{"id":103492,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/dynamics-365-scm\/ghid-de-integrare\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"ghid-de-integrare","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/dynamics-365-scm\/ghid-de-integrare\/","title":{"rendered":"Ghid de integrare Dynamics 365 Supply Chain Management pentru programarea produc\u021biei cu SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ Microsoft Dynamics 365 Supply Chain Management<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Ghid de integrare Dynamics 365 Supply Chain Management <span class=\"hl\">pentru programarea produc\u021biei cu SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Acest ghid de integrare Dynamics 365 Supply Chain Management le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze Microsoft Dynamics 365 Supply Chain Management la SkyPlanner APS. Integrarea dintre SkyPlanner \u0219i Dynamics 365 Supply Chain Management este bidirec\u021bional\u0103 \u0219i folose\u0219te entit\u0103\u021bile de date standard ale acestuia:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u00cen SkyPlanner sunt importate comenzile de produc\u021bie, opera\u021biile \u0219i sarcinile din rutele tehnologice, liniile BOM, resursele, calendarele, produsele lansate, stocul existent \u0219i liniile comenzilor de achizi\u021bie.<\/li>\n\n\n<li>Momentele de \u00eenceput \u0219i de sf\u00e2r\u0219it programate \u0219i resursa aleas\u0103 sunt transmise c\u0103tre SCM pentru actualizarea comenzii de produc\u021bie \u0219i a opera\u021biilor din ruta sa tehnologic\u0103.<\/li>\n\n\n<li>Orele lucrate de operatori \u0219i cantit\u0103\u021bile sunt transmise \u00eenapoi prin jurnalul fi\u0219elor de rut\u0103.<\/li>\n\n\n<li>Webhook-urile SkyPlanner transmit modific\u0103rile programului pe m\u0103sur\u0103 ce apar.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u00cen etapa de implementare, echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 Supply Chain Management \u0219i ofer\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een func\u021biune. Acest ghid se adreseaz\u0103 partenerilor \u0219i dezvoltatorilor care vor s\u0103 participe la proiect sau s\u0103 dezvolte singuri solu\u021bii folosind REST API documentat al SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"dynamics-365-scm-integration-options\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Op\u021biuni de integrare Dynamics 365 SCM<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Supply Chain Management pune datele la dispozi\u021bie prin <strong>entit\u0103\u021bi de date<\/strong>. Pentru programarea produc\u021biei sunt relevante patru op\u021biuni:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Endpoint REST OData v4.<\/strong> <code>[Your organization's root URL]\/data<\/code> expune toate entit\u0103\u021bile de date marcate IsPublic \u0219i permite crearea, citirea, actualizarea \u0219i \u0219tergerea acestora. Sunt acceptate <code>$filter<\/code>, <code>$count<\/code>, <code>$orderby<\/code>, <code>$skip<\/code>, <code>$top<\/code>, <code>$select<\/code> \u0219i <code>$expand<\/code> la primul nivel. Paginarea este controlat\u0103 de server, cu maximum 10.000 de \u00eenregistr\u0103ri, iar cererile \u00een lot pot grupa scrierile \u00een seturi de modific\u0103ri. OData func\u021bioneaz\u0103 sincron. (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/fin-ops-core\/dev-itpro\/data-entities\/odata\">surs\u0103<\/a>)<\/li>\n\n\n<li><strong>API pentru date \u00een lot.<\/strong> Data management package REST API \u0219i integr\u0103rile recurente transfer\u0103 asincron volume mari de date. Microsoft precizeaz\u0103: &#8220;If the volume is more than a few hundred thousand records, use the batch data API.&#8221; (Dac\u0103 volumul dep\u0103\u0219e\u0219te c\u00e2teva sute de mii de \u00eenregistr\u0103ri, folosi\u021bi API-ul pentru date \u00een lot.) Acest API este acceptat \u0219i \u00een instal\u0103rile locale. (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/fin-ops-core\/dev-itpro\/data-entities\/integration-overview\">surs\u0103<\/a>)<\/li>\n\n\n<li><strong>Evenimente de afaceri.<\/strong> Aplica\u021biile Finance and operations public\u0103 evenimente de afaceri c\u0103tre Azure Service Bus, Event Grid, endpointuri HTTPS sau Power Automate. (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/fin-ops-core\/dev-itpro\/business-events\/home-page\">surs\u0103<\/a>)<\/li>\n\n\n<li><strong>Servicii personalizate \u0219i ac\u021biuni OData.<\/strong> Serviciile personalizate X++ \u0219i ac\u021biunile OData asociate entit\u0103\u021bilor execut\u0103 logica de afaceri la cerere.<\/li>\n\n<\/ol>\n\n\n<p>Integrarea SkyPlanner folose\u0219te endpointul OData pentru transferurile zilnice \u0219i API-ul pentru date \u00een lot atunci c\u00e2nd \u00eenc\u0103rcarea ini\u021bial\u0103 are un volum mare. Nu se instaleaz\u0103 nimic \u00een Supply Chain Management.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentificare<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u00cenregistra\u021bi o aplica\u021bie \u00een <strong>Microsoft Entra ID<\/strong> (service principal). \u00cen Supply Chain Management, asocia\u021bi aplica\u021bia cu un utilizator care are rolurile de securitate necesare integr\u0103rii. Integrarea cite\u0219te date despre produc\u021bie, resurse \u0219i stocuri \u0219i scrie datele de programare ale comenzilor de produc\u021bie \u0219i jurnalele. Tokenurile sunt solicitate de la Entra ID folosind acredit\u0103rile clientului.<\/p>\n\n\n<p>Dou\u0103 reguli stabilesc ce date poate vedea integrarea:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Entit\u0103\u021bi juridice.<\/strong> OData returneaz\u0103 datele companiei implicite, cu excep\u021bia cazului \u00een care cererea include <code>?cross-company=true<\/code>. Unit\u0103\u021bile de produc\u021bie cu mai multe loca\u021bii filtreaz\u0103 dup\u0103 <code>dataAreaId<\/code>.<\/li>\n\n\n<li><strong>Denumiri publice.<\/strong> Denumirile entit\u0103\u021bilor de mai jos sunt cele folosite la gestionarea datelor. Denumirile publice ale colec\u021biilor OData pot fi diferite, a\u0219a c\u0103 prelua\u021bi-le din <code>\/data\/$metadata<\/code> al mediului dumneavoastr\u0103.<\/li>\n\n<\/ul>\n\n\n<p>\u00cen SkyPlanner, autentificarea la REST API se face cu un token API (SkyPlanner Settings &gt; API), iar documenta\u021bia este \u00een format Swagger\/OpenAPI. <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">Tutorialul de integrare<\/a> explic\u0103 pas cu pas cum s\u0103 efectua\u021bi primele apeluri.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Maparea datelor<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Entitate D365 SCM<\/th><th>Obiect SkyPlanner<\/th><th>Direc\u021bie<\/th><th>Frecven\u021b\u0103<\/th><\/tr><\/thead><tbody><tr><td>Produse lansate (ItemNumber)<\/td><td>Produse \u0219i materiale<\/td><td>SCM \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi doar modific\u0103rile<\/td><\/tr><tr><td>Linii BOM de produc\u021bie (ProdProductionOrderBillOfMaterialsLineEntity), linii BOM<\/td><td>Structura produsului, materiale pentru fiecare comand\u0103<\/td><td>SCM \u2192 SkyPlanner<\/td><td>La fiecare sincronizare a comenzilor<\/td><\/tr><tr><td>Rute tehnologice, versiuni de rute, opera\u021bii din rute, propriet\u0103\u021bile opera\u021biilor (RouteOperationPropertiesV2Entity)<\/td><td>Etape de proces cu timpi de preg\u0103tire \u0219i de execu\u021bie<\/td><td>SCM \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modific\u0103ri<\/td><\/tr><tr><td>Resurse (OpResOperationsResourceEntity), grupuri de resurse, capabilit\u0103\u021bi<\/td><td>Centre de lucru, grupuri de centre de lucru, coeficien\u021bi de eficien\u021b\u0103<\/td><td>SCM \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi rar<\/td><\/tr><tr><td>Calendare de lucru, zile \u0219i intervale orare din calendare, atribuiri de calendare<\/td><td>Schimburi<\/td><td>SCM \u2192 SkyPlanner<\/td><td>Zilnic sau schimburi gestionate \u00een SkyPlanner<\/td><\/tr><tr><td>Antete de comenzi de produc\u021bie (ProdProductionOrderHeaderEntity)<\/td><td>Comenzi cu termene \u0219i st\u0103ri<\/td><td>SCM \u2192 SkyPlanner<\/td><td>La fiecare c\u00e2teva minute sau la un eveniment de afaceri<\/td><\/tr><tr><td>Opera\u021bii din rute (ProdProductionOrderRouteOperationEntity), sarcini din rute (ProdProductionOrderRouteJobEntity)<\/td><td>Opera\u021bii cu durate \u0219i cerin\u021be de resurse<\/td><td>SCM \u2192 SkyPlanner<\/td><td>La fiecare sincronizare a comenzilor<\/td><\/tr><tr><td>Stoc existent<\/td><td>Solduri de stoc<\/td><td>SCM \u2192 SkyPlanner<\/td><td>La fiecare or\u0103 sau la calcularea programului de produc\u021bie<\/td><\/tr><tr><td>Linii de comenzi de achizi\u021bie cu data livr\u0103rii<\/td><td>Materiale \u00een curs de aprovizionare; stocul se actualizeaz\u0103 c\u00e2nd comanda de achizi\u021bie este marcat\u0103 Delivered<\/td><td>SCM \u2192 SkyPlanner<\/td><td>La fiecare or\u0103 sau la calcularea programului de produc\u021bie<\/td><\/tr><tr><td>Data \u0219i ora de \u00eenceput \u0219i de sf\u00e2r\u0219it programate \u0219i resursa de produc\u021bie pentru fiecare opera\u021bie din rut\u0103<\/td><td>\u00cenceputul, sf\u00e2r\u0219itul \u0219i centrul de lucru planificate pentru fiecare opera\u021bie<\/td><td>SkyPlanner \u2192 SCM<\/td><td>La modificarea programului, prin webhook SkyPlanner<\/td><\/tr><tr><td>Jurnalul fi\u0219elor de rut\u0103 (ProdRouteCardProductionJournalEntryEntity: RegisteredHours, ReportedGoodInventoryQuantity)<\/td><td>\u00cenregistr\u0103ri de timp \u0219i cantit\u0103\u021bi<\/td><td>SkyPlanner \u2192 SCM<\/td><td>La fiecare confirmare sau schimb, dac\u0103 se alege aceast\u0103 op\u021biune<\/td><\/tr><tr><td>Configurarea constr\u00e2ngerilor \u00een SkyPlanner<\/td><td>Matricea timpilor de preg\u0103tire, scule ca resurse cu capacitate finit\u0103, num\u0103rul de operatori, resurse alternative<\/td><td>Gestionate \u00een SkyPlanner<\/td><td>Configurate \u00een etapa de implementare<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Modele de integrare<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00cenc\u0103rcarea ini\u021bial\u0103 a nomenclatoarelor.<\/strong> \u00cenc\u0103rca\u021bi resursele, grupurile de resurse, calendarele, produsele lansate, rutele tehnologice \u0219i listele BOM. Folosi\u021bi API-ul pentru date \u00een lot c\u00e2nd volumul ajunge la sute de mii de \u00eenregistr\u0103ri, iar \u00een celelalte cazuri, paginarea OData. Asocia\u021bi fiecare resurs\u0103 SCM cu un centru de lucru SkyPlanner. Nu mapa\u021bi doar grupurile de resurse: programarea opera\u021biilor rezerv\u0103 grupuri, dar \u00een sec\u021bie se lucreaz\u0103 cu resurse individuale.<\/p>\n\n\n<p><strong>2. Sincronizarea comenzilor.<\/strong> Citi\u021bi comenzile de produc\u021bie fermizate aflate \u00een st\u0103rile gestionate de SkyPlanner, de regul\u0103 Scheduled \u0219i Released, \u00eempreun\u0103 cu opera\u021biile \u0219i sarcinile din rutele lor tehnologice \u0219i liniile BOM. Citi\u021bi \u0219i liniile deschise ale comenzilor de achizi\u021bie. SkyPlanner consider\u0103 materialul comandat disponibil la data livr\u0103rii din comanda de achizi\u021bie \u0219i actualizeaz\u0103 stocul c\u00e2nd aceasta este marcat\u0103 Delivered.<\/p>\n\n\n<p>Exclude\u021bi comenzile de produc\u021bie planificate, cu excep\u021bia cazului \u00een care sunt incluse explicit \u00een domeniul proiectului. Planning Optimization le regenereaz\u0103 la fiecare rulare.<\/p>\n\n\n<p><strong>3. Actualizarea programului \u00een SCM.<\/strong> Pentru fiecare opera\u021bie pe care motorul a programat-o sau a mutat-o, SkyPlanner actualizeaz\u0103 \u00een opera\u021bia din rut\u0103 data \u0219i ora de \u00eenceput \u0219i de sf\u00e2r\u0219it programate \u0219i resursa de produc\u021bie, folosind denumirile c\u00e2mpurilor din <code>\/data\/$metadata<\/code> al mediului dumneavoastr\u0103. Modific\u0103rile sunt grupate \u00een seturi de modific\u0103ri din cereri OData \u00een lot, astfel \u00eenc\u00e2t rezultatul fiec\u0103rui calcul al programului s\u0103 fie aplicat ca o singur\u0103 actualizare coerent\u0103.<\/p>\n\n\n<p><strong>4. Confirm\u0103ri din sec\u021bia de produc\u021bie.<\/strong> Operatorii \u00eenregistreaz\u0103 munca efectuat\u0103 cu SkyPlanner Mobile Confirmations sau Production Timer, iar \u00eenregistr\u0103rile de timp men\u021bin programul la zi. Orele \u0219i cantit\u0103\u021bile de produse conforme pot fi transmise \u00eenapoi ca linii \u00een jurnalul fi\u0219elor de rut\u0103. Report as finished r\u0103m\u00e2ne \u00een sistemul \u00een care \u00eel folosi\u021bi \u00een prezent: SCM sau Production floor execution.<\/p>\n\n\n<p>Alege\u021bi un singur canal pentru fiecare \u00eenregistrare. Dac\u0103 \u00eenregistra\u021bi acelea\u0219i ore at\u00e2t din SkyPlanner, c\u00e2t \u0219i din Production floor execution, acestea se dubleaz\u0103.<\/p>\n\n\n<p><strong>5. Reguli de responsabilitate \u0219i de gestionare a conflictelor.<\/strong> Documenta\u021bi-le \u00eenainte de punerea \u00een func\u021biune:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Date<\/th><th>Sistem responsabil<\/th><\/tr><\/thead><tbody><tr><td>Produse, liste BOM, rute tehnologice, cantit\u0103\u021bi, starea comenzilor, calculul costurilor<\/td><td>Supply Chain Management<\/td><\/tr><tr><td>Comenzi de produc\u021bie planificate<\/td><td>Planning Optimization<\/td><\/tr><tr><td>Succesiunea opera\u021biilor, \u00eenceputul \u0219i sf\u00e2r\u0219itul programate, alocarea resurselor<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matricea timpilor de preg\u0103tire, scule, num\u0103rul de operatori, resurse alternative<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Schimburi \u0219i absen\u021be<\/td><td>Un singur sistem, ales la definirea domeniului proiectului<\/td><\/tr><tr><td>\u00cenregistrarea orelor \u0219i a produc\u021biei realizate<\/td><td>Supply Chain Management, pe baza \u00eenregistr\u0103rilor de timp din SkyPlanner dac\u0103 se alege aceast\u0103 op\u021biune<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Principala surs\u0103 de conflicte este programarea opera\u021biilor \u00een SCM. Dac\u0103 un planificator reprogrameaz\u0103 o comand\u0103 \u00een SCM, datele stabilite de SkyPlanner sunt suprascrise. Folosi\u021bi <strong>IsProductionOrderSchedulingLocked<\/strong> \u00een antetul comenzilor de produc\u021bie gestionate de SkyPlanner. Trata\u021bi orice comand\u0103 modificat\u0103 \u00een SCM ca pe o versiune nou\u0103 \u0219i sincroniza\u021bi-o din nou. Autopilot reprogrameaz\u0103 automat atunci c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-the-project-contains\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce cuprinde proiectul<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementarea se finalizeaz\u0103, de regul\u0103, \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea configur\u0103rii ini\u021biale. \u00cenainte de aceast\u0103 etap\u0103, pute\u021bi folosi propriile date \u00een perioada de testare gratuit\u0103 de 30 de zile. Exporta\u021bi resursele, rutele tehnologice \u0219i comenzile de produc\u021bie deschise printr-un proiect de export din gestionarea datelor sau prin programul de completare Excel, importa\u021bi-le \u00een format CSV sau Excel \u0219i valida\u021bi programul de produc\u021bie.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Definirea domeniului.<\/strong> Stabili\u021bi tabelul de coresponden\u021b\u0103, st\u0103rile gestionate de SkyPlanner, frecven\u021bele de sincronizare \u0219i canalul de \u00eenregistrare.<\/li>\n\n\n<li><strong>Acces.<\/strong> \u00cenregistra\u021bi aplica\u021bia Entra ID, asocia\u021bi-o unui utilizator SCM cu roluri care acord\u0103 doar permisiunile strict necesare \u0219i verifica\u021bi denumirile entit\u0103\u021bilor publice \u00een <code>\/data\/$metadata<\/code>. Mai \u00eent\u00e2i \u00een mediul de testare, apoi \u00een produc\u021bie.<\/li>\n\n\n<li><strong>\u00cenc\u0103rcarea ini\u021bial\u0103.<\/strong> Resurse, calendare, produse lansate, rute tehnologice, liste de materiale.<\/li>\n\n\n<li><strong>Sincronizarea comenzilor de produc\u021bie \u0219i de achizi\u021bie.<\/strong> Interog\u0103ri periodice cu <code>$filter<\/code> pentru \u00eenregistr\u0103rile modificate, plus evenimente de afaceri acolo unde acestea sunt disponibile \u00een catalogul dumneavoastr\u0103.<\/li>\n\n\n<li><strong>Configurarea constr\u00e2ngerilor \u00een SkyPlanner.<\/strong> Matricea timpilor de preg\u0103tire, sculele, num\u0103rul de operatori \u0219i utilajele sau personalul alternativ.<\/li>\n\n\n<li><strong>Actualizarea programului \u00een SCM.<\/strong> Actualiz\u0103ri \u00een lot ale opera\u021biilor din rutele tehnologice \u0219i blocarea program\u0103rii pentru comenzile gestionate de SkyPlanner.<\/li>\n\n\n<li><strong>Testarea \u00een paralel.<\/strong> Rula\u021bi SkyPlanner \u00een paralel cu planul curent, compara\u021bi datele \u0219i corecta\u021bi nomenclatoarele.<\/li>\n\n\n<li><strong>Punerea \u00een produc\u021bie.<\/strong> Activa\u021bi actualizarea programului \u00een SCM dup\u0103 ce datele corespund.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-to-plan-for-in-a-dynamics-365-scm-integrati\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce trebuie s\u0103 ave\u021bi \u00een vedere la integrarea cu Dynamics 365 SCM<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Eficien\u021ba se poate aplica de dou\u0103 ori.<\/strong> SCM calculeaz\u0103 astfel: &#8220;Scheduling time = Time x 100 \/ Efficiency percentage.&#8221; (Durata programat\u0103 se calculeaz\u0103 \u00een func\u021bie de timp \u0219i de procentul de eficien\u021b\u0103.) Mapa\u021bi eficien\u021ba la eficien\u021ba centrului de lucru din SkyPlanner o singur\u0103 dat\u0103, nu o aplica\u021bi din nou unor timpi deja ajusta\u021bi.<\/li>\n\n\n<li><strong>Calendarele sunt atribuite grupurilor de resurse.<\/strong> Citi\u021bi atribuirile calendarelor at\u00e2t pentru grupul de resurse, c\u00e2t \u0219i pentru fiecare resurs\u0103; altfel, capacitatea calculat\u0103 nu va mai corespunde.<\/li>\n\n\n<li><strong>Programarea la nivel de opera\u021bii fa\u021b\u0103 de programarea detaliat\u0103.<\/strong> Comenzile programate la nivel de opera\u021bii nu au ore de \u00eenceput \u0219i de sf\u00e2r\u0219it \u0219i nici o resurs\u0103 specific\u0103. Sincroniza\u021bi opera\u021biile din rutele tehnologice \u0219i cerin\u021bele de resurse, nu doar datele.<\/li>\n\n\n<li><strong>Set\u0103rile pentru capacitatea finit\u0103.<\/strong> Resursele pentru care Finite capacity este setat la No pot fi supra\u00eenc\u0103rcate \u00een SCM. Reprezenta\u021bi \u00een SkyPlanner fiecare constr\u00e2ngere real\u0103 printr-o limit\u0103 de capacitate.<\/li>\n\n\n<li><strong>32 de resurse pe opera\u021bie.<\/strong> SCM limiteaz\u0103 programarea detaliat\u0103 la 32 de resurse pe opera\u021bie. \u00cen SkyPlanner, alternativele se definesc prin grupuri de centre de lucru \u0219i centre de lucru alternative.<\/li>\n\n\n<li><strong>Paginarea \u0219i volumul de date.<\/strong> OData returneaz\u0103 pagini de 10.000 de \u00eenregistr\u0103ri \u0219i permite extinderea pe un singur nivel. Pentru \u00eenc\u0103rc\u0103rile ini\u021biale mari, folosi\u021bi API-ul pentru transferul datelor \u00een loturi.<\/li>\n\n\n<li><strong>Entit\u0103\u021bile juridice.<\/strong> F\u0103r\u0103 <code>cross-company=true<\/code> \u0219i filtrele <code>dataAreaId<\/code>, o fabric\u0103 \u00een care opereaz\u0103 mai multe companii sincronizeaz\u0103 doar compania implicit\u0103.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"who-configures-the-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cine configureaz\u0103 integrarea<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Lucr\u0103rile includ maparea \u00een func\u021bie de rutele tehnologice, resursele \u0219i configura\u021bia SCM pe care le utiliza\u021bi, precum \u0219i configurarea constr\u00e2ngerilor \u00een SkyPlanner: matricea timpilor de preg\u0103tire, sculele, num\u0103rul de operatori \u0219i resursele alternative.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Echipa SkyPlanner configureaz\u0103 integrarea \u00een etapa ini\u021bial\u0103 \u0219i ofer\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een produc\u021bie<\/strong>, at\u00e2t pentru partea SkyPlanner, c\u00e2t \u0219i pentru entit\u0103\u021bile de date SCM convenite. Fiecare fabric\u0103 folose\u0219te D365 SCM \u00een mod diferit, iar aceast\u0103 experien\u021b\u0103 practic\u0103 \u00ee\u0219i g\u0103se\u0219te aici aplicarea.<\/li>\n\n\n<li><strong>Partenerul dumneavoastr\u0103 Dynamics poate participa.<\/strong> Acesta cunoa\u0219te configura\u021bia, extensiile \u0219i rolurile de securitate pe care le utiliza\u021bi \u0219i poate configura aplica\u021bia Entra ID \u0219i accesul la entit\u0103\u021bi. SkyPlanner pune la dispozi\u021bie REST API, documenta\u021bia Swagger\/OpenAPI \u0219i webhookuri.<\/li>\n\n\n<li><strong>Dezvoltatorii dumneavoastr\u0103 pot construi pe aceast\u0103 baz\u0103<\/strong>, folosind acela\u0219i REST API documentat \u0219i un token API. Un token API este suficient pentru a \u00eencepe, iar echipa SkyPlanner ofer\u0103 asisten\u021b\u0103 la nevoie.<\/li>\n\n<\/ol>\n\n\n<p>Dup\u0103 conectare, motorul Arcturus programeaz\u0103 produc\u021bia pe baza comenzilor de produc\u021bie actualizate din SCM, iar datele programate sunt scrise \u00een opera\u021biile rutelor tehnologice. SkyPlanner porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse \u0219i facturare lunar\u0103. Oferta pentru integrare este stabilit\u0103 de la \u00eenceput, \u00een func\u021bie de procesele \u0219i nevoile dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul, astfel \u00eenc\u00e2t s\u0103 cunoa\u0219te\u021bi costul total \u00eenainte de a \u00eencepe.<\/p>\n\n\n<p>Vede\u021bi o compara\u021bie cu func\u021biile de planificare din SCM \u00een articolul despre <a href=\"\/ro\/integrari\/erp\/dynamics-365-scm\/cu-capacitate-finita\/\">programarea cu capacitate finit\u0103 \u00een Dynamics 365 SCM<\/a>. G\u0103si\u021bi prezentarea general\u0103 pe <a href=\"\/ro\/integrari\/erp\/dynamics-365-scm\/\">pagina Dynamics 365 SCM<\/a>, iar celelalte sisteme ERP, \u00een <a href=\"\/ro\/integrari\/erp\/\">sec\u021biunea de integr\u0103ri ERP<\/a>.<\/p>\n\n\n<p><a href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a> <a href=\"\/ro\/contact-vanzari\/\">Discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een hala de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi p\u0103rerea UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate, la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui plan optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi p\u0103rerea Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>respectarea termenelor de livrare din 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ne ofer\u0103 vizibilitate asupra capacit\u0103\u021bii \u0219i face planificarea predictibil\u0103.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Produc\u021bie chimic\u0103 \u0219i alimentar\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Termenele de livrare au fost respectate \u00een propor\u021bie de 100% pe \u00eentreaga perioad\u0103 de utilizare a SkyPlanner, din 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/opes-corporation\/\">Citi\u021bi p\u0103rerea Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, director general al Mamec, \u00een hala de produc\u021bie a companiei din Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000+<\/b><span>comenzi de lucru programate automat<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eAvem un cu totul alt control asupra produc\u021biei, iar modul \u00een care \u00een\u021belegem capacitatea este la un nivel complet diferit.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, director general<\/b><br>Mamec \u00b7 Mixere industriale, pompe \u0219i produc\u021bie pe baz\u0103 de contract cu tehnologie avansat\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Mii de comenzi de lucru sunt programate automat, iar \u00eentreaga organiza\u021bie are o imagine \u00een timp real asupra produc\u021biei.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/mamec\/\">Citi\u021bi p\u0103rerea Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ce API D365 SCM folose\u0219te integrarea?<\/summary>\n<p class=\"sp-faq__a\">Endpointul REST OData v4 de la <code>\/data<\/code>, care expune toate entit\u0103\u021bile de date publice \u0219i permite crearea, citirea, actualizarea \u0219i \u0219tergerea acestora. \u00cenc\u0103rc\u0103rile ini\u021biale mari folosesc API-ul pentru transferul datelor \u00een loturi. Evenimentele de afaceri adaug\u0103 declan\u0219atoare aproape \u00een timp real, acolo unde acestea sunt disponibile \u00een catalogul dumneavoastr\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Trebuie s\u0103 instal\u0103m ceva \u00een Supply Chain Management?<\/summary>\n<p class=\"sp-faq__a\">Nu. Integrarea folose\u0219te entit\u0103\u021bi de date standard prin OData. Administratorul dumneavoastr\u0103 \u00eenregistreaz\u0103 o aplica\u021bie Microsoft Entra ID \u0219i o asociaz\u0103 unui utilizator SCM cu rolurile necesare.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum sunt transmise datele programate \u00eenapoi \u00een Supply Chain Management?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner scrie datele \u0219i orele programate de \u00eenceput \u0219i de sf\u00e2r\u0219it, precum \u0219i resursa opera\u021biei, \u00een opera\u021biile rutelor tehnologice ale comenzilor de produc\u021bie, prin seturi de modific\u0103ri OData \u00een lot. Comenzile gestionate de SkyPlanner sunt protejate cu IsProductionOrderSchedulingLocked.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>De ce s\u0103 conect\u0103m SkyPlanner \u00een loc s\u0103 ajust\u0103m programarea detaliat\u0103 din SCM?<\/summary>\n<p class=\"sp-faq__a\">Planning Optimization \u021bine cont de capacitatea finit\u0103 doar \u00een interiorul orizontului de capacitate finit\u0103; dincolo de acesta, planific\u0103 folosind capacitate infinit\u0103 (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/planning-optimization\/finite-capacity\">surs\u0103<\/a>). Programarea detaliat\u0103 din SCM plaseaz\u0103 c\u00e2te o comand\u0103 de produc\u021bie \u00een capacitatea r\u0103mas\u0103 disponibil\u0103 dup\u0103 rezerv\u0103rile existente, incluz\u00e2nd preg\u0103tirea ca timp al opera\u021biei (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/job-scheduling\">surs\u0103<\/a>), iar Microsoft nu recomand\u0103 planificarea general\u0103 cu capacitate finit\u0103 atunci c\u00e2nd schimburile modific\u0103 capacitatea (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/planning-optimization\/finite-capacity\">surs\u0103<\/a>). SkyPlanner programeaz\u0103 toate comenzile confirmate \u00eempreun\u0103, folosind o matrice a timpilor de preg\u0103tire, iar Autopilot reprogrameaz\u0103 automat la fiecare schimbare semnificativ\u0103. Echipa SkyPlanner configureaz\u0103 integrarea bidirec\u021bional\u0103 \u0219i ofer\u0103 asisten\u021b\u0103 pentru aceasta, iar partenerul dumneavoastr\u0103 Dynamics poate prelua responsabilitatea pentru partea SCM.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar trebui SkyPlanner s\u0103 programeze comenzile de produc\u021bie planificate?<\/summary>\n<p class=\"sp-faq__a\">De regul\u0103, nu. Planning Optimization regenereaz\u0103 comenzile de produc\u021bie planificate la fiecare rulare. SkyPlanner programeaz\u0103 comenzile de produc\u021bie confirmate care au st\u0103rile convenite la definirea domeniului.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Integrarea func\u021bioneaz\u0103 cu Supply Chain Management instalat local?<\/summary>\n<p class=\"sp-faq__a\">\u00cen instal\u0103rile locale, integrarea folose\u0219te API-ul pentru transferul datelor \u00een loturi, acceptat de Microsoft \u00een acest mediu. Pe partea SkyPlanner se folose\u0219te acela\u0219i REST API \u00een ambele cazuri, iar varianta de integrare este confirmat\u0103 la definirea domeniului.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de a construi integrarea?<\/summary>\n<p class=\"sp-faq__a\">Da. Perioada de testare gratuit\u0103 de 30 de zile permite utilizarea a p\u00e2n\u0103 la 20 de centre de lucru, cu importuri CSV sau Excel din Supply Chain Management, f\u0103r\u0103 a fi necesar un card de credit. <a href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea<\/a> sau <a href=\"\/ro\/contact-vanzari\/\">discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a> pentru definirea domeniului integr\u0103rii.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ Microsoft Dynamics 365 Supply Chain Management Ghid de integrare Dynamics 365 Supply Chain Management pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare Dynamics 365 Supply Chain Management le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze Microsoft Dynamics 365 Supply Chain Management la SkyPlanner APS. Integrarea dintre SkyPlanner \u0219i &#8230; <a title=\"Ghid de integrare Dynamics 365 Supply Chain Management pentru programarea produc\u021biei cu SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/dynamics-365-scm\/ghid-de-integrare\/\" aria-label=\"Read more about Ghid de integrare Dynamics 365 Supply Chain Management pentru programarea produc\u021biei cu SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102841,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103492","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Dynamics 365 SCM: integrare APS pentru programarea produc\u021biei<\/title>\n<meta name=\"description\" content=\"D365 SCM\u2013SkyPlanner APS: entit\u0103\u021bi OData, autentificare Entra ID, evenimente de afaceri, actualizarea comenzilor \u00een SCM, maparea datelor, sfaturi de proiect.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/dynamics-365-scm\/ghid-de-integrare\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ghid de integrare Dynamics 365 Supply Chain Management pentru programarea produc\u021biei cu SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"D365 SCM\u2013SkyPlanner APS: entit\u0103\u021bi OData, autentificare Entra ID, evenimente de afaceri, actualizarea comenzilor \u00een SCM, maparea datelor, sfaturi de proiect.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/dynamics-365-scm\/ghid-de-integrare\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/dynamics-365-scm\\\/ghid-de-integrare\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/dynamics-365-scm\\\/ghid-de-integrare\\\/\",\"name\":\"Dynamics 365 SCM: integrare APS pentru programarea produc\u021biei\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"D365 SCM\u2013SkyPlanner APS: entit\u0103\u021bi OData, autentificare Entra ID, evenimente de afaceri, actualizarea comenzilor \u00een SCM, maparea datelor, sfaturi de proiect.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/dynamics-365-scm\\\/ghid-de-integrare\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/dynamics-365-scm\\\/ghid-de-integrare\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/dynamics-365-scm\\\/ghid-de-integrare\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru Dynamics 365 Supply Chain Management: programarea produc\u021biei cu capacitate finit\u0103\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/dynamics-365-scm\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Ghid de integrare Dynamics 365 Supply Chain Management pentru programarea produc\u021biei cu SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Dynamics 365 SCM: integrare APS pentru programarea produc\u021biei","description":"D365 SCM\u2013SkyPlanner APS: entit\u0103\u021bi OData, autentificare Entra ID, evenimente de afaceri, actualizarea comenzilor \u00een SCM, maparea datelor, sfaturi de proiect.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/dynamics-365-scm\/ghid-de-integrare\/","og_locale":"ro_RO","og_type":"article","og_title":"Ghid de integrare Dynamics 365 Supply Chain Management pentru programarea produc\u021biei cu SkyPlanner APS","og_description":"D365 SCM\u2013SkyPlanner APS: entit\u0103\u021bi OData, autentificare Entra ID, evenimente de afaceri, actualizarea comenzilor \u00een SCM, maparea datelor, sfaturi de proiect.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/dynamics-365-scm\/ghid-de-integrare\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/dynamics-365-scm\/ghid-de-integrare\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/dynamics-365-scm\/ghid-de-integrare\/","name":"Dynamics 365 SCM: integrare APS pentru programarea produc\u021biei","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"D365 SCM\u2013SkyPlanner APS: entit\u0103\u021bi OData, autentificare Entra ID, evenimente de afaceri, actualizarea comenzilor \u00een SCM, maparea datelor, sfaturi de proiect.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/dynamics-365-scm\/ghid-de-integrare\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/dynamics-365-scm\/ghid-de-integrare\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/dynamics-365-scm\/ghid-de-integrare\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru Dynamics 365 Supply Chain Management: programarea produc\u021biei cu capacitate finit\u0103","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/dynamics-365-scm\/"},{"@type":"ListItem","position":5,"name":"Ghid de integrare Dynamics 365 Supply Chain Management pentru programarea produc\u021biei cu SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ Microsoft Dynamics 365 Supply Chain Management Ghid de integrare Dynamics 365 Supply Chain Management pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare Dynamics 365 Supply Chain Management le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze Microsoft Dynamics 365 Supply Chain Management la SkyPlanner APS. Integrarea dintre SkyPlanner \u0219i&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/103492","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=103492"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/103492\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/102841"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=103492"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}