{"id":106169,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/oracle-fusion-cloud\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"oracle-fusion-cloud","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/oracle-fusion-cloud\/","title":{"rendered":"SkyPlanner APS pentru Oracle Fusion Cloud: programarea produc\u021biei cu capacitate finit\u0103"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ Oracle Fusion Cloud<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS pentru Oracle Fusion Cloud: <span class=\"hl\">programarea produc\u021biei cu capacitate finit\u0103<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS este o extensie pentru Oracle Fusion Cloud care asigur\u0103 programarea cu capacitate finit\u0103 a fiec\u0103rui utilaj, operator, a fiec\u0103rei scule \u0219i a materialelor din fabricile dumneavoastr\u0103. Vede\u021bi c\u00e2nd \u0219i pe ce resurs\u0103 se execut\u0103 fiecare opera\u021bie dintr-o comand\u0103 de produc\u021bie, iar Autopilot reface automat programul c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner se integreaz\u0103 bidirec\u021bional cu Oracle Fusion Cloud: preia comenzile de produc\u021bie \u0219i opera\u021biile acestora, defini\u021biile de fabrica\u021bie, centrele de lucru, resursele de produc\u021bie, articolele, structurile de articole, stocurile disponibile \u0219i comenzile de achizi\u021bie. Datele programate de \u00eencepere \u0219i finalizare a opera\u021biilor sunt transmise \u00eenapoi \u00een comenzile de produc\u021bie, iar activitatea \u00eenregistrat\u0103 este trimis\u0103 sub form\u0103 de tranzac\u021bii de opera\u021bii \u0219i de resurse. \u00cen etapa de implementare, echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 Oracle Fusion Cloud.<\/p>\n\n\n<p>Pre\u021bul porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, iar fiecare centru de lucru suplimentar cost\u0103 20 \u20ac pe lun\u0103. Perioada de testare gratuit\u0103 dureaz\u0103 30 de zile, cu p\u00e2n\u0103 la 20 de centre de lucru, f\u0103r\u0103 card de credit.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce se schimb\u0103 \u00een produc\u021bia dumneavoastr\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Opera\u021bii ordonate \u00een limita capacit\u0103\u021bii fiec\u0103rei resurse.<\/p>\n\n\n<p class=\"fx-pain__b\">Oracle Fusion Cloud Manufacturing stabile\u0219te datele fiec\u0103rei comenzi de produc\u021bie separat. SkyPlanner aloc\u0103 fiecare opera\u021bie unui anumit utilaj sau unei anumite persoane, la un moment precis, \u021bin\u00e2nd cont de schimburile reale, de absen\u021be \u0219i de \u00eenc\u0103rcarea generat\u0103 de toate celelalte comenzi de produc\u021bie.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Mai multe fabrici, un singur plan.<\/p>\n\n\n<p class=\"fx-pain__b\">Fiecare fabric\u0103 devine un grup de centre de lucru, iar timpii de transfer \u00eentre fabrici sunt inclu\u0219i \u00een program. SkyPlanner arat\u0103 \u00een ce fabric\u0103 \u0219i la ce centre de lucru trebuie executate opera\u021biile. Astfel, planificatorii v\u0103d \u00eentreaga re\u021bea, nu doar c\u00e2te o organiza\u021bie.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Costuri mai mici la schimb\u0103rile de fabrica\u021bie.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner p\u0103streaz\u0103 timpul de schimbare de fabrica\u021bie pentru fiecare pereche de produse, \u00een ambele sensuri. Trecerea de la albastru la ro\u0219u poate dura 30 de minute, iar de la ro\u0219u la albastru, 60. Motorul de programare ordoneaz\u0103 opera\u021biile astfel \u00eenc\u00e2t s\u0103 se piard\u0103 c\u00e2t mai pu\u021bin timp.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u0218i oamenii \u0219i sculele au disponibilitate limitat\u0103.<\/p>\n\n\n<p class=\"fx-pain__b\">Unei opera\u021bii care necesit\u0103 trei operatori \u00eei sunt alocate trei persoane disponibile \u00een schimburile respective. O matri\u021b\u0103 sau o form\u0103 utilizat\u0103 pe un utilaj nu este niciodat\u0103 rezervat\u0103 simultan pe altul. C\u00e2nd o resurs\u0103 este ocupat\u0103, opera\u021bia este mutat\u0103 pe un alt utilaj sau alocat\u0103 altei persoane.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materialele stabilesc momentul \u00eenceperii.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner verific\u0103 stocul disponibil \u0219i comenzile de achizi\u021bie \u00een curs pentru fiecare articol. O comand\u0103 de produc\u021bie care a\u0219teapt\u0103 o livrare de la furnizor este programat\u0103 dup\u0103 data livr\u0103rii, \u00een loc s\u0103 fie \u00eenceput\u0103 \u0219i apoi oprit\u0103 \u00een sec\u021bia de produc\u021bie.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatorii \u00ee\u0219i v\u0103d lista de opera\u021bii.<\/p>\n\n\n<p class=\"fx-pain__b\">Fiecare operator vede urm\u0103toarele opera\u021bii pe telefon sau tablet\u0103 \u0219i \u00eenregistreaz\u0103 activitatea pe m\u0103sur\u0103 ce o execut\u0103. La birou, progresul este vizibil \u00een timp real, iar finaliz\u0103rile sunt transmise \u00eenapoi \u00een Oracle Fusion Cloud.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een sec\u021bia de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar noua list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi m\u0103rturia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui program optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi m\u0103rturia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, director general Mamec, \u00een hala de produc\u021bie a companiei din Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000+<\/b><span>de comenzi de produc\u021bie programate automat<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eControl\u0103m produc\u021bia \u00eentr-un mod diferit, iar \u00een\u021belegerea capacit\u0103\u021bii noastre a ajuns la un cu totul alt nivel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, director general<\/b><br>Mamec \u00b7 Mixere industriale, pompe \u0219i produc\u021bie de \u00eenalt\u0103 tehnologie \u00een regim de subcontractare<\/p>\n\n\n<p class=\"ind-cust__result\">Mii de comenzi de produc\u021bie sunt programate automat, iar \u00eentreaga organiza\u021bie are o imagine \u00een timp real asupra produc\u021biei.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/mamec\/\">Citi\u021bi recenzia Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, directoare de produc\u021bie la Fredman Operations, l\u00e2ng\u0103 o celul\u0103 robotizat\u0103 de paletizare din Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 luni<\/b><span>pentru care echipa de v\u00e2nz\u0103ri vede capacitatea disponibil\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ofer\u0103 o baz\u0103 solid\u0103 \u0219i siguran\u021b\u0103 \u00eentregii activit\u0103\u021bi de planificare a produc\u021biei.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, directoare de produc\u021bie<\/b><br>Fredman Operations \u00b7 H\u00e2rtie pentru ambalaje destinat\u0103 contactului cu alimentele<\/p>\n\n\n<p class=\"ind-cust__result\">Echipa de v\u00e2nz\u0103ri vede capacitatea disponibil\u0103 cu \u0219ase luni \u00eenainte, iar solicit\u0103rile de modificare a programului, care necesitau o or\u0103 sau mai mult, primesc acum r\u0103spuns \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/fredman-operations\/\">Citi\u021bi recenzia Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-oracle-fusion-cloud-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum func\u021bioneaz\u0103 integrarea cu Oracle Fusion Cloud<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Oracle Fusion Cloud trimite datele de produc\u021bie.<\/strong> SkyPlanner preia comenzile de produc\u021bie \u0219i opera\u021biile acestora, defini\u021biile de fabrica\u021bie, centrele de lucru, resursele de produc\u021bie, calendarele \u0219i schimburile, articolele, structurile de articole, stocurile disponibile \u0219i comenzile de achizi\u021bie.<\/li>\n\n\n<li><strong>SkyPlanner creeaz\u0103 programul \u0219i \u00eel men\u021bine la zi.<\/strong> Motorul Arcturus optimizeaz\u0103 \u00eentregul plan \u00een c\u00e2teva secunde \u0219i \u00eel reface pe m\u0103sur\u0103 ce apar schimb\u0103ri \u00een produc\u021bie.<\/li>\n\n\n<li><strong>Datele \u0219i activitatea \u00eenregistrat\u0103 sunt trimise \u00eenapoi.<\/strong> Datele programate de \u00eencepere \u0219i finalizare sunt transmise \u00eenapoi pentru fiecare opera\u021bie din comanda de produc\u021bie, prin resursa <code>workOrders<\/code>. Confirm\u0103rile operatorilor sunt \u00eenregistrate ca tranzac\u021bii de opera\u021bii \u0219i tranzac\u021bii de resurse.<\/li>\n\n<\/ol>\n\n\n<p>Oracle Fusion Cloud r\u0103m\u00e2ne sistemul de referin\u021b\u0103 pentru datele dumneavoastr\u0103. Articolele, defini\u021biile de fabrica\u021bie, Supply Planning, calculul costurilor, gestiunea stocurilor \u0219i finan\u021bele r\u0103m\u00e2n acolo unde sunt. SkyPlanner se ocup\u0103 de un singur lucru: ordinea \u0219i programarea \u00een timp a fiec\u0103rei opera\u021bii pe fiecare resurs\u0103.<\/p>\n\n\n<p>SkyPlanner cite\u0219te datele din Oracle Fusion Cloud prin REST API pentru Oracle Fusion Cloud SCM: <code>workOrders<\/code>, <code>workDefinitions<\/code>, <code>workCenters<\/code>, <code>productionResources<\/code>, <code>itemsV2<\/code>, <code>itemStructures<\/code> \u0219i <code>inventoryOnhandBalances<\/code>. Scrie datele \u00eenapoi printr-o cerere PATCH asupra comenzii de produc\u021bie \u0219i a obiectului subordonat <code>WorkOrderOperation<\/code>, care con\u021bine <code>PlannedStartDate<\/code> \u0219i <code>PlannedCompletionDate<\/code>, \u0219i \u00eenregistreaz\u0103 progresul \u00een <code>operationTransactions<\/code> \u0219i <code>resourceTransactions<\/code>. Webhook-urile SkyPlanner transmit fiecare modificare a programului \u00een momentul \u00een care apare.<\/p>\n\n\n<p>Fiecare fabric\u0103 utilizeaz\u0103 Oracle Fusion Cloud diferit. De aceea, echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 \u00een etapa de implementare \u0219i asigur\u0103 suportul dup\u0103 punerea \u00een func\u021biune. Oferta pentru integrare este stabilit\u0103 de la \u00eenceput, \u00een func\u021bie de procesul \u0219i nevoile dumneavoastr\u0103. Partenerul dumneavoastr\u0103 Oracle sau propriii dezvoltatori pot, de asemenea, s\u0103 realizeze integrarea folosind API-ul documentat al SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia API<\/a>).<\/p>\n\n\n<p>Resursele, maparea datelor \u0219i regulile de transmitere a datelor \u00eenapoi \u00een Oracle Fusion Cloud sunt descrise \u00een <a href=\"\/ro\/integrari\/erp\/oracle-fusion-cloud\/ghid-de-integrare\/\">ghidul de integrare cu Oracle Fusion Cloud pentru programarea produc\u021biei<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-oracle-fusion-cloud-schedules-and-what-skyp\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce programeaz\u0103 Oracle Fusion Cloud \u0219i ce adaug\u0103 SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Oracle Fusion Cloud Manufacturing stabile\u0219te datele pentru fiecare comand\u0103 de produc\u021bie, iar Oracle ofer\u0103 programare cu capacitate finit\u0103 \u00eentr-un spa\u021biu de lucru separat. <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/faumf\/how-work-orders-are-scheduled.html\">Documenta\u021bia Oracle<\/a> descrie aceste niveluri:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Comenzile de produc\u021bie sunt programate f\u0103r\u0103 constr\u00e2ngeri.<\/strong> &#8220;Oracle Manufacturing uses unconstrained scheduling engine in the background to schedule work orders during create and certain update actions.&#8221; (Oracle Manufacturing folose\u0219te \u00een fundal un motor de programare f\u0103r\u0103 constr\u00e2ngeri pentru a programa comenzile de produc\u021bie la creare \u0219i la anumite actualiz\u0103ri.)<\/li>\n\n\n<li><strong>Celelalte comenzi de produc\u021bie sunt ignorate.<\/strong> La programarea unei comenzi de produc\u021bie, &#8220;resources are assumed to have infinite capacity and the scheduling engine disregards loads on the resources from other work orders.&#8221; (Se presupune c\u0103 resursele au capacitate infinit\u0103, iar motorul de programare ignor\u0103 \u00eenc\u0103rcarea acestora din celelalte comenzi de produc\u021bie.)<\/li>\n\n\n<li><strong>Comenzile de produc\u021bie se pot suprapune pe aceea\u0219i resurs\u0103.<\/strong> Aplica\u021bia de produc\u021bie &#8220;assumes that your resources have unlimited capacity; it then potentially plans to execute production for multiple work orders simultaneously.&#8221; (Presupune c\u0103 resursele au capacitate nelimitat\u0103 \u0219i poate programa execu\u021bia simultan\u0103 a mai multor comenzi de produc\u021bie.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/why-you-use-production-scheduling.html\">sursa<\/a>)<\/li>\n\n\n<li><strong>Supply Planning lucreaz\u0103 cu intervale de timp.<\/strong> Un plan de aprovizionare cu constr\u00e2ngeri mut\u0103 comenzile &#8220;to earlier time buckets,&#8221; (\u00een intervale de timp anterioare) \u0219i &#8220;as a last resort, overloads resource and supplier capacity to meet demands on time.&#8221; (\u00cen ultim\u0103 instan\u021b\u0103, dep\u0103\u0219e\u0219te capacitatea resurselor \u0219i a furnizorilor pentru a satisface cererea la timp.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fausp\/overview-of-constraint-based-supply-planning.html\">sursa<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Ordonarea opera\u021biilor cu capacitate finit\u0103 este asigurat\u0103 de Oracle Production Scheduling, un spa\u021biu de lucru activat \u00een cadrul ofertei Supply Chain Planning, nu \u00een Fusion Manufacturing (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/how-to-enable-the-production-scheduling-work-area.html\">configurarea Oracle<\/a>). Planificatorul creeaz\u0103 c\u00e2te un program pentru fiecare organiza\u021bie de programare \u0219i parcurge etapele Refresh, Solve, Repair \u0219i Release.<\/p>\n\n\n<p>Fiecare etap\u0103 \u0219i limitare este explicat\u0103 \u00een articolul <a href=\"\/ro\/integrari\/erp\/oracle-fusion-cloud\/cu-capacitate-finita\/\">Oracle Fusion Cloud ofer\u0103 programare cu capacitate finit\u0103?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"oracle-fusion-cloud-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Oracle Fusion Cloud \u00een prezent \u0219i cu SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Programarea \u00een Oracle Fusion Cloud Manufacturing<\/th><th>Oracle Fusion Cloud cu SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Capacitate<\/td><td>Infinit\u0103: datele fiec\u0103rei comenzi de produc\u021bie sunt stabilite f\u0103r\u0103 a \u021bine cont de \u00eenc\u0103rcarea generat\u0103 de celelalte<\/td><td>Capacitate finit\u0103 pentru fiecare utilaj, persoan\u0103 \u0219i scul\u0103, conform schimburilor reale<\/td><\/tr><tr><td>Ordinea opera\u021biilor<\/td><td>Date stabilite pentru fiecare comand\u0103 de produc\u021bie pe baza utiliz\u0103rii resurselor \u0219i a calendarelor<\/td><td>Ordinea opera\u021biilor pe fiecare resurs\u0103, stabilit\u0103 \u00een c\u00e2teva secunde<\/td><\/tr><tr><td>Fabrici<\/td><td>Production Scheduling calculeaz\u0103 programul pentru c\u00e2te o organiza\u021bie de programare<\/td><td>Mai multe fabrici \u00eentr-un singur plan, cu timpii de transfer dintre ele<\/td><\/tr><tr><td>Schimb\u0103ri de fabrica\u021bie<\/td><td>Reguli de schimbare de fabrica\u021bie \u00een Production Scheduling doar pentru echipamente cu o singur\u0103 unitate<\/td><td>Matrice a timpilor de preg\u0103tire pentru fiecare centru de lucru: timp total de preg\u0103tire minim<\/td><\/tr><tr><td>Personal \u0219i scule<\/td><td>Personal \u0219i echipamente definite ca resurse ale opera\u021biei<\/td><td>Operatori nominaliza\u021bi, cu schimburi definite, opera\u021bii cu mai mul\u021bi operatori, scule partajate cu disponibilitate limitat\u0103<\/td><\/tr><tr><td>Materiale<\/td><td>Supply Planning pe intervale de timp<\/td><td>Opera\u021biile \u00eencep c\u00e2nd materialele sunt disponibile din stoc sau din livrarea comenzilor de achizi\u021bie<\/td><\/tr><tr><td>Modific\u0103ri<\/td><td>Planificatorul execut\u0103 Refresh, Solve, Repair, Release<\/td><td>Autopilot reface planul respect\u00e2nd priorit\u0103\u021bile dumneavoastr\u0103; Running Time Lock fixeaz\u0103 programul pentru urm\u0103toarele ore<\/td><\/tr><tr><td>Transmiterea datelor \u00eenapoi<\/td><td>Release actualizeaz\u0103 comenzile de produc\u021bie din orizontul de lansare<\/td><td>Datele programate ale opera\u021biilor sunt scrise \u00een fiecare comand\u0103 de produc\u021bie programat\u0103<\/td><\/tr><tr><td>Sec\u021bia de produc\u021bie<\/td><td>Lista opera\u021biilor de executat \u00een Oracle<\/td><td>Operatorii v\u0103d opera\u021biile care urmeaz\u0103 \u0219i \u00eenregistreaz\u0103 activitatea pe telefon sau tablet\u0103<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"oracle-fusion-cloud-scheduling-software-and-add\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Compara\u021bie \u00eentre solu\u021biile \u0219i extensiile de programare pentru Oracle Fusion Cloud<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Op\u021biune<\/th><th>Ce este<\/th><th>C\u00e2nd este potrivit\u0103<\/th><\/tr><\/thead><tbody><tr><td>Oracle Production Scheduling \u0219i Supply Planning<\/td><td>Spa\u021biile de lucru Oracle pentru planificare din oferta Supply Chain Planning<\/td><td>Folosi\u021bi deja Supply Chain Planning, iar o echip\u0103 central\u0103 de planificare gestioneaz\u0103 fiecare organiza\u021bie de programare<\/td><\/tr><tr><td>MES \u0219i aplica\u021bii pentru operatori conectate la Fusion (de exemplu, Accevo, Tulip)<\/td><td>Aplica\u021bii pentru execu\u021bie \u0219i colectarea datelor \u00een sec\u021bia de produc\u021bie, care citesc \u0219i \u00eenregistreaz\u0103 datele comenzilor de produc\u021bie din Fusion<\/td><td>Proiectul vizeaz\u0103 execu\u021bia \u0219i colectarea datelor \u00een sec\u021bia de produc\u021bie<\/td><\/tr><tr><td>Solu\u021bii APS independente \u0219i instrumente de planificare (de exemplu, PlanetTogether, b2wise)<\/td><td>Software de planificare conectat la Oracle printr-un proiect de integrare<\/td><td>O echip\u0103 de planificare va gestiona un model de optimizare separat<\/td><\/tr><tr><td>APS \u00een cloud conectat prin REST (SkyPlanner APS)<\/td><td>O solu\u021bie de programare cu capacitate finit\u0103, accesibil\u0103 \u00een browser, care se sincronizeaz\u0103 bidirec\u021bional cu comenzile de produc\u021bie din Fusion<\/td><td>Programul trebuie s\u0103 se men\u021bin\u0103 automat la zi, s\u0103 acopere toate fabricile \u0219i s\u0103 fie disponibil fiec\u0103rui operator<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Alege\u021bi SkyPlanner \u00een locul Oracle Production Scheduling c\u00e2nd:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Folosi\u021bi Fusion Manufacturing f\u0103r\u0103 Supply Chain Planning.<\/strong> Oracle pune la dispozi\u021bie Production Scheduling \u00een \u201eOffering: Supply Chain Planning\u201d (oferta Supply Chain Planning). SkyPlanner programeaz\u0103 comenzile de produc\u021bie din Fusion cu capacitate finit\u0103 \u0219i completeaz\u0103 sistemul Manufacturing pe care \u00eel folosi\u021bi deja.<\/li>\n\n\n<li><strong>Mai multe fabrici \u00ee\u0219i \u00eempart lucr\u0103rile.<\/strong> Production Scheduling creeaz\u0103 c\u00e2te un program pentru fiecare organiza\u021bie de programare. SkyPlanner include toate fabricile \u00eentr-un singur program \u0219i arat\u0103 \u00een ce fabric\u0103 ar trebui executate lucr\u0103rile.<\/li>\n\n\n<li><strong>Schimb\u0103rile de fabrica\u021bie nu se limiteaz\u0103 la utilaje individuale.<\/strong> Oracle aplic\u0103 regulile de schimbare de fabrica\u021bie \u201eonly on resources that have resource type set to equipment and default units available set to 1\u201d (doar resurselor de tip echipament pentru care num\u0103rul implicit de unit\u0103\u021bi disponibile are valoarea indicat\u0103 \u00een citat) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/changeover-rules.html\">sursa<\/a>). Matricea timpilor de preg\u0103tire din SkyPlanner con\u021bine, pentru fiecare centru de lucru, timpii de schimbare de fabrica\u021bie \u00een func\u021bie de sensul tranzi\u021biei.<\/li>\n\n\n<li><strong>Programul trebuie s\u0103 se actualizeze singur.<\/strong> Oracle avertizeaz\u0103 c\u0103 \u201eif the schedule isn&#8217;t refreshed after the previous release, changes to the schedule for some work orders might not be released\u201d (dac\u0103 programul nu este actualizat dup\u0103 publicarea precedent\u0103, este posibil ca modific\u0103rile pentru unele comenzi de produc\u021bie s\u0103 nu fie publicate) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/release-analysis-and-actions.html\">sursa<\/a>). Autopilot reface programul la fiecare schimbare semnificativ\u0103, iar noile date sunt transmise \u00eenapoi \u00een comenzile de produc\u021bie.<\/li>\n\n\n<li><strong>Fiecare operator trebuie s\u0103 lucreze dup\u0103 program.<\/strong> Mobile Confirmations afi\u0219eaz\u0103 lista actualizat\u0103 a opera\u021biilor pe telefon sau tablet\u0103. Num\u0103rul de utilizatori este nelimitat: pre\u021bul depinde de centrele de lucru, nu de num\u0103rul de utilizatori.<\/li>\n\n\n<li><strong>Dori\u021bi un program func\u021bional \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni.<\/strong> \u00cen perioada de prob\u0103 de 30 de zile, testa\u021bi SkyPlanner cu propriile comenzi de produc\u021bie din Fusion. Implementarea se finalizeaz\u0103 de obicei \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea configur\u0103rii ini\u021biale.<\/li>\n\n<\/ul>\n\n\n<p><strong>Folosi\u021bi, \u00een schimb, Oracle NetSuite?<\/strong> NetSuite este sistemul ERP de la Oracle pentru companii \u00een cre\u0219tere, \u00een timp ce Oracle Fusion Cloud se adreseaz\u0103 produc\u0103torilor mari, cu mai multe fabrici. Consulta\u021bi <a href=\"\/ro\/integrari\/erp\/netsuite\/\">SkyPlanner pentru NetSuite<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum \u00eencepe\u021bi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103.<\/strong> 30 de zile, p\u00e2n\u0103 la 20 de centre de lucru, toate func\u021bionalit\u0103\u021bile Basic, f\u0103r\u0103 card bancar.<\/li>\n\n\n<li><strong>Modela\u021bi produc\u021bia.<\/strong> Crea\u021bi utilajele, personalul \u0219i schimburile \u00een SkyPlanner sau importa\u021bi centrele de lucru \u0219i resursele de produc\u021bie din Oracle. Pute\u021bi beneficia de asisten\u021b\u0103 la configurarea ini\u021bial\u0103.<\/li>\n\n\n<li><strong>\u00cenc\u0103rca\u021bi comenzile de produc\u021bie.<\/strong> Exporta\u021bi din Oracle Fusion Cloud \u00een Excel comenzile de produc\u021bie deschise \u0219i opera\u021biile acestora, importa\u021bi-le \u00een SkyPlanner \u0219i compara\u021bi programul rezultat cu cel actual.<\/li>\n\n\n<li><strong>Conecta\u021bi Oracle Fusion Cloud.<\/strong> Echipa SkyPlanner configureaz\u0103 integrarea bidirec\u021bional\u0103 prin SCM REST API \u0219i asigur\u0103 asisten\u021b\u0103 pentru aceasta dup\u0103 punerea \u00een func\u021biune.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u021buri.<\/strong> Abonamentele se factureaz\u0103 lunar, pe centru de lucru. Pute\u021bi ad\u0103uga sau elimina centre de lucru ori pute\u021bi anula abonamentul oric\u00e2nd. Consulta\u021bi <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a> pentru detalii, citi\u021bi <a href=\"\/ro\/resurse\/planificare-si-programare-avansata-aps\/\">ghidul APS<\/a> sau explora\u021bi <a href=\"\/ro\/integrari\/erp\/\">toate integr\u0103rile ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi proba gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Contacta\u021bi echipa de v\u00e2nz\u0103ri<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Care este cea mai bun\u0103 extensie de programare a produc\u021biei pentru Oracle Fusion Cloud?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS este o extensie de programare cu capacitate finit\u0103, cu integrare bidirec\u021bional\u0103 cu Oracle Fusion Cloud: preia comenzile de produc\u021bie, defini\u021biile de fabrica\u021bie, centrele de lucru, resursele de produc\u021bie, articolele \u0219i comenzile de achizi\u021bie \u0219i trimite \u00eenapoi datele planificate ale opera\u021biilor \u0219i munca \u00eenregistrat\u0103. Capacitatea fiec\u0103rui utilaj, operator \u0219i a fiec\u0103rei scule, precum \u0219i disponibilitatea materialelor sunt tratate ca finite. Matricea timpilor de preg\u0103tire \u021bine cont de sensul tranzi\u021biei \u0219i ordoneaz\u0103 opera\u021biile astfel \u00eenc\u00e2t s\u0103 reduc\u0103 la minimum preg\u0103tirile. Autopilot reface automat programul c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie. Pre\u021burile pornesc de la 199 \u20ac pe lun\u0103, iar perioada de prob\u0103 gratuit\u0103 dureaz\u0103 30 de zile.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Oracle Fusion Cloud ofer\u0103 programare cu capacitate finit\u0103?<\/summary>\n<p class=\"sp-faq__a\">Nu \u00een Fusion Manufacturing propriu-zis. Oracle precizeaz\u0103 c\u0103 motorul s\u0103u de programare a comenzilor de produc\u021bie nu \u021bine cont de constr\u00e2ngeri \u0219i presupune o capacitate infinit\u0103. Programarea cu capacitate finit\u0103 este disponibil\u0103 \u00een Oracle Production Scheduling, o zon\u0103 de lucru din oferta Supply Chain Planning. SkyPlanner APS completeaz\u0103 Fusion Manufacturing prin programarea produc\u021biei \u00een func\u021bie de capacitatea finit\u0103 a fiec\u0103rui utilaj, a fiec\u0103rei persoane \u0219i scule, precum \u0219i de disponibilitatea limitat\u0103 a materialelor.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ce software de programare a produc\u021biei se integreaz\u0103 cu Oracle Fusion Cloud?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS se integreaz\u0103 bidirec\u021bional cu Oracle Fusion Cloud prin REST API pentru Oracle Fusion Cloud SCM. Cite\u0219te <code>workOrders<\/code>, <code>workDefinitions<\/code>, <code>workCenters<\/code>, <code>productionResources<\/code>, <code>itemsV2<\/code> \u0219i stocurile disponibile, scrie <code>PlannedStartDate<\/code> \u0219i <code>PlannedCompletionDate<\/code> \u00een fiecare <code>WorkOrderOperation<\/code> \u0219i trimite confirm\u0103ri c\u0103tre <code>operationTransactions<\/code> \u0219i <code>resourceTransactions<\/code>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>S\u0103 alegem Oracle Production Scheduling sau SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, dac\u0103 dori\u021bi un singur program cu capacitate finit\u0103 pentru toate fabricile, care se actualizeaz\u0103 singur. Oracle Production Scheduling face parte din oferta Supply Chain Planning, calculeaz\u0103 programul pentru c\u00e2te o organiza\u021bie, aplic\u0103 reguli de schimbare de fabrica\u021bie doar echipamentelor cu o singur\u0103 unitate \u0219i public\u0103 datele doar \u00een intervalul de publicare stabilit. SkyPlanner reface automat programul \u0219i planific\u0103 schimb\u0103rile de fabrica\u021bie, sculele, echipele \u0219i materialele pentru fiecare centru de lucru. Fiecare operator \u00ee\u0219i vede lista de opera\u021bii pe telefon, iar num\u0103rul de utilizatori este nelimitat.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner \u00eenlocuie\u0219te Oracle Supply Planning sau Fusion Manufacturing?<\/summary>\n<p class=\"sp-faq__a\">Nu, le completeaz\u0103. Oracle gestioneaz\u0103 \u00een continuare articolele, defini\u021biile de fabrica\u021bie, Supply Planning, stocurile, calculul costurilor \u0219i finan\u021bele. SkyPlanner programeaz\u0103 comenzile de produc\u021bie \u00een func\u021bie de capacitatea real\u0103 \u0219i trimite \u00eenapoi datele opera\u021biilor.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>C\u00e2t cost\u0103 SkyPlanner pentru o fabric\u0103 ce folose\u0219te Oracle Fusion Cloud?<\/summary>\n<p class=\"sp-faq__a\">De la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, plus 20 \u20ac pe lun\u0103 pentru fiecare centru de lucru suplimentar. Un centru de lucru este o resurs\u0103 de produc\u021bie cu propria list\u0103 de opera\u021bii programate. Primi\u021bi de la \u00eenceput o ofert\u0103 pentru integrare, adaptat\u0103 procesului \u0219i nevoilor dumneavoastr\u0103, \u00eempreun\u0103 cu oferta pentru abonament, astfel \u00eenc\u00e2t s\u0103 cunoa\u0219te\u021bi costul total \u00eenainte de a \u00eencepe.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>C\u00e2t dureaz\u0103 implementarea?<\/summary>\n<p class=\"sp-faq__a\">Implementarea se finalizeaz\u0103 de obicei \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea configur\u0103rii ini\u021biale, chiar \u0219i \u00een companiile mari. Echipa stabile\u0219te coresponden\u021bele pentru centrele de lucru, resursele de produc\u021bie \u0219i defini\u021biile de fabrica\u021bie, conecteaz\u0103 comenzile de produc\u021bie \u0219i de achizi\u021bie \u0219i trimite \u00eenapoi datele planificate. \u00cenainte de punerea \u00een func\u021biune, totul este testat prin compara\u021bie cu programul actual.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de integrarea cu Oracle Fusion Cloud?<\/summary>\n<p class=\"sp-faq__a\">Da. \u00cen perioada de prob\u0103 de 30 de zile, folosi\u021bi un export Excel al comenzilor de produc\u021bie deschise din Oracle. Vede\u021bi <a href=\"\/ro\/resurse\/capacitate-finita\/\">programarea cu capacitate finit\u0103<\/a> a propriei produc\u021bii \u00eenainte de \u00eenceperea oric\u0103rei lucr\u0103ri de integrare.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ Oracle Fusion Cloud SkyPlanner APS pentru Oracle Fusion Cloud: programarea produc\u021biei cu capacitate finit\u0103 SkyPlanner APS este o extensie pentru Oracle Fusion Cloud care asigur\u0103 programarea cu capacitate finit\u0103 a fiec\u0103rui utilaj, operator, a fiec\u0103rei scule \u0219i a materialelor din fabricile dumneavoastr\u0103. Vede\u021bi c\u00e2nd \u0219i pe ce resurs\u0103 se execut\u0103 fiecare &#8230; <a title=\"SkyPlanner APS pentru Oracle Fusion Cloud: programarea produc\u021biei cu capacitate finit\u0103\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/oracle-fusion-cloud\/\" aria-label=\"Read more about SkyPlanner APS pentru Oracle Fusion Cloud: programarea produc\u021biei cu capacitate finit\u0103\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100697,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106169","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Oracle Fusion: integrare APS, programare cu capacitate finit\u0103<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: extensie Oracle Fusion Cloud, programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103: utilaje, oameni, scule, materiale. De la 199 \u20ac\/lun\u0103.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/oracle-fusion-cloud\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS pentru Oracle Fusion Cloud: programarea produc\u021biei cu capacitate finit\u0103\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: extensie Oracle Fusion Cloud, programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103: utilaje, oameni, scule, materiale. De la 199 \u20ac\/lun\u0103.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/oracle-fusion-cloud\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/oracle-fusion-cloud\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/oracle-fusion-cloud\\\/\",\"name\":\"Oracle Fusion: integrare APS, programare cu capacitate finit\u0103\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS: extensie Oracle Fusion Cloud, programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103: utilaje, oameni, scule, materiale. De la 199 \u20ac\\\/lun\u0103.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/oracle-fusion-cloud\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/oracle-fusion-cloud\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/oracle-fusion-cloud\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru Oracle Fusion Cloud: programarea produc\u021biei cu capacitate finit\u0103\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Oracle Fusion: integrare APS, programare cu capacitate finit\u0103","description":"SkyPlanner APS: extensie Oracle Fusion Cloud, programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103: utilaje, oameni, scule, materiale. De la 199 \u20ac\/lun\u0103.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/oracle-fusion-cloud\/","og_locale":"ro_RO","og_type":"article","og_title":"SkyPlanner APS pentru Oracle Fusion Cloud: programarea produc\u021biei cu capacitate finit\u0103","og_description":"SkyPlanner APS: extensie Oracle Fusion Cloud, programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103: utilaje, oameni, scule, materiale. De la 199 \u20ac\/lun\u0103.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/oracle-fusion-cloud\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/oracle-fusion-cloud\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/oracle-fusion-cloud\/","name":"Oracle Fusion: integrare APS, programare cu capacitate finit\u0103","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS: extensie Oracle Fusion Cloud, programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103: utilaje, oameni, scule, materiale. De la 199 \u20ac\/lun\u0103.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/oracle-fusion-cloud\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/oracle-fusion-cloud\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/oracle-fusion-cloud\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru Oracle Fusion Cloud: programarea produc\u021biei cu capacitate finit\u0103"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ Oracle Fusion Cloud SkyPlanner APS pentru Oracle Fusion Cloud: programarea produc\u021biei cu capacitate finit\u0103 SkyPlanner APS este o extensie pentru Oracle Fusion Cloud care asigur\u0103 programarea cu capacitate finit\u0103 a fiec\u0103rui utilaj, operator, a fiec\u0103rei scule \u0219i a materialelor din fabricile dumneavoastr\u0103. Vede\u021bi c\u00e2nd \u0219i pe ce resurs\u0103 se execut\u0103 fiecare&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106169","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=106169"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106169\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/100697"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=106169"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}