{"id":106256,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/applus\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"applus","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/applus\/","title":{"rendered":"SkyPlanner APS pentru APplus: programarea produc\u021biei cu capacitate finit\u0103"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ APplus<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS pentru APplus: <span class=\"hl\">programarea produc\u021biei cu capacitate finit\u0103<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS este o extensie pentru APplus care asigur\u0103 programarea cu capacitate finit\u0103 a fiec\u0103rui utilaj, operator, a fiec\u0103rei scule \u0219i a fiec\u0103rui material. Vede\u021bi unde \u0219i c\u00e2nd se execut\u0103 fiecare opera\u021bie din fiecare comand\u0103 de produc\u021bie, iar Autopilot reface automat programul c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner se integreaz\u0103 bidirec\u021bional cu APplus. Preia comenzile de produc\u021bie (Fertigungsauftr\u00e4ge) \u00eempreun\u0103 cu opera\u021biile (Arbeitsg\u00e4nge), fi\u0219ele tehnologice (Arbeitspl\u00e4ne), listele de materiale (St\u00fccklisten), unit\u0103\u021bile de capacitate (Kapazit\u00e4tsstellen \u0219i Kapazit\u00e4tseinheiten), sculele (Betriebsmittel), stocurile \u0219i comenzile de achizi\u021bie. Trimite \u00eenapoi datele programate de \u00eenceput \u0219i de sf\u00e2r\u0219it, precum \u0219i unitatea de capacitate pentru fiecare opera\u021bie, iar timpii \u00eenregistra\u021bi de operatori pot fi transmi\u0219i ca mesaje BDE aferente comenzii. Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 APplus \u00een etapa de implementare ini\u021bial\u0103.<\/p>\n\n\n<p>Pre\u021bul porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, iar fiecare centru de lucru suplimentar cost\u0103 20 \u20ac pe lun\u0103. Perioada de prob\u0103 gratuit\u0103 dureaz\u0103 30 de zile \u0219i include p\u00e2n\u0103 la 20 de centre de lucru \u0219i toate func\u021biile Basic, f\u0103r\u0103 a necesita un card de credit.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce se schimb\u0103 \u00een produc\u021bia dumneavoastr\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Capacitate finit\u0103 pentru fiecare unitate, implicit.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner aloc\u0103 fiecare opera\u021bie unui anumit utilaj, la o anumit\u0103 or\u0103, \u021bin\u00e2nd cont de schimburile efective, absen\u021be \u0219i ore suplimentare. Nicio resurs\u0103 nu este programat\u0103 ca \u0219i cum ar avea capacitate nelimitat\u0103, astfel \u00eenc\u00e2t sec\u021bia de produc\u021bie poate executa programul.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Costuri mai mici pentru schimb\u0103rile de fabrica\u021bie.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner p\u0103streaz\u0103 timpul de trecere \u00eentre fiecare pereche de produse, \u00een ambele sensuri. Trecerea de la albastru la ro\u0219u poate dura 30 de minute, iar de la ro\u0219u la albastru, 60. Motorul Arcturus ordoneaz\u0103 opera\u021biile astfel \u00eenc\u00e2t s\u0103 se piard\u0103 c\u00e2t mai pu\u021bin timp.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u0218i oamenii, \u0219i sculele au disponibilitate limitat\u0103.<\/p>\n\n\n<p class=\"fx-pain__b\">Unei opera\u021bii care necesit\u0103 trei operatori i se aloc\u0103 trei persoane disponibile \u00een schimburile respective. Un dispozitiv de fixare sau o scul\u0103 din Betriebsmittel \u00een APplus nu este niciodat\u0103 rezervat pe dou\u0103 utilaje simultan. C\u00e2nd un utilaj este ocupat, opera\u021bia este alocat\u0103 unui alt utilaj sau unei alte persoane.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materialele \u00eent\u00e2rziate nu mai dau planul peste cap.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner verific\u0103 stocul disponibil \u0219i comenzile de achizi\u021bie care urmeaz\u0103 s\u0103 fie livrate. O opera\u021bie care a\u0219teapt\u0103 o livrare de la furnizor este programat\u0103 dup\u0103 data livr\u0103rii, \u00een loc s\u0103 fie \u00eenceput\u0103 \u0219i apoi oprit\u0103 \u00een sec\u021bia de produc\u021bie.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Panoul de planificare se actualizeaz\u0103 singur.<\/p>\n\n\n<p class=\"fx-pain__b\">C\u00e2nd un utilaj se opre\u0219te sau apare o comand\u0103 urgent\u0103, Autopilot reface programul. Bloc\u0103rile \u0219i priorit\u0103\u021bile stabilite de dumneavoastr\u0103 sunt respectate, iar Running Time Lock fixeaz\u0103 programul pentru urm\u0103toarele ore de produc\u021bie.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatorii \u00ee\u0219i v\u0103d lista de opera\u021bii.<\/p>\n\n\n<p class=\"fx-pain__b\">Fiecare operator vede pe telefon sau tablet\u0103 urm\u0103toarele opera\u021bii \u0219i \u00ee\u0219i \u00eenregistreaz\u0103 activitatea pe m\u0103sur\u0103 ce o execut\u0103. Personalul din birou urm\u0103re\u0219te progresul \u00een timp real, iar dumneavoastr\u0103 alege\u021bi dac\u0103 timpii \u00eenregistra\u021bi sunt trimi\u0219i \u00eenapoi \u00een APplus.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een sec\u021bia de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar noua list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi m\u0103rturia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui program optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi m\u0103rturia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>respectarea termenelor de livrare din 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ne ofer\u0103 vizibilitate asupra capacit\u0103\u021bii \u0219i face planificarea previzibil\u0103.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Produc\u021bie chimic\u0103 \u0219i alimentar\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Termenele de livrare au fost respectate \u00een propor\u021bie de 100% pe \u00eentreaga perioad\u0103 de utilizare a SkyPlanner, din 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/opes-corporation\/\">Citi\u021bi recenzia Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Vedere aerian\u0103 a fabricii Piristeel de sisteme de siguran\u021b\u0103 pentru acoperi\u0219uri din Kauhava\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>respectarea termenelor de livrare<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ne-a ajutat s\u0103 identific\u0103m blocajele \u0219i a f\u0103cut mai clar\u0103 gestionarea produc\u021biei.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, director de produc\u021bie<\/b><br>Piristeel \u00b7 Sisteme de siguran\u021b\u0103 pentru acoperi\u0219uri \u0219i sisteme pluviale<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a ajuns la 99,2% anul acesta, iar programarea economise\u0219te p\u00e2n\u0103 la patru ore de lucru pe zi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/piristeel\/\">Citi\u021bi recenzia Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-applus-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum func\u021bioneaz\u0103 integrarea cu APplus<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>APplus trimite comenzile de executat.<\/strong> Comenzile de produc\u021bie, \u00eempreun\u0103 cu opera\u021biile, fi\u0219ele tehnologice, listele de materiale, unit\u0103\u021bile de capacitate, sculele, stocurile \u0219i comenzile de achizi\u021bie sunt preluate \u00een SkyPlanner.<\/li>\n\n\n<li><strong>SkyPlanner creeaz\u0103 programul \u0219i \u00eel men\u021bine actualizat.<\/strong> Motorul Arcturus programeaz\u0103 fiecare opera\u021bie \u00een c\u00e2teva secunde \u0219i reface programul pe m\u0103sur\u0103 ce apar schimb\u0103ri \u00een produc\u021bie.<\/li>\n\n\n<li><strong>Datele programate \u0219i activitatea \u00eenregistrat\u0103 sunt trimise \u00eenapoi.<\/strong> Datele programate de \u00eenceput \u0219i de sf\u00e2r\u0219it, precum \u0219i unitatea de capacitate sunt transmise pentru fiecare opera\u021bie a comenzii de produc\u021bie din APplus. Timpii \u00eenregistra\u021bi de operatori pot fi transmi\u0219i ca mesaje BDE aferente comenzii.<\/li>\n\n<\/ol>\n\n\n<p>APplus r\u0103m\u00e2ne sistemul principal de eviden\u021b\u0103. Piesele, listele de materiale, fi\u0219ele tehnologice, planificarea materialelor (Disposition), achizi\u021biile, calcula\u021bia costurilor \u0219i finan\u021bele r\u0103m\u00e2n acolo unde sunt. Planificatorul lanseaz\u0103 \u00een continuare comenzile de produc\u021bie \u00een APplus. SkyPlanner se ocup\u0103 de un singur lucru: ordinea \u0219i programarea \u00een timp a fiec\u0103rei opera\u021bii pe fiecare resurs\u0103.<\/p>\n\n\n<p>APplus se bazeaz\u0103 pe o arhitectur\u0103 de servicii web. Potrivit Asseco, sistemele informatice ale clien\u021bilor \u0219i furnizorilor pot accesa direct prin internet toate func\u021biile de programare necesare (<a href=\"https:\/\/www.applus-erp.de\/en\/solutions\/erp-features\/e-business\/\">Asseco<\/a>). Business Integration Framework conecteaz\u0103 sisteme ter\u021be f\u0103r\u0103 programare, prin structuri de date adaptive (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/it-business-2016-asseco-stellt-neue-produktversion-applus-63-vor\/\">Asseco<\/a>), iar Universal Cloud Connector conecteaz\u0103 solu\u021biile partenerilor \u0219i ofertele SaaS la APplus (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/asseco-veroeffentlicht-applus-71\/\">Asseco<\/a>). Prin aceste interfe\u021be, SkyPlanner cite\u0219te datele de produc\u021bie \u0219i trimite \u00eenapoi datele programate de \u00eenceput \u0219i de sf\u00e2r\u0219it, precum \u0219i unitatea de capacitate pentru fiecare opera\u021bie. Calea exact\u0103 de integrare pentru instalarea dumneavoastr\u0103 este stabilit\u0103 la definirea domeniului proiectului, \u00een etapa de implementare ini\u021bial\u0103. Webhook-urile SkyPlanner transmit fiecare modificare a programului imediat ce aceasta are loc.<\/p>\n\n\n<p>Fiecare fabric\u0103 folose\u0219te APplus diferit, a\u0219a c\u0103 echipa SkyPlanner configureaz\u0103 integrarea pentru configura\u021bia dumneavoastr\u0103 \u00een etapa de implementare ini\u021bial\u0103 \u0219i ofer\u0103 suport dup\u0103 punerea \u00een func\u021biune. Primi\u021bi \u00een avans o ofert\u0103 pentru integrare, adaptat\u0103 procesului \u0219i nevoilor dumneavoastr\u0103. Partenerul dumneavoastr\u0103 APplus sau propriii dezvoltatori pot realiza, de asemenea, integrarea folosind API-ul documentat al SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia de referin\u021b\u0103 API<\/a>).<\/p>\n\n\n<p>Interfe\u021bele, coresponden\u021bele dintre date \u0219i regulile pentru transmiterea datelor \u00eenapoi sunt descrise \u00een <a href=\"\/ro\/integrari\/erp\/applus\/ghid-de-integrare\/\">ghidul de integrare cu APplus pentru programarea produc\u021biei<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-applus-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce programeaz\u0103 APplus \u0219i ce aduce \u00een plus SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>APplus planific\u0103 produc\u021bia pe trei niveluri:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Programarea PPS \u0219i panoul de planificare.<\/strong> O singur\u0103 rulare planific\u0103 utilajele, materialele, capacitatea personalului \u0219i, dac\u0103 este necesar, sculele. Potrivit Asseco, \u00een cazul cel mai simplu, programarea presupune capacit\u0103\u021bi nelimitate. Calculul poate \u021bine cont de resurse limitate pentru blocaje sau pentru toate unit\u0103\u021bile de capacitate. Ajust\u0103rile de detaliu \u0219i mut\u0103rile se fac manual \u00een panoul de planificare (Plantafel) (<a href=\"https:\/\/www.applus-erp.de\/loesungen\/erp-funktionsbereiche\/pps\/\">Asseco PPS<\/a>).<\/li>\n\n\n<li><strong>APplus Feinplanung (planificare detaliat\u0103).<\/strong> Un modul integrat care optimizeaz\u0103 timpii de reglaj, ordinea opera\u021biilor, \u00eenc\u0103rcarea \u0219i alocarea la posturile de lucru, folosind scenarii de optimizare predefinite (<a href=\"https:\/\/www.applus-erp.de\/loesungen\/erp-funktionsbereiche\/feinplanung\/\">Asseco Feinplanung<\/a>).<\/li>\n\n\n<li><strong>APplus APS.<\/strong> Pentru cazurile complexe, Asseco a integrat produsul APS al unui partener sub numele APplus APS. Potrivit Asseco, planificarea detaliat\u0103 din ERP acoper\u0103 majoritatea nevoilor pie\u021bei, iar restul necesit\u0103 solu\u021bii speciale: o matrice detaliat\u0103 a timpilor de reglaj pentru mai multe scule \u0219i dispozitive de fixare, precum \u0219i planificarea cu mai multe resurse (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/multiressourcenplanung-asseco-solutions-schliesst-partnerschaft-mit-dualis\/\">Asseco<\/a>).<\/li>\n\n<\/ul>\n\n\n<p>Lista de pre\u021buri \u0219i licen\u021be Asseco stabile\u0219te dac\u0103 o func\u021bie este inclus\u0103 \u00een pachetul standard sau necesit\u0103 o licen\u021b\u0103 separat\u0103 (<a href=\"https:\/\/www.applus-erp.de\/en\/facts\/\">Informa\u021bii despre APplus<\/a>).<\/p>\n\n\n<p>SkyPlanner adaug\u0103 un program unic \u00een cloud, care \u021bine cont, pentru fiecare resurs\u0103, de matricea timpilor de preg\u0103tire \u0219i tranzi\u021bie, de disponibilitatea limitat\u0103 a sculelor, de opera\u021biile cu mai mul\u021bi operatori \u0219i de materialele care urmeaz\u0103 s\u0103 fie livrate. Autopilot \u00eel men\u021bine actualizat, iar fiecare operator \u00ee\u0219i vede pe telefon opera\u021biile de executat.<\/p>\n\n\n<p>Fiecare nivel \u0219i limitele sale sunt explicate \u00een articolul <a href=\"\/ro\/integrari\/erp\/applus\/cu-capacitate-finita\/\">APplus ofer\u0103 programare cu capacitate finit\u0103?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"applus-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">APplus \u00een prezent \u0219i \u00eempreun\u0103 cu SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>APplus PPS \u0219i Feinplanung<\/th><th>APplus cu SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Capacitate<\/td><td>Capacit\u0103\u021bi nelimitate \u00een cazul cel mai simplu; capacitate limitat\u0103 pentru blocaje sau pentru toate unit\u0103\u021bile de capacitate, dac\u0103 se configureaz\u0103 astfel<\/td><td>Capacitate finit\u0103 pentru fiecare utilaj, persoan\u0103 \u0219i scul\u0103, pe baza schimburilor efective<\/td><\/tr><tr><td>Program de produc\u021bie<\/td><td>Panou de planificare cu ajust\u0103ri manuale de detaliu<\/td><td>Ordinea opera\u021biilor pe fiecare resurs\u0103, stabilit\u0103 \u00een c\u00e2teva secunde<\/td><\/tr><tr><td>Treceri \u00eentre produse<\/td><td>Feinplanung optimizeaz\u0103 reglajele; matricea timpilor de reglaj pentru mai multe scule este disponibil\u0103 prin APplus APS<\/td><td>Matricea timpilor de preg\u0103tire \u0219i tranzi\u021bie: timp total minim de reglaj, \u021bin\u00e2nd cont de ambele sensuri de trecere<\/td><\/tr><tr><td>Personal \u0219i scule<\/td><td>Capacitatea personalului \u0219i sculele sunt incluse \u00een rularea PPS<\/td><td>Operatori nominaliza\u021bi, cu schimburi definite, opera\u021bii cu mai mul\u021bi operatori \u0219i scule tratate ca resurse comune cu disponibilitate limitat\u0103<\/td><\/tr><tr><td>Materiale<\/td><td>Planificarea materialelor (Disposition), cu propuneri de achizi\u021bie<\/td><td>Opera\u021biile \u00eencep c\u00e2nd materialele sunt disponibile \u00een stoc sau sunt livrate pe baza comenzilor de achizi\u021bie<\/td><\/tr><tr><td>Schimb\u0103ri<\/td><td>Planificatorul mut\u0103 opera\u021biile \u00een panoul de planificare<\/td><td>Autopilot reface programul \u00eentregii fabrici, respect\u00e2nd priorit\u0103\u021bile dumneavoastr\u0103<\/td><\/tr><tr><td>Sec\u021bia de produc\u021bie<\/td><td>Mesaje BDE \u00eenregistrate pe comand\u0103 prin scanarea codului de bare<\/td><td>Operatorii v\u0103d opera\u021biile de executat \u0219i \u00ee\u0219i \u00eenregistreaz\u0103 activitatea pe telefon sau tablet\u0103, iar timpii pot fi transmi\u0219i ca mesaje BDE<\/td><\/tr><tr><td>Licen\u021biere<\/td><td>Conform listei de pre\u021buri \u0219i licen\u021be Asseco<\/td><td>De la 199 \u20ac pe lun\u0103, cu un num\u0103r nelimitat de utilizatori<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-applus\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum alege\u021bi o solu\u021bie de programare a produc\u021biei pentru APplus<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Programarea PPS este potrivit\u0103 pentru o fabric\u0103 \u00een care capacitatea resurselor care constituie blocaje \u0219i ajust\u0103rile din panoul de planificare permit stabilirea unor termene realiste. O fabric\u0103 \u00een care ordinea opera\u021biilor este ref\u0103cut\u0103 manual \u00een fiecare zi sau \u00een care reglajele depind de scule \u0219i de succesiunea produselor are nevoie de mai mult. \u00cen acest caz, alegerea real\u0103 este \u00eentre APplus Feinplanung \u00eempreun\u0103 cu APplus APS \u0219i SkyPlanner APS.<\/p>\n\n\n<p><strong>Alege\u021bi SkyPlanner \u00een locul APplus Feinplanung \u0219i APplus APS atunci c\u00e2nd:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Reglajele depind de ordinea opera\u021biilor \u0219i de scule.<\/strong> Potrivit Asseco, o matrice detaliat\u0103 a timpilor de reglaj pentru mai multe scule \u0219i planificarea cu mai multe resurse necesit\u0103 solu\u021bii speciale, dincolo de planificarea oferit\u0103 de ERP (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/multiressourcenplanung-asseco-solutions-schliesst-partnerschaft-mit-dualis\/\">Asseco<\/a>). \u00cen SkyPlanner, matricea timpilor de preg\u0103tire \u0219i tranzi\u021bie, disponibilitatea limitat\u0103 a sculelor \u0219i opera\u021biile cu mai mul\u021bi operatori sunt func\u021bii standard, reunite \u00eentr-un singur program.<\/li>\n\n\n<li><strong>Dori\u021bi un program func\u021bional \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni, nu \u00eenc\u0103 un proiect de implementare a unui modul.<\/strong> APplus APS este produsul unui partener, integrat \u00een APplus, iar licen\u021bierea urmeaz\u0103 lista de pre\u021buri Asseco (<a href=\"https:\/\/www.applus-erp.de\/en\/facts\/\">Informa\u021bii despre APplus<\/a>). SkyPlanner este o aplica\u021bie \u00een cloud pe care o testa\u021bi cu propriile comenzi de produc\u021bie \u00een perioada de prob\u0103 de 30 de zile, iar implementarea se finalizeaz\u0103, \u00een mod normal, \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea etapei ini\u021biale.<\/li>\n\n\n<li><strong>Programul trebuie s\u0103 se actualizeze singur.<\/strong> \u00cen APplus, ajust\u0103rile de detaliu \u0219i mut\u0103rile se fac \u00een panoul de planificare (<a href=\"https:\/\/www.applus-erp.de\/loesungen\/erp-funktionsbereiche\/pps\/\">Asseco PPS<\/a>). Autopilot reface automat programul la fiecare schimbare semnificativ\u0103, iar noile date sunt trimise \u00eenapoi \u00een APplus.<\/li>\n\n\n<li><strong>Operatorii, sculele \u0219i materialele care urmeaz\u0103 s\u0103 soseasc\u0103 impun limite programului de produc\u021bie.<\/strong> Acela\u0219i program \u021bine cont de capacitatea limitat\u0103 a fiec\u0103rui utilaj, a fiec\u0103rei persoane \u0219i scule, precum \u0219i de cantit\u0103\u021bile limitate de materiale. Se folosesc utilaje alternative, iar opera\u021biile \u00eencep c\u00e2nd materialele sunt disponibile din stoc sau prin comenzile de achizi\u021bie.<\/li>\n\n\n<li><strong>Fiecare operator trebuie s\u0103 lucreze conform programului de produc\u021bie.<\/strong> Mobile Confirmations afi\u0219eaz\u0103 lista actualizat\u0103 de opera\u021bii pe telefon sau tablet\u0103, iar num\u0103rul de utilizatori este nelimitat: pre\u021bul depinde de num\u0103rul de centre de lucru, nu de utilizatori.<\/li>\n\n\n<li><strong>Ave\u021bi nevoie de un pre\u021b lunar afi\u0219at public.<\/strong> De la 199 \u20ac pe lun\u0103, cu o ofert\u0103 de pre\u021b pentru integrarea bidirec\u021bional\u0103 comunicat\u0103 de la \u00eenceput. Echipa SkyPlanner configureaz\u0103 integrarea \u0219i asigur\u0103 suportul.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum \u00eencepe\u021bi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103.<\/strong> 30 de zile, p\u00e2n\u0103 la 20 de centre de lucru, toate func\u021biile Basic, f\u0103r\u0103 card bancar.<\/li>\n\n\n<li><strong>Modela\u021bi-v\u0103 produc\u021bia.<\/strong> Crea\u021bi utilajele, personalul \u0219i schimburile \u00een SkyPlanner sau importa\u021bi unit\u0103\u021bile de capacitate din APplus. Pute\u021bi beneficia de asisten\u021b\u0103 la configurarea ini\u021bial\u0103.<\/li>\n\n\n<li><strong>\u00cenc\u0103rca\u021bi comenzile.<\/strong> Exporta\u021bi \u00een Excel comenzile de produc\u021bie deschise \u0219i opera\u021biile aferente din APplus, importa\u021bi-le \u0219i compara\u021bi programul SkyPlanner cu panoul de planificare pe care \u00eel folosi\u021bi \u00een prezent.<\/li>\n\n\n<li><strong>Conecta\u021bi APplus.<\/strong> Echipa SkyPlanner configureaz\u0103 integrarea bidirec\u021bional\u0103 \u0219i asigur\u0103 suportul dup\u0103 punerea \u00een func\u021biune.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u021buri.<\/strong> Abonamentele se factureaz\u0103 lunar, \u00een func\u021bie de num\u0103rul de centre de lucru. Pute\u021bi ad\u0103uga sau elimina centre de lucru ori anula abonamentul \u00een orice moment. Consulta\u021bi <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a> pentru detalii sau explora\u021bi <a href=\"\/ro\/integrari\/erp\/\">toate integr\u0103rile ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi proba gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Care este cea mai bun\u0103 extensie pentru programarea produc\u021biei \u00een APplus?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS este o extensie pentru programare cu capacitate finit\u0103, cu integrare bidirec\u021bional\u0103 \u00een APplus. Preia comenzile de produc\u021bie, opera\u021biile, rutele tehnologice, listele de materiale, unit\u0103\u021bile de capacitate, sculele, stocurile \u0219i comenzile de achizi\u021bie. Trimite \u00eenapoi \u00eenceputul \u0219i sf\u00e2r\u0219itul planificate, precum \u0219i unitatea de capacitate pentru fiecare opera\u021bie, iar timpul lucrat de operatori poate fi \u00eenregistrat prin mesaje BDE. Programul \u021bine cont de capacitatea limitat\u0103 a fiec\u0103rui utilaj, a fiec\u0103rui operator \u0219i a fiec\u0103rei scule, precum \u0219i de cantit\u0103\u021bile limitate de materiale. O matrice a timpilor de reglaj care \u021bine cont de sensul tranzi\u021biei \u00eentre opera\u021bii stabile\u0219te succesiunea acestora pentru a reduce la minimum reglajele, iar Autopilot reface automat programul c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie. Pre\u021bul porne\u0219te de la 199 \u20ac pe lun\u0103, iar perioada de testare gratuit\u0103 dureaz\u0103 30 de zile.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>APplus ofer\u0103 programare cu capacitate finit\u0103?<\/summary>\n<p class=\"sp-faq__a\">Par\u021bial. \u00cen forma sa cea mai simpl\u0103, programarea din APplus PPS folose\u0219te capacit\u0103\u021bi f\u0103r\u0103 limite impuse, \u00eens\u0103 resursele care constituie blocaje sau toate unit\u0103\u021bile de capacitate pot fi configurate ca resurse limitate. Feinplanung optimizeaz\u0103 reglajele \u0219i succesiunea opera\u021biilor. Pentru reglaje complexe \u0219i planificare cu mai multe resurse, Asseco ofer\u0103 APplus APS, un produs partener integrat. SkyPlanner APS func\u021bioneaz\u0103 al\u0103turi de APplus \u0219i programeaz\u0103 produc\u021bia \u021bin\u00e2nd cont de capacitatea limitat\u0103 a fiec\u0103rui utilaj, a fiec\u0103rei persoane \u0219i scule, precum \u0219i de cantit\u0103\u021bile limitate de materiale.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ce software de programare a produc\u021biei se integreaz\u0103 cu APplus?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS se integreaz\u0103 bidirec\u021bional cu APplus. Preia comenzile de produc\u021bie, opera\u021biile, rutele tehnologice, listele de materiale, unit\u0103\u021bile de capacitate, sculele, stocurile \u0219i comenzile de achizi\u021bie prin serviciile web APplus, Business Integration Framework sau Universal Cloud Connector. \u00cenceputul \u0219i sf\u00e2r\u0219itul planificate, precum \u0219i unitatea de capacitate pentru fiecare opera\u021bie sunt trimise \u00eenapoi prin canalul stabilit la definirea domeniului integr\u0103rii, \u00een etapa ini\u021bial\u0103. Timpul lucrat de operatori este \u00eenregistrat pe comand\u0103 prin mesaje BDE.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner \u00eenlocuie\u0219te APplus PPS?<\/summary>\n<p class=\"sp-faq__a\">Nu, \u00eel completeaz\u0103. APplus gestioneaz\u0103 \u00een continuare piesele, listele de materiale, rutele tehnologice, planificarea necesarului de materiale, achizi\u021biile, lansarea comenzilor de produc\u021bie, calcula\u021bia costurilor \u0219i finan\u021bele. SkyPlanner programeaz\u0103 comenzile de produc\u021bie \u00een func\u021bie de capacitatea real\u0103 \u0219i trimite datele planificate \u00eenapoi.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>S\u0103 alegem APplus APS sau SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, dac\u0103 dori\u021bi un program de produc\u021bie cu capacitate finit\u0103, func\u021bional \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni \u0219i care se men\u021bine singur la zi. APplus APS este un produs partener integrat \u00een APplus, destinat cazurilor complexe men\u021bionate de Asseco: matrice de reglaj pentru mai multe scule \u0219i planificare cu mai multe resurse. SkyPlanner acoper\u0103 aceste cerin\u021be prin matricea timpilor de reglaj, disponibilitatea limitat\u0103 a sculelor \u0219i opera\u021biile cu mai mul\u021bi operatori. Reface automat programul \u0219i \u00eei ofer\u0103 fiec\u0103rui operator lista de opera\u021bii pe telefon, f\u0103r\u0103 limit\u0103 de utilizatori. Verifica\u021bi toate acestea pe propriile comenzi de produc\u021bie \u00een perioada de testare gratuit\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>C\u00e2t cost\u0103 SkyPlanner pentru o fabric\u0103 ce folose\u0219te APplus?<\/summary>\n<p class=\"sp-faq__a\">De la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, plus 20 \u20ac pe lun\u0103 pentru fiecare centru de lucru suplimentar. Un centru de lucru este o resurs\u0103 de produc\u021bie cu propria list\u0103 de opera\u021bii programate. Oferta pentru integrare este stabilit\u0103 de la \u00eenceput, \u00een func\u021bie de procesele \u0219i nevoile dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul, astfel \u00eenc\u00e2t s\u0103 cunoa\u0219te\u021bi costul total \u00eenainte de a \u00eencepe.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>C\u00e2t dureaz\u0103 implementarea?<\/summary>\n<p class=\"sp-faq__a\">Implementarea se finalizeaz\u0103 de regul\u0103 \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea configur\u0103rii ini\u021biale. Echipa stabile\u0219te coresponden\u021bele pentru unit\u0103\u021bile de capacitate, scule \u0219i rute tehnologice, conecteaz\u0103 comenzile de produc\u021bie \u0219i de achizi\u021bie \u0219i trimite \u00eenapoi datele planificate. \u00cenainte de punerea \u00een func\u021biune, totul este testat prin compara\u021bie cu programul de produc\u021bie actual.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de integrarea cu APplus?<\/summary>\n<p class=\"sp-faq__a\">Da. \u00cen perioada de testare de 30 de zile, folosi\u021bi un export Excel al comenzilor de produc\u021bie deschise din APplus. Vede\u021bi un <a href=\"\/ro\/resurse\/capacitate-finita\/\">program de produc\u021bie cu capacitate finit\u0103<\/a> pentru propria produc\u021bie \u00eenainte de \u00eenceperea oric\u0103ror lucr\u0103ri de integrare.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ APplus SkyPlanner APS pentru APplus: programarea produc\u021biei cu capacitate finit\u0103 SkyPlanner APS este o extensie pentru APplus care asigur\u0103 programarea cu capacitate finit\u0103 a fiec\u0103rui utilaj, operator, a fiec\u0103rei scule \u0219i a fiec\u0103rui material. Vede\u021bi unde \u0219i c\u00e2nd se execut\u0103 fiecare opera\u021bie din fiecare comand\u0103 de produc\u021bie, iar Autopilot reface automat &#8230; <a title=\"SkyPlanner APS pentru APplus: programarea produc\u021biei cu capacitate finit\u0103\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/applus\/\" aria-label=\"Read more about SkyPlanner APS pentru APplus: programarea produc\u021biei cu capacitate finit\u0103\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100697,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106256","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integrare APplus: programare cu capacitate finit\u0103 prin APS<\/title>\n<meta name=\"description\" content=\"Extensie SkyPlanner APS pentru APplus: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, orice utilaj, operator, scul\u0103 \u0219i material. De la 199 \u20ac\/lun\u0103.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/applus\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS pentru APplus: programarea produc\u021biei cu capacitate finit\u0103\" \/>\n<meta property=\"og:description\" content=\"Extensie SkyPlanner APS pentru APplus: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, orice utilaj, operator, scul\u0103 \u0219i material. De la 199 \u20ac\/lun\u0103.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/applus\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/applus\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/applus\\\/\",\"name\":\"Integrare APplus: programare cu capacitate finit\u0103 prin APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Extensie SkyPlanner APS pentru APplus: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, orice utilaj, operator, scul\u0103 \u0219i material. De la 199 \u20ac\\\/lun\u0103.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/applus\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/applus\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/applus\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru APplus: programarea produc\u021biei cu capacitate finit\u0103\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integrare APplus: programare cu capacitate finit\u0103 prin APS","description":"Extensie SkyPlanner APS pentru APplus: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, orice utilaj, operator, scul\u0103 \u0219i material. De la 199 \u20ac\/lun\u0103.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/applus\/","og_locale":"ro_RO","og_type":"article","og_title":"SkyPlanner APS pentru APplus: programarea produc\u021biei cu capacitate finit\u0103","og_description":"Extensie SkyPlanner APS pentru APplus: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, orice utilaj, operator, scul\u0103 \u0219i material. De la 199 \u20ac\/lun\u0103.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/applus\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/applus\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/applus\/","name":"Integrare APplus: programare cu capacitate finit\u0103 prin APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Extensie SkyPlanner APS pentru APplus: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, orice utilaj, operator, scul\u0103 \u0219i material. De la 199 \u20ac\/lun\u0103.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/applus\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/applus\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/applus\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru APplus: programarea produc\u021biei cu capacitate finit\u0103"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ APplus SkyPlanner APS pentru APplus: programarea produc\u021biei cu capacitate finit\u0103 SkyPlanner APS este o extensie pentru APplus care asigur\u0103 programarea cu capacitate finit\u0103 a fiec\u0103rui utilaj, operator, a fiec\u0103rei scule \u0219i a fiec\u0103rui material. Vede\u021bi unde \u0219i c\u00e2nd se execut\u0103 fiecare opera\u021bie din fiecare comand\u0103 de produc\u021bie, iar Autopilot reface automat&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106256","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=106256"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106256\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/100697"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=106256"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}