{"id":104203,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/proalpha\/ghid-de-integrare\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"ghid-de-integrare","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proalpha\/ghid-de-integrare\/","title":{"rendered":"Ghid de integrare proALPHA pentru programarea produc\u021biei cu SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ proALPHA ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Ghid de integrare proALPHA <span class=\"hl\">pentru programarea produc\u021biei cu SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Acest ghid de integrare Proalpha le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze Proalpha ERP la SkyPlanner APS. Integrarea dintre SkyPlanner \u0219i Proalpha este bidirec\u021bional\u0103:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>SkyPlanner preia articole, comenzi de produc\u021bie cu opera\u021biile aferente, resurse, calendare, stocuri \u0219i comenzi de achizi\u021bie.<\/li>\n\n\n<li>\u00cenceputul \u0219i sf\u00e2r\u0219itul planificate pentru fiecare opera\u021bie sunt trimise \u00eenapoi prin setWorkOrderOperationDates.<\/li>\n\n\n<li>Modific\u0103rile de resurse sunt trimise \u00eenapoi prin changeWorkOrderOperationResource.<\/li>\n\n\n<li>Confirm\u0103rile operatorilor sunt trimise \u00eenapoi prin operationDataEntry.<\/li>\n\n\n<li>Webhook-urile SkyPlanner transmit modific\u0103rile programului pe m\u0103sur\u0103 ce apar.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagram\u0103 Gantt \u00een SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 Proalpha \u00een etapa de implementare \u0219i ofer\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een func\u021biune. Acest ghid se adreseaz\u0103 partenerilor \u0219i dezvoltatorilor care doresc s\u0103 participe la integrare sau s\u0103 dezvolte singuri solu\u021bii folosind interfa\u021ba REST API documentat\u0103 a SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"the-proalpha-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Interfe\u021bele Proalpha<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Proalpha ERP ruleaz\u0103 pe Progress OpenEdge, iar odat\u0103 cu Release 9, platforma a trecut la OpenEdge 12. (<a href=\"https:\/\/www.proalpha.com\/en\/blog\/proalpha-release-9-integration-is-the-key-to-success\">Proalpha<\/a>) Patru interfe\u021be sunt relevante pentru programarea produc\u021biei.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Proalpha ERP REST APIs.<\/strong> Portalul public <a href=\"https:\/\/api.proalpha.services\/\">Proalpha API Portal<\/a> listeaz\u0103 108 specifica\u021bii OpenAPI 3.0 sub <code>api\/web\/v1<\/code>. Aceste API-uri permit scrierea datelor \u00eenapoi \u00een Proalpha \u0219i citirea articolelor \u0219i a stocurilor.<\/li>\n\n\n<li><strong>Integration Workbench (INWB).<\/strong> Potrivit Proalpha, INWB &#8220;is a central platform which connects different IT systems, machines, sites&#8221; (este o platform\u0103 central\u0103 care conecteaz\u0103 diferite sisteme IT, utilaje \u0219i loca\u021bii) \u0219i &#8220;converts the data into the format of the target system.&#8221; (converte\u0219te datele \u00een formatul sistemului destina\u021bie). (<a href=\"https:\/\/www.proalpha.com\/en\/areas\/business-partners-system-integration\">Proalpha<\/a>) Prime\u0219te mesaje pAX prin <code>POST \/api\/web\/v1\/inwb\/message<\/code>. Folosi\u021bi aceast\u0103 interfa\u021b\u0103 pentru transferul comenzilor de produc\u021bie din \u0219i c\u0103tre Proalpha.<\/li>\n\n\n<li><strong>Proalpha Integration Platform.<\/strong> Anun\u021bat\u0103 \u00een aprilie 2026 \u0219i bazat\u0103 pe n8n, platforma &#8220;will be available to customers either on-premises or in the cloud.&#8221; (va fi disponibil\u0103 clien\u021bilor at\u00e2t pentru instalare local\u0103, c\u00e2t \u0219i \u00een cloud). Proalpha &#8220;will rely on an API-centric reference architecture and REST interfaces.&#8221; (se va baza pe o arhitectur\u0103 de referin\u021b\u0103 centrat\u0103 pe API-uri \u0219i pe interfe\u021be REST). (<a href=\"https:\/\/www.proalpha.com\/en\/blog\/proalpha-enters-into-strategic-partnership-with-n8n\">Proalpha<\/a>)<\/li>\n\n\n<li><strong>EDI \u0219i exporturi de fi\u0219iere.<\/strong> INWB gestioneaz\u0103 formate de fi\u0219iere specifice industriei, iar exporturile de fi\u0219iere sunt suficiente pentru testarea SkyPlanner.<\/li>\n\n<\/ol>\n\n\n<h3 class=\"wp-block-heading\">Endpoint-uri pentru produc\u021bie<\/h3>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>API Proalpha<\/th><th>Endpoint<\/th><th>Utilizare \u00een integrare<\/th><\/tr><\/thead><tbody><tr><td>Production Workorder Operation Dates API V1<\/td><td><code>POST \/api\/web\/v1\/pps\/prod\/setWorkOrderOperationDates<\/code><\/td><td>\u00cenceputul \u0219i sf\u00e2r\u0219itul planificate pentru fiecare opera\u021bie (guid, startTimePoint, endTimePoint)<\/td><\/tr><tr><td>Production Workorder Operation Resource API V1<\/td><td><code>POST \/api\/web\/v1\/pps\/prod\/changeWorkOrderOperationResource<\/code><\/td><td>Resursa selectat\u0103 la programare (guid, resourceGUID)<\/td><\/tr><tr><td>Production Workorder Operation API V1<\/td><td><code>POST \/api\/web\/v1\/pps\/prod\/operationDataEntry\/{combined, setup, process}<\/code><\/td><td>Confirm\u0103ri: postingQty, scrapQty, finishOperation, employeeID, resourceTime<\/td><\/tr><tr><td>Part API<\/td><td><code>GET\/POST \/api\/web\/v1\/master\/part<\/code><\/td><td>Articole cu partNumber, partType, quantityUnitCode<\/td><\/tr><tr><td>Material API V1<\/td><td><code>GET \/api\/web\/v1\/mawi\/MRPArea\/{mrpAreaGuid}\/part\/{partGuid}\/stock<\/code><\/td><td>Stoc pe zon\u0103 MRP<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentificare<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Specifica\u021biile publicate de Proalpha folosesc autentificarea HTTP Basic. Endpoint-urile sunt specifice mediului, <code>{schema}:\/\/{host}:{port}\/api\/web\/v1\/...<\/code>, pe serverul dumneavoastr\u0103 Proalpha sau \u00een Proalpha Cloud. Crea\u021bi un utilizator tehnic dedicat, cu drepturi limitate la obiectele din tabelul de mapare. Stabili\u021bi \u00eempreun\u0103 cu echipa IT accesul prin re\u021bea de la cloud-ul SkyPlanner la acel endpoint.<\/p>\n\n\n<p>\u00cen SkyPlanner, interfa\u021ba REST API folose\u0219te un token API pentru autentificare (SkyPlanner Settings &gt; API) \u0219i este documentat\u0103 \u00een Swagger\/OpenAPI. Un token API este suficient pentru a \u00eencepe. <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">Tutorialul de integrare<\/a> v\u0103 ghideaz\u0103 prin primele apeluri.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Evenimente \u0219i interog\u0103ri periodice<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Proalpha API Portal nu listeaz\u0103 niciun API pentru abonarea la webhook-uri. Modific\u0103rile din Proalpha sunt transmise prin:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>un <strong>flux de mesaje INWB<\/strong> care trimite comenzile de produc\u021bie noi \u0219i modificate, \u00eempreun\u0103 cu opera\u021biile aferente<\/li>\n\n\n<li>un <strong>flux de lucru n8n<\/strong> pe Proalpha Integration Platform<\/li>\n\n\n<li><strong>interog\u0103ri periodice programate<\/strong> ale Material API pentru stocuri<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner trimite webhook-uri c\u00e2nd se modific\u0103 starea sau programul de produc\u021bie, astfel c\u0103 scrierea datelor \u00eenapoi \u00een Proalpha este declan\u0219at\u0103 de evenimente.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Maparea datelor<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Obiect sau API Proalpha<\/th><th>Obiect SkyPlanner<\/th><th>Direc\u021bie<\/th><th>Frecven\u021b\u0103<\/th><\/tr><\/thead><tbody><tr><td>Part (Part API)<\/td><td>Produse \u0219i materiale<\/td><td>Proalpha \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la fiecare modificare<\/td><\/tr><tr><td>Modelul procesului de fabrica\u021bie al produsului: proces, activit\u0103\u021bi; pozi\u021bii BOM ale comenzii de produc\u021bie<\/td><td>Structura produsului, subproduse, etape de proces<\/td><td>Proalpha \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la fiecare modificare<\/td><\/tr><tr><td>Comand\u0103 de produc\u021bie (Fertigungsauftrag) cu cantitate \u0219i termen de finalizare<\/td><td>Comand\u0103 \u0219i opera\u021bii cu termen de finalizare \u0219i prioritate<\/td><td>Proalpha \u2192 SkyPlanner<\/td><td>Transmitere prin INWB sau n8n, ori la fiecare c\u00e2teva minute<\/td><\/tr><tr><td>Opera\u021biile comenzii de produc\u021bie: targetSetupTime, targetProcessTime, resource<\/td><td>Etape de proces cu timpi de reglaj \u0219i durate<\/td><td>Proalpha \u2192 SkyPlanner<\/td><td>Odat\u0103 cu comanda de produc\u021bie<\/td><\/tr><tr><td>Resurse, grupuri de resurse, grupuri de resurse alternative<\/td><td>Centre de lucru, grupuri de centre de lucru, centre de lucru alternative<\/td><td>Proalpha \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103<\/td><\/tr><tr><td>Intervale din calendarul resurselor cu intensity \u0219i overloadIntensity<\/td><td>Schimburi \u0219i eficien\u021ba centrelor de lucru<\/td><td>Proalpha \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103; actualizare zilnic\u0103 sau gestionare \u00een SkyPlanner<\/td><\/tr><tr><td>Stoc pe zon\u0103 MRP<\/td><td>Stoc de materiale<\/td><td>Proalpha \u2192 SkyPlanner<\/td><td>La fiecare or\u0103 sau \u00eenainte de fiecare generare a programului<\/td><\/tr><tr><td>Comenzi de achizi\u021bie cu dat\u0103 de livrare<\/td><td>Materiale de primit, disponibile la data livr\u0103rii<\/td><td>Proalpha \u2192 SkyPlanner<\/td><td>La fiecare or\u0103 sau \u00eenainte de fiecare generare a programului<\/td><\/tr><tr><td>setWorkOrderOperationDates<\/td><td>\u00cenceputul \u0219i sf\u00e2r\u0219itul programate pentru fiecare opera\u021bie<\/td><td>SkyPlanner \u2192 Proalpha<\/td><td>La modificarea programului, printr-un webhook SkyPlanner<\/td><\/tr><tr><td>changeWorkOrderOperationResource<\/td><td>Centrul de lucru ales de motorul de programare<\/td><td>SkyPlanner \u2192 Proalpha<\/td><td>La modificarea programului<\/td><\/tr><tr><td>operationDataEntry (setup, process, combined)<\/td><td>\u00cenregistr\u0103ri de timp \u0219i cantit\u0103\u021bi din Mobile Confirmations<\/td><td>SkyPlanner \u2192 Proalpha<\/td><td>La fiecare confirmare sau pe schimb<\/td><\/tr><tr><td>Reguli de programare SkyPlanner<\/td><td>Matricea timpilor de preg\u0103tire \u0219i tranzi\u021bie, scule ca resurse cu capacitate finit\u0103, num\u0103r de operatori<\/td><td>Gestionate \u00een SkyPlanner<\/td><td>Configurate \u00een etapa de implementare<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Modele de integrare<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00cenc\u0103rcarea ini\u021bial\u0103 a nomenclatoarelor.<\/strong> Citi\u021bi articolele prin Part API \u0219i \u00eenc\u0103rca\u021bi o singur\u0103 dat\u0103 resursele, grupurile de resurse \u0219i calendarele prin INWB sau printr-un export de fi\u0219iere. Stabili\u021bi cu aten\u021bie coresponden\u021ba dintre fiecare resurs\u0103 Proalpha \u0219i un centru de lucru SkyPlanner. Grupurile de resurse alternative devin centre de lucru alternative.<\/p>\n\n\n<p><strong>2. Sincronizarea comenzilor.<\/strong> Un flux de mesaje INWB sau un flux de lucru n8n trimite comenzile de produc\u021bie deschise, \u00eempreun\u0103 cu opera\u021biile, timpii planifica\u021bi \u0219i resursele acestora. Stocurile sunt preluate prin Material API pentru fiecare arie MRP, iar comenzile de achizi\u021bie deschise, prin INWB. SkyPlanner consider\u0103 materialele comandate disponibile la data de livrare din comanda de achizi\u021bie \u0219i actualizeaz\u0103 stocul c\u00e2nd aceasta este marcat\u0103 cu starea Delivered.<\/p>\n\n\n<p><strong>3. Scrierea programului \u00eenapoi \u00een ERP.<\/strong> Pentru fiecare opera\u021bie programat\u0103 sau mutat\u0103 de motor, integrarea apeleaz\u0103 setWorkOrderOperationDates cu guid-ul opera\u021biei \u0219i momentele de \u00eenceput \u0219i de sf\u00e2r\u0219it. Dac\u0103 motorul a ales o alt\u0103 resurs\u0103, urmeaz\u0103 apelul changeWorkOrderOperationResource.<\/p>\n\n\n<p><strong>4. Confirm\u0103rile din produc\u021bie.<\/strong> Operatorii \u00eenregistreaz\u0103 activitatea cu SkyPlanner Mobile Confirmations sau Production Timer. \u00cenregistr\u0103rile de timp men\u021bin programul la zi \u0219i sunt transmise \u00een Proalpha prin operationDataEntry. Dac\u0103 fabrica dumneavoastr\u0103 folose\u0219te deja terminale PDC pentru confirm\u0103ri, p\u0103stra\u021bi un singur canal pentru a evita \u00eenregistr\u0103rile duble.<\/p>\n\n\n<p><strong>5. Reguli privind responsabilitatea pentru date \u0219i solu\u021bionarea conflictelor.<\/strong> Documenta\u021bi-le \u00eenainte de punerea \u00een produc\u021bie:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Date<\/th><th>Sistem responsabil<\/th><\/tr><\/thead><tbody><tr><td>Articole, modele de proces, cantit\u0103\u021bi, starea comenzilor de produc\u021bie<\/td><td>Proalpha<\/td><\/tr><tr><td>Succesiunea opera\u021biilor, momentele de \u00eenceput \u0219i de sf\u00e2r\u0219it, alocarea resurselor<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matricea timpilor de preg\u0103tire \u0219i tranzi\u021bie, scule, num\u0103rul de operatori<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Schimburi \u0219i absen\u021be<\/td><td>Un singur sistem, ales la definirea domeniului<\/td><\/tr><tr><td>Confirm\u0103ri \u0219i \u00eenregistr\u0103ri de stoc<\/td><td>Proalpha, alimentat cu \u00eenregistr\u0103ri de timp din SkyPlanner sau PDC<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Dac\u0103 Proalpha APS sau Feinplanung este activ, stabili\u021bi care sistem gestioneaz\u0103 datele calendaristice ale opera\u021biilor. Dac\u0103 dou\u0103 sisteme de planificare scriu acelea\u0219i date, se suprascriu reciproc. Cu Autopilot, SkyPlanner reface automat programul c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapele obi\u0219nuite ale proiectului<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementarea se finalizeaz\u0103 de regul\u0103 \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea procesului de configurare ini\u021bial\u0103. \u00cenainte de aceasta, pute\u021bi folosi propriile date \u00een perioada de testare gratuit\u0103 de 30 de zile. Exporta\u021bi din Proalpha comenzile de produc\u021bie deschise, opera\u021biile \u0219i resursele \u00een format CSV sau Excel, importa\u021bi-le \u0219i valida\u021bi programul.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Atelier de mapare.<\/strong> Stabili\u021bi \u00eempreun\u0103 cu partenerul dumneavoastr\u0103 Proalpha tabelul de coresponden\u021be, regulile privind responsabilitatea pentru date, frecven\u021bele de sincronizare \u0219i canalul de confirmare.<\/li>\n\n\n<li><strong>Configurarea interfe\u021belor.<\/strong> Activa\u021bi interfe\u021bele REST API \u0219i fluxurile INWB, crea\u021bi utilizatorul tehnic \u0219i permite\u021bi accesul prin re\u021bea. Mai \u00eent\u00e2i \u00een mediul de testare, apoi \u00een cel de produc\u021bie.<\/li>\n\n\n<li><strong>\u00cenc\u0103rcarea ini\u021bial\u0103.<\/strong> Articole, resurse, grupuri de resurse \u0219i calendare.<\/li>\n\n\n<li><strong>Sincronizarea comenzilor de produc\u021bie, a stocurilor \u0219i a comenzilor de achizi\u021bie.<\/strong> Comenzile de produc\u021bie sunt trimise prin INWB sau n8n, iar stocurile sunt preluate prin interog\u0103ri periodice, cu re\u00eencerc\u0103ri.<\/li>\n\n\n<li><strong>Configurarea constr\u00e2ngerilor \u00een SkyPlanner.<\/strong> Matricea timpilor de preg\u0103tire \u0219i tranzi\u021bie, scule, num\u0103rul de operatori \u0219i centre de lucru alternative.<\/li>\n\n\n<li><strong>Scrierea programului \u00eenapoi \u00een ERP.<\/strong> setWorkOrderOperationDates \u0219i changeWorkOrderOperationResource; \u00een aceast\u0103 etap\u0103 se adaug\u0103 \u0219i operationDataEntry.<\/li>\n\n\n<li><strong>Rularea \u00een paralel.<\/strong> Compara\u021bi datele calendaristice din SkyPlanner cu planul curent \u0219i corecta\u021bi nomenclatoarele.<\/li>\n\n\n<li><strong>Punerea \u00een produc\u021bie.<\/strong> Activa\u021bi scrierea \u00eenapoi \u00een ERP dup\u0103 ce datele concord\u0103.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-proalpha-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce trebuie s\u0103 ave\u021bi \u00een vedere la integrarea cu Proalpha<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Nu exist\u0103 un obiect pentru fluxul tehnologic.<\/strong> Proalpha planific\u0103 pe baza modelelor de proces ale produselor. Instrumentele preluate din proiecte SAP sau Business Central caut\u0103 fluxuri tehnologice \u0219i omit date. Citi\u021bi opera\u021biile \u0219i pozi\u021biile BOM din comanda de produc\u021bie.<\/li>\n\n\n<li><strong>Intensitatea din calendar.<\/strong> Blocurile din calendar con\u021bin c\u00e2mpurile intensity \u0219i overloadIntensity. Mapa\u021bi-le la schimburile \u0219i eficien\u021bele din SkyPlanner, \u00een loc s\u0103 copia\u021bi pur \u0219i simplu orele.<\/li>\n\n\n<li><strong>Unit\u0103\u021bile de m\u0103sur\u0103.<\/strong> Verifica\u021bi quantityUnitCode \u0219i dac\u0103 timpul de reglaj planificat este definit pe comand\u0103 sau pe bucat\u0103. Unit\u0103\u021bile gre\u0219ite denatureaz\u0103 toate duratele.<\/li>\n\n\n<li><strong>Endpointuri g\u0103zduite de client.<\/strong> Componenta REST ruleaz\u0103 pe serverul dumneavoastr\u0103 Proalpha. Configurarea firewallurilor, a porturilor \u0219i a certificatelor determin\u0103 data de \u00eencepere a proiectului, a\u0219a c\u0103 preg\u0103ti\u021bi-le din timp.<\/li>\n\n\n<li><strong>Versiunea instalat\u0103.<\/strong> \u00cenainte de a definitiva maparea, verifica\u021bi \u00eempreun\u0103 cu partenerul ce interfe\u021be REST API sunt expuse de versiunea dumneavoastr\u0103 Proalpha.<\/li>\n\n\n<li><strong>Documenta\u021bie accesibil\u0103 doar dup\u0103 autentificare.<\/strong> Ajutorul online Proalpha este disponibil prin Documentation Portal. Verifica\u021bi denumirile c\u00e2mpurilor cu partenerul, \u00een loc s\u0103 le ghici\u021bi.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"the-proalpha-integration-who-configures-and-supp\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integrarea cu Proalpha: cine o configureaz\u0103 \u0219i asigur\u0103 asisten\u021ba<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Echipa SkyPlanner configureaz\u0103 integrarea \u00een etapa ini\u021bial\u0103 \u0219i ofer\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een produc\u021bie.<\/strong> Fiecare instalare Proalpha are propriul model de date \u0219i procese, iar configurarea integr\u0103rii necesit\u0103 cunoa\u0219terea acestuia.<\/li>\n\n\n<li><strong>Partenerul dumneavoastr\u0103 Proalpha poate participa.<\/strong> Acesta cunoa\u0219te modelele de proces, fluxurile INWB \u0219i versiunea instalat\u0103 \u0219i poate configura accesul la API. SkyPlanner pune la dispozi\u021bie REST API, documenta\u021bia Swagger\/OpenAPI \u0219i webhookuri.<\/li>\n\n\n<li><strong>Dezvoltatorii dumneavoastr\u0103 pot extinde integrarea<\/strong> folosind aceea\u0219i interfa\u021b\u0103 REST API \u0219i un token API. Echipa SkyPlanner ofer\u0103 asisten\u021b\u0103 c\u00e2nd este nevoie. Documenta\u021bia produsului este public\u0103 \u0219i disponibil\u0103 \u00een <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">documenta\u021bia SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse \u0219i facturare lunar\u0103. Primi\u021bi de la \u00eenceput o ofert\u0103 pentru integrare, adaptat\u0103 procesului \u0219i nevoilor dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul, astfel \u00eenc\u00e2t s\u0103 cunoa\u0219te\u021bi costul total \u00eenainte de a \u00eencepe. Afla\u021bi cum planific\u0103 Proalpha capacitatea \u00een <a href=\"\/ro\/integrari\/erp\/proalpha\/cu-capacitate-finita\/\">Ofer\u0103 proALPHA programare cu capacitate finit\u0103?<\/a>, consulta\u021bi prezentarea general\u0103 de pe <a href=\"\/ro\/integrari\/erp\/proalpha\/\">pagina proALPHA<\/a> \u0219i descoperi\u021bi alte sisteme \u00een <a href=\"\/ro\/integrari\/erp\/\">sec\u021biunea de integr\u0103ri ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een hala de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi opinia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui plan optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi opinia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Vedere aerian\u0103 a fabricii Piristeel de sisteme de siguran\u021b\u0103 pentru acoperi\u0219uri din Kauhava\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>respectarea termenelor de livrare<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ne-a oferit vizibilitatea necesar\u0103 pentru identificarea blocajelor \u0219i a adus claritate \u00een gestionarea produc\u021biei.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, director de produc\u021bie<\/b><br>Piristeel \u00b7 Sisteme de siguran\u021b\u0103 pentru acoperi\u0219uri \u0219i sisteme pluviale<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a ajuns la 99,2% anul acesta, iar programarea economise\u0219te p\u00e2n\u0103 la patru ore de lucru pe zi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/piristeel\/\">Citi\u021bi opinia Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Mai pu\u021bine<\/b><span>opriri cauzate de lipsa materialelor<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eValoarea pe care ne-o aduce SkyPlanner este c\u0103 func\u021bioneaz\u0103 \u00een activitatea de zi cu zi, mai ales pentru stabilirea termenelor de livrare.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, manager de planificare a produc\u021biei<\/b><br>Eskomatic \u00b7 Prelucr\u0103ri mecanice la comand\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Programarea automat\u0103 a \u00eenc\u0103rc\u0103rii resurselor ofer\u0103 termene de livrare mai precise, iar opririle de produc\u021bie cauzate de lipsa materialelor s-au redus semnificativ.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/eskomatic\/\">Citi\u021bi opinia Eskomatic<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ce interfe\u021be Proalpha folose\u0219te integrarea?<\/summary>\n<p class=\"sp-faq__a\">Interfe\u021bele REST API Proalpha pentru articole, stocuri \u0219i transmiterea \u00eenapoi \u00een Proalpha a datelor calendaristice, a resurselor \u0219i a confirm\u0103rilor. Fluxurile de mesaje INWB sau Integration Platform, bazat\u0103 pe n8n, transfer\u0103 comenzile de produc\u021bie \u00eempreun\u0103 cu opera\u021biile acestora. Pentru testare \u0219i \u00eenc\u0103rc\u0103ri \u00een mas\u0103 se folosesc exporturi de fi\u0219iere.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Unde sunt scrise datele calendaristice planificate \u00een Proalpha?<\/summary>\n<p class=\"sp-faq__a\">\u00cen opera\u021bia comenzii de produc\u021bie, prin setWorkOrderOperationDates, cu momentele de \u00eenceput \u0219i de sf\u00e2r\u0219it. Dac\u0103 motorul a mutat opera\u021bia pe alt utilaj, changeWorkOrderOperationResource actualizeaz\u0103 resursa.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Proalpha accept\u0103 webhookuri?<\/summary>\n<p class=\"sp-faq__a\">Proalpha API Portal nu listeaz\u0103 niciun API de abonare la webhookuri. Modific\u0103rile ajung \u00een SkyPlanner prin fluxuri de mesaje INWB, fluxuri de lucru n8n sau interog\u0103ri periodice. Webhookurile proprii SkyPlanner declan\u0219eaz\u0103 transmiterea datelor \u00eenapoi \u00een Proalpha pe baza evenimentelor.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Confirm\u0103rile operatorilor pot fi \u00eenregistrate \u00een Proalpha?<\/summary>\n<p class=\"sp-faq__a\">Da. \u00cenregistr\u0103rile de timp din SkyPlanner Mobile Confirmations sunt transmise prin operationDataEntry, \u00eempreun\u0103 cu cantitatea \u0219i timpii aferen\u021bi angajatului \u0219i resursei. P\u0103stra\u021bi un singur canal de confirmare dac\u0103 folosi\u021bi \u0219i terminale PDC.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Avem nevoie de Proalpha APS \u0219i ce facem dac\u0103 \u00eel folosim deja?<\/summary>\n<p class=\"sp-faq__a\">Nu ave\u021bi nevoie de el. SkyPlanner realizeaz\u0103 singur programarea cu capacitate finit\u0103 pe baza comenzilor de produc\u021bie, a opera\u021biilor \u0219i a resurselor dumneavoastr\u0103, iar Autopilot o men\u021bine la zi. Dac\u0103 Proalpha APS este activ, stabili\u021bi la definirea domeniului care sistem gestioneaz\u0103 datele calendaristice ale opera\u021biilor. SkyPlanner scrie apoi doar datele pentru care este responsabil, astfel \u00eenc\u00e2t cele dou\u0103 planuri s\u0103 nu se suprascrie niciodat\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de a realiza integrarea?<\/summary>\n<p class=\"sp-faq__a\">Da. Perioada de testare gratuit\u0103 de 30 de zile permite utilizarea a p\u00e2n\u0103 la 20 de centre de lucru, pe baza unui export CSV sau Excel al comenzilor dumneavoastr\u0103 de produc\u021bie, f\u0103r\u0103 card de credit. <a href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea<\/a> sau <a href=\"\/ro\/contact-vanzari\/\">discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a> pentru definirea domeniului integr\u0103rii.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ proALPHA ERP Ghid de integrare proALPHA pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare Proalpha le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze Proalpha ERP la SkyPlanner APS. Integrarea dintre SkyPlanner \u0219i Proalpha este bidirec\u021bional\u0103: skyplanner.ai \u00b7 Programarea produc\u021biei Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 &#8230; <a title=\"Ghid de integrare proALPHA pentru programarea produc\u021biei cu SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proalpha\/ghid-de-integrare\/\" aria-label=\"Read more about Ghid de integrare proALPHA pentru programarea produc\u021biei cu SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":103192,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-104203","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integrare proALPHA APS: ghid pentru programarea produc\u021biei<\/title>\n<meta name=\"description\" content=\"proALPHA\u2013SkyPlanner APS: Proalpha REST APIs, Integration Workbench, mapare comenzi de produc\u021bie, date \u00eenapoi prin setWorkOrderOperationDates, sfaturi de proiect.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proalpha\/ghid-de-integrare\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ghid de integrare proALPHA pentru programarea produc\u021biei cu SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"proALPHA\u2013SkyPlanner APS: Proalpha REST APIs, Integration Workbench, mapare comenzi de produc\u021bie, date \u00eenapoi prin setWorkOrderOperationDates, sfaturi de proiect.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proalpha\/ghid-de-integrare\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/proalpha\\\/ghid-de-integrare\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/proalpha\\\/ghid-de-integrare\\\/\",\"name\":\"Integrare proALPHA APS: ghid pentru programarea produc\u021biei\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"proALPHA\u2013SkyPlanner APS: Proalpha REST APIs, Integration Workbench, mapare comenzi de produc\u021bie, date \u00eenapoi prin setWorkOrderOperationDates, sfaturi de proiect.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/proalpha\\\/ghid-de-integrare\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/proalpha\\\/ghid-de-integrare\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/proalpha\\\/ghid-de-integrare\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru proALPHA: programarea produc\u021biei cu capacitate finit\u0103\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/proalpha\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Ghid de integrare proALPHA pentru programarea produc\u021biei cu SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integrare proALPHA APS: ghid pentru programarea produc\u021biei","description":"proALPHA\u2013SkyPlanner APS: Proalpha REST APIs, Integration Workbench, mapare comenzi de produc\u021bie, date \u00eenapoi prin setWorkOrderOperationDates, sfaturi de proiect.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proalpha\/ghid-de-integrare\/","og_locale":"ro_RO","og_type":"article","og_title":"Ghid de integrare proALPHA pentru programarea produc\u021biei cu SkyPlanner APS","og_description":"proALPHA\u2013SkyPlanner APS: Proalpha REST APIs, Integration Workbench, mapare comenzi de produc\u021bie, date \u00eenapoi prin setWorkOrderOperationDates, sfaturi de proiect.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proalpha\/ghid-de-integrare\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proalpha\/ghid-de-integrare\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proalpha\/ghid-de-integrare\/","name":"Integrare proALPHA APS: ghid pentru programarea produc\u021biei","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"proALPHA\u2013SkyPlanner APS: Proalpha REST APIs, Integration Workbench, mapare comenzi de produc\u021bie, date \u00eenapoi prin setWorkOrderOperationDates, sfaturi de proiect.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proalpha\/ghid-de-integrare\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proalpha\/ghid-de-integrare\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proalpha\/ghid-de-integrare\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru proALPHA: programarea produc\u021biei cu capacitate finit\u0103","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proalpha\/"},{"@type":"ListItem","position":5,"name":"Ghid de integrare proALPHA pentru programarea produc\u021biei cu SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ proALPHA ERP Ghid de integrare proALPHA pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare Proalpha le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze Proalpha ERP la SkyPlanner APS. Integrarea dintre SkyPlanner \u0219i Proalpha este bidirec\u021bional\u0103: skyplanner.ai \u00b7 Programarea produc\u021biei Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/104203","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=104203"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/104203\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/103192"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=104203"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}