{"id":102841,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/dynamics-365-scm\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"dynamics-365-scm","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/dynamics-365-scm\/","title":{"rendered":"SkyPlanner APS pentru Dynamics 365 Supply Chain Management: programarea produc\u021biei cu capacitate finit\u0103"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ Microsoft Dynamics 365 Supply Chain Management<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS pentru Dynamics 365 Supply Chain Management: <span class=\"hl\">programarea produc\u021biei cu capacitate finit\u0103<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS este o extensie de programare cu capacitate finit\u0103 pentru Microsoft Dynamics 365 Supply Chain Management. Pentru fiecare comand\u0103 de produc\u021bie, \u021bine cont de disponibilitatea efectiv\u0103 a fiec\u0103rei resurse, a fiec\u0103rui operator, a fiec\u0103rei scule \u0219i a fiec\u0103rui material, la ore exacte, pe \u00eentregul orizont de programare. D365 \u021bine cont doar par\u021bial de capacitatea finit\u0103. Planning Optimization o ia \u00een calcul numai \u00een intervalul definit pentru capacitate. Microsoft recomand\u0103 s\u0103 nu folosi\u021bi capacitatea finit\u0103 atunci c\u00e2nd capacitatea variaz\u0103 \u00een func\u021bie de schimburi (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/planning-optimization\/finite-capacity\">sursa<\/a>), iar programarea lucr\u0103rilor aloc\u0103 resurse pentru c\u00e2te o comand\u0103 pe r\u00e2nd (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/job-scheduling\">sursa<\/a>). SkyPlanner programeaz\u0103 toate comenzile \u00eempreun\u0103, iar Autopilot le reprogrameaz\u0103 automat c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner se integreaz\u0103 bidirec\u021bional cu Dynamics 365 Supply Chain Management: preia comenzile de produc\u021bie, opera\u021biile din rutele tehnologice, resursele, produsele lansate \u0219i comenzile de achizi\u021bie \u0219i trimite \u00eenapoi datele programate \u0219i resursele alocate. \u00cen etapa de implementare, echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 Supply Chain Management.<\/p>\n\n\n<p>Pre\u021bul porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, iar fiecare centru de lucru suplimentar cost\u0103 20 \u20ac pe lun\u0103. Perioada de testare gratuit\u0103 dureaz\u0103 30 de zile, cu p\u00e2n\u0103 la 20 de centre de lucru, f\u0103r\u0103 card de credit.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce se schimb\u0103 \u00een produc\u021bia dumneavoastr\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u00centreaga fabric\u0103 \u00eentr-un singur program.<\/p>\n\n\n<p class=\"fx-pain__b\">\u00cen D365 SCM, programarea lucr\u0103rilor plaseaz\u0103 comenzile de produc\u021bie una c\u00e2te una, \u00een func\u021bie de capacitatea deja rezervat\u0103. SkyPlanner programeaz\u0103 \u00eempreun\u0103 toate comenzile deschise, \u00een limita capacit\u0103\u021bii reale. Astfel, comanda programat\u0103 prima nu mai prime\u0219te implicit cele mai bune intervale.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Schimburi luate cu adev\u0103rat \u00een calcul.<\/p>\n\n\n<p class=\"fx-pain__b\">Pentru fiecare utilaj \u0219i fiecare persoan\u0103, capacitatea finit\u0103 se stabile\u0219te pe baza schimburilor reale, a absen\u021belor \u0219i a orelor suplimentare. Tocmai \u00een cazul capacit\u0103\u021bii bazate pe schimburi, Microsoft recomand\u0103 s\u0103 nu se foloseasc\u0103 capacitatea finit\u0103 \u00een planificarea general\u0103. SkyPlanner este conceput pentru acest mod de lucru.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Mai pu\u021bine schimb\u0103ri de fabrica\u021bie.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner cunoa\u0219te timpul de schimbare de fabrica\u021bie pentru fiecare pereche de produse, \u00een ambele sensuri. Trecerea de la albastru la ro\u0219u poate dura 30 de minute, iar cea de la ro\u0219u la albastru, 60. Motorul de programare ordoneaz\u0103 opera\u021biile astfel \u00eenc\u00e2t s\u0103 se piard\u0103 c\u00e2t mai pu\u021bin timp cu reglajele.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Scule \u0219i echipe comune, alocate \u00een limita disponibilit\u0103\u021bii.<\/p>\n\n\n<p class=\"fx-pain__b\">O matri\u021b\u0103 folosit\u0103 pe un utilaj nu este niciodat\u0103 rezervat\u0103 simultan pe altul. Unei opera\u021bii care necesit\u0103 trei operatori \u00eei sunt alocate trei persoane disponibile \u00een schimburile respective. C\u00e2nd o resurs\u0103 este ocupat\u0103, opera\u021bia este mutat\u0103 la un alt utilaj sau la o alt\u0103 persoan\u0103.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Un program care \u021bine cont de materiale.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner verific\u0103 stocurile \u0219i comenzile de achizi\u021bie cu livr\u0103ri a\u0219teptate. O opera\u021bie care depinde de o livrare de la furnizor este programat\u0103 dup\u0103 data livr\u0103rii, \u00een loc s\u0103 se blocheze \u00een sec\u021bia de produc\u021bie.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Comenzi urgente reprogramate \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"fx-pain__b\">C\u00e2nd un utilaj se opre\u0219te sau apare o comand\u0103 urgent\u0103, Autopilot reface automat programul. Bloc\u0103rile \u0219i priorit\u0103\u021bile stabilite de dumneavoastr\u0103 r\u0103m\u00e2n \u00een vigoare, iar planificatorii pot ajusta opera\u021biile \u00eentr-o diagram\u0103 Gantt interactiv\u0103.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatorii \u00ee\u0219i v\u0103d lista de opera\u021bii.<\/p>\n\n\n<p class=\"fx-pain__b\">Fiecare operator vede urm\u0103toarele opera\u021bii pe telefon sau tablet\u0103 \u0219i \u00eenregistreaz\u0103 activitatea pe m\u0103sur\u0103 ce o execut\u0103. Personalul de la birou urm\u0103re\u0219te progresul \u00een timp real.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een sec\u021bia de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei necesit\u0103 cu 2 ore mai pu\u021bin \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de opera\u021bii ajunge pe linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi recenzia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui plan optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi recenzia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, director general Mamec, \u00een hala de produc\u021bie a companiei din Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Peste 1.000<\/b><span>de comenzi de produc\u021bie programate automat<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eAvem un alt nivel de control asupra produc\u021biei, iar \u00een\u021belegerea capacit\u0103\u021bii noastre a ajuns la un cu totul alt nivel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, director general<\/b><br>Mamec \u00b7 Mixere industriale, pompe \u0219i produc\u021bie de \u00eenalt\u0103 tehnologie pe baz\u0103 de contract<\/p>\n\n\n<p class=\"ind-cust__result\">Mii de comenzi de produc\u021bie sunt programate automat, iar \u00eentreaga organiza\u021bie are o imagine \u00een timp real asupra produc\u021biei.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/mamec\/\">Citi\u021bi recenzia Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, manager de produc\u021bie la Fredman Operations, l\u00e2ng\u0103 o celul\u0103 robotizat\u0103 de paletizare din Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 luni<\/b><span>de vizibilitate asupra capacit\u0103\u021bii disponibile pentru echipa de v\u00e2nz\u0103ri<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ofer\u0103 o baz\u0103 solid\u0103 \u0219i siguran\u021b\u0103 pentru \u00eentreaga planificare a produc\u021biei.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, manager de produc\u021bie<\/b><br>Fredman Operations \u00b7 H\u00e2rtie pentru ambalaje destinat\u0103 contactului cu alimentele<\/p>\n\n\n<p class=\"ind-cust__result\">Echipa de v\u00e2nz\u0103ri vede capacitatea disponibil\u0103 pe urm\u0103toarele \u0219ase luni, iar solicit\u0103rile de modificare a programului, care necesitau o or\u0103 sau mai mult, primesc acum r\u0103spuns \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/fredman-operations\/\">Citi\u021bi recenzia Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-dynamics-365-supply-chain-management-int\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum func\u021bioneaz\u0103 integrarea cu Dynamics 365 Supply Chain Management<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Supply Chain Management transmite lucr\u0103rile de executat.<\/strong> Comenzile de produc\u021bie confirmate \u0219i lansate sunt transferate \u00een SkyPlanner cu opera\u021biile din rutele tehnologice \u0219i pozi\u021biile din listele de materiale, \u00eempreun\u0103 cu resursele, calendarele, stocurile disponibile \u0219i comenzile de achizi\u021bie.<\/li>\n\n\n<li><strong>SkyPlanner creeaz\u0103 programul \u0219i \u00eel men\u021bine la zi.<\/strong> Motorul Arcturus programeaz\u0103 fiecare opera\u021bie pe ansamblul resurselor \u00een c\u00e2teva secunde \u0219i reface programul pe m\u0103sur\u0103 ce apar schimb\u0103ri \u00een produc\u021bie.<\/li>\n\n\n<li><strong>Datele programate sunt trimise \u00eenapoi \u00een Supply Chain Management.<\/strong> Momentele programate de \u00eenceput \u0219i de sf\u00e2r\u0219it, precum \u0219i resursa aleas\u0103, sunt transmise \u00eenapoi \u00een comanda de produc\u021bie \u0219i \u00een opera\u021biile din ruta sa tehnologic\u0103. Webhook-urile SkyPlanner transmit fiecare modificare a programului imediat ce aceasta are loc.<\/li>\n\n<\/ol>\n\n\n<p>Supply Chain Management r\u0103m\u00e2ne sistemul dumneavoastr\u0103 de referin\u021b\u0103 pentru date. \u00cen acesta r\u0103m\u00e2n produsele lansate, listele de materiale, rutele tehnologice, Planning Optimization, achizi\u021biile, stocurile \u0219i calculul costurilor. SkyPlanner gestioneaz\u0103 ordinea \u0219i programarea \u00een timp a fiec\u0103rei opera\u021bii.<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Obiect Dynamics 365 SCM<\/th><th>Obiect SkyPlanner<\/th><th>Sensul transferului<\/th><\/tr><\/thead><tbody><tr><td>Produse lansate<\/td><td>Produse \u0219i materiale<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>List\u0103 de materiale, pozi\u021bii din lista de materiale de produc\u021bie<\/td><td>Structura produsului, subproduse<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Rut\u0103 tehnologic\u0103, opera\u021bii din rut\u0103, propriet\u0103\u021bile opera\u021biilor<\/td><td>Etape de proces cu timpi de reglaj \u0219i de execu\u021bie<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Resurse, grupuri de resurse, capabilit\u0103\u021bi<\/td><td>Centre de lucru, grupuri de centre de lucru, eficien\u021be<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Calendare de lucru<\/td><td>Schimburi<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Comenzi de produc\u021bie, opera\u021bii \u0219i lucr\u0103ri din ruta tehnologic\u0103<\/td><td>Comenzi \u0219i opera\u021bii cu termene de finalizare<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Stocuri disponibile, pozi\u021bii din comenzile de achizi\u021bie<\/td><td>Stocuri \u0219i materiale \u00een curs de aprovizionare<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>\u00cenceput \u0219i sf\u00e2r\u0219it programate, resurs\u0103<\/td><td>Datele planificate ale opera\u021biei \u0219i centrul de lucru<\/td><td>SkyPlanner \u2192 SCM<\/td><\/tr><tr><td>Jurnalul fi\u0219ei de rut\u0103<\/td><td>Ore \u0219i cantit\u0103\u021bi \u00eenregistrate<\/td><td>SkyPlanner \u2192 SCM<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>SkyPlanner se conecteaz\u0103 la entit\u0103\u021bile de date standard din Supply Chain Management prin endpoint-ul OData REST, cu autentificare printr-o aplica\u021bie \u00eenregistrat\u0103 \u00een Microsoft Entra ID. Nu trebuie instalat\u0103 nicio extensie. Fiecare fabric\u0103 folose\u0219te D365 SCM \u00een mod diferit, a\u0219a c\u0103 echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 \u00een etapa de implementare \u0219i asigur\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een func\u021biune. Oferta de pre\u021b pentru integrare este stabilit\u0103 de la \u00eenceput, \u00een func\u021bie de procesele \u0219i nevoile dumneavoastr\u0103. Partenerul dumneavoastr\u0103 Dynamics sau propriii dezvoltatori pot construi, de asemenea, integrarea folosind API-ul documentat al SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia API<\/a>).<\/p>\n\n\n<p>Entit\u0103\u021bile, regulile de scriere a datelor \u00eenapoi \u00een sistem \u0219i capcanele de evitat sunt prezentate \u00een <a href=\"\/ro\/integrari\/erp\/dynamics-365-scm\/ghid-de-integrare\/\">ghidul de integrare cu Dynamics 365 SCM pentru programarea produc\u021biei<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"job-scheduling-planning-optimization-and-finite\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Programarea lucr\u0103rilor, Planning Optimization \u0219i programarea cu capacitate finit\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>D365 SCM \u021bine cont doar par\u021bial de capacitatea finit\u0103. Planning Optimization consider\u0103 capacitatea finit\u0103 \u00eentr-un interval definit \u0219i infinit\u0103 dincolo de acesta. Programarea lucr\u0103rilor rezerv\u0103 capacitate finit\u0103, dar pentru c\u00e2te o comand\u0103 pe r\u00e2nd, \u00een func\u021bie de capacitatea deja rezervat\u0103 de comenzile anterioare (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/job-scheduling\">sursa<\/a>). <a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/planning-optimization\/finite-capacity\">Documenta\u021bia Microsoft<\/a> precizeaz\u0103 aceste limite:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Planificarea general\u0103 cu capacitate finit\u0103 presupune o capacitate fix\u0103.<\/strong> Pentru planificarea general\u0103, Microsoft recomand\u0103: &#8220;If your capacity can change as requirements change (for example, when you&#8217;re working with shifts), you shouldn&#8217;t use finite capacity functionality.&#8221; (Dac\u0103 disponibilitatea capacit\u0103\u021bii se poate schimba odat\u0103 cu cerin\u021bele, de exemplu c\u00e2nd lucra\u021bi \u00een schimburi, nu ar trebui s\u0103 folosi\u021bi func\u021bionalitatea de capacitate finit\u0103.)<\/li>\n\n\n<li><strong>Capacitate finit\u0103 doar \u00eentr-un interval de timp delimitat.<\/strong> \u00cen afara intervalului de capacitate finit\u0103, planificarea general\u0103 consider\u0103 capacitatea nelimitat\u0103. Microsoft precizeaz\u0103: &#8220;a single-day time fence is probably too low for most manufacturers.&#8221; (Un interval de o singur\u0103 zi este probabil prea scurt pentru majoritatea produc\u0103torilor.)<\/li>\n\n\n<li><strong>Comand\u0103 cu comand\u0103.<\/strong> Programarea lucr\u0103rilor plaseaz\u0103 fiecare comand\u0103 de produc\u021bie \u00eenainte sau \u00eenapoi \u00een timp, \u021bin\u00e2nd cont de rezerv\u0103rile existente, \u0219i selecteaz\u0103 resursele dup\u0103 cel mai scurt lead time sau dup\u0103 prioritate. Timpul de reglaj este alocat opera\u021biei, iar programarea lucr\u0103rilor gestioneaz\u0103 cel mult 32 de resurse per opera\u021bie. Planificarea general\u0103 poate ordona comenzile planificate dup\u0103 atribute ale produsului, cum ar fi culoarea \u0219i dimensiunea (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/master-plans\">surs\u0103<\/a>).<\/li>\n\n\n<li><strong>Diagrama Gantt pentru ajust\u0103ri manuale.<\/strong> Planificatorii programeaz\u0103 opera\u021biile selectate dintr-un meniu, le ordoneaz\u0103 pe o resurs\u0103 \u0219i le reatribuie altei resurse. Prin glisare \u0219i fixare se mut\u0103 c\u00e2te o opera\u021bie, pe aceea\u0219i resurs\u0103. (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/visual-scheduling-production\">surs\u0103<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Dincolo de intervalul delimitat \u0219i ori de c\u00e2te ori schimburile modific\u0103 disponibilitatea capacit\u0103\u021bii, planificarea general\u0103 din D365 ofer\u0103 doar un plan orientativ. SkyPlanner programeaz\u0103 \u00eempreun\u0103 toate comenzile, utilajele, persoanele, sculele, materialele \u0219i schimb\u0103rile de fabrica\u021bie, cu capacitate finit\u0103, \u00eentr-un singur motor, pe \u00eentregul orizont de programare. Autopilot replanific\u0103 automat c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie. G\u0103si\u021bi toate detaliile \u00een <a href=\"\/ro\/integrari\/erp\/dynamics-365-scm\/cu-capacitate-finita\/\">Dynamics 365 SCM ofer\u0103 programare cu capacitate finit\u0103?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"dynamics-365-scm-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Dynamics 365 SCM \u00een prezent \u0219i cu SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Programarea standard din D365 SCM<\/th><th>D365 SCM cu SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Aria de programare<\/td><td>Comenzile de produc\u021bie sunt programate pe r\u00e2nd, \u021bin\u00e2nd cont de rezerv\u0103rile existente<\/td><td>Toate comenzile de produc\u021bie sunt programate \u00eempreun\u0103 \u00een c\u00e2teva secunde<\/td><\/tr><tr><td>Capacitate<\/td><td>Par\u021bial finit\u0103: \u00een planificarea general\u0103, doar \u00eentr-un interval delimitat \u0219i nu pentru capacitatea care variaz\u0103 \u00een func\u021bie de schimburi; programarea lucr\u0103rilor trateaz\u0103 c\u00e2te o comand\u0103 pe r\u00e2nd<\/td><td>Programarea respect\u0103 capacitatea real\u0103 a fiec\u0103rui utilaj \u0219i a fiec\u0103rei persoane \u0219i disponibilitatea fiec\u0103rei scule \u0219i a fiec\u0103rui material, la ore exacte, \u021bin\u00e2nd cont de schimburile \u0219i absen\u021bele reale, pe \u00eentregul orizont<\/td><\/tr><tr><td>Schimb\u0103ri de fabrica\u021bie<\/td><td>Timp de reglaj per opera\u021bie; ordonarea comenzilor planificate dup\u0103 atribute<\/td><td>Opera\u021bii ordonate pentru cel mai mic timp total de reglaj<\/td><\/tr><tr><td>Scule \u0219i echipe<\/td><td>Sculele \u0219i personalul sunt rezervate comand\u0103 cu comand\u0103<\/td><td>Rezervarea sculelor comune \u0219i a opera\u021biilor cu mai mul\u021bi operatori se face pentru toate comenzile \u00eempreun\u0103<\/td><\/tr><tr><td>Materiale<\/td><td>Disponibilitatea materialelor este luat\u0103 \u00een calcul pentru fiecare comand\u0103<\/td><td>Opera\u021biile \u00eencep c\u00e2nd materialele sunt disponibile din stoc sau din livr\u0103rile primite<\/td><\/tr><tr><td>Modific\u0103ri<\/td><td>Planificatorul reprogrameaz\u0103 comenzile \u0219i ajusteaz\u0103 opera\u021biile \u00een diagrama Gantt<\/td><td>Autopilot replanific\u0103 \u00eentreaga fabric\u0103, respect\u00e2nd priorit\u0103\u021bile dumneavoastr\u0103<\/td><\/tr><tr><td>Sec\u021bia de produc\u021bie<\/td><td>Production floor execution<\/td><td>Mobile Confirmations: operatorii \u00ee\u0219i v\u0103d lista de opera\u021bii \u0219i \u00eenregistreaz\u0103 activitatea pe telefon sau tablet\u0103<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-dynamics-365-scm\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum alege\u021bi o solu\u021bie de programare pentru Dynamics 365 SCM<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Pentru o <a href=\"\/ro\/software-de-programare-a-productiei-pentru-producatori-de\/\">fabric\u0103 de dimensiuni medii<\/a> care renun\u021b\u0103 la foile de calcul, alegerea este \u00eentre programarea opera\u021biilor \u0219i Planning Optimization din D365, pe de o parte, \u0219i SkyPlanner, pe de alt\u0103 parte. D365 ofer\u0103 capacitate finit\u0103 \u00eentr-un interval delimitat \u0219i programeaz\u0103 c\u00e2te o comand\u0103 pe r\u00e2nd. SkyPlanner ofer\u0103 un program cu capacitate finit\u0103 pentru \u00eentreaga fabric\u0103. <strong>Alege\u021bi SkyPlanner \u00een locul program\u0103rii opera\u021biilor din D365 \u0219i al Planning Optimization atunci c\u00e2nd:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Toate comenzile de produc\u021bie concureaz\u0103 pentru acelea\u0219i resurse.<\/strong> La programarea opera\u021biilor, stabili\u021bi o dat\u0103 de \u00eenceput sau de sf\u00e2r\u0219it \u0219i rula\u021bi programarea, iar motorul alege resursa cu cel mai scurt lead time, \u021bin\u00e2nd cont de rezerv\u0103rile deja f\u0103cute (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/job-scheduling\">surs\u0103<\/a>). Prima comand\u0103 programat\u0103 prime\u0219te cele mai bune intervale. SkyPlanner programeaz\u0103 toate comenzile \u00eempreun\u0103 \u00een c\u00e2teva secunde.<\/li>\n\n\n<li><strong>Dori\u021bi programare cu capacitate finit\u0103 pe \u00eentregul orizont de planificare, \u00een func\u021bie de schimburile efective.<\/strong> Planning Optimization \u021bine cont de capacitatea finit\u0103 doar \u00een intervalul stabilit pentru aceasta, iar Microsoft recomand\u0103 s\u0103 nu folosi\u021bi capacitatea finit\u0103 \u00een planificarea general\u0103 c\u00e2nd capacitatea variaz\u0103 \u00een func\u021bie de schimburi (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/planning-optimization\/finite-capacity\">surs\u0103<\/a>). SkyPlanner programeaz\u0103 activitatea fiec\u0103rui utilaj \u0219i a fiec\u0103rei persoane pe \u00eentregul orizont de planificare, respect\u00e2nd capacitatea disponibil\u0103 \u00een func\u021bie de schimburile efective, orele suplimentare \u0219i absen\u021be.<\/li>\n\n\n<li><strong>Schimb\u0103rile de fabrica\u021bie determin\u0103 volumul produc\u021biei.<\/strong> La programarea opera\u021biilor, timpul de reglaj este alocat opera\u021biei \u0219i se adaug\u0103 timpului de execu\u021bie (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/job-scheduling\">surs\u0103<\/a>). Matricea timpilor de preg\u0103tire din SkyPlanner con\u021bine timpul de schimbare de fabrica\u021bie pentru fiecare pereche de produse, \u00een ambele sensuri. SkyPlanner ordoneaz\u0103 opera\u021biile astfel \u00eenc\u00e2t timpul total de reglaj s\u0103 fie minim.<\/li>\n\n\n<li><strong>Sculele comune, echipele \u0219i sosirea materialelor determin\u0103 ce poate intra \u00een lucru \u00een continuare.<\/strong> Programarea respect\u0103 num\u0103rul de scule disponibile, opera\u021biilor care necesit\u0103 mai mul\u021bi operatori li se aloc\u0103 \u00eentregul personal necesar, lucr\u0103rile sunt mutate pe centre de lucru alternative, iar opera\u021biile \u00eencep c\u00e2nd materialele sunt disponibile din stoc sau din livr\u0103rile primite.<\/li>\n\n\n<li><strong>Planul se schimb\u0103 de mai multe ori pe s\u0103pt\u0103m\u00e2n\u0103.<\/strong> Autopilot replanific\u0103 automat la fiecare modificare semnificativ\u0103, iar noile date sunt trimise \u00eenapoi \u00een Supply Chain Management.<\/li>\n\n\n<li><strong>Dori\u021bi un program cu capacitate finit\u0103 \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni.<\/strong> Testarea gratuit\u0103 de 30 de zile folose\u0219te propriile date, abonamentele pornesc de la 199 \u20ac pe lun\u0103, iar operatorii \u00eenregistreaz\u0103 activitatea prin Mobile Confirmations \u00een aceea\u0219i aplica\u021bie.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum \u00eencepe\u021bi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u00cencepe\u021bi testarea gratuit\u0103.<\/strong> 30 de zile, p\u00e2n\u0103 la 20 de centre de lucru, toate func\u021bionalit\u0103\u021bile Basic, f\u0103r\u0103 card bancar.<\/li>\n\n\n<li><strong>Modela\u021bi-v\u0103 produc\u021bia.<\/strong> Crea\u021bi utilaje, persoane \u0219i schimburi \u00een SkyPlanner sau importa\u021bi-le din resursele \u0219i calendarele dumneavoastr\u0103. Pute\u021bi beneficia de asisten\u021b\u0103 la configurarea ini\u021bial\u0103.<\/li>\n\n\n<li><strong>\u00cenc\u0103rca\u021bi comenzile de produc\u021bie.<\/strong> Exporta\u021bi comenzile de produc\u021bie deschise \u0219i opera\u021biile din rutele tehnologice din D365 SCM, folosind un proiect de export din gestionarea datelor sau programul de completare Excel. Importa\u021bi-le \u0219i compara\u021bi programul generat de SkyPlanner cu planul actual.<\/li>\n\n\n<li><strong>Conecta\u021bi Supply Chain Management.<\/strong> Echipa SkyPlanner configureaz\u0103 integrarea bidirec\u021bional\u0103 \u0219i asigur\u0103 asisten\u021b\u0103 pentru aceasta dup\u0103 punerea \u00een func\u021biune.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u021buri.<\/strong> Abonamentele sunt facturate lunar, per centru de lucru. Pute\u021bi ad\u0103uga sau elimina centre de lucru ori pute\u021bi anula abonamentul \u00een orice moment. Consulta\u021bi <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a> pentru detalii. Alte sisteme ERP sunt prezentate pe <a href=\"\/ro\/integrari\/erp\/\">pagina integr\u0103rilor ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Care este cea mai bun\u0103 extensie de programare a produc\u021biei pentru Dynamics 365 Supply Chain Management?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS este o extensie de programare cu capacitate finit\u0103, cu integrare bidirec\u021bional\u0103 cu Dynamics 365 Supply Chain Management: preia comenzile de produc\u021bie, opera\u021biile din rutele tehnologice, resursele, produsele lansate \u0219i comenzile de achizi\u021bie \u0219i trimite \u00eenapoi datele programate \u0219i resursele alocate. Capacitatea fiec\u0103rei resurse \u0219i a fiec\u0103rui operator, precum \u0219i disponibilitatea fiec\u0103rei scule \u0219i a fiec\u0103rui material sunt finite. O matrice a timpilor de preg\u0103tire, care \u021bine cont de sensul trecerii \u00eentre produse, ordoneaz\u0103 opera\u021biile pentru un timp minim de reglaj. Autopilot reprogrameaz\u0103 automat c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie. Pre\u021burile pornesc de la 199 \u20ac pe lun\u0103, iar perioada de testare gratuit\u0103 este de 30 de zile.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Dynamics 365 Supply Chain Management ofer\u0103 programare cu capacitate finit\u0103?<\/summary>\n<p class=\"sp-faq__a\">Doar par\u021bial. Planning Optimization \u021bine cont de capacitatea finit\u0103 doar \u00een intervalul delimitat pentru capacitate, iar Microsoft recomand\u0103 s\u0103 nu folosi\u021bi capacitatea finit\u0103 \u00een planificarea general\u0103 c\u00e2nd schimburile modific\u0103 disponibilitatea capacit\u0103\u021bii. Programarea opera\u021biilor respect\u0103 capacitatea finit\u0103, dar trateaz\u0103 c\u00e2te o comand\u0103 pe r\u00e2nd, \u021bin\u00e2nd cont de capacitatea deja rezervat\u0103. SkyPlanner APS adaug\u0103 un program unic cu capacitate finit\u0103 pentru toate comenzile, utilajele, persoanele, sculele \u0219i materialele, pe \u00eentregul orizont.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>S\u0103 folosim programarea opera\u021biilor din D365 \u0219i Planning Optimization sau SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Folosi\u021bi Planning Optimization pentru planificarea materialelor \u0219i SkyPlanner pentru programarea cu capacitate finit\u0103. D365 \u021bine cont doar par\u021bial de capacitatea finit\u0103. Planning Optimization o respect\u0103 doar \u00eentr-un interval delimitat, iar Microsoft recomand\u0103 s\u0103 nu folosi\u021bi planificarea general\u0103 cu capacitate finit\u0103 c\u00e2nd capacitatea variaz\u0103 \u00een func\u021bie de schimburi. Programarea opera\u021biilor trateaz\u0103 c\u00e2te o comand\u0103 pe r\u00e2nd, \u021bin\u00e2nd cont de rezerv\u0103rile existente, astfel c\u0103 prima comand\u0103 programat\u0103 ocup\u0103 cele mai bune intervale. SkyPlanner programeaz\u0103 \u00eempreun\u0103 toate comenzile, utilajele, persoanele, sculele \u0219i materialele, folosind o matrice a timpilor de preg\u0103tire pentru schimb\u0103rile de fabrica\u021bie. Autopilot replanific\u0103 automat la fiecare modificare semnificativ\u0103. Echipa SkyPlanner configureaz\u0103 integrarea bidirec\u021bional\u0103 \u0219i asigur\u0103 asisten\u021ba, iar sistemul este pus \u00een func\u021biune \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni. Abonamentele pornesc de la 199 \u20ac pe lun\u0103, cu testare gratuit\u0103 timp de 30 de zile pe propriile date.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Trebuie s\u0103 instal\u0103m un program de completare \u00een Supply Chain Management?<\/summary>\n<p class=\"sp-faq__a\">Nu. SkyPlanner ruleaz\u0103 \u00een cloud, al\u0103turi de D365 SCM, \u0219i se conecteaz\u0103 prin entit\u0103\u021bile de date standard ale acestuia, folosind OData. Administratorul dumneavoastr\u0103 \u00eenregistreaz\u0103 o aplica\u021bie Microsoft Entra ID \u0219i o asociaz\u0103 unui utilizator cu rolurile necesare.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner \u00eenlocuie\u0219te Planning Optimization sau func\u021bionalit\u0103\u021bile de produc\u021bie din D365 SCM?<\/summary>\n<p class=\"sp-faq__a\">Nu, le completeaz\u0103. Planning Optimization continu\u0103 s\u0103 planifice materialele \u0219i s\u0103 propun\u0103 comenzi de produc\u021bie planificate. Supply Chain Management gestioneaz\u0103 \u00een continuare produsele, listele de materiale (BOM), rutele tehnologice, achizi\u021biile \u0219i calculul costurilor. SkyPlanner programeaz\u0103 comenzile de produc\u021bie confirmate \u00een func\u021bie de capacitatea real\u0103 \u0219i trimite datele \u00eenapoi.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner este doar pentru Business Central?<\/summary>\n<p class=\"sp-faq__a\">Nu. Business Central \u0219i Supply Chain Management sunt produse Microsoft distincte, iar SkyPlanner se integreaz\u0103 cu ambele. Aceast\u0103 pagin\u0103 prezint\u0103 integrarea cu Supply Chain Management: comenzi de produc\u021bie, opera\u021bii din rutele tehnologice, resurse \u0219i grupuri de resurse. Business Central are <a href=\"\/ro\/integrari\/erp\/business-central\/\">o pagin\u0103 dedicat\u0103<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>C\u00e2t cost\u0103 SkyPlanner pentru o fabric\u0103 ce folose\u0219te Dynamics 365 SCM?<\/summary>\n<p class=\"sp-faq__a\">De la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, plus 20 \u20ac pe lun\u0103 pentru fiecare centru de lucru suplimentar. Un centru de lucru este o resurs\u0103 de produc\u021bie cu propria list\u0103 de opera\u021bii programate. Primi\u021bi de la \u00eenceput o ofert\u0103 pentru integrare, adaptat\u0103 procesului \u0219i nevoilor dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul, astfel \u00eenc\u00e2t s\u0103 cunoa\u0219te\u021bi costul total \u00eenainte de a \u00eencepe.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>C\u00e2t dureaz\u0103 implementarea?<\/summary>\n<p class=\"sp-faq__a\">Implementarea se finalizeaz\u0103 \u00een mod normal \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea configur\u0103rii ini\u021biale, chiar \u0219i \u00een companiile mari. Echipa stabile\u0219te coresponden\u021bele pentru resurse \u0219i rute tehnologice, conecteaz\u0103 comenzile de produc\u021bie \u0219i de achizi\u021bie \u0219i configureaz\u0103 trimiterea datelor \u00eenapoi \u00een sistem. Totul este testat prin raportare la planul actual \u00eenainte de punerea \u00een func\u021biune.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de integrarea cu Supply Chain Management?<\/summary>\n<p class=\"sp-faq__a\">Da. Testarea de 30 de zile folose\u0219te un export al comenzilor de produc\u021bie, al opera\u021biilor din rutele tehnologice \u0219i al resurselor dumneavoastr\u0103. Vede\u021bi un program cu capacitate finit\u0103 pentru propria produc\u021bie \u00eenainte s\u0103 \u00eenceap\u0103 orice lucrare de integrare.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ Microsoft Dynamics 365 Supply Chain Management SkyPlanner APS pentru Dynamics 365 Supply Chain Management: programarea produc\u021biei cu capacitate finit\u0103 SkyPlanner APS este o extensie de programare cu capacitate finit\u0103 pentru Microsoft Dynamics 365 Supply Chain Management. Pentru fiecare comand\u0103 de produc\u021bie, \u021bine cont de disponibilitatea efectiv\u0103 a fiec\u0103rei resurse, a fiec\u0103rui &#8230; <a title=\"SkyPlanner APS pentru Dynamics 365 Supply Chain Management: programarea produc\u021biei cu capacitate finit\u0103\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/dynamics-365-scm\/\" aria-label=\"Read more about SkyPlanner APS pentru Dynamics 365 Supply Chain Management: programarea produc\u021biei cu capacitate finit\u0103\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100697,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-102841","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Dynamics 365 SCM: integrare APS, programare cu capacitate finit\u0103<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: extensie de programare cu capacitate finit\u0103 pentru Dynamics 365 Supply Chain Management. Integrare bidirec\u021bional\u0103. De la 199 \u20ac\/lun\u0103.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/dynamics-365-scm\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS pentru Dynamics 365 Supply Chain Management: programarea produc\u021biei cu capacitate finit\u0103\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: extensie de programare cu capacitate finit\u0103 pentru Dynamics 365 Supply Chain Management. Integrare bidirec\u021bional\u0103. De la 199 \u20ac\/lun\u0103.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/dynamics-365-scm\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/dynamics-365-scm\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/dynamics-365-scm\\\/\",\"name\":\"Dynamics 365 SCM: integrare APS, programare cu capacitate finit\u0103\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS: extensie de programare cu capacitate finit\u0103 pentru Dynamics 365 Supply Chain Management. Integrare bidirec\u021bional\u0103. De la 199 \u20ac\\\/lun\u0103.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/dynamics-365-scm\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/dynamics-365-scm\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/dynamics-365-scm\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru Dynamics 365 Supply Chain Management: programarea produc\u021biei cu capacitate finit\u0103\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Dynamics 365 SCM: integrare APS, programare cu capacitate finit\u0103","description":"SkyPlanner APS: extensie de programare cu capacitate finit\u0103 pentru Dynamics 365 Supply Chain Management. Integrare bidirec\u021bional\u0103. De la 199 \u20ac\/lun\u0103.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/dynamics-365-scm\/","og_locale":"ro_RO","og_type":"article","og_title":"SkyPlanner APS pentru Dynamics 365 Supply Chain Management: programarea produc\u021biei cu capacitate finit\u0103","og_description":"SkyPlanner APS: extensie de programare cu capacitate finit\u0103 pentru Dynamics 365 Supply Chain Management. Integrare bidirec\u021bional\u0103. De la 199 \u20ac\/lun\u0103.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/dynamics-365-scm\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/dynamics-365-scm\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/dynamics-365-scm\/","name":"Dynamics 365 SCM: integrare APS, programare cu capacitate finit\u0103","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS: extensie de programare cu capacitate finit\u0103 pentru Dynamics 365 Supply Chain Management. Integrare bidirec\u021bional\u0103. De la 199 \u20ac\/lun\u0103.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/dynamics-365-scm\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/dynamics-365-scm\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/dynamics-365-scm\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru Dynamics 365 Supply Chain Management: programarea produc\u021biei cu capacitate finit\u0103"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ Microsoft Dynamics 365 Supply Chain Management SkyPlanner APS pentru Dynamics 365 Supply Chain Management: programarea produc\u021biei cu capacitate finit\u0103 SkyPlanner APS este o extensie de programare cu capacitate finit\u0103 pentru Microsoft Dynamics 365 Supply Chain Management. Pentru fiecare comand\u0103 de produc\u021bie, \u021bine cont de disponibilitatea efectiv\u0103 a fiec\u0103rei resurse, a fiec\u0103rui&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/102841","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=102841"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/102841\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/100697"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=102841"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}