{"id":103015,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/katana\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"katana","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/katana\/","title":{"rendered":"SkyPlanner APS pentru Katana: programarea produc\u021biei cu capacitate finit\u0103"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ Katana<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS pentru Katana: <span class=\"hl\">programarea produc\u021biei cu capacitate finit\u0103<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS este o extensie de programare cu capacitate finit\u0103 pentru Katana Cloud Inventory (Katana MRP). Transform\u0103 comenzile de fabrica\u021bie din Katana \u00eentr-un program pentru fiecare centru de lucru, operator, scul\u0103 \u0219i material. Vede\u021bi unde \u0219i c\u00e2nd se execut\u0103 fiecare opera\u021bie, iar Autopilot reprogrameaz\u0103 automat atunci c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner se integreaz\u0103 bidirec\u021bional cu Katana. Preia comenzile de fabrica\u021bie, re\u021betele, opera\u021biile, resursele, stocurile \u0219i comenzile de achizi\u021bie \u0219i trimite \u00eenapoi ordinea de execu\u021bie, termenele \u0219i munca \u00eenregistrat\u0103. Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 Katana \u00een etapa de implementare.<\/p>\n\n\n<p>Pre\u021bul porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, iar fiecare centru de lucru suplimentar cost\u0103 20 \u20ac pe lun\u0103. Perioada de testare gratuit\u0103 dureaz\u0103 30 de zile, cu p\u00e2n\u0103 la 20 de centre de lucru, f\u0103r\u0103 card de credit.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce se schimb\u0103 \u00een produc\u021bia dumneavoastr\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Un grafic pentru fiecare utilaj, nu o singur\u0103 list\u0103 pentru \u00eentreaga fabric\u0103.<\/p>\n\n\n<p class=\"fx-pain__b\">Katana ordoneaz\u0103 comenzile de fabrica\u021bie \u00eentr-o singur\u0103 list\u0103 de priorit\u0103\u021bi. Motorul Arcturus din SkyPlanner plaseaz\u0103 fiecare opera\u021bie pe centrul de lucru unde va fi executat\u0103, la un moment concret, \u00eentr-un grafic Gantt interactiv.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Termene de livrare verificate \u00een raport cu capacitatea real\u0103.<\/p>\n\n\n<p class=\"fx-pain__b\">Data de finalizare a fiec\u0103rei comenzi se calculeaz\u0103 pe baza \u00eenc\u0103rc\u0103rii fiec\u0103rui utilaj \u0219i a fiec\u0103rei persoane. \u00cenainte s\u0103 comunica\u021bi un termen, vede\u021bi c\u0103 utilajul CNC este ocupat pentru dou\u0103 s\u0103pt\u0103m\u00e2ni, \u00een timp ce la asamblare exist\u0103 capacitate disponibil\u0103.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Schimburi adaptate fabricii dumneavoastr\u0103.<\/p>\n\n\n<p class=\"fx-pain__b\">Pentru fiecare centru de lucru \u0219i fiecare persoan\u0103 se definesc separat schimburile, concediile, absen\u021bele \u0219i schimburile suplimentare. Ad\u0103ugarea unui al doilea schimb la resursa care provoac\u0103 un blocaj se reflect\u0103 imediat \u00een termene.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Mai pu\u021bine schimb\u0103ri de fabrica\u021bie.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner p\u0103streaz\u0103 timpul de reglaj pentru trecerea de la un produs la altul, pentru fiecare pereche, \u00een ambele sensuri. Trecerea de la albastru la ro\u0219u poate dura 30 de minute, iar de la ro\u0219u la albastru 60. Motorul ordoneaz\u0103 opera\u021biile astfel \u00eenc\u00e2t s\u0103 se piard\u0103 c\u00e2t mai pu\u021bin timp.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Programare care \u021bine cont de sculele \u0219i echipele comune.<\/p>\n\n\n<p class=\"fx-pain__b\">O matri\u021b\u0103 folosit\u0103 la un centru de lucru nu este niciodat\u0103 alocat\u0103 simultan altui centru. Unei opera\u021bii care necesit\u0103 trei operatori i se aloc\u0103 trei persoane disponibile \u00een schimburile respective.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprogramare automat\u0103 la comenzi urgente \u0219i defec\u021biuni.<\/p>\n\n\n<p class=\"fx-pain__b\">Activa\u021bi Fast Track pentru o comand\u0103 sau acorda\u021bi-i o prioritate mai mare, iar motorul \u00eei face loc \u00een program. C\u00e2nd un utilaj se opre\u0219te, Autopilot replanific\u0103, iar Running Time Lock men\u021bine opera\u021biile \u00eencepute pe pozi\u021biile lor.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materiale verificate la fiecare modificare a programului.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner verific\u0103 stocurile \u0219i comenzile de achizi\u021bie \u00een curs de aprovizionare. O opera\u021bie care a\u0219teapt\u0103 o livrare de la furnizor este programat\u0103 dup\u0103 data sosirii materialelor.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatorii \u00ee\u0219i v\u0103d lista de opera\u021bii.<\/p>\n\n\n<p class=\"fx-pain__b\">Fiecare operator vede urm\u0103toarele opera\u021bii pe telefon sau tablet\u0103 \u0219i \u00eenregistreaz\u0103 munca efectuat\u0103 cu Mobile Confirmations sau Production Timer. Progresul este transmis \u00eenapoi la comanda de fabrica\u021bie din Katana.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een sec\u021bia de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi p\u0103rerea UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor din fabrica de medicamente Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui plan optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi p\u0103rerea Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Un sudor KJH-Comp polizeaz\u0103 o structur\u0103 sudat\u0103 din o\u021bel la fabrica din Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>respectarea termenelor de livrare, fa\u021b\u0103 de circa 50% anterior<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner are un rol decisiv \u00een a ne ajuta s\u0103 respect\u0103m \u00een continuare termenele de livrare.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, director general<\/b><br>KJH-Comp \u00b7 Prelucrarea tablei \u0219i fabrica\u021bie la comand\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a crescut de la aproximativ 50% p\u00e2n\u0103 la 98%, iar programarea necesit\u0103 acum un singur responsabil \u00een loc de doi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/kjh-comp\/\">Citi\u021bi p\u0103rerea KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>respectarea termenelor de livrare din 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ne ofer\u0103 vizibilitate asupra capacit\u0103\u021bii \u0219i face planificarea predictibil\u0103.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Produc\u021bie chimic\u0103 \u0219i alimentar\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a fost de 100% pe \u00eentreaga perioad\u0103 de utilizare a SkyPlanner, \u00eencep\u00e2nd din 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/opes-corporation\/\">Citi\u021bi p\u0103rerea Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-katana-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum func\u021bioneaz\u0103 integrarea cu Katana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Katana trimite lucr\u0103rile de executat.<\/strong> Comenzile de fabrica\u021bie cu liniile lor de opera\u021bii, re\u021betele produselor, opera\u021biile de produc\u021bie, resursele, stocurile \u0219i comenzile de achizi\u021bie sunt preluate \u00een SkyPlanner.<\/li>\n\n\n<li><strong>SkyPlanner creeaz\u0103 programul \u0219i \u00eel men\u021bine actualizat.<\/strong> Motorul Arcturus programeaz\u0103 \u00een c\u00e2teva secunde fiecare opera\u021bie pe fiecare centru de lucru \u0219i reprogrameaz\u0103 pe m\u0103sur\u0103 ce apar schimb\u0103ri \u00een produc\u021bie.<\/li>\n\n\n<li><strong>Planul este trimis \u00eenapoi \u00een Katana.<\/strong> SkyPlanner aranjeaz\u0103 comenzile de fabrica\u021bie \u00een aceea\u0219i ordine \u00een fila Schedule din Katana \u0219i \u00eenscrie termenul de produc\u021bie al fiec\u0103rei comenzi. Munca \u00eenregistrat\u0103 este transmis\u0103 \u00eenapoi \u00een liniile de opera\u021bii.<\/li>\n\n<\/ol>\n\n\n<p>Integrarea folose\u0219te API-ul public Katana, deci nu se instaleaz\u0103 nimic \u00een Katana. Webhook-urile Katana semnaleaz\u0103 comenzile noi \u0219i modificate, iar webhook-urile SkyPlanner transmit modific\u0103rile programului pe m\u0103sur\u0103 ce apar. Fiecare fabric\u0103 \u00ee\u0219i configureaz\u0103 diferit resursele \u0219i opera\u021biile din Katana, a\u0219a c\u0103 echipa SkyPlanner stabile\u0219te coresponden\u021bele pentru configura\u021bia dumneavoastr\u0103 \u00een etapa de implementare \u0219i asigur\u0103 suport pentru integrare dup\u0103 punerea \u00een func\u021biune.<\/p>\n\n\n<p>Costul integr\u0103rii este ofertat de la \u00eenceput, \u00een func\u021bie de procesele \u0219i nevoile dumneavoastr\u0103. Consultantul dumneavoastr\u0103 Katana sau propriii dezvoltatori pot realiza integrarea \u0219i pe baza API-ului documentat al SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia API<\/a>). Endpoint-urile, coresponden\u021bele dintre c\u00e2mpuri \u0219i regulile de scriere a datelor \u00eenapoi \u00een Katana sunt prezentate \u00een <a href=\"\/ro\/integrari\/erp\/katana\/ghid-de-integrare\/\">ghidul de integrare Katana pentru programarea produc\u021biei<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-katana-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce programeaz\u0103 Katana \u0219i ce adaug\u0103 SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ecranul Make din Katana are o fil\u0103 Schedule care &#8220;acts as a central production queue&#8221; (func\u021bioneaz\u0103 ca o list\u0103 central\u0103 a lucr\u0103rilor de produc\u021bie). <a href=\"https:\/\/support.katanamrp.com\/en\/articles\/5914369-managing-manufacturing-order-priorities\">Centrul de ajutor Katana<\/a> explic\u0103 modul de func\u021bionare:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>O singur\u0103 list\u0103 pentru \u00eentreaga fabric\u0103.<\/strong> &#8220;The topmost MO has the highest priority.&#8221; (Comanda de fabrica\u021bie din capul listei are prioritatea cea mai mare.)<\/li>\n\n\n<li><strong>Planificatorul stabile\u0219te ordinea.<\/strong> &#8220;Click and drag the MO to the desired position in the list.&#8221; (Face\u021bi clic \u0219i trage\u021bi comanda de fabrica\u021bie \u00een pozi\u021bia dorit\u0103 din list\u0103.)<\/li>\n\n\n<li><strong>Capacitatea este exprimat\u0103 printr-o singur\u0103 valoare s\u0103pt\u0103m\u00e2nal\u0103.<\/strong> Termenele automate se bazeaz\u0103 pe Weekly throughput la nivelul \u00eentregii fabrici, iar &#8220;Weekly capacity is spread evenly across 5 weekdays.&#8221; (Capacitatea s\u0103pt\u0103m\u00e2nal\u0103 este distribuit\u0103 uniform \u00eentre aceste zile lucr\u0103toare.) (<a href=\"https:\/\/support.katanamrp.com\/en\/articles\/5914341-how-to-manage-production-deadlines\">surs\u0103<\/a>)<\/li>\n\n\n<li><strong>Recomandarea Katana pentru fabricile cu produc\u021bie complex\u0103.<\/strong> &#8220;For complex, long-term, or multi-stream production setups, manual deadlines might offer better control.&#8221; (Pentru produc\u021bia complex\u0103, pe termen lung sau cu fluxuri multiple, termenele stabilite manual ar putea oferi un control mai bun.)<\/li>\n\n<\/ul>\n\n\n<p>Resursele din Katana nu au schimburi sau calendare proprii, iar fila Tasks urmeaz\u0103 prioritatea comenzilor de fabrica\u021bie. Prin urmare, Katana nu verific\u0103 dac\u0103 un anumit utilaj este supra\u00eenc\u0103rcat, iar reglajul este un tip de cost, nu o schimbare de fabrica\u021bie care depinde de produsul executat anterior. Fiecare limitare este explicat\u0103 \u00een <a href=\"\/ro\/integrari\/erp\/katana\/cu-capacitate-finita\/\">Katana ofer\u0103 programare cu capacitate finit\u0103?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-moves-between-katana-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce date se transfer\u0103 \u00eentre Katana \u0219i SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Katana<\/th><th>SkyPlanner<\/th><th>Direc\u021bie<\/th><\/tr><\/thead><tbody><tr><td>Produse, materiale, variante<\/td><td>Produse \u0219i materiale<\/td><td>Spre SkyPlanner<\/td><\/tr><tr><td>Re\u021beta produsului \/ BOM<\/td><td>Structura produsului, subproduse<\/td><td>Spre SkyPlanner<\/td><\/tr><tr><td>Opera\u021bii de produc\u021bie: Type, Resource, Time<\/td><td>Etape de proces, timpi de reglaj<\/td><td>Spre SkyPlanner<\/td><\/tr><tr><td>Resurse (centru de lucru, utilaj, angajat)<\/td><td>Centre de lucru, grupuri de centre de lucru<\/td><td>Spre SkyPlanner<\/td><\/tr><tr><td>Comand\u0103 de fabrica\u021bie cu linii de opera\u021bii \u0219i ingrediente<\/td><td>Comenzi \u0219i opera\u021bii<\/td><td>Spre SkyPlanner<\/td><\/tr><tr><td>Stocuri, comenzi de achizi\u021bie cu date de sosire<\/td><td>Stocuri \u0219i materiale \u00een curs de aprovizionare<\/td><td>Spre SkyPlanner<\/td><\/tr><tr><td>Data de livrare a comenzii de v\u00e2nzare<\/td><td>Termenul comenzii, prioritatea clientului<\/td><td>Spre SkyPlanner<\/td><\/tr><tr><td>Pozi\u021bia comenzii de fabrica\u021bie \u00een fila Schedule, termenul de produc\u021bie<\/td><td>Ordinea de execu\u021bie, finalizarea programat\u0103<\/td><td>\u00cenapoi \u00een Katana<\/td><\/tr><tr><td>Starea liniei de opera\u021bie \u0219i timpul efectiv<\/td><td>Mobile Confirmations, \u00eenregistr\u0103ri de timp<\/td><td>\u00cenapoi<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"katana-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Katana acum \u0219i cu SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Katana<\/th><th>Katana cu SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Planificare<\/td><td>O singur\u0103 list\u0103 de priorit\u0103\u021bi pentru comenzile de fabrica\u021bie<\/td><td>Fiecare opera\u021bie pe axa de timp a unui centru de lucru<\/td><\/tr><tr><td>Capacitate<\/td><td>O singur\u0103 valoare pentru volumul s\u0103pt\u0103m\u00e2nal de produc\u021bie<\/td><td>Fiecare utilaj, persoan\u0103 \u0219i scul\u0103 cu propriul program de schimburi<\/td><\/tr><tr><td>Calendare<\/td><td>De luni p\u00e2n\u0103 vineri, pentru \u00eentreaga fabric\u0103<\/td><td>Schimburi, concedii, absen\u021be \u0219i ore suplimentare pentru fiecare resurs\u0103<\/td><\/tr><tr><td>Stabilirea succesiunii<\/td><td>Planificatorul mut\u0103 manual comenzile de fabrica\u021bie prin glisare<\/td><td>Motorul stabile\u0219te succesiunea tuturor comenzilor deschise \u00een func\u021bie de prioritate \u0219i termen<\/td><\/tr><tr><td>Schimb\u0103ri de fabrica\u021bie<\/td><td>Reglajul este tratat drept cost al opera\u021biei<\/td><td>Matrice a timpilor de reglaj, timp total de reglaj minim<\/td><\/tr><tr><td>Modific\u0103ri<\/td><td>Reordonare prin glisare dup\u0103 fiecare perturbare<\/td><td>Autopilot replanific\u0103 \u00eentreaga fabric\u0103<\/td><\/tr><tr><td>Materiale<\/td><td>Rezervate \u00een ordinea priorit\u0103\u021bilor<\/td><td>Stocul \u0219i comenzile de aprovizionare \u00een curs sunt verificate la fiecare modificare<\/td><\/tr><tr><td>Sec\u021bia de produc\u021bie<\/td><td>List\u0103 de sarcini pentru fiecare resurs\u0103<\/td><td>List\u0103 de opera\u021bii cu ore programate, Mobile Confirmations, Production Timer<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-choose-a-scheduler-for-katana\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum alege\u021bi o solu\u021bie de programare a produc\u021biei pentru Katana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Fila Schedule din Katana este potrivit\u0103 pentru un atelier mic, cu cicluri scurte, un volum constant de produc\u021bie \u0219i un singur blocaj sau niciunul. Dincolo de acest nivel, cump\u0103r\u0103torii compar\u0103 patru variante: Katana ca solu\u021bie de sine st\u0103t\u0103toare, programarea \u00een foi de calcul alimentate prin exporturi CSV, instrumente care urm\u0103resc stadiul lucr\u0103rilor din sec\u021bia de produc\u021bie \u0219i un APS \u00een cloud care programeaz\u0103 fiecare resurs\u0103 \u0219i trimite rezultatele \u00eenapoi \u00een Katana.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Alege\u021bi SkyPlanner c\u00e2nd mai multe utilaje trebuie alocate acelora\u0219i comenzi,<\/strong> iar o singur\u0103 valoare a volumului s\u0103pt\u0103m\u00e2nal de produc\u021bie ascunde supra\u00eenc\u0103rcarea.<\/li>\n\n\n<li><strong>Alege\u021bi SkyPlanner c\u00e2nd programul schimburilor difer\u0103 \u00een func\u021bie de utilaj sau echip\u0103.<\/strong><\/li>\n\n\n<li><strong>Alege\u021bi SkyPlanner c\u00e2nd schimb\u0103rile de fabrica\u021bie depind de succesiunea opera\u021biilor.<\/strong> Matricea timpilor de reglaj stabile\u0219te ordinea.<\/li>\n\n\n<li><strong>Alege\u021bi SkyPlanner c\u00e2nd sculele \u0219i echipele folosite \u00een comun determin\u0103 ce opera\u021bie poate \u00eencepe \u00een continuare.<\/strong><\/li>\n\n\n<li><strong>Alege\u021bi SkyPlanner c\u00e2nd dori\u021bi ca succesiunea s\u0103 fie transmis\u0103 \u00eenapoi \u00een Katana,<\/strong> astfel \u00eenc\u00e2t rezerv\u0103rile de materiale s\u0103 urmeze planul real.<\/li>\n\n\n<li><strong>Alege\u021bi SkyPlanner c\u00e2nd operatorii trebuie s\u0103 lucreze dup\u0103 o list\u0103 de opera\u021bii cu ore programate,<\/strong> pe telefon sau tablet\u0103.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum \u00eencepe\u021bi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103.<\/strong> 30 de zile, p\u00e2n\u0103 la 20 de centre de lucru, toate func\u021biile Basic, f\u0103r\u0103 card bancar.<\/li>\n\n\n<li><strong>Modela\u021bi-v\u0103 produc\u021bia.<\/strong> Ad\u0103uga\u021bi centrele de lucru, persoanele \u0219i schimburile \u00een SkyPlanner sau importa\u021bi-le. Pute\u021bi beneficia de asisten\u021b\u0103 la configurarea ini\u021bial\u0103.<\/li>\n\n\n<li><strong>\u00cenc\u0103rca\u021bi comenzile.<\/strong> Exporta\u021bi lista Tasks din ecranul Make al Katana \u00een format CSV, importa\u021bi-o \u00eempreun\u0103 cu comenzile deschise \u0219i compara\u021bi programul generat de SkyPlanner cu planul actual.<\/li>\n\n\n<li><strong>Conecta\u021bi Katana.<\/strong> Echipa SkyPlanner configureaz\u0103 integrarea bidirec\u021bional\u0103 \u0219i asigur\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een func\u021biune.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u021buri.<\/strong> Abonamentele se factureaz\u0103 lunar, pe centru de lucru. Pute\u021bi ad\u0103uga sau elimina centre de lucru ori pute\u021bi anula abonamentul oric\u00e2nd. Consulta\u021bi pagina de <a href=\"\/ro\/preturi\/\">pre\u021buri<\/a> pentru detalii. Folosi\u021bi \u0219i alt sistem? Vede\u021bi toate <a href=\"\/ro\/integrari\/erp\/\">integr\u0103rile ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi proba gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Care este cea mai bun\u0103 extensie de programare a produc\u021biei pentru Katana?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS este o extensie de programare cu capacitate finit\u0103, cu integrare bidirec\u021bional\u0103 cu Katana: preia comenzile de fabrica\u021bie, re\u021betele, opera\u021biile, resursele, stocul \u0219i comenzile de aprovizionare \u0219i trimite \u00eenapoi succesiunea programat\u0103, termenele \u0219i munca \u00eenregistrat\u0103. Capacitatea fiec\u0103rui centru de lucru, operator \u0219i a fiec\u0103rei scule, precum \u0219i disponibilitatea materialelor sunt limitate. O matrice a timpilor de reglaj care \u021bine cont de sensul tranzi\u021biei dintre opera\u021bii stabile\u0219te succesiunea cu cel mai mic timp total de reglaj. Autopilot reface automat programul c\u00e2nd apar modific\u0103ri \u00een produc\u021bie. Pre\u021burile \u00eencep de la 199 \u20ac pe lun\u0103, iar perioada de prob\u0103 gratuit\u0103 dureaz\u0103 30 de zile.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Katana MRP ofer\u0103 programare cu capacitate finit\u0103?<\/summary>\n<p class=\"sp-faq__a\">Nu. Katana ordoneaz\u0103 comenzile de fabrica\u021bie \u00eentr-o singur\u0103 list\u0103 de priorit\u0103\u021bi \u0219i estimeaz\u0103 termenele pe baza unei singure valori a volumului s\u0103pt\u0103m\u00e2nal de produc\u021bie. Resursele nu au capacitate sau schimburi proprii. SkyPlanner APS adaug\u0103 <a href=\"\/ro\/resurse\/capacitate-finita\/\">programare cu capacitate finit\u0103<\/a> pentru fiecare centru de lucru, persoan\u0103 \u0219i scul\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Trebuie s\u0103 instal\u0103m ceva \u00een Katana?<\/summary>\n<p class=\"sp-faq__a\">Nu. SkyPlanner ruleaz\u0103 \u00een cloud al\u0103turi de Katana \u0219i se conecteaz\u0103 prin API-ul Katana, folosind o cheie API. Notific\u0103rile webhook din Katana semnaleaz\u0103 modific\u0103rile comenzilor, astfel \u00eenc\u00e2t programul s\u0103 r\u0103m\u00e2n\u0103 la zi.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner \u00eenlocuie\u0219te Katana?<\/summary>\n<p class=\"sp-faq__a\">Nu, \u00eel completeaz\u0103. Katana gestioneaz\u0103 \u00een continuare produsele, re\u021betele, stocurile, achizi\u021biile, comenzile de v\u00e2nzare \u0219i conexiunile cu sistemul contabil. SkyPlanner programeaz\u0103 comenzile de fabrica\u021bie \u00een func\u021bie de capacitatea real\u0103 \u0219i transmite \u00eenapoi succesiunea, termenele \u0219i progresul.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>C\u00e2t cost\u0103 SkyPlanner folosit \u00eempreun\u0103 cu Katana?<\/summary>\n<p class=\"sp-faq__a\">De la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, plus 20 \u20ac pe lun\u0103 pentru fiecare centru de lucru suplimentar. O fabric\u0103 cu 20 de centre de lucru pl\u0103te\u0219te 499 \u20ac pe lun\u0103. Oferta pentru integrare este stabilit\u0103 de la \u00eenceput, \u00een func\u021bie de procesele \u0219i nevoile dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul, astfel \u00eenc\u00e2t s\u0103 cunoa\u0219te\u021bi costul total \u00eenainte de a \u00eencepe.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>De ce abonament Katana avem nevoie pentru integrare?<\/summary>\n<p class=\"sp-faq__a\">Pagina de pre\u021buri Katana men\u021bioneaz\u0103 accesul API at\u00e2t pentru abonamentul Free, c\u00e2t \u0219i pentru Advantage. Comenzile de fabrica\u021bie \u0219i opera\u021biile de produc\u021bie sunt disponibile prin func\u021bionalitatea Manufacturing Management din Katana. Crea\u021bi cheia API din Settings &gt; API.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>C\u00e2t dureaz\u0103 implementarea?<\/summary>\n<p class=\"sp-faq__a\">Implementarea se finalizeaz\u0103 de obicei \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea configur\u0103rii ini\u021biale. Echipa mapeaz\u0103 resursele \u0219i opera\u021biile de produc\u021bie, conecteaz\u0103 comenzile de fabrica\u021bie \u0219i de aprovizionare \u0219i configureaz\u0103 transmiterea \u00eenapoi a succesiunii \u0219i a termenelor. \u00cenainte de punerea \u00een func\u021biune, totul este testat prin raportare la planul actual.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa mai \u00eent\u00e2i SkyPlanner cu datele noastre din Katana?<\/summary>\n<p class=\"sp-faq__a\">Da. \u00cen perioada de prob\u0103, importa\u021bi centrele de lucru \u0219i comenzile deschise dintr-un export CSV din Katana. Vede\u021bi rezultatul program\u0103rii cu capacitate finit\u0103 pentru propria produc\u021bie \u00eenainte de a \u00eencepe lucr\u0103rile de integrare.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ Katana SkyPlanner APS pentru Katana: programarea produc\u021biei cu capacitate finit\u0103 SkyPlanner APS este o extensie de programare cu capacitate finit\u0103 pentru Katana Cloud Inventory (Katana MRP). Transform\u0103 comenzile de fabrica\u021bie din Katana \u00eentr-un program pentru fiecare centru de lucru, operator, scul\u0103 \u0219i material. Vede\u021bi unde \u0219i c\u00e2nd se execut\u0103 fiecare opera\u021bie, &#8230; <a title=\"SkyPlanner APS pentru Katana: programarea produc\u021biei cu capacitate finit\u0103\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/katana\/\" aria-label=\"Read more about SkyPlanner APS pentru Katana: programarea produc\u021biei cu capacitate finit\u0103\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100697,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103015","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Katana MRP: integrare APS pentru programare cu capacitate finit\u0103<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS pentru Katana MRP: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, centre de lucru, schimburi, scule, materiale. De la 199 \u20ac\/lun\u0103.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/katana\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS pentru Katana: programarea produc\u021biei cu capacitate finit\u0103\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS pentru Katana MRP: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, centre de lucru, schimburi, scule, materiale. De la 199 \u20ac\/lun\u0103.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/katana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/katana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/katana\\\/\",\"name\":\"Katana MRP: integrare APS pentru programare cu capacitate finit\u0103\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS pentru Katana MRP: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, centre de lucru, schimburi, scule, materiale. De la 199 \u20ac\\\/lun\u0103.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/katana\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/katana\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/katana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru Katana: programarea produc\u021biei cu capacitate finit\u0103\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Katana MRP: integrare APS pentru programare cu capacitate finit\u0103","description":"SkyPlanner APS pentru Katana MRP: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, centre de lucru, schimburi, scule, materiale. De la 199 \u20ac\/lun\u0103.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/katana\/","og_locale":"ro_RO","og_type":"article","og_title":"SkyPlanner APS pentru Katana: programarea produc\u021biei cu capacitate finit\u0103","og_description":"SkyPlanner APS pentru Katana MRP: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, centre de lucru, schimburi, scule, materiale. De la 199 \u20ac\/lun\u0103.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/katana\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/katana\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/katana\/","name":"Katana MRP: integrare APS pentru programare cu capacitate finit\u0103","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS pentru Katana MRP: programare cu capacitate finit\u0103, integrare bidirec\u021bional\u0103, centre de lucru, schimburi, scule, materiale. De la 199 \u20ac\/lun\u0103.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/katana\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/katana\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/katana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru Katana: programarea produc\u021biei cu capacitate finit\u0103"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ Katana SkyPlanner APS pentru Katana: programarea produc\u021biei cu capacitate finit\u0103 SkyPlanner APS este o extensie de programare cu capacitate finit\u0103 pentru Katana Cloud Inventory (Katana MRP). Transform\u0103 comenzile de fabrica\u021bie din Katana \u00eentr-un program pentru fiecare centru de lucru, operator, scul\u0103 \u0219i material. Vede\u021bi unde \u0219i c\u00e2nd se execut\u0103 fiecare opera\u021bie,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/103015","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=103015"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/103015\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/100697"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=103015"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}