{"id":106401,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/cegid\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"cegid","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/cegid\/","title":{"rendered":"SkyPlanner APS pentru Cegid: programarea produc\u021biei cu capacitate finit\u0103"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ Cegid<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS pentru Cegid: <span class=\"hl\">programarea produc\u021biei cu capacitate finit\u0103<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS adaug\u0103 programarea cu capacitate finit\u0103 la sistemele ERP Cegid pentru produc\u021bie, \u00een primul r\u00e2nd Cegid PMI, dar \u0219i Cegid Primavera \u0219i Cegid Ekon. Programeaz\u0103 fiecare utilaj, operator, scul\u0103 \u0219i material. Vede\u021bi unde \u0219i c\u00e2nd se execut\u0103 fiecare opera\u021bie a fiec\u0103rui ordin de fabrica\u021bie, iar Autopilot reprogrameaz\u0103 automat c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner se integreaz\u0103 bidirec\u021bional cu Cegid. Din Cegid PMI sunt preluate ordres de fabrication (OF), \u00eempreun\u0103 cu gammes, nomenclatures, postes de charge \u0219i utilajele aferente, precum \u0219i articolele, stocurile \u0219i comenzile c\u0103tre furnizori. Datele planificate de \u00eenceput \u0219i de sf\u00e2r\u0219it pentru fiecare opera\u021bie OF sunt trimise \u00eenapoi, \u00eempreun\u0103 cu timpul \u00eenregistrat sub form\u0103 de pointages. Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 Cegid \u00een etapa de implementare.<\/p>\n\n\n<p>Pre\u021bul porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, iar fiecare centru de lucru suplimentar cost\u0103 20 \u20ac pe lun\u0103. Perioada de testare gratuit\u0103 dureaz\u0103 30 de zile, cu p\u00e2n\u0103 la 20 de centre de lucru, f\u0103r\u0103 card de credit.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce se schimb\u0103 \u00een produc\u021bia dumneavoastr\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">O succesiune realizabil\u0103 pe fiecare utilaj.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner aloc\u0103 fiecare opera\u021bie OF unui anumit utilaj, la un anumit moment. Capacitatea este stabilit\u0103 pe baza schimburilor reale, a absen\u021belor \u0219i a orelor suplimentare, astfel \u00eenc\u00e2t sec\u021bia de produc\u021bie s\u0103 poat\u0103 respecta programul.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Costuri mai mici pentru schimb\u0103rile de fabrica\u021bie.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner p\u0103streaz\u0103 timpul de reglaj pentru trecerea de la un produs la altul, \u00een ambele sensuri, pentru fiecare pereche de produse. Trecerea de la un material moale la unul dur poate necesita doar o schimbare rapid\u0103 a sculei, \u00een timp ce trecerea invers\u0103 necesit\u0103 o cur\u0103\u021bare complet\u0103. Motorul ordoneaz\u0103 opera\u021biile astfel \u00eenc\u00e2t s\u0103 se piard\u0103 c\u00e2t mai pu\u021bin timp.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u0218i oamenii, \u0219i sculele au disponibilitate limitat\u0103.<\/p>\n\n\n<p class=\"fx-pain__b\">Unei opera\u021bii care necesit\u0103 trei operatori i se aloc\u0103 trei persoane disponibile \u00een schimburile respective. O matri\u021b\u0103 sau un dispozitiv de fixare folosit pe un utilaj nu este niciodat\u0103 rezervat simultan pe altul. C\u00e2nd un utilaj este ocupat, opera\u021bia este mutat\u0103 la un alt utilaj sau la o alt\u0103 persoan\u0103.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materialul stabile\u0219te momentul \u00eenceperii.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner verific\u0103 stocul \u0219i comenzile deschise c\u0103tre furnizori pentru fiecare component\u0103. O opera\u021bie care a\u0219teapt\u0103 o livrare este programat\u0103 dup\u0103 data acelei livr\u0103ri, \u00een loc s\u0103 fie \u00eenceput\u0103 \u0219i apoi oprit\u0103 \u00een sec\u021bia de produc\u021bie.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprogramare automat\u0103 la comenzi urgente \u0219i defec\u021biuni.<\/p>\n\n\n<p class=\"fx-pain__b\">C\u00e2nd un utilaj se opre\u0219te sau apare o comand\u0103 urgent\u0103, Autopilot reface programul. Bloc\u0103rile \u0219i priorit\u0103\u021bile stabilite de dumneavoastr\u0103 sunt respectate, iar noile date sunt trimise \u00eenapoi \u00een Cegid.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatorii \u00ee\u0219i v\u0103d lista de opera\u021bii.<\/p>\n\n\n<p class=\"fx-pain__b\">Fiecare operator vede urm\u0103toarele opera\u021bii pe telefon sau tablet\u0103 \u0219i \u00eenregistreaz\u0103 activitatea pe m\u0103sur\u0103 ce o execut\u0103. La birou, progresul este vizibil \u00een timp real, iar dumneavoastr\u0103 decide\u021bi dac\u0103 timpul \u00eenregistrat este trimis \u00eenapoi \u00een Cegid.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een sec\u021bia de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar noua list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi m\u0103rturia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui program optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi m\u0103rturia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Un sudor KJH-Comp polizeaz\u0103 o structur\u0103 din o\u021bel sudat\u0103 la fabrica din Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>rata de respectare a termenelor de livrare, \u00een cre\u0219tere de la circa 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner joac\u0103 un rol decisiv \u00een men\u021binerea ratei noastre de respectare a termenelor de livrare.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, director general<\/b><br>KJH-Comp \u00b7 Prelucr\u0103ri de tabl\u0103 \u0219i produc\u021bie \u00een regim de subcontractare<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a crescut de la circa 50% p\u00e2n\u0103 la 98%, iar de programare se ocup\u0103 acum un singur responsabil \u00een loc de doi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/kjh-comp\/\">Citi\u021bi recenzia KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, director general al Mamec, \u00een hala de produc\u021bie a companiei din Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000+<\/b><span>de comenzi de produc\u021bie programate automat<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eAvem un alt control asupra produc\u021biei \u0219i \u00een\u021belegem cu totul altfel capacitatea de produc\u021bie de care dispunem.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, director general<\/b><br>Mamec \u00b7 Mixere industriale, pompe \u0219i subcontractare pentru produc\u021bie de \u00eenalt\u0103 tehnologie<\/p>\n\n\n<p class=\"ind-cust__result\">Mii de comenzi de produc\u021bie sunt programate automat, iar \u00eentreaga organiza\u021bie are o imagine \u00een timp real asupra produc\u021biei.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/mamec\/\">Citi\u021bi recenzia Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-cegid-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum func\u021bioneaz\u0103 integrarea cu Cegid<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Cegid transmite lucr\u0103rile de executat.<\/strong> \u00cen SkyPlanner sunt preluate OF cu opera\u021biile aferente, gammes, nomenclatures, postes de charge, utilajele, articolele, stocurile \u0219i comenzile c\u0103tre furnizori.<\/li>\n\n\n<li><strong>SkyPlanner creeaz\u0103 programul \u0219i \u00eel men\u021bine la zi.<\/strong> Motorul Arcturus programeaz\u0103 fiecare opera\u021bie \u00een c\u00e2teva secunde \u0219i reface programul c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie.<\/li>\n\n\n<li><strong>Datele \u0219i activitatea \u00eenregistrat\u0103 sunt trimise \u00eenapoi.<\/strong> Datele planificate de \u00eenceput \u0219i de sf\u00e2r\u0219it sunt trimise \u00eenapoi pentru fiecare opera\u021bie OF, iar timpul \u00eenregistrat poate fi transmis sub form\u0103 de pointages.<\/li>\n\n<\/ol>\n\n\n<p>Cegid r\u0103m\u00e2ne sistemul de referin\u021b\u0103 pentru datele dumneavoastr\u0103. Articolele, nomenclatures, gammes, CBN (necesarul net), achizi\u021biile, stocurile, calcula\u021bia costurilor \u0219i gestiunea financiar\u0103 r\u0103m\u00e2n acolo unde sunt. SkyPlanner se ocup\u0103 de un singur lucru: ordinea \u0219i momentul execut\u0103rii fiec\u0103rei opera\u021bii pe fiecare resurs\u0103.<\/p>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cegid PMI.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner cite\u0219te \u0219i scrie date prin interfa\u021ba Web API pus\u0103 la dispozi\u021bie de Cegid pentru PMI. Potrivit Cegid, aceasta permite schimbul securizat de date cu aplica\u021bii externe, p\u0103str\u00e2nd intacte regulile de gestiune din Manufacturing PMI (<a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Cegid PMI<\/a>).<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cegid Primavera.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner folose\u0219te PRIMAVERA ERP V10 API, care permite citirea \u0219i scrierea datelor \u00een toate modulele. Sunt preluate ordens de fabrico, opera\u021biile, centros de trabalho, roteiros \u0219i fichas t\u00e9cnicas. Datele planificate ale opera\u021biilor sunt trimise \u00eenapoi prin serviciul Planeamento (ActualizaPlaneamentoOperacao), iar timpul \u00eenregistrat, prin Di\u00e1rios de Trabalho (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/api-documentation\/\">V10 API<\/a>).<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cegid Ekon.<\/p>\n\n\n<p class=\"fx-pain__b\">Sunt preluate \u00f3rdenes de fabricaci\u00f3n, hojas de ruta \u0219i listas de materiales, iar datele planificate \u0219i imputaciones sunt trimise \u00eenapoi. Echipa SkyPlanner stabile\u0219te modalitatea de integrare pentru instalarea dumneavoastr\u0103 Ekon \u00een etapa de definire a domeniului.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Webhook-urile SkyPlanner transmit fiecare modificare a programului imediat ce are loc, iar frecven\u021ba sincroniz\u0103rii cu Cegid se stabile\u0219te pentru fiecare fabric\u0103. Fiecare fabric\u0103 folose\u0219te Cegid diferit, a\u0219a c\u0103 echipa SkyPlanner adapteaz\u0103 integrarea la configura\u021bia dumneavoastr\u0103 \u00een etapa de implementare \u0219i asigur\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een func\u021biune. Oferta de pre\u021b pentru integrare este stabilit\u0103 de la \u00eenceput, \u00een func\u021bie de procesele \u0219i nevoile dumneavoastr\u0103. Partenerul dumneavoastr\u0103 Cegid sau propriii dezvoltatori pot, de asemenea, s\u0103 realizeze integrarea folosind API-ul documentat SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">Documenta\u021bie API<\/a>).<\/p>\n\n\n<p>Interfe\u021bele, coresponden\u021ba dintre date \u0219i regulile de scriere \u00eenapoi \u00een Cegid sunt prezentate \u00een <a href=\"\/ro\/integrari\/erp\/cegid\/ghid-de-integrare\/\">ghidul de integrare cu Cegid pentru programarea produc\u021biei<\/a>. Folosi\u021bi Cegid XRP Flex? Acesta este construit pe Acumatica, a\u0219a c\u0103 vede\u021bi <a href=\"\/ro\/integrari\/erp\/acumatica\/\">SkyPlanner pentru Acumatica<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-cegid-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce programeaz\u0103 Cegid \u0219i ce adaug\u0103 SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Cegid PMI gestioneaz\u0103 \u00eentregul ciclu de produc\u021bie: OF generate din comanda clientului sau din CBN, planificare, urm\u0103rirea activit\u0103\u021bii din sec\u021bia de produc\u021bie pe fiecare centru de lucru \u0219i \u00eenregistrarea timpului prin coduri de bare. <a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Pagina Cegid PMI<\/a> descrie planificarea \u00een doi pa\u0219i \u0219i arat\u0103 cum poate fi extins\u0103:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Mai \u00eent\u00e2i, capacitate infinit\u0103.<\/strong> PMI ofer\u0103 &#8220;des OF planifi\u00e9s \u00e0 capacit\u00e9 infinie pour vous permettre de g\u00e9rer rapidement les charges et surcharges, la file d&#8217;attente&#8221; (OF planificate cu capacitate infinit\u0103, pentru a gestiona rapid \u00eenc\u0103rcarea, supra\u00eenc\u0103rcarea \u0219i coada de a\u0219teptare).<\/li>\n\n\n<li><strong>Apoi, capacitate finit\u0103, \u021bin\u00e2nd cont de resurse \u0219i stocuri.<\/strong> Urm\u0103torul pas este &#8220;la planification \u00e0 capacit\u00e9 finie tenant compte des contraintes de vos ressources et des stocks.&#8221; (planificarea cu capacitate finit\u0103, care \u021bine cont de constr\u00e2ngerile resurselor \u0219i ale stocurilor).<\/li>\n\n\n<li><strong>Cegid recomand\u0103 un APS pentru cerin\u021be suplimentare.<\/strong> &#8220;Connectez des outils de planification avanc\u00e9e pour aller plus loin dans la gestion des contraintes de planification.&#8221; (Conecta\u021bi instrumente de planificare avansat\u0103 pentru a gestiona mai bine constr\u00e2ngerile de planificare.)<\/li>\n\n<\/ul>\n\n\n<p><strong>Cegid Primavera<\/strong> ofer\u0103 planificare grafic\u0103: planificatorul distribuie opera\u021biile pe centros de trabalho, iar &#8220;o algoritmo de planeamento que sugere a melhor alternativa de escalonamento&#8221; (algoritmul de planificare care sugereaz\u0103 cea mai bun\u0103 variant\u0103 de programare) propune o succesiune. Planificatorul simuleaz\u0103 variante de plan \u0219i decide (<a href=\"https:\/\/pt.primaverabss.com\/pt\/software\/solucoes-setoriais\/industria\/manufacturing\/\">Cegid Primavera Manufacturing<\/a>).<\/p>\n\n\n<p><strong>Cegid Ekon XRP Industria<\/strong> genereaz\u0103 hojas de ruta, listas de materiales \u0219i \u00f3rdenes de trabajo pe baza \u00f3rdenes de fabricaci\u00f3n \u0219i \u00eenregistreaz\u0103 imputaciones \u00een sec\u021bia de produc\u021bie sau la birou (<a href=\"https:\/\/www.cegid.com\/ib\/es\/productos\/software-gestion-produccion-industrial\/\">Cegid Ekon<\/a>).<\/p>\n\n\n<p>SkyPlanner este un instrument de planificare avansat\u0103 exact de tipul celor pe care Cegid recomand\u0103 s\u0103 le conecta\u021bi. Fiecare pas este explicat \u00een <a href=\"\/ro\/integrari\/erp\/cegid\/cu-capacitate-finita\/\">Cegid ofer\u0103 programare cu capacitate finit\u0103?<\/a> Pentru conceptele de baz\u0103, consulta\u021bi <a href=\"\/ro\/resurse\/capacitate-finita\/\">programarea cu capacitate finit\u0103<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"cegid-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cegid \u00een prezent \u0219i al\u0103turi de SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Planificarea \u00een Cegid PMI<\/th><th>Cegid cu SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Capacitate<\/td><td>OF cu capacitate infinit\u0103, apoi planificare cu capacitate finit\u0103 pe baza resurselor \u0219i a stocurilor<\/td><td>Capacitate finit\u0103 pentru fiecare utilaj, persoan\u0103 \u0219i scul\u0103, pe baza schimburilor reale<\/td><\/tr><tr><td>Program<\/td><td>Urm\u0103toarele OF pe fiecare centru de lucru, pentru orele sau zilele urm\u0103toare<\/td><td>Succesiune detaliat\u0103 pentru fiecare opera\u021bie OF, stabilit\u0103 \u00een c\u00e2teva secunde<\/td><\/tr><tr><td>Schimb\u0103ri de fabrica\u021bie<\/td><td>Planificate cu respectarea constr\u00e2ngerilor de resurse \u0219i stocuri<\/td><td>Matricea timpilor de preg\u0103tire: timp total de reglaj minim<\/td><\/tr><tr><td>Personal \u0219i scule<\/td><td>Salari\u00e9s \u0219i utilaje \u00een nomenclatoare<\/td><td>Operatori nominaliza\u021bi, cu schimburi; scule ca resurse partajate cu capacitate finit\u0103; opera\u021bii cu mai mul\u021bi operatori<\/td><\/tr><tr><td>Materiale<\/td><td>CBN propune OF \u0219i comenzi c\u0103tre furnizori<\/td><td>Opera\u021biile \u00eencep c\u00e2nd materialele sunt disponibile din stoc sau sosesc de la furnizori<\/td><\/tr><tr><td>Modific\u0103ri<\/td><td>Planificatorul gestioneaz\u0103 \u00eenc\u0103rcarea, supra\u00eenc\u0103rcarea \u0219i coada de a\u0219teptare<\/td><td>Autopilot reface programul \u00eentregii fabrici, respect\u00e2nd priorit\u0103\u021bile dumneavoastr\u0103<\/td><\/tr><tr><td>Lucr\u0103ri \u00eencepute<\/td><td>Pointages \u00eenregistrate pe OF prin coduri de bare<\/td><td>Progresul \u00eenregistrat actualizeaz\u0103 programul; Running Time Lock fixeaz\u0103 programul pentru orele urm\u0103toare<\/td><\/tr><tr><td>Vizualizare pentru planificator<\/td><td>\u00cenc\u0103rcare, supra\u00eenc\u0103rcare \u0219i coad\u0103 de a\u0219teptare pe fiecare centru de lucru<\/td><td>Diagram\u0103 Gantt interactiv\u0103: muta\u021bi opera\u021biile, iar programul r\u0103m\u00e2ne coerent<\/td><\/tr><tr><td>Sec\u021bia de produc\u021bie<\/td><td>Terminale cu cititoare de coduri de bare \u0219i interfa\u021b\u0103 MES<\/td><td>Operatorii \u00ee\u0219i v\u0103d coada de opera\u021bii \u0219i \u00eenregistreaz\u0103 activitatea pe telefon sau tablet\u0103<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-cegid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum alege\u021bi o solu\u021bie de programare pentru Cegid<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Planificarea din Cegid PMI se potrive\u0219te unei fabrici cu gammes stabile, c\u00e2teva postes de charge esen\u021biale \u0219i un plan s\u0103pt\u0103m\u00e2nal revizuit de un planificator. Planificarea grafic\u0103 din Cegid Primavera se potrive\u0219te unui planificator care stabile\u0219te succesiunea pe panoul de planificare, folosind sugestiile algoritmului. C\u00e2nd utilajele, personalul, sculele \u0219i materialele limiteaz\u0103 toate produc\u021bia, iar programul se schimb\u0103 zilnic, conecta\u021bi un APS, a\u0219a cum sugereaz\u0103 chiar Cegid.<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Op\u021biune<\/th><th>Ce ofer\u0103<\/th><th>C\u00e2nd se potrive\u0219te<\/th><\/tr><\/thead><tbody><tr><td>Planificarea integrat\u0103 \u00een Cegid<\/td><td>PMI: planificare cu capacitate infinit\u0103, apoi finit\u0103; Primavera: planificare grafic\u0103, cu sugestii de la algoritm<\/td><td>Un planificator stabile\u0219te manual succesiunea opera\u021biilor pentru c\u00e2teva resurse care limiteaz\u0103 produc\u021bia<\/td><\/tr><tr><td>APS \u0219i instrumente de planificare pentru Cegid<\/td><td>Solu\u021bii de programare pe baza constr\u00e2ngerilor, instrumente generale de planificare a resurselor \u0219i sisteme MES cu planificare, conectate la Cegid<\/td><td>O echip\u0103 dedicat\u0103 de planificare folose\u0219te un instrument separat de programare<\/td><\/tr><tr><td>APS \u00een cloud cu func\u021bii pentru execu\u021bia produc\u021biei \u00een sec\u021bie<\/td><td>SkyPlanner APS: capacitate finit\u0103 pentru fiecare resurs\u0103, reprogramare automat\u0103, aplica\u021bie pentru operatori, integrare bidirec\u021bional\u0103 cu Cegid<\/td><td>Dori\u021bi s\u0103 ave\u021bi \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni un program cu capacitate finit\u0103, actualizat automat \u00een timp real<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Alege\u021bi SkyPlanner \u00een locul planific\u0103rii integrate \u00een Cegid c\u00e2nd:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Constr\u00e2ngerile nu se limiteaz\u0103 la resurse \u0219i stocuri.<\/strong> Cegid descrie etapa cu capacitate finit\u0103 din PMI drept planificare pe baza resurselor \u0219i a stocurilor \u0219i recomand\u0103 instrumente de planificare avansat\u0103 pentru constr\u00e2ngeri suplimentare (<a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Cegid PMI<\/a>). SkyPlanner programeaz\u0103 utilajele, operatorii, sculele, reglajele \u0219i materialele care urmeaz\u0103 s\u0103 soseasc\u0103 \u00eentr-o singur\u0103 rulare.<\/li>\n\n\n<li><strong>Planul trebuie s\u0103 r\u0103m\u00e2n\u0103 mereu actualizat.<\/strong> Algoritmul Primavera propune un plan, iar planificatorul simuleaz\u0103 \u0219i decide (<a href=\"https:\/\/pt.primaverabss.com\/pt\/software\/solucoes-setoriais\/industria\/manufacturing\/\">Cegid Primavera<\/a>). Autopilot replanific\u0103 automat la fiecare schimbare semnificativ\u0103, iar datele sunt trimise \u00eenapoi \u00een Cegid.<\/li>\n\n\n<li><strong>Schimb\u0103rile de fabrica\u021bie determin\u0103 volumul produs.<\/strong> Matricea timpilor de reglaj \u021bine cont de sensul trecerii de la un produs la altul, iar \u201eAllow similarity\u201d grupeaz\u0103 opera\u021biile dup\u0103 o caracteristic\u0103, de exemplu scula utilizat\u0103.<\/li>\n\n\n<li><strong>Echipele \u0219i sculele impun limite planului.<\/strong> Opera\u021biilor care necesit\u0103 mai mul\u021bi operatori li se aloc\u0103 personalul disponibil efectiv \u00een schimburi. O scul\u0103 este rezervat\u0103 unui singur utilaj la un moment dat, iar opera\u021biile pot fi transferate c\u0103tre alte utilaje sau persoane.<\/li>\n\n\n<li><strong>Fiecare operator ar trebui s\u0103 lucreze conform planului.<\/strong> Mobile Confirmations afi\u0219eaz\u0103 lista actualizat\u0103 de opera\u021bii pe fiecare telefon sau tablet\u0103, iar num\u0103rul de utilizatori este nelimitat: pre\u021bul depinde de centrele de lucru, nu de num\u0103rul de utilizatori.<\/li>\n\n\n<li><strong>Dori\u021bi un singur pre\u021b lunar.<\/strong> De la 199 \u20ac pe lun\u0103, cu integrarea bidirec\u021bional\u0103 configurat\u0103 de echipa SkyPlanner \u0219i cu asisten\u021b\u0103 tehnic\u0103 oferit\u0103 de aceasta.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum \u00eencepe\u021bi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103.<\/strong> 30 de zile, p\u00e2n\u0103 la 20 de centre de lucru, toate func\u021biile Basic, f\u0103r\u0103 card de credit.<\/li>\n\n\n<li><strong>Modela\u021bi-v\u0103 produc\u021bia.<\/strong> Defini\u021bi utilajele, personalul \u0219i schimburile \u00een SkyPlanner sau importa\u021bi postes de charge \u0219i utilajele din Cegid. Ave\u021bi la dispozi\u021bie asisten\u021b\u0103 la configurarea ini\u021bial\u0103.<\/li>\n\n\n<li><strong>\u00cenc\u0103rca\u021bi ordinele de fabrica\u021bie (OF).<\/strong> Exporta\u021bi din Cegid \u00een Excel ordinele OF deschise \u0219i opera\u021biile lor, de exemplu cu generatorul de rapoarte din PMI. Importa\u021bi-le \u0219i compara\u021bi programul SkyPlanner cu planul actual.<\/li>\n\n\n<li><strong>Conecta\u021bi Cegid.<\/strong> Echipa SkyPlanner configureaz\u0103 integrarea bidirec\u021bional\u0103 \u0219i asigur\u0103 suportul dup\u0103 punerea \u00een func\u021biune.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u021buri.<\/strong> Abonamentele sunt facturate lunar, pe centru de lucru. Pute\u021bi ad\u0103uga sau elimina centre de lucru ori anula abonamentul \u00een orice moment. Consulta\u021bi <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a> pentru detalii sau descoperi\u021bi <a href=\"\/ro\/integrari\/erp\/\">toate integr\u0103rile ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi proba gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Contacta\u021bi echipa de v\u00e2nz\u0103ri<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Care este cea mai bun\u0103 extensie de programare a produc\u021biei pentru Cegid?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS este o extensie de programare cu capacitate finit\u0103 care se integreaz\u0103 bidirec\u021bional cu Cegid PMI, Cegid Primavera \u0219i Cegid Ekon. Preia ordinele OF cu gammes, nomenclatures, postes de charge, utilaje, articole, stocuri \u0219i comenzi c\u0103tre furnizori \u0219i trimite \u00eenapoi datele planificate ale opera\u021biilor \u0219i timpii \u00eenregistra\u021bi. Capacitatea fiec\u0103rui utilaj \u0219i operator, precum \u0219i disponibilitatea fiec\u0103rei scule \u0219i a fiec\u0103rui material sunt limitate. O matrice a timpilor de reglaj, care \u021bine cont de sensul trecerii de la un produs la altul, ordoneaz\u0103 opera\u021biile pentru a reduce la minimum reglajele. Autopilot reprogrameaz\u0103 automat c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie. Pre\u021bul porne\u0219te de la 199 \u20ac pe lun\u0103, iar perioada de prob\u0103 gratuit\u0103 dureaz\u0103 30 de zile.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cegid ofer\u0103 programare cu capacitate finit\u0103?<\/summary>\n<p class=\"sp-faq__a\">Par\u021bial. Cegid PMI planific\u0103 mai \u00eent\u00e2i ordinele OF cu capacitate infinit\u0103, apoi cu capacitate finit\u0103, pe baza resurselor \u0219i stocurilor. Pentru constr\u00e2ngeri suplimentare, Cegid recomand\u0103 instrumente de planificare avansat\u0103. Cegid Primavera permite planificarea grafic\u0103, folosind un algoritm care propune o succesiune a opera\u021biilor. SkyPlanner APS completeaz\u0103 Cegid prin programarea care respect\u0103 capacitatea fiec\u0103rui utilaj \u0219i a fiec\u0103rei persoane, precum \u0219i disponibilitatea sculelor \u0219i materialelor, \u0219i replanific\u0103 automat.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ce software de programare a produc\u021biei se integreaz\u0103 cu Cegid?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS se integreaz\u0103 bidirec\u021bional cu Cegid. \u00cen cazul Cegid PMI, cite\u0219te \u0219i scrie date prin PMI Web API: preia ordinele OF \u0219i opera\u021biile \u0219i trimite \u00eenapoi datele planificate \u0219i pointages. Pentru Cegid Primavera, folose\u0219te PRIMAVERA V10 API: preia ordens de fabrico, trimite \u00eenapoi datele planificate ale opera\u021biilor prin serviciul Planeamento \u0219i timpii prin Di\u00e1rios de Trabalho.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>S\u0103 folosim planificarea din Cegid PMI sau SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, atunci c\u00e2nd constr\u00e2ngerile dep\u0103\u0219esc utilajele \u0219i stocurile, iar planul se schimb\u0103 frecvent. Cegid descrie planificarea cu capacitate finit\u0103 din PMI ca fiind bazat\u0103 pe resurse \u0219i stocuri \u0219i recomand\u0103 instrumente de planificare avansat\u0103 pentru cerin\u021be suplimentare. SkyPlanner este un astfel de instrument: planific\u0103 \u00eempreun\u0103 operatorii, sculele, reglajele \u0219i materialele care urmeaz\u0103 s\u0103 soseasc\u0103, replanific\u0103 automat \u0219i ofer\u0103 fiec\u0103rui operator propria list\u0103 de opera\u021bii, f\u0103r\u0103 limit\u0103 de utilizatori. Pute\u021bi verifica toate acestea cu propriile ordine OF \u00een perioada de prob\u0103 gratuit\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner \u00eenlocuie\u0219te gestionarea produc\u021biei din Cegid?<\/summary>\n<p class=\"sp-faq__a\">Nu, o completeaz\u0103. Articolele, nomenclatures, gammes, CBN, crearea ordinelor OF, achizi\u021biile, stocurile, calculul costurilor \u0219i gestiunea financiar\u0103 r\u0103m\u00e2n \u00een Cegid. SkyPlanner programeaz\u0103 ordinele OF \u00een func\u021bie de capacitatea real\u0103 \u0219i trimite datele \u00eenapoi.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cu ce sisteme ERP Cegid func\u021bioneaz\u0103 SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Cegid PMI \u00een Fran\u021ba, Cegid Primavera Manufacturing \u00een Portugalia \u0219i Cegid Ekon XRP Industria \u00een Spania. Cegid XRP Flex este construit pe Acumatica, a\u0219adar se aplic\u0103 <a href=\"\/ro\/integrari\/erp\/acumatica\/\">integrarea cu Acumatica<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>C\u00e2t cost\u0103 SkyPlanner pentru o fabric\u0103 ce folose\u0219te Cegid?<\/summary>\n<p class=\"sp-faq__a\">De la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, plus 20 \u20ac pe lun\u0103 pentru fiecare centru de lucru suplimentar. Un centru de lucru este o resurs\u0103 de produc\u021bie cu propria list\u0103 de opera\u021bii programate. Primi\u021bi de la \u00eenceput o ofert\u0103 pentru integrare, adaptat\u0103 procesului \u0219i nevoilor dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul, astfel \u00eenc\u00e2t s\u0103 cunoa\u0219te\u021bi costul total \u00eenainte de a \u00eencepe.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>C\u00e2t dureaz\u0103 implementarea?<\/summary>\n<p class=\"sp-faq__a\">Implementarea se finalizeaz\u0103 \u00een mod normal \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea configur\u0103rii ini\u021biale. Echipa stabile\u0219te coresponden\u021bele pentru postes de charge, utilaje \u0219i gammes, conecteaz\u0103 ordinele OF \u0219i comenzile c\u0103tre furnizori \u0219i trimite \u00eenapoi datele planificate. Totul este testat \u00een raport cu planul actual \u00eenainte de punerea \u00een func\u021biune.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de integrarea cu Cegid?<\/summary>\n<p class=\"sp-faq__a\">Da. \u00cen perioada de prob\u0103 de 30 de zile, folosi\u021bi un export Excel al ordinelor OF deschise din Cegid. Vede\u021bi un <a href=\"\/ro\/resurse\/capacitate-finita\/\">program cu capacitate finit\u0103<\/a> pentru propria produc\u021bie \u00eenainte s\u0103 \u00eenceap\u0103 lucr\u0103rile de integrare.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ Cegid SkyPlanner APS pentru Cegid: programarea produc\u021biei cu capacitate finit\u0103 SkyPlanner APS adaug\u0103 programarea cu capacitate finit\u0103 la sistemele ERP Cegid pentru produc\u021bie, \u00een primul r\u00e2nd Cegid PMI, dar \u0219i Cegid Primavera \u0219i Cegid Ekon. Programeaz\u0103 fiecare utilaj, operator, scul\u0103 \u0219i material. Vede\u021bi unde \u0219i c\u00e2nd se execut\u0103 fiecare opera\u021bie a &#8230; <a title=\"SkyPlanner APS pentru Cegid: programarea produc\u021biei cu capacitate finit\u0103\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/cegid\/\" aria-label=\"Read more about SkyPlanner APS pentru Cegid: programarea produc\u021biei cu capacitate finit\u0103\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100697,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106401","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integrare Cegid: programare cu capacitate finit\u0103 prin APS<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS extinde Cegid: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, fiecare utilaj, operator, scul\u0103 \u0219i material. De la 199 \u20ac pe lun\u0103.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/cegid\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS pentru Cegid: programarea produc\u021biei cu capacitate finit\u0103\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS extinde Cegid: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, fiecare utilaj, operator, scul\u0103 \u0219i material. De la 199 \u20ac pe lun\u0103.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/cegid\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/cegid\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/cegid\\\/\",\"name\":\"Integrare Cegid: programare cu capacitate finit\u0103 prin APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS extinde Cegid: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, fiecare utilaj, operator, scul\u0103 \u0219i material. De la 199 \u20ac pe lun\u0103.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/cegid\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/cegid\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/cegid\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru Cegid: programarea produc\u021biei cu capacitate finit\u0103\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integrare Cegid: programare cu capacitate finit\u0103 prin APS","description":"SkyPlanner APS extinde Cegid: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, fiecare utilaj, operator, scul\u0103 \u0219i material. De la 199 \u20ac pe lun\u0103.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/cegid\/","og_locale":"ro_RO","og_type":"article","og_title":"SkyPlanner APS pentru Cegid: programarea produc\u021biei cu capacitate finit\u0103","og_description":"SkyPlanner APS extinde Cegid: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, fiecare utilaj, operator, scul\u0103 \u0219i material. De la 199 \u20ac pe lun\u0103.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/cegid\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/cegid\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/cegid\/","name":"Integrare Cegid: programare cu capacitate finit\u0103 prin APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS extinde Cegid: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, fiecare utilaj, operator, scul\u0103 \u0219i material. De la 199 \u20ac pe lun\u0103.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/cegid\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/cegid\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/cegid\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru Cegid: programarea produc\u021biei cu capacitate finit\u0103"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ Cegid SkyPlanner APS pentru Cegid: programarea produc\u021biei cu capacitate finit\u0103 SkyPlanner APS adaug\u0103 programarea cu capacitate finit\u0103 la sistemele ERP Cegid pentru produc\u021bie, \u00een primul r\u00e2nd Cegid PMI, dar \u0219i Cegid Primavera \u0219i Cegid Ekon. Programeaz\u0103 fiecare utilaj, operator, scul\u0103 \u0219i material. Vede\u021bi unde \u0219i c\u00e2nd se execut\u0103 fiecare opera\u021bie a&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106401","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=106401"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106401\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/100697"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=106401"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}