{"id":106227,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/psipenta\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"psipenta","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/psipenta\/","title":{"rendered":"SkyPlanner APS pentru PSIpenta: programarea produc\u021biei cu capacitate finit\u0103"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ PSIpenta<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS pentru PSIpenta: <span class=\"hl\">programarea produc\u021biei cu capacitate finit\u0103<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS completeaz\u0103 PSIpenta cu programare cu capacitate finit\u0103 \u0219i programeaz\u0103 fiecare utilaj, operator, scul\u0103 \u0219i material. Vede\u021bi unde \u0219i c\u00e2nd se execut\u0103 fiecare opera\u021bie \u0219i c\u0103rei comenzi de produc\u021bie \u00eei apar\u021bine, iar Autopilot reface automat programul c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner se integreaz\u0103 bidirec\u021bional cu PSIpenta. Preia comenzile de produc\u021bie (Fertigungsauftr\u00e4ge) cu opera\u021biile lor, fi\u0219ele tehnologice (Arbeitspl\u00e4ne), listele de materiale (St\u00fccklisten), centrele de lucru, utilajele, sculele (Betriebsmittel), stocurile \u0219i comenzile de achizi\u021bie. Trimite \u00eenapoi \u00eenceputul \u0219i sf\u00e2r\u0219itul planificate \u0219i centrul de lucru pentru fiecare opera\u021bie, iar timpul \u00eenregistrat de operatori poate fi transmis sub form\u0103 de confirm\u0103ri BDE (R\u00fcckmeldungen). Echipa SkyPlanner adapteaz\u0103 integrarea la configura\u021bia dumneavoastr\u0103 PSIpenta \u00een etapa de implementare ini\u021bial\u0103.<\/p>\n\n\n<p>Pre\u021bul porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, iar fiecare centru de lucru suplimentar cost\u0103 20 \u20ac pe lun\u0103. Perioada de testare gratuit\u0103 dureaz\u0103 30 de zile \u0219i include p\u00e2n\u0103 la 20 de centre de lucru \u0219i toate func\u021biile Basic, f\u0103r\u0103 a necesita un card bancar.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce se schimb\u0103 \u00een produc\u021bia dumneavoastr\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Opera\u021bii programate la ore precise pe fiecare utilaj.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner aloc\u0103 fiecare opera\u021bie din fiecare comand\u0103 de produc\u021bie unui anumit utilaj, la o anumit\u0103 or\u0103. Capacitatea este stabilit\u0103 pe baza schimburilor reale, a absen\u021belor \u0219i a orelor suplimentare, astfel \u00eenc\u00e2t sec\u021bia de produc\u021bie s\u0103 poat\u0103 executa planul.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Costuri mai mici pentru schimb\u0103rile de fabrica\u021bie.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner memoreaz\u0103 timpii de schimbare de fabrica\u021bie \u00eentre produsele din fiecare pereche, \u00een ambele sensuri. Trecerea de la albastru la ro\u0219u poate dura 30 de minute, iar de la ro\u0219u la albastru, 60. Motorul Arcturus ordoneaz\u0103 opera\u021biile astfel \u00eenc\u00e2t s\u0103 se piard\u0103 c\u00e2t mai pu\u021bin timp.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u0218i oamenii, \u0219i sculele au disponibilitate limitat\u0103.<\/p>\n\n\n<p class=\"fx-pain__b\">O opera\u021bie care necesit\u0103 trei operatori prime\u0219te trei persoane disponibile \u00een schimburile respective. Un dispozitiv sau o scul\u0103 din lista Betriebsmittel din PSIpenta nu este niciodat\u0103 alocat pe dou\u0103 utilaje simultan. C\u00e2nd un utilaj este ocupat, opera\u021bia este mutat\u0103 pe un utilaj alternativ sau la o alt\u0103 persoan\u0103.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materialele \u00eent\u00e2rziate nu mai dau planul peste cap.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner verific\u0103 stocul disponibil \u0219i comenzile de achizi\u021bie care urmeaz\u0103 s\u0103 fie livrate. O opera\u021bie care a\u0219teapt\u0103 o livrare de la furnizor este programat\u0103 dup\u0103 data livr\u0103rii, \u00een loc s\u0103 fie \u00eenceput\u0103 \u0219i apoi oprit\u0103 \u00een sec\u021bia de produc\u021bie.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprogramare automat\u0103 la comenzi urgente \u0219i defec\u021biuni.<\/p>\n\n\n<p class=\"fx-pain__b\">C\u00e2nd un utilaj se opre\u0219te sau apare o comand\u0103 urgent\u0103, Autopilot reface programul. Bloc\u0103rile \u0219i priorit\u0103\u021bile stabilite de dumneavoastr\u0103 sunt respectate, iar Running Time Lock fixeaz\u0103 programul pentru urm\u0103toarele ore de produc\u021bie.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatorii \u00ee\u0219i v\u0103d lista de opera\u021bii.<\/p>\n\n\n<p class=\"fx-pain__b\">Fiecare operator vede opera\u021biile urm\u0103toare pe telefon sau tablet\u0103 \u0219i \u00eenregistreaz\u0103 activitatea pe m\u0103sur\u0103 ce o execut\u0103. Personalul de la birou urm\u0103re\u0219te progresul \u00een timp real, iar dumneavoastr\u0103 decide\u021bi dac\u0103 timpul \u00eenregistrat este transmis \u00eenapoi \u00een PSIpenta.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een sec\u021bia de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar noua list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi m\u0103rturia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui program optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi m\u0103rturia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Un sudor KJH-Comp polizeaz\u0103 o structur\u0103 din o\u021bel sudat\u0103 la fabrica din Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>rata de respectare a termenelor de livrare, \u00een cre\u0219tere de la circa 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner joac\u0103 un rol decisiv \u00een men\u021binerea ratei noastre de respectare a termenelor de livrare.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, director general<\/b><br>KJH-Comp \u00b7 Prelucr\u0103ri de tabl\u0103 \u0219i produc\u021bie \u00een regim de subcontractare<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a crescut de la circa 50% p\u00e2n\u0103 la 98%, iar de programare se ocup\u0103 acum un singur responsabil \u00een loc de doi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/kjh-comp\/\">Citi\u021bi recenzia KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, director general al Mamec, \u00een hala de produc\u021bie a companiei din Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000+<\/b><span>de comenzi de produc\u021bie programate automat<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eAvem un alt control asupra produc\u021biei \u0219i \u00een\u021belegem cu totul altfel capacitatea de produc\u021bie de care dispunem.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, director general<\/b><br>Mamec \u00b7 Mixere industriale, pompe \u0219i subcontractare pentru produc\u021bie de \u00eenalt\u0103 tehnologie<\/p>\n\n\n<p class=\"ind-cust__result\">Mii de comenzi de produc\u021bie sunt programate automat, iar \u00eentreaga organiza\u021bie are o imagine \u00een timp real asupra produc\u021biei.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/mamec\/\">Citi\u021bi recenzia Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-psipenta-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum func\u021bioneaz\u0103 integrarea cu PSIpenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>PSIpenta transmite lucr\u0103rile de executat.<\/strong> SkyPlanner preia comenzile de produc\u021bie cu opera\u021biile lor, fi\u0219ele tehnologice, listele de materiale, centrele de lucru, utilajele, sculele, stocurile \u0219i comenzile de achizi\u021bie.<\/li>\n\n\n<li><strong>SkyPlanner creeaz\u0103 programul \u0219i \u00eel men\u021bine la zi.<\/strong> Motorul Arcturus programeaz\u0103 fiecare opera\u021bie \u00een c\u00e2teva secunde \u0219i reface programul pe m\u0103sur\u0103 ce apar schimb\u0103ri \u00een produc\u021bie.<\/li>\n\n\n<li><strong>Termenele \u0219i activitatea \u00eenregistrat\u0103 sunt trimise \u00eenapoi.<\/strong> \u00cenceputul \u0219i sf\u00e2r\u0219itul planificate \u0219i centrul de lucru sunt transmise c\u0103tre fiecare opera\u021bie a comenzii de produc\u021bie din PSIpenta. \u00cenregistr\u0103rile de timp ale operatorilor pot fi transmise sub form\u0103 de confirm\u0103ri BDE.<\/li>\n\n<\/ol>\n\n\n<p>PSIpenta r\u0103m\u00e2ne sistemul de referin\u021b\u0103 pentru datele dumneavoastr\u0103. Piesele, listele de materiale, fi\u0219ele tehnologice, planificarea necesarului de materiale, achizi\u021biile, calcula\u021bia costurilor \u0219i gestiunea financiar\u0103 r\u0103m\u00e2n acolo unde sunt. SkyPlanner se ocup\u0103 de un singur lucru: ordinea \u0219i programarea \u00een timp a fiec\u0103rei opera\u021bii pe fiecare resurs\u0103.<\/p>\n\n\n<p>PSI dezvolt\u0103 PSIpenta pentru a permite acest tip de conexiune. Stratul s\u0103u de interfa\u021bare, PSIintegration, conecteaz\u0103 modulele PSIpenta \u0219i sistemele externe prin mesaje mapate, iar PSI afirm\u0103 c\u0103 toate componentele PSIpenta pot fi integrate prin servicii web RESTful. PSI men\u021bioneaz\u0103 \u0219i un API REST \u0219i SOAP pentru PSIpenta\/ERP \u0219i PSIpenta\/BDE (<a href=\"https:\/\/www.messe.de\/apollo\/hannover_messe_2020\/obs\/Binary\/A1002706\/1002706_02134036.pdf\">bro\u0219ura PSI<\/a>). SkyPlanner cite\u0219te datele de produc\u021bie \u0219i scrie datele planificate ale opera\u021biilor prin PSIpenta\/ERP REST API. Confirm\u0103rile sunt transmise prin API-ul PSIpenta\/BDE. Resursele \u0219i c\u00e2mpurile exacte pentru instalarea dumneavoastr\u0103 sunt stabilite la definirea domeniului integr\u0103rii, \u00een etapa de implementare ini\u021bial\u0103. Webhook-urile SkyPlanner transmit fiecare modificare a programului imediat ce are loc.<\/p>\n\n\n<p>Fiecare fabric\u0103 folose\u0219te PSIpenta \u00een felul s\u0103u, a\u0219a c\u0103 echipa SkyPlanner adapteaz\u0103 integrarea la configura\u021bia dumneavoastr\u0103 \u00een etapa de implementare ini\u021bial\u0103 \u0219i ofer\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een func\u021biune. Primi\u021bi de la \u00eenceput o ofert\u0103 pentru integrare, \u00een func\u021bie de procesul \u0219i nevoile dumneavoastr\u0103. Partenerul dumneavoastr\u0103 PSI sau propriii dezvoltatori pot, de asemenea, s\u0103 realizeze integrarea folosind API-ul documentat SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia API<\/a>).<\/p>\n\n\n<p>Interfe\u021bele, maparea datelor \u0219i regulile de scriere a datelor \u00eenapoi \u00een PSIpenta sunt descrise \u00een <a href=\"\/ro\/integrari\/erp\/psipenta\/ghid-de-integrare\/\">ghidul de integrare PSIpenta pentru programarea produc\u021biei<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-psipenta-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce programeaz\u0103 PSIpenta \u0219i ce aduce \u00een plus SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>PSIpenta\/ERP este un ERP modular pentru produc\u021bia discret\u0103. Potrivit PSI, cump\u0103ra\u021bi doar func\u021biile de care ave\u021bi nevoie (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/erp\">PSI<\/a>), iar planificarea este structurat\u0103 pe mai multe niveluri:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Modulul Production.<\/strong> Planificarea de ansamblu a materialelor \u0219i a capacit\u0103\u021bilor care genereaz\u0103 blocaje, precum \u0219i planificarea detaliat\u0103, pe mai multe niveluri, a listelor de materiale \u0219i a fi\u0219elor tehnologice (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/erp\/modul\/produktion-1\">PSI Produktion<\/a>).<\/li>\n\n\n<li><strong>Modulul Leitstand.<\/strong> PSIpenta\/Advanced Scheduling &amp; Monitoring este un panou de planificare cu o zon\u0103 \u00eenghe\u021bat\u0103, planificare cu capacitate limitat\u0103 \u0219i simulare. Planific\u0103 resursele cu capacitate limitat\u0103 sau nelimitat\u0103 (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/erp\/modul\/leitstand-1\">PSI Leitstand<\/a>).<\/li>\n\n\n<li><strong>Adaptive Planung.<\/strong> Un modul APS care reac\u021bioneaz\u0103 la perturb\u0103ri. \u00cent\u00e2rzierile pe care nu le poate rezolva sunt marcate drept drumuri critice, pentru ca planificatorul s\u0103 intervin\u0103 (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/erp\/modul\/adaptive-planung\">PSI Adaptive Planung<\/a>).<\/li>\n\n\n<li><strong>PSIpenta\/MES Scheduling.<\/strong> Planific\u0103 succesiunea opera\u021biilor pentru fiecare centru de lucru, cu capacitate finit\u0103. Face parte din gama PSIpenta\/MES \u0219i este conectat la aceasta prin mesaje standardizate (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/mes\/modul\/psipentames-scheduling\">PSI MES Scheduling<\/a>).<\/li>\n\n<\/ul>\n\n\n<p>A\u0219adar, \u00een ecosistemul PSIpenta, programarea cu capacitate finit\u0103 presupune alegerea, licen\u021bierea \u0219i implementarea unui modul, precum \u0219i un planificator care s\u0103 \u00eel utilizeze. SkyPlanner adaug\u0103 un singur program \u00een cloud, care \u021bine cont \u00een acela\u0219i timp de utilaje, oameni, scule, preg\u0103tirile dependente de succesiunea opera\u021biilor \u0219i materialele care urmeaz\u0103 s\u0103 soseasc\u0103. Programul se men\u021bine la zi prin Autopilot, iar fiecare operator are la \u00eendem\u00e2n\u0103 lista opera\u021biilor de executat.<\/p>\n\n\n<p>Fiecare nivel \u0219i limitele sale sunt explicate \u00een <a href=\"\/ro\/integrari\/erp\/psipenta\/cu-capacitate-finita\/\">Ofer\u0103 PSIpenta programare cu capacitate finit\u0103?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"psipenta-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">PSIpenta \u00een prezent \u0219i cu SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Modulele de planificare PSIpenta<\/th><th>PSIpenta cu SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Acoperire<\/td><td>Production, Leitstand, Adaptive Planung sau MES Scheduling, fiecare ca modul separat<\/td><td>Un singur program \u00een cloud, al\u0103turi de PSIpenta\/ERP<\/td><\/tr><tr><td>Capacitate<\/td><td>Planificarea de ansamblu a blocajelor; capacitate limitat\u0103 sau nelimitat\u0103 \u00een Leitstand<\/td><td>Capacitate finit\u0103 pentru fiecare utilaj, persoan\u0103 \u0219i scul\u0103, pe baza schimburilor reale<\/td><\/tr><tr><td>Schimb\u0103ri de fabrica\u021bie<\/td><td>Succesiune stabilit\u0103 dup\u0103 dependen\u021bele tehnologice \u00een MES Scheduling<\/td><td>Matricea timpilor de preg\u0103tire: timp total minim de preg\u0103tire \u00een ambele sensuri<\/td><\/tr><tr><td>Personal \u0219i scule<\/td><td>Betriebsmittel gestionate \u00een PSIpenta<\/td><td>Operatori nominaliza\u021bi, cu schimburi definite, opera\u021bii cu mai mul\u021bi operatori \u0219i scule tratate ca resurse partajate cu capacitate finit\u0103<\/td><\/tr><tr><td>Materiale<\/td><td>Planificarea necesarului de materiale cu propuneri de achizi\u021bie<\/td><td>Opera\u021biile \u00eencep c\u00e2nd materialele sunt disponibile \u00een stoc sau sosesc din comenzile de achizi\u021bie<\/td><\/tr><tr><td>Schimb\u0103ri<\/td><td>Drumuri critice marcate pentru interven\u021bia planificatorului<\/td><td>Autopilot reface automat programul c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie, respect\u00e2nd priorit\u0103\u021bile dumneavoastr\u0103<\/td><\/tr><tr><td>Opera\u021bii cu programare blocat\u0103<\/td><td>Zon\u0103 \u00eenghe\u021bat\u0103 \u00een Leitstand<\/td><td>Running Time Lock men\u021bine neschimbat programul opera\u021biilor din urm\u0103toarele ore<\/td><\/tr><tr><td>Sec\u021bia de produc\u021bie<\/td><td>Terminale \u0219i confirm\u0103ri BDE<\/td><td>Operatorii \u00ee\u0219i v\u0103d lista de opera\u021bii \u0219i \u00eenregistreaz\u0103 activitatea pe telefon sau tablet\u0103, iar timpul poate fi transmis sub form\u0103 de confirm\u0103ri BDE<\/td><\/tr><tr><td>Licen\u021biere<\/td><td>Fiecare modul se licen\u021biaz\u0103 separat<\/td><td>De la 199 \u20ac pe lun\u0103, cu un num\u0103r nelimitat de utilizatori<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-psipenta\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum alege\u021bi o solu\u021bie de programare pentru PSIpenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Modulul Production este potrivit pentru o fabric\u0103 ce are nevoie de planificarea de ansamblu a blocajelor \u0219i de termene pentru achizi\u021bii. O fabric\u0103 ce planific\u0103 activitatea sec\u021biei de produc\u021bie \u00een foi de calcul are nevoie de o succesiune a opera\u021biilor pentru fiecare utilaj. \u00cen acest caz, alegerea real\u0103 este \u00eentre un modul de planificare PSI (Leitstand, Adaptive Planung sau MES Scheduling) \u0219i SkyPlanner APS.<\/p>\n\n\n<p><strong>Alege\u021bi SkyPlanner \u00een locul PSIpenta Leitstand \u0219i MES Scheduling c\u00e2nd:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Dori\u021bi un program func\u021bional \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni, nu un proiect de implementare a unui modul.<\/strong> PSIpenta se licen\u021biaz\u0103 pe module (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/erp\">PSI<\/a>), iar MES Scheduling apar\u021bine gamei PSIpenta\/MES (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/mes\/modul\/psipentames-scheduling\">PSI<\/a>). SkyPlanner este o solu\u021bie software \u00een cloud care func\u021bioneaz\u0103 al\u0103turi de PSIpenta\/ERP. O testa\u021bi cu propriile comenzi de produc\u021bie \u00een perioada de prob\u0103 de 30 de zile, iar implementarea se finalizeaz\u0103 \u00een mod normal \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea procesului de configurare ini\u021bial\u0103.<\/li>\n\n\n<li><strong>Programul trebuie s\u0103 se men\u021bin\u0103 singur la zi.<\/strong> \u00cen Adaptive Planung, \u00eent\u00e2rzierile pe care modulul nu le poate rezolva sunt marcate drept drumuri critice pentru planificator (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/erp\/modul\/adaptive-planung\">PSI<\/a>). Autopilot reface automat programul c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie, iar noile date sunt transmise \u00eenapoi \u00een PSIpenta.<\/li>\n\n\n<li><strong>Schimb\u0103rile de fabrica\u021bie determin\u0103 volumul produc\u021biei.<\/strong> Matricea timpilor de preg\u0103tire con\u021bine timpii de schimbare de fabrica\u021bie pentru fiecare sens al tranzi\u021biei \u0219i stabile\u0219te succesiunea culorilor, materialelor sau sculelor cu cel mai mic timp total de preg\u0103tire.<\/li>\n\n\n<li><strong>Operatorii, sculele \u0219i materialele care urmeaz\u0103 s\u0103 soseasc\u0103 impun constr\u00e2ngeri programului.<\/strong> Un singur program \u021bine cont de capacitatea limitat\u0103 a fiec\u0103rui utilaj, a fiec\u0103rei persoane \u0219i a fiec\u0103rei scule, precum \u0219i de disponibilitatea limitat\u0103 a materialelor. Opera\u021biilor care necesit\u0103 mai mul\u021bi operatori li se aloc\u0103 personalul necesar, sunt folosite utilaje alternative, iar opera\u021biile \u00eencep c\u00e2nd materialele sunt disponibile din stoc sau sunt livrate conform comenzilor de achizi\u021bie.<\/li>\n\n\n<li><strong>Fiecare operator trebuie s\u0103 lucreze dup\u0103 program.<\/strong> Mobile Confirmations afi\u0219eaz\u0103 lista actualizat\u0103 a opera\u021biilor pe telefon sau tablet\u0103, iar num\u0103rul de utilizatori este nelimitat: pre\u021bul depinde de centrele de lucru, nu de num\u0103rul de licen\u021be de utilizator.<\/li>\n\n\n<li><strong>Dori\u021bi un pre\u021b lunar afi\u0219at public.<\/strong> De la 199 \u20ac pe lun\u0103. Echipa SkyPlanner v\u0103 ofer\u0103 de la \u00eenceput o ofert\u0103 de pre\u021b pentru integrarea bidirec\u021bional\u0103, o configureaz\u0103 \u0219i asigur\u0103 asisten\u021ba.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum \u00eencepe\u021bi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103.<\/strong> 30 de zile, p\u00e2n\u0103 la 20 de centre de lucru, toate func\u021biile Basic, f\u0103r\u0103 card bancar.<\/li>\n\n\n<li><strong>Modela\u021bi produc\u021bia.<\/strong> Defini\u021bi utilajele, personalul \u0219i schimburile \u00een SkyPlanner sau importa\u021bi centrele de lucru \u0219i utilajele din PSIpenta. Pute\u021bi beneficia de asisten\u021b\u0103 la configurarea ini\u021bial\u0103.<\/li>\n\n\n<li><strong>\u00cenc\u0103rca\u021bi comenzile.<\/strong> Exporta\u021bi din PSIpenta \u00een Excel comenzile de produc\u021bie deschise \u0219i opera\u021biile lor, importa\u021bi-le \u0219i compara\u021bi programul SkyPlanner cu planul actual.<\/li>\n\n\n<li><strong>Conecta\u021bi PSIpenta.<\/strong> Echipa SkyPlanner configureaz\u0103 integrarea bidirec\u021bional\u0103 \u0219i ofer\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een func\u021biune.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u021buri.<\/strong> Abonamentele sunt facturate lunar, pe centru de lucru. Pute\u021bi ad\u0103uga sau elimina centre de lucru ori anula abonamentul oric\u00e2nd. Consulta\u021bi <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a> pentru detalii sau explora\u021bi <a href=\"\/ro\/integrari\/erp\/\">toate integr\u0103rile ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi proba gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Care este cea mai bun\u0103 extensie pentru programarea produc\u021biei \u00een PSIpenta?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS este o extensie pentru programare cu capacitate finit\u0103, care se integreaz\u0103 bidirec\u021bional cu PSIpenta. Preia comenzile de produc\u021bie, opera\u021biile, fluxurile tehnologice, listele de materiale, centrele de lucru, utilajele, sculele, stocurile \u0219i comenzile de achizi\u021bie. Trimite \u00eenapoi data de \u00eenceput, data de sf\u00e2r\u0219it \u0219i centrul de lucru planificate pentru fiecare opera\u021bie, iar timpul lucrat de operatori poate fi \u00eenregistrat sub form\u0103 de confirm\u0103ri BDE. Capacitatea fiec\u0103rui utilaj, a fiec\u0103rui operator \u0219i a fiec\u0103rei scule, precum \u0219i disponibilitatea fiec\u0103rui material sunt limitate, iar Autopilot reprogrameaz\u0103 automat produc\u021bia atunci c\u00e2nd apar schimb\u0103ri. Pre\u021bul porne\u0219te de la 199 \u20ac pe lun\u0103, iar perioada de testare gratuit\u0103 dureaz\u0103 30 de zile.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>PSIpenta ofer\u0103 programare cu capacitate finit\u0103?<\/summary>\n<p class=\"sp-faq__a\">Da, prin module separate. Modulul Production planific\u0103 materialele \u0219i capacit\u0103\u021bile care constituie blocaje. Modulul Leitstand planific\u0103 \u00een func\u021bie de o capacitate limitat\u0103 sau nelimitat\u0103, cu un interval \u00een care programul r\u0103m\u00e2ne fix, iar PSIpenta\/MES Scheduling programeaz\u0103 fiecare post de lucru \u00een limita capacit\u0103\u021bii disponibile. SkyPlanner APS programeaz\u0103 fiecare utilaj, persoan\u0103, scul\u0103 \u0219i material \u021bin\u00e2nd cont de limitele reale, \u00eentr-un singur program \u00een cloud, al\u0103turi de PSIpenta\/ERP.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ce software de programare a produc\u021biei se integreaz\u0103 cu PSIpenta?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS se integreaz\u0103 bidirec\u021bional cu PSIpenta. Preia comenzile de produc\u021bie, opera\u021biile, fluxurile tehnologice, listele de materiale, centrele de lucru, sculele, stocurile \u0219i comenzile de achizi\u021bie prin PSIpenta\/ERP REST API \u0219i PSIintegration. Datele planificate ale opera\u021biilor sunt trimise \u00eenapoi prin PSIpenta\/ERP REST API, iar timpul lucrat de operatori este \u00eenregistrat sub form\u0103 de confirm\u0103ri prin PSIpenta\/BDE API.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner \u00eenlocuie\u0219te planificarea necesarului de materiale din PSIpenta?<\/summary>\n<p class=\"sp-faq__a\">Nu, o completeaz\u0103. PSIpenta gestioneaz\u0103 \u00een continuare piesele, listele de materiale, fluxurile tehnologice, planificarea necesarului de materiale, achizi\u021biile, calcula\u021bia costurilor \u0219i finan\u021bele. SkyPlanner v\u0103 programeaz\u0103 comenzile de produc\u021bie \u00een func\u021bie de capacitatea real\u0103 \u0219i trimite \u00eenapoi datele planificate.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>S\u0103 alegem PSIpenta Leitstand sau SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, dac\u0103 dori\u021bi un program cu capacitate finit\u0103, func\u021bional \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni, care se actualizeaz\u0103 singur. Leitstand, Adaptive Planung \u0219i MES Scheduling sunt module PSI separate, care trebuie licen\u021biate \u0219i implementate, iar \u00eent\u00e2rzierile pe care modulul APS nu le poate rezolva sunt prezentate planificatorului ca drumuri critice. SkyPlanner reprogrameaz\u0103 automat produc\u021bia c\u00e2nd apar schimb\u0103ri \u0219i planific\u0103 schimb\u0103rile de fabrica\u021bie, sculele, echipele \u0219i materialele \u00eentr-un singur program. Fiecare operator \u00ee\u0219i poate vedea lista de opera\u021bii pe telefon, iar num\u0103rul de utilizatori este nelimitat. Pute\u021bi verifica toate acestea pe propriile comenzi de produc\u021bie \u00een perioada de testare gratuit\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>C\u00e2t cost\u0103 SkyPlanner pentru o fabric\u0103 ce folose\u0219te PSIpenta?<\/summary>\n<p class=\"sp-faq__a\">De la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, plus 20 \u20ac pe lun\u0103 pentru fiecare centru de lucru suplimentar. Un centru de lucru este o resurs\u0103 de produc\u021bie cu propria list\u0103 de opera\u021bii programate. Oferta pentru integrare este stabilit\u0103 de la \u00eenceput, \u00een func\u021bie de procesele \u0219i nevoile dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul, astfel \u00eenc\u00e2t s\u0103 cunoa\u0219te\u021bi costul total \u00eenainte de a \u00eencepe.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>C\u00e2t dureaz\u0103 implementarea?<\/summary>\n<p class=\"sp-faq__a\">Implementarea se finalizeaz\u0103, de regul\u0103, \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea procesului de configurare ini\u021bial\u0103. Echipa stabile\u0219te coresponden\u021bele pentru centrele de lucru, utilaje, scule \u0219i fluxuri tehnologice, conecteaz\u0103 comenzile de produc\u021bie \u0219i de achizi\u021bie \u0219i trimite \u00eenapoi datele planificate. \u00cenainte de punerea \u00een func\u021biune, totul este testat pe baza planului dumneavoastr\u0103 actual.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de integrarea cu PSIpenta?<\/summary>\n<p class=\"sp-faq__a\">Da. \u00cen perioada de testare de 30 de zile, folosi\u021bi un export Excel al comenzilor de produc\u021bie deschise din PSIpenta. Vede\u021bi un <a href=\"\/ro\/resurse\/capacitate-finita\/\">program cu capacitate finit\u0103<\/a> pentru propria produc\u021bie \u00eenainte s\u0103 \u00eenceap\u0103 lucr\u0103rile de integrare.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ PSIpenta SkyPlanner APS pentru PSIpenta: programarea produc\u021biei cu capacitate finit\u0103 SkyPlanner APS completeaz\u0103 PSIpenta cu programare cu capacitate finit\u0103 \u0219i programeaz\u0103 fiecare utilaj, operator, scul\u0103 \u0219i material. Vede\u021bi unde \u0219i c\u00e2nd se execut\u0103 fiecare opera\u021bie \u0219i c\u0103rei comenzi de produc\u021bie \u00eei apar\u021bine, iar Autopilot reface automat programul c\u00e2nd apar schimb\u0103ri \u00een &#8230; <a title=\"SkyPlanner APS pentru PSIpenta: programarea produc\u021biei cu capacitate finit\u0103\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/psipenta\/\" aria-label=\"Read more about SkyPlanner APS pentru PSIpenta: programarea produc\u021biei cu capacitate finit\u0103\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100697,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106227","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integrare PSIpenta: programare cu capacitate finit\u0103 prin APS<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS pentru PSIpenta: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103. Fiecare utilaj, operator, scul\u0103 \u0219i material. De la 199 \u20ac\/lun\u0103.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/psipenta\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS pentru PSIpenta: programarea produc\u021biei cu capacitate finit\u0103\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS pentru PSIpenta: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103. Fiecare utilaj, operator, scul\u0103 \u0219i material. De la 199 \u20ac\/lun\u0103.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/psipenta\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/psipenta\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/psipenta\\\/\",\"name\":\"Integrare PSIpenta: programare cu capacitate finit\u0103 prin APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS pentru PSIpenta: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103. Fiecare utilaj, operator, scul\u0103 \u0219i material. De la 199 \u20ac\\\/lun\u0103.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/psipenta\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/psipenta\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/psipenta\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru PSIpenta: programarea produc\u021biei cu capacitate finit\u0103\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integrare PSIpenta: programare cu capacitate finit\u0103 prin APS","description":"SkyPlanner APS pentru PSIpenta: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103. Fiecare utilaj, operator, scul\u0103 \u0219i material. De la 199 \u20ac\/lun\u0103.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/psipenta\/","og_locale":"ro_RO","og_type":"article","og_title":"SkyPlanner APS pentru PSIpenta: programarea produc\u021biei cu capacitate finit\u0103","og_description":"SkyPlanner APS pentru PSIpenta: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103. Fiecare utilaj, operator, scul\u0103 \u0219i material. De la 199 \u20ac\/lun\u0103.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/psipenta\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/psipenta\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/psipenta\/","name":"Integrare PSIpenta: programare cu capacitate finit\u0103 prin APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS pentru PSIpenta: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103. Fiecare utilaj, operator, scul\u0103 \u0219i material. De la 199 \u20ac\/lun\u0103.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/psipenta\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/psipenta\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/psipenta\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru PSIpenta: programarea produc\u021biei cu capacitate finit\u0103"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ PSIpenta SkyPlanner APS pentru PSIpenta: programarea produc\u021biei cu capacitate finit\u0103 SkyPlanner APS completeaz\u0103 PSIpenta cu programare cu capacitate finit\u0103 \u0219i programeaz\u0103 fiecare utilaj, operator, scul\u0103 \u0219i material. Vede\u021bi unde \u0219i c\u00e2nd se execut\u0103 fiecare opera\u021bie \u0219i c\u0103rei comenzi de produc\u021bie \u00eei apar\u021bine, iar Autopilot reface automat programul c\u00e2nd apar schimb\u0103ri \u00een&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106227","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=106227"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106227\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/100697"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=106227"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}