bi cu capacitate infinit\u0103, deoarece programarea cu capacitate finit\u0103 necesit\u0103 un planificator dedicat, date tehnice fiabile \u0219i raport\u0103ri aproape \u00een timp real. SkyPlanner APS func\u021bioneaz\u0103 al\u0103turi de Sylob \u0219i programeaz\u0103 simultan toate utilajele, persoanele, sculele \u0219i materialele, \u021bin\u00e2nd cont de disponibilitatea lor limitat\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>S\u0103 alegem CADPLAN sau SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Alege\u021bi SkyPlanner dac\u0103 dori\u021bi un singur program pentru \u00eentreaga fabric\u0103, bazat pe capacitatea finit\u0103 \u0219i actualizat automat. CADPLAN \u00eei ofer\u0103 planificatorului simul\u0103ri, euristici \u0219i editare interactiv\u0103 pe baza propriilor date tehnologice. SkyPlanner programeaz\u0103 direct comenzile de fabrica\u021bie (OF) din Sylob, reface automat programarea la fiecare schimbare, planific\u0103 sculele, echipele, schimb\u0103rile de fabrica\u021bie \u0219i materialele \u0219i le afi\u0219eaz\u0103 operatorilor lista de opera\u021bii pe telefon. \u00cen perioada de testare vede\u021bi programul propriei produc\u021bii \u00eenainte de a lua o decizie.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner \u00eenlocuie\u0219te gestionarea produc\u021biei din Sylob?<\/summary>\n<p class=\"sp-faq__a\">Nu, o completeaz\u0103. Articolele, nomenclatoarele de materiale, gamele tehnologice, CBN, achizi\u021biile, stocurile, calitatea \u0219i finan\u021bele r\u0103m\u00e2n \u00een Sylob. SkyPlanner programeaz\u0103 comenzile de fabrica\u021bie (OF) \u00een func\u021bie de capacitatea real\u0103 \u0219i trimite \u00eenapoi datele planificate \u0219i raport\u0103rile de produc\u021bie.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>C\u00e2t cost\u0103 SkyPlanner pentru o fabric\u0103 ce folose\u0219te Sylob?<\/summary>\n<p class=\"sp-faq__a\">De la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, plus 20 \u20ac pe lun\u0103 pentru fiecare centru de lucru suplimentar. Un centru de lucru este o resurs\u0103 de produc\u021bie cu propria list\u0103 de opera\u021bii programate. Primi\u021bi de la \u00eenceput o ofert\u0103 pentru integrare, adaptat\u0103 procesului \u0219i nevoilor dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul, astfel \u00eenc\u00e2t s\u0103 cunoa\u0219te\u021bi costul total \u00eenainte de a \u00eencepe.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>C\u00e2t dureaz\u0103 implementarea?<\/summary>\n<p class=\"sp-faq__a\">Implementarea se finalizeaz\u0103, de regul\u0103, \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea configur\u0103rii ini\u021biale. Echipa stabile\u0219te coresponden\u021bele pentru gamele tehnologice \u0219i centrele de lucru, conecteaz\u0103 comenzile de fabrica\u021bie (OF) \u0219i comenzile de achizi\u021bie \u0219i trimite \u00eenapoi datele planificate. Totul este testat prin compara\u021bie cu planul actual \u00eenainte de punerea \u00een func\u021biune.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de integrarea cu Sylob ERP?<\/summary>\n<p class=\"sp-faq__a\">Da. \u00cen perioada de testare de 30 de zile, folosi\u021bi un export CSV sau Excel al comenzilor de fabrica\u021bie (OF) din Sylob. Vede\u021bi <a href=\"\/ro\/resurse\/capacitate-finita\/\">programarea cu capacitate finit\u0103<\/a> a propriei produc\u021bii \u00eenainte de \u00eenceperea oric\u0103ror lucr\u0103ri de integrare.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ Sylob SkyPlanner APS pentru Sylob ERP: programarea produc\u021biei cu capacitate finit\u0103 SkyPlanner APS este o extensie pentru Sylob ERP care asigur\u0103 programarea cu capacitate finit\u0103 a fiec\u0103rui utilaj, operator, fiec\u0103rei scule \u0219i fiec\u0103rui material. Vede\u021bi ce ordin de fabrica\u021bie (ordre de fabrication, OF) se execut\u0103, pe ce centru de lucru \u0219i &#8230; <a title=\"SkyPlanner APS pentru Sylob ERP: programarea produc\u021biei cu capacitate finit\u0103\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sylob\/\" aria-label=\"Read more about SkyPlanner APS pentru Sylob ERP: programarea produc\u021biei cu capacitate finit\u0103\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100697,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106633","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Sylob ERP: integrare APS pentru programare cu capacitate finit\u0103<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: programare cu capacitate finit\u0103 pentru Sylob ERP, integrare bidirec\u021bional\u0103: orice utilaj, operator, scul\u0103, material. De la 199 \u20ac\/lun\u0103.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sylob\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS pentru Sylob ERP: programarea produc\u021biei cu capacitate finit\u0103\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: programare cu capacitate finit\u0103 pentru Sylob ERP, integrare bidirec\u021bional\u0103: orice utilaj, operator, scul\u0103, material. De la 199 \u20ac\/lun\u0103.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sylob\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/sylob\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/sylob\\\/\",\"name\":\"Sylob ERP: integrare APS pentru programare cu capacitate finit\u0103\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS: programare cu capacitate finit\u0103 pentru Sylob ERP, integrare bidirec\u021bional\u0103: orice utilaj, operator, scul\u0103, material. De la 199 \u20ac\\\/lun\u0103.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/sylob\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/sylob\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/sylob\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru Sylob ERP: programarea produc\u021biei cu capacitate finit\u0103\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Sylob ERP: integrare APS pentru programare cu capacitate finit\u0103","description":"SkyPlanner APS: programare cu capacitate finit\u0103 pentru Sylob ERP, integrare bidirec\u021bional\u0103: orice utilaj, operator, scul\u0103, material. De la 199 \u20ac\/lun\u0103.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sylob\/","og_locale":"ro_RO","og_type":"article","og_title":"SkyPlanner APS pentru Sylob ERP: programarea produc\u021biei cu capacitate finit\u0103","og_description":"SkyPlanner APS: programare cu capacitate finit\u0103 pentru Sylob ERP, integrare bidirec\u021bional\u0103: orice utilaj, operator, scul\u0103, material. De la 199 \u20ac\/lun\u0103.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sylob\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sylob\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sylob\/","name":"Sylob ERP: integrare APS pentru programare cu capacitate finit\u0103","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS: programare cu capacitate finit\u0103 pentru Sylob ERP, integrare bidirec\u021bional\u0103: orice utilaj, operator, scul\u0103, material. De la 199 \u20ac\/lun\u0103.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sylob\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sylob\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sylob\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru Sylob ERP: programarea produc\u021biei cu capacitate finit\u0103"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ Sylob SkyPlanner APS pentru Sylob ERP: programarea produc\u021biei cu capacitate finit\u0103 SkyPlanner APS este o extensie pentru Sylob ERP care asigur\u0103 programarea cu capacitate finit\u0103 a fiec\u0103rui utilaj, operator, fiec\u0103rei scule \u0219i fiec\u0103rui material. Vede\u021bi ce ordin de fabrica\u021bie (ordre de fabrication, OF) se execut\u0103, pe ce centru de lucru \u0219i&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106633","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=106633"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106633\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/100697"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=106633"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}