{"id":103673,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/infor-ln\/ghid-de-integrare\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"ghid-de-integrare","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-ln\/ghid-de-integrare\/","title":{"rendered":"Ghid de integrare Infor LN pentru programarea produc\u021biei cu SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ Infor LN<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Ghid de integrare Infor LN <span class=\"hl\">pentru programarea produc\u021biei cu SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Acest ghid de integrare Infor LN le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze Infor LN la SkyPlanner APS. Integrarea dintre SkyPlanner \u0219i Infor LN este bidirec\u021bional\u0103:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u00cen SkyPlanner sunt preluate comenzile de produc\u021bie, opera\u021biile din fluxurile tehnologice, centrele de lucru, utilajele, articolele, stocurile \u0219i comenzile de achizi\u021bie.<\/li>\n\n\n<li>Datele planificate de \u00eenceput \u0219i de sf\u00e2r\u0219it pentru fiecare opera\u021bie sunt retrimise \u00een comenzile de produc\u021bie din LN.<\/li>\n\n\n<li>Pontajele operatorilor sunt retrimise ca ore de func\u021bionare a utilajelor, ore de manoper\u0103 \u0219i cantit\u0103\u021bi realizate.<\/li>\n\n\n<li>Webhook-urile SkyPlanner transmit modific\u0103rile programului pe m\u0103sur\u0103 ce apar.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 LN \u00een etapa de implementare ini\u021bial\u0103 \u0219i asigur\u0103 suportul dup\u0103 punerea \u00een func\u021biune. Partenerii \u0219i dezvoltatorii pot participa sau pot realiza singuri integrarea folosind REST API documentat al SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"cloud-or-on-premises-what-shapes-every-ln-integr\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00cen cloud sau local: ce determin\u0103 modul de integrare cu LN<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>LN are dou\u0103 ramuri de versiuni, fiecare cu un mod diferit de conectare. SkyPlanner ruleaz\u0103 \u00een cloud \u00een ambele cazuri, deci nu se instaleaz\u0103 nimic \u00een LN.<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>LN \u00een cloud (2022.x p\u00e2n\u0103 la 2026.x, CloudSuites)<\/th><th>LN 10.x instalat local<\/th><\/tr><\/thead><tbody><tr><td>Interfa\u021ba principal\u0103<\/td><td>LN REST API (grupul de servicii LN\/lnapi) prin ION API Gateway<\/td><td>ION cu documente BOD<\/td><\/tr><tr><td>Autentificare<\/td><td>OAuth 2.0, date de autentificare <code>.ionapi<\/code> pentru serviciul backend<\/td><td>Puncte de conectare ION<\/td><\/tr><tr><td>Semnalarea modific\u0103rilor<\/td><td>Documente BOD publicate \u00een ION sau interogare periodic\u0103<\/td><td>Documente BOD publicate \u00een ION<\/td><\/tr><tr><td>Extragere \u00een mas\u0103 a datelor<\/td><td>ION Data Lake sau exporturi<\/td><td>Scheme de schimb, vizualiz\u0103ri ale bazei de date sau exporturi din sesiuni<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"ln-interfaces-for-scheduling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Interfe\u021be LN pentru programarea produc\u021biei<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. LN REST API.<\/strong> Infor public\u0103 serviciile LN \u00een ION API Gateway: &#8220;You can review the available documentation for the public services that are part of LN API.&#8221; (Pute\u021bi consulta documenta\u021bia disponibil\u0103 pentru serviciile publice care fac parte din LN API.) Pentru programarea produc\u021biei, serviciul esen\u021bial este <code>tiapi.sfcProductionOrder<\/code>. Acesta acoper\u0103 comenzile de produc\u021bie \u0219i opera\u021biile pe utilaje, cu ac\u021biunile Get Machine Operations, Register machine quantities, Register machine hours \u0219i Finish Machine Operations. Alte servicii <code>tiapi<\/code> \u0219i <code>tcapi<\/code> sunt listate \u00een gateway pentru fiecare tenant.<\/p>\n\n\n<p>Pentru fiecare serviciu trebuie s\u0103 ave\u021bi drept de utilizare, iar serviciul trebuie activat. Infor precizeaz\u0103 c\u0103 &#8220;Try it out&#8221; (\u00cencerca\u021bi) &#8220;only works if you are entitled for the service and the service has been activated.&#8221; (func\u021bioneaz\u0103 doar dac\u0103 ave\u021bi drept de utilizare a serviciului \u0219i acesta a fost activat.) Include\u021bi aceast\u0103 verificare \u00een lista de control a proiectului din prima zi.<\/p>\n\n\n<p><strong>2. ION BODs.<\/strong> &#8220;Business object documents (BODs) are XML messages used to exchange data between enterprises or enterprise applications.&#8221; (Documentele BOD sunt mesaje XML folosite pentru schimbul de date \u00eentre companii sau aplica\u021bii de \u00eentreprindere.) LN le trimite c\u0103tre Infor ION, care le direc\u021bioneaz\u0103 c\u0103tre abona\u021bi. <code>Process.ItemMaster<\/code> \u0219i <code>Process.BillOfMaterials<\/code> sunt men\u021bionate \u00een documenta\u021bia LN 10.8, care descrie \u0219i integrarea prin BOD cu LN instalat local. Lista complet\u0103 de documente BOD pentru versiunea dumneavoastr\u0103 se afl\u0103 \u00een tenant.<\/p>\n\n\n<p><strong>3. Exporturi de fi\u0219iere.<\/strong> LN instalat local poate exporta tabele prin scheme de schimb sau vizualiz\u0103ri ale bazei de date. Aceast\u0103 variant\u0103 este potrivit\u0103 pentru \u00eenc\u0103rcarea ini\u021bial\u0103 \u0219i pentru fabricile care prefer\u0103 un schimb periodic de fi\u0219iere.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"authentication\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentificare<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Pentru LN \u00een cloud, folosi\u021bi ION API Gateway cu OAuth 2.0:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Crea\u021bi o aplica\u021bie autorizat\u0103 ION API de tip <strong>Backend Service<\/strong> \u0219i desc\u0103rca\u021bi fi\u0219ierul <code>.ionapi<\/code> al acesteia.<\/li>\n\n\n<li>Fi\u0219ierul con\u021bine identificatorul clientului (<code>ci<\/code>), secretul clientului (<code>cs<\/code>), adresa URL a gateway-ului (<code>iu<\/code>), serverul de autentificare (<code>pu<\/code>), calea pentru token (<code>ot<\/code>) \u0219i tenantul (<code>ti<\/code>).<\/li>\n\n\n<li>Solicita\u021bi tokenuri folosind fluxul client credentials. Apelurile se execut\u0103 cu un cont de serviciu.<\/li>\n\n\n<li>Acorda\u021bi contului de serviciu doar rolurile LN necesare integr\u0103rii.<\/li>\n\n<\/ul>\n\n\n<p>\u00cen SkyPlanner, REST API folose\u0219te un token API pentru autentificare (SkyPlanner Settings &gt; API) \u0219i este documentat \u00een Swagger\/OpenAPI. <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">Tutorialul de integrare<\/a> v\u0103 ghideaz\u0103 prin primele apeluri. Un token API este suficient pentru a \u00eencepe.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"events-webhooks-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Evenimente, webhookuri \u0219i interogare periodic\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>LN public\u0103 documente BOD \u00een Infor ION la apari\u021bia unor evenimente de business, iar ION le direc\u021bioneaz\u0103 c\u0103tre abona\u021bi. Un abonat sincronizeaz\u0103 articolul sau comanda modificat\u0103. Dac\u0103 nu exist\u0103 un BOD potrivit, integrarea interogheaz\u0103 periodic serviciile LN REST, cu filtrare pentru comenzile deschise.<\/p>\n\n\n<p>SkyPlanner trimite webhookuri c\u00e2nd se modific\u0103 starea sau programul de produc\u021bie, astfel \u00eenc\u00e2t retrimiterea datelor se face pe baz\u0103 de evenimente.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Maparea datelor<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Obiect Infor LN (sesiune sau serviciu)<\/th><th>Obiect SkyPlanner<\/th><th>Direc\u021bie<\/th><th>Frecven\u021b\u0103<\/th><\/tr><\/thead><tbody><tr><td>Items &#8211; General (tcibd0501m000), Items &#8211; Planning (cprpd1100m000), <code>Process.ItemMaster<\/code><\/td><td>Produse \u0219i materiale<\/td><td>LN \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td>Bill of Material (tibom1110m000), liste de materiale pentru produc\u021bie, leg\u0103turi \u00eentre materiale \u0219i fluxuri tehnologice, <code>Process.BillOfMaterials<\/code><\/td><td>Structura produsului, subproduse, materiale pentru fiecare opera\u021bie<\/td><td>LN \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td>Routing Operations (tirou1102m000), Tasks (tirou0103m000)<\/td><td>Etape de proces cu timpi de preg\u0103tire \u0219i de execu\u021bie<\/td><td>LN \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td>Work Centers (tirou0101m000), Machines (tirou0102m000)<\/td><td>Centre de lucru, grupuri de centre de lucru, eficien\u021be<\/td><td>LN \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi rar<\/td><\/tr><tr><td>Calendare, Working Time Schedule (tcppl1100m000)<\/td><td>Schimburi \u0219i timp de lucru<\/td><td>LN \u2192 SkyPlanner<\/td><td>Zilnic sau schimburi gestionate \u00een SkyPlanner<\/td><\/tr><tr><td>Production Orders (tisfc0501m000), opera\u021bii pe utilaje (<code>tiapi.sfcProductionOrder<\/code>)<\/td><td>Comenzi \u0219i opera\u021bii cu termene \u0219i necesar de materiale<\/td><td>LN \u2192 SkyPlanner<\/td><td>La un eveniment BOD sau prin interogare la intervale de c\u00e2teva minute<\/td><\/tr><tr><td>Stoc existent<\/td><td>Solduri de stoc<\/td><td>LN \u2192 SkyPlanner<\/td><td>La fiecare or\u0103 sau \u00eenainte de fiecare generare a programului de produc\u021bie<\/td><\/tr><tr><td>Pozi\u021bii ale comenzilor de achizi\u021bie cu date de recep\u021bie estimate<\/td><td>Materiale de recep\u021bionat; stocul se actualizeaz\u0103 c\u00e2nd comanda de achizi\u021bie este marcat\u0103 cu starea Delivered<\/td><td>LN \u2192 SkyPlanner<\/td><td>La fiecare or\u0103 sau \u00eenainte de fiecare generare a programului de produc\u021bie<\/td><\/tr><tr><td>Opera\u021biile comenzilor de produc\u021bie: \u00eenceput \u0219i sf\u00e2r\u0219it planificate, utilaj<\/td><td>Opera\u021bii programate<\/td><td>SkyPlanner \u2192 LN<\/td><td>La modificarea programului, printr-un webhook SkyPlanner<\/td><\/tr><tr><td>Register machine hours and quantities, Finish Machine Operations; Production Order Hours (bptmm1120m000), Report Operations Completed (tisfc0130m000)<\/td><td>Pontaje, cantit\u0103\u021bi, opera\u021bii finalizate<\/td><td>SkyPlanner \u2192 LN<\/td><td>La fiecare confirmare sau pe schimb<\/td><\/tr><tr><td>Nu exist\u0103 \u00een LN<\/td><td>Matricea timpilor de preg\u0103tire, scule ca resurse cu capacitate finit\u0103, num\u0103r de operatori, centre de lucru alternative<\/td><td>Gestionate \u00een SkyPlanner<\/td><td>Configurate \u00een etapa de implementare ini\u021bial\u0103<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Modele de integrare<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00cenc\u0103rcarea ini\u021bial\u0103 a nomenclatoarelor.<\/strong> \u00cenc\u0103rca\u021bi articolele, listele de materiale, opera\u021biile din fluxurile tehnologice, sarcinile, centrele de lucru, utilajele \u0219i calendarele. Stabili\u021bi cum se mapeaz\u0103 \u00een SkyPlanner nivelurile de centru de lucru \u0219i de utilaj din LN: un centru de lucru cu patru utilaje poate deveni un grup de centre de lucru cu patru centre de lucru.<\/p>\n\n\n<p><strong>2. Sincronizarea comenzilor.<\/strong> Prelua\u021bi comenzile de produc\u021bie cu opera\u021biile \u0219i pozi\u021biile lor de materiale, \u00eempreun\u0103 cu stocurile \u0219i pozi\u021biile deschise ale comenzilor de achizi\u021bie. SkyPlanner consider\u0103 materialele comandate disponibile la data de livrare a comenzii de achizi\u021bie, astfel c\u0103 programarea \u021bine cont at\u00e2t de stoc, c\u00e2t \u0219i de aprovizion\u0103rile viitoare.<\/p>\n\n\n<p><strong>3. Retrimiterea programului de produc\u021bie.<\/strong> Pentru fiecare opera\u021bie programat\u0103 sau mutat\u0103 de motorul de programare, SkyPlanner actualizeaz\u0103 opera\u021bia corespunz\u0103toare a comenzii de produc\u021bie din LN cu \u00eenceputul \u0219i sf\u00e2r\u0219itul planificate \u0219i cu utilajul alocat. Cantit\u0103\u021bile, starea \u0219i calculul costurilor r\u0103m\u00e2n gestionate \u00een LN.<\/p>\n\n\n<p><strong>4. Confirm\u0103ri din produc\u021bie.<\/strong> Operatorii \u00ee\u0219i \u00eenregistreaz\u0103 activitatea cu Mobile Confirmations, Production Timer sau Quick Log Mode. Pontajele men\u021bin programul de produc\u021bie actualizat \u0219i sunt retrimise \u00een LN ca ore de func\u021bionare a utilajelor, cantit\u0103\u021bi \u0219i opera\u021bii finalizate. Alege\u021bi un singur canal de \u00eenregistrare, SkyPlanner sau sesiunile LN, pentru ca orele s\u0103 nu fie niciodat\u0103 \u00eenregistrate de dou\u0103 ori.<\/p>\n\n\n<p><strong>5. Responsabilitatea asupra datelor \u0219i regulile de rezolvare a conflictelor.<\/strong> Stabili\u021bi-le de comun acord \u00eenainte de punerea \u00een func\u021biune:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Date<\/th><th>Sistem responsabil<\/th><\/tr><\/thead><tbody><tr><td>Articole, liste de materiale, fluxuri tehnologice, cantit\u0103\u021bile \u0219i starea comenzilor, stocuri, \u00eenregistr\u0103ri<\/td><td>Infor LN<\/td><\/tr><tr><td>Succesiunea opera\u021biilor, \u00eenceputul \u0219i sf\u00e2r\u0219itul planificate, alocarea utilajelor<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matricea timpilor de preg\u0103tire, scule, num\u0103r de operatori, centre de lucru alternative<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Schimburi \u0219i absen\u021be<\/td><td>Un singur sistem, ales la definirea domeniului<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>6. Utilizarea \u00een paralel cu instrumentele de planificare Infor.<\/strong> Enterprise Planning continu\u0103 s\u0103 propun\u0103 aprovizionarea, iar SkyPlanner programeaz\u0103 comenzile de produc\u021bie \u00een func\u021bie de capacitatea real\u0103. \u00cen versiunile LN 2026, setarea <strong>External Planner<\/strong> permite acest lucru: &#8220;The organization can integrate an external planning solution with Infor LN.&#8221; (Organiza\u021bia poate integra o solu\u021bie extern\u0103 de planificare cu Infor LN.) Dac\u0103 Scheduler+ este activ, stabili\u021bi mai \u00eent\u00e2i ce sistem controleaz\u0103 datele calendaristice: acesta adaug\u0103 starea Scheduled \u0219i impune programarea \u00eenainte de lansare.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapele obi\u0219nuite ale proiectului<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementarea se finalizeaz\u0103 de obicei \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea configur\u0103rii ini\u021biale. \u00cenainte de aceasta, pute\u021bi folosi perioada de testare gratuit\u0103 de 30 de zile cu propriile date. Exporta\u021bi din sesiunile LN \u00een Excel centrele de lucru, utilajele, opera\u021biile din fluxurile tehnologice \u0219i comenzile de produc\u021bie deschise, apoi importa\u021bi-le \u0219i valida\u021bi programul de produc\u021bie.<\/p>\n\n\n<p>Proiectul propriu-zis cuprinde:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Definirea domeniului.<\/strong> Familia de versiuni, metoda de conectare, tabelul de coresponden\u021be, regulile privind sistemul responsabil pentru fiecare tip de date \u0219i canalul de \u00eenregistrare.<\/li>\n\n\n<li><strong>Acces.<\/strong> Acorda\u021bi drepturile de utilizare \u0219i activa\u021bi serviciile LN REST, crea\u021bi serviciul backend <code>.ionapi<\/code> \u0219i contul de serviciu sau configura\u021bi abonamentele BOD \u00een ION. \u00cencepe\u021bi cu instan\u021ba sandbox.<\/li>\n\n\n<li><strong>\u00cenc\u0103rcarea ini\u021bial\u0103.<\/strong> Articole, liste de materiale, opera\u021bii din fluxurile tehnologice, centre de lucru, utilaje \u0219i calendare.<\/li>\n\n\n<li><strong>Sincronizarea comenzilor.<\/strong> Comenzi de produc\u021bie, stocuri \u0219i pozi\u021bii ale comenzilor de achizi\u021bie, prin evenimente BOD sau interog\u0103ri periodice.<\/li>\n\n\n<li><strong>Configurarea constr\u00e2ngerilor \u00een SkyPlanner.<\/strong> Matricea timpilor de preg\u0103tire, sculele, num\u0103rul de operatori \u0219i centrele de lucru alternative.<\/li>\n\n\n<li><strong>Retrimiterea datelor \u00een LN.<\/strong> Datele planificate ale opera\u021biilor, apoi orele \u0219i cantit\u0103\u021bile.<\/li>\n\n\n<li><strong>Rularea \u00een paralel.<\/strong> Rula\u021bi SkyPlanner \u00een paralel cu planul actual, compara\u021bi datele calendaristice \u0219i corecta\u021bi nomenclatoarele.<\/li>\n\n\n<li><strong>Punerea \u00een produc\u021bie.<\/strong> Activa\u021bi retrimiterea datelor \u00een LN dup\u0103 ce datele corespund.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-to-plan-for-in-an-infor-ln-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce trebuie s\u0103 ave\u021bi \u00een vedere la integrarea cu Infor LN<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Documenta\u021bie pentru alt\u0103 versiune.<\/strong> LN 10.x difer\u0103 de versiunile cloud anuale. Planner+ \u0219i Scheduler+ sunt documentate doar \u00een seturile de documenta\u021bie pentru 2026, iar Job Shop Scheduler este disponibil \u00eencep\u00e2nd cu 10.8. Verifica\u021bi dac\u0103 fiecare pagin\u0103 se aplic\u0103 versiunii dumneavoastr\u0103.<\/li>\n\n\n<li><strong>Alt produs Infor.<\/strong> Infor LN nu este CloudSuite Industrial (SyteLine) sau M3. Documentele BOD \u0219i interfe\u021bele API difer\u0103, a\u0219a c\u0103 folosi\u021bi doar documenta\u021bia LN.<\/li>\n\n\n<li><strong>Serviciu neactivat.<\/strong> Apelurile LN REST e\u0219ueaz\u0103 p\u00e2n\u0103 c\u00e2nd se acord\u0103 dreptul de utilizare a serviciului \u0219i acesta este activat \u00een instan\u021b\u0103.<\/li>\n\n\n<li><strong>Filtre pentru enumer\u0103ri.<\/strong> OrderStatus este o enumerare, deci un <code>$filter<\/code> OData pentru stare necesit\u0103 sintaxa specific\u0103 enumer\u0103rilor, dup\u0103 cum semnaleaz\u0103 utilizatorii din comunitatea Infor.<\/li>\n\n\n<li><strong>Lead time sau flux tehnologic.<\/strong> Operations Horizon din Items &#8211; Planning stabile\u0219te dac\u0103 comenzile planificate folosesc datele fluxului tehnologic sau o valoare fix\u0103 Order Lead Time. Prelua\u021bi duratele din opera\u021biile fluxului tehnologic, nu din valorile lead time ale comenzilor.<\/li>\n\n\n<li><strong>Sesiunile pentru centre de lucru.<\/strong> C\u00e2nd Job Shop by Site este activ, LN folose\u0219te sesiunea Work Center (tirou0601m000) \u00een loc de Work Centers (tirou0101m000). Defini\u021bi coresponden\u021bele pe baza sesiunii utilizate de compania dumneavoastr\u0103.<\/li>\n\n\n<li><strong>Ore de utilaj \u0219i ore de manoper\u0103.<\/strong> \u00cen Production Order Hours, c\u00e2mpul Employee este gol pentru orele de utilaj. Asocia\u021bi timpii de utilaj \u0219i timpii operatorilor din SkyPlanner cu pozi\u021biile corespunz\u0103toare.<\/li>\n\n\n<li><strong>Calendare pe unit\u0103\u021bi ale \u00eentreprinderii.<\/strong> \u00cenc\u0103rca\u021bi calendarul unit\u0103\u021bii de care apar\u021bine fiecare centru de lucru, nu un singur calendar pentru \u00eentreaga fabric\u0103.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"who-configures-the-infor-ln-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cine configureaz\u0103 integrarea cu Infor LN<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Echipa SkyPlanner o configureaz\u0103 \u00een etapa ini\u021bial\u0103 \u0219i asigur\u0103 suport dup\u0103 punerea \u00een produc\u021bie.<\/strong> Fiecare fabric\u0103 folose\u0219te LN diferit: unit\u0103\u021bi de planificare, structuri ale centrelor de lucru, flux de lansare \u0219i practici de \u00eenregistrare. Expertiza este esen\u021bial\u0103 pentru a defini coresponden\u021bele dintre acestea.<\/li>\n\n\n<li><strong>Partenerul dumneavoastr\u0103 Infor LN poate participa.<\/strong> Acesta cunoa\u0219te instan\u021ba, drepturile de utilizare \u0219i configura\u021bia ION \u0219i poate prelua responsabilitatea pentru partea LN, \u00een timp ce SkyPlanner furnizeaz\u0103 REST API, documenta\u021bia Swagger\/OpenAPI \u0219i webhook-urile.<\/li>\n\n\n<li><strong>Dezvoltatorii dumneavoastr\u0103 pot realiza integrarea<\/strong> folosind acela\u0219i REST API documentat \u0219i un token API. Un token API este suficient pentru a \u00eencepe, iar echipa SkyPlanner v\u0103 ajut\u0103 c\u00e2nd este nevoie. Documenta\u021bia produsului este public\u0103 \u0219i disponibil\u0103 \u00een <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">documenta\u021bia SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse \u0219i facturare lunar\u0103. Primi\u021bi \u00een avans o ofert\u0103 pentru integrare, adaptat\u0103 procesului \u0219i nevoilor dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul, astfel \u00eenc\u00e2t s\u0103 cunoa\u0219te\u021bi costul total \u00eenainte de a \u00eencepe. Compara\u021bi cu planificarea oferit\u0103 de LN \u00een pagina <a href=\"\/ro\/integrari\/erp\/infor-ln\/cu-capacitate-finita\/\">Programare cu capacitate finit\u0103 \u00een Infor LN<\/a>, consulta\u021bi prezentarea de pe <a href=\"\/ro\/integrari\/erp\/infor-ln\/\">pagina Infor LN<\/a> \u0219i descoperi\u021bi alte sisteme \u00een <a href=\"\/ro\/integrari\/erp\/\">sec\u021biunea de integr\u0103ri ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een hala de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite s\u0103pt\u0103m\u00e2nal<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi p\u0103rerea UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui plan optimizat pe trei luni pentru toate centrele de lucru dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi p\u0103rerea Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Vedere aerian\u0103 a fabricii Piristeel de sisteme de siguran\u021b\u0103 pentru acoperi\u0219uri din Kauhava\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>respectarea termenelor de livrare<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ne-a oferit vizibilitatea necesar\u0103 pentru a identifica blocajele \u0219i a adus claritate \u00een gestionarea produc\u021biei.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, director de produc\u021bie<\/b><br>Piristeel \u00b7 Sisteme de siguran\u021b\u0103 pentru acoperi\u0219uri \u0219i sisteme pluviale<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a ajuns la 99,2% anul acesta, iar programarea produc\u021biei economise\u0219te p\u00e2n\u0103 la patru ore de lucru pe zi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/piristeel\/\">Citi\u021bi p\u0103rerea Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Mai pu\u021bine<\/b><span>opriri din lips\u0103 de materiale<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eValoarea pe care ne-o aduce SkyPlanner este c\u0103 func\u021bioneaz\u0103 \u00een activitatea de zi cu zi, mai ales la stabilirea termenelor de livrare.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, manager de planificare a produc\u021biei<\/b><br>Eskomatic \u00b7 Prelucr\u0103ri mecanice la comand\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Programarea automat\u0103 a \u00eenc\u0103rc\u0103rii resurselor ofer\u0103 termene de livrare mai precise, iar opririle de produc\u021bie cauzate de lipsa materialelor s-au redus considerabil.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/eskomatic\/\">Citi\u021bi p\u0103rerea Eskomatic<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum se conecteaz\u0103 un sistem APS la Infor LN?<\/summary>\n<p class=\"sp-faq__a\">Pentru LN \u00een cloud, prin LN REST API din ION API Gateway, cu OAuth 2.0, plus documente ION BOD ca evenimente de modificare. Pentru LN 10.x instalat local, prin ION BOD sau exporturi de fi\u0219iere. SkyPlanner se integreaz\u0103 bidirec\u021bional cu Infor LN \u00een ambele variante.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ce API LN gestioneaz\u0103 comenzile de produc\u021bie?<\/summary>\n<p class=\"sp-faq__a\">Serviciul <code>tiapi.sfcProductionOrder<\/code> din LN REST API. Acesta cite\u0219te comenzile de produc\u021bie \u0219i opera\u021biile pe utilaje \u0219i \u00eenregistreaz\u0103 orele de utilaj, cantit\u0103\u021bile \u0219i opera\u021biile finalizate. Celelalte servicii sunt listate pentru fiecare instan\u021b\u0103 \u00een ION API Gateway.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cine realizeaz\u0103 integrarea cu Infor LN?<\/summary>\n<p class=\"sp-faq__a\">Echipa SkyPlanner configureaz\u0103 integrarea bidirec\u021bional\u0103 \u00een func\u021bie de configura\u021bia LN \u00een etapa ini\u021bial\u0103 \u0219i asigur\u0103 suport dup\u0103 punerea \u00een produc\u021bie. Partenerul dumneavoastr\u0103 Infor LN sau propriii dezvoltatori pot realiza, de asemenea, integrarea folosind REST API documentat al SkyPlanner. Un token API este suficient pentru a \u00eencepe.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Avem nevoie de Scheduler+ sau Planner+ pentru a folosi SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Nu. SkyPlanner programeaz\u0103 comenzile de produc\u021bie LN cu propriul motor, indiferent de versiunea LN. \u00cen versiunile LN 2026, setarea External Planner este metoda documentat\u0103 pentru a utiliza o solu\u021bie extern\u0103 de planificare \u00een paralel cu LN.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>De ce s\u0103 conect\u0103m SkyPlanner \u00een loc s\u0103 implement\u0103m Scheduler+?<\/summary>\n<p class=\"sp-faq__a\">Scheduler+ este un modul suplimentar care &#8220;may require a commercial component&#8221; (poate necesita o component\u0103 comercial\u0103) (<a href=\"https:\/\/docs.infor.com\/ln\/2026.10\/en-us\/lnolh\/plschug\/plom005.html\">surs\u0103<\/a>), documentat \u00eencep\u00e2nd cu versiunile LN 2026. Planificatorul \u00eencarc\u0103 programul de produc\u021bie, ruleaz\u0103 programarea \u0219i apoi accept\u0103 rezultatul (<a href=\"https:\/\/docs.infor.com\/lncs\/2026.x\/en-us\/lncslib\/lncspov\/ijr1757604049666.html\">surs\u0103<\/a>). SkyPlanner se conecteaz\u0103 la versiunea LN pe care o folosi\u021bi ast\u0103zi \u0219i devine opera\u021bional \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea configur\u0103rii ini\u021biale, iar Autopilot reprogrameaz\u0103 automat la fiecare schimbare semnificativ\u0103. Echipa SkyPlanner configureaz\u0103 integrarea bidirec\u021bional\u0103 \u0219i asigur\u0103 suport, iar partenerul dumneavoastr\u0103 LN poate prelua responsabilitatea pentru partea LN.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de a realiza integrarea?<\/summary>\n<p class=\"sp-faq__a\">Da. Perioada de testare gratuit\u0103 de 30 de zile permite utilizarea a p\u00e2n\u0103 la 20 de centre de lucru cu exporturi CSV sau Excel din LN, f\u0103r\u0103 card de credit. <a href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea<\/a> sau <a href=\"\/ro\/contact-vanzari\/\">discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a> pentru definirea domeniului integr\u0103rii.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ Infor LN Ghid de integrare Infor LN pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare Infor LN le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze Infor LN la SkyPlanner APS. Integrarea dintre SkyPlanner \u0219i Infor LN este bidirec\u021bional\u0103: skyplanner.ai \u00b7 Programarea produc\u021biei Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie &#8230; <a title=\"Ghid de integrare Infor LN pentru programarea produc\u021biei cu SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-ln\/ghid-de-integrare\/\" aria-label=\"Read more about Ghid de integrare Infor LN pentru programarea produc\u021biei cu SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102928,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103673","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integrare Infor LN cu APS: ghid pentru programarea produc\u021biei<\/title>\n<meta name=\"description\" content=\"Infor LN\u2013SkyPlanner APS: LN REST API prin ION API Gateway, OAuth 2.0, ION BODs, mapare comenzi de produc\u021bie, program retrimis \u0219i recomand\u0103ri de proiect.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-ln\/ghid-de-integrare\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ghid de integrare Infor LN pentru programarea produc\u021biei cu SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Infor LN\u2013SkyPlanner APS: LN REST API prin ION API Gateway, OAuth 2.0, ION BODs, mapare comenzi de produc\u021bie, program retrimis \u0219i recomand\u0103ri de proiect.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-ln\/ghid-de-integrare\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/infor-ln\\\/ghid-de-integrare\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/infor-ln\\\/ghid-de-integrare\\\/\",\"name\":\"Integrare Infor LN cu APS: ghid pentru programarea produc\u021biei\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Infor LN\u2013SkyPlanner APS: LN REST API prin ION API Gateway, OAuth 2.0, ION BODs, mapare comenzi de produc\u021bie, program retrimis \u0219i recomand\u0103ri de proiect.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/infor-ln\\\/ghid-de-integrare\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/infor-ln\\\/ghid-de-integrare\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/infor-ln\\\/ghid-de-integrare\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru Infor LN: programarea produc\u021biei cu capacitate finit\u0103\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/infor-ln\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Ghid de integrare Infor LN pentru programarea produc\u021biei cu SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integrare Infor LN cu APS: ghid pentru programarea produc\u021biei","description":"Infor LN\u2013SkyPlanner APS: LN REST API prin ION API Gateway, OAuth 2.0, ION BODs, mapare comenzi de produc\u021bie, program retrimis \u0219i recomand\u0103ri de proiect.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-ln\/ghid-de-integrare\/","og_locale":"ro_RO","og_type":"article","og_title":"Ghid de integrare Infor LN pentru programarea produc\u021biei cu SkyPlanner APS","og_description":"Infor LN\u2013SkyPlanner APS: LN REST API prin ION API Gateway, OAuth 2.0, ION BODs, mapare comenzi de produc\u021bie, program retrimis \u0219i recomand\u0103ri de proiect.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-ln\/ghid-de-integrare\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-ln\/ghid-de-integrare\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-ln\/ghid-de-integrare\/","name":"Integrare Infor LN cu APS: ghid pentru programarea produc\u021biei","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Infor LN\u2013SkyPlanner APS: LN REST API prin ION API Gateway, OAuth 2.0, ION BODs, mapare comenzi de produc\u021bie, program retrimis \u0219i recomand\u0103ri de proiect.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-ln\/ghid-de-integrare\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-ln\/ghid-de-integrare\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-ln\/ghid-de-integrare\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru Infor LN: programarea produc\u021biei cu capacitate finit\u0103","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-ln\/"},{"@type":"ListItem","position":5,"name":"Ghid de integrare Infor LN pentru programarea produc\u021biei cu SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ Infor LN Ghid de integrare Infor LN pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare Infor LN le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze Infor LN la SkyPlanner APS. Integrarea dintre SkyPlanner \u0219i Infor LN este bidirec\u021bional\u0103: skyplanner.ai \u00b7 Programarea produc\u021biei Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/103673","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=103673"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/103673\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/102928"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=103673"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}