{"id":101352,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101352"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"ghid-de-integrare","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/ghid-de-integrare\/","title":{"rendered":"Ghid de integrare Infor CloudSuite Industrial pentru programarea produc\u021biei cu SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ Infor CloudSuite Industrial<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Ghid de integrare Infor CloudSuite Industrial <span class=\"hl\">pentru programarea produc\u021biei cu SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Acest ghid le arat\u0103 partenerilor \u0219i echipelor IT care lucreaz\u0103 cu Infor CloudSuite Industrial (CSI, anterior SyteLine) cum s\u0103 conecteze CSI la SkyPlanner APS. SkyPlanner se integreaz\u0103 bidirec\u021bional cu CSI, prin Infor OS:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Comenzile de produc\u021bie, opera\u021biile, resursele, stocurile \u0219i comenzile de achizi\u021bie sunt preluate \u00een SkyPlanner.<\/li>\n\n\n<li>Datele planificate ale opera\u021biilor sunt trimise \u00eenapoi \u00een comenzile de produc\u021bie din CSI.<\/li>\n\n\n<li>Manopera operatorilor este trimis\u0103 \u00eenapoi sub form\u0103 de tranzac\u021bii ale comenzilor de produc\u021bie, pentru \u00eenregistrare \u00een CSI.<\/li>\n\n\n<li>Webhook-urile SkyPlanner transmit modific\u0103rile programului pe m\u0103sur\u0103 ce apar.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu lucr\u0103ri programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 CSI \u00een etapa de punere \u00een func\u021biune \u0219i asigur\u0103 asisten\u021b\u0103 dup\u0103 intrarea \u00een exploatare. Acest ghid se adreseaz\u0103 partenerilor \u0219i dezvoltatorilor care vor s\u0103 participe sau s\u0103 dezvolte singuri solu\u021bii folosind API-ul REST documentat al SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-shapes-every-csi-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce determin\u0103 modul de integrare cu CSI<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner ruleaz\u0103 \u00een cloud, deci nu se instaleaz\u0103 niciun software SkyPlanner \u00een CSI. \u00cen mediile CSI multi-tenant, integr\u0103rile trec prin Infor OS, pe una dintre dou\u0103 c\u0103i:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mongoose IDO REST API prin ION API Gateway.<\/strong> Obiectele de business din CSI sunt IDO (Intelligent Data Objects) pe platforma Mongoose. Serviciul REST este disponibil sub <code>IDORequestService<\/code>, iar Infor \u00eel public\u0103 \u00een depozitul ION API. Versiunea REST 1 ofer\u0103 <code>LoadCollection<\/code>, <code>AddItem(s)<\/code>, <code>UpdateItem(s)<\/code>, <code>DeleteItem(s)<\/code>, <code>InvokeMethod<\/code>, <code>IDOInfo<\/code> \u0219i <code>FireAESEvent<\/code>, cu r\u0103spunsuri XML sau JSON. Exist\u0103 \u0219i un set de endpointuri pentru versiunea REST 2.<\/li>\n\n\n<li><strong>Documente ION BOD (Business Object Documents)<\/strong> direc\u021bionate de ION prin puncte de conexiune. CSI public\u0103 documente BOD <code>Sync<\/code> de ie\u0219ire pentru <code>ProductionOrder<\/code>, <code>ItemMaster<\/code> \u0219i <code>PurchaseOrder<\/code>, precum \u0219i documente de stoc, cum ar fi <code>InventoryAdjustment<\/code>, <code>InventoryCount<\/code> \u0219i <code>InventoryHold<\/code>.<\/li>\n\n<\/ol>\n\n\n<p>Lista BOD de ie\u0219ire din versiunea 2026.10 nu include liste de materiale, fluxuri tehnologice sau centre de lucru. De aceea, integrarea pentru programarea produc\u021biei se bazeaz\u0103 \u00een primul r\u00e2nd pe IDO, iar mesajele BOD pot fi folosite op\u021bional pentru a semnala modific\u0103rile comenzilor de produc\u021bie.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentificare \u0219i licen\u021biere<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Prin gateway, CSI folose\u0219te tokenuri bearer OAuth 2.0 emise de ION API:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Crea\u021bi o aplica\u021bie <strong>Backend Service<\/strong> \u00een ION API \u0219i desc\u0103rca\u021bi fi\u0219ierul <code>.ionapi<\/code> al acesteia. Fi\u0219ierul con\u021bine creden\u021bialele clientului \u0219i cheile contului de serviciu (<code>saak<\/code>, <code>sask<\/code>). F\u0103r\u0103 acestea, cererile de token e\u0219ueaz\u0103.<\/li>\n\n\n<li>Trimite\u021bi antetul <code>X-Infor-MongooseConfig<\/code> la fiecare apel efectuat prin ION. Acesta indic\u0103 configura\u021bia CSI (unitatea) vizat\u0103.<\/li>\n\n\n<li>P\u0103stra\u021bi fi\u0219iere <code>.ionapi<\/code> separate pentru fiecare mediu. Un fi\u0219ier pentru mediul de produc\u021bie nu va permite autentificarea \u00een instan\u021ba sandbox.<\/li>\n\n<\/ul>\n\n\n<p>SyteLine instalat local folose\u0219te acela\u0219i model IDO. Documenta\u021bia Mongoose descrie apelurile directe c\u0103tre IDO REST API cu un token de securitate ob\u021binut prin <code>GetSecurityToken<\/code>, f\u0103r\u0103 ION API Gateway.<\/p>\n\n\n<p>Aplica\u021biile externe care se conecteaz\u0103 prin stratul IDO folosesc modulul de licen\u021biere <strong>Automation<\/strong>, c\u0103ruia i se atribuie \u00eentotdeauna tipul de sesiune IDO. Aplica\u021biile proprii Infor, precum APS, nu au nevoie de o licen\u021b\u0103 suplimentar\u0103. Conexiunea SkyPlanner folose\u0219te o astfel de licen\u021b\u0103 \u0219i necesit\u0103 acces la ION API \u00een instan\u021ba dumneavoastr\u0103 tenant.<\/p>\n\n\n<p>\u00cen SkyPlanner, REST API permite citirea \u0219i scrierea comenzilor, produselor, materialelor, etapelor de proces, comenzilor de achizi\u021bie \u0219i \u00eenregistr\u0103rilor de timp. Autentificarea se face cu un token API trimis \u00een antetul Authorization-Token, iar documenta\u021bia este disponibil\u0103 \u00een format Swagger\/OpenAPI (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia de referin\u021b\u0103 API<\/a>); consulta\u021bi \u0219i <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">documenta\u021bia SkyPlanner<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"change-detection-bod-triggers-aes-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Detectarea modific\u0103rilor: declan\u0219atoare BOD, AES \u0219i interogare periodic\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Modific\u0103rile sunt transmise din CSI ca documente ION BOD, iar documentul BOD relevant pentru programare este <code>ProductionOrder<\/code>. \u00cel configura\u021bi \u00een formularul <strong>Replication Document Outbound Cross References<\/strong>, folosind defini\u021bii de publicare:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Declan\u0219ator<\/th><th>Ce public\u0103<\/th><\/tr><\/thead><tbody><tr><td><code>TriggerProductionOrderSyncSp<\/code><\/td><td>Toate comenzile de produc\u021bie; ruleaz\u0103 doar \u00een prim-plan<\/td><\/tr><tr><td><code>TriggerProductionOrderBGSyncSp<\/code><\/td><td>Comenzile tocmai programate; poate rula ca sarcin\u0103 \u00een fundal<\/td><\/tr><tr><td><code>TriggerProductionOrderBGSchSyncSp<\/code><\/td><td>Comenzile de produc\u021bie modificate; poate rula ca sarcin\u0103 \u00een fundal<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Exemplele Infor filtreaz\u0103 dup\u0103 starea comenzii: <code>'Firm'<\/code> pentru modific\u0103rile de program \u0219i, op\u021bional, <code>'Released'<\/code> pentru modific\u0103rile privind materialele \u0219i manopera. De asemenea, filtreaz\u0103 \u00eenregistr\u0103rile cu <code>RecordDate<\/code> ulterior datei ultimei public\u0103ri manuale a sarcinii din fundal.<\/p>\n\n\n<p><strong>Application Event System (AES)<\/strong> din Mongoose poate executa \u0219i ac\u021biuni la evenimente, iar REST API expune <code>FireAESEvent<\/code>. Abordarea de baz\u0103 este interogarea periodic\u0103 a IDO: la fiecare c\u00e2teva minute se apeleaz\u0103 <code>LoadCollection<\/code> pentru <code>SLJobs<\/code> \u0219i <code>SLJobRoutes<\/code>, cu filtrare dup\u0103 data \u00eenregistr\u0103rii. Se adaug\u0103 documentul BOD <code>ProductionOrder<\/code> acolo unde unitatea dore\u0219te transmiterea automat\u0103 a modific\u0103rilor.<\/p>\n\n\n<p>\u00cen sens invers, webhook-urile SkyPlanner transmit modific\u0103rile programului pe m\u0103sur\u0103 ce apar, iar fiecare declan\u0219eaz\u0103 scrierea datelor \u00eenapoi \u00een CSI.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Maparea datelor<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Denumirile de mai jos sunt cele ale obiectelor IDO standard. Instan\u021bele tenant care extind IDO p\u0103streaz\u0103 acelea\u0219i obiecte, cu propriet\u0103\u021bi suplimentare, pe care echipa SkyPlanner le mapeaz\u0103 \u00een etapa de punere \u00een func\u021biune.<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Obiect CSI (IDO \/ BOD \/ formular)<\/th><th>Obiect SkyPlanner<\/th><th>Sens<\/th><th>Frecven\u021b\u0103<\/th><\/tr><\/thead><tbody><tr><td>Articole (<code>SLItems<\/code>), document BOD <code>Sync ItemMaster<\/code><\/td><td>Produse \u0219i materiale<\/td><td>CSI \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi prin BOD sau actualizare zilnic\u0103 a modific\u0103rilor<\/td><\/tr><tr><td>Fluxul tehnologic al articolului (<code>SLItemRoutes<\/code>)<\/td><td>Etape de proces cu timpi de preg\u0103tire \u0219i de execu\u021bie<\/td><td>CSI \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td>Grupuri de resurse pentru preg\u0103tire \u0219i tabele de referin\u021b\u0103 pentru preg\u0103tire<\/td><td>Matricea timpilor de preg\u0103tire (schimb\u0103ri de fabrica\u021bie \u00eentre produse, \u00een func\u021bie de succesiunea lor)<\/td><td>CSI \u2192 SkyPlanner, apoi gestionare \u00een SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103<\/td><\/tr><tr><td>BOM al articolului, materiale pentru comand\u0103 (<code>SLJobmatls<\/code>)<\/td><td>Structura produsului, subproduse, necesar de materiale pentru fiecare opera\u021bie<\/td><td>CSI \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi odat\u0103 cu fiecare comand\u0103<\/td><\/tr><tr><td>Grupuri de resurse \u0219i resurse (cu ordinea membrilor)<\/td><td>Grupuri de centre de lucru, centre de lucru, centre de lucru alternative<\/td><td>CSI \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi rar<\/td><\/tr><tr><td>Scule \u0219i num\u0103r de operatori pentru fiecare opera\u021bie<\/td><td>Scule ca resurse partajate cu capacitate finit\u0103, num\u0103r de operatori pentru fiecare centru de lucru<\/td><td>Gestionare \u00een SkyPlanner<\/td><td>Configurare \u00een etapa de implementare ini\u021bial\u0103<\/td><\/tr><tr><td>Centre de lucru (<code>SLWcs<\/code>)<\/td><td>Nu este un obiect de programare; se p\u0103streaz\u0103 doar ca referin\u021b\u0103 pentru costuri<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Op\u021bional<\/td><\/tr><tr><td>Schimburi \u0219i s\u0103rb\u0103tori legale<\/td><td>Schimburi \u0219i absen\u021be<\/td><td>CSI \u2192 SkyPlanner<\/td><td>S\u0103pt\u0103m\u00e2nal sau gestionare \u00een SkyPlanner<\/td><\/tr><tr><td>Comenzi de produc\u021bie (<code>SLJobs<\/code>), document BOD <code>Sync ProductionOrder<\/code><\/td><td>Comenzi cu termene \u0219i prioritate<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Declan\u0219are prin BOD sau interogare la fiecare c\u00e2teva minute<\/td><\/tr><tr><td>Opera\u021biile comenzii (<code>SLJobRoutes<\/code>)<\/td><td>Opera\u021bii pentru fiecare etap\u0103 de proces, grup de resurse pentru fiecare etap\u0103<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Odat\u0103 cu fiecare comand\u0103<\/td><\/tr><tr><td>Linii ale comenzilor clien\u021bilor (<code>SLCoItems<\/code>), clien\u021bi (<code>SLCustomers<\/code>)<\/td><td>Termenele de livrare c\u0103tre clien\u021bi \u0219i prioritatea clien\u021bilor<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Interogare periodic\u0103<\/td><\/tr><tr><td>Stocul articolelor pe depozite, documente BOD de stoc<\/td><td>Stocuri (solduri de stoc)<\/td><td>CSI \u2192 SkyPlanner<\/td><td>La fiecare or\u0103 sau \u00eenainte de fiecare rulare a program\u0103rii<\/td><\/tr><tr><td>Comenzi de achizi\u021bie (linii deschise), document BOD <code>Sync PurchaseOrder<\/code><\/td><td>Comenzi de achizi\u021bie \u0219i materiale care urmeaz\u0103 s\u0103 soseasc\u0103, cu data de livrare estimat\u0103<\/td><td>CSI \u2192 SkyPlanner<\/td><td>La fiecare or\u0103 sau la primirea unui BOD, \u00eenainte de fiecare rulare a program\u0103rii<\/td><\/tr><tr><td>Programul opera\u021biilor comenzii (\u00eenceputul \u0219i sf\u00e2r\u0219itul fiec\u0103rei opera\u021bii) \u0219i datele Start \u0219i End ale comenzii din <code>SLJobs<\/code>, prin <code>UpdateItems<\/code><\/td><td>\u00cenceputul \u0219i sf\u00e2r\u0219itul planificate pentru fiecare opera\u021bie<\/td><td>SkyPlanner \u2192 CSI<\/td><td>La fiecare modificare a programului, transferul fiind declan\u0219at de un webhook SkyPlanner<\/td><\/tr><tr><td>Tranzac\u021bii necontabilizate ale comenzilor (<code>SLJobtrans<\/code>) prin <code>AddItems<\/code>, angaja\u021bi (<code>SLEmployees<\/code>), motive (<code>SLReasons<\/code>)<\/td><td>\u00cenregistr\u0103ri de timp, cantit\u0103\u021bi conforme \u0219i rebutate, coduri de motiv<\/td><td>SkyPlanner \u2192 CSI<\/td><td>La fiecare confirmare<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Modele de integrare<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00cenc\u0103rcarea ini\u021bial\u0103 a nomenclatoarelor.<\/strong> Citi\u021bi articolele, fluxurile tehnologice ale articolelor, BOM-urile, grupurile de resurse, resursele \u0219i schimburile prin <code>LoadCollection<\/code>. Crea\u021bi centrele de lucru SkyPlanner pe baza resurselor \u0219i a grupurilor de resurse, nu a centrelor de lucru din CSI. Infor precizeaz\u0103 clar c\u0103 centrul de lucru \u201ecaptures costs only and does not affect the actual planning or scheduling.\u201d (\u00eenregistreaz\u0103 doar costurile \u0219i nu influen\u021beaz\u0103 planificarea sau programarea efectiv\u0103).<\/p>\n\n\n<p><strong>2. Sincronizarea comenzilor.<\/strong> Trimite\u021bi comenzile de produc\u021bie ferme \u0219i lansate, \u00eempreun\u0103 cu opera\u021biile \u0219i materialele aferente. P\u0103stra\u021bi comenzile planificate de APS \u00een CSI. APS Planning \u00ee\u0219i \u0219terge \u0219i \u00ee\u0219i regenereaz\u0103 planul la fiecare rulare, astfel \u00eenc\u00e2t comenzile planificate nu au o identitate stabil\u0103 pe baza c\u0103reia s\u0103 poat\u0103 fi programate. Transforma\u021bi-le mai \u00eent\u00e2i \u00een comenzi de produc\u021bie ferme \u00een <strong>Planning Detail<\/strong>.<\/p>\n\n\n<p><strong>3. Scrierea programului \u00eenapoi \u00een CSI.<\/strong> Un webhook SkyPlanner pentru program declan\u0219eaz\u0103 scrierea. Integrarea cite\u0219te din SkyPlanner REST API noile momente planificate de \u00eenceput \u0219i de sf\u00e2r\u0219it pentru fiecare opera\u021bie. Le scrie prin <code>UpdateItems<\/code> \u00een programul opera\u021biilor comenzii, folosind drept cheie comanda, sufixul \u0219i num\u0103rul opera\u021biei. Sunt acelea\u0219i date ale opera\u021biilor pe care le stabile\u0219te Scheduler \u0219i care se modific\u0103 \u00een Resource Gantt, iar datele Start \u0219i End ale comenzii din <code>SLJobs<\/code> se actualizeaz\u0103 \u00een consecin\u021b\u0103.<\/p>\n\n\n<p>Unele unit\u0103\u021bi protejeaz\u0103 c\u00e2mpurile programului sau doresc executarea unei logici \u00een CSI la fiecare modificare. \u00cen aceste cazuri, scrierea se face printr-o metod\u0103 IDO personalizat\u0103, apelat\u0103 cu <code>InvokeMethod<\/code>, care aplic\u0103 aceea\u0219i actualizare folosind valid\u0103rile proprii ale CSI.<\/p>\n\n\n<p><strong>4. Confirm\u0103ri din sec\u021bia de produc\u021bie.<\/strong> Operatorii \u00eenregistreaz\u0103 timpul \u0219i cantit\u0103\u021bile pe telefon sau tablet\u0103 (Mobile Confirmations, Production Timer, Quick Log Mode). Fiecare \u00eenregistrare de timp \u00eenchis\u0103 devine un r\u00e2nd necontabilizat \u00een <code>SLJobtrans<\/code>, creat cu <code>AddItems<\/code>, care con\u021bine comanda, sufixul, opera\u021bia, angajatul, orele \u0219i cantit\u0103\u021bile conforme \u0219i rebutate. Apoi, Job Labor Transaction Posting din CSI contabilizeaz\u0103 costul manoperei \u0219i cheltuielile indirecte \u00een produc\u021bia \u00een curs aferent\u0103 comenzii, cu frecven\u021ba aleas\u0103 de dumneavoastr\u0103.<\/p>\n\n\n<p><strong>5. Responsabilitatea asupra datelor, re\u00eencerc\u0103ri \u0219i reguli pentru conflicte.<\/strong><\/p>\n\n\n<p>Fiecare \u00eenregistrare are drept cheie identificatorii proprii CSI (comand\u0103 de produc\u021bie, sufix, num\u0103r de opera\u021bie, ID de tranzac\u021bie). Astfel, repetarea unui webhook sau a unei interog\u0103ri actualizeaz\u0103 acela\u0219i r\u00e2nd, f\u0103r\u0103 a crea un duplicat. Scrierile e\u0219uate sunt re\u00eencercate \u0219i consemnate \u00een jurnal \u00eempreun\u0103 cu textul erorii din CSI. O comand\u0103 trecut\u0103 \u00een starea Complete sau History \u00een CSI este eliminat\u0103 din programul SkyPlanner la urm\u0103toarea sincronizare, iar o opera\u021bie anulat\u0103 \u00een SkyPlanner nu trimite niciodat\u0103 date \u00eenapoi.<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Date<\/th><th>Sistem responsabil<\/th><\/tr><\/thead><tbody><tr><td>Articole, fluxuri tehnologice, liste de materiale, cantit\u0103\u021bi, starea comenzilor de produc\u021bie, calculul costurilor<\/td><td>CSI<\/td><\/tr><tr><td>Succesiunea opera\u021biilor, momentele de \u00eenceput \u0219i de sf\u00e2r\u0219it, alocarea resurselor<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Planul de materiale pe termen lung, Get CTP\/ATP<\/td><td>CSI APS, dac\u0103 exist\u0103 licen\u021b\u0103<\/td><\/tr><tr><td>Schimburi \u0219i s\u0103rb\u0103tori legale<\/td><td>Un singur sistem, stabilit la definirea domeniului<\/td><\/tr><tr><td>Manoper\u0103 \u0219i produc\u021bie realizat\u0103<\/td><td>Scrise \u00een CSI din \u00eenregistr\u0103rile de timp SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Instrumentele native de programare sunt principala surs\u0103 de conflicte. APS Planning consider\u0103 opera\u021biile programate ca fiind fixate, \u00eens\u0103 rul\u0103rile ulterioare ale <strong>Scheduler<\/strong> (de obicei, o rulare zilnic\u0103 cu un orizont de o zi) le pot muta din nou. C\u00e2nd SkyPlanner gestioneaz\u0103 secven\u021bierea detaliat\u0103 pentru anumite grupuri de resurse, exclude\u021bi aceste grupuri din CSI Scheduler. Apoi dezactiva\u021bi setarea din <strong>Shop Floor Control Parameters<\/strong> care face ca Scheduler s\u0103 trateze comenzile planificate drept cerere. MRP, planificarea comenzilor prin APS \u0219i Get CTP pot r\u0103m\u00e2ne \u00een CSI. Running Time Lock din SkyPlanner men\u021bine fixe opera\u021biile \u00eencepute. \u00cen SkyPlanner, Autopilot reface automat programul c\u00e2nd apar modific\u0103ri \u00een produc\u021bie, respect\u00e2nd bloc\u0103rile \u0219i priorit\u0103\u021bile stabilite de dumneavoastr\u0103.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapele obi\u0219nuite ale proiectului<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementarea se finalizeaz\u0103 de regul\u0103 \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea etapei de punere \u00een func\u021biune, chiar \u0219i \u00een companiile mari. Un proiect CSI cuprinde:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Testare cu date exportate.<\/strong> Folosi\u021bi <strong>Save to Excel<\/strong> \u00een listele de comenzi de produc\u021bie, opera\u021bii \u0219i resurse din CSI, converti\u021bi datele \u00een CSV \u0219i importa\u021bi-le \u00een SkyPlanner. Valida\u021bi programul \u00eenainte de a \u00eencepe lucrul la interfa\u021b\u0103.<\/li>\n\n\n<li><strong>Definirea domeniului \u0219i maparea nomenclatoarelor.<\/strong> Stabili\u021bi tabelul de mapare, sistemul responsabil pentru fiecare c\u00e2mp, frecven\u021ba sincroniz\u0103rii, canalul de \u00eenregistrare \u0219i modul \u00een care se restr\u00e2nge domeniul gestionat de Scheduler nativ.<\/li>\n\n\n<li><strong>Configurarea Infor OS.<\/strong> Aplica\u021bie Backend Service, fi\u0219iere <code>.ionapi<\/code> pentru fiecare instan\u021b\u0103, licen\u021b\u0103 Automation \u0219i acces IDO REST. Solicita\u021bi de la \u00eenceput echipei de asisten\u021b\u0103 Infor Cloud activarea IDO REST, deoarece \u00een unele instan\u021be acesta trebuie activat.<\/li>\n\n\n<li><strong>\u00cenc\u0103rcarea ini\u021bial\u0103.<\/strong> Articole, BOM-uri, fluxuri tehnologice ale articolelor, resurse, grupuri de resurse \u0219i schimburi prin <code>LoadCollection<\/code>, plus matricea timpilor de preg\u0103tire, sculele \u0219i num\u0103rul de operatori \u00een SkyPlanner.<\/li>\n\n\n<li><strong>Sincronizarea comenzilor de produc\u021bie \u0219i de achizi\u021bie.<\/strong> Mai \u00eent\u00e2i, interogare periodic\u0103 a IDO pentru comenzi, opera\u021bii, materiale \u0219i comenzi de achizi\u021bie deschise, apoi declan\u0219are prin documentul BOD <code>ProductionOrder<\/code>, dac\u0103 este necesar.<\/li>\n\n\n<li><strong>Testare \u00een paralel cu planul actual.<\/strong> Rula\u021bi SkyPlanner \u00een paralel cu lista de lansare \u00een execu\u021bie \u0219i corecta\u021bi timpii din fluxurile tehnologice \u0219i datele resurselor.<\/li>\n\n\n<li><strong>Scrierea programului \u00eenapoi \u00een CSI \u0219i confirm\u0103rile din sec\u021bia de produc\u021bie.<\/strong> Activa\u021bi scrierea programului \u0219i transferul manoperei \u00een <code>SLJobtrans<\/code> dup\u0103 ce datele calendaristice \u0219i celelalte date corespund.<\/li>\n\n\n<li><strong>Intrarea \u00een exploatare<\/strong> pentru grupurile de resurse gestionate de SkyPlanner.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"csi-pitfalls\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Capcane de evitat \u00een CSI<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Maparea centrelor de lucru ca utilaje.<\/strong> <code>SLWcs<\/code> pare alegerea evident\u0103 pentru IDO, dar nu este potrivit pentru capacitate. Programarea se bazeaz\u0103 pe resurse \u0219i grupuri de resurse (cu ordinea membrilor).<\/li>\n\n\n<li><strong>Filtre BOD care omit sau retrimit comenzi.<\/strong> Publicarea <code>ProductionOrder<\/code> depinde de declan\u0219atorul ales \u0219i de filtrele de stare. Un filtru doar pe <code>'Firm'<\/code> omite modific\u0103rile de materiale \u0219i manoper\u0103 la comenzile lansate; lipsa unui filtru dup\u0103 data ultimei public\u0103ri duce la retrimiterea tuturor datelor.<\/li>\n\n\n<li><strong>Manoper\u0103 respins\u0103 la scrierea \u00eenapoi.<\/strong> CSI respinge manopera c\u00e2nd comanda de produc\u021bie nu este \u00een starea Released sau Scheduled, c\u00e2nd opera\u021bia este deja finalizat\u0103 sau c\u00e2nd angajatul este inactiv. Valida\u021bi datele \u00eenainte de trimitere \u0219i consemna\u021bi respingerile \u00een jurnal.<\/li>\n\n\n<li><strong>Presupunerea c\u0103 un r\u00e2nd \u00eenseamn\u0103 o tranzac\u021bie contabilizat\u0103.<\/strong> Un r\u00e2nd <code>SLJobtrans<\/code> r\u0103m\u00e2ne necontabilizat p\u00e2n\u0103 la rularea Job Labor Transaction Posting. Stabili\u021bi frecven\u021ba contabiliz\u0103rii \u00eempreun\u0103 cu departamentul financiar, astfel \u00eenc\u00e2t manopera s\u0103 ajung\u0103 \u00een eviden\u021ba produc\u021biei \u00een curs \u0219i \u00een salarizare la momentul a\u0219teptat.<\/li>\n\n\n<li><strong>Comenzi \u00eent\u00e2rziate din APS.<\/strong> APS planific\u0103 \u00eenapoi de la termenul de livrare \u0219i, dac\u0103 nu reu\u0219e\u0219te, \u00eenainte, pornind de ast\u0103zi; nu planific\u0103 niciodat\u0103 \u00een trecut. L\u0103sa\u021bi SkyPlanner s\u0103 programeze comenzile \u00eent\u00e2rziate pe baza capacit\u0103\u021bii reale, \u00een loc s\u0103 v\u0103 baza\u021bi pe data de \u00eenceput primit\u0103.<\/li>\n\n\n<li><strong>Detalii Mongoose.<\/strong> \u00cen valorile parametrilor <code>InvokeMethod<\/code>, \u00eenlocui\u021bi virgulele cu secven\u021ba de escape <code>\\x2c<\/code>.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-the-cloudsuite-industrial-integra\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cine configureaz\u0103 integrarea cu CloudSuite Industrial<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Echipa SkyPlanner o configureaz\u0103 \u00een etapa de punere \u00een func\u021biune \u0219i asigur\u0103 asisten\u021b\u0103 dup\u0103 intrarea \u00een exploatare.<\/strong> Aceasta acoper\u0103 at\u00e2t partea SkyPlanner, c\u00e2t \u0219i interfa\u021ba IDO \u0219i BOD, cu map\u0103ri adaptate instan\u021bei dumneavoastr\u0103 tenant. Echipa \u00eentre\u021bine integrarea c\u00e2nd se schimb\u0103 grupurile de resurse, extensiile IDO sau st\u0103rile comenzilor de produc\u021bie. Fiecare fabric\u0103 folose\u0219te CSI diferit, iar realizarea acestor map\u0103ri este specialitatea echipei.<\/li>\n\n\n<li><strong>Partenerul dumneavoastr\u0103 Infor poate participa.<\/strong> Acesta cunoa\u0219te extensiile IDO \u0219i configura\u021bia ION, lucreaz\u0103 pe baza documenta\u021biei Swagger\/OpenAPI a SkyPlanner \u0219i se aboneaz\u0103 la webhook-urile sale.<\/li>\n\n\n<li><strong>Dezvoltatorii dumneavoastr\u0103 pot construi integrarea<\/strong> folosind acela\u0219i REST API cu autentificare prin token. Pentru a \u00eencepe, este suficient\u0103 o cheie API SkyPlanner (<a href=\"\/ro\/docs\/tutorial-de-integrare\/\">tutorial de integrare<\/a>), iar echipa SkyPlanner v\u0103 ajut\u0103 la nevoie.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"why-csi-teams-add-skyplanner-instead-of-tuning-a\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">De ce echipele care folosesc CSI aleg SkyPlanner \u00een loc s\u0103 ajusteze \u00eenc\u0103 o procesare \u00een lot<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner limiteaz\u0103 interven\u021biile necesare \u00een CSI. Cite\u0219te comenzi, opera\u021bii, materiale \u0219i resurse \u0219i scrie \u00eenapoi dou\u0103 lucruri: momentele planificate ale opera\u021biilor \u0219i manopera \u00een <code>SLJobtrans<\/code>. \u00centre aceste etape, realizeaz\u0103 reprogramarea pe care CSI o las\u0103 \u00een seama modific\u0103rilor f\u0103cute de planificator \u00een Resource Gantt \u0219i a urm\u0103toarei rul\u0103ri Scheduler:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Program actualizat la fiecare eveniment.<\/strong> Arcturus creeaz\u0103 \u00een c\u00e2teva secunde programul de produc\u021bie \u021bin\u00e2nd cont de capacitatea finit\u0103, iar Autopilot \u00eel reface automat c\u00e2nd apar modific\u0103ri \u00een produc\u021bie, fie c\u0103 sose\u0219te o comand\u0103 modificat\u0103 din CSI, fie c\u0103 un operator \u00eenregistreaz\u0103 progresul. Webhook-urile transmit apoi noile momente programate.<\/li>\n\n\n<li><strong>Manoper\u0103 \u00eenregistrat\u0103 la surs\u0103.<\/strong> Mobile Confirmations, Production Timer \u0219i Quick Log Mode transform\u0103 datele introduse de operatori \u00een \u00eenregistr\u0103ri de timp mapate la r\u00e2nduri <code>SLJobtrans<\/code>, astfel \u00eenc\u00e2t manopera ajunge \u00een CSI f\u0103r\u0103 reintroducerea datelor.<\/li>\n\n\n<li><strong>Constr\u00e2ngeri conforme cu realitatea din sec\u021bie.<\/strong> O matrice a timpilor de preg\u0103tire alege succesiunea schimb\u0103rilor de fabrica\u021bie care necesit\u0103 cel mai pu\u021bin timp de preg\u0103tire. Sculele sunt resurse comune cu disponibilitate limitat\u0103, mai mul\u021bi operatori pot lucra simultan la acela\u0219i centru de lucru, iar utilajele \u0219i personalul alternativ preiau sarcinile c\u00e2nd resursele principale sunt ocupate.<\/li>\n\n\n<li><strong>Secven\u021biere \u00een func\u021bie de materiale.<\/strong> Datele preluate includ materialele comenzilor de produc\u021bie, stocurile \u0219i comenzile de achizi\u021bie deschise din CSI, astfel \u00eenc\u00e2t disponibilitatea materialelor este verificat\u0103 \u00een program. Materialele comandate sunt considerate disponibile la data de livrare a comenzii de achizi\u021bie, iar stocul se actualizeaz\u0103 c\u00e2nd aceasta este marcat\u0103 Delivered.<\/li>\n\n\n<li><strong>Testare care reduce riscurile proiectului.<\/strong> \u00cenc\u0103rca\u021bi un export Save to Excel \u00een versiunea de \u00eencercare de 30 de zile \u0219i vede\u021bi cum sunt programate propriile comenzi \u021bin\u00e2nd cont de capacitatea finit\u0103. Opri\u021bi o resurs\u0103 care constituie un blocaj, ad\u0103uga\u021bi o comand\u0103 urgent\u0103 \u0219i \u00eent\u00e2rzia\u021bi o comand\u0103 de achizi\u021bie. Maparea pe care o valida\u021bi aici define\u0219te domeniul lucr\u0103rilor de integrare IDO.<\/li>\n\n<\/ul>\n\n\n<p><strong>Alege\u021bi SkyPlanner c\u00e2nd<\/strong> CSI trebuie s\u0103 r\u0103m\u00e2n\u0103 sistemul de referin\u021b\u0103 pentru articole, comenzi de produc\u021bie \u0219i costuri. Primi\u021bi un instrument de programare \u0219i o aplica\u021bie pentru sec\u021bia de produc\u021bie, conectate printr-o interfa\u021b\u0103 de integrare limitat\u0103 \u0219i clar definit\u0103: se preiau comenzi de produc\u021bie \u0219i nomenclatoare \u0219i se transmit \u00eenapoi datele \u0219i orele programate \u0219i manopera. SkyPlanner porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, facturare lunar\u0103 \u0219i posibilitatea de a renun\u021ba oric\u00e2nd. Integrarea este ofertat\u0103 de la \u00eenceput, \u00een func\u021bie de procesele \u0219i nevoile dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul, astfel \u00eenc\u00e2t s\u0103 cunoa\u0219te\u021bi costul total \u00eenainte de a \u00eencepe.<\/p>\n\n\n<p>Consulta\u021bi <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a>, <a href=\"\/ro\/functionalitati\/\">func\u021bionalit\u0103\u021bile<\/a> \u0219i <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">documenta\u021bia SkyPlanner<\/a>. Compara\u021bi CSI APS \u0219i Scheduler cu un instrument de programare \u00een cloud \u00een articolul despre <a href=\"\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/cu-capacitate-finita\/\">programarea cu capacitate finit\u0103 \u00een Infor CloudSuite Industrial<\/a>. Sau accesa\u021bi <a href=\"\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/\">pagina Infor CloudSuite Industrial<\/a> \u0219i <a href=\"\/ro\/integrari\/erp\/\">sec\u021biunea de integr\u0103ri ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">P\u0103rerile produc\u0103torilor despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een sec\u021bia de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">La planificarea produc\u021biei se economisesc 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de opera\u021bii ajunge pe linie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/customers\/utu\/\">Citi\u021bi p\u0103rerea UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate, la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui plan optimizat pe trei luni pentru toate centrele de lucru dureaz\u0103 sub 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/customers\/laboratory-allied\/\">Citi\u021bi m\u0103rturia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Un sudor KJH-Comp \u0219lefuie\u0219te o structur\u0103 din o\u021bel sudat\u0103 la fabrica din Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>rata de respectare a termenelor de livrare, fa\u021b\u0103 de aproximativ 50% anterior<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner joac\u0103 un rol decisiv \u00een men\u021binerea ratei noastre de respectare a termenelor de livrare.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, director general<\/b><br>KJH-Comp \u00b7 Prelucrarea tablei \u0219i produc\u021bie pe baz\u0103 de contract<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a crescut de la aproximativ 50% p\u00e2n\u0103 la 98%, iar programarea necesit\u0103 acum un singur supervizor \u00een loc de doi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/customers\/kjh-comp\/\">Citi\u021bi m\u0103rturia KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, directoare de produc\u021bie la Fredman Operations, l\u00e2ng\u0103 o celul\u0103 robotizat\u0103 de paletizare din Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 luni<\/b><span>pentru care echipa de v\u00e2nz\u0103ri vede capacitatea disponibil\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ofer\u0103 o baz\u0103 solid\u0103 \u0219i siguran\u021b\u0103 pentru \u00eentreaga planificare a produc\u021biei.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, directoare de produc\u021bie<\/b><br>Fredman Operations \u00b7 H\u00e2rtie de ambalaj adecvat\u0103 contactului cu alimentele<\/p>\n\n\n<p class=\"ind-cust__result\">Echipa de v\u00e2nz\u0103ri vede capacitatea disponibil\u0103 cu \u0219ase luni \u00een avans, iar solicit\u0103rile de modificare a programului, al c\u0103ror r\u0103spuns dura o or\u0103 sau mai mult, primesc acum r\u0103spuns \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/customers\/fredman-operations\/\">Citi\u021bi m\u0103rturia Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cine realizeaz\u0103 integrarea cu CloudSuite Industrial sau SyteLine?<\/summary>\n<p class=\"sp-faq__a\">\u00cen etapa de implementare, echipa SkyPlanner configureaz\u0103 integrarea bidirec\u021bional\u0103 cu mediul dumneavoastr\u0103 CSI, folosind IDO REST API \u0219i ION BODs, \u0219i asigur\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een func\u021biune. Partenerul dumneavoastr\u0103 Infor sau propriii dezvoltatori pot realiza integrarea \u0219i prin API-ul REST documentat al SkyPlanner, folosind doar o cheie API. \u00cen perioada de prob\u0103, pute\u021bi \u00eencepe cu exporturi CSV sau Excel.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ce API trebuie folosit \u00een CSI pentru integrarea unui sistem de programare a produc\u021biei?<\/summary>\n<p class=\"sp-faq__a\">Mongoose IDO REST API prin ION API Gateway, cu OAuth 2.0 pe baza unui fi\u0219ier <code>.ionapi<\/code> al unei aplica\u021bii Backend Service. Ad\u0103uga\u021bi documentul BOD <code>ProductionOrder<\/code> pentru detectarea modific\u0103rilor la comenzi dac\u0103 interogarea periodic\u0103 nu este suficient de rapid\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum sunt transmise \u00eenapoi \u00een CSI datele planificate \u0219i manopera?<\/summary>\n<p class=\"sp-faq__a\">\u00cenceputul \u0219i sf\u00e2r\u0219itul planificate ale opera\u021biilor sunt scrise \u00eenapoi prin IDO <code>UpdateItems<\/code> \u00een programul opera\u021biilor comenzii, iar datele Start \u0219i End ale comenzii sunt actualizate \u00een <code>SLJobs<\/code>. Unit\u0103\u021bile care protejeaz\u0103 aceste c\u00e2mpuri folosesc o metod\u0103 IDO personalizat\u0103 prin <code>InvokeMethod<\/code>. Manopera este introdus\u0103 cu <code>AddItems<\/code> sub form\u0103 de r\u00e2nduri necontabilizate \u00een <code>SLJobtrans<\/code>, iar Job Labor Transaction Posting le contabilizeaz\u0103 \u00een produc\u021bia \u00een curs.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Avem nevoie de o licen\u021b\u0103 Infor suplimentar\u0103 pentru a conecta un sistem extern de programare a produc\u021biei?<\/summary>\n<p class=\"sp-faq__a\">Da, este necesar\u0103 o licen\u021b\u0103 Automation. Conform documenta\u021biei Infor privind licen\u021bierea, aplica\u021biile externe care se conecteaz\u0103 prin stratul IDO utilizeaz\u0103 o astfel de licen\u021b\u0103, cu tipul de sesiune IDO.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem p\u0103stra CSI APS \u0219i ad\u0103uga SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Da. CSI APS gestioneaz\u0103 \u00een continuare planul de materiale \u0219i Get CTP\/ATP, iar SkyPlanner preia stabilirea succesiunii opera\u021biilor pentru grupurile de resurse pe care i le \u00eencredin\u021ba\u021bi.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>C\u00e2t dureaz\u0103 un proiect de integrare cu CSI?<\/summary>\n<p class=\"sp-faq__a\">Implementarea se finalizeaz\u0103 \u00een mod normal \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea procesului de integrare ini\u021bial\u0103. Proiectul parcurge maparea, \u00eenc\u0103rcarea ini\u021bial\u0103, sincronizarea comenzilor de produc\u021bie \u0219i de achizi\u021bie, scrierea programului \u00eenapoi \u00een CSI, confirm\u0103rile <code>SLJobtrans<\/code>, rularea \u00een paralel \u0219i punerea \u00een func\u021biune.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de a dezvolta integrarea?<\/summary>\n<p class=\"sp-faq__a\">Da. Perioada de prob\u0103 gratuit\u0103 de 30 de zile include p\u00e2n\u0103 la 20 de centre de lucru \u0219i toate func\u021biile Basic, f\u0103r\u0103 a necesita un card de credit. \u00cencepe\u021bi cu fi\u0219iere CSV sau Excel exportate din CSI. <a href=\"\/ro\/proba\/\">\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103<\/a> sau <a href=\"\/ro\/contact-vanzari\/\">discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a> despre instan\u021ba dumneavoastr\u0103.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ Infor CloudSuite Industrial Ghid de integrare Infor CloudSuite Industrial pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid le arat\u0103 partenerilor \u0219i echipelor IT care lucreaz\u0103 cu Infor CloudSuite Industrial (CSI, anterior SyteLine) cum s\u0103 conecteze CSI la SkyPlanner APS. SkyPlanner se integreaz\u0103 bidirec\u021bional cu CSI, prin Infor OS: skyplanner.ai \u00b7 Programarea &#8230; <a title=\"Ghid de integrare Infor CloudSuite Industrial pentru programarea produc\u021biei cu SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/ghid-de-integrare\/\" aria-label=\"Read more about Ghid de integrare Infor CloudSuite Industrial pentru programarea produc\u021biei cu SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100905,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101352","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Infor CloudSuite Industrial: ghid de integrare pentru programare<\/title>\n<meta name=\"description\" content=\"Infor CloudSuite Industrial (SyteLine)\u2013SkyPlanner APS: IDO REST prin ION, BOD ProductionOrder, scriere \u00eenapoi a programului, manoper\u0103 SLJobtrans \u0219i capcane.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/ghid-de-integrare\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ghid de integrare Infor CloudSuite Industrial pentru programarea produc\u021biei cu SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Infor CloudSuite Industrial (SyteLine)\u2013SkyPlanner APS: IDO REST prin ION, BOD ProductionOrder, scriere \u00eenapoi a programului, manoper\u0103 SLJobtrans \u0219i capcane.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/ghid-de-integrare\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"19 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/infor-cloudsuite-industrial\\\/ghid-de-integrare\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/infor-cloudsuite-industrial\\\/ghid-de-integrare\\\/\",\"name\":\"Infor CloudSuite Industrial: ghid de integrare pentru programare\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Infor CloudSuite Industrial (SyteLine)\u2013SkyPlanner APS: IDO REST prin ION, BOD ProductionOrder, scriere \u00eenapoi a programului, manoper\u0103 SLJobtrans \u0219i capcane.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/infor-cloudsuite-industrial\\\/ghid-de-integrare\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/infor-cloudsuite-industrial\\\/ghid-de-integrare\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/infor-cloudsuite-industrial\\\/ghid-de-integrare\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru Infor CloudSuite Industrial (SyteLine): programarea produc\u021biei cu capacitate finit\u0103\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/infor-cloudsuite-industrial\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Ghid de integrare Infor CloudSuite Industrial pentru programarea produc\u021biei cu SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Infor CloudSuite Industrial: ghid de integrare pentru programare","description":"Infor CloudSuite Industrial (SyteLine)\u2013SkyPlanner APS: IDO REST prin ION, BOD ProductionOrder, scriere \u00eenapoi a programului, manoper\u0103 SLJobtrans \u0219i capcane.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/ghid-de-integrare\/","og_locale":"ro_RO","og_type":"article","og_title":"Ghid de integrare Infor CloudSuite Industrial pentru programarea produc\u021biei cu SkyPlanner APS","og_description":"Infor CloudSuite Industrial (SyteLine)\u2013SkyPlanner APS: IDO REST prin ION, BOD ProductionOrder, scriere \u00eenapoi a programului, manoper\u0103 SLJobtrans \u0219i capcane.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/ghid-de-integrare\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"19 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/ghid-de-integrare\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/ghid-de-integrare\/","name":"Infor CloudSuite Industrial: ghid de integrare pentru programare","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Infor CloudSuite Industrial (SyteLine)\u2013SkyPlanner APS: IDO REST prin ION, BOD ProductionOrder, scriere \u00eenapoi a programului, manoper\u0103 SLJobtrans \u0219i capcane.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/ghid-de-integrare\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/ghid-de-integrare\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/ghid-de-integrare\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru Infor CloudSuite Industrial (SyteLine): programarea produc\u021biei cu capacitate finit\u0103","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/"},{"@type":"ListItem","position":5,"name":"Ghid de integrare Infor CloudSuite Industrial pentru programarea produc\u021biei cu SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ Infor CloudSuite Industrial Ghid de integrare Infor CloudSuite Industrial pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid le arat\u0103 partenerilor \u0219i echipelor IT care lucreaz\u0103 cu Infor CloudSuite Industrial (CSI, anterior SyteLine) cum s\u0103 conecteze CSI la SkyPlanner APS. SkyPlanner se integreaz\u0103 bidirec\u021bional cu CSI, prin Infor OS: skyplanner.ai \u00b7 Programarea&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/101352","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=101352"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/101352\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/100905"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=101352"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}