{"id":106459,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/helios\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"helios","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/helios\/","title":{"rendered":"SkyPlanner APS pentru HELIOS: programarea produc\u021biei cu capacitate finit\u0103"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ HELIOS<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS pentru HELIOS: <span class=\"hl\">Programarea produc\u021biei cu capacitate finit\u0103<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS este o extensie pentru HELIOS care programeaz\u0103 produc\u021bia cu capacitate finit\u0103, \u021bin\u00e2nd cont de fiecare utilaj, operator, scul\u0103 \u0219i material. Vede\u021bi unde \u0219i c\u00e2nd se execut\u0103 fiecare opera\u021bie, iar Autopilot reface automat programul c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie. Func\u021bioneaz\u0103 cu HELIOS Nephrite \u0219i HELIOS iNuvio de la Asseco Solutions, dar \u0219i \u00een fabricile care folosesc \u00eenc\u0103 HELIOS Orange sau HELIOS Green.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner se integreaz\u0103 bidirec\u021bional cu HELIOS: preia comenzile de produc\u021bie, listele de materiale \u0219i fluxurile tehnologice, posturile de lucru, utilajele, meseriile, stocurile \u0219i comenzile de achizi\u021bie \u0219i trimite \u00eenapoi datele planificate \u0219i munca \u00eenregistrat\u0103. Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 HELIOS \u00een etapa de punere \u00een func\u021biune.<\/p>\n\n\n<p>Pre\u021bul porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, iar fiecare centru de lucru suplimentar cost\u0103 20 \u20ac pe lun\u0103. Perioada de testare gratuit\u0103 dureaz\u0103 30 de zile, cu p\u00e2n\u0103 la 20 de centre de lucru, f\u0103r\u0103 card de credit.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce se schimb\u0103 \u00een produc\u021bia dumneavoastr\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">O succesiune realizabil\u0103 pe fiecare utilaj.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner programeaz\u0103 fiecare opera\u021bie din fiecare comand\u0103 de produc\u021bie pe un anumit utilaj, la un anumit moment. Capacitatea este determinat\u0103 de schimburile efective, absen\u021be \u0219i ore suplimentare, astfel \u00eenc\u00e2t sec\u021bia de produc\u021bie s\u0103 poat\u0103 pune cu adev\u0103rat planul \u00een aplicare.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Costuri mai mici pentru schimb\u0103rile de fabrica\u021bie.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner memoreaz\u0103 timpii de trecere \u00eentre fiecare pereche de produse, \u00een ambele sensuri. Trecerea de la o culoare deschis\u0103 la una \u00eenchis\u0103 poate necesita o cl\u0103tire scurt\u0103, \u00een timp ce trecerea invers\u0103 necesit\u0103 o cur\u0103\u021bare complet\u0103. Motorul ordoneaz\u0103 opera\u021biile astfel \u00eenc\u00e2t timpul pierdut s\u0103 fie minim.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u0218i oamenii, \u0219i sculele au disponibilitate limitat\u0103.<\/p>\n\n\n<p class=\"fx-pain__b\">Unei opera\u021bii care necesit\u0103 trei operatori i se aloc\u0103 trei persoane disponibile \u00een schimburile respective. O matri\u021b\u0103 folosit\u0103 pe un utilaj nu este niciodat\u0103 alocat\u0103 simultan altui utilaj. C\u00e2nd un utilaj este ocupat, opera\u021bia este mutat\u0103 pe un utilaj alternativ sau la o alt\u0103 persoan\u0103.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materialele \u00eent\u00e2rziate nu mai dau planul peste cap.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner verific\u0103 stocul disponibil \u0219i comenzile de achizi\u021bie \u00een curs pentru fiecare material. O comand\u0103 de produc\u021bie care a\u0219teapt\u0103 o livrare de la furnizor este programat\u0103 dup\u0103 data acelei livr\u0103ri, \u00een loc s\u0103 fie \u00eenceput\u0103 \u0219i apoi oprit\u0103 \u00een sec\u021bia de produc\u021bie.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprogramare automat\u0103 la comenzi urgente \u0219i defec\u021biuni.<\/p>\n\n\n<p class=\"fx-pain__b\">C\u00e2nd un utilaj se opre\u0219te, un operator intr\u0103 \u00een concediu medical sau apare o comand\u0103 urgent\u0103, Autopilot reface programul. Bloc\u0103rile \u0219i priorit\u0103\u021bile stabilite de dumneavoastr\u0103 sunt respectate.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatorii \u00ee\u0219i v\u0103d lista de opera\u021bii.<\/p>\n\n\n<p class=\"fx-pain__b\">Fiecare operator vede urm\u0103toarele opera\u021bii pe telefon sau tablet\u0103 \u0219i \u00eenregistreaz\u0103 munca pe m\u0103sur\u0103 ce o execut\u0103. Personalul din birou urm\u0103re\u0219te progresul \u00een timp real, iar dumneavoastr\u0103 decide\u021bi dac\u0103 timpii efectivi sunt trimi\u0219i \u00eenapoi \u00een HELIOS.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een sec\u021bia de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar noua list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi m\u0103rturia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui program optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi m\u0103rturia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Un sudor KJH-Comp polizeaz\u0103 o structur\u0103 din o\u021bel sudat\u0103 la fabrica din Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>rata de respectare a termenelor de livrare, \u00een cre\u0219tere de la circa 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner joac\u0103 un rol decisiv \u00een men\u021binerea ratei noastre de respectare a termenelor de livrare.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, director general<\/b><br>KJH-Comp \u00b7 Prelucr\u0103ri de tabl\u0103 \u0219i produc\u021bie \u00een regim de subcontractare<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a crescut de la circa 50% p\u00e2n\u0103 la 98%, iar de programare se ocup\u0103 acum un singur responsabil \u00een loc de doi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/kjh-comp\/\">Citi\u021bi recenzia KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Vedere aerian\u0103 a fabricii Piristeel de sisteme de siguran\u021b\u0103 pentru acoperi\u0219uri din Kauhava\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>respectarea termenelor de livrare<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ne-a ajutat s\u0103 identific\u0103m blocajele \u0219i a clarificat gestionarea produc\u021biei.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, director de produc\u021bie<\/b><br>Piristeel \u00b7 Sisteme de siguran\u021b\u0103 pentru acoperi\u0219uri \u0219i sisteme pluviale<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a ajuns la 99,2% anul acesta, iar programarea economise\u0219te p\u00e2n\u0103 la patru ore de lucru pe zi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/piristeel\/\">Citi\u021bi recenzia Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-helios-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum func\u021bioneaz\u0103 integrarea cu HELIOS<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>HELIOS trimite lucr\u0103rile de executat.<\/strong> SkyPlanner preia comenzile de produc\u021bie (v\u00fdrobn\u00ed p\u0159\u00edkazy) cu opera\u021biile lor, listele de materiale (kusovn\u00edky), fluxurile tehnologice (technologick\u00e9 postupy), posturile de lucru, utilajele, meseriile, stocurile \u0219i comenzile de achizi\u021bie.<\/li>\n\n\n<li><strong>SkyPlanner creeaz\u0103 programul de produc\u021bie \u0219i \u00eel men\u021bine la zi.<\/strong> Motorul Arcturus programeaz\u0103 fiecare opera\u021bie \u00een c\u00e2teva secunde \u0219i reface programul pe m\u0103sur\u0103 ce apar schimb\u0103ri \u00een produc\u021bie.<\/li>\n\n\n<li><strong>Datele \u0219i munca \u00eenregistrat\u0103 sunt trimise \u00eenapoi.<\/strong> Datele planificate de \u00eenceput \u0219i de sf\u00e2r\u0219it sunt transferate \u00een comenzile de produc\u021bie din HELIOS, iar munca \u00eenregistrat\u0103 poate fi transmis\u0103 sub form\u0103 de \u00eenregistr\u0103ri ale opera\u021biilor (evidence v\u00fdrobn\u00edch operac\u00ed).<\/li>\n\n<\/ol>\n\n\n<p>HELIOS r\u0103m\u00e2ne sistemul principal de eviden\u021b\u0103. Articolele, preg\u0103tirea tehnic\u0103 (TPV), MRP, achizi\u021biile, gestiunea stocurilor, calcula\u021bia costurilor \u0219i finan\u021bele r\u0103m\u00e2n acolo unde sunt. SkyPlanner se ocup\u0103 de un singur lucru: ordinea \u0219i momentul execut\u0103rii fiec\u0103rei opera\u021bii pe fiecare resurs\u0103.<\/p>\n\n\n<p>Pentru HELIOS iNuvio, SkyPlanner cite\u0219te datele prin Inuvio REST API de pe Helios Inuvio Server \u0219i trimite datele \u00eenapoi prin ac\u021biuni REST configurate pentru activit\u0103\u021bile dumneavoastr\u0103 de produc\u021bie. Pentru HELIOS Nephrite, echipa SkyPlanner stabile\u0219te calea de integrare REST pentru instalarea dumneavoastr\u0103 \u00eempreun\u0103 cu dumneavoastr\u0103 \u0219i partenerul HELIOS, la definirea domeniului \u00een etapa de punere \u00een func\u021biune. Acelea\u0219i obiecte sunt transferate \u00een ambele sensuri. Webhook-urile SkyPlanner transmit fiecare modificare a programului imediat ce apare, iar frecven\u021ba sincroniz\u0103rii cu HELIOS se stabile\u0219te pentru fiecare fabric\u0103.<\/p>\n\n\n<p>Fiecare fabric\u0103 folose\u0219te HELIOS \u00een felul s\u0103u, a\u0219a c\u0103 echipa SkyPlanner adapteaz\u0103 integrarea la configura\u021bia dumneavoastr\u0103 \u00een etapa de punere \u00een func\u021biune \u0219i asigur\u0103 suport dup\u0103 lansare. Oferta de pre\u021b pentru integrare este stabilit\u0103 de la \u00eenceput, \u00een func\u021bie de procesele \u0219i nevoile dumneavoastr\u0103. Partenerul HELIOS sau propriii dezvoltatori pot construi, de asemenea, o integrare folosind API-ul documentat al SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia API<\/a>).<\/p>\n\n\n<p>Resursele REST, maparea datelor \u0219i regulile de trimitere a datelor \u00eenapoi sunt prezentate \u00een <a href=\"\/ro\/integrari\/erp\/helios\/ghid-de-integrare\/\">ghidul de integrare cu HELIOS pentru programarea produc\u021biei<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-helios-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce programeaz\u0103 HELIOS \u0219i ce aduce \u00een plus SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>HELIOS are propriile func\u021bii de planificare. HELIOS Nephrite include propriul APS, care <a href=\"https:\/\/www.helios.eu\/vyroba-nephrite\">optimizeaz\u0103 timpii dintre opera\u021bii \u0219i ordinea loturilor la fiecare post de lucru<\/a>, cu un panou pentru planul de produc\u021bie. HELIOS iNuvio ofer\u0103 planificarea de baz\u0103 a capacit\u0103\u021bii de produc\u021bie (Z\u00e1kladn\u00ed kapacitn\u00ed pl\u00e1nov\u00e1n\u00ed) \u0219i planificarea avansat\u0103 a produc\u021biei (Pokro\u010dil\u00e9 pl\u00e1nov\u00e1n\u00ed v\u00fdroby), cu vizualizare Gantt. <a href=\"https:\/\/public.helios.eu\/inuvio\/doc\/cs\/index.php?title=Pokro%C4%8Dil%C3%A9_pl%C3%A1nov%C3%A1n%C3%AD_v%C3%BDroby_-_V%C3%BDroba\">Documenta\u021bia iNuvio<\/a> explic\u0103 modul de func\u021bionare:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Planific\u0103 regresiv, apoi optimizeaz\u0103.<\/strong> Baza este planificarea regresiv\u0103 pornind de la data de finalizare a comenzii, completat\u0103 de o optimizare a produc\u021biei \u00een curs (*Z\u00e1kladem je tedy zp\u011btn\u00e9 pl\u00e1nov\u00e1n\u00ed*).<\/li>\n\n\n<li><strong>Capacitatea poate deveni nelimitat\u0103.<\/strong> O setare permite planificarea cu capacitate nelimitat\u0103 c\u00e2nd termenele-limit\u0103 nu sunt respectate (*Pl\u00e1novat do neomezen\u00fdch kapacit p\u0159i nedodr\u017een\u00ed limitn\u00edch term\u00edn\u016f*), iar resursele configurate s\u0103 nu blocheze capacitatea sunt planificate f\u0103r\u0103 limit\u0103 de capacitate \u00een orele prev\u0103zute de calendar.<\/li>\n\n\n<li><strong>Un singur plan activ, calculat prin rul\u0103ri succesive.<\/strong> Poate fi activ un singur plan al capacit\u0103\u021bii de produc\u021bie; celelalte sunt planuri de test. Fiecare plan afi\u0219eaz\u0103 data ultimei rul\u0103ri de calcul (<a href=\"https:\/\/public.helios.eu\/inuvio\/doc\/cs\/index.php?title=Z%C3%A1kladn%C3%AD_kapacitn%C3%AD_pl%C3%A1nov%C3%A1n%C3%AD_-_V%C3%BDroba\">documenta\u021bia pentru planificarea de baz\u0103 a capacit\u0103\u021bii de produc\u021bie<\/a>).<\/li>\n\n\n<li><strong>Planificatorul rezolv\u0103 conflictele.<\/strong> Dup\u0103 o rulare, HELIOS afi\u0219eaz\u0103 conflictele, cum ar fi supra\u00eenc\u0103rcarea resurselor \u0219i nerespectarea ordinii opera\u021biilor, pentru ca planificatorul s\u0103 le rezolve.<\/li>\n\n<\/ul>\n\n\n<p>Fiecare opera\u021bie din fluxul tehnologic are propriul timp de preg\u0103tire pentru utilaj \u0219i pentru operator (*p\u0159\u00edpravn\u00fd \u010das strojn\u00ed, p\u0159\u00edpravn\u00fd \u010das obsluhy*). SkyPlanner adaug\u0103 un program care respect\u0103 permanent capacitatea finit\u0103 a fiec\u0103rui utilaj, a fiec\u0103rei persoane \u0219i a fiec\u0103rei scule, programeaz\u0103 schimb\u0103rile de fabrica\u021bie \u00een func\u021bie de succesiune, verific\u0103 materialele care urmeaz\u0103 s\u0103 soseasc\u0103 \u0219i reface automat programul c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie.<\/p>\n\n\n<p>Fiecare pas \u0219i fiecare limit\u0103 sunt explicate \u00een <a href=\"\/ro\/integrari\/erp\/helios\/cu-capacitate-finita\/\">Ofer\u0103 HELIOS programare cu capacitate finit\u0103?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"helios-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">HELIOS \u00een prezent \u0219i cu SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Planificarea capacit\u0103\u021bii de produc\u021bie \u00een HELIOS<\/th><th>HELIOS cu SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Capacitate<\/td><td>Limitat\u0103 sau nelimitat\u0103 pentru fiecare resurs\u0103; trecere la capacitate nelimitat\u0103 c\u00e2nd termenele nu sunt respectate<\/td><td>Capacitate finit\u0103 pentru fiecare utilaj, persoan\u0103 \u0219i scul\u0103, pe baza schimburilor efective<\/td><\/tr><tr><td>Program de produc\u021bie<\/td><td>Loturi de produc\u021bie cu date estimate pentru fiecare opera\u021bie<\/td><td>Succesiune detaliat\u0103 pentru toate opera\u021biile, stabilit\u0103 \u00een c\u00e2teva secunde<\/td><\/tr><tr><td>Planuri<\/td><td>Un singur plan activ, celelalte planuri pentru testare<\/td><td>Un singur plan actualizat permanent de Autopilot<\/td><\/tr><tr><td>Schimb\u0103ri de fabrica\u021bie<\/td><td>Timp de preg\u0103tire stabilit pentru fiecare opera\u021bie din fluxul tehnologic<\/td><td>Matricea timpilor de preg\u0103tire: timp total minim de preg\u0103tire<\/td><\/tr><tr><td>Personal<\/td><td>Cerin\u021bele privind meseriile sunt corelate cu personalul disponibil<\/td><td>Operatori nominaliza\u021bi, cu schimburi definite; personal alocat opera\u021biilor care necesit\u0103 mai mul\u021bi operatori<\/td><\/tr><tr><td>Scule<\/td><td>Asocierile cu sculele sunt p\u0103strate \u00een preg\u0103tirea tehnic\u0103<\/td><td>Scule gestionate ca resurse partajate cu capacitate finit\u0103<\/td><\/tr><tr><td>Materiale<\/td><td>MRP genereaz\u0103 solicit\u0103ri de achizi\u021bie \u0219i de produc\u021bie<\/td><td>Opera\u021biile \u00eencep c\u00e2nd materialele sunt disponibile \u00een stoc sau sosesc din comenzile de achizi\u021bie<\/td><\/tr><tr><td>Modific\u0103ri<\/td><td>Recalcularea planului \u0219i rezolvarea conflictelor din list\u0103<\/td><td>Autopilot reface programul \u00eentregii fabrici, respect\u00e2nd priorit\u0103\u021bile dumneavoastr\u0103<\/td><\/tr><tr><td>Vizualizare pentru planificator<\/td><td>Diagram\u0103 Gantt a comenzilor \u00een raport cu capacitatea resurselor<\/td><td>Diagram\u0103 Gantt interactiv\u0103: muta\u021bi opera\u021biile, iar planul r\u0103m\u00e2ne coerent<\/td><\/tr><tr><td>Sec\u021bia de produc\u021bie<\/td><td>Raportarea opera\u021biilor \u00een HELIOS prin terminale sau coduri de bare<\/td><td>Operatorii v\u0103d lista de opera\u021bii de executat \u0219i \u00eenregistreaz\u0103 munca pe telefon sau tablet\u0103<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Alege\u021bi SkyPlanner \u00een locul HELIOS APS \u0219i al planific\u0103rii avansate din iNuvio atunci c\u00e2nd:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Planul se schimb\u0103 de mai multe ori pe s\u0103pt\u0103m\u00e2n\u0103.<\/strong> Autopilot reface automat programul la fiecare schimbare semnificativ\u0103, f\u0103r\u0103 o rulare de recalculare sau o list\u0103 de conflicte, iar noile date sunt trimise \u00eenapoi \u00een HELIOS.<\/li>\n\n\n<li><strong>Capacitatea trebuie s\u0103 r\u0103m\u00e2n\u0103 finit\u0103.<\/strong> SkyPlanner nu trece niciodat\u0103 la capacitate nelimitat\u0103 pentru a respecta un termen. Afi\u0219eaz\u0103 data real\u0103 de finalizare \u0219i v\u0103 permite s\u0103 interveni\u021bi prin priorit\u0103\u021bi, ore suplimentare sau un utilaj alternativ.<\/li>\n\n\n<li><strong>Schimb\u0103rile de fabrica\u021bie determin\u0103 volumul produc\u021biei.<\/strong> Matricea timpilor de preg\u0103tire con\u021bine timpii de schimbare a fabrica\u021biei pentru fiecare sens de trecere \u0219i stabile\u0219te succesiunile de culori, arome sau materiale cu cel mai mic timp total de preg\u0103tire.<\/li>\n\n\n<li><strong>Operatorii, sculele \u0219i materialele care urmeaz\u0103 s\u0103 soseasc\u0103 limiteaz\u0103 programul.<\/strong> Fiecare utilaj, persoan\u0103, scul\u0103 \u0219i material are o disponibilitate finit\u0103. Opera\u021biilor care necesit\u0103 mai mul\u021bi operatori li se aloc\u0103 personalul necesar, se folosesc centre de lucru alternative, iar opera\u021biile \u00eencep c\u00e2nd materialele sunt disponibile din stoc sau sunt livrate \u00een baza comenzilor de achizi\u021bie.<\/li>\n\n\n<li><strong>Fiecare operator trebuie s\u0103 lucreze dup\u0103 plan.<\/strong> Mobile Confirmations afi\u0219eaz\u0103 lista actualizat\u0103 a opera\u021biilor de executat pe telefon sau tablet\u0103, iar num\u0103rul de utilizatori este nelimitat: pre\u021bul depinde de num\u0103rul de centre de lucru, nu de num\u0103rul de utilizatori.<\/li>\n\n\n<li><strong>Dori\u021bi un program de produc\u021bie func\u021bional \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni.<\/strong> SkyPlanner este un software \u00een cloud care func\u021bioneaz\u0103 al\u0103turi de HELIOS. \u00cel testa\u021bi pe propriile comenzi de produc\u021bie \u00een perioada de prob\u0103 de 30 de zile, iar implementarea se finalizeaz\u0103, de regul\u0103, \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea etapei de punere \u00een func\u021biune.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum \u00eencepe\u021bi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103.<\/strong> 30 de zile, p\u00e2n\u0103 la 20 de centre de lucru, toate func\u021biile Basic, f\u0103r\u0103 card de credit.<\/li>\n\n\n<li><strong>Modela\u021bi produc\u021bia.<\/strong> Crea\u021bi utilaje, persoane \u0219i schimburi \u00een SkyPlanner sau importa\u021bi posturile de lucru \u0219i utilajele din HELIOS. Pute\u021bi beneficia de asisten\u021b\u0103 la punerea \u00een func\u021biune.<\/li>\n\n\n<li><strong>\u00cenc\u0103rca\u021bi comenzile.<\/strong> Exporta\u021bi \u00een Excel comenzile de produc\u021bie deschise \u0219i opera\u021biile lor dintr-o list\u0103 HELIOS, importa\u021bi-le \u0219i compara\u021bi programul creat de SkyPlanner cu planul dumneavoastr\u0103 actual.<\/li>\n\n\n<li><strong>Conecta\u021bi HELIOS.<\/strong> Echipa SkyPlanner configureaz\u0103 integrarea bidirec\u021bional\u0103 \u0219i asigur\u0103 suport dup\u0103 punerea \u00een func\u021biune.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u021buri.<\/strong> Abonamentele sunt facturate lunar, \u00een func\u021bie de num\u0103rul de centre de lucru. Pute\u021bi ad\u0103uga sau elimina centre de lucru ori anula abonamentul \u00een orice moment. Consulta\u021bi <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a> pentru detalii sau explora\u021bi <a href=\"\/ro\/integrari\/erp\/\">toate integr\u0103rile ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi proba gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Care este cel mai bun modul suplimentar de programare a produc\u021biei pentru HELIOS?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS este un modul suplimentar de programare cu capacitate finit\u0103, cu integrare bidirec\u021bional\u0103 cu HELIOS: preia comenzile de produc\u021bie, listele de materiale, fluxurile tehnologice, posturile de lucru, utilajele, stocurile \u0219i comenzile de achizi\u021bie \u0219i trimite \u00eenapoi datele planificate \u0219i lucr\u0103rile \u00eenregistrate. Capacitatea fiec\u0103rui utilaj, operator \u0219i a fiec\u0103rei scule, precum \u0219i disponibilitatea fiec\u0103rui material sunt limitate. O matrice a timpilor de preg\u0103tire, care \u021bine cont de sensul trecerii de la o opera\u021bie la alta, stabile\u0219te ordinea opera\u021biilor pentru a reduce la minimum timpul de preg\u0103tire. Autopilot reface automat programul c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie. Pre\u021bul porne\u0219te de la 199 \u20ac pe lun\u0103, iar perioada de testare gratuit\u0103 dureaz\u0103 30 de zile.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>HELIOS ofer\u0103 programare cu capacitate finit\u0103?<\/summary>\n<p class=\"sp-faq__a\">Par\u021bial. HELIOS Nephrite are propriul APS, iar HELIOS iNuvio ofer\u0103 func\u021bii de baz\u0103 \u0219i avansate pentru planificarea capacit\u0103\u021bii de produc\u021bie, care pot \u021bine cont de capacitatea limitat\u0103. Planurile sunt generate prin calcule efectuate pe un singur plan activ. Dac\u0103 termenele nu pot fi respectate, se poate trece la capacitate nelimitat\u0103, iar conflictele r\u0103m\u00e2n de rezolvat de c\u0103tre planificator. SkyPlanner APS func\u021bioneaz\u0103 al\u0103turi de HELIOS, \u021bine cont de capacitatea limitat\u0103 a fiec\u0103rui utilaj, a fiec\u0103rei persoane \u0219i a fiec\u0103rei scule, precum \u0219i de disponibilitatea limitat\u0103 a materialelor, \u0219i reface automat programul.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ce software de programare a produc\u021biei se integreaz\u0103 cu HELIOS?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS se integreaz\u0103 bidirec\u021bional cu HELIOS. Pentru HELIOS iNuvio, cite\u0219te comenzile de produc\u021bie, fluxurile tehnologice, stocurile \u0219i comenzile de achizi\u021bie prin Inuvio REST API \u0219i trimite \u00eenapoi datele planificate \u0219i munca \u00eenregistrat\u0103 prin ac\u021biuni REST. Pentru HELIOS Nephrite, acelea\u0219i obiecte sunt transferate \u00een ambele sensuri, iar echipa SkyPlanner stabile\u0219te calea de conectare pentru instalarea dumneavoastr\u0103 \u00een etapa de definire a domeniului implement\u0103rii.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner \u00eenlocuie\u0219te modulele de produc\u021bie HELIOS?<\/summary>\n<p class=\"sp-faq__a\">Nu, le completeaz\u0103. Preg\u0103tirea tehnic\u0103 (TPV), controlul produc\u021biei, MRP, achizi\u021biile, gestiunea stocurilor, calcula\u021bia costurilor \u0219i activit\u0103\u021bile financiare r\u0103m\u00e2n \u00een HELIOS. SkyPlanner programeaz\u0103 comenzile de produc\u021bie \u00een func\u021bie de capacitatea real\u0103 \u0219i trimite datele \u00eenapoi.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>S\u0103 alegem HELIOS APS sau SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, dac\u0103 planul se schimb\u0103 des, iar limitele de capacitate trebuie respectate. \u00cen HELIOS, planificarea se face prin calcule pe un singur plan activ. Sistemul poate trece la capacitate nelimitat\u0103 pentru a respecta termenele \u0219i las\u0103 planificatorului o list\u0103 de conflicte de rezolvat. SkyPlanner reface automat programul la fiecare schimbare, planific\u0103 schimb\u0103rile de fabrica\u021bie, sculele, echipele \u0219i materialele \u0219i \u00eei afi\u0219eaz\u0103 fiec\u0103rui operator pe telefon lista opera\u021biilor de executat, f\u0103r\u0103 limit\u0103 de utilizatori. Pute\u021bi verifica toate acestea cu propriile comenzi din HELIOS \u00een perioada de testare gratuit\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner func\u021bioneaz\u0103 cu HELIOS Orange \u0219i HELIOS Green?<\/summary>\n<p class=\"sp-faq__a\">Da. \u00cen etapa ini\u021bial\u0103 de implementare, echipa SkyPlanner define\u0219te domeniul integr\u0103rii pentru gama \u0219i versiunea HELIOS pe care le folosi\u021bi, iar programarea func\u021bioneaz\u0103 la fel \u00een toate gamele.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner este disponibil \u00een limba ceh\u0103?<\/summary>\n<p class=\"sp-faq__a\">Da. Fiecare utilizator poate alege limba ceh\u0103 pentru interfa\u021ba SkyPlanner, astfel \u00eenc\u00e2t planificatorii \u0219i operatorii s\u0103 lucreze \u00een propria limb\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>C\u00e2t cost\u0103 SkyPlanner pentru o fabric\u0103 ce folose\u0219te HELIOS?<\/summary>\n<p class=\"sp-faq__a\">De la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, plus 20 \u20ac pe lun\u0103 pentru fiecare centru de lucru suplimentar. Un centru de lucru este o resurs\u0103 de produc\u021bie cu propria list\u0103 de opera\u021bii programate. Oferta pentru integrare este stabilit\u0103 de la \u00eenceput \u00een func\u021bie de procesele \u0219i nevoile dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul, astfel \u00eenc\u00e2t s\u0103 cunoa\u0219te\u021bi costul total \u00eenainte de a \u00eencepe.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de integrarea cu HELIOS?<\/summary>\n<p class=\"sp-faq__a\">Da. \u00cen perioada de testare de 30 de zile, folosi\u021bi un export Excel al comenzilor de produc\u021bie deschise din HELIOS. Vede\u021bi un <a href=\"\/ro\/resurse\/capacitate-finita\/\">program cu capacitate finit\u0103<\/a> pentru propria produc\u021bie \u00eenainte de \u00eenceperea lucr\u0103rilor de integrare.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ HELIOS SkyPlanner APS pentru HELIOS: Programarea produc\u021biei cu capacitate finit\u0103 SkyPlanner APS este o extensie pentru HELIOS care programeaz\u0103 produc\u021bia cu capacitate finit\u0103, \u021bin\u00e2nd cont de fiecare utilaj, operator, scul\u0103 \u0219i material. Vede\u021bi unde \u0219i c\u00e2nd se execut\u0103 fiecare opera\u021bie, iar Autopilot reface automat programul c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie. Func\u021bioneaz\u0103 &#8230; <a title=\"SkyPlanner APS pentru HELIOS: programarea produc\u021biei cu capacitate finit\u0103\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/helios\/\" aria-label=\"Read more about SkyPlanner APS pentru HELIOS: programarea produc\u021biei cu capacitate finit\u0103\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100697,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106459","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integrare HELIOS pentru programare: APS cu capacitate finit\u0103<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS pentru HELIOS: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, fiecare utilaj, operator, scul\u0103 \u0219i material. De la 199 \u20ac pe lun\u0103.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/helios\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS pentru HELIOS: programarea produc\u021biei cu capacitate finit\u0103\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS pentru HELIOS: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, fiecare utilaj, operator, scul\u0103 \u0219i material. De la 199 \u20ac pe lun\u0103.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/helios\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/helios\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/helios\\\/\",\"name\":\"Integrare HELIOS pentru programare: APS cu capacitate finit\u0103\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS pentru HELIOS: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, fiecare utilaj, operator, scul\u0103 \u0219i material. De la 199 \u20ac pe lun\u0103.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/helios\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/helios\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/helios\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru HELIOS: programarea produc\u021biei cu capacitate finit\u0103\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integrare HELIOS pentru programare: APS cu capacitate finit\u0103","description":"SkyPlanner APS pentru HELIOS: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, fiecare utilaj, operator, scul\u0103 \u0219i material. De la 199 \u20ac pe lun\u0103.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/helios\/","og_locale":"ro_RO","og_type":"article","og_title":"SkyPlanner APS pentru HELIOS: programarea produc\u021biei cu capacitate finit\u0103","og_description":"SkyPlanner APS pentru HELIOS: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, fiecare utilaj, operator, scul\u0103 \u0219i material. De la 199 \u20ac pe lun\u0103.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/helios\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/helios\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/helios\/","name":"Integrare HELIOS pentru programare: APS cu capacitate finit\u0103","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS pentru HELIOS: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, fiecare utilaj, operator, scul\u0103 \u0219i material. De la 199 \u20ac pe lun\u0103.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/helios\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/helios\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/helios\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru HELIOS: programarea produc\u021biei cu capacitate finit\u0103"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ HELIOS SkyPlanner APS pentru HELIOS: Programarea produc\u021biei cu capacitate finit\u0103 SkyPlanner APS este o extensie pentru HELIOS care programeaz\u0103 produc\u021bia cu capacitate finit\u0103, \u021bin\u00e2nd cont de fiecare utilaj, operator, scul\u0103 \u0219i material. Vede\u021bi unde \u0219i c\u00e2nd se execut\u0103 fiecare opera\u021bie, iar Autopilot reface automat programul c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie. Func\u021bioneaz\u0103&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106459","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=106459"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106459\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/100697"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=106459"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}