{"id":104261,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/proshop-erp\/ghid-de-integrare\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"ghid-de-integrare","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proshop-erp\/ghid-de-integrare\/","title":{"rendered":"Ghid de integrare ProShop ERP pentru programarea produc\u021biei cu SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ ProShop ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Ghid de integrare ProShop ERP <span class=\"hl\">pentru programarea produc\u021biei cu SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Acest ghid de integrare ProShop le arat\u0103 administratorilor, consultan\u021bilor \u0219i echipelor IT cum s\u0103 conecteze ProShop ERP la SkyPlanner APS. SkyPlanner se integreaz\u0103 bidirec\u021bional cu ProShop, folosind API-ul propriu al ProShop:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u00cen SkyPlanner sunt importate Work Orders cu opera\u021biile aferente, Parts, \u00eenregistr\u0103rile Work Order BOM, Work Cells, Users, Tools, Fixtures \u0219i Purchase Orders.<\/li>\n\n\n<li>Datele planificate de \u00eenceput \u0219i de finalizare sunt trimise \u00eenapoi \u00een comenzile de produc\u021bie.<\/li>\n\n\n<li>Dac\u0103 dori\u021bi, timpul lucrat de operatori poate fi trimis \u00eenapoi \u00een ProShop Time Tracking.<\/li>\n\n\n<li>Webhook-urile SkyPlanner transmit modific\u0103rile programului pe m\u0103sur\u0103 ce apar.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u00cen etapa de implementare ini\u021bial\u0103, echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 ProShop \u0219i ofer\u0103 asisten\u021b\u0103 \u0219i dup\u0103 punerea \u00een func\u021biune. Acest ghid se adreseaz\u0103 partenerilor \u0219i dezvoltatorilor care doresc s\u0103 participe sau s\u0103 dezvolte singuri solu\u021bii pe baza REST API documentat al SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"proshop-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Interfe\u021bele de integrare ProShop<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>ProShop ofer\u0103 unui sistem extern de programare dou\u0103 c\u0103i de integrare, descrise \u00een documenta\u021bia ProShop API pentru dezvoltatori:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>ProShop GraphQL API.<\/strong> &#8220;ProShop provides a GraphQL API, available via HTTP(S).&#8221; (ProShop ofer\u0103 un API GraphQL, disponibil prin HTTP(S).) Exist\u0103 un singur endpoint: fiecare apel este o cerere HTTP POST c\u0103tre <code>&lt;proshop root&gt;\/api\/graphql<\/code>, cu <code>query<\/code>, <code>variables<\/code> \u0219i <code>operationName<\/code> \u00een corpul JSON. Fiecare modul are o interogare la singular pentru o singur\u0103 \u00eenregistrare \u0219i una la plural pentru liste. Listele sunt paginate cu <code>pageSize<\/code> (implicit 20) \u0219i <code>pageStart<\/code>, returneaz\u0103 <code>records<\/code> \u0219i <code>totalRecords<\/code> \u0219i accept\u0103 argumentele <code>filter<\/code> \u0219i <code>query<\/code>, care corespund func\u021biei Advanced Search din fiecare modul. Schema permite introspec\u021bia. (<a href=\"https:\/\/adionsystems.atlassian.net\/wiki\/spaces\/PADD\/pages\/460554241\/Introduction+to+the+ProShop+API\">Introducere \u00een API-ul ProShop<\/a>)<\/li>\n\n\n<li><strong>Recently Updated Records API.<\/strong> &#8220;A simple REST interface allows external integrations to request information between arbitrary points in time.&#8221; (O interfa\u021b\u0103 REST simpl\u0103 permite integr\u0103rilor externe s\u0103 solicite informa\u021bii pentru orice interval de timp.) Apela\u021bi <code>&lt;proshop root&gt;\/recentlyupdatedrecords<\/code> cu <code>start<\/code> (ISO 8601) \u0219i, op\u021bional, cu <code>end<\/code> \u0219i <code>filterby<\/code>, de exemplu <code>workorders,workcells,purchaseorders,timetracking,deletions<\/code>. Echipa ProShop trebuie mai \u00eent\u00e2i s\u0103 activeze indexul. (<a href=\"https:\/\/adionsystems.atlassian.net\/wiki\/spaces\/PADD\/pages\/2214100993\/The+Recently+Updated+Records+API\">Recently Updated Records API<\/a>)<\/li>\n\n<\/ol>\n\n\n<p>Scrierea datelor se face prin <strong>muta\u021bii<\/strong> GraphQL. Exemplul documentat este Time Tracking Login, iar accesul de scriere se acord\u0103 pentru fiecare modul prin permisiuni de tip scope.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-scopes\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentificare \u0219i permisiuni de tip scope<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Token de acces la fiecare apel.<\/strong> Trimite\u021bi-l ca <code>Authorization: Bearer &lt;token&gt;<\/code> sau ca parametru de interogare <code>token<\/code>.<\/li>\n\n\n<li><strong>OAuth 2.0 Client Credentials<\/strong> (ProShop 5.2.3 \u0219i versiunile ulterioare). Un administrator de sistem ProShop deschide System Config &gt; Manage Authorizations, creeaz\u0103 o Authorization cu Name \u0219i Maximum Scope \u0219i bifeaz\u0103 <strong>Direct Login<\/strong> \u0219i <strong>Active<\/strong>. Unique ID \u0219i Shared Secret devin <code>client_id<\/code> \u0219i <code>client_secret<\/code>. Aplica\u021bia trimite prin POST <code>grant_type=client_credentials<\/code> c\u0103tre <code>&lt;proshop root&gt;\/home\/member\/oauth\/accesstoken<\/code> \u0219i prime\u0219te un token Bearer cu <code>expires_in<\/code>. Nu exist\u0103 token de re\u00eemprosp\u0103tare, a\u0219adar solicita\u021bi un token nou c\u00e2nd cel curent expir\u0103. (<a href=\"https:\/\/adionsystems.atlassian.net\/wiki\/spaces\/PADD\/pages\/1230209075\/OAuth+2.0+Client+Credentials+Flow\">Fluxul Client Credentials<\/a>)<\/li>\n\n\n<li><strong>OAuth 2.0 Authorization Flow<\/strong> pentru apelurile care necesit\u0103 un context de utilizator, cum ar fi Time Tracking Login.<\/li>\n\n\n<li><strong>Permisiuni de tip scope.<\/strong> Formatul este <code>SCOPE_NAME:[{r|w|d|p}]<\/code>, pentru citire, scriere, \u0219tergere \u0219i preferin\u021be. Un sistem de programare solicit\u0103 de obicei <code>workorders:rw parts:r purchaseorders:r users:r tools:r<\/code>, plus Time Tracking dac\u0103 timpul lucrat este trimis \u00eenapoi. \u00cencep\u00e2nd cu ProShop 5.1.9, &#8220;a scope grant request is now required on all connections to the API.&#8221; (O cerere de acordare a permisiunilor de tip scope este acum obligatorie pentru toate conexiunile la API.) (<a href=\"https:\/\/adionsystems.atlassian.net\/wiki\/spaces\/PADD\/pages\/1444184068\/Authorization+scopes\">Permisiuni de autorizare de tip scope<\/a>)<\/li>\n\n\n<li><strong>Jurnal de audit.<\/strong> Pentru apelurile efectuate cu creden\u021bialele clientului apare numele aplica\u021biei, nu un utilizator.<\/li>\n\n<\/ul>\n\n\n<p>\u00cen SkyPlanner, autentificarea pentru REST API se face cu un token API \u00een antetul <code>Authorization-Token<\/code> (SkyPlanner Settings &gt; API), iar documenta\u021bia este disponibil\u0103 \u00een Swagger\/OpenAPI. <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">Tutorialul de integrare<\/a> v\u0103 ghideaz\u0103 prin primele apeluri.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Evenimente \u0219i interogare periodic\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Documenta\u021bia ProShop pentru dezvoltatori nu descrie webhook-uri de ie\u0219ire sau abonamente GraphQL. Datele din ProShop sunt preluate prin interogare periodic\u0103, iar Recently Updated Records API reduce costul acestei opera\u021bii: solicita\u021bi tot ce a fost creat, modificat sau \u0219ters de la ultima rulare, filtr\u00e2nd dup\u0103 tipurile de \u00eenregistr\u0103ri necesare program\u0103rii. Apoi prelua\u021bi prin GraphQL comenzile de produc\u021bie modificate, dup\u0103 num\u0103r. ProShop precizeaz\u0103 c\u0103 aceast\u0103 metod\u0103 este mai rapid\u0103 dec\u00e2t interogarea dup\u0103 <code>lastModifiedTime<\/code>.<\/p>\n\n\n<p>O alegere obi\u0219nuit\u0103 este un ciclu de cinci minute pentru comenzile de produc\u021bie \u0219i pontaj \u0219i unul de o or\u0103 pentru piese \u0219i comenzile de achizi\u021bie. SkyPlanner trimite webhook-uri c\u00e2nd se modific\u0103 starea sau programul de produc\u021bie, astfel \u00eenc\u00e2t scrierea datelor \u00eenapoi este declan\u0219at\u0103 de evenimente.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Coresponden\u021ba datelor<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Obiect ProShop (API)<\/th><th>Obiect SkyPlanner<\/th><th>Sens<\/th><th>Frecven\u021b\u0103<\/th><\/tr><\/thead><tbody><tr><td>Parts, COTS (permisiunea GraphQL <code>parts<\/code>)<\/td><td>Produse \u0219i materiale<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>La \u00eenc\u0103rcarea ini\u021bial\u0103, apoi la fiecare modificare<\/td><\/tr><tr><td>\u00cenregistr\u0103ri Work Order BOM<\/td><td>Structura produsului, materiale pentru fiecare comand\u0103<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>La fiecare comand\u0103 de produc\u021bie<\/td><\/tr><tr><td>Opera\u021biile comenzii de produc\u021bie: celul\u0103 de lucru, timp estimat de preg\u0103tire \u0219i de ciclu (timpi-\u021bint\u0103)<\/td><td>Etape de proces cu durate, timpi de preg\u0103tire \u0219i de demontare<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>La fiecare comand\u0103 de produc\u021bie<\/td><\/tr><tr><td>Work Cells (utilaj, banc de lucru, echipament)<\/td><td>Centre de lucru, grupuri de centre de lucru, valori de eficien\u021b\u0103<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi rar<\/td><\/tr><tr><td>Work Cells atribuite persoanelor, Users<\/td><td>Personal \u0219i aloc\u0103ri de operatori<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modific\u0103ri<\/td><\/tr><tr><td>Programele celulelor de lucru (ore disponibile, schimburi)<\/td><td>Schimburi \u0219i zile nelucr\u0103toare<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>Zilnic sau schimburi gestionate \u00een SkyPlanner<\/td><\/tr><tr><td>Work Orders (cantitate, termen de livrare, stare)<\/td><td>Comenzi \u0219i opera\u021bii cu termene de livrare \u0219i prioritate<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>Interogare periodic\u0103 la c\u00e2teva minute<\/td><\/tr><tr><td>Tools, Toolpots, Fixtures, RTAs<\/td><td>Scule ca resurse partajate cu disponibilitate limitat\u0103<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modific\u0103ri<\/td><\/tr><tr><td>Purchase Orders cu termene de livrare<\/td><td>Comenzi de achizi\u021bie, materiale de recep\u021bionat \u00een func\u021bie de data livr\u0103rii<\/td><td>ProShop \u2192 SkyPlanner<\/td><td>Interogare periodic\u0103, la fiecare or\u0103 sau la rularea program\u0103rii<\/td><\/tr><tr><td>\u00cenceputul \u0219i finalul planificate ale comenzii de produc\u021bie (muta\u021bie GraphQL, <code>workorders:w<\/code>)<\/td><td>\u00cenceputul \u0219i finalul planificate pentru fiecare opera\u021bie<\/td><td>SkyPlanner \u2192 ProShop<\/td><td>La modificarea programului de produc\u021bie, prin webhook SkyPlanner<\/td><\/tr><tr><td>Time Tracking: timp de preg\u0103tire \u0219i de execu\u021bie, piese finalizate, pentru fiecare opera\u021bie a comenzii de produc\u021bie<\/td><td>\u00cenregistr\u0103ri de timp \u0219i confirm\u0103ri ale operatorilor<\/td><td>SkyPlanner \u2192 ProShop<\/td><td>La fiecare confirmare sau schimb, dac\u0103 se opteaz\u0103 pentru aceasta<\/td><\/tr><tr><td>Nu exist\u0103 \u00een ProShop<\/td><td>Matricea timpilor de preg\u0103tire, opera\u021bii cu mai mul\u021bi operatori, utilaje \u0219i personal alternativ<\/td><td>Gestionate \u00een SkyPlanner<\/td><td>Configurate \u00een etapa de implementare ini\u021bial\u0103<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Modele de integrare<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00cenc\u0103rcarea ini\u021bial\u0103 a nomenclatoarelor.<\/strong> Parcurge\u021bi \u00eenregistr\u0103rile Parts, Work Cells, Users, Tools \u0219i Fixtures pagin\u0103 cu pagin\u0103, folosind interog\u0103ri GraphQL la plural. Seta\u021bi o valoare mare pentru <code>pageSize<\/code> la prima \u00eenc\u0103rcare \u0219i continua\u021bi iterarea pe baza <code>totalRecords<\/code>. Stabili\u021bi maparea celulelor de lucru: cele care reprezint\u0103 utilaje devin centre de lucru, iar cele care reprezint\u0103 persoane devin personal, astfel \u00eenc\u00e2t aceea\u0219i opera\u021bie s\u0103 poat\u0103 rezerva simultan un utilaj \u0219i operatorul s\u0103u.<\/p>\n\n\n<p><strong>2. Sincronizarea comenzilor de produc\u021bie.<\/strong> Citi\u021bi comenzile de produc\u021bie active cu opera\u021biile, timpii-\u021bint\u0103 \u0219i \u00eenregistr\u0103rile BOM aferente, precum \u0219i comenzile de achizi\u021bie deschise. SkyPlanner consider\u0103 materialul comandat disponibil la data de livrare din comanda de achizi\u021bie \u0219i actualizeaz\u0103 stocul c\u00e2nd aceasta este marcat\u0103 Delivered. Modific\u0103rile sunt detectate prin Recently Updated Records cu <code>filterby=workorders,purchaseorders,deletions<\/code>.<\/p>\n\n\n<p><strong>3. Scrierea programului de produc\u021bie \u00eenapoi \u00een ProShop.<\/strong> C\u00e2nd motorul plaseaz\u0103 sau mut\u0103 o opera\u021bie, un webhook SkyPlanner declan\u0219eaz\u0103 o muta\u021bie GraphQL care stabile\u0219te datele planificate ale comenzii de produc\u021bie, folosind o Authorization cu <code>workorders:w<\/code>. Prognoza ProShop privind respectarea termenelor \u0219i datele de necesar pentru achizi\u021bii se bazeaz\u0103 apoi pe datele din SkyPlanner.<\/p>\n\n\n<p><strong>4. Confirm\u0103ri din atelier.<\/strong> Operatorii \u00eenregistreaz\u0103 munca folosind SkyPlanner Mobile Confirmations sau Production Timer, iar \u00eenregistr\u0103rile de timp men\u021bin programul de produc\u021bie la zi. Dumneavoastr\u0103 alege\u021bi dac\u0103 timpul efectiv lucrat este trimis \u00eenapoi \u00een ProShop Time Tracking pentru opera\u021bia aferent\u0103 comenzii de produc\u021bie. Dac\u0103 nu, operatorii ponteaz\u0103 \u00een ProShop ca \u00eenainte, iar SkyPlanner cite\u0219te datele prin <code>timetracking<\/code>.<\/p>\n\n\n<p><strong>5. Responsabilitatea pentru date \u0219i regulile de solu\u021bionare a conflictelor.<\/strong> Documenta\u021bi-le \u00eenainte de punerea \u00een produc\u021bie:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Date<\/th><th>Sistem responsabil<\/th><\/tr><\/thead><tbody><tr><td>Piese, opera\u021bii, timpi-\u021bint\u0103, cantit\u0103\u021bi, starea comenzii de produc\u021bie<\/td><td>ProShop<\/td><\/tr><tr><td>Succesiunea opera\u021biilor, orele de \u00eenceput \u0219i de finalizare, alocarea utilajelor \u0219i a operatorilor<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matricea timpilor de preg\u0103tire \u0219i tranzi\u021bie, necesarul de scule \u0219i operatori, resurse alternative<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Schimburi \u0219i zile nelucr\u0103toare<\/td><td>Un singur sistem, ales la definirea domeniului<\/td><\/tr><tr><td>Time Tracking, stocuri, achizi\u021bii, calculul costurilor pe comand\u0103<\/td><td>ProShop, cu date introduse direct acolo sau trimise din \u00eenregistr\u0103rile de timp SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Alege\u021bi un singur sistem care s\u0103 scrie datele comenzilor de produc\u021bie. Dup\u0103 ce SkyPlanner preia programarea unei celule de lucru, planificatorii nu mai schimb\u0103 ordinea listei acelei celule \u00een ProShop. Astfel, cele dou\u0103 programe nu intr\u0103 niciodat\u0103 \u00een conflict.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapele obi\u0219nuite ale proiectului<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementarea se finalizeaz\u0103 de regul\u0103 \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea configur\u0103rii ini\u021biale. \u00cenainte de aceast\u0103 etap\u0103, valida\u021bi programul de produc\u021bie \u00een perioada de prob\u0103 gratuit\u0103 de 30 de zile, folosind celule de lucru, opera\u021bii \u0219i comenzi de produc\u021bie deschise exportate din ProShop \u00een format CSV sau Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapare.<\/strong> Stabili\u021bi tabelul de mapare, regulile privind sistemul responsabil de date, frecven\u021bele de sincronizare \u0219i dac\u0103 timpul lucrat va fi trimis \u00eenapoi.<\/li>\n\n\n<li><strong>Acces la ProShop.<\/strong> Administratorul creeaz\u0103 Authorization cu Maximum Scope convenit \u0219i solicit\u0103 echipei ProShop s\u0103 activeze Recently Updated Records.<\/li>\n\n\n<li><strong>\u00cenc\u0103rcare ini\u021bial\u0103.<\/strong> Parts, Work Cells, Users, Tools, Fixtures, programele celulelor de lucru.<\/li>\n\n\n<li><strong>Sincronizarea comenzilor de produc\u021bie \u0219i de achizi\u021bie.<\/strong> Interogare periodic\u0103 pentru detectarea modific\u0103rilor, cu paginare \u0219i re\u00eencerc\u0103ri.<\/li>\n\n\n<li><strong>Configurarea constr\u00e2ngerilor \u00een SkyPlanner.<\/strong> Matricea timpilor de preg\u0103tire, scule, num\u0103rul de operatori pentru fiecare opera\u021bie \u0219i utilaje sau personal alternativ.<\/li>\n\n\n<li><strong>Scrierea programului de produc\u021bie \u00eenapoi \u00een ProShop.<\/strong> Muta\u021bii declan\u0219ate de webhook-urile SkyPlanner, plus Time Tracking dac\u0103 se opteaz\u0103 pentru acesta.<\/li>\n\n\n<li><strong>Testare \u00een paralel.<\/strong> Rula\u021bi SkyPlanner \u00een paralel cu programul actual din ProShop, compara\u021bi datele \u0219i corecta\u021bi timpii \u021bint\u0103.<\/li>\n\n\n<li><strong>Punerea \u00een produc\u021bie.<\/strong> Activa\u021bi scrierea datelor \u00eenapoi \u00een ProShop dup\u0103 ce datele coincid.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-proshop-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce trebuie s\u0103 ave\u021bi \u00een vedere la integrarea cu ProShop<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Timpii \u021bint\u0103 sunt decisivi.<\/strong> ProShop calculeaz\u0103 durata pe baza timpilor estima\u021bi de preg\u0103tire \u0219i de ciclu. Prelua\u021bi timpii \u021bint\u0103 actuali, nu estimarea ini\u021bial\u0103, \u0219i separa\u021bi timpul de preg\u0103tire de timpul de execu\u021bie, astfel \u00eenc\u00e2t matricea timpilor de preg\u0103tire s\u0103 poat\u0103 \u00eenlocui valoarea unic\u0103 de preg\u0103tire.<\/li>\n\n\n<li><strong>Celule de lucru care reprezint\u0103 persoane.<\/strong> O celul\u0103 de lucru poate fi o persoan\u0103. Asocia\u021bi aceste celule cu personalul din SkyPlanner, nu cu utilajele; altfel, fiecare operator devine un utilaj care lucreaz\u0103 \u00een paralel.<\/li>\n\n\n<li><strong>Time Tracking necesit\u0103 un utilizator.<\/strong> Din aprilie 2026, muta\u021bia Time Tracking Login \u201erequires user context\u201d (necesit\u0103 contextul unui utilizator) \u0219i nu este autorizat\u0103 prin Client Credentials. Transmite\u021bi timpii operatorilor prin OAuth 2.0 Authorization Flow sau p\u0103stra\u021bi pontajul \u00een ProShop \u0219i citi\u021bi-l de acolo.<\/li>\n\n\n<li><strong>Activa\u021bi indexul modific\u0103rilor.<\/strong> Recently Updated Records func\u021bioneaz\u0103 doar dup\u0103 ce echipa ProShop \u00eel activeaz\u0103. Solicita\u021bi activarea \u00een prima s\u0103pt\u0103m\u00e2n\u0103.<\/li>\n\n\n<li><strong>\u00cenregistr\u0103ri supuse restric\u021biilor ITAR.<\/strong> ProShop filtreaz\u0103 \u00eenregistr\u0103rile supuse restric\u021biilor ITAR pentru fiecare conexiune, iar o op\u021biune din Developer System Config stabile\u0219te dac\u0103 acestea sunt returnate ca valori null sau sunt omise. Stabili\u021bi de comun acord la ce comenzi de produc\u021bie are acces integrarea \u0219i trata\u021bi valorile null la fiecare citire.<\/li>\n\n\n<li><strong>Prelucr\u0103ri externalizate.<\/strong> Opera\u021biile efectuate de furnizori \u00eenseamn\u0103 timp scurs, nu consum din capacitatea proprie. Modela\u021bi-le ca etape care au doar durat\u0103.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-proshop-integrat\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cine configureaz\u0103 integrarea cu ProShop \u0219i asigur\u0103 asisten\u021ba<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Echipa SkyPlanner configureaz\u0103 integrarea \u00een etapa de implementare \u0219i asigur\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een func\u021biune,<\/strong> pentru interog\u0103rile GraphQL, muta\u021biile \u0219i verific\u0103rile periodice ale modific\u0103rilor convenite. Fiecare atelier folose\u0219te ProShop \u00een felul s\u0103u, iar aceast\u0103 experien\u021b\u0103 practic\u0103 este valorificat\u0103 aici.<\/li>\n\n\n<li><strong>Administratorul sau consultantul dumneavoastr\u0103 ProShop particip\u0103 la proiect.<\/strong> Acesta creeaz\u0103 Authorization, stabile\u0219te permisiunile, solicit\u0103 indexul modific\u0103rilor \u0219i cunoa\u0219te configura\u021bia celulelor de lucru.<\/li>\n\n\n<li><strong>Dezvoltatorii dumneavoastr\u0103 pot extinde integrarea<\/strong> folosind REST API din SkyPlanner \u0219i un token API. Un token API este suficient pentru a \u00eencepe, iar echipa SkyPlanner ofer\u0103 asisten\u021b\u0103 la nevoie. Detaliile tehnice se g\u0103sesc \u00een <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">documenta\u021bia de integrare SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse \u0219i facturare lunar\u0103. Oferta pentru integrare se stabile\u0219te de la \u00eenceput, \u00een func\u021bie de procesele \u0219i nevoile dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul ales. Consulta\u021bi <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a>, <a href=\"\/ro\/integrari\/erp\/proshop-erp\/cu-capacitate-finita\/\">programarea cu capacitate finit\u0103 pentru ProShop<\/a>, <a href=\"\/ro\/integrari\/erp\/proshop-erp\/\">pagina ProShop ERP<\/a>, <a href=\"\/ro\/functionalitati\/\">func\u021bionalit\u0103\u021bile<\/a> SkyPlanner \u0219i <a href=\"\/ro\/integrari\/erp\/\">pagina integr\u0103rilor ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een hala de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi m\u0103rturia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui plan optimizat pe trei luni pentru toate centrele de lucru dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi m\u0103rturia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Un sudor KJH-Comp polizeaz\u0103 o structur\u0103 sudat\u0103 din o\u021bel la fabrica din Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>respectarea termenelor de livrare, fa\u021b\u0103 de aproximativ 50% anterior<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner joac\u0103 un rol decisiv \u00een men\u021binerea nivelului de respectare a termenelor noastre de livrare.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, director general<\/b><br>KJH-Comp \u00b7 Prelucrarea tablei \u0219i produc\u021bie la comand\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a crescut de la aproximativ 50% p\u00e2n\u0103 la 98%, iar programarea necesit\u0103 acum un singur \u0219ef de echip\u0103 \u00een loc de doi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/kjh-comp\/\">Citi\u021bi m\u0103rturia KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, director general al Mamec, \u00een hala de produc\u021bie a companiei din Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000+<\/b><span>comenzi de produc\u021bie programate automat<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eAvem un alt nivel de control asupra produc\u021biei, iar \u00een\u021belegerea capacit\u0103\u021bii noastre este la un nivel cu totul diferit.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, director general<\/b><br>Mamec \u00b7 Mixere industriale, pompe \u0219i produc\u021bie la comand\u0103 de \u00eenalt\u0103 tehnologie<\/p>\n\n\n<p class=\"ind-cust__result\">Mii de comenzi de produc\u021bie sunt programate automat, iar \u00eentreaga organiza\u021bie are o imagine \u00een timp real asupra produc\u021biei.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/mamec\/\">Citi\u021bi m\u0103rturia Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>ProShop are un API?<\/summary>\n<p class=\"sp-faq__a\">Da. ProShop are un GraphQL API la <code>&lt;proshop root&gt;\/api\/graphql<\/code>, cu OAuth 2.0 sau Basic Authentication \u0219i permisiuni la nivel de modul. Un endpoint REST, Recently Updated Records, returneaz\u0103 \u00eenregistr\u0103rile create, modificate sau \u0219terse \u00eentr-un interval de timp.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>ProShop accept\u0103 webhook-uri?<\/summary>\n<p class=\"sp-faq__a\">Documenta\u021bia ProShop pentru dezvoltatori nu descrie webhook-uri de ie\u0219ire. Integrarea interogheaz\u0103 periodic API-ul Recently Updated Records, la intervale stabilite pentru fiecare atelier. Webhook-urile proprii SkyPlanner transmit modific\u0103rile programului pe m\u0103sur\u0103 ce apar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum sunt transmise \u00eenapoi \u00een ProShop datele planificate?<\/summary>\n<p class=\"sp-faq__a\">Printr-o muta\u021bie GraphQL asupra comenzii de produc\u021bie, folosind o Authorization cu permisiune de scriere pentru <code>workorders<\/code>. SkyPlanner o declan\u0219eaz\u0103 printr-un webhook de fiecare dat\u0103 c\u00e2nd programul se modific\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cine creeaz\u0103 datele de autentificare pentru API-ul ProShop?<\/summary>\n<p class=\"sp-faq__a\">Un administrator de sistem ProShop, din System Config &gt; Manage Authorizations. Direct Login activeaz\u0103 fluxul Client Credentials, iar Maximum Scope limiteaz\u0103 ce poate citi \u0219i scrie integrarea.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Un consultant ProShop ar trebui s\u0103 recomande programarea din ProShop sau SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, atunci c\u00e2nd ordinea opera\u021biilor clientului este decisiv\u0103 pentru livrare. Programul din ProShop afi\u0219eaz\u0103 priorit\u0103\u021bile \u0219i previziunile privind respectarea termenelor pentru fiecare celul\u0103 de lucru, iar planificatorii ajusteaz\u0103 priorit\u0103\u021bile. SkyPlanner se conecteaz\u0103 prin GraphQL API, optimizeaz\u0103 automat \u00eentregul plan, planific\u0103 schimb\u0103rile de fabrica\u021bie, operatorii, sculele \u0219i materialele \u0219i permite un num\u0103r nelimitat de utilizatori, de la 199 \u20ac pe lun\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de a realiza integrarea?<\/summary>\n<p class=\"sp-faq__a\">Da. Perioada de testare gratuit\u0103 de 30 de zile permite utilizarea a p\u00e2n\u0103 la 20 de centre de lucru, cu importuri CSV sau Excel din ProShop, f\u0103r\u0103 card bancar. <a href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea<\/a> sau <a href=\"\/ro\/contact-vanzari\/\">discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a> pentru definirea domeniului integr\u0103rii.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ ProShop ERP Ghid de integrare ProShop ERP pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare ProShop le arat\u0103 administratorilor, consultan\u021bilor \u0219i echipelor IT cum s\u0103 conecteze ProShop ERP la SkyPlanner APS. SkyPlanner se integreaz\u0103 bidirec\u021bional cu ProShop, folosind API-ul propriu al ProShop: skyplanner.ai \u00b7 Programarea produc\u021biei \u00cen etapa de &#8230; <a title=\"Ghid de integrare ProShop ERP pentru programarea produc\u021biei cu SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proshop-erp\/ghid-de-integrare\/\" aria-label=\"Read more about Ghid de integrare ProShop ERP pentru programarea produc\u021biei cu SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":103222,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-104261","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>ProShop ERP: ghid de integrare APS pentru programarea produc\u021biei<\/title>\n<meta name=\"description\" content=\"ProShop ERP\u2013SkyPlanner APS: GraphQL API, OAuth 2.0 Authorizations \u0219i permisiuni, Recently Updated Records, mapare, scriere \u00eenapoi \u0219i sfaturi de proiect.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proshop-erp\/ghid-de-integrare\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ghid de integrare ProShop ERP pentru programarea produc\u021biei cu SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"ProShop ERP\u2013SkyPlanner APS: GraphQL API, OAuth 2.0 Authorizations \u0219i permisiuni, Recently Updated Records, mapare, scriere \u00eenapoi \u0219i sfaturi de proiect.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proshop-erp\/ghid-de-integrare\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/proshop-erp\\\/ghid-de-integrare\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/proshop-erp\\\/ghid-de-integrare\\\/\",\"name\":\"ProShop ERP: ghid de integrare APS pentru programarea produc\u021biei\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"ProShop ERP\u2013SkyPlanner APS: GraphQL API, OAuth 2.0 Authorizations \u0219i permisiuni, Recently Updated Records, mapare, scriere \u00eenapoi \u0219i sfaturi de proiect.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/proshop-erp\\\/ghid-de-integrare\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/proshop-erp\\\/ghid-de-integrare\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/proshop-erp\\\/ghid-de-integrare\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru ProShop ERP: programarea produc\u021biei cu capacitate finit\u0103\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/proshop-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Ghid de integrare ProShop ERP pentru programarea produc\u021biei cu SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"ProShop ERP: ghid de integrare APS pentru programarea produc\u021biei","description":"ProShop ERP\u2013SkyPlanner APS: GraphQL API, OAuth 2.0 Authorizations \u0219i permisiuni, Recently Updated Records, mapare, scriere \u00eenapoi \u0219i sfaturi de proiect.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proshop-erp\/ghid-de-integrare\/","og_locale":"ro_RO","og_type":"article","og_title":"Ghid de integrare ProShop ERP pentru programarea produc\u021biei cu SkyPlanner APS","og_description":"ProShop ERP\u2013SkyPlanner APS: GraphQL API, OAuth 2.0 Authorizations \u0219i permisiuni, Recently Updated Records, mapare, scriere \u00eenapoi \u0219i sfaturi de proiect.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proshop-erp\/ghid-de-integrare\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proshop-erp\/ghid-de-integrare\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proshop-erp\/ghid-de-integrare\/","name":"ProShop ERP: ghid de integrare APS pentru programarea produc\u021biei","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"ProShop ERP\u2013SkyPlanner APS: GraphQL API, OAuth 2.0 Authorizations \u0219i permisiuni, Recently Updated Records, mapare, scriere \u00eenapoi \u0219i sfaturi de proiect.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proshop-erp\/ghid-de-integrare\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proshop-erp\/ghid-de-integrare\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proshop-erp\/ghid-de-integrare\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru ProShop ERP: programarea produc\u021biei cu capacitate finit\u0103","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proshop-erp\/"},{"@type":"ListItem","position":5,"name":"Ghid de integrare ProShop ERP pentru programarea produc\u021biei cu SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ ProShop ERP Ghid de integrare ProShop ERP pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare ProShop le arat\u0103 administratorilor, consultan\u021bilor \u0219i echipelor IT cum s\u0103 conecteze ProShop ERP la SkyPlanner APS. SkyPlanner se integreaz\u0103 bidirec\u021bional cu ProShop, folosind API-ul propriu al ProShop: skyplanner.ai \u00b7 Programarea produc\u021biei \u00cen etapa de&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/104261","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=104261"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/104261\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/103222"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=104261"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}