{"id":106488,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/comarch-erp-xl\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"comarch-erp-xl","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/comarch-erp-xl\/","title":{"rendered":"SkyPlanner APS pentru Comarch ERP XL: programarea produc\u021biei cu capacitate finit\u0103"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ Comarch ERP XL<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS pentru Comarch ERP XL: <span class=\"hl\">programarea produc\u021biei cu capacitate finit\u0103<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS completeaz\u0103 Comarch ERP XL cu programare cu capacitate finit\u0103 pentru fiecare utilaj, operator, scul\u0103 \u0219i material. Vede\u021bi unde \u0219i c\u00e2nd se execut\u0103 fiecare opera\u021bie din fiecare comand\u0103 de produc\u021bie (zlecenie produkcyjne), iar Autopilot reprogrameaz\u0103 automat c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner se integreaz\u0103 bidirec\u021bional cu Comarch ERP XL: preia comenzile de produc\u021bie, tehnologiile cu opera\u021biile aferente, centrele de lucru \u0219i resursele, articolele, stocurile \u0219i comenzile de achizi\u021bie \u0219i transmite \u00eenapoi datele programate ale opera\u021biilor \u0219i activitatea \u00eenregistrat\u0103. \u00cen etapa de configurare ini\u021bial\u0103, echipa SkyPlanner adapteaz\u0103 integrarea la configura\u021bia dumneavoastr\u0103 Comarch ERP XL.<\/p>\n\n\n<p>Pre\u021bul porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, iar fiecare centru de lucru suplimentar cost\u0103 20 \u20ac pe lun\u0103. Perioada de testare gratuit\u0103 dureaz\u0103 30 de zile, cu p\u00e2n\u0103 la 20 de centre de lucru, f\u0103r\u0103 card de credit.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce se schimb\u0103 \u00een produc\u021bia dumneavoastr\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Capacitatea rezult\u0103 din program, nu dintr-un num\u0103r introdus manual.<\/p>\n\n\n<p class=\"fx-pain__b\">Fiecare utilaj, persoan\u0103 \u0219i scul\u0103 are un calendar cu capacitate finit\u0103, bazat pe schimburile, absen\u021bele \u0219i orele suplimentare reale. Fiecare opera\u021bie prime\u0219te o or\u0103 de \u00eenceput, o or\u0103 de sf\u00e2r\u0219it \u0219i un centru de lucru. Nu mai estima\u021bi capacitatea pe perioade \u0219i nu mai ad\u0103uga\u021bi o marj\u0103 procentual\u0103 pentru schimb\u0103rile de fabrica\u021bie.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Schimb\u0103ri de fabrica\u021bie programate \u00eentre produse.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner p\u0103streaz\u0103 timpul de trecere \u00eentre fiecare pereche de produse, \u00een ambele sensuri. Trecerea de la albastru la ro\u0219u poate dura 30 de minute, iar cea de la ro\u0219u la albastru, 60. Motorul ordoneaz\u0103 opera\u021biile astfel \u00eenc\u00e2t s\u0103 se piard\u0103 c\u00e2t mai pu\u021bin timp cu reglajele.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u0218i echipele \u0219i sculele au disponibilitate limitat\u0103.<\/p>\n\n\n<p class=\"fx-pain__b\">Unei opera\u021bii care necesit\u0103 trei operatori i se aloc\u0103 trei persoane disponibile \u00een schimburile respective. O matri\u021b\u0103 sau un dispozitiv folosit pe un utilaj nu este niciodat\u0103 rezervat simultan pe altul. C\u00e2nd un utilaj este ocupat, opera\u021bia este mutat\u0103 pe un alt utilaj sau alocat\u0103 altei persoane.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materialele sunt verificate \u00eenainte de \u00eenceperea lucrului.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner cite\u0219te stocurile \u0219i comenzile de achizi\u021bie deschise (zam\u00f3wienia zakupu) din Comarch ERP XL. O comand\u0103 de produc\u021bie care a\u0219teapt\u0103 o livrare de la furnizor este programat\u0103 dup\u0103 data acelei livr\u0103ri.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprogramare automat\u0103 la comenzi urgente \u0219i defec\u021biuni.<\/p>\n\n\n<p class=\"fx-pain__b\">C\u00e2nd un utilaj se opre\u0219te sau apare o comand\u0103 urgent\u0103, Autopilot reprogrameaz\u0103 produc\u021bia. Arcturus optimizeaz\u0103 \u00eentregul plan \u00een c\u00e2teva secunde, respect\u00e2nd \u00een continuare bloc\u0103rile \u0219i priorit\u0103\u021bile stabilite de dumneavoastr\u0103.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatorii \u00ee\u0219i v\u0103d lista de opera\u021bii.<\/p>\n\n\n<p class=\"fx-pain__b\">Fiecare operator vede urm\u0103toarele opera\u021bii pe telefon sau tablet\u0103 \u0219i \u00ee\u0219i \u00eenregistreaz\u0103 activitatea pe m\u0103sur\u0103 ce lucreaz\u0103. La birou, progresul este vizibil \u00een timp real, iar activitatea \u00eenregistrat\u0103 este transmis\u0103 \u00eenapoi \u00een comanda de produc\u021bie ca execu\u021bie a opera\u021biei.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een sec\u021bia de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar noua list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi m\u0103rturia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui program optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi m\u0103rturia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Un sudor KJH-Comp polizeaz\u0103 o structur\u0103 din o\u021bel sudat\u0103 la fabrica din Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>rata de respectare a termenelor de livrare, \u00een cre\u0219tere de la circa 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner joac\u0103 un rol decisiv \u00een men\u021binerea ratei noastre de respectare a termenelor de livrare.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, director general<\/b><br>KJH-Comp \u00b7 Prelucr\u0103ri de tabl\u0103 \u0219i produc\u021bie \u00een regim de subcontractare<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a crescut de la circa 50% p\u00e2n\u0103 la 98%, iar de programare se ocup\u0103 acum un singur responsabil \u00een loc de doi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/kjh-comp\/\">Citi\u021bi recenzia KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, director general al Mamec, \u00een hala de produc\u021bie a companiei din Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000+<\/b><span>de comenzi de produc\u021bie programate automat<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eControl\u0103m produc\u021bia \u00eentr-un mod diferit, iar \u00een\u021belegerea capacit\u0103\u021bii noastre este la un cu totul alt nivel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, director general<\/b><br>Mamec \u00b7 Mixere industriale, pompe \u0219i produc\u021bie de \u00eenalt\u0103 tehnologie \u00een regim de subcontractare<\/p>\n\n\n<p class=\"ind-cust__result\">Mii de comenzi de produc\u021bie sunt programate automat, iar \u00eentreaga organiza\u021bie are o imagine \u00een timp real asupra produc\u021biei.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/mamec\/\">Citi\u021bi recenzia Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-comarch-erp-xl-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum func\u021bioneaz\u0103 integrarea cu Comarch ERP XL<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Comarch ERP XL transmite lucr\u0103rile de executat.<\/strong> SkyPlanner preia comenzile de produc\u021bie cu procesele \u0219i opera\u021biile aferente, tehnologiile, centrele de lucru (gniazda robocze) \u0219i resursele (zasoby), articolele, stocurile \u0219i comenzile de achizi\u021bie.<\/li>\n\n\n<li><strong>SkyPlanner creeaz\u0103 programul \u0219i \u00eel men\u021bine actualizat.<\/strong> Motorul Arcturus programeaz\u0103 fiecare opera\u021bie \u00een c\u00e2teva secunde \u0219i reface programul c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie. Webhook-urile SkyPlanner transmit fiecare modificare a programului imediat ce aceasta are loc.<\/li>\n\n\n<li><strong>Datele \u0219i activitatea \u00eenregistrat\u0103 sunt transmise \u00eenapoi.<\/strong> Momentele de \u00eenceput \u0219i de sf\u00e2r\u0219it programate sunt trimise c\u0103tre fiecare opera\u021bie a comenzii de produc\u021bie prin func\u021bia XL API XLDodajTerminDoProcesuProd. Timpii \u00eenregistra\u021bi de operatori sunt trimi\u0219i ca execu\u021bii ale opera\u021biilor prin XLDodajRealizacjeOperacjiProd.<\/li>\n\n<\/ol>\n\n\n<p>Comarch ERP XL r\u0103m\u00e2ne sistemul principal de eviden\u021b\u0103. Articolele, tehnologiile, MRP, achizi\u021biile, stocurile, documentele RW \u0219i PW \u0219i calculul costurilor r\u0103m\u00e2n acolo unde sunt. SkyPlanner stabile\u0219te ordinea \u0219i momentele de execu\u021bie ale fiec\u0103rei opera\u021bii pe fiecare resurs\u0103.<\/p>\n\n\n<p>Comarch prezint\u0103 trei modalit\u0103\u021bi de conectare la ERP XL: DCOM, o conexiune direct\u0103 la baza de date (SQL Client) \u0219i un REST API (<a href=\"https:\/\/www.comarch.pl\/erp\/xl\/\">Comarch<\/a>). SkyPlanner cite\u0219te datele de produc\u021bie prin REST API din Comarch ERP XL Web sau printr-o conexiune de citire la baza de date ERP XL. Transmite datele \u00eenapoi prin XL API (CDN_API.DLL), biblioteca Comarch care permite ad\u0103ugarea din afara sistemului a tehnologiilor, comenzilor de produc\u021bie, datelor opera\u021biilor \u0219i execu\u021biilor acestora (<a href=\"https:\/\/pomoc.comarch.pl\/xl\/index.php\/dokumentacja\/xl128-przyklady-zastosowania-api-w-produkcji\/\">Documenta\u021bia Comarch<\/a>).<\/p>\n\n\n<p>Fiecare fabric\u0103 folose\u0219te Comarch ERP XL \u00een mod diferit. De aceea, echipa SkyPlanner adapteaz\u0103 integrarea la configura\u021bia dumneavoastr\u0103 \u00een etapa ini\u021bial\u0103 \u0219i asigur\u0103 suport dup\u0103 punerea \u00een func\u021biune. Primi\u021bi \u00een avans o ofert\u0103 pentru integrare, \u00een func\u021bie de procesul \u0219i nevoile dumneavoastr\u0103. Partenerul dumneavoastr\u0103 Comarch sau propriii dezvoltatori pot, de asemenea, s\u0103 creeze integrarea folosind API-ul documentat SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">Documenta\u021bia API<\/a>).<\/p>\n\n\n<p>Func\u021biile, coresponden\u021ba dintre date \u0219i regulile de transmitere \u00eenapoi \u00een ERP sunt descrise \u00een <a href=\"\/ro\/integrari\/erp\/comarch-erp-xl\/ghid-de-integrare\/\">ghidul de integrare cu Comarch ERP XL pentru programarea produc\u021biei<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-comarch-erp-xl-schedules-and-what-skyplanne\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce programeaz\u0103 Comarch ERP XL \u0219i ce aduce \u00een plus SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Modulul Produkcja din Comarch ERP XL planific\u0103 comenzile de produc\u021bie pe baza tehnologiilor \u0219i a calendarelor resurselor. Semnaleaz\u0103 conflictele \u0219i permite planificatorului s\u0103 mute opera\u021biile prin glisare pe o diagram\u0103 Gantt. Documenta\u021bia Comarch arat\u0103 unde planul depinde \u00een continuare de aprecierea planificatorului:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Capacitatea centrului de lucru este un num\u0103r introdus manual.<\/strong> \u00cen fi\u0219a centrului de lucru, Comarch explic\u0103 faptul c\u0103 aceast\u0103 capacitate &#8220;cannot always be stated so unambiguously&#8221; (nu poate fi \u00eentotdeauna exprimat\u0103 at\u00e2t de clar), a\u0219adar &#8220;this field is left for the user to define.&#8221; (acest c\u00e2mp este l\u0103sat la latitudinea utilizatorului). (<a href=\"https:\/\/pomoc.comarch.pl\/xl\/index.php\/dokumentacja\/plan-obciazenia-gniazd-roboczych\/\">Documenta\u021bia Comarch, tradus\u0103<\/a>)<\/li>\n\n\n<li><strong>Schimb\u0103rile de fabrica\u021bie sunt exprimate procentual.<\/strong> Parametrul de \u00eenc\u0103rcare admis\u0103 permite rezervarea, din acea capacitate, a &#8220;some % of time for downtime, changeovers etc.&#8221; (unui procent din timp pentru opriri, schimb\u0103ri de fabrica\u021bie etc.). (<a href=\"https:\/\/pomoc.comarch.pl\/xl\/index.php\/dokumentacja\/plan-obciazenia-gniazd-roboczych\/\">aceea\u0219i surs\u0103<\/a>)<\/li>\n\n\n<li><strong>Planificarea agregat\u0103 poate supra\u00eenc\u0103rca o perioad\u0103.<\/strong> Una dintre variantele de planificare programeaz\u0103 opera\u021bii \u00een perioada curent\u0103 chiar \u0219i atunci c\u00e2nd &#8220;the resource availability limit is exceeded&#8221; (limita de disponibilitate a resursei este dep\u0103\u0219it\u0103). (<a href=\"https:\/\/pomoc.comarch.pl\/xl\/index.php\/dokumentacja\/zlecenia-produkcyjne\/\">Documenta\u021bia Comarch<\/a>)<\/li>\n\n\n<li><strong>Pentru resurse, schimb\u0103rile se refer\u0103 la trecerea \u00eentre centre de lucru.<\/strong> Setarea define\u0219te &#8220;the changeover time of the resource&#8217;s work center and the cost of that change&#8221; (timpul necesar schimb\u0103rii centrului de lucru al resursei \u0219i costul acelei schimb\u0103ri), nu trecerea de la un produs la urm\u0103torul. (<a href=\"https:\/\/pomoc.comarch.pl\/xl\/index.php\/dokumentacja\/gniazda-robocze-i-zasoby-kalendarze-i-okresy-przestoje-i-awarie\/\">Documenta\u021bia Comarch<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Pentru secven\u021bierea detaliat\u0103, Comarch comercializeaz\u0103 Comarch APS, &#8220;a standalone application with its own interface and its own database (PSQL)&#8221; (o aplica\u021bie independent\u0103, cu interfa\u021b\u0103 proprie \u0219i baz\u0103 de date proprie (PSQL)) (<a href=\"https:\/\/pomoc.comarch.pl\/aps\/index.php\/dokumentacja\/dokumentacja-uzytkownika-wersja-2026-3\/\">Documenta\u021bia Comarch APS<\/a>). Aceasta se instaleaz\u0103 pe serverul dumneavoastr\u0103, cu propria cheie de licen\u021b\u0103 \u0219i un serviciu de integrare.<\/p>\n\n\n<p>Fiecare op\u021biune \u0219i limitare este explicat\u0103 \u00een articolul <a href=\"\/ro\/integrari\/erp\/comarch-erp-xl\/cu-capacitate-finita\/\">Comarch ERP XL ofer\u0103 programare cu capacitate finit\u0103?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"comarch-erp-xl-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Comarch ERP XL \u00een prezent \u0219i cu SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Comarch ERP XL Produkcja<\/th><th>Comarch ERP XL cu SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Capacitate<\/td><td>Capacitate definit\u0103 de utilizator pentru fiecare centru de lucru \u0219i perioad\u0103, cu un procent de \u00eenc\u0103rcare admis\u0103<\/td><td>Capacitate finit\u0103 pentru fiecare utilaj, persoan\u0103 \u0219i scul\u0103, \u00eentr-un calendar real<\/td><\/tr><tr><td>Conflicte<\/td><td>Sunt semnalate, apoi planificatorul reprogrameaz\u0103 sau mut\u0103 opera\u021biile prin glisare<\/td><td>Motorul aloc\u0103 opera\u021biile numai acolo unde exist\u0103 capacitate disponibil\u0103<\/td><\/tr><tr><td>Schimb\u0103ri de fabrica\u021bie<\/td><td>Marj\u0103 procentual\u0103; durat\u0103 fix\u0103 la mutarea unei resurse \u00eentre centre de lucru<\/td><td>Matrice a timpilor de preg\u0103tire \u0219i tranzi\u021bie: timp total minim de reglaj \u00eentre produse<\/td><\/tr><tr><td>Personal \u0219i scule<\/td><td>Resurse alocate opera\u021biei tehnologice<\/td><td>Operatori nominaliza\u021bi, cu schimburi definite, opera\u021bii cu mai mul\u021bi operatori, scule ca resurse partajate cu disponibilitate limitat\u0103<\/td><\/tr><tr><td>Materiale<\/td><td>Rezerv\u0103ri de materii prime, sugestii MRP<\/td><td>Opera\u021biile \u00eencep c\u00e2nd materialele sunt disponibile din stoc sau din comenzile de achizi\u021bie recep\u021bionate<\/td><\/tr><tr><td>Modific\u0103ri<\/td><td>Reluarea planific\u0103rii sau reprogramarea pentru rezolvarea conflictelor<\/td><td>Autopilot reface programul \u00eentregii fabrici, respect\u00e2nd priorit\u0103\u021bile dumneavoastr\u0103<\/td><\/tr><tr><td>Interfa\u021ba planificatorului<\/td><td>Gantt pe resurs\u0103 sau centru de lucru, plan de \u00eenc\u0103rcare (PLZ)<\/td><td>Gantt interactiv: muta\u021bi o opera\u021bie, iar planul r\u0103m\u00e2ne coerent<\/td><\/tr><tr><td>Sec\u021bia de produc\u021bie<\/td><td>\u00cenregistrarea execu\u021biei opera\u021biilor \u00een ERP XL sau Comarch MES<\/td><td>Operatorii \u00ee\u0219i v\u0103d lista de opera\u021bii \u0219i \u00eenregistreaz\u0103 activitatea pe telefon sau tablet\u0103<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"comarch-erp-xl-scheduling-software-and-add-ons-c\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Compara\u021bie \u00eentre solu\u021biile de programare pentru Comarch ERP XL<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Op\u021biune<\/th><th>Ce ofer\u0103<\/th><th>C\u00e2nd se potrive\u0219te<\/th><\/tr><\/thead><tbody><tr><td>Comarch ERP XL Produkcja<\/td><td>Metode de planificare, rapoarte de conflicte, plan de \u00eenc\u0103rcare \u0219i Gantt \u00een ERP XL<\/td><td>Capacitatea pe centru de lucru \u0219i perioad\u0103 este suficient de precis\u0103<\/td><\/tr><tr><td>Comarch APS<\/td><td>Aplica\u021bie separat\u0103 de programare de la Comarch, cu baz\u0103 de date PostgreSQL \u0219i cheie de licen\u021b\u0103 proprii, instalat\u0103 pe serverul dumneavoastr\u0103<\/td><td>Dori\u021bi s\u0103 r\u0103m\u00e2ne\u021bi \u00een gama de produse Comarch \u0219i s\u0103 implementa\u021bi solu\u021bia pe infrastructura proprie<\/td><\/tr><tr><td>Panouri de programare poloneze \u0219i germane (dFLEX Gantt, proMExS Leitstand)<\/td><td>Software de planificare Gantt sau Leitstand de la furnizori ter\u021bi care includ Comarch printre sistemele ERP la care se conecteaz\u0103<\/td><td>Un planificator lucreaz\u0103 cu panoul de programare, adesea folosind \u0219i date colectate din sec\u021bia de produc\u021bie<\/td><\/tr><tr><td>APS \u00een cloud conectat prin API (SkyPlanner APS)<\/td><td>Solu\u021bie de programare cu capacitate finit\u0103 \u00een browser, sincronizat\u0103 bidirec\u021bional cu comenzile de produc\u021bie din ERP XL<\/td><td>Programul trebuie s\u0103 se actualizeze automat \u0219i s\u0103 fie disponibil fiec\u0103rui operator<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Alege\u021bi SkyPlanner \u00een loc de Comarch APS c\u00e2nd:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Dori\u021bi un program actualizat \u00een timp real \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni, nu un proiect de instalare pe server.<\/strong> Comarch APS necesit\u0103 o baz\u0103 de date PostgreSQL proprie, un program de instalare, un serviciu de integrare al\u0103turi de baza de date ERP XL \u0219i o cheie de licen\u021b\u0103 \u00een Comarch ERP Menad\u017cer Kluczy (<a href=\"https:\/\/pomoc.comarch.pl\/aps\/index.php\/dokumentacja\/comarch-aps-instalacja-2026-3\/\">Instalarea Comarch APS<\/a>). SkyPlanner este o solu\u021bie \u00een cloud, iar implementarea se \u00eencheie \u00een mod normal \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea configur\u0103rii ini\u021biale.<\/li>\n\n\n<li><strong>Planul trebuie s\u0103 se actualizeze singur.<\/strong> \u00cen Comarch APS, planificatorul actualizeaz\u0103 datele cu \u201eAktualizuj dane z ERP\u201d \u0219i trimite \u00eenapoi varianta aleas\u0103 cu \u201eWy\u015blij do ERP\u201d (<a href=\"https:\/\/pomoc.comarch.pl\/aps\/index.php\/dokumentacja\/dokumentacja-uzytkownika-wersja-2026-3\/\">documenta\u021bia Comarch APS<\/a>). Autopilot replanific\u0103 automat la fiecare schimbare semnificativ\u0103, iar webhook-urile SkyPlanner transmit noile date.<\/li>\n\n\n<li><strong>Schimb\u0103rile de fabrica\u021bie depind de produsul fabricat anterior.<\/strong> Comarch APS preia timpul de reglaj ca \u201ea fixed value taken from the technology\u201d (o valoare fix\u0103 preluat\u0103 din tehnologie) (<a href=\"https:\/\/pomoc.comarch.pl\/aps\/index.php\/dokumentacja\/dokumentacja-uzytkownika-wersja-2026-3\/\">aceea\u0219i surs\u0103<\/a>). Matricea timpilor de reglaj din SkyPlanner p\u0103streaz\u0103 un timp distinct pentru fiecare pereche, \u00een fiecare sens, \u0219i stabile\u0219te succesiunea cu cel mai mic timp total de reglaj.<\/li>\n\n\n<li><strong>Dori\u021bi ca motorul s\u0103 optimizeze, nu s\u0103 aleag\u0103 o regul\u0103.<\/strong> Comarch \u00ee\u0219i prezint\u0103 metodele predefinite ca reguli, de exemplu programarea \u201ethe longest processes first\u201d (mai \u00eent\u00e2i procesele cu durata cea mai mare), folosind un algoritm greedy (<a href=\"https:\/\/www.comarch.pl\/erp\/system-aps\/\">Comarch<\/a>). Arcturus optimizeaz\u0103 \u00eentregul plan \u00een c\u00e2teva secunde, \u021bin\u00e2nd cont de priorit\u0103\u021bi, termene, reglaje \u0219i capacitatea limitat\u0103 a fiec\u0103rei resurse.<\/li>\n\n\n<li><strong>Echipele, sculele \u0219i materialele impun limite planului.<\/strong> Capacitatea fiec\u0103rui utilaj, a fiec\u0103rei persoane \u0219i scule, precum \u0219i disponibilitatea materialelor sunt luate \u00een calcul simultan. Opera\u021biilor care necesit\u0103 mai mul\u021bi operatori li se aloc\u0103 personalul necesar, iar opera\u021biile \u00eencep c\u00e2nd materialele sunt disponibile din stoc sau din livr\u0103rile aferente comenzilor de achizi\u021bie.<\/li>\n\n\n<li><strong>Fiecare operator trebuie s\u0103 lucreze conform planului.<\/strong> Mobile Confirmations afi\u0219eaz\u0103 lista actualizat\u0103 a opera\u021biilor pe telefon sau tablet\u0103, iar timpul \u00eenregistrat este transmis \u00eenapoi \u00een ERP XL ca realizare a opera\u021biei.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum \u00eencepe\u021bi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103.<\/strong> 30 de zile, p\u00e2n\u0103 la 20 de centre de lucru, toate func\u021biile Basic, f\u0103r\u0103 card bancar.<\/li>\n\n\n<li><strong>Modela\u021bi produc\u021bia.<\/strong> Crea\u021bi utilaje, persoane \u0219i schimburi \u00een SkyPlanner sau importa\u021bi centrele de lucru \u0219i resursele din ERP XL. Pute\u021bi beneficia de asisten\u021b\u0103 la configurarea ini\u021bial\u0103.<\/li>\n\n\n<li><strong>\u00cenc\u0103rca\u021bi comenzile.<\/strong> Exporta\u021bi comenzile de produc\u021bie deschise \u0219i opera\u021biile aferente din Comarch ERP XL \u00een Excel sau CSV, importa\u021bi-le \u0219i compara\u021bi programul generat de SkyPlanner cu planul actual.<\/li>\n\n\n<li><strong>Conecta\u021bi Comarch ERP XL.<\/strong> Echipa SkyPlanner configureaz\u0103 integrarea bidirec\u021bional\u0103 \u0219i asigur\u0103 suportul dup\u0103 punerea \u00een func\u021biune.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u021buri.<\/strong> Abonamentele sunt facturate lunar, pe centru de lucru. Pute\u021bi ad\u0103uga sau elimina centre de lucru ori anula abonamentul oric\u00e2nd. Consulta\u021bi <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a> pentru detalii sau explora\u021bi <a href=\"\/ro\/integrari\/erp\/\">toate integr\u0103rile ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi proba gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Care este cea mai bun\u0103 extensie pentru programarea produc\u021biei \u00een Comarch ERP XL?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS este o extensie pentru programare cu capacitate finit\u0103, cu integrare bidirec\u021bional\u0103 cu Comarch ERP XL: preia comenzile de produc\u021bie, tehnologiile, centrele de lucru, resursele, articolele, stocurile \u0219i comenzile de achizi\u021bie \u0219i trimite \u00eenapoi datele planificate ale opera\u021biilor \u0219i munca \u00eenregistrat\u0103. Programarea respect\u0103 capacitatea limitat\u0103 a fiec\u0103rui utilaj, a fiec\u0103rui operator \u0219i a fiec\u0103rei scule, precum \u0219i disponibilitatea materialelor. O matrice a timpilor de reglaj care \u021bine cont de sensul schimb\u0103rii stabile\u0219te succesiunea opera\u021biilor pentru a minimiza timpul de reglaj. Autopilot reprogrameaz\u0103 automat c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie. Pre\u021bul porne\u0219te de la 199 \u20ac pe lun\u0103, iar perioada de testare gratuit\u0103 dureaz\u0103 30 de zile.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Comarch ERP XL ofer\u0103 programare cu capacitate finit\u0103?<\/summary>\n<p class=\"sp-faq__a\">Par\u021bial. Modulul Produkcja verific\u0103 gradul de ocupare a resurselor, semnaleaz\u0103 conflictele \u0219i permite planificatorului s\u0103 mute opera\u021biile prin tragere pe o diagram\u0103 Gantt. Capacitatea centrului de lucru este o valoare definit\u0103 de utilizator pentru fiecare perioad\u0103, iar pentru schimb\u0103rile de fabrica\u021bie se aloc\u0103 un adaos procentual. SkyPlanner APS completeaz\u0103 ERP XL prin programarea care respect\u0103 capacitatea real\u0103 a fiec\u0103rui utilaj, a fiec\u0103rei persoane \u0219i scule, precum \u0219i disponibilitatea materialelor.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ce software de programare a produc\u021biei se integreaz\u0103 cu Comarch ERP XL?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS se integreaz\u0103 bidirec\u021bional cu Comarch ERP XL. Cite\u0219te comenzile de produc\u021bie, tehnologiile, resursele, stocurile \u0219i comenzile de achizi\u021bie prin ERP XL Web REST API sau printr-o conexiune de citire la baza de date \u0219i scrie \u00eenapoi datele \u0219i realiz\u0103rile opera\u021biilor prin XL API. Comarch comercializeaz\u0103 \u0219i propria solu\u021bie Comarch APS, iar furnizorii ter\u021bi de solu\u021bii Gantt \u0219i Leitstand men\u021bioneaz\u0103 conexiuni cu Comarch.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>S\u0103 alegem Comarch APS sau SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, dac\u0103 dori\u021bi ca \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni s\u0103 ave\u021bi un program de produc\u021bie care respect\u0103 capacitatea real\u0103 \u0219i se actualizeaz\u0103 singur. Comarch APS este o aplica\u021bie separat\u0103, instalat\u0103 pe serverul dumneavoastr\u0103, cu propria baz\u0103 de date \u0219i cheie de licen\u021b\u0103. Planificatorul preia manual datele \u0219i trimite manual programele \u00eenapoi, iar timpul de reglaj este o valoare fix\u0103 pentru fiecare opera\u021bie. SkyPlanner este o solu\u021bie cloud care replanific\u0103 automat, stabile\u0219te succesiunea schimb\u0103rilor de fabrica\u021bie \u00een func\u021bie de perechile de produse \u0219i planific\u0103 \u00eempreun\u0103 echipele, sculele \u0219i materialele. Pute\u021bi verifica toate acestea pe propriile comenzi de produc\u021bie \u00een perioada de testare gratuit\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner \u00eenlocuie\u0219te modulul Produkcja?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner \u00eel completeaz\u0103. Comarch ERP XL gestioneaz\u0103 \u00een continuare tehnologiile, comenzile de produc\u021bie, MRP, rezerv\u0103rile, documentele RW \u0219i PW \u0219i calcula\u021bia costurilor. SkyPlanner programeaz\u0103 opera\u021biile \u00een func\u021bie de capacitatea real\u0103 \u0219i trimite datele \u00eenapoi \u00een comenzile de produc\u021bie.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Integrarea func\u021bioneaz\u0103 \u0219i cu Comarch ERP XL \u00een cloud?<\/summary>\n<p class=\"sp-faq__a\">Da. Comarch ofer\u0103 ERP XL pe serverele dumneavoastr\u0103 sau \u00een cloud, cu acces de la distan\u021b\u0103. Echipa SkyPlanner configureaz\u0103 conexiunea de citire \u0219i scriere pentru mediul dumneavoastr\u0103 \u00een etapa de configurare ini\u021bial\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>C\u00e2t cost\u0103 SkyPlanner pentru o fabric\u0103 ce utilizeaz\u0103 Comarch ERP XL?<\/summary>\n<p class=\"sp-faq__a\">De la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, plus 20 \u20ac pe lun\u0103 pentru fiecare centru de lucru suplimentar. Un centru de lucru este o resurs\u0103 de produc\u021bie cu propria list\u0103 de opera\u021bii programate. Primi\u021bi de la \u00eenceput o ofert\u0103 pentru integrare, adaptat\u0103 procesului \u0219i nevoilor dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul, astfel \u00eenc\u00e2t s\u0103 cunoa\u0219te\u021bi costul total \u00eenainte de a \u00eencepe.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de integrarea cu Comarch ERP XL?<\/summary>\n<p class=\"sp-faq__a\">Da. \u00cen perioada de testare de 30 de zile, pute\u021bi folosi un export Excel sau CSV al comenzilor de produc\u021bie deschise. Vede\u021bi un <a href=\"\/ro\/resurse\/capacitate-finita\/\">program cu capacitate finit\u0103<\/a> pentru propria produc\u021bie \u00eenainte de \u00eenceperea oric\u0103ror lucr\u0103ri de integrare. Implementarea se finalizeaz\u0103 apoi, de regul\u0103, \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea etapei de configurare ini\u021bial\u0103.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ Comarch ERP XL SkyPlanner APS pentru Comarch ERP XL: programarea produc\u021biei cu capacitate finit\u0103 SkyPlanner APS completeaz\u0103 Comarch ERP XL cu programare cu capacitate finit\u0103 pentru fiecare utilaj, operator, scul\u0103 \u0219i material. Vede\u021bi unde \u0219i c\u00e2nd se execut\u0103 fiecare opera\u021bie din fiecare comand\u0103 de produc\u021bie (zlecenie produkcyjne), iar Autopilot reprogrameaz\u0103 automat &#8230; <a title=\"SkyPlanner APS pentru Comarch ERP XL: programarea produc\u021biei cu capacitate finit\u0103\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/comarch-erp-xl\/\" aria-label=\"Read more about SkyPlanner APS pentru Comarch ERP XL: programarea produc\u021biei cu capacitate finit\u0103\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100697,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106488","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Comarch ERP XL: integrare APS cu capacitate finit\u0103<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS pentru Comarch ERP XL: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, utilaje, oameni, scule \u0219i materiale. De la 199 \u20ac pe lun\u0103.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/comarch-erp-xl\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS pentru Comarch ERP XL: programarea produc\u021biei cu capacitate finit\u0103\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS pentru Comarch ERP XL: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, utilaje, oameni, scule \u0219i materiale. De la 199 \u20ac pe lun\u0103.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/comarch-erp-xl\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/comarch-erp-xl\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/comarch-erp-xl\\\/\",\"name\":\"Comarch ERP XL: integrare APS cu capacitate finit\u0103\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS pentru Comarch ERP XL: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, utilaje, oameni, scule \u0219i materiale. De la 199 \u20ac pe lun\u0103.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/comarch-erp-xl\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/comarch-erp-xl\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/comarch-erp-xl\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru Comarch ERP XL: programarea produc\u021biei cu capacitate finit\u0103\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Comarch ERP XL: integrare APS cu capacitate finit\u0103","description":"SkyPlanner APS pentru Comarch ERP XL: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, utilaje, oameni, scule \u0219i materiale. De la 199 \u20ac pe lun\u0103.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/comarch-erp-xl\/","og_locale":"ro_RO","og_type":"article","og_title":"SkyPlanner APS pentru Comarch ERP XL: programarea produc\u021biei cu capacitate finit\u0103","og_description":"SkyPlanner APS pentru Comarch ERP XL: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, utilaje, oameni, scule \u0219i materiale. De la 199 \u20ac pe lun\u0103.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/comarch-erp-xl\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/comarch-erp-xl\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/comarch-erp-xl\/","name":"Comarch ERP XL: integrare APS cu capacitate finit\u0103","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS pentru Comarch ERP XL: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, utilaje, oameni, scule \u0219i materiale. De la 199 \u20ac pe lun\u0103.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/comarch-erp-xl\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/comarch-erp-xl\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/comarch-erp-xl\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru Comarch ERP XL: programarea produc\u021biei cu capacitate finit\u0103"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ Comarch ERP XL SkyPlanner APS pentru Comarch ERP XL: programarea produc\u021biei cu capacitate finit\u0103 SkyPlanner APS completeaz\u0103 Comarch ERP XL cu programare cu capacitate finit\u0103 pentru fiecare utilaj, operator, scul\u0103 \u0219i material. Vede\u021bi unde \u0219i c\u00e2nd se execut\u0103 fiecare opera\u021bie din fiecare comand\u0103 de produc\u021bie (zlecenie produkcyjne), iar Autopilot reprogrameaz\u0103 automat&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106488","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=106488"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106488\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/100697"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=106488"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}