{"id":106575,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/delmiaworks\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"delmiaworks","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/delmiaworks\/","title":{"rendered":"SkyPlanner APS pentru DELMIAWorks (IQMS): programarea produc\u021biei cu capacitate finit\u0103"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ DELMIAWorks<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS pentru DELMIAWorks (IQMS): <span class=\"hl\">programarea produc\u021biei cu capacitate finit\u0103<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS este o extensie pentru programare cu capacitate finit\u0103, destinat\u0103 DELMIAWorks, sistemul ERP cunoscut anterior ca IQMS. Programeaz\u0103 fiecare pres\u0103, matri\u021b\u0103, operator \u0219i material la ore precise. Arcturus optimizeaz\u0103 \u00eentregul plan \u00een c\u00e2teva secunde, iar Autopilot reface automat programul c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner se integreaz\u0103 bidirec\u021bional cu DELMIAWorks. Preia comenzile de produc\u021bie, Bills of Manufacturing cu opera\u021biile pentru piese, centrele de lucru, sculele \u0219i matri\u021bele, articolele de stoc \u0219i comenzile de achizi\u021bie. Transmite \u00eenapoi datele planificate de \u00eenceput \u0219i de sf\u00e2r\u0219it, centrul de lucru alocat, \u00eenregistr\u0103rile de produc\u021bie \u0219i pontajele pe opera\u021bii. \u00cen etapa de implementare, echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 DELMIAWorks.<\/p>\n\n\n<p>Pre\u021bul porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, iar fiecare centru de lucru suplimentar cost\u0103 20 \u20ac pe lun\u0103. Perioada de testare gratuit\u0103 dureaz\u0103 30 de zile \u0219i include p\u00e2n\u0103 la 20 de centre de lucru \u0219i toate func\u021biile Basic, f\u0103r\u0103 a necesita un card bancar.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce se schimb\u0103 \u00een produc\u021bia dumneavoastr\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Fiecare pres\u0103 are o succesiune de lucru realizabil\u0103.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner aloc\u0103 fiecare comand\u0103 de produc\u021bie unei anumite prese, unui extruder sau unei celule de asamblare, la o or\u0103 precis\u0103. Capacitatea este determinat\u0103 de schimburi, absen\u021be \u0219i ore suplimentare, astfel \u00eenc\u00e2t planul s\u0103 corespund\u0103 cu ceea ce poate executa sec\u021bia de produc\u021bie.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Schimb\u0103rile de matri\u021b\u0103 \u0219i de culoare cost\u0103 mai pu\u021bin.<\/p>\n\n\n<p class=\"fx-pain__b\">Matricea timpilor de preg\u0103tire con\u021bine timpul de schimbare de fabrica\u021bie \u00eentre fiecare pereche de produse, \u00een ambele sensuri. Trecerea de la albastru la ro\u0219u poate dura 30 de minute, \u00een timp ce trecerea de la ro\u0219u la albastru dureaz\u0103 60 de minute, deoarece cilindrul necesit\u0103 o purjare complet\u0103. Arcturus stabile\u0219te succesiunea care reduce la minimum timpul pierdut la nivelul tuturor preselor.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Matri\u021bele sunt resurse cu disponibilitate limitat\u0103.<\/p>\n\n\n<p class=\"fx-pain__b\">O matri\u021b\u0103 aflat\u0103 \u00eentr-o pres\u0103 nu este niciodat\u0103 rezervat\u0103 simultan pe o a doua pres\u0103. Piesele unei matri\u021be de familie sunt programate \u00eentr-o singur\u0103 opera\u021bie. C\u00e2nd presa preferat\u0103 este ocupat\u0103, opera\u021bia este mutat\u0103 pe o pres\u0103 alternativ\u0103, compatibil\u0103 cu matri\u021ba.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Echipele sunt programate \u00eempreun\u0103 cu utilajele.<\/p>\n\n\n<p class=\"fx-pain__b\">Unei opera\u021bii care necesit\u0103 trei operatori i se aloc\u0103 trei persoane disponibile \u00een schimburile respective. Reglorii de matri\u021be, tehnicienii de proces \u0219i operatorii preselor sunt programa\u021bi pe baza aceluia\u0219i plan.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">R\u0103\u0219ina \u0219i inser\u021biile sosesc \u00eenainte de \u00eenceperea opera\u021biei.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner verific\u0103 stocul \u0219i comenzile de achizi\u021bie \u00een curs pentru fiecare material. O comand\u0103 de produc\u021bie care a\u0219teapt\u0103 o livrare de r\u0103\u0219in\u0103 este programat\u0103 dup\u0103 data livr\u0103rii, nu lansat\u0103 \u0219i apoi oprit\u0103 la pres\u0103.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprogramare automat\u0103 \u00een caz de avarii \u0219i comenzi urgente.<\/p>\n\n\n<p class=\"fx-pain__b\">C\u00e2nd o pres\u0103 se defecteaz\u0103 sau sose\u0219te o comand\u0103 urgent\u0103, Autopilot reface programul. Running Time Lock fixeaz\u0103 opera\u021biile din urm\u0103toarele ore, astfel \u00eenc\u00e2t matri\u021bele deja montate s\u0103 r\u0103m\u00e2n\u0103 pe pozi\u021bie.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Fiecare operator vede lista de opera\u021bii de executat.<\/p>\n\n\n<p class=\"fx-pain__b\">Operatorii \u00ee\u0219i v\u0103d urm\u0103toarele opera\u021bii pe telefon sau tablet\u0103 \u0219i \u00eenregistreaz\u0103 activitatea pe m\u0103sur\u0103 ce lucreaz\u0103. Num\u0103rul de utilizatori este nelimitat, astfel \u00eenc\u00e2t toate schimburile lucreaz\u0103 dup\u0103 acela\u0219i plan.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een sec\u021bia de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Timpul de lucru dedicat planific\u0103rii produc\u021biei se reduce cu 2 ore \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de opera\u021bii ajunge pe linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi recenzia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui plan optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi recenzia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, director general Mamec, \u00een hala de produc\u021bie a companiei din Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Peste 1.000<\/b><span>de comenzi de produc\u021bie programate automat<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eAvem un alt nivel de control asupra produc\u021biei, iar \u00een\u021belegerea capacit\u0103\u021bii noastre a ajuns la un cu totul alt nivel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, director general<\/b><br>Mamec \u00b7 Mixere industriale, pompe \u0219i produc\u021bie de \u00eenalt\u0103 tehnologie pe baz\u0103 de contract<\/p>\n\n\n<p class=\"ind-cust__result\">Mii de comenzi de produc\u021bie sunt programate automat, iar \u00eentreaga organiza\u021bie are o imagine \u00een timp real asupra produc\u021biei.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/mamec\/\">Citi\u021bi recenzia Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>respectarea termenelor de livrare din 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ne ofer\u0103 vizibilitate asupra capacit\u0103\u021bii \u0219i face planificarea predictibil\u0103.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Produc\u021bie \u00een industria chimic\u0103 \u0219i alimentar\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Termenele de livrare au fost respectate \u00een propor\u021bie de 100% pe \u00eentreaga perioad\u0103 de utilizare a SkyPlanner, din 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/opes-corporation\/\">Citi\u021bi recenzia Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-delmiaworks-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum func\u021bioneaz\u0103 integrarea cu DELMIAWorks<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>DELMIAWorks transmite datele de produc\u021bie.<\/strong> Comenzile de produc\u021bie, Bills of Manufacturing cu opera\u021biile pentru piese, centrele de lucru, sculele \u0219i matri\u021bele, articolele de stoc, stocurile \u0219i comenzile de achizi\u021bie sunt preluate \u00een SkyPlanner.<\/li>\n\n\n<li><strong>SkyPlanner creeaz\u0103 programul \u0219i \u00eel men\u021bine actualizat.<\/strong> Arcturus programeaz\u0103 fiecare comand\u0103 de produc\u021bie pe fiecare pres\u0103 \u00een c\u00e2teva secunde \u0219i reface programul pe m\u0103sur\u0103 ce apar schimb\u0103ri \u00een produc\u021bie.<\/li>\n\n\n<li><strong>Datele, presele alocate \u0219i activitatea \u00eenregistrat\u0103 sunt transmise \u00eenapoi.<\/strong> Datele planificate de \u00eenceput \u0219i de sf\u00e2r\u0219it \u0219i centrul de lucru alocat sunt transmise \u00eenapoi c\u0103tre comenzile de produc\u021bie din DELMIAWorks. Piesele conforme sunt \u00eenscrise ca \u00eenregistr\u0103ri de produc\u021bie, iar timpii de preg\u0103tire \u0219i de execu\u021bie sunt \u00eenregistra\u021bi ca pontaje pe opera\u021bii.<\/li>\n\n<\/ol>\n\n\n<p>DELMIAWorks r\u0103m\u00e2ne sistemul de referin\u021b\u0103 pentru datele dumneavoastr\u0103. Articolele de stoc, BOM-urile, MRP, achizi\u021biile, calitatea, monitorizarea RealTime, calcula\u021bia costurilor \u0219i contabilitatea r\u0103m\u00e2n acolo unde sunt. SkyPlanner se ocup\u0103 de un singur lucru: succesiunea \u0219i programarea \u00een timp a fiec\u0103rei comenzi de produc\u021bie, pentru fiecare pres\u0103, matri\u021b\u0103 \u0219i operator.<\/p>\n\n\n<p>SkyPlanner cite\u0219te datele din DELMIAWorks prin DELMIAWorks WebAPI, care ofer\u0103 SDK-uri REST \u0219i GraphQL. Scrierea \u00eenapoi se face prin controlerele REST ale WebAPI: controlerul Manufacturing WorkOrders transmite datele planificate \u0219i centrul de lucru al fiec\u0103rei comenzi de produc\u021bie, AddProductionRecords \u00eenregistreaz\u0103 piesele conforme, iar apelurile pentru opera\u021bii din Time &amp; Attendance \u00eenregistreaz\u0103 manopera. C\u00e2mpurile exacte ale comenzilor de produc\u021bie sunt stabilite la definirea domeniului integr\u0103rii, \u00een etapa de implementare. Webhook-urile SkyPlanner transmit fiecare modificare a programului imediat ce apare, iar frecven\u021ba sincroniz\u0103rii cu DELMIAWorks se stabile\u0219te pentru fiecare fabric\u0103.<\/p>\n\n\n<p>Fiecare fabric\u0103 folose\u0219te DELMIAWorks diferit. De aceea, \u00een etapa de implementare, echipa SkyPlanner configureaz\u0103 integrarea prin REST API \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 \u0219i ofer\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een func\u021biune. Oferta de pre\u021b pentru integrare este stabilit\u0103 de la \u00eenceput, pe baza procesului \u0219i a nevoilor dumneavoastr\u0103. Partenerul dumneavoastr\u0103 DELMIAWorks sau propriii dezvoltatori pot, de asemenea, s\u0103 creeze integrarea folosind API-ul documentat al SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bie de referin\u021b\u0103 API<\/a>).<\/p>\n\n\n<p>Controlerele WebAPI, maparea datelor \u0219i regulile de scriere \u00eenapoi sunt descrise \u00een <a href=\"\/ro\/integrari\/erp\/delmiaworks\/ghid-de-integrare\/\">ghidul de integrare APS cu DELMIAWorks pentru programarea produc\u021biei<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-delmiaworks-schedules-and-what-skyplanner-a\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce programeaz\u0103 DELMIAWorks \u0219i ce adaug\u0103 SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>DELMIAWorks ofer\u0103 \u00eentr-adev\u0103r programare cu capacitate finit\u0103. Modulul s\u0103u Advanced Planning and Scheduling este &#8220;a core component&#8221; (o component\u0103 de baz\u0103) a sistemului ERP, iar <a href=\"https:\/\/www.solidworks.com\/product\/delmiaworks\/manufacturing-erp\/manufacturing\/scheduling\/aps-software\/\">pagina APS<\/a> a Dassault descrie modul de func\u021bionare:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u00cenc\u0103rcarea respect\u0103 reguli.<\/strong> Auto Load aloc\u0103 &#8220;work orders based on priority and &#8220;runs the best&#8221; machine information.&#8221; (comenzile de produc\u021bie pe baza priorit\u0103\u021bii \u0219i a informa\u021biilor despre utilajul pe care se execut\u0103 cel mai bine). Regulile sunt definite la nivelul Bill of Manufacturing.<\/li>\n\n\n<li><strong>Materialele \u0219i sculele sunt tratate ca excep\u021bii.<\/strong> &#8220;Exceptions lists&#8221; (listele de excep\u021bii) afi\u0219eaz\u0103 &#8220;materials and tools or other constraints associated with a work order that will be unavailable or need to be expedited.&#8221; (materialele \u0219i sculele ori alte constr\u00e2ngeri asociate unei comenzi de produc\u021bie care nu vor fi disponibile sau pentru care trebuie urgentat\u0103 aprovizionarea). Planificatorul intervine pe baza listei.<\/li>\n\n\n<li><strong>Programul pe termen scurt este protejat.<\/strong> &#8220;User-defined &#8220;time fences&#8221; protect the current schedule against repositioning.&#8221; (Intervalele de protec\u021bie definite de utilizator \u00eempiedic\u0103 mutarea opera\u021biilor din programul curent.)<\/li>\n\n\n<li><strong>Capacitatea este verificat\u0103 global.<\/strong> &#8220;Rough Cut Capacity Tools&#8221; (instrumentele de verificare global\u0103 a capacit\u0103\u021bii) compar\u0103 &#8220;work center daily and weekly required hours to available hours.&#8221; (orele necesare zilnic \u0219i s\u0103pt\u0103m\u00e2nal pentru centrul de lucru cu orele disponibile).<\/li>\n\n<\/ul>\n\n\n<p>\u00cen activitatea zilnic\u0103, planificatorul mut\u0103 comenzile de produc\u021bie \u00eentre centrele de lucru prin glisare, pentru a echilibra \u00eenc\u0103rcarea, \u0219i ruleaz\u0103 din nou Update Schedule \u0219i Auto Load dup\u0103 modific\u0103ri. SkyPlanner adaug\u0103 optimizarea \u00eentregului plan: Arcturus stabile\u0219te simultan succesiunea tuturor comenzilor de produc\u021bie pe toate presele. \u00cen aceea\u0219i rulare, \u021bine cont de timpii de schimbare de fabrica\u021bie \u00een func\u021bie de sensul trecerii, de disponibilitatea limitat\u0103 a matri\u021belor, de personalul disponibil pentru echipe \u0219i de materialele care urmeaz\u0103 s\u0103 soseasc\u0103. Autopilot men\u021bine apoi planul actualizat.<\/p>\n\n\n<p>Pa\u0219ii de lucru \u0219i momentul \u00een care un instrument de programare devine rentabil sunt explica\u021bi \u00een articolul <a href=\"\/ro\/integrari\/erp\/delmiaworks\/cu-capacitate-finita\/\">DELMIAWorks ofer\u0103 programare cu capacitate finit\u0103?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"delmiaworks-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">DELMIAWorks \u00een prezent \u0219i cu SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>DELMIAWorks APS<\/th><th>DELMIAWorks cu SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Capacitate<\/td><td>Programare cu capacitate finit\u0103 pe fiecare centru de lucru; verific\u0103ri globale zilnice \u0219i s\u0103pt\u0103m\u00e2nale<\/td><td>Capacitate finit\u0103 pentru fiecare pres\u0103, persoan\u0103 \u0219i matri\u021b\u0103, cu schimburi reale \u0219i ore precise<\/td><\/tr><tr><td>Succesiune<\/td><td>Auto Load \u00een func\u021bie de prioritate \u0219i de centrul de lucru &#8220;runs best&#8221; (pe care se execut\u0103 cel mai bine)<\/td><td>Arcturus optimizeaz\u0103 \u00eentregul plan \u00een c\u00e2teva secunde<\/td><\/tr><tr><td>Schimb\u0103ri de fabrica\u021bie<\/td><td>\u0218abloane de reglaj \u0219i liste de verificare pentru urm\u0103toarea preg\u0103tire<\/td><td>Matricea timpilor de preg\u0103tire: albastru\u2192ro\u0219u 30 min, ro\u0219u\u2192albastru 60 min, timp total minim de preg\u0103tire<\/td><\/tr><tr><td>Matri\u021be \u0219i scule<\/td><td>Conflictele de alocare a sculelor sunt afi\u0219ate \u00een listele de excep\u021bii<\/td><td>Matri\u021bele \u0219i sculele sunt rezervate ca resurse partajate cu disponibilitate limitat\u0103<\/td><\/tr><tr><td>Echipe<\/td><td>Capacitatea personalului este comparat\u0103 cu norma<\/td><td>Unei opera\u021bii care necesit\u0103 trei operatori i se aloc\u0103 trei persoane disponibile \u00een schimburile respective<\/td><\/tr><tr><td>Materiale<\/td><td>List\u0103 de excep\u021bii privind materialele, pe baza c\u0103reia planificatorul urgenteaz\u0103 aprovizionarea<\/td><td>Opera\u021biile \u00eencep c\u00e2nd materialele sunt disponibile \u00een stoc sau sosesc cele comandate prin comenzile de achizi\u021bie<\/td><\/tr><tr><td>Planul pe termen scurt<\/td><td>Intervalele de protec\u021bie \u00eempiedic\u0103 modificarea programului curent<\/td><td>Running Time Lock fixeaz\u0103 opera\u021biile din urm\u0103toarele ore<\/td><\/tr><tr><td>Modific\u0103ri<\/td><td>Update Schedule \u0219i Auto Load, apoi mut\u0103ri manuale<\/td><td>Autopilot reface programul respect\u00e2nd priorit\u0103\u021bile \u0219i bloc\u0103rile stabilite de dumneavoastr\u0103<\/td><\/tr><tr><td>Sec\u021bia de produc\u021bie<\/td><td>Shopworks \u0219i RealTime la pres\u0103<\/td><td>Operatorii \u00ee\u0219i pot vedea \u0219i lista de opera\u021bii \u0219i pot \u00eenregistra activitatea pe telefon sau tablet\u0103; utilizatori nelimita\u021bi<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"delmiaworks-scheduling-software-and-add-ons-comp\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Compara\u021bie \u00eentre solu\u021biile de programare \u0219i extensiile pentru DELMIAWorks<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Op\u021biune<\/th><th>Ce ofer\u0103<\/th><th>C\u00e2nd se potrive\u0219te<\/th><\/tr><\/thead><tbody><tr><td>DELMIAWorks APS<\/td><td>Programare cu capacitate finit\u0103, Auto Load \u0219i instrumente de analiz\u0103 a capacit\u0103\u021bii, integrate \u00een DELMIAWorks<\/td><td>Un singur planificator gestioneaz\u0103 panoul de programare, iar schimb\u0103rile de fabrica\u021bie sunt simple<\/td><\/tr><tr><td>DELMIA Ortems<\/td><td>Produs separat de la Dassault pentru planificare \u0219i programare la nivel de \u00eentreprindere, conectat la ERP \u0219i MES<\/td><td>O echip\u0103 central\u0103 de planificare gestioneaz\u0103 un proiect de optimizare pentru mai multe fabrici<\/td><\/tr><tr><td>Instrumente de execu\u021bie bazate pe priorit\u0103\u021bi (de exemplu, LillyWorks)<\/td><td>Liste de opera\u021bii ordonate dup\u0103 riscul asociat comenzilor, \u00een locul unui program cu ore stabilite<\/td><td>Un atelier care produce la comand\u0103 dore\u0219te o list\u0103 de priorit\u0103\u021bi, nu o succesiune de opera\u021bii cu ore stabilite<\/td><\/tr><tr><td>APS \u00een cloud, conectat prin API (SkyPlanner APS)<\/td><td>Un instrument de programare accesibil din browser, cu sincronizare bidirec\u021bional\u0103 a comenzilor de produc\u021bie din DELMIAWorks<\/td><td>Programul trebuie s\u0103 se optimizeze automat, s\u0103 r\u0103m\u00e2n\u0103 actualizat \u0219i s\u0103 ajung\u0103 la fiecare operator<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Alege\u021bi SkyPlanner \u00een locul DELMIAWorks APS c\u00e2nd:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Dori\u021bi optimizarea \u00eentregului plan.<\/strong> Auto Load respect\u0103 priorit\u0103\u021bile \u0219i regulile \u201eruns best\u201d. Arcturus optimizeaz\u0103 \u00eentregul plan \u00een c\u00e2teva secunde, iar Autopilot \u00eel reface la fiecare schimbare semnificativ\u0103.<\/li>\n\n\n<li><strong>Schimb\u0103rile de matri\u021b\u0103 \u0219i culoare determin\u0103 volumul produc\u021biei.<\/strong> Matricea timpilor de preg\u0103tire p\u0103streaz\u0103 un timp distinct de schimbare de fabrica\u021bie pentru fiecare pereche de produse, \u00een fiecare sens, \u0219i stabile\u0219te succesiunea cu cel mai mic timp total de preg\u0103tire.<\/li>\n\n\n<li><strong>Matri\u021bele, echipele \u0219i r\u0103\u0219ina limiteaz\u0103 planul la fel de mult ca presele.<\/strong> Acela\u0219i motor de programare \u021bine cont de disponibilitatea limitat\u0103 a fiec\u0103rei prese, persoane, matri\u021be \u0219i a fiec\u0103rui material. Opera\u021biilor care necesit\u0103 mai mul\u021bi operatori li se aloc\u0103 personalul necesar, iar opera\u021biile \u00eencep c\u00e2nd materialul este disponibil.<\/li>\n\n\n<li><strong>Listele de excep\u021bii ocup\u0103 prea mult din ziua planificatorului.<\/strong> SkyPlanner adapteaz\u0103 planul la indisponibilitatea sculelor \u0219i la \u00eent\u00e2rzierile materialelor, \u00een loc s\u0103 le treac\u0103 pe o list\u0103 de probleme pe care cineva trebuie s\u0103 le rezolve.<\/li>\n\n\n<li><strong>Fiecare operator trebuie s\u0103 lucreze conform planului.<\/strong> Mobile Confirmations afi\u0219eaz\u0103 lista actualizat\u0103 de opera\u021bii pe telefon sau tablet\u0103, iar num\u0103rul de utilizatori este nelimitat: pre\u021bul depinde de centrele de lucru, nu de num\u0103rul de utilizatori.<\/li>\n\n\n<li><strong>Dori\u021bi un pre\u021b clar.<\/strong> De la 199 \u20ac pe lun\u0103, cu o ofert\u0103 de pre\u021b \u00een avans pentru integrarea bidirec\u021bional\u0103 \u0219i asisten\u021b\u0103 din partea echipei SkyPlanner.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum \u00eencepe\u021bi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u00cencepe\u021bi testarea gratuit\u0103.<\/strong> 30 de zile, p\u00e2n\u0103 la 20 de centre de lucru, toate func\u021biile Basic, f\u0103r\u0103 card de credit.<\/li>\n\n\n<li><strong>Modela\u021bi produc\u021bia.<\/strong> Crea\u021bi prese, matri\u021be, persoane \u0219i schimburi \u00een SkyPlanner sau importa\u021bi centrele de lucru din DELMIAWorks. Pute\u021bi beneficia de asisten\u021b\u0103 la configurarea ini\u021bial\u0103.<\/li>\n\n\n<li><strong>\u00cenc\u0103rca\u021bi comenzile de produc\u021bie.<\/strong> Exporta\u021bi din DELMIAWorks \u00een Excel comenzile de produc\u021bie deschise \u0219i opera\u021biile aferente, importa\u021bi-le \u0219i compara\u021bi programul SkyPlanner cu planul actual.<\/li>\n\n\n<li><strong>Conecta\u021bi DELMIAWorks.<\/strong> Echipa SkyPlanner configureaz\u0103 integrarea bidirec\u021bional\u0103 \u0219i ofer\u0103 asisten\u021b\u0103 pentru aceasta dup\u0103 punerea \u00een func\u021biune.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u021buri.<\/strong> Abonamentele se factureaz\u0103 lunar, per centru de lucru, iar dumneavoastr\u0103 pute\u021bi ad\u0103uga sau elimina centre de lucru ori pute\u021bi anula abonamentul oric\u00e2nd. Consulta\u021bi <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a> pentru detalii, citi\u021bi <a href=\"\/ro\/resurse\/ce-este-programarea-productiei\/\">ghidul de programare a produc\u021biei<\/a> sau descoperi\u021bi <a href=\"\/ro\/integrari\/erp\/\">toate integr\u0103rile ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Care este cea mai bun\u0103 extensie de programare pentru DELMIAWorks?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS este o extensie pentru programare cu capacitate finit\u0103, cu integrare bidirec\u021bional\u0103 cu DELMIAWorks. Preia comenzile de produc\u021bie, listele de materiale, centrele de lucru, matri\u021bele, articolele de stoc \u0219i comenzile de achizi\u021bie \u0219i trimite \u00eenapoi datele planificate, centrele de lucru, \u00eenregistr\u0103rile de produc\u021bie \u0219i datele privind manopera. \u021aine cont de disponibilitatea limitat\u0103 a fiec\u0103rei prese, a fiec\u0103rui operator, a fiec\u0103rei matri\u021be \u0219i a fiec\u0103rui material. O matrice a timpilor de preg\u0103tire, care \u021bine cont de sensul trecerii de la un produs la altul, stabile\u0219te succesiunea schimb\u0103rilor de matri\u021b\u0103 \u0219i culoare pentru un timp minim de preg\u0103tire. Pre\u021bul porne\u0219te de la 199 \u20ac pe lun\u0103, iar testarea gratuit\u0103 dureaz\u0103 30 de zile.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>DELMIAWorks ofer\u0103 programare cu capacitate finit\u0103?<\/summary>\n<p class=\"sp-faq__a\">Da. DELMIAWorks APS ofer\u0103 programare cu capacitate finit\u0103 pentru fiecare centru de lucru, cu Auto Load \u00een func\u021bie de priorit\u0103\u021bi \u0219i de utilajul cel mai potrivit, intervale de protejare a programului \u0219i liste de excep\u021bii pentru scule \u0219i materiale. SkyPlanner APS adaug\u0103 optimizarea \u00eentregului plan, \u021bin\u00e2nd cont simultan de disponibilitatea limitat\u0103 a fiec\u0103rei prese, matri\u021be, echipe \u0219i a fiec\u0103rui material, precum \u0219i reprogramarea automat\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ce software de programare se integreaz\u0103 cu DELMIAWorks?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS se integreaz\u0103 bidirec\u021bional cu DELMIAWorks prin DELMIAWorks WebAPI. SkyPlanner cite\u0219te comenzile de produc\u021bie, listele de materiale, centrele de lucru, articolele de stoc \u0219i comenzile de achizi\u021bie prin controlerele REST. Datele planificate \u0219i centrele de lucru sunt trimise \u00eenapoi \u00een comenzile de produc\u021bie prin controlerul Manufacturing WorkOrders, datele despre piesele conforme prin AddProductionRecords, iar datele privind manopera prin apelurile pentru sarcini din Time &amp; Attendance.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>S\u0103 folosim DELMIAWorks APS sau SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, atunci c\u00e2nd programul trebuie s\u0103 se optimizeze automat, iar volumul produc\u021biei este limitat de schimb\u0103rile de fabrica\u021bie, matri\u021be, echipe \u0219i materiale. DELMIAWorks APS programeaz\u0103 comenzile de produc\u021bie pe baza unor reguli \u0219i afi\u0219eaz\u0103 problemele legate de scule \u0219i materiale ca excep\u021bii pentru planificator. SkyPlanner le rezolv\u0103 \u00eentr-un singur plan, reprogrameaz\u0103 automat \u0219i ofer\u0103 fiec\u0103rui operator lista sa de opera\u021bii pe telefon, cu un num\u0103r nelimitat de utilizatori. Verifica\u021bi aceste rezultate cu propriile comenzi de produc\u021bie din DELMIAWorks \u00een perioada de testare gratuit\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>DELMIAWorks este acela\u0219i produs ca IQMS?<\/summary>\n<p class=\"sp-faq__a\">Da. Dassault Systemes a achizi\u021bionat IQMS \u0219i a redenumit sistemul s\u0103u ERP EnterpriseIQ \u00een DELMIAWorks. SkyPlanner func\u021bioneaz\u0103 cu versiunile actuale DELMIAWorks prin WebAPI.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner \u00eenlocuie\u0219te DELMIAWorks MRP sau RealTime?<\/summary>\n<p class=\"sp-faq__a\">Nu, le completeaz\u0103. DELMIAWorks gestioneaz\u0103 \u00een continuare stocurile, listele de materiale, MRP, achizi\u021biile, calitatea \u0219i monitorizarea preselor prin RealTime. SkyPlanner programeaz\u0103 comenzile de produc\u021bie \u00een func\u021bie de capacitatea real\u0103 \u0219i trimite \u00eenapoi datele planificate.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>C\u00e2t cost\u0103 SkyPlanner pentru o fabric\u0103 ce folose\u0219te DELMIAWorks?<\/summary>\n<p class=\"sp-faq__a\">De la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, plus 20 \u20ac pe lun\u0103 pentru fiecare centru de lucru suplimentar. Un centru de lucru este o resurs\u0103 de produc\u021bie cu propria list\u0103 de opera\u021bii programate, de exemplu o pres\u0103. Primi\u021bi \u00een avans oferta pentru integrare, adaptat\u0103 procesului \u0219i nevoilor dumneavoastr\u0103, \u00eempreun\u0103 cu oferta pentru abonament, astfel \u00eenc\u00e2t s\u0103 cunoa\u0219te\u021bi costul total \u00eenainte de a \u00eencepe.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>C\u00e2t dureaz\u0103 implementarea?<\/summary>\n<p class=\"sp-faq__a\">Implementarea se finalizeaz\u0103 de obicei \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea configur\u0103rii ini\u021biale. Echipa configureaz\u0103 coresponden\u021bele pentru prese, matri\u021be \u0219i opera\u021bii, conecteaz\u0103 comenzile de produc\u021bie \u0219i de achizi\u021bie \u0219i trimite \u00eenapoi datele planificate. Totul este testat prin compara\u021bie cu planul actual \u00eenainte de punerea \u00een func\u021biune.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de integrarea cu DELMIAWorks?<\/summary>\n<p class=\"sp-faq__a\">Da. Pentru testarea de 30 de zile se folose\u0219te un export Excel al comenzilor de produc\u021bie deschise din DELMIAWorks. Vede\u021bi un <a href=\"\/ro\/resurse\/capacitate-finita\/\">program cu capacitate finit\u0103<\/a> pentru propriile prese \u00eenainte de \u00eenceperea oric\u0103ror lucr\u0103ri de integrare.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ DELMIAWorks SkyPlanner APS pentru DELMIAWorks (IQMS): programarea produc\u021biei cu capacitate finit\u0103 SkyPlanner APS este o extensie pentru programare cu capacitate finit\u0103, destinat\u0103 DELMIAWorks, sistemul ERP cunoscut anterior ca IQMS. Programeaz\u0103 fiecare pres\u0103, matri\u021b\u0103, operator \u0219i material la ore precise. Arcturus optimizeaz\u0103 \u00eentregul plan \u00een c\u00e2teva secunde, iar Autopilot reface automat programul &#8230; <a title=\"SkyPlanner APS pentru DELMIAWorks (IQMS): programarea produc\u021biei cu capacitate finit\u0103\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/delmiaworks\/\" aria-label=\"Read more about SkyPlanner APS pentru DELMIAWorks (IQMS): programarea produc\u021biei cu capacitate finit\u0103\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100697,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106575","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integrare DELMIAWorks pentru programare: APS cu capacitate finit\u0103<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS pentru DELMIAWorks (IQMS): programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103: fiecare pres\u0103, matri\u021b\u0103, operator. De la 199 \u20ac\/lun\u0103.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/delmiaworks\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS pentru DELMIAWorks (IQMS): programarea produc\u021biei cu capacitate finit\u0103\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS pentru DELMIAWorks (IQMS): programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103: fiecare pres\u0103, matri\u021b\u0103, operator. De la 199 \u20ac\/lun\u0103.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/delmiaworks\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/delmiaworks\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/delmiaworks\\\/\",\"name\":\"Integrare DELMIAWorks pentru programare: APS cu capacitate finit\u0103\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS pentru DELMIAWorks (IQMS): programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103: fiecare pres\u0103, matri\u021b\u0103, operator. De la 199 \u20ac\\\/lun\u0103.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/delmiaworks\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/delmiaworks\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/delmiaworks\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru DELMIAWorks (IQMS): programarea produc\u021biei cu capacitate finit\u0103\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integrare DELMIAWorks pentru programare: APS cu capacitate finit\u0103","description":"SkyPlanner APS pentru DELMIAWorks (IQMS): programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103: fiecare pres\u0103, matri\u021b\u0103, operator. De la 199 \u20ac\/lun\u0103.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/delmiaworks\/","og_locale":"ro_RO","og_type":"article","og_title":"SkyPlanner APS pentru DELMIAWorks (IQMS): programarea produc\u021biei cu capacitate finit\u0103","og_description":"SkyPlanner APS pentru DELMIAWorks (IQMS): programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103: fiecare pres\u0103, matri\u021b\u0103, operator. De la 199 \u20ac\/lun\u0103.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/delmiaworks\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/delmiaworks\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/delmiaworks\/","name":"Integrare DELMIAWorks pentru programare: APS cu capacitate finit\u0103","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS pentru DELMIAWorks (IQMS): programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103: fiecare pres\u0103, matri\u021b\u0103, operator. De la 199 \u20ac\/lun\u0103.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/delmiaworks\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/delmiaworks\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/delmiaworks\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru DELMIAWorks (IQMS): programarea produc\u021biei cu capacitate finit\u0103"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ DELMIAWorks SkyPlanner APS pentru DELMIAWorks (IQMS): programarea produc\u021biei cu capacitate finit\u0103 SkyPlanner APS este o extensie pentru programare cu capacitate finit\u0103, destinat\u0103 DELMIAWorks, sistemul ERP cunoscut anterior ca IQMS. Programeaz\u0103 fiecare pres\u0103, matri\u021b\u0103, operator \u0219i material la ore precise. Arcturus optimizeaz\u0103 \u00eentregul plan \u00een c\u00e2teva secunde, iar Autopilot reface automat programul&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106575","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=106575"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106575\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/100697"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=106575"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}