{"id":104029,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/monitor-erp\/ghid-de-integrare\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"ghid-de-integrare","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/monitor-erp\/ghid-de-integrare\/","title":{"rendered":"Ghid de integrare Monitor ERP pentru programarea produc\u021biei cu SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ Monitor ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Ghid de integrare Monitor ERP <span class=\"hl\">pentru programarea produc\u021biei cu SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Acest ghid de integrare Monitor ERP le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze Monitor ERP (Monitor G5) la SkyPlanner APS. SkyPlanner se integreaz\u0103 bidirec\u021bional cu Monitor ERP prin Monitor ERP API:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u00cen SkyPlanner sunt preluate comenzile de fabrica\u021bie, opera\u021biile, centrele de lucru, fluxurile tehnologice \u0219i materialele.<\/li>\n\n\n<li>Datele planificate de \u00eenceput \u0219i de sf\u00e2r\u0219it, precum \u0219i centrul de lucru pentru fiecare opera\u021bie sunt transmise c\u0103tre Monitor.<\/li>\n\n\n<li>Timpii \u0219i cantit\u0103\u021bile raportate men\u021bin cele dou\u0103 sisteme sincronizate.<\/li>\n\n\n<li>Webhook-urile SkyPlanner transmit modific\u0103rile programului pe m\u0103sur\u0103 ce apar.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u00cen etapa de implementare ini\u021bial\u0103, echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 Monitor G5 \u0219i asigur\u0103 suport dup\u0103 punerea \u00een func\u021biune. Acest ghid se adreseaz\u0103 partenerilor \u0219i dezvoltatorilor care doresc s\u0103 participe sau s\u0103 dezvolte singuri solu\u021bii folosind interfa\u021ba REST API documentat\u0103 a SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"the-monitor-erp-api\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Monitor ERP API<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Interfa\u021ba de integrare documentat\u0103 pentru Monitor G5 este <strong>Monitor ERP API v1<\/strong>. Aceasta combin\u0103 CQRS \u0219i REST \u0219i utilizeaz\u0103 JSON prin HTTPS. (<a href=\"https:\/\/api.monitor.se\/articles\/v1\/index.html\">Monitor ERP API<\/a>)<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Interog\u0103rile<\/strong> citesc date prin GET. Accept\u0103 op\u021biuni de tip OData: <code>$filter<\/code>, <code>$select<\/code>, <code>$expand<\/code>, <code>$orderby<\/code>, <code>$top<\/code> \u0219i <code>$skip<\/code>.<\/li>\n\n\n<li><strong>Comenzile<\/strong> scriu date prin POST, de exemplu <code>Manufacturing\/ManufacturingOrderOperations\/Update<\/code>.<\/li>\n\n\n<li><strong>Batch<\/strong> execut\u0103 mai multe comenzi \u00eentr-o singur\u0103 tranzac\u021bie de tip \u201etotul sau nimic\u201d, prin <code>POST \/api\/v1\/Batch<\/code>. Ad\u0103uga\u021bi <code>\/Simulate<\/code> sau <code>\/Validate<\/code> pentru a testa un lot de comenzi \u0219i a anula modific\u0103rile. Aceasta este modalitatea sigur\u0103 de a scrie un program de produc\u021bie complet. (<a href=\"https:\/\/api.monitor.se\/articles\/v1\/commands\/batch.html\">Batch<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>URL-ul de baz\u0103 este <code>https:\/\/{host}:8001\/{languageCode}\/{companyNumber}\/api\/v1\/<\/code>. Num\u0103rul companiei combin\u0103 num\u0103rul bazei de date cu identificatorul companiei, de exemplu <code>004.1<\/code>.<\/p>\n\n\n<p>\u00cen privin\u021ba licen\u021bierii, Monitor precizeaz\u0103: &#8220;It is free to query and extract information from the API for all our customers. However, in order to use commands and write data to the ERP system, you need to purchase Monitor ERP API.&#8221; (To\u021bi clien\u021bii no\u0219tri pot interoga \u0219i extrage gratuit informa\u021bii prin API. Pentru a utiliza comenzi \u0219i a scrie date \u00een sistemul ERP, trebuie \u00eens\u0103 s\u0103 achizi\u021bioneze Monitor ERP API.) Include\u021bi licen\u021ba pentru scrierea datelor \u00een proiect \u00eenc\u0103 din prima zi. (<a href=\"https:\/\/api.monitor.se\/\">api.monitor.se<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentificare<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Autentificare pe baz\u0103 de sesiune.<\/strong> Apelul <code>POST \/{languageCode}\/{companyNumber}\/login<\/code>, cu numele \u0219i parola unui utilizator Monitor, returneaz\u0103 un antet <code>X-Monitor-SessionId<\/code> pentru apelurile ulterioare. Este disponibil \u0219i un flux cu token MFA.<\/li>\n\n\n<li><strong>OIDC.<\/strong> \u00cencep\u00e2nd cu Monitor 25.8, autentificarea func\u021bioneaz\u0103 \u0219i prin Microsoft Entra ID, cu Authorization Code \u0219i PKCE. (<a href=\"https:\/\/api.monitor.se\/articles\/authentication\/index.html\">Autentificare<\/a>)<\/li>\n\n\n<li><strong>Utilizator API dedicat.<\/strong> Crea\u021bi un singur utilizator pentru integrare. Acestuia i se aplic\u0103 permisiunile din Monitor, precum Show manufacturing orders \u0219i Replan existing manufacturing order.<\/li>\n\n<\/ul>\n\n\n<p>\u00cen SkyPlanner, interfa\u021ba REST API folose\u0219te un token API pentru autentificare (SkyPlanner Settings &gt; API) \u0219i este documentat\u0103 \u00een Swagger\/OpenAPI. <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">Tutorialul de integrare<\/a> v\u0103 ghideaz\u0103 prin primele apeluri.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"change-detection-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Detectarea modific\u0103rilor \u0219i interogarea periodic\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Documenta\u021bia Monitor ERP API nu descrie webhook-uri sau abonamente la evenimente. Modific\u0103rile sunt preluate prin interogare periodic\u0103:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><code>Common\/EntityChangeLogs<\/code> (\u00eencep\u00e2nd cu 2.33) returneaz\u0103 <code>ChangeType<\/code> (Update, Create, Delete), <code>EntityTypeId<\/code>, <code>EntityId<\/code> \u0219i <code>ModifiedTimestamp<\/code>. Interoga\u021bi acest endpoint la fiecare c\u00e2teva minute \u0219i prelua\u021bi doar \u00eenregistr\u0103rile modificate. (<a href=\"https:\/\/api.monitor.se\/api\/Monitor.API.Common.EntityChangeLog.html\">EntityChangeLog<\/a>)<\/li>\n\n\n<li>Filtra\u021bi interog\u0103rile comenzilor de fabrica\u021bie pentru a include doar comenzile deschise \u0219i pagina\u021bi rezultatele cu <code>$top<\/code> \u0219i <code>$skip<\/code>.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner trimite webhook-uri c\u00e2nd se modific\u0103 starea sau programul de produc\u021bie, astfel \u00eenc\u00e2t transmiterea datelor c\u0103tre Monitor este declan\u0219at\u0103 de evenimente.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Maparea datelor<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Obiect Monitor ERP (API)<\/th><th>Obiect SkyPlanner<\/th><th>Direc\u021bie<\/th><th>Frecven\u021b\u0103<\/th><\/tr><\/thead><tbody><tr><td>Part (<code>Inventory\/Parts<\/code>)<\/td><td>Produse \u0219i materiale<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi pe baza jurnalului de modific\u0103ri<\/td><\/tr><tr><td>BOM \u0219i flux tehnologic: <code>Manufacturing\/MaterialRows<\/code>, <code>Manufacturing\/OperationRows<\/code><\/td><td>Structura produsului; etape de proces cu timpi de preg\u0103tire \u0219i timpi unitari<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td><code>Manufacturing\/AlternativeOperationRows<\/code><\/td><td>Centre de lucru alternative pentru fiecare etap\u0103<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td>Centru de lucru (<code>Manufacturing\/WorkCenters<\/code>): Type, TimePrecision, BasicTime, NumberOfPlanningUnits, AvailabilityFactor<\/td><td>Centre de lucru, grupuri de centre de lucru, randamente<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi rar<\/td><\/tr><tr><td><code>Manufacturing\/ProductionCalendarExceptions<\/code>, <code>TimeRecording\/Schedules<\/code><\/td><td>Schimburi \u0219i absen\u021be<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Zilnic sau schimburi proprii \u00een SkyPlanner<\/td><\/tr><tr><td><code>Manufacturing\/ManufacturingOrders<\/code>, <code>ManufacturingOrderNodes<\/code><\/td><td>Comenzi cu termene \u0219i stare<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Interogarea jurnalului de modific\u0103ri la fiecare c\u00e2teva minute<\/td><\/tr><tr><td><code>Manufacturing\/ManufacturingOrderOperations<\/code>: Priority, WorkCenterId, PlannedQuantity, RestQuantity, PlannedSetupTime, PlannedUnitTime<\/td><td>Lucr\u0103ri cu durate \u0219i cantitate r\u0103mas\u0103<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Interogarea jurnalului de modific\u0103ri la fiecare c\u00e2teva minute<\/td><\/tr><tr><td><code>Manufacturing\/ManufacturingOrderMaterials<\/code><\/td><td>Necesar de materiale pentru fiecare comand\u0103<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Interogarea periodic\u0103 a jurnalului de modific\u0103ri<\/td><\/tr><tr><td><code>Inventory\/PartLocations<\/code> (Balance), <code>Purchase\/PurchaseOrderRows<\/code> (DeliveryDate, RestQuantity)<\/td><td>Stoc; materiale \u00een curs de aprovizionare, la data livr\u0103rii<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Interogare la fiecare or\u0103 sau la fiecare recalculare a programului de produc\u021bie<\/td><\/tr><tr><td><code>ManufacturingOrderOperations\/Update<\/code>: PlannedStartDate, PlannedFinishDate (24.5+)<\/td><td>\u00cenceputul \u0219i sf\u00e2r\u0219itul planificate pentru fiecare opera\u021bie<\/td><td>SkyPlanner \u2192 Monitor<\/td><td>La modificarea programului de produc\u021bie, prin webhook SkyPlanner<\/td><\/tr><tr><td><code>ManufacturingOrderOperations\/SetWorkCenter<\/code><\/td><td>Centrul de lucru ales de motorul de programare<\/td><td>SkyPlanner \u2192 Monitor<\/td><td>La modificarea programului de produc\u021bie<\/td><\/tr><tr><td><code>ReportManufacturingOrderOperation<\/code> \/ <code>ManufacturingOrderOperationReportings<\/code><\/td><td>\u00cenregistr\u0103ri de timp \u0219i cantit\u0103\u021bi<\/td><td>Un singur canal, ales la definirea domeniului<\/td><td>La fiecare confirmare sau la fiecare schimb<\/td><\/tr><tr><td>Nu exist\u0103 \u00een Monitor<\/td><td>Matricea timpilor de preg\u0103tire, scule ca resurse cu capacitate finit\u0103, lucr\u0103ri cu mai mul\u021bi operatori<\/td><td>Gestionate \u00een SkyPlanner<\/td><td>Configurate \u00een etapa de implementare ini\u021bial\u0103<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Modele de integrare<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00cenc\u0103rcarea ini\u021bial\u0103 a nomenclatoarelor.<\/strong> Citi\u021bi centrele de lucru, r\u00e2ndurile de opera\u021bii, r\u00e2ndurile de opera\u021bii alternative, r\u00e2ndurile de materiale, articolele \u0219i programele de lucru. Stabili\u021bi cu aten\u021bie coresponden\u021ba dintre fiecare centru de lucru \u0219i un centru de lucru SkyPlanner. Un centru de lucru de tip Pool devine un grup de centre de lucru, iar centrele incluse \u00een acesta devin centrele de lucru \u00eentre care alege motorul de programare.<\/p>\n\n\n<p><strong>2. Sincronizarea comenzilor.<\/strong> Citi\u021bi comenzile de fabrica\u021bie deschise, cu nodurile, opera\u021biile \u0219i materialele lor, precum \u0219i stocul \u0219i comenzile de achizi\u021bie deschise. SkyPlanner consider\u0103 materialul comandat disponibil la data de livrare a comenzii de achizi\u021bie \u0219i actualizeaz\u0103 stocul c\u00e2nd comanda este marcat\u0103 Delivered. Dup\u0103 prima \u00eenc\u0103rcare, actualiz\u0103rile incrementale se bazeaz\u0103 pe <code>Common\/EntityChangeLogs<\/code>.<\/p>\n\n\n<p><strong>3. Transmiterea programului de produc\u021bie c\u0103tre Monitor.<\/strong> Pentru fiecare opera\u021bie programat\u0103 sau mutat\u0103 de motor, SkyPlanner trimite <code>ManufacturingOrderOperations\/Update<\/code> cu PlannedStartDate \u0219i PlannedFinishDate. Dac\u0103 motorul a mutat o opera\u021bie pe alt utilaj dintr-un grup, se execut\u0103 mai \u00eent\u00e2i <code>SetWorkCenter<\/code>. Comenzile aferente unei comenzi de fabrica\u021bie sunt incluse \u00eentr-un singur <code>Batch<\/code>, astfel \u00eenc\u00e2t Monitor le accept\u0103 pe toate sau pe niciuna. \u00cen timpul test\u0103rii, rula\u021bi lotul de comenzi prin <code>\/Validate<\/code>.<\/p>\n\n\n<p>\u00cen versiunile Monitor anterioare versiunii 24.5, datele planificate nu pot fi scrise prin Update. Folosi\u021bi \u00een schimb <code>ManufacturingOrders\/ReplanOperation<\/code> (\u00eencep\u00e2nd cu 2.40), cu StartDate \u0219i FinishDate, \u0219i configura\u021bi RestrictToOrderBounds conform regulilor dumneavoastr\u0103.<\/p>\n\n\n<p><strong>4. Confirm\u0103ri din produc\u021bie.<\/strong> P\u0103stra\u021bi un singur canal de raportare:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Monitor r\u0103m\u00e2ne canalul de raportare.<\/strong> Operatorii raporteaz\u0103 \u00een Recording terminal sau prin integrarea cu utilajele, ca \u0219i p\u00e2n\u0103 acum. SkyPlanner cite\u0219te <code>ManufacturingOrderOperationReportings<\/code> pentru a urm\u0103ri progresul \u0219i reface programarea.<\/li>\n\n\n<li><strong>SkyPlanner devine canalul de raportare.<\/strong> Operatorii \u00eenregistreaz\u0103 lucrul prin Mobile Confirmations sau Production Timer, iar SkyPlanner trimite <code>ReportManufacturingOrderOperation<\/code> c\u0103tre Monitor.<\/li>\n\n<\/ul>\n\n\n<p>Raportarea din ambele sisteme dubleaz\u0103 timpii \u0219i cantit\u0103\u021bile.<\/p>\n\n\n<p><strong>5. Responsabilitatea asupra datelor \u0219i regulile de gestionare a conflictelor.<\/strong> Documenta\u021bi-le \u00eenainte de punerea \u00een func\u021biune:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Date<\/th><th>Sistem responsabil<\/th><\/tr><\/thead><tbody><tr><td>Articole, BOM \u0219i flux tehnologic, cantit\u0103\u021bi, starea comenzilor<\/td><td>Monitor<\/td><\/tr><tr><td>Succesiunea opera\u021biilor, \u00eenceputul \u0219i sf\u00e2r\u0219itul planificate, centrul de lucru din cadrul unui grup<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matricea timpilor de preg\u0103tire, scule, num\u0103rul de operatori, resurse alternative<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Schimburi \u0219i absen\u021be<\/td><td>Un singur sistem, ales la definirea domeniului<\/td><\/tr><tr><td>Raportarea opera\u021biilor<\/td><td>Un singur canal, ales la definirea domeniului<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Principala surs\u0103 de conflicte este continuarea modific\u0103rii planului de priorit\u0103\u021bi de c\u0103tre planificatori. <strong>Rescheduling according to New finish<\/strong> \u0219i mutarea r\u00e2ndurilor prin glisare \u00een Priority planning suprascriu datele calendaristice \u00eenscrise de SkyPlanner. Odat\u0103 ce SkyPlanner stabile\u0219te succesiunea, Priority planning se folose\u0219te doar pentru vizualizare. Cu Autopilot, SkyPlanner reface automat programarea c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapele obi\u0219nuite ale proiectului<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementarea se finalizeaz\u0103, de regul\u0103, \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea configur\u0103rii ini\u021biale. \u00cenainte de aceast\u0103 etap\u0103, pute\u021bi folosi perioada de prob\u0103 gratuit\u0103 de 30 de zile cu propriile date. Exporta\u021bi \u00een Excel opera\u021biile comenzilor de fabrica\u021bie deschise \u0219i centrele de lucru din Monitor, importa\u021bi-le \u0219i valida\u021bi programul de produc\u021bie \u00eenainte de a \u00eencepe lucr\u0103rile de integrare.<\/p>\n\n\n<p>Proiectul propriu-zis cuprinde:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Definirea domeniului.<\/strong> Stabili\u021bi tabelul de coresponden\u021b\u0103, regulile privind sistemul responsabil pentru fiecare tip de date, intervalele de interogare, canalul de raportare \u0219i versiunea Monitor.<\/li>\n\n\n<li><strong>Acces.<\/strong> Crea\u021bi utilizatorul API, achizi\u021biona\u021bi licen\u021ba de scriere pentru Monitor ERP API \u0219i permite\u021bi accesul prin re\u021bea la portul 8001.<\/li>\n\n\n<li><strong>\u00cenc\u0103rcarea ini\u021bial\u0103.<\/strong> Articole, centre de lucru, r\u00e2nduri de opera\u021bii, alternative, materiale \u0219i programe de lucru.<\/li>\n\n\n<li><strong>Sincronizarea comenzilor \u0219i a comenzilor de achizi\u021bie<\/strong> pe baza jurnalului de modific\u0103ri.<\/li>\n\n\n<li><strong>Configurarea constr\u00e2ngerilor \u00een SkyPlanner.<\/strong> Matricea timpilor de preg\u0103tire, scule, num\u0103rul de operatori \u0219i utilaje sau personal alternativ.<\/li>\n\n\n<li><strong>Transmiterea programului de produc\u021bie c\u0103tre Monitor<\/strong> \u00een loturi, testat\u0103 cu <code>\/Validate<\/code>.<\/li>\n\n\n<li><strong>Testarea \u00een paralel.<\/strong> Rula\u021bi SkyPlanner \u00een paralel cu planul de priorit\u0103\u021bi, compara\u021bi datele calendaristice \u0219i corecta\u021bi nomenclatoarele.<\/li>\n\n\n<li><strong>Punerea \u00een produc\u021bie.<\/strong> Activa\u021bi transmiterea datelor c\u0103tre Monitor odat\u0103 ce datele corespund.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-monitor-erp-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce trebuie s\u0103 ave\u021bi \u00een vedere la integrarea cu Monitor ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Factorul de disponibilitate.<\/strong> Monitor calculeaz\u0103 capacitatea net\u0103 din capacitatea brut\u0103 folosind factorul de disponibilitate, setat implicit la 80 % pentru un centru de lucru nou. Aplica\u021bi-l o singur\u0103 dat\u0103: fie ca eficien\u021b\u0103 \u00een SkyPlanner, fie prin schimburi mai scurte, niciodat\u0103 prin ambele metode.<\/li>\n\n\n<li><strong>Precizia temporal\u0103.<\/strong> Pentru centrele de lucru configurate \u00een Day planning, capacitatea este exprimat\u0103 ca timp de baz\u0103 pe zi, f\u0103r\u0103 orele schimburilor. Configura\u021bi \u00een SkyPlanner schimburile reale pe baza programelor de lucru din produc\u021bie, astfel \u00eenc\u00e2t lucr\u0103rile s\u0103 fie programate \u00een orele de lucru.<\/li>\n\n\n<li><strong>Timpul de a\u0219teptare \u0219i suprapunerea.<\/strong> R\u00e2ndurile de opera\u021bii con\u021bin timpul de a\u0219teptare \u0219i suprapunerea \u00een %. Stabili\u021bi la definirea domeniului cum se transpune fiecare \u00een SkyPlanner; altfel, duratele de realizare se vor modifica dup\u0103 punerea \u00een produc\u021bie.<\/li>\n\n\n<li><strong>Grupuri de centre de lucru.<\/strong> Centrele de lucru de tip grup se planific\u0103 \u00een Pool planning, nu \u00een Priority planning. Citi\u021bi datele centrelor de lucru incluse, nu doar r\u00e2ndul grupului.<\/li>\n\n\n<li><strong>Cerin\u021be de versiune.<\/strong> Scrierea datelor calendaristice planificate prin Update necesit\u0103 versiunea 24.5. C\u00e2mpurile de capacitate ale centrelor de lucru din API necesit\u0103 24.3, iar OIDC necesit\u0103 25.8. Verifica\u021bi versiunea exact\u0103 \u00eenainte de definirea domeniului.<\/li>\n\n\n<li><strong>Re\u021bea \u0219i certificat.<\/strong> Monitor instalat local expune API-ul pe portul 8001, cu un certificat autosemnat. SkyPlanner ruleaz\u0103 \u00een cloud, a\u0219a c\u0103 prevede\u021bi o regul\u0103 de firewall sau un releu \u0219i configura\u021bi explicit certificatul ca fiind de \u00eencredere.<\/li>\n\n\n<li><strong>Licen\u021be.<\/strong> Fiecare aplica\u021bie ter\u021b\u0103 care scrie date are nevoie de propriii utilizatori cu licen\u021b\u0103 API. Fiecare sistem include un utilizator API cu acces doar pentru citire.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"the-monitor-erp-integration-who-configures-and-s\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integrarea cu Monitor ERP: cine o configureaz\u0103 \u0219i ofer\u0103 asisten\u021b\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Lucr\u0103rile includ stabilirea coresponden\u021belor cu centrele de lucru, r\u00e2ndurile de opera\u021bii \u0219i fluxul comenzilor dumneavoastr\u0103, precum \u0219i configurarea constr\u00e2ngerilor care nu sunt p\u0103strate \u00een Monitor: matricea timpilor de preg\u0103tire, sculele, num\u0103rul de operatori \u0219i resursele alternative.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Echipa SkyPlanner configureaz\u0103 integrarea \u00een etapa ini\u021bial\u0103 \u0219i ofer\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een produc\u021bie,<\/strong> at\u00e2t pentru partea SkyPlanner, c\u00e2t \u0219i pentru apelurile convenite c\u0103tre Monitor ERP API. Fiecare fabric\u0103 folose\u0219te Monitor G5 \u00een mod diferit, iar aici este pus\u0103 \u00een practic\u0103 aceast\u0103 experien\u021b\u0103.<\/li>\n\n\n<li><strong>Partenerul dumneavoastr\u0103 Monitor poate participa.<\/strong> Acesta cunoa\u0219te configura\u021bia, versiunea \u0219i permisiunile dumneavoastr\u0103 \u0219i poate preg\u0103ti utilizatorul API, licen\u021ba \u0219i accesul prin re\u021bea. SkyPlanner pune la dispozi\u021bie REST API, documenta\u021bia Swagger\/OpenAPI \u0219i webhook-uri.<\/li>\n\n\n<li><strong>Dezvoltatorii dumneavoastr\u0103 pot dezvolta solu\u021bii pe aceast\u0103 baz\u0103<\/strong> folosind acela\u0219i REST API documentat, cu un token API. Pentru a \u00eencepe este suficient un token API, iar echipa SkyPlanner ofer\u0103 ajutor la nevoie. Documenta\u021bia public\u0103 este disponibil\u0103 la <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">SkyPlanner docs<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>Dup\u0103 conectare, motorul Arcturus programeaz\u0103 produc\u021bia pe baza comenzilor actualizate din Monitor, iar datele calendaristice planificate sunt \u00eenscrise \u00een opera\u021biile comenzilor de fabrica\u021bie. SkyPlanner porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse \u0219i facturare lunar\u0103. Oferta pentru integrare se stabile\u0219te de la \u00eenceput, \u00een func\u021bie de procesul \u0219i nevoile dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul, astfel \u00eenc\u00e2t s\u0103 cunoa\u0219te\u021bi costul total \u00eenainte de a \u00eencepe. Consulta\u021bi <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a>, compara\u021bia cu planificarea proprie din Monitor \u00een <a href=\"\/ro\/integrari\/erp\/monitor-erp\/cu-capacitate-finita\/\">programarea cu capacitate finit\u0103 \u00een Monitor ERP<\/a>, prezentarea general\u0103 de pe <a href=\"\/ro\/integrari\/erp\/monitor-erp\/\">pagina Monitor ERP<\/a> \u0219i celelalte sisteme ERP din <a href=\"\/ro\/integrari\/erp\/\">sec\u021biunea de integr\u0103ri ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi proba gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een sec\u021bia de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de lucr\u0103ri ajunge pe linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi m\u0103rturia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een echipament pentru camere curate la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui plan optimizat pe trei luni pentru toate centrele de lucru dureaz\u0103 sub 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi m\u0103rturia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, director general al Mamec, \u00een hala de produc\u021bie a companiei din Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Peste 1.000<\/b><span> de comenzi de lucru programate automat<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eControl\u0103m produc\u021bia \u00eentr-un mod diferit, iar capacitatea de produc\u021bie o \u00een\u021belegem acum la un cu totul alt nivel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, director general<\/b><br>Mamec \u00b7 Mixere industriale, pompe \u0219i produc\u021bie la comand\u0103 de \u00eenalt\u0103 tehnologie<\/p>\n\n\n<p class=\"ind-cust__result\">Mii de comenzi de lucru sunt programate automat, iar \u00eentreaga organiza\u021bie are o imagine \u00een timp real asupra produc\u021biei.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/mamec\/\">Citi\u021bi m\u0103rturia Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, manager de produc\u021bie la Fredman Operations, l\u00e2ng\u0103 o celul\u0103 robotizat\u0103 de paletizare din Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 luni<\/b><span>\u00een avans: capacitatea disponibil\u0103 este vizibil\u0103 echipei de v\u00e2nz\u0103ri<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ofer\u0103 o baz\u0103 solid\u0103 \u0219i siguran\u021b\u0103 pentru \u00eentreaga planificare a produc\u021biei.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, manager de produc\u021bie<\/b><br>Fredman Operations \u00b7 H\u00e2rtie pentru ambalaje destinat\u0103 contactului cu alimentele<\/p>\n\n\n<p class=\"ind-cust__result\">Echipa de v\u00e2nz\u0103ri vede capacitatea disponibil\u0103 cu \u0219ase luni \u00eenainte, iar cererile de modificare a programului, care necesitau o or\u0103 sau mai mult, primesc r\u0103spuns \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/fredman-operations\/\">Citi\u021bi m\u0103rturia Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Monitor ERP are un API pentru comenzile de fabrica\u021bie?<\/summary>\n<p class=\"sp-faq__a\">Da. Monitor ERP API expune <code>Manufacturing\/ManufacturingOrders<\/code>, <code>ManufacturingOrderNodes<\/code>, <code>ManufacturingOrderOperations<\/code> \u0219i <code>ManufacturingOrderMaterials<\/code> pentru interogare. Comenzi precum <code>ManufacturingOrderOperations\/Update<\/code> \u0219i <code>ReplanOperation<\/code> scriu datele calendaristice planificate \u00eenapoi \u00een Monitor.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Scrierea \u00een Monitor prin API necesit\u0103 o licen\u021b\u0103 suplimentar\u0103?<\/summary>\n<p class=\"sp-faq__a\">Da. Citirea prin API este gratuit\u0103 pentru to\u021bi clien\u021bii Monitor. Comenzile care scriu date necesit\u0103 Monitor ERP API, comercializat de Monitor. Partenerul dumneavoastr\u0103 Monitor sau echipa de v\u00e2nz\u0103ri Monitor v\u0103 ofer\u0103 o cota\u021bie.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Monitor ERP API accept\u0103 webhook-uri?<\/summary>\n<p class=\"sp-faq__a\">Nu sunt documentate webhook-uri. Integrarea interogheaz\u0103 <code>Common\/EntityChangeLogs<\/code> la fiecare c\u00e2teva minute \u0219i preia doar \u00eenregistr\u0103rile modificate. \u00cen sens invers, webhook-urile proprii SkyPlanner transmit modific\u0103rile programului de produc\u021bie imediat ce apar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>De ce versiune Monitor avem nevoie?<\/summary>\n<p class=\"sp-faq__a\">Scrierea datelor planificate de \u00eenceput \u0219i de sf\u00e2r\u0219it prin <code>ManufacturingOrderOperations\/Update<\/code> necesit\u0103 Monitor 24.5 sau o versiune ulterioar\u0103. Versiunile G5 mai vechi, \u00eencep\u00e2nd cu 2.40, folosesc <code>ReplanOperation<\/code>. La definirea domeniului, confirm\u0103m metoda potrivit\u0103 pentru versiunea dumneavoastr\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cine realizeaz\u0103 integrarea cu Monitor ERP?<\/summary>\n<p class=\"sp-faq__a\">Echipa SkyPlanner configureaz\u0103 integrarea bidirec\u021bional\u0103 pentru configura\u021bia dumneavoastr\u0103 Monitor G5 \u00een etapa ini\u021bial\u0103 \u0219i ofer\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een produc\u021bie. Partenerul dumneavoastr\u0103 Monitor sau propriii dezvoltatori pot realiza, de asemenea, dezvolt\u0103ri folosind REST API documentat al SkyPlanner, iar pentru a \u00eencepe este suficient un token API.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de realizarea integr\u0103rii?<\/summary>\n<p class=\"sp-faq__a\">Da. Perioada de prob\u0103 gratuit\u0103 de 30 de zile permite p\u00e2n\u0103 la 20 de centre de lucru, cu importuri Excel sau CSV din Monitor, f\u0103r\u0103 card de credit. <a href=\"\/ro\/proba\/\">\u00cencepe\u021bi proba gratuit\u0103<\/a> sau <a href=\"\/ro\/contact-vanzari\/\">discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a> pentru definirea domeniului integr\u0103rii.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ Monitor ERP Ghid de integrare Monitor ERP pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare Monitor ERP le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze Monitor ERP (Monitor G5) la SkyPlanner APS. SkyPlanner se integreaz\u0103 bidirec\u021bional cu Monitor ERP prin Monitor ERP API: skyplanner.ai \u00b7 Programarea produc\u021biei \u00cen &#8230; <a title=\"Ghid de integrare Monitor ERP pentru programarea produc\u021biei cu SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/monitor-erp\/ghid-de-integrare\/\" aria-label=\"Read more about Ghid de integrare Monitor ERP pentru programarea produc\u021biei cu SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":103102,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-104029","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ghid de integrare Monitor ERP cu APS pentru programarea produc\u021biei<\/title>\n<meta name=\"description\" content=\"Monitor G5\u2013SkyPlanner APS: interog\u0103ri \u0219i comenzi Monitor ERP API, Batch, rescrierea datelor opera\u021biilor, polling, mapare \u0219i sfaturi de proiect.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/monitor-erp\/ghid-de-integrare\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ghid de integrare Monitor ERP pentru programarea produc\u021biei cu SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Monitor G5\u2013SkyPlanner APS: interog\u0103ri \u0219i comenzi Monitor ERP API, Batch, rescrierea datelor opera\u021biilor, polling, mapare \u0219i sfaturi de proiect.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/monitor-erp\/ghid-de-integrare\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/monitor-erp\\\/ghid-de-integrare\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/monitor-erp\\\/ghid-de-integrare\\\/\",\"name\":\"Ghid de integrare Monitor ERP cu APS pentru programarea produc\u021biei\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Monitor G5\u2013SkyPlanner APS: interog\u0103ri \u0219i comenzi Monitor ERP API, Batch, rescrierea datelor opera\u021biilor, polling, mapare \u0219i sfaturi de proiect.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/monitor-erp\\\/ghid-de-integrare\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/monitor-erp\\\/ghid-de-integrare\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/monitor-erp\\\/ghid-de-integrare\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru Monitor ERP: programarea produc\u021biei cu capacitate finit\u0103\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/monitor-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Ghid de integrare Monitor ERP pentru programarea produc\u021biei cu SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ghid de integrare Monitor ERP cu APS pentru programarea produc\u021biei","description":"Monitor G5\u2013SkyPlanner APS: interog\u0103ri \u0219i comenzi Monitor ERP API, Batch, rescrierea datelor opera\u021biilor, polling, mapare \u0219i sfaturi de proiect.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/monitor-erp\/ghid-de-integrare\/","og_locale":"ro_RO","og_type":"article","og_title":"Ghid de integrare Monitor ERP pentru programarea produc\u021biei cu SkyPlanner APS","og_description":"Monitor G5\u2013SkyPlanner APS: interog\u0103ri \u0219i comenzi Monitor ERP API, Batch, rescrierea datelor opera\u021biilor, polling, mapare \u0219i sfaturi de proiect.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/monitor-erp\/ghid-de-integrare\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/monitor-erp\/ghid-de-integrare\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/monitor-erp\/ghid-de-integrare\/","name":"Ghid de integrare Monitor ERP cu APS pentru programarea produc\u021biei","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Monitor G5\u2013SkyPlanner APS: interog\u0103ri \u0219i comenzi Monitor ERP API, Batch, rescrierea datelor opera\u021biilor, polling, mapare \u0219i sfaturi de proiect.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/monitor-erp\/ghid-de-integrare\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/monitor-erp\/ghid-de-integrare\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/monitor-erp\/ghid-de-integrare\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru Monitor ERP: programarea produc\u021biei cu capacitate finit\u0103","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/monitor-erp\/"},{"@type":"ListItem","position":5,"name":"Ghid de integrare Monitor ERP pentru programarea produc\u021biei cu SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ Monitor ERP Ghid de integrare Monitor ERP pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare Monitor ERP le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze Monitor ERP (Monitor G5) la SkyPlanner APS. SkyPlanner se integreaz\u0103 bidirec\u021bional cu Monitor ERP prin Monitor ERP API: skyplanner.ai \u00b7 Programarea produc\u021biei \u00cen&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/104029","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=104029"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/104029\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/103102"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=104029"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}