{"id":103854,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/katana\/ghid-de-integrare\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"ghid-de-integrare","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/katana\/ghid-de-integrare\/","title":{"rendered":"Ghid de integrare Katana pentru programarea produc\u021biei cu SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ Katana<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Ghid de integrare Katana <span class=\"hl\">pentru programarea produc\u021biei cu SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Acest ghid de integrare Katana le arat\u0103 consultan\u021bilor \u0219i echipelor IT cum s\u0103 conecteze Katana Cloud Inventory (Katana MRP) la SkyPlanner APS. SkyPlanner se integreaz\u0103 bidirec\u021bional cu Katana prin interfa\u021ba public\u0103 Katana API:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u00cen SkyPlanner sunt importate comenzile de produc\u021bie, liniile de opera\u021bii, re\u021betele produselor, opera\u021biile de produc\u021bie, resursele, stocurile \u0219i comenzile de achizi\u021bie.<\/li>\n\n\n<li>Ordinea programat\u0103 este transmis\u0103 \u00eenapoi \u00een fila Schedule din Katana, \u00eempreun\u0103 cu un termen de finalizare pentru fiecare comand\u0103 de produc\u021bie.<\/li>\n\n\n<li>Starea opera\u021biilor \u0219i timpul efectiv sunt transmise \u00eenapoi \u00een liniile de opera\u021bii.<\/li>\n\n\n<li>Webhookurile Katana notific\u0103 SkyPlanner despre modific\u0103ri, iar webhookurile SkyPlanner transmit modific\u0103rile programului pe m\u0103sur\u0103 ce apar.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia Katana \u00een etapa de implementare \u0219i asigur\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een func\u021biune. Acest ghid se adreseaz\u0103 consultan\u021bilor \u0219i dezvoltatorilor care vor s\u0103 participe la integrare sau s\u0103 dezvolte singuri solu\u021bii folosind interfa\u021ba REST API documentat\u0103 a SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"the-katana-api\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Interfa\u021ba Katana API<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Katana este un produs cloud unic, cu arhitectur\u0103 multi-tenant, astfel \u00eenc\u00e2t to\u021bi clien\u021bii folosesc aceea\u0219i interfa\u021b\u0103 API. Este o interfa\u021b\u0103 REST API, versiunea v1, disponibil\u0103 la <code>https:\/\/api.katanamrp.com\/v1<\/code>, cu specifica\u021bia OpenAPI 3.0 la <code>https:\/\/api.katanamrp.com\/v1\/openapi.json<\/code>. Documenta\u021bia este disponibil\u0103 \u00een <a href=\"https:\/\/developer.katanamrp.com\/reference\/api-introduction\">Katana Developer Hub<\/a>.<\/p>\n\n\n<p>Endpointurile necesare pentru programarea produc\u021biei:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Nomenclatoare:<\/strong> <code>\/products<\/code>, <code>\/materials<\/code>, <code>\/variants<\/code>, <code>\/recipe_rows<\/code>, <code>\/bom_rows<\/code>, <code>\/product_operation_rows<\/code>.<\/li>\n\n\n<li><strong>Comenzi:<\/strong> <code>\/manufacturing_orders<\/code>, <code>\/manufacturing_order_operation_rows<\/code>, <code>\/manufacturing_order_recipe_rows<\/code>, <code>\/manufacturing_order_productions<\/code>.<\/li>\n\n\n<li><strong>Ordine de execu\u021bie:<\/strong> <code>\/manufacturing_order_rerank<\/code>.<\/li>\n\n\n<li><strong>Aprovizionare \u0219i cerere:<\/strong> <code>\/inventory<\/code>, <code>\/purchase_orders<\/code>, <code>\/purchase_order_rows<\/code>, <code>\/sales_orders<\/code>, <code>\/sales_order_rows<\/code>.<\/li>\n\n<\/ul>\n\n\n<p>Nu exist\u0103 un endpoint <code>\/resources<\/code>. Resursele apar \u00een c\u00e2mpurile <code>resource_id<\/code> \u0219i <code>resource_name<\/code> din liniile de opera\u021bii ale produselor \u0219i ale comenzilor de produc\u021bie.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-limits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentificare \u0219i limite<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Autentificarea folose\u0219te o cheie API ca token bearer: <code>Authorization: Bearer &lt;api key&gt;<\/code>. Crea\u021bi cheia din <strong>Settings &gt; API &gt; Add new API key<\/strong>. (<a href=\"https:\/\/developer.katanamrp.com\/reference\/api-authentication\">surs\u0103<\/a>)<\/p>\n\n\n<p>La proiectarea sincroniz\u0103rii trebuie s\u0103 \u021bine\u021bi cont de urm\u0103toarele limite:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>\u00cen mod implicit, Katana API permite 60 de cereri la fiecare 60 de secunde (<a href=\"https:\/\/developer.katanamrp.com\/reference\/api-rate-limiting\">surs\u0103<\/a>)<\/li>\n\n\n<li>La dep\u0103\u0219irea limitei, interfa\u021ba API returneaz\u0103 codul 429 \u00eempreun\u0103 cu <code>Retry-After<\/code>. <code>X-Ratelimit-Remaining<\/code> indic\u0103 num\u0103rul de cereri r\u0103mase disponibile.<\/li>\n\n\n<li>Endpointurile de listare returneaz\u0103 rezultate paginate \u0219i accept\u0103 filtre dup\u0103 data actualiz\u0103rii, astfel \u00eenc\u00e2t volumul de date transferat la sincroniz\u0103rile incrementale r\u0103m\u00e2ne mic.<\/li>\n\n<\/ul>\n\n\n<p>\u00cen SkyPlanner, interfa\u021ba REST API folose\u0219te un token API pentru autentificare (SkyPlanner Settings &gt; API) \u0219i este documentat\u0103 \u00een Swagger\/OpenAPI. <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">Tutorialul de integrare<\/a> explic\u0103 pas cu pas primele apeluri.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"webhooks\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Webhookuri<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u00cenregistra\u021bi un webhook prin POST <code>\/webhooks<\/code>, specific\u00e2nd un URL HTTPS \u0219i evenimentele de care ave\u021bi nevoie. (<a href=\"https:\/\/developer.katanamrp.com\/reference\/webhooks\">surs\u0103<\/a>) Evenimente utile pentru programarea produc\u021biei:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><code>manufacturing_order.created<\/code>, <code>.updated<\/code>, <code>.deleted<\/code>, <code>.in_progress<\/code>, <code>.blocked<\/code>, <code>.done<\/code><\/li>\n\n\n<li><code>manufacturing_order_operation_row.created<\/code>, <code>.updated<\/code>, <code>.in_progress<\/code>, <code>.paused<\/code>, <code>.completed<\/code><\/li>\n\n\n<li><code>current_inventory.material_updated<\/code>, <code>.material_out_of_stock<\/code><\/li>\n\n\n<li><code>purchase_order.*<\/code> \u0219i <code>purchase_order_row.*<\/code>, inclusiv received<\/li>\n\n\n<li><code>product.*<\/code>, <code>product_recipe_row.*<\/code> \u0219i <code>sales_order.*<\/code><\/li>\n\n<\/ul>\n\n\n<p>Mesajele con\u021bin pu\u021bine date: tipul resursei, ac\u021biunea \u0219i un <code>href<\/code>. Sistemul receptor preia obiectul complet de la adresa href. Fiecare mesaj include un antet <code>x-sha2-signature<\/code> (HMAC SHA-256) pentru verificare. Endpointul dumneavoastr\u0103 trebuie s\u0103 r\u0103spund\u0103 cu 20X \u00een cel mult 10 secunde, iar Katana re\u00eencearc\u0103 de trei ori: la 30 de secunde, 2 minute \u0219i 15 minute.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Maparea datelor<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Obiect Katana (endpoint)<\/th><th>Obiect SkyPlanner<\/th><th>Direc\u021bie<\/th><th>Frecven\u021b\u0103<\/th><\/tr><\/thead><tbody><tr><td>Produse, materiale, variante (<code>\/products<\/code>, <code>\/materials<\/code>, <code>\/variants<\/code>)<\/td><td>Produse \u0219i materiale<\/td><td>Katana \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la primirea unui webhook<\/td><\/tr><tr><td>Re\u021beta produsului \/ BOM (<code>\/recipe_rows<\/code>, <code>\/bom_rows<\/code>)<\/td><td>Structura produsului, subproduse<\/td><td>Katana \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la primirea unui webhook<\/td><\/tr><tr><td>Opera\u021bii de produc\u021bie (<code>\/product_operation_rows<\/code>): tip, resurs\u0103, durat\u0103<\/td><td>Etape de proces cu durate \u0219i timpi de preg\u0103tire<\/td><td>Katana \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la fiecare modificare<\/td><\/tr><tr><td>Resurse (<code>resource_id<\/code>, <code>resource_name<\/code> \u00een liniile de opera\u021bii)<\/td><td>Centre de lucru, grupuri de centre de lucru<\/td><td>Katana \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la ad\u0103ugarea unei resurse<\/td><\/tr><tr><td>Comand\u0103 de produc\u021bie cu linii de opera\u021bii (<code>\/manufacturing_orders<\/code>, <code>\/manufacturing_order_operation_rows<\/code>)<\/td><td>Comenzi \u0219i opera\u021bii<\/td><td>Katana \u2192 SkyPlanner<\/td><td>\u00cen timp real, prin webhook<\/td><\/tr><tr><td>Ingrediente ale comenzii de produc\u021bie (<code>\/manufacturing_order_recipe_rows<\/code>)<\/td><td>Materiale pentru fiecare opera\u021bie<\/td><td>Katana \u2192 SkyPlanner<\/td><td>\u00cen timp real, prin webhook<\/td><\/tr><tr><td>Stocuri, comenzi de achizi\u021bie cu date de sosire (<code>\/inventory<\/code>, <code>\/purchase_order_rows<\/code>)<\/td><td>Stocuri \u0219i materiale \u00een curs de aprovizionare<\/td><td>Katana \u2192 SkyPlanner<\/td><td>\u00cen timp real, prin webhook<\/td><\/tr><tr><td>C\u00e2mpul <code>delivery_date<\/code> al comenzii de v\u00e2nzare (<code>\/sales_orders<\/code>)<\/td><td>Termenul comenzii, prioritatea clientului<\/td><td>Katana \u2192 SkyPlanner<\/td><td>\u00cen timp real, prin webhook<\/td><\/tr><tr><td>Ordinea comenzilor de produc\u021bie (POST <code>\/manufacturing_order_rerank<\/code>)<\/td><td>Ordinea programat\u0103 a comenzilor de produc\u021bie deschise<\/td><td>SkyPlanner \u2192 Katana<\/td><td>La modificarea programului<\/td><\/tr><tr><td>C\u00e2mpul <code>production_deadline_date<\/code> al comenzii de produc\u021bie (PATCH <code>\/manufacturing_orders\/{id}<\/code>)<\/td><td>Finalizare programat\u0103<\/td><td>SkyPlanner \u2192 Katana<\/td><td>La modificarea programului<\/td><\/tr><tr><td>C\u00e2mpurile <code>status<\/code>, <code>total_actual_time<\/code> ale liniei de opera\u021bie (PATCH <code>\/manufacturing_order_operation_rows\/{id}<\/code>)<\/td><td>Mobile Confirmations, \u00eenregistr\u0103ri de timp<\/td><td>SkyPlanner \u2192 Katana<\/td><td>Pe m\u0103sur\u0103 ce se \u00eenregistreaz\u0103 activitatea<\/td><\/tr><tr><td>Nu exist\u0103 \u00een Katana<\/td><td>Schimburi, absen\u021be, matricea timpilor de preg\u0103tire, scule, num\u0103r de operatori, centre de lucru alternative<\/td><td>Gestionate \u00een SkyPlanner<\/td><td>Configurate \u00een etapa de implementare<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Modele de integrare<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00cenc\u0103rcarea ini\u021bial\u0103 a nomenclatoarelor.<\/strong> Prelua\u021bi paginat produsele, materialele, variantele, liniile de re\u021bet\u0103 \u0219i liniile de opera\u021bii ale produselor, men\u021bin\u00e2nd frecven\u021ba cererilor sub limita admis\u0103. Crea\u021bi centrele de lucru \u00een SkyPlanner pe baza resurselor distincte din liniile de opera\u021bii \u0219i p\u0103stra\u021bi o coresponden\u021b\u0103 1:1 \u00eentre chei. Configura\u021bi \u00een SkyPlanner schimburile, concediile \u0219i orele suplimentare pentru fiecare centru de lucru, deoarece Katana nu are un calendar al resurselor.<\/p>\n\n\n<p><strong>2. Sincronizarea comenzilor.<\/strong> Abona\u021bi-v\u0103 la evenimentele pentru comenzi de produc\u021bie, linii de opera\u021bii, stocuri \u0219i comenzi de achizi\u021bie. La fiecare eveniment, prelua\u021bi obiectul de la adresa href \u0219i actualiza\u021bi opera\u021bia. SkyPlanner consider\u0103 materialul comandat disponibil la data de livrare a comenzii de achizi\u021bie \u0219i actualizeaz\u0103 stocul la recep\u021bia acesteia. O reconciliere \u00een fiecare noapte, cu filtre dup\u0103 data actualiz\u0103rii, identific\u0103 orice eveniment omis.<\/p>\n\n\n<p><strong>3. Transmiterea programului \u00eenapoi \u00een Katana.<\/strong> Dou\u0103 apeluri transfer\u0103 programul \u00een Katana:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>POST <code>\/manufacturing_order_rerank<\/code> &#8220;moves one or more manufacturing orders to an exact place in the production schedule&#8221; (mut\u0103 una sau mai multe comenzi de produc\u021bie \u00eentr-o pozi\u021bie exact\u0103 din programul de produc\u021bie). Accept\u0103 p\u00e2n\u0103 la 250 de comenzi de produc\u021bie deschise per cerere, plasate la \u00eenceput, la sf\u00e2r\u0219it sau \u00eenainte ori dup\u0103 o anumit\u0103 comand\u0103 de produc\u021bie. (<a href=\"https:\/\/developer.katanamrp.com\/reference\/rerankmanufacturingorder\">surs\u0103<\/a>)<\/li>\n\n\n<li>PATCH <code>\/manufacturing_orders\/{id}<\/code> seteaz\u0103 <code>production_deadline_date<\/code>. Katana accept\u0103 aceast\u0103 valoare numai dac\u0103 este dezactivat calculul automat al termenului de finalizare pentru loca\u021bia de produc\u021bie respectiv\u0103. (<a href=\"https:\/\/developer.katanamrp.com\/reference\/updatemanufacturingorder\">surs\u0103<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Reordonarea nu afecteaz\u0103 doar lista. \u00cen Katana, &#8220;higher-priority MOs reserve required materials and subassemblies first&#8221; (comenzile de produc\u021bie cu prioritate mai mare rezerv\u0103 primele materialele \u0219i subansamblurile necesare), astfel \u00eenc\u00e2t ordinea stabilit\u0103 de SkyPlanner decide \u0219i c\u0103rei comenzi de produc\u021bie i se aloc\u0103 stocul \u00een Katana.<\/p>\n\n\n<p><strong>4. Confirm\u0103ri din sec\u021bia de produc\u021bie.<\/strong> Operatorii \u00eenregistreaz\u0103 activitatea prin SkyPlanner Mobile Confirmations, Production Timer sau Quick Log Mode. SkyPlanner scrie starea \u0219i timpul efectiv \u00een linia de opera\u021bie a comenzii de produc\u021bie. Dac\u0103 o fabric\u0103 p\u0103streaz\u0103 \u00een schimb Katana Shop Floor App, SkyPlanner cite\u0219te evenimentele liniilor de opera\u021bii. Alege\u021bi un singur canal de raportare pentru fiecare fabric\u0103.<\/p>\n\n\n<p><strong>5. Responsabilitatea asupra datelor \u0219i regulile de solu\u021bionare a conflictelor.<\/strong> Documenta\u021bi-le \u00eenainte de punerea \u00een func\u021biune:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Date<\/th><th>Sistem responsabil<\/th><\/tr><\/thead><tbody><tr><td>Produse, re\u021bete, opera\u021bii de produc\u021bie, stocuri, achizi\u021bii, comenzi de v\u00e2nzare<\/td><td>Katana<\/td><\/tr><tr><td>Ordinea opera\u021biilor, momentele de \u00eenceput \u0219i de sf\u00e2r\u0219it, centrul de lucru pentru fiecare opera\u021bie<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Pozi\u021bia comenzii de produc\u021bie \u00een fila Schedule \u0219i termenul de finalizare a produc\u021biei<\/td><td>SkyPlanner, cu transmitere \u00een Katana<\/td><\/tr><tr><td>Schimburi, absen\u021be, matricea timpilor de preg\u0103tire, scule, resurse alternative<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Starea opera\u021biei \u0219i timpul \u00eenregistrat<\/td><td>Un singur canal, ales la definirea domeniului<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapele obi\u0219nuite ale proiectului<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementarea se \u00eencheie, de regul\u0103, \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea procesului de configurare ini\u021bial\u0103. \u00cenainte de aceast\u0103 etap\u0103, pute\u021bi folosi perioada de prob\u0103 gratuit\u0103 de 30 de zile cu propriile date dintr-un export CSV din Katana, de exemplu lista Tasks din ecranul Make.<\/p>\n\n\n<p>Proiectul propriu-zis cuprinde:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Abonament \u0219i cheie.<\/strong> Verifica\u021bi dac\u0103 abonamentul Katana include API \u0219i Manufacturing Management \u0219i crea\u021bi cheia API.<\/li>\n\n\n<li><strong>Modul de stabilire a termenelor.<\/strong> Conveni\u021bi dezactivarea termenelor automate pentru loca\u021bia fabricii, astfel \u00eenc\u00e2t SkyPlanner s\u0103 gestioneze termenele de produc\u021bie.<\/li>\n\n\n<li><strong>Mapare.<\/strong> Stabili\u021bi tabelul de coresponden\u021be, cheile resurselor, regulile privind sistemul care gestioneaz\u0103 fiecare tip de date \u0219i canalul de raportare.<\/li>\n\n\n<li><strong>\u00cenc\u0103rcare ini\u021bial\u0103.<\/strong> Produse, variante, re\u021bete, opera\u021bii de produc\u021bie, resurse.<\/li>\n\n\n<li><strong>Sincronizare pe baz\u0103 de evenimente.<\/strong> Webhook-uri pentru comenzi, opera\u021bii, stocuri \u0219i comenzi de achizi\u021bie, plus reconciliere \u00een fiecare noapte.<\/li>\n\n\n<li><strong>Configurarea constr\u00e2ngerilor \u00een SkyPlanner.<\/strong> Schimburi, matricea timpilor de preg\u0103tire, scule, num\u0103r de operatori \u0219i centre de lucru alternative.<\/li>\n\n\n<li><strong>Scrierea datelor \u00eenapoi \u00een Katana.<\/strong> Reordonare \u0219i termene, apoi starea opera\u021biilor \u0219i timpii.<\/li>\n\n\n<li><strong>Testare \u00een paralel \u0219i punere \u00een func\u021biune.<\/strong> Compara\u021bi datele calendaristice din SkyPlanner cu cele din fila Schedule, corecta\u021bi nomenclatoarele, apoi activa\u021bi scrierea datelor \u00eenapoi \u00een Katana.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-katana-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce trebuie s\u0103 ave\u021bi \u00een vedere la integrarea cu Katana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Modul de stabilire a termenelor \u0219terge datele existente.<\/strong> &#8220;Once automatic mode is enabled, all manual deadlines will be overwritten and cannot be restored.&#8221; (Odat\u0103 activat modul automat, toate termenele introduse manual vor fi suprascrise \u0219i nu vor mai putea fi recuperate.) Alege\u021bi modul o singur\u0103 dat\u0103, la \u00eenceputul proiectului.<\/li>\n\n\n<li><strong>Nu exist\u0103 un calendar al resurselor.<\/strong> Nu deduce\u021bi schimburile din valoarea unic\u0103 Weekly throughput. Configura\u021bi-le pentru fiecare centru de lucru \u00een SkyPlanner.<\/li>\n\n\n<li><strong>Resursele apar doar pe r\u00e2ndurile opera\u021biilor.<\/strong> P\u0103stra\u021bi neschimbate denumirile resurselor \u00een Katana, deoarece acestea servesc drept cheie de coresponden\u021b\u0103 cu centrele de lucru din SkyPlanner.<\/li>\n\n\n<li><strong>Unit\u0103\u021bi de timp.<\/strong> <code>planned_time_parameter<\/code> este exprimat \u00een secunde: pe unitate pentru opera\u021biile de tip per-unit \u0219i ca total pentru tipurile process, setup \u0219i fixed. Mapa\u021bi corect tipul; altfel, duratele vor fi eronate cu un factor egal cu cantitatea.<\/li>\n\n\n<li><strong>Grupuri pentru produc\u021bia la comand\u0103.<\/strong> La reordonare, comenzile de fabrica\u021bie (MO) asociate aceleia\u0219i comenzi de v\u00e2nzare r\u0103m\u00e2n \u00eempreun\u0103, a\u0219a c\u0103 stabili\u021bi-le pozi\u021bia \u00een secven\u021b\u0103 ca grup.<\/li>\n\n\n<li><strong>Comportamentul la reordonare s-a schimbat.<\/strong> Din 7 octombrie 2026, endpoint-urile de reordonare plaseaz\u0103 comenzile exact \u00een pozi\u021bia solicitat\u0103. Integr\u0103rile dezvoltate pentru comportamentul anterior trebuie testate din nou. (<a href=\"https:\/\/developer.katanamrp.com\/changelog\/breaking-change-order-rerank-endpoints-place-orders-exactly-where-asked\">surs\u0103<\/a>)<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"the-katana-integration-who-configures-and-suppor\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integrarea cu Katana: cine o configureaz\u0103 \u0219i asigur\u0103 suportul<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Configurarea acoper\u0103 resursele, opera\u021biile de produc\u021bie, fluxul comenzilor \u0219i modul de stabilire a termenelor. Sunt ad\u0103ugate informa\u021biile care lipsesc din Katana: schimburi, matricea timpilor de preg\u0103tire, scule, num\u0103r de operatori \u0219i resurse alternative.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Echipa SkyPlanner configureaz\u0103 integrarea \u00een etapa ini\u021bial\u0103 \u0219i asigur\u0103 suportul dup\u0103 punerea \u00een func\u021biune.<\/strong> Fiecare fabric\u0103 \u00ee\u0219i configureaz\u0103 diferit resursele \u0219i opera\u021biile \u00een Katana, iar aceast\u0103 experien\u021b\u0103 practic\u0103 este pus\u0103 \u00een valoare aici.<\/li>\n\n\n<li><strong>Consultantul Katana sau partenerul dumneavoastr\u0103 de integrare o poate dezvolta.<\/strong> SkyPlanner pune la dispozi\u021bie REST API, documenta\u021bia Swagger\/OpenAPI \u0219i webhook-uri.<\/li>\n\n\n<li><strong>Propriii dezvoltatori pot construi pe aceast\u0103 baz\u0103<\/strong> folosind un token API. Un token API este suficient pentru a \u00eencepe, iar echipa SkyPlanner ofer\u0103 asisten\u021b\u0103 c\u00e2nd este nevoie. Documenta\u021bia produsului, inclusiv informa\u021biile despre comenzile de achizi\u021bie \u0219i API-ul pentru produse \u0219i materiale, este disponibil\u0103 \u00een <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">documenta\u021bia SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse \u0219i facturare lunar\u0103. Primi\u021bi de la \u00eenceput o ofert\u0103 pentru integrare, adaptat\u0103 procesului \u0219i nevoilor dumneavoastr\u0103, \u00eempreun\u0103 cu oferta pentru abonament, astfel \u00eenc\u00e2t s\u0103 cunoa\u0219te\u021bi costul total \u00eenainte de a \u00eencepe. Consulta\u021bi <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a>, <a href=\"\/ro\/functionalitati\/\">func\u021bionalit\u0103\u021bile<\/a> \u0219i compara\u021bia cu programarea disponibil\u0103 \u00een Katana \u00een pagina <a href=\"\/ro\/integrari\/erp\/katana\/cu-capacitate-finita\/\">Programare cu capacitate finit\u0103 pentru Katana<\/a>. G\u0103si\u021bi prezentarea general\u0103 pe <a href=\"\/ro\/integrari\/erp\/katana\/\">pagina Katana<\/a>, iar celelalte sisteme ERP \u00een <a href=\"\/ro\/integrari\/erp\/\">sec\u021biunea de integr\u0103ri ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi proba gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een sec\u021bia de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi opinia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor, \u00een fabrica de medicamente Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui plan optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 sub 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi opinia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Mai pu\u021bine<\/b><span>opriri cauzate de lipsa materialelor<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eValoarea pe care ne-o aduce SkyPlanner este c\u0103 func\u021bioneaz\u0103 \u00een activitatea de zi cu zi, mai ales c\u00e2nd stabilim termenele de livrare.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, manager de planificare a produc\u021biei<\/b><br>Eskomatic \u00b7 Prelucr\u0103ri mecanice \u00een subcontractare<\/p>\n\n\n<p class=\"ind-cust__result\">Programarea automat\u0103 a \u00eenc\u0103rc\u0103rii permite stabilirea unor termene de livrare mai precise, iar opririle de produc\u021bie cauzate de lipsa materialelor s-au redus considerabil.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/eskomatic\/\">Citi\u021bi opinia Eskomatic<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, director general al Mamec, \u00een hala de produc\u021bie a companiei din Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000+<\/b><span>de comenzi de fabrica\u021bie programate automat<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eAvem un alt control asupra produc\u021biei, iar acum \u00een\u021belegem capacitatea la un cu totul alt nivel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, director general<\/b><br>Mamec \u00b7 Mixere industriale, pompe \u0219i produc\u021bie de \u00eenalt\u0103 tehnologie \u00een subcontractare<\/p>\n\n\n<p class=\"ind-cust__result\">Mii de comenzi de fabrica\u021bie sunt programate automat, iar \u00eentreaga organiza\u021bie are o imagine \u00een timp real a produc\u021biei.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/mamec\/\">Citi\u021bi opinia Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Katana are un API \u0219i de ce abonament am nevoie?<\/summary>\n<p class=\"sp-faq__a\">Da. Katana ofer\u0103 un REST API public, v1, cu o specifica\u021bie OpenAPI 3.0. Pagina de pre\u021buri men\u021bioneaz\u0103 accesul la API pentru abonamentele Free \u0219i Advantage. Autentificarea se face cu o cheie API de tip bearer, ob\u021binut\u0103 din Settings &gt; API.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Poate SkyPlanner s\u0103 transmit\u0103 programul de produc\u021bie \u00eenapoi \u00een Katana?<\/summary>\n<p class=\"sp-faq__a\">Da. SkyPlanner reordoneaz\u0103 comenzile de fabrica\u021bie deschise din fila Schedule a Katana conform propriei secven\u021be, prin <code>\/manufacturing_order_rerank<\/code>, \u0219i scrie valoarea <code>production_deadline_date<\/code> pentru fiecare MO. Starea opera\u021biilor \u0219i timpul efectiv sunt \u00eenscrise pe r\u00e2ndurile opera\u021biilor din MO. Programul cu intervale orare pentru fiecare centru de lucru r\u0103m\u00e2ne \u00een SkyPlanner, unde operatorii lucreaz\u0103 pe baza propriei liste de opera\u021bii.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Katana transmite modific\u0103rile \u00een timp real?<\/summary>\n<p class=\"sp-faq__a\">Da. Webhook-urile Katana acoper\u0103 comenzile de fabrica\u021bie, r\u00e2ndurile opera\u021biilor, stocurile, comenzile de achizi\u021bie \u0219i comenzile de v\u00e2nzare. SkyPlanner preia fiecare obiect modificat \u0219i reconciliaz\u0103 datele \u00een fiecare noapte, astfel \u00eenc\u00e2t niciun eveniment ratat nu las\u0103 o opera\u021bie neactualizat\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum devin resursele din Katana centre de lucru \u00een SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Fiecare resurs\u0103 distinct\u0103 de pe r\u00e2ndurile opera\u021biilor din Katana devine un centru de lucru \u00een SkyPlanner, cu o cheie de coresponden\u021b\u0103 1:1. Schimburile, absen\u021bele \u0219i centrele de lucru alternative sunt apoi configurate \u00een SkyPlanner.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de a dezvolta integrarea?<\/summary>\n<p class=\"sp-faq__a\">Da. Perioada de prob\u0103 gratuit\u0103 de 30 de zile permite folosirea a p\u00e2n\u0103 la 20 de centre de lucru, cu import CSV din Katana, f\u0103r\u0103 card de credit. <a href=\"\/ro\/proba\/\">\u00cencepe\u021bi proba gratuit\u0103<\/a> sau <a href=\"\/ro\/contact-vanzari\/\">discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a> pentru definirea domeniului integr\u0103rii.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ Katana Ghid de integrare Katana pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare Katana le arat\u0103 consultan\u021bilor \u0219i echipelor IT cum s\u0103 conecteze Katana Cloud Inventory (Katana MRP) la SkyPlanner APS. SkyPlanner se integreaz\u0103 bidirec\u021bional cu Katana prin interfa\u021ba public\u0103 Katana API: skyplanner.ai \u00b7 Programarea produc\u021biei Echipa SkyPlanner configureaz\u0103 &#8230; <a title=\"Ghid de integrare Katana pentru programarea produc\u021biei cu SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/katana\/ghid-de-integrare\/\" aria-label=\"Read more about Ghid de integrare Katana pentru programarea produc\u021biei cu SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":103015,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103854","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ghid de integrare Katana MRP\u2013APS pentru programarea produc\u021biei<\/title>\n<meta name=\"description\" content=\"Katana\u2013SkyPlanner APS: API v1, chei API, webhookuri, limite de cereri, reordonarea comenzilor de produc\u021bie, maparea datelor \u0219i sfaturi pentru proiect.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/katana\/ghid-de-integrare\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ghid de integrare Katana pentru programarea produc\u021biei cu SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Katana\u2013SkyPlanner APS: API v1, chei API, webhookuri, limite de cereri, reordonarea comenzilor de produc\u021bie, maparea datelor \u0219i sfaturi pentru proiect.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/katana\/ghid-de-integrare\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/katana\\\/ghid-de-integrare\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/katana\\\/ghid-de-integrare\\\/\",\"name\":\"Ghid de integrare Katana MRP\u2013APS pentru programarea produc\u021biei\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Katana\u2013SkyPlanner APS: API v1, chei API, webhookuri, limite de cereri, reordonarea comenzilor de produc\u021bie, maparea datelor \u0219i sfaturi pentru proiect.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/katana\\\/ghid-de-integrare\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/katana\\\/ghid-de-integrare\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/katana\\\/ghid-de-integrare\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru Katana: programarea produc\u021biei cu capacitate finit\u0103\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/katana\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Ghid de integrare Katana pentru programarea produc\u021biei cu SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ghid de integrare Katana MRP\u2013APS pentru programarea produc\u021biei","description":"Katana\u2013SkyPlanner APS: API v1, chei API, webhookuri, limite de cereri, reordonarea comenzilor de produc\u021bie, maparea datelor \u0219i sfaturi pentru proiect.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/katana\/ghid-de-integrare\/","og_locale":"ro_RO","og_type":"article","og_title":"Ghid de integrare Katana pentru programarea produc\u021biei cu SkyPlanner APS","og_description":"Katana\u2013SkyPlanner APS: API v1, chei API, webhookuri, limite de cereri, reordonarea comenzilor de produc\u021bie, maparea datelor \u0219i sfaturi pentru proiect.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/katana\/ghid-de-integrare\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/katana\/ghid-de-integrare\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/katana\/ghid-de-integrare\/","name":"Ghid de integrare Katana MRP\u2013APS pentru programarea produc\u021biei","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Katana\u2013SkyPlanner APS: API v1, chei API, webhookuri, limite de cereri, reordonarea comenzilor de produc\u021bie, maparea datelor \u0219i sfaturi pentru proiect.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/katana\/ghid-de-integrare\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/katana\/ghid-de-integrare\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/katana\/ghid-de-integrare\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru Katana: programarea produc\u021biei cu capacitate finit\u0103","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/katana\/"},{"@type":"ListItem","position":5,"name":"Ghid de integrare Katana pentru programarea produc\u021biei cu SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ Katana Ghid de integrare Katana pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare Katana le arat\u0103 consultan\u021bilor \u0219i echipelor IT cum s\u0103 conecteze Katana Cloud Inventory (Katana MRP) la SkyPlanner APS. SkyPlanner se integreaz\u0103 bidirec\u021bional cu Katana prin interfa\u021ba public\u0103 Katana API: skyplanner.ai \u00b7 Programarea produc\u021biei Echipa SkyPlanner configureaz\u0103&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/103854","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=103854"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/103854\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/103015"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=103854"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}