{"id":103703,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/infor-m3\/cu-capacitate-finita\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"cu-capacitate-finita","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-m3\/cu-capacitate-finita\/","title":{"rendered":"Ofer\u0103 Infor M3 programare cu capacitate finit\u0103? PDS010, Scheduling Workbench \u0219i SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ Infor M3<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Ofer\u0103 Infor M3 programare cu capacitate finit\u0103? <span class=\"hl\">PDS010, Scheduling Workbench \u0219i SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Infor M3 face o planificare aproximativ\u0103 a capacit\u0103\u021bii de produc\u021bie, nu o programare detaliat\u0103 cu capacitate finit\u0103. \u00cen versiunea de baz\u0103, M3 permite setarea capacit\u0103\u021bii fiec\u0103rui centru de lucru ca finit\u0103 sau infinit\u0103 \u0219i planific\u0103 \u00een jurul unui singur blocaj pe flux de opera\u021bii. Secven\u021bierea detaliat\u0103 este asigurat\u0103 de modulul suplimentar M3 Scheduling Workbench. Chiar \u0219i acolo, Infor recomand\u0103 ca, la punerea \u00een func\u021biune, toate resursele s\u0103 aib\u0103 ini\u021bial capacitate infinit\u0103, iar numai blocajul critic s\u0103 fie trecut la capacitate finit\u0103 (<a href=\"https:\/\/docs.infor.com\/m3swb\/2026.x\/en-us\/m3swbolh\/pages\/1096_help.html\">documenta\u021bia Infor<\/a>). Fabricile care vor un program care s\u0103 \u021bin\u0103 cont, la ore precise, de disponibilitatea limitat\u0103 a fiec\u0103rui utilaj, a fiec\u0103rei persoane, scule \u0219i a fiec\u0103rui material, s\u0103 stabileasc\u0103 succesiunea schimb\u0103rilor de fabrica\u021bie, s\u0103 se refac\u0103 automat \u0219i s\u0103 intre \u00een exploatare \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni folosesc SkyPlanner APS al\u0103turi de M3.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Codurile de programe de mai jos provin din documenta\u021bia Infor pentru M3 Business Engine \u0219i M3 CloudSuite.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-infor-m3-plans-capacity-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum planific\u0103 Infor M3 capacitatea de produc\u021bie, pas cu pas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Centrele de lucru \u0219i capacitatea<\/h3>\n\n\n<p>Centrele de lucru se creeaz\u0103 \u00een <strong>Work Center. Open (PDS010)<\/strong>. Capacitatea zilnic\u0103 se gestioneaz\u0103 \u00een <strong>Work Center. Change Capacity (PDS015)<\/strong>, iar timpii de a\u0219teptare \u0219i de transport \u00een <strong>PDS020<\/strong>. Articolele se gestioneaz\u0103 \u00een <strong>Item. Open (MMS001)<\/strong>.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Opera\u021biile fac parte din structura produsului<\/h3>\n\n\n<p>M3 nu are un obiect separat pentru fluxul tehnologic. Antetul structurii de produs se creeaz\u0103 \u00een <strong>PDS001<\/strong>. At\u00e2t materialele, c\u00e2t \u0219i opera\u021biile se asociaz\u0103 \u00een <strong>Product. Connect Materials\/Operations (PDS002)<\/strong>, unde se definesc num\u0103rul opera\u021biei, centrul de lucru, timpul de reglaj \u0219i timpul de execu\u021bie.<\/p>\n\n\n<p>Infor precizeaz\u0103 o regul\u0103 important\u0103 pentru orice sistem de programare: &#8220;Note that the structure must have at least one operation.&#8221; (Re\u021bine\u021bi c\u0103 structura trebuie s\u0103 con\u021bin\u0103 cel pu\u021bin o opera\u021bie.) F\u0103r\u0103 o opera\u021bie, nu se genereaz\u0103 nicio \u00eenc\u0103rcare. (<a href=\"https:\/\/docs.infor.com\/m3udi\/16.x\/en-us\/m3beud\/manexechs\/cps600.html\">documenta\u021bia Infor<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Planificarea materialelor \u0219i a aprovizion\u0103rii<\/h3>\n\n\n<p>Modulele Supply Chain Planning acoper\u0103 Material Planning, Master Production Scheduling, Rough Cut Capacity Planning, DRP \u0219i Global CTP. Ele planific\u0103 materialele \u0219i aprovizionarea. \u00cen privin\u021ba capacit\u0103\u021bii, prezentarea produsului men\u021bioneaz\u0103 planificarea aproximativ\u0103. (<a href=\"https:\/\/docs.infor.com\/m3csfsh\/2026.x\/en-us\/csfshlib\/solution_overview_fashion\/jpo1586931917083.html\">documenta\u021bia Infor<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Ordinele de fabrica\u021bie genereaz\u0103 \u00eenc\u0103rcare<\/h3>\n\n\n<p>&#8220;Load is automatically generated when a manufacturing order or planned manufacturing order is generated or replanned.&#8221; (\u00cenc\u0103rcarea se genereaz\u0103 automat la crearea sau replanificarea unui ordin de fabrica\u021bie ori a unui ordin de fabrica\u021bie planificat.) Tipul de \u00eenc\u0103rcare A sau B se stabile\u0219te pentru tipul de ordin de fabrica\u021bie \u00een <strong>PMS120<\/strong>. Ordinele de fabrica\u021bie se deschid \u00een <strong>PMS100<\/strong>, iar cele planificate \u00een <strong>PMS170<\/strong>.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Setarea capacit\u0103\u021bii finite \u0219i planificarea blocajelor<\/h3>\n\n\n<p>Capacitatea finit\u0103 este controlat\u0103 prin dou\u0103 set\u0103ri:<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Setare<\/th><th>Program<\/th><th>Rol<\/th><\/tr><\/thead><tbody><tr><td>Capacitate infinit\u0103\/finit\u0103<\/td><td>Work Center. Open (PDS010)<\/td><td>Stabile\u0219te &#8220;whether overload can be created for the operation&#8221; (dac\u0103 se poate genera o supra\u00eenc\u0103rcare pentru opera\u021bie) la calcularea orelor de \u00eenceput \u0219i de sf\u00e2r\u0219it<\/td><\/tr><tr><td>Planificarea blocajelor<\/td><td>Settings &#8211; Capacity Planning (CRS786)<\/td><td>Planific\u0103 toate necesit\u0103\u021bile \u00een jurul unei singure opera\u021bii; \u00een sistem \u00eempins dac\u0103 aceasta este prima din flux, \u00een sistem tras dac\u0103 este ultima<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>La introducerea ordinului, o simulare calculeaz\u0103 datele de \u00eenceput \u0219i de finalizare pentru \u00eentregul ordin de fabrica\u021bie. Limita este explicit\u0103: &#8220;Only one operation in a flow of operations can be set as bottleneck planned.&#8221; (Doar o singur\u0103 opera\u021bie dintr-un flux poate fi setat\u0103 pentru planificare ca blocaj.) (<a href=\"https:\/\/docs.infor.com\/m3udi\/16.x\/en-us\/m3beud\/manexechs\/crs786.html\">documenta\u021bia Infor<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Vizualizarea \u00eenc\u0103rc\u0103rii \u0219i echilibrarea manual\u0103<\/h3>\n\n\n<p>Planificatorii urm\u0103resc \u00eenc\u0103rcarea \u00een <strong>Load. Display Totals (CPS100)<\/strong>, <strong>Detailed (CPS105)<\/strong>, <strong>per Product (CPS110)<\/strong>, <strong>Over &amp; Under (CPS120)<\/strong> \u0219i <strong>Gantt Chart for MOs (CPS130)<\/strong>, precum \u0219i \u00een <strong>Work Center Schedule (PMS230)<\/strong>. Echilibrarea se face manual. Infor descrie echilibrarea \u00eenc\u0103rc\u0103rii drept &#8220;an ongoing way of working more or less all the time.&#8221; (un mod de lucru continuu, practicat aproape permanent.)<\/p>\n\n\n<h3 class=\"wp-block-heading\">7. Modulele suplimentare de planificare Infor<\/h3>\n\n\n<p><strong>M3 Capacity Planning Workbench<\/strong> afi\u0219eaz\u0103 un tabel \u0219i un grafic al centrelor de lucru cu &#8220;their current capacity and load situation in M3 ERP,&#8221; (situa\u021bia actual\u0103 a capacit\u0103\u021bii \u0219i a \u00eenc\u0103rc\u0103rii lor \u00een M3 ERP), folosind culori pentru a indica suprautilizarea \u0219i subutilizarea. Este un instrument de vizualizare \u0219i de identificare a abaterilor. (<a href=\"https:\/\/docs.infor.com\/m3csfsh\/2026.x\/en-us\/csfshlib\/solution_overview_fashion\/yps1694163159688.html\">documenta\u021bia Infor<\/a>)<\/p>\n\n\n<p><strong>M3 Scheduling Workbench (SWB)<\/strong> este instrumentul Infor pentru programare cu capacitate finit\u0103 \u00een M3. Infor \u00eel descrie ca &#8220;a powerful decision support tool for production planning and the scheduling of manufacturing orders.&#8221; (un instrument puternic de sprijin decizional pentru planificarea produc\u021biei \u0219i programarea ordinelor de fabrica\u021bie.) Tot Infor precizeaz\u0103: &#8220;It takes into consideration finite capacity constraints and material flow from raw materials to finished products.&#8221; (Ia \u00een considerare constr\u00e2ngerile de capacitate finit\u0103 \u0219i fluxul de materiale, de la materii prime la produse finite.) Ofer\u0103 gestionarea blocajelor pe baza teoriei constr\u00e2ngerilor, optimizarea secven\u021bei pe baz\u0103 de reguli \u0219i un Interactive Scheduling Board. (<a href=\"https:\/\/docs.infor.com\/m3csfsh\/2026.x\/en-us\/csfshlib\/solution_overview_fashion\/lko1518614227567.html\">documenta\u021bia Infor<\/a>)<\/p>\n\n\n<p><strong>M3 Planning Workbench (PWB)<\/strong> este o aplica\u021bie desktop pentru decizii pe termen mediu privind capacitatea \u0219i subcontractarea. Macro Orders reduc num\u0103rul de ordine folosite \u00een simulare. (<a href=\"https:\/\/docs.infor.com\/m3pwb\/2026.x\/en-us\/m3pwbolh\/svr1587368598875.html\">documenta\u021bia Infor<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce r\u0103m\u00e2ne \u00een sarcina planificatorului<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Capacitatea finit\u0103 se seteaz\u0103 pentru fiecare centru de lucru.<\/strong> Versiunea de baz\u0103 M3 stabile\u0219te dac\u0103 este permis\u0103 supra\u00eenc\u0103rcarea. Nu coreleaz\u0103 secven\u021bele de lucru ale mai multor resurse.<\/li>\n\n\n<li><strong>Un singur blocaj pe flux.<\/strong> Dup\u0103 cum precizeaz\u0103 Infor, &#8220;all requirements planning will occur around this operation.&#8221; (\u00eentreaga planificare a necesit\u0103\u021bilor se va face \u00een jurul acestei opera\u021bii.)<\/li>\n\n\n<li><strong>Echilibrarea r\u0103m\u00e2ne manual\u0103.<\/strong> Vizualiz\u0103rile \u00eenc\u0103rc\u0103rii arat\u0103 supra\u00eenc\u0103rcarea \u0219i sub\u00eenc\u0103rcarea, iar planificatorul mut\u0103 opera\u021biile.<\/li>\n\n\n<li><strong>Corectitudinea \u00eenc\u0103rc\u0103rii depinde de raportare.<\/strong> Infor: &#8220;it is important that every operation is reported.&#8221; (este important ca fiecare opera\u021bie s\u0103 fie raportat\u0103.) Dac\u0103 lipsesc raport\u0103ri, \u00eenc\u0103rcarea veche r\u0103m\u00e2ne \u00een eviden\u021b\u0103.<\/li>\n\n\n<li><strong>SWB este un modul suplimentar.<\/strong> \u00cen Food and Beverage CloudSuite, Infor \u00eel include la &#8220;core plus add-ons are recommended,&#8221; (se recomand\u0103 func\u021bionalit\u0103\u021bile de baz\u0103 plus module suplimentare), al\u0103turi de Factory Track \u0219i alte module suplimentare. (<a href=\"https:\/\/docs.infor.com\/m3csfab\/latest\/en-us\/csfablib\/solution_overview_food-beverage\/nyj1693564666315.html\">documenta\u021bia Infor<\/a>)<\/li>\n\n\n<li><strong>SWB ruleaz\u0103 ca aplica\u021bie separat\u0103.<\/strong> Utilizatorii o pornesc din RDWeb cu un ID de utilizator RDWeb individual sau din meniul Start, iar ION API \u0219i M3 BE trebuie configurate pentru SWB. (<a href=\"https:\/\/docs.infor.com\/m3swb\/2026.x\/en-us\/m3swbolh\/bxo1633498608635.html\">documenta\u021bia Infor<\/a>, <a href=\"https:\/\/docs.infor.com\/m3swb\/2026.x\/en-us\/m3swbolh\/wsu1633500923509.html\">documenta\u021bia Infor<\/a>)<\/li>\n\n\n<li><strong>SWB porne\u0219te cu planificare axat\u0103 pe blocaje.<\/strong> Pentru punerea \u00een func\u021biune, Infor recomand\u0103 urm\u0103toarele: &#8220;start all resources with infinite capacity,&#8221; (porni\u021bi cu capacitate infinit\u0103 pentru toate resursele), trece\u021bi doar blocajul critic la capacitate finit\u0103 \u0219i &#8220;Focus only on the critical bottlenecks before going live.&#8221; (Concentra\u021bi-v\u0103 doar asupra blocajelor critice \u00eenainte de punerea \u00een func\u021biune.) Toate celelalte resurse r\u0103m\u00e2n cu capacitate infinit\u0103. (<a href=\"https:\/\/docs.infor.com\/m3swb\/2026.x\/en-us\/m3swbolh\/pages\/1096_help.html\">documenta\u021bia Infor<\/a>)<\/li>\n\n\n<li><strong>Ordinele din PWB sunt temporare.<\/strong> &#8220;The order number in M3 PWB is temporary until a new order number is inserted by the central system.&#8221; (Num\u0103rul ordinului din M3 PWB este temporar p\u00e2n\u0103 c\u00e2nd sistemul central introduce un num\u0103r nou.) (<a href=\"https:\/\/docs.infor.com\/m3pwb\/2026.x\/en-us\/m3pwbolh\/pfa1568180108821.html\">documenta\u021bia Infor<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>\u00cen versiunea de baz\u0103 M3, dar \u0219i \u00een SWB pus \u00een func\u021biune conform recomand\u0103rilor Infor, doar blocajul este programat cu capacitate finit\u0103, iar pentru fiecare alt centru de lucru se calculeaz\u0103 o valoare aproximativ\u0103 a \u00eenc\u0103rc\u0103rii. Planificatorii p\u0103streaz\u0103 secven\u021ba real\u0103 \u00een foi de calcul, \u00een paralel cu M3.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-infor-m3-s-own-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">C\u00e2nd este suficient\u0103 planificarea oferit\u0103 de Infor M3<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>PDS010 \u0219i CRS786 sunt suficiente atunci c\u00e2nd:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Fiecare flux de produs are un singur blocaj clar, iar restul fabricii are capacitate disponibil\u0103.<\/li>\n\n\n<li>Structurile de produs sunt stabile \u0219i fiecare opera\u021bie este raportat\u0103 la timp.<\/li>\n\n\n<li>Planificatorii echilibreaz\u0103 \u00eenc\u0103rcarea s\u0103pt\u0103m\u00e2nal \u00een CPS120 \u0219i CPS130, iar acest ritm este suficient de rapid.<\/li>\n\n\n<li>Aprovizionarea cu materiale este principala problem\u0103, astfel c\u0103 MRP \u0219i MPS conteaz\u0103 mai mult dec\u00e2t succesiunea opera\u021biilor pe utilaje.<\/li>\n\n\n<li>Schimb\u0103rile de fabrica\u021bie, sculele partajate \u0219i disponibilitatea operatorilor nu determin\u0103 ce intr\u0103 \u00een lucru \u00een continuare.<\/li>\n\n<\/ul>\n\n\n<p>SWB se potrive\u0219te fabricilor care au o echip\u0103 dedicat\u0103 de planificare, accept\u0103 un proiect de implementare a unui modul suplimentar cu Infor sau cu un partener \u0219i introduc treptat modelul cu capacitate finit\u0103.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">C\u00e2nd ave\u021bi nevoie de un instrument de programare cu capacitate finit\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Versiunea de baz\u0103 M3 nu mai este suficient\u0103 c\u00e2nd v\u0103 reg\u0103si\u021bi \u00een mai multe dintre situa\u021biile urm\u0103toare:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Blocajele se mut\u0103 odat\u0103 cu schimbarea mixului de produse, deci modelul cu un singur blocaj pe flux nu este potrivit.<\/li>\n\n\n<li>Termenele de livrare sunt dep\u0103\u0219ite, de\u0219i CPS100 arat\u0103 o \u00eenc\u0103rcare echilibrat\u0103 pe perioade.<\/li>\n\n\n<li>Durata schimb\u0103rii de fabrica\u021bie depinde de produsul executat anterior.<\/li>\n\n\n<li>Matri\u021bele, \u0219tan\u021bele sau dispozitivele de fixare sunt partajate \u00eentre centrele de lucru.<\/li>\n\n\n<li>Personalul \u0219i schimburile limiteaz\u0103 programul la fel de mult ca utilajele, iar unele opera\u021bii necesit\u0103 mai mul\u021bi operatori.<\/li>\n\n\n<li>Comenzile urgente \u0219i defec\u021biunile impun refacerea programului \u00een timpul schimbului.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Ce s\u0103 urm\u0103ri\u021bi<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Un singur motor care trateaz\u0103 simultan toate resursele ca finite<\/strong>: utilaje, personal, scule \u0219i materiale.<\/li>\n\n\n<li><strong>O matrice a timpilor de preg\u0103tire<\/strong> cu durate de schimbare a fabrica\u021biei care depind de succesiunea produselor, \u00een ambele sensuri.<\/li>\n\n\n<li><strong>Scule modelate ca resurse partajate cu capacitate finit\u0103<\/strong> \u0219i <strong>opera\u021bii cu mai mul\u021bi operatori<\/strong>.<\/li>\n\n\n<li><strong>Centre de lucru alternative \u0219i personal de \u00eenlocuire<\/strong> pe care motorul chiar s\u0103 se poat\u0103 baza la programare.<\/li>\n\n\n<li><strong>Programare care \u021bine cont de materiale<\/strong>, pe baza stocurilor \u0219i a livr\u0103rilor viitoare aferente comenzilor de achizi\u021bie.<\/li>\n\n\n<li><strong>Refacerea automat\u0103 a programului<\/strong> c\u00e2nd se modific\u0103 progresul produc\u021biei sau comenzile.<\/li>\n\n\n<li><strong>Stabili\u021bi clar ce sistem gestioneaz\u0103 datele opera\u021biilor: M3 sau sistemul de programare.<\/strong> Programa\u021bi ordine de fabrica\u021bie ferme, nu ordine planificate pe care MRP le regenereaz\u0103, \u0219i stabili\u021bi care sistem gestioneaz\u0103 datele opera\u021biilor.<\/li>\n\n\n<li><strong>Raportarea opera\u021biilor \u00eenapoi \u00een M3<\/strong> prin PMS070MI, astfel \u00eenc\u00e2t \u00eenc\u0103rcarea din M3 s\u0103 r\u0103m\u00e2n\u0103 corect\u0103.<\/li>\n\n<\/ul>\n\n\n<p>Op\u021biunile se \u00eempart \u00een patru categorii:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Planificarea capacit\u0103\u021bii de produc\u021bie din M3<\/strong> acoper\u0103 un singur blocaj pe flux, direct \u00een M3.<\/li>\n\n\n<li><strong>Modulele suplimentare Infor<\/strong>, SWB \u0219i PWB, le ofer\u0103 planificatorilor secven\u021biere cu capacitate finit\u0103, cu matrice ale timpilor de reglaj \u0219i optimizare bazat\u0103 pe reguli, precum \u0219i simulare pe termen mediu.<\/li>\n\n\n<li><strong>Suitele APS pentru companii mari<\/strong> se conecteaz\u0103 printr-un proiect de implementare \u0219i necesit\u0103 o echip\u0103 central\u0103 de planificare.<\/li>\n\n\n<li><strong>Solu\u021biile APS \u00een cloud cu func\u021bii de execu\u021bie \u00een atelier<\/strong>, categorie din care face parte SkyPlanner, programeaz\u0103 automat fiecare resurs\u0103 al\u0103turi de M3 \u0219i pun programul de produc\u021bie la dispozi\u021bia operatorilor.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Unde se \u00eencadreaz\u0103 SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS programeaz\u0103 fiecare centru de lucru, persoan\u0103, scul\u0103 \u0219i material \u021bin\u00e2nd cont de capacitatea finit\u0103, \u00eentr-un singur motor de calcul. Motorul Arcturus AI genereaz\u0103 \u00een c\u00e2teva secunde programul la nivel de opera\u021bie \u0219i stabile\u0219te succesiunea \u00een func\u021bie de prioritatea opera\u021biei, data de finalizare, prioritatea clientului, Fast Track \u0219i Dynamic Priorities. Nimeni nu mai reechilibreaz\u0103 manual CPS120.<\/p>\n\n\n<p>Matricea timpilor de reglaj con\u021bine timpii de schimbare de fabrica\u021bie \u00eentre produse, \u00een ambele sensuri, iar motorul alege succesiunea cu cel mai mic timp de reglaj. Sculele sunt resurse partajate cu capacitate finit\u0103, iar o opera\u021bie poate necesita mai mul\u021bi operatori. C\u00e2nd resursa principal\u0103 nu este disponibil\u0103, motorul transfer\u0103 lucr\u0103rile c\u0103tre centre de lucru sau persoane alternative.<\/p>\n\n\n<p>Programarea \u00een func\u021bie de materiale simuleaz\u0103 stocul viitor pe baza stocului existent \u0219i a livr\u0103rilor viitoare aferente comenzilor de achizi\u021bie. Materialul comandat este considerat disponibil la data livr\u0103rii, astfel \u00eenc\u00e2t un ordin de fabrica\u021bie \u00eencepe doar c\u00e2nd materialul este disponibil.<\/p>\n\n\n<p>Autopilot reprogrameaz\u0103 automat c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie, respect\u00e2nd bloc\u0103rile \u0219i priorit\u0103\u021bile stabilite de dumneavoastr\u0103, iar Running Time Lock men\u021bine pe pozi\u021bie opera\u021biile \u00eencepute. Operatorii \u00eenregistreaz\u0103 lucr\u0103rile prin Mobile Confirmations \u0219i Production Timer, iar raport\u0103rile sunt trimise \u00eenapoi \u00een M3 prin PMS070MI.<\/p>\n\n\n<p><strong>Alege\u021bi SkyPlanner \u00een loc de M3 Scheduling Workbench atunci c\u00e2nd:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Dori\u021bi programare cu capacitate finit\u0103 real\u0103, nu un plan estimativ.<\/strong> Pentru punerea \u00een func\u021biune a SWB, Infor recomand\u0103 capacitate infinit\u0103 pentru toate resursele, cu excep\u021bia blocajului critic. \u00cenc\u0103 de la primul program, SkyPlanner planific\u0103 fiecare utilaj, persoan\u0103, scul\u0103 \u0219i material cu capacitate finit\u0103, la ore precise, pe \u00eentregul orizont de planificare.<\/li>\n\n\n<li><strong>Dori\u021bi un program de produc\u021bie func\u021bional \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni.<\/strong> SWB este o aplica\u021bie pe care utilizatorii o pornesc din RDWeb, fiecare cu propriul ID de utilizator RDWeb, sau din meniul Start. Mai \u00eent\u00e2i trebuie configurate ION API \u0219i M3 BE (<a href=\"https:\/\/docs.infor.com\/m3swb\/2026.x\/en-us\/m3swbolh\/bxo1633498608635.html\">documenta\u021bia Infor<\/a>). SkyPlanner ruleaz\u0103 \u00een browser, se testeaz\u0103 pe propriile ordine de fabrica\u021bie \u00een perioada de prob\u0103 \u0219i intr\u0103 \u00een exploatare \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea procesului de implementare.<\/li>\n\n\n<li><strong>Planul trebuie s\u0103 se actualizeze singur.<\/strong> Autopilot replanific\u0103 automat la fiecare schimbare semnificativ\u0103 \u0219i ia \u00een calcul, \u00een aceea\u0219i rulare, matricea timpilor de reglaj, opera\u021biile cu mai mul\u021bi operatori, centrele de lucru alternative \u0219i sosirea materialelor comandate.<\/li>\n\n\n<li><strong>Operatorii trebuie s\u0103 lucreze dup\u0103 acela\u0219i program.<\/strong> Prin Mobile Confirmations, fiecare operator vede lista actualizat\u0103 de opera\u021bii pe telefon sau tablet\u0103. Num\u0103rul de utilizatori este nelimitat, iar raport\u0103rile sunt trimise \u00eenapoi \u00een M3 prin PMS070MI.<\/li>\n\n<\/ul>\n\n\n<p>\u00cencepe\u021bi cu un export CSV sau Excel din M3 \u00een <a href=\"\/ro\/proba\/\">perioada de prob\u0103 gratuit\u0103 de 30 de zile<\/a>, cu p\u00e2n\u0103 la 20 de centre de lucru, f\u0103r\u0103 card de credit. Pre\u021bul porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse \u0219i facturare lunar\u0103. Oferta pentru integrare este stabilit\u0103 de la \u00eenceput, \u00een func\u021bie de procesele \u0219i nevoile dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul.<\/p>\n\n\n<p>Vede\u021bi cum se conecteaz\u0103 sistemele pe pagina <a href=\"\/ro\/integrari\/erp\/infor-m3\/\">SkyPlanner pentru Infor M3<\/a> sau consulta\u021bi <a href=\"\/ro\/integrari\/erp\/infor-m3\/ghid-de-integrare\/\">ghidul de integrare cu Infor M3<\/a>. Alte sisteme ERP sunt prezentate \u00een <a href=\"\/ro\/integrari\/erp\/\">sec\u021biunea de integr\u0103ri ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi proba gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een hala de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i echipamente de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi p\u0103rerea UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021ba produc\u021biei<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba produc\u021biei a crescut cu 90%, iar generarea unui plan optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi p\u0103rerea Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, director general al Mamec, \u00een hala de produc\u021bie a companiei din Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Peste 1.000<\/b><span> de ordine de fabrica\u021bie programate automat<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eAvem un alt nivel de control asupra produc\u021biei \u0219i \u00een\u021belegem capacitatea de produc\u021bie la un nivel cu totul diferit.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, director general<\/b><br>Mamec \u00b7 Mixere industriale, pompe \u0219i produc\u021bie de \u00eenalt\u0103 tehnologie la comand\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Mii de ordine de fabrica\u021bie sunt programate automat, iar \u00eentreaga organiza\u021bie are o imagine \u00een timp real asupra produc\u021biei.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/mamec\/\">Citi\u021bi p\u0103rerea Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Vedere aerian\u0103 a fabricii Piristeel de sisteme de siguran\u021b\u0103 pentru acoperi\u0219uri din Kauhava\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>respectarea termenelor de livrare<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ne-a oferit vizibilitatea necesar\u0103 pentru a identifica blocajele \u0219i a adus claritate \u00een gestionarea produc\u021biei.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, director de produc\u021bie<\/b><br>Piristeel \u00b7 Sisteme de siguran\u021b\u0103 pentru acoperi\u0219uri \u0219i sisteme de colectare a apelor pluviale<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a ajuns la 99,2% anul acesta, iar programarea economise\u0219te p\u00e2n\u0103 la patru ore de lucru pe zi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/piristeel\/\">Citi\u021bi p\u0103rerea Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Infor M3 are un instrument de programare a produc\u021biei?<\/summary>\n<p class=\"sp-faq__a\">Da. Func\u021bionalitatea de baz\u0103 M3 calculeaz\u0103 datele opera\u021biilor pe baza capacit\u0103\u021bii centrelor de lucru \u0219i poate planifica un singur blocaj pe flux \u00een CRS786. M3 Scheduling Workbench este un modul suplimentar care adaug\u0103 secven\u021bierea ordinelor de fabrica\u021bie cu capacitate finit\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Care este diferen\u021ba dintre M3 Scheduling Workbench \u0219i Planning Workbench?<\/summary>\n<p class=\"sp-faq__a\">Scheduling Workbench stabile\u0219te succesiunea ordinelor de fabrica\u021bie \u00een func\u021bie de capacitatea finit\u0103 \u0219i de fluxul de materiale. Planning Workbench este o aplica\u021bie desktop pentru decizii privind capacitatea \u0219i subcontractarea pe termen mediu, iar ordinele sale r\u0103m\u00e2n temporare p\u00e2n\u0103 c\u00e2nd M3 le atribuie numere.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M3 Scheduling Workbench este inclus \u00een M3 CloudSuite?<\/summary>\n<p class=\"sp-faq__a\">\u00cen Food and Beverage CloudSuite, Infor \u00eel prezint\u0103 ca modul suplimentar recomandat, nu ca aplica\u021bie de baz\u0103. Verifica\u021bi cu Infor sau cu partenerul dumneavoastr\u0103 ce include abonamentul CloudSuite.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>S\u0103 folosim M3 Scheduling Workbench sau SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, dac\u0103 dori\u021bi un program real cu capacitate finit\u0103, nu un plan estimativ. La punerea \u00een func\u021biune a SWB, Infor recomand\u0103 pornirea cu capacitate infinit\u0103 pentru toate resursele \u0219i limitarea capacit\u0103\u021bii doar pentru blocajul critic. SWB este un modul suplimentar care ruleaz\u0103 ca aplica\u021bie separat\u0103 prin RDWeb. SkyPlanner programeaz\u0103 fiecare utilaj, persoan\u0103, scul\u0103 \u0219i material cu capacitate finit\u0103, la ore precise, \u021bin\u00e2nd cont de timpii de schimbare de fabrica\u021bie \u00een fiecare sens, de opera\u021biile cu mai mul\u021bi operatori \u0219i de centrele de lucru alternative. Autopilot replanific\u0103 la fiecare schimbare semnificativ\u0103, iar solu\u021bia intr\u0103 \u00een exploatare \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni, de la 199 \u20ac pe lun\u0103, cu o perioad\u0103 de prob\u0103 de 30 de zile pe propriile date.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M3 MRP programeaz\u0103 produc\u021bia \u021bin\u00e2nd cont de capacitatea finit\u0103?<\/summary>\n<p class=\"sp-faq__a\">M3 MRP \u0219i MPS planific\u0103 materialele \u0219i aprovizionarea, iar prezentarea general\u0103 a planific\u0103rii de la Infor men\u021bioneaz\u0103 planificarea estimativ\u0103 a capacit\u0103\u021bii de produc\u021bie. Indicatorul de capacitate finit\u0103 din PDS010 intervine ulterior, c\u00e2nd se calculeaz\u0103 momentele de \u00eenceput \u0219i de sf\u00e2r\u0219it ale opera\u021biilor pentru un ordin.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Pot testa SkyPlanner \u00eenainte de a-l integra cu Infor M3?<\/summary>\n<p class=\"sp-faq__a\">Da. Exporta\u021bi articolele, centrele de lucru \u0219i ordinele de fabrica\u021bie deschise din M3, importa\u021bi-le \u00een format CSV sau Excel \u00een perioada de prob\u0103 de 30 de zile \u0219i compara\u021bi programul cu planul actual. Consulta\u021bi <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a>, <a href=\"\/ro\/proba\/\">\u00eencepe\u021bi perioada de prob\u0103<\/a> sau <a href=\"\/ro\/contact-vanzari\/\">discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ Infor M3 Ofer\u0103 Infor M3 programare cu capacitate finit\u0103? PDS010, Scheduling Workbench \u0219i SkyPlanner APS Infor M3 face o planificare aproximativ\u0103 a capacit\u0103\u021bii de produc\u021bie, nu o programare detaliat\u0103 cu capacitate finit\u0103. \u00cen versiunea de baz\u0103, M3 permite setarea capacit\u0103\u021bii fiec\u0103rui centru de lucru ca finit\u0103 sau infinit\u0103 \u0219i planific\u0103 \u00een &#8230; <a title=\"Ofer\u0103 Infor M3 programare cu capacitate finit\u0103? PDS010, Scheduling Workbench \u0219i SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-m3\/cu-capacitate-finita\/\" aria-label=\"Read more about Ofer\u0103 Infor M3 programare cu capacitate finit\u0103? PDS010, Scheduling Workbench \u0219i SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102957,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103703","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Infor M3: programare cu capacitate finit\u0103? Rolul SWB<\/title>\n<meta name=\"description\" content=\"Infor M3: capacitate finit\u0103 pe centru, un blocaj pe flux. Ce fac PDS010, CRS786 \u0219i Scheduling Workbench \u0219i care sunt limitele lor.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-m3\/cu-capacitate-finita\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ofer\u0103 Infor M3 programare cu capacitate finit\u0103? PDS010, Scheduling Workbench \u0219i SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Infor M3: capacitate finit\u0103 pe centru, un blocaj pe flux. Ce fac PDS010, CRS786 \u0219i Scheduling Workbench \u0219i care sunt limitele lor.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-m3\/cu-capacitate-finita\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/infor-m3\\\/cu-capacitate-finita\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/infor-m3\\\/cu-capacitate-finita\\\/\",\"name\":\"Infor M3: programare cu capacitate finit\u0103? Rolul SWB\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Infor M3: capacitate finit\u0103 pe centru, un blocaj pe flux. Ce fac PDS010, CRS786 \u0219i Scheduling Workbench \u0219i care sunt limitele lor.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/infor-m3\\\/cu-capacitate-finita\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/infor-m3\\\/cu-capacitate-finita\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/infor-m3\\\/cu-capacitate-finita\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru Infor M3: programarea produc\u021biei cu capacitate finit\u0103\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/infor-m3\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Ofer\u0103 Infor M3 programare cu capacitate finit\u0103? PDS010, Scheduling Workbench \u0219i SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Infor M3: programare cu capacitate finit\u0103? Rolul SWB","description":"Infor M3: capacitate finit\u0103 pe centru, un blocaj pe flux. Ce fac PDS010, CRS786 \u0219i Scheduling Workbench \u0219i care sunt limitele lor.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-m3\/cu-capacitate-finita\/","og_locale":"ro_RO","og_type":"article","og_title":"Ofer\u0103 Infor M3 programare cu capacitate finit\u0103? PDS010, Scheduling Workbench \u0219i SkyPlanner APS","og_description":"Infor M3: capacitate finit\u0103 pe centru, un blocaj pe flux. Ce fac PDS010, CRS786 \u0219i Scheduling Workbench \u0219i care sunt limitele lor.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-m3\/cu-capacitate-finita\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-m3\/cu-capacitate-finita\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-m3\/cu-capacitate-finita\/","name":"Infor M3: programare cu capacitate finit\u0103? Rolul SWB","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Infor M3: capacitate finit\u0103 pe centru, un blocaj pe flux. Ce fac PDS010, CRS786 \u0219i Scheduling Workbench \u0219i care sunt limitele lor.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-m3\/cu-capacitate-finita\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-m3\/cu-capacitate-finita\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-m3\/cu-capacitate-finita\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru Infor M3: programarea produc\u021biei cu capacitate finit\u0103","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-m3\/"},{"@type":"ListItem","position":5,"name":"Ofer\u0103 Infor M3 programare cu capacitate finit\u0103? PDS010, Scheduling Workbench \u0219i SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ Infor M3 Ofer\u0103 Infor M3 programare cu capacitate finit\u0103? PDS010, Scheduling Workbench \u0219i SkyPlanner APS Infor M3 face o planificare aproximativ\u0103 a capacit\u0103\u021bii de produc\u021bie, nu o programare detaliat\u0103 cu capacitate finit\u0103. \u00cen versiunea de baz\u0103, M3 permite setarea capacit\u0103\u021bii fiec\u0103rui centru de lucru ca finit\u0103 sau infinit\u0103 \u0219i planific\u0103 \u00een&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/103703","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=103703"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/103703\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/102957"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=103703"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}