{"id":103192,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/proalpha\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"proalpha","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proalpha\/","title":{"rendered":"SkyPlanner APS pentru proALPHA: programarea produc\u021biei cu capacitate finit\u0103"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ proALPHA ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS pentru proALPHA: <span class=\"hl\">programarea produc\u021biei cu capacitate finit\u0103<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS este o extensie de programare cu capacitate finit\u0103 pentru proALPHA, care programeaz\u0103 fiecare utilaj, operator, scul\u0103 \u0219i material. Planificatorii nu mai refac planul \u00een Excel, iar Autopilot reprogrameaz\u0103 automat c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner se integreaz\u0103 bidirec\u021bional cu Proalpha: preia comenzile de produc\u021bie, opera\u021biile, resursele, piesele \u0219i stocurile \u0219i trimite \u00eenapoi datele programate ale opera\u021biilor, aloc\u0103rile de utilaje \u0219i confirm\u0103rile operatorilor. \u00cen etapa de implementare, echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 Proalpha.<\/p>\n\n\n<p>Pre\u021bul porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, iar fiecare centru de lucru suplimentar cost\u0103 20 \u20ac pe lun\u0103. Perioada de testare gratuit\u0103 dureaz\u0103 30 de zile, cu p\u00e2n\u0103 la 20 de centre de lucru, f\u0103r\u0103 card de credit.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce se schimb\u0103 \u00een produc\u021bia dumneavoastr\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Renun\u021ba\u021bi la planul din Excel.<\/p>\n\n\n<p class=\"fx-pain__b\">Programul este \u00eentr-un singur loc, construit pe baza comenzilor de produc\u021bie din Proalpha. Toat\u0103 lumea lucreaz\u0103 dup\u0103 acela\u0219i plan, nu dup\u0103 fi\u0219ierul sau agenda unui planificator.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Fiecare resurs\u0103 are o capacitate limitat\u0103.<\/p>\n\n\n<p class=\"fx-pain__b\">Pentru utilaje, personal \u0219i scule se iau \u00een calcul schimburile reale, absen\u021bele \u0219i orele suplimentare. Un dispozitiv de fixare folosit pe un utilaj nu este niciodat\u0103 rezervat pe altul \u00een acela\u0219i timp. O opera\u021bie care necesit\u0103 trei operatori prime\u0219te trei persoane disponibile \u00een schimburile respective.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Mai pu\u021bine schimb\u0103ri de fabrica\u021bie.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner p\u0103streaz\u0103 timpul de reglaj pentru trecerea \u00eentre fiecare pereche de produse, \u00een ambele sensuri. Trecerea de la albastru la ro\u0219u poate dura 30 de minute, iar de la ro\u0219u la albastru, 60. Motorul ordoneaz\u0103 opera\u021biile astfel \u00eenc\u00e2t s\u0103 se piard\u0103 c\u00e2t mai pu\u021bin timp.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materialele sunt verificate \u00eenainte de \u00eenceperea lucrului.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner programeaz\u0103 \u00een func\u021bie de stocuri \u0219i de comenzile de achizi\u021bie \u00een curs. O opera\u021bie care a\u0219teapt\u0103 o livrare de la furnizor este programat\u0103 \u00eencep\u00e2nd cu data livr\u0103rii, \u00een loc s\u0103 r\u0103m\u00e2n\u0103 blocat\u0103 la utilaj.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprogramare automat\u0103 la schimb\u0103ri.<\/p>\n\n\n<p class=\"fx-pain__b\">C\u00e2nd se opre\u0219te un utilaj, sose\u0219te o comand\u0103 urgent\u0103 sau lucrul se termin\u0103 mai devreme, Autopilot reprogrameaz\u0103 automat. Bloc\u0103rile \u0219i priorit\u0103\u021bile stabilite de dumneavoastr\u0103 sunt respectate \u00een continuare.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatorii \u00ee\u0219i v\u0103d lista de opera\u021bii.<\/p>\n\n\n<p class=\"fx-pain__b\">Fiecare operator vede urm\u0103toarele opera\u021bii pe telefon sau tablet\u0103 \u0219i \u00eenregistreaz\u0103 lucrul pe m\u0103sur\u0103 ce \u00eel execut\u0103. Confirm\u0103rile sunt trimise \u00eenapoi \u00een comanda de produc\u021bie din Proalpha.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een sec\u021bia de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar noua list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi m\u0103rturia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui program optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi m\u0103rturia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, director de produc\u021bie la Fredman Operations, l\u00e2ng\u0103 o celul\u0103 robotizat\u0103 de paletizare din Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 luni<\/b><span>pentru care echipa de v\u00e2nz\u0103ri vede capacitatea disponibil\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ofer\u0103 o baz\u0103 solid\u0103 \u0219i siguran\u021b\u0103 pentru \u00eentreaga planificare a produc\u021biei.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, director de produc\u021bie<\/b><br>Fredman Operations \u00b7 H\u00e2rtie pentru ambalaje destinate contactului cu alimentele<\/p>\n\n\n<p class=\"ind-cust__result\">Echipa de v\u00e2nz\u0103ri vede capacitatea disponibil\u0103 cu \u0219ase luni \u00eenainte, iar solicit\u0103rile de modificare a programului, care \u00eenainte necesitau o or\u0103 sau mai mult, primesc acum r\u0103spuns \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/fredman-operations\/\">Citi\u021bi m\u0103rturia Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, director general al Mamec, \u00een hala de produc\u021bie a companiei din Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000+<\/b><span>comenzi de produc\u021bie programate automat<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eControl\u0103m produc\u021bia \u00eentr-un mod diferit \u0219i ne \u00een\u021belegem capacitatea la un cu totul alt nivel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, director general<\/b><br>Mamec \u00b7 Mixere industriale, pompe \u0219i produc\u021bie la comand\u0103 de \u00eenalt\u0103 tehnologie<\/p>\n\n\n<p class=\"ind-cust__result\">Mii de comenzi de produc\u021bie sunt programate automat, iar \u00eentreaga organiza\u021bie are o imagine \u00een timp real asupra produc\u021biei.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/mamec\/\">Citi\u021bi recenzia Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-proalpha-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum func\u021bioneaz\u0103 integrarea cu proALPHA<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Proalpha transmite lucr\u0103rile de executat.<\/strong> Comenzile de produc\u021bie deschise (Fertigungsauftr\u00e4ge) sunt transferate \u00een SkyPlanner \u00eempreun\u0103 cu opera\u021biile, resursele, timpii de reglaj \u0219i de execu\u021bie, precum \u0219i cu piesele \u0219i stocurile.<\/li>\n\n\n<li><strong>SkyPlanner creeaz\u0103 programul \u0219i \u00eel men\u021bine actualizat.<\/strong> Motorul Arcturus programeaz\u0103 \u00een c\u00e2teva secunde fiecare opera\u021bie pe fiecare centru de lucru \u0219i reprogrameaz\u0103 pe m\u0103sur\u0103 ce apar schimb\u0103ri \u00een produc\u021bie.<\/li>\n\n\n<li><strong>Datele, utilajele \u0219i confirm\u0103rile sunt trimise \u00eenapoi.<\/strong> Datele programate de \u00eenceput \u0219i de sf\u00e2r\u0219it pentru fiecare opera\u021bie, resursa alocat\u0103 \u0219i confirm\u0103rile operatorilor sunt transferate \u00een comanda de produc\u021bie din Proalpha.<\/li>\n\n<\/ol>\n\n\n<p>Pentru scrierea datelor \u00eenapoi \u00een Proalpha se folosesc propriile sale API-uri REST din Proalpha API Portal: setWorkOrderOperationDates, changeWorkOrderOperationResource \u0219i operationDataEntry. Fiecare fabric\u0103 \u00ee\u0219i modeleaz\u0103 diferit produc\u021bia \u00een Proalpha, a\u0219a c\u0103 echipa SkyPlanner stabile\u0219te coresponden\u021bele pentru resursele \u0219i comenzile dumneavoastr\u0103 de produc\u021bie \u00een etapa de implementare \u0219i asigur\u0103 suport pentru integrare dup\u0103 punerea \u00een func\u021biune. Primi\u021bi de la \u00eenceput o ofert\u0103 pentru integrare, adaptat\u0103 procesului \u0219i nevoilor dumneavoastr\u0103. Partenerul dumneavoastr\u0103 Proalpha sau propriii dezvoltatori pot realiza integrarea \u0219i folosind API-ul documentat al SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia API<\/a>).<\/p>\n\n\n<p>Interfe\u021bele, coresponden\u021bele dintre c\u00e2mpuri \u0219i regulile care stabilesc sistemul responsabil pentru fiecare tip de date sunt descrise \u00een <a href=\"\/ro\/integrari\/erp\/proalpha\/ghid-de-integrare\/\">ghidul de integrare proALPHA pentru programarea produc\u021biei<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-proalpha-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce date se transfer\u0103 \u00eentre proALPHA \u0219i SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>proALPHA<\/th><th>SkyPlanner<\/th><th>Direc\u021bie<\/th><\/tr><\/thead><tbody><tr><td>Pies\u0103 (Teil)<\/td><td>Produse \u0219i materiale<\/td><td>Spre SkyPlanner<\/td><\/tr><tr><td>Comand\u0103 de produc\u021bie (Fertigungsauftrag) cu cantitate \u0219i termen de finalizare<\/td><td>Comand\u0103 \u0219i opera\u021bii cu termen de finalizare \u0219i prioritate<\/td><td>Spre SkyPlanner<\/td><\/tr><tr><td>Opera\u021biile comenzii de produc\u021bie, cu timpi norma\u021bi de reglaj \u0219i de execu\u021bie<\/td><td>Etape de proces cu timpi de reglaj \u0219i durate<\/td><td>Spre SkyPlanner<\/td><\/tr><tr><td>Resurse, grupuri de resurse, grupuri alternative de resurse<\/td><td>Centre de lucru, grupuri de centre de lucru, centre de lucru alternative<\/td><td>Spre SkyPlanner<\/td><\/tr><tr><td>Calendarele resurselor<\/td><td>Schimburi, absen\u021be \u0219i randamente<\/td><td>Spre SkyPlanner<\/td><\/tr><tr><td>Stoc pe zon\u0103 MRP<\/td><td>Stoc de materiale<\/td><td>Spre SkyPlanner<\/td><\/tr><tr><td>Comenzi de achizi\u021bie cu dat\u0103 de livrare<\/td><td>Materiale de primit, disponibile la data livr\u0103rii<\/td><td>Spre SkyPlanner<\/td><\/tr><tr><td>setWorkOrderOperationDates<\/td><td>Datele programate de \u00eenceput \u0219i de sf\u00e2r\u0219it pentru fiecare opera\u021bie<\/td><td>\u00cenapoi \u00een Proalpha<\/td><\/tr><tr><td>changeWorkOrderOperationResource<\/td><td>Centrul de lucru alocat prin programare<\/td><td>\u00cenapoi \u00een Proalpha<\/td><\/tr><tr><td>operationDataEntry<\/td><td>Timpi \u0219i cantit\u0103\u021bi \u00eenregistrate de operatori<\/td><td>\u00cenapoi \u00een Proalpha<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Matricea timpilor de preg\u0103tire, sculele folosite ca resurse \u0219i num\u0103rul de operatori necesari pentru fiecare opera\u021bie se configureaz\u0103 \u00een SkyPlanner \u00een etapa de implementare.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"proalpha-aps-and-finite-capacity-scheduling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Proalpha APS \u0219i programarea cu capacitate finit\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Proalpha include propriul APS \u00een Proalpha Production. Furnizorul \u00eel descrie astfel:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>APS este componenta central\u0103.<\/strong> &#8220;APS (Advanced Planning and Scheduling) is the core of Proalpha Production.&#8221; (APS \u2014 planificare \u0219i programare avansat\u0103 \u2014 este componenta central\u0103 a Proalpha Production.) (<a href=\"https:\/\/www.proalpha.com\/en\/proalpha-erp\/modules\/production\/\">Proalpha<\/a>)<\/li>\n\n\n<li><strong>Planificare optimizat\u0103 pentru mai multe resurse.<\/strong> APS &#8220;allows optimized resource planning according to managerial targets such as delivery reliability and cycle times.&#8221; (permite planificarea optimizat\u0103 a resurselor \u00een func\u021bie de obiectivele conducerii, precum respectarea termenelor de livrare \u0219i timpii de ciclu.) O opera\u021bie poate folosi oric\u00e2te resurse, cu disponibilitate sincronizat\u0103.<\/li>\n\n\n<li><strong>Planificarea automat\u0103 a comenzilor.<\/strong> \u00centr-un studiu de caz al unui client Proalpha, APS planific\u0103 \u0219i ordoneaz\u0103 automat comenzile (&#8220;automatisch geplant und eingetaktet&#8221; \u2014 planificate \u0219i programate automat). (<a href=\"https:\/\/www.proalpha.com\/de\/proalpha-referenzen\/dickert\">Proalpha<\/a>)<\/li>\n\n\n<li><strong>Sunt posibile \u0219i ajust\u0103ri manuale.<\/strong> &#8220;Finite planning allows manual changes to the sequence in which orders are processed on short notice.&#8221; (Programarea cu capacitate finit\u0103 permite modificarea manual\u0103 a ordinii de executare a comenzilor chiar \u0219i cu pu\u021bin timp \u00eenainte de execu\u021bie.)<\/li>\n\n\n<li><strong>Modele de proces \u00een locul rutelor tehnologice.<\/strong> Proalpha &#8220;completely dispenses with bills of materials and routings for production planning&#8221; (renun\u021b\u0103 complet la listele de materiale \u0219i la rutele tehnologice pentru planificarea produc\u021biei) \u0219i planific\u0103 pe baza modelelor de proces ale produselor.<\/li>\n\n\n<li><strong>Sunt necesare date din produc\u021bie \u00een timp real.<\/strong> Colectarea datelor din fabric\u0103 &#8220;enables precise advanced planning and scheduling (APS).&#8221; (permite o planificare \u0219i programare avansat\u0103 (APS) precis\u0103.) (<a href=\"https:\/\/www.proalpha.com\/en\/proalpha-erp\/processes\/plant-data-collection-pdc\">Proalpha<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Aceast\u0103 optimizare depinde de modele de proces corecte, de calendarele resurselor \u0219i de date \u00een timp real din sec\u021bia de produc\u021bie, configurate \u00een cadrul unui proiect Proalpha. Dr. Markus Berg de la Proalpha descrie confirm\u0103rile pe h\u00e2rtie introduse \u00een sistem la sf\u00e2r\u0219it de s\u0103pt\u0103m\u00e2n\u0103 drept &#8220;f\u00fcr eine APS-Planung zu ungenau&#8221; (prea imprecise pentru planificarea APS) (<a href=\"https:\/\/it-production.com\/produktionsmanagement\/interview-markus-berg-proalpha\/\">IT&amp;Production<\/a>). Fabricile f\u0103r\u0103 aceast\u0103 configura\u021bie continu\u0103 s\u0103 planifice \u00een Excel, \u00een paralel cu ERP-ul. SkyPlanner programeaz\u0103 simultan utilajele, personalul, sculele, materialele \u0219i schimb\u0103rile de serie \u00eentr-un singur motor, cu reprogramare prin Autopilot \u0219i o integrare configurat\u0103 de echipa SkyPlanner. Astfel, fabricile ob\u021bin \u00eenc\u0103 din perioada de prob\u0103 un program cu capacitate finit\u0103 pentru propriile comenzi de produc\u021bie, la un pre\u021b public. Fiecare pas este explicat \u00een <a href=\"\/ro\/integrari\/erp\/proalpha\/cu-capacitate-finita\/\">Ofer\u0103 proALPHA programare cu capacitate finit\u0103?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-skyplanner-adds-to-proalpha\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce adaug\u0103 SkyPlanner la proALPHA<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Proalpha cu un plan \u00een Excel<\/th><th>Proalpha cu SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Plan<\/td><td>Fi\u0219ier de calcul \u00eentre\u021binut de un singur planificator<\/td><td>Un singur program actualizat \u00een timp real, bazat pe comenzile de produc\u021bie din Proalpha<\/td><\/tr><tr><td>Capacitate<\/td><td>Verificat\u0103 din ochi<\/td><td>Capacitate finit\u0103 pentru fiecare utilaj, persoan\u0103 \u0219i scul\u0103, cu schimburile aferente<\/td><\/tr><tr><td>Ordinea opera\u021biilor<\/td><td>Reordonare manual\u0103<\/td><td>Program detaliat pe opera\u021bii, \u00een c\u00e2teva secunde<\/td><\/tr><tr><td>Schimb\u0103ri de serie<\/td><td>Pe baza experien\u021bei planificatorului<\/td><td>Opera\u021bii ordonate pentru un timp total de reglaj minim<\/td><\/tr><tr><td>Scule \u0219i echipe<\/td><td>Urm\u0103rite separat<\/td><td>Disponibilitate limitat\u0103 a sculelor; personal alocat opera\u021biilor care necesit\u0103 mai mul\u021bi operatori<\/td><\/tr><tr><td>Materiale<\/td><td>Verificate de planificator<\/td><td>Opera\u021biile \u00eencep c\u00e2nd materialele sunt \u00een stoc sau au fost livrate<\/td><\/tr><tr><td>Schimb\u0103ri<\/td><td>Plan ref\u0103cut dup\u0103 fiecare perturbare<\/td><td>Autopilot reprogrameaz\u0103 respect\u00e2nd priorit\u0103\u021bile dumneavoastr\u0103<\/td><\/tr><tr><td>Sec\u021bia de produc\u021bie<\/td><td>Confirm\u0103ri pe h\u00e2rtie sau la terminal<\/td><td>Lista de opera\u021bii a operatorului \u0219i \u00eenregistrarea activit\u0103\u021bii pe telefon sau tablet\u0103<\/td><\/tr><tr><td>Transfer \u00eenapoi \u00een ERP<\/td><td>Date calendaristice introduse manual \u00een Proalpha<\/td><td>Date calendaristice, resurse \u0219i confirm\u0103ri transferate prin REST<\/td><\/tr><tr><td>Pornire<\/td><td>Proiect Proalpha, f\u0103r\u0103 list\u0103 public\u0103 de pre\u021buri<\/td><td>Propriile comenzi de produc\u021bie programate \u00een perioada de testare gratuit\u0103<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-choose-a-scheduler-for-proalpha\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum alege\u021bi o solu\u021bie de programare pentru proALPHA<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Pe l\u00e2ng\u0103 configurarea din cadrul proiectului descris mai sus, Proalpha ajusteaz\u0103 APS cu ajutorul propriilor consultan\u021bi: la KWM, &#8220;Production planning was optimized remotely together with Proalpha consultants&#8221; (Planificarea produc\u021biei a fost optimizat\u0103 de la distan\u021b\u0103 \u00eempreun\u0103 cu consultan\u021bii Proalpha) (<a href=\"https:\/\/www.proalpha.com\/en\/references\/kwm-weisshaar-gmbh\">Proalpha<\/a>). Proalpha nu public\u0103 pre\u021buri; pe pagina de pre\u021buri, r\u0103spunsul este &#8220;Das kommt darauf an&#8221; (Depinde) (<a href=\"https:\/\/www.proalpha.com\/de\/preis\">Proalpha<\/a>). O <a href=\"\/ro\/software-de-programare-a-productiei-pentru-producatori-de\/\">fabric\u0103 de dimensiuni medii<\/a> care planific\u0103 ast\u0103zi \u00een Excel ob\u021bine mai repede cu SkyPlanner un program de produc\u021bie utilizabil, care respect\u0103 capacitatea finit\u0103. \u00cen ambele cazuri, Proalpha r\u0103m\u00e2ne sistemul principal.<\/p>\n\n\n<p><strong>Alege\u021bi SkyPlanner \u00een locul Proalpha APS atunci c\u00e2nd:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u00cen prezent, planifica\u021bi \u00een Excel<\/strong> \u0219i dori\u021bi s\u0103 v\u0103 programa\u021bi propriile comenzi de produc\u021bie cu capacitate finit\u0103 \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni, nu abia dup\u0103 un proiect de planificare.<\/li>\n\n\n<li><strong>Dori\u021bi s\u0103 testa\u021bi mai \u00eent\u00e2i cu date reale,<\/strong> \u00een perioada de testare de 30 de zile, \u00eenainte de a lua o decizie privind licen\u021ba sau proiectul.<\/li>\n\n\n<li><strong>Trecerile de la un produs la altul determin\u0103 volumul produc\u021biei.<\/strong> Matricea timpilor de reglaj ordoneaz\u0103 opera\u021biile astfel \u00eenc\u00e2t timpul total de reglaj s\u0103 fie minim.<\/li>\n\n\n<li><strong>Sculele folosite \u00een comun \u0219i opera\u021biile care necesit\u0103 mai mul\u021bi operatori determin\u0103 ce se poate executa \u00een continuare.<\/strong><\/li>\n\n\n<li><strong>Sosirea materialelor determin\u0103 ce opera\u021bie poate \u00eencepe.<\/strong> Stocurile \u0219i comenzile de achizi\u021bie condi\u021bioneaz\u0103 \u00eenceperea fiec\u0103rei opera\u021bii.<\/li>\n\n\n<li><strong>Planul se schimb\u0103 zilnic.<\/strong> Autopilot reface programarea la fiecare schimbare, f\u0103r\u0103 ca un planificator s\u0103 lanseze calculul, iar noile date sunt transmise \u00eenapoi \u00een Proalpha.<\/li>\n\n\n<li><strong>Operatorii trebuie s\u0103 lucreze pe baza propriei liste de opera\u021bii<\/strong> de pe telefon sau tablet\u0103, iar confirm\u0103rile s\u0103 fie \u00eenregistrate \u00een Proalpha.<\/li>\n\n\n<li><strong>Dori\u021bi ca altcineva s\u0103 se ocupe de configurarea \u0219i asisten\u021ba pentru integrare.<\/strong> Echipa SkyPlanner configureaz\u0103 integrarea \u0219i \u00eei asigur\u0103 func\u021bionarea dup\u0103 punerea \u00een exploatare, la un pre\u021b public care porne\u0219te de la 199 \u20ac pe lun\u0103.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum \u00eencepe\u021bi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u00cencepe\u021bi testarea gratuit\u0103.<\/strong> 30 de zile, p\u00e2n\u0103 la 20 de centre de lucru, toate func\u021biile Basic, f\u0103r\u0103 card de credit.<\/li>\n\n\n<li><strong>Modela\u021bi-v\u0103 produc\u021bia.<\/strong> Defini\u021bi utilajele, personalul \u0219i schimburile \u00een SkyPlanner sau importa\u021bi-le. Pute\u021bi beneficia de asisten\u021b\u0103 la configurarea ini\u021bial\u0103.<\/li>\n\n\n<li><strong>\u00cenc\u0103rca\u021bi comenzile de produc\u021bie.<\/strong> Exporta\u021bi din Proalpha comenzile de produc\u021bie deschise \u0219i opera\u021biile acestora \u00een format CSV sau Excel. Importa\u021bi-le \u0219i compara\u021bi programul generat de SkyPlanner cu planul actual.<\/li>\n\n\n<li><strong>Conecta\u021bi Proalpha.<\/strong> Echipa SkyPlanner configureaz\u0103 integrarea bidirec\u021bional\u0103 \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 \u0219i asigur\u0103 asisten\u021ba dup\u0103 punerea \u00een exploatare.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u021buri.<\/strong> Abonamentele se factureaz\u0103 lunar, pentru fiecare centru de lucru. Pute\u021bi ad\u0103uga sau elimina centre de lucru ori anula abonamentul \u00een orice moment. Consulta\u021bi pagina de <a href=\"\/ro\/preturi\/\">pre\u021buri<\/a> pentru detalii \u0219i descoperi\u021bi celelalte sisteme ERP \u00een <a href=\"\/ro\/integrari\/erp\/\">sec\u021biunea de integr\u0103ri ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Contacta\u021bi echipa de v\u00e2nz\u0103ri<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Care este cea mai bun\u0103 extensie de programare a produc\u021biei pentru Proalpha?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS este o extensie pentru programare cu capacitate finit\u0103, cu integrare bidirec\u021bional\u0103 cu Proalpha: preia comenzile de produc\u021bie, opera\u021biile, resursele, piesele \u0219i stocurile \u0219i transmite \u00eenapoi datele planificate ale opera\u021biilor, aloc\u0103rile pe utilaje \u0219i confirm\u0103rile operatorilor. Capacitatea fiec\u0103rui utilaj, operator \u0219i a fiec\u0103rei scule, precum \u0219i disponibilitatea fiec\u0103rui material sunt limitate. O matrice a timpilor de reglaj care \u021bine cont de sensul tranzi\u021biei ordoneaz\u0103 opera\u021biile pentru a minimiza timpul de reglaj. Autopilot reface automat programarea atunci c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie. Pre\u021bul porne\u0219te de la 199 \u20ac pe lun\u0103, iar perioada de testare gratuit\u0103 dureaz\u0103 30 de zile.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>proALPHA ofer\u0103 programare cu capacitate finit\u0103?<\/summary>\n<p class=\"sp-faq__a\">Da. Proalpha APS optimizeaz\u0103 planurile care implic\u0103 mai multe resurse \u00een func\u021bie de obiective precum respectarea termenelor de livrare \u0219i timpii de ciclu, iar Feinplanung le permite planificatorilor s\u0103 ajusteze manual succesiunea opera\u021biilor. Sunt necesare modele de proces bine definite \u0219i date \u00een timp real din sec\u021bia de produc\u021bie. SkyPlanner APS programeaz\u0103 fiecare utilaj, persoan\u0103, scul\u0103 \u0219i material \u00eentr-un singur motor de calcul \u00een cloud, cu reprogramare prin Autopilot, un pre\u021b public \u0219i posibilitatea de testare pe propriile comenzi de produc\u021bie.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>S\u0103 alegem Proalpha APS sau SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Alege\u021bi SkyPlanner dac\u0103 \u00een prezent planifica\u021bi \u00een Excel. Proalpha APS planific\u0103 bine doar dup\u0103 ce modelele de proces, calendarele resurselor \u0219i transmiterea datelor PDC \u00een timp real sunt configurate \u00een cadrul unui proiect Proalpha. Ajust\u0103rile sunt realizate de consultan\u021bii proprii Proalpha, la un pre\u021b ofertat pentru fiecare instalare. SkyPlanner programeaz\u0103 fiecare utilaj, persoan\u0103, scul\u0103 \u0219i material \u00een cloud, Autopilot reface programarea la fiecare schimbare, iar operatorii lucreaz\u0103 \u00een Mobile Confirmations. \u00cencepe\u021bi utilizarea \u00een produc\u021bie \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni, de la 199 \u20ac pe lun\u0103, dup\u0103 o perioad\u0103 de testare de 30 de zile pe propriile comenzi de produc\u021bie. Nu ave\u021bi nevoie de Proalpha APS pentru a utiliza SkyPlanner; dac\u0103 este activ, \u00een etapa de configurare ini\u021bial\u0103 se stabile\u0219te care sistem gestioneaz\u0103 datele calendaristice ale opera\u021biilor.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner \u00eenlocuie\u0219te Proalpha Production?<\/summary>\n<p class=\"sp-faq__a\">Nu, \u00eel completeaz\u0103. Proalpha continu\u0103 s\u0103 gestioneze piesele, modelele proceselor de fabrica\u021bie ale produselor, materialele, achizi\u021biile \u0219i finan\u021bele. SkyPlanner programeaz\u0103 comenzile de produc\u021bie deschise \u00een func\u021bie de capacitatea real\u0103 \u0219i transmite \u00eenapoi datele, resursele \u0219i confirm\u0103rile.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Trebuie s\u0103 instal\u0103m ceva \u00een Proalpha?<\/summary>\n<p class=\"sp-faq__a\">Nu. SkyPlanner ruleaz\u0103 \u00een cloud \u0219i transmite datele \u00eenapoi prin interfe\u021bele REST API publicate de Proalpha. Comenzile de produc\u021bie ajung \u00een SkyPlanner prin interfe\u021bele Proalpha, configurate \u00een etapa ini\u021bial\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>C\u00e2t cost\u0103 SkyPlanner pentru o fabric\u0103 ce utilizeaz\u0103 Proalpha?<\/summary>\n<p class=\"sp-faq__a\">De la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, plus 20 \u20ac pe lun\u0103 pentru fiecare centru de lucru suplimentar. Un centru de lucru este o resurs\u0103 de produc\u021bie cu propria list\u0103 de opera\u021bii programate. Primi\u021bi de la \u00eenceput o ofert\u0103 pentru integrare, adaptat\u0103 procesului \u0219i nevoilor dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul, astfel \u00eenc\u00e2t s\u0103 cunoa\u0219te\u021bi costul total \u00eenainte de a \u00eencepe.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>C\u00e2t dureaz\u0103 implementarea?<\/summary>\n<p class=\"sp-faq__a\">Implementarea se finalizeaz\u0103 de obicei \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea configur\u0103rii ini\u021biale. Echipa stabile\u0219te coresponden\u021bele pentru resurse \u0219i comenzi de produc\u021bie, conecteaz\u0103 stocurile \u0219i comenzile de achizi\u021bie \u0219i activeaz\u0103 transmiterea datelor \u00eenapoi \u00een Proalpha. \u00cenainte de punerea \u00een exploatare, totul este testat prin compara\u021bie cu planul actual.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de integrarea cu Proalpha?<\/summary>\n<p class=\"sp-faq__a\">Da. \u00cen perioada de testare de 30 de zile, utiliza\u021bi un export CSV sau Excel al comenzilor de produc\u021bie deschise din Proalpha. Vede\u021bi rezultatul <a href=\"\/ro\/resurse\/capacitate-finita\/\">program\u0103rii cu capacitate finit\u0103<\/a> pentru propria produc\u021bie \u00eenainte s\u0103 \u00eenceap\u0103 lucr\u0103rile de integrare.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ proALPHA ERP SkyPlanner APS pentru proALPHA: programarea produc\u021biei cu capacitate finit\u0103 SkyPlanner APS este o extensie de programare cu capacitate finit\u0103 pentru proALPHA, care programeaz\u0103 fiecare utilaj, operator, scul\u0103 \u0219i material. Planificatorii nu mai refac planul \u00een Excel, iar Autopilot reprogrameaz\u0103 automat c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie. skyplanner.ai \u00b7 Programarea produc\u021biei &#8230; <a title=\"SkyPlanner APS pentru proALPHA: programarea produc\u021biei cu capacitate finit\u0103\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proalpha\/\" aria-label=\"Read more about SkyPlanner APS pentru proALPHA: programarea produc\u021biei cu capacitate finit\u0103\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100697,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103192","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integrare proALPHA: APS pentru programare cu capacitate finit\u0103<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS pentru proALPHA: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103; fiecare utilaj, schimb, scul\u0103 \u0219i material. De la 199 \u20ac pe lun\u0103.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proalpha\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS pentru proALPHA: programarea produc\u021biei cu capacitate finit\u0103\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS pentru proALPHA: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103; fiecare utilaj, schimb, scul\u0103 \u0219i material. De la 199 \u20ac pe lun\u0103.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proalpha\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/proalpha\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/proalpha\\\/\",\"name\":\"Integrare proALPHA: APS pentru programare cu capacitate finit\u0103\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS pentru proALPHA: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103; fiecare utilaj, schimb, scul\u0103 \u0219i material. De la 199 \u20ac pe lun\u0103.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/proalpha\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/proalpha\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/proalpha\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru proALPHA: programarea produc\u021biei cu capacitate finit\u0103\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integrare proALPHA: APS pentru programare cu capacitate finit\u0103","description":"SkyPlanner APS pentru proALPHA: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103; fiecare utilaj, schimb, scul\u0103 \u0219i material. De la 199 \u20ac pe lun\u0103.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proalpha\/","og_locale":"ro_RO","og_type":"article","og_title":"SkyPlanner APS pentru proALPHA: programarea produc\u021biei cu capacitate finit\u0103","og_description":"SkyPlanner APS pentru proALPHA: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103; fiecare utilaj, schimb, scul\u0103 \u0219i material. De la 199 \u20ac pe lun\u0103.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proalpha\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proalpha\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proalpha\/","name":"Integrare proALPHA: APS pentru programare cu capacitate finit\u0103","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS pentru proALPHA: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103; fiecare utilaj, schimb, scul\u0103 \u0219i material. De la 199 \u20ac pe lun\u0103.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proalpha\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proalpha\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/proalpha\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru proALPHA: programarea produc\u021biei cu capacitate finit\u0103"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ proALPHA ERP SkyPlanner APS pentru proALPHA: programarea produc\u021biei cu capacitate finit\u0103 SkyPlanner APS este o extensie de programare cu capacitate finit\u0103 pentru proALPHA, care programeaz\u0103 fiecare utilaj, operator, scul\u0103 \u0219i material. Planificatorii nu mai refac planul \u00een Excel, iar Autopilot reprogrameaz\u0103 automat c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie. skyplanner.ai \u00b7 Programarea produc\u021biei&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/103192","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=103192"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/103192\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/100697"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=103192"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}