{"id":101262,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101262"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"cu-capacitate-finita","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/epicor-kinetic\/cu-capacitate-finita\/","title":{"rendered":"Epicor Kinetic ofer\u0103 programare cu capacitate finit\u0103? Programarea nativ\u0103, APS \u0219i SkyPlanner APS explicate"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ Epicor Kinetic<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Epicor Kinetic ofer\u0103 programare cu capacitate finit\u0103? <span class=\"hl\">Programarea nativ\u0103, APS \u0219i SkyPlanner APS explicate<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Da, Epicor Kinetic include programarea cu capacitate finit\u0103. Modulul Scheduling and Resource Management programeaz\u0103 cu capacitate finit\u0103, iar modulul separat Advanced Planning and Scheduling (APS) permite utilizarea a mai mult de dou\u0103 constr\u00e2ngeri \u0219i adaug\u0103 programarea pe baza capabilit\u0103\u021bilor \u0219i reguli de optimizare.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u00cen utilizarea zilnic\u0103, exist\u0103 trei limite. Programarea cu capacitate finit\u0103 trebuie activat\u0103 \u00een mai multe locuri, modulul de baz\u0103 gestioneaz\u0103 cel mult dou\u0103 constr\u00e2ngeri pe opera\u021bie, iar optimizarea reglajelor este disponibil\u0103 \u00een APS.<\/p>\n\n\n<p>SkyPlanner APS func\u021bioneaz\u0103 al\u0103turi de Kinetic \u0219i respect\u0103 automat capacitatea finit\u0103 a fiec\u0103rui centru de lucru, f\u0103r\u0103 o licen\u021b\u0103 APS. Programul s\u0103u \u021bine cont de echipele de operatori, sculele comune, materialele din stoc \u0219i din comenzile de achizi\u021bie \u00een curs, precum \u0219i de schimb\u0103rile de fabrica\u021bie care depind de succesiunea opera\u021biilor. Autopilot reface automat programul atunci c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-epicor-kinetic-schedules-capacity-step-by-st\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum programeaz\u0103 Epicor Kinetic produc\u021bia \u00een func\u021bie de capacitate, pas cu pas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Kinetic are trei niveluri de planificare. <strong>MRP<\/strong> (cu Forecasting \u0219i MPS incluse) planific\u0103 necesarul de materiale. <strong>Scheduling and Resource Management<\/strong> este un modul separat care programeaz\u0103 comenzile de produc\u021bie \u00een func\u021bie de resurse. <strong>APS<\/strong> este un alt modul, pe care Epicor \u00eel descrie drept &#8220;an extension to Scheduling&#8221; (o extensie a modulului Scheduling). (<a href=\"https:\/\/www.epaccsys.com\/wp-content\/uploads\/Epicor-Kinetic-Planning-and-Scheduling-Suite-Epaccsys.pdf\">Bro\u0219ura Epicor<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Comenzile de produc\u021bie \u0219i metoda de fabrica\u021bie<\/h3>\n\n\n<p>Epicor nume\u0219te o comand\u0103 de produc\u021bie <strong>Job<\/strong>. Fiecare comand\u0103 se bazeaz\u0103 pe o metod\u0103 de fabrica\u021bie: o list\u0103 BOM pentru materiale \u0219i o list\u0103 de opera\u021bii pentru fluxul tehnologic. Fiecare opera\u021bie face referire la o <strong>Capability<\/strong>, un <strong>Resource Group<\/strong> sau o <strong>Resource<\/strong>. Pe forumul Epicor User Help, utilizatorii cu experien\u021b\u0103 sunt de acord c\u0103 selectarea unei capabilit\u0103\u021bi exclude celelalte dou\u0103 op\u021biuni, dar c\u0103 \u00eentr-un grup se poate indica totu\u0219i o anumit\u0103 resurs\u0103. Bro\u0219ura Epicor prezint\u0103 <strong>Automated Scheduling by Capability<\/strong>, func\u021bia prin care motorul alege resursa individual\u0103, ca func\u021bie APS. (<a href=\"https:\/\/www.epiusers.help\/t\/finite-schedule-not-doing-finite-scheduling\/72831\">forum<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Resursele: capacitate finit\u0103 sau infinit\u0103, pentru fiecare \u00een parte<\/h3>\n\n\n<p>Capacitatea se define\u0219te la nivelul resurselor (utilaje, oameni, scule), organizate \u00een grupuri de resurse. Un grup poate con\u021bine oric\u00e2te resurse, iar sistemul aloc\u0103 resursa efectiv\u0103 \u00een func\u021bie de disponibilitate. Fiecare resurs\u0103 are propriul calendar, propria capacitate, un timp de a\u0219teptare \u0219i un timp de transfer.<\/p>\n\n\n<p>Capacitatea finit\u0103 se alege separat pentru fiecare resurs\u0103. Pe forum, verific\u0103rile pentru depanare \u00eencep cu caseta &#8220;Finite&#8221; a resursei, iar bro\u0219ura Epicor precizeaz\u0103: &#8220;Define each resource with either finite or infinite capacity. When a piece of the schedule is moved, the resource is rescheduled according to its type.&#8221; (Defini\u021bi fiecare resurs\u0103 cu capacitate finit\u0103 sau infinit\u0103. C\u00e2nd o parte a programului este mutat\u0103, resursa este reprogramat\u0103 conform tipului s\u0103u.) Astfel, Kinetic permite abordarea hibrid\u0103 uzual\u0103: capacitate finit\u0103 la resursele care constituie blocaje \u0219i infinit\u0103 la toate celelalte.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Orizontul de programare cu capacitate finit\u0103<\/h3>\n\n\n<p>Setarea <strong>Finite Load Horizon<\/strong> limiteaz\u0103 perioada pentru care programul este ajustat \u00een func\u021bie de capacitatea finit\u0103. Epicor o descrie ca pe o limit\u0103 temporal\u0103 sau o dat\u0103-limit\u0103 &#8220;for finitely scheduling load on the resource.&#8221; (pentru programarea \u00eenc\u0103rc\u0103rii resursei cu capacitate finit\u0103). Dincolo de aceast\u0103 limit\u0103, opera\u021biile sunt programate consider\u00e2nd capacitatea infinit\u0103. Utilizatorii de pe forum seteaz\u0103 acest orizont la nivelul resursei, al grupului de resurse \u0219i \u00een <strong>Site Maintenance<\/strong>, \u00een fila <strong>Planning<\/strong>.<\/p>\n\n\n<p>\u00cen plus, fiecare instrument de programare are propria caset\u0103 pentru capacitate finit\u0103. Dac\u0103 omite\u021bi un nivel, sistemul va programa cu capacitate infinit\u0103 la acea rulare. Un r\u0103spuns de pe forum la o \u00eentrebare despre nefunc\u021bionarea program\u0103rii cu capacitate finit\u0103 spune: &#8220;Be sure the site maintenance &gt; planning tab has a finite horizon value filled in also.&#8221; (Asigura\u021bi-v\u0103 c\u0103 este completat\u0103 \u0219i valoarea orizontului de capacitate finit\u0103 \u00een Site Maintenance &gt; fila Planning.) (<a href=\"https:\/\/www.epiusers.help\/t\/finite-schedule-not-doing-finite-scheduling\/72831\">forum<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Scheduling Blocks, Setup Grouping \u0219i Dual Resource Constraints<\/h3>\n\n\n<p><strong>Scheduling Blocks<\/strong> modeleaz\u0103 necesit\u0103\u021bile periodice de reglaj, precum schimb\u0103rile de scule. <strong>Setup Grouping<\/strong> grupeaz\u0103 lucr\u0103rile dup\u0103 criteriile definite de dumneavoastr\u0103, pentru a eficientiza reglajele.<\/p>\n\n\n<p>Cu <strong>Dual Resource Constraints<\/strong>, o opera\u021bie poate rezerva o resurs\u0103 secundar\u0103, o scul\u0103 sau un angajat, al\u0103turi de resursa principal\u0103, \u00een timpul program\u0103rii cu capacitate finit\u0103. Exemplul clasic este un utilaj care necesit\u0103 un operator certificat.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Global Scheduling<\/h3>\n\n\n<p><strong>Global Scheduling<\/strong> ruleaz\u0103 programarea pentru \u00eentreaga fabric\u0103. Textul de ajutor precizeaz\u0103 c\u0103 aplic\u0103 &#8220;scheduling on all jobs that are eligible for Global Scheduling&#8221; (programarea tuturor comenzilor eligibile pentru Global Scheduling) \u0219i calculeaz\u0103 zilele de \u00eent\u00e2rziere de la data de \u00eenceput a programului global. Prioritatea de programare a comenzilor influen\u021beaz\u0103 ordinea. De asemenea, pute\u021bi programa o singur\u0103 comand\u0103 din <strong>Job Entry<\/strong>, pute\u021bi l\u0103sa MRP s\u0103 programeze comenzile pe care le creeaz\u0103 \u0219i pute\u021bi programa \u00eenainte sau \u00eenapoi \u00een timp. Utilizatorii de pe forum interogheaz\u0103 aloc\u0103rile programate ale resurselor din tabelul <strong>ResourceTimeUsed<\/strong>, excluz\u00e2nd \u00eenregistr\u0103rile de simulare. (<a href=\"https:\/\/www.epiusers.help\/t\/global-scheduling-order\/82411\">forum<\/a>, <a href=\"https:\/\/www.epiusers.help\/t\/query-scheduling-board-data\/79381\">forum<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Panourile de programare<\/h3>\n\n\n<p>Planificatorii lucreaz\u0103 \u00een trei panouri de tip Gantt, cu func\u021bii de glisare \u0219i fixare:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Panou<\/th><th>Utilizare<\/th><\/tr><\/thead><tbody><tr><td>Job Scheduling Board<\/td><td>Mutarea \u0219i blocarea opera\u021biilor unei comenzi de produc\u021bie<\/td><\/tr><tr><td>Resource Scheduling Board<\/td><td>Vizualizarea \u0219i reordonarea \u00eenc\u0103rc\u0103rii unei resurse sau a unui grup<\/td><\/tr><tr><td>Multi-Resource Scheduling Board<\/td><td>Compararea mai multor resurse \u0219i mutarea lucr\u0103rilor \u00eentre ele<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Instrumentele auxiliare includ un mod de <strong>simulare<\/strong>, <strong>Change Impact Informer<\/strong>, <strong>Overload Informer<\/strong>, blocarea comenzilor de produc\u021bie \u0219i alerte privind \u00eent\u00e2rzierile \u0219i disponibilitatea materialelor. Tabelul <strong>Related Materials<\/strong> afi\u0219eaz\u0103 materialele care constituie constr\u00e2ngeri, \u00eempreun\u0103 cu comanda de achizi\u021bie, comanda de produc\u021bie \u0219i lead time-ul aferente. \u00cen sec\u021bia de produc\u021bie, operatorii raporteaz\u0103 lucr\u0103rile prin <strong>Start Activity<\/strong> \u0219i <strong>Labor Entry<\/strong>.<\/p>\n\n\n<h3 class=\"wp-block-heading\">7. Ce aduce \u00een plus APS<\/h3>\n\n\n<p>APS p\u0103streaz\u0103 acela\u0219i motor \u0219i adaug\u0103:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Mai mult de dou\u0103 constr\u00e2ngeri.<\/strong> Epicor: &#8220;The Advanced Planning and Scheduling module provides the ability to use more than two resource constraints.&#8221; (Modulul Advanced Planning and Scheduling permite utilizarea a mai mult de dou\u0103 constr\u00e2ngeri de resurse.)<\/li>\n\n\n<li><strong>Programare pe baza Capability \u0219i Dependent Capability.<\/strong><\/li>\n\n\n<li><strong>Minimum WIP scheduling<\/strong> \u0219i <strong>Balanced Optimization<\/strong>, care \u021bine cont de prioritate, marja de timp \u0219i reglaje.<\/li>\n\n\n<li><strong>Optimization Rules<\/strong> pentru fiecare resurs\u0103, plus programare \u00een func\u021bie de ritmul de produc\u021bie \u0219i de dimensiuni.<\/li>\n\n\n<li><strong>Unlimited What-If<\/strong> \u0219i <strong>capable-to-promise<\/strong> \u00een Order Management.<\/li>\n\n\n<li><strong>Multi-Plant Communication<\/strong> \u0219i tratarea materialelor ca o constr\u00e2ngere strict\u0103, \u021bin\u00e2nd cont de calendarele furnizorilor.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-kinetic-s-native-scheduling-leaves-work-to\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce r\u0103m\u00e2ne \u00een sarcina planificatorului cu programarea nativ\u0103 din Kinetic<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Dou\u0103 constr\u00e2ngeri f\u0103r\u0103 APS.<\/strong> Modulul de baz\u0103 gestioneaz\u0103 o resurs\u0103 principal\u0103 \u0219i una secundar\u0103. Pentru a lua \u00een calcul simultan un utilaj, doi operatori, un dispozitiv de fixare \u0219i un material, este necesar\u0103 licen\u021ba APS. (<a href=\"https:\/\/www.epaccsys.com\/wp-content\/uploads\/Epicor-Kinetic-Planning-and-Scheduling-Suite-Epaccsys.pdf\">Bro\u0219ura Epicor<\/a>)<\/li>\n\n\n<li><strong>Programarea cu capacitate finit\u0103 se poate configura u\u0219or gre\u0219it.<\/strong> Op\u021biunea de activare \u0219i orizontul se seteaz\u0103 la nivelul resursei, al grupului de resurse, \u00een Site Maintenance \u0219i \u00een fiecare instrument. Datele calendaristice din Kinetic pot rezulta dintr-o programare cu capacitate finit\u0103 sau infinit\u0103, \u00een func\u021bie de rularea care le-a generat. (<a href=\"https:\/\/www.epiusers.help\/t\/finite-schedule-not-doing-finite-scheduling\/72831\">forum<\/a>)<\/li>\n\n\n<li><strong>Reglaje gestionate prin grupare, optimizare \u00een APS.<\/strong> Global Scheduling se bazeaz\u0103 pe prioritatea comenzilor de produc\u021bie \u0219i pe zilele de \u00eent\u00e2rziere. Scheduling Blocks \u0219i Setup Grouping gestioneaz\u0103 reglajele \u00een modulul de baz\u0103, iar <strong>Balanced Optimization<\/strong> (care combin\u0103 prioritatea, marja de timp \u0219i timpul de reglaj) este o func\u021bie APS. Bluesky ERP, partener Epicor, adaug\u0103 c\u0103 rezultatele depind de acurate\u021bea timpilor de opera\u021bie \u0219i a lead time-urilor de achizi\u021bie, precum \u0219i de \u00eenchiderea comenzilor de produc\u021bie. (<a href=\"https:\/\/www.blueskyerp.co.uk\/blog\/a-brief-overview-of-epicor-erp-advanced-planning-scheduling\/\">Bluesky ERP<\/a>)<\/li>\n\n\n<li><strong>Replanificarea a\u0219teapt\u0103 interven\u021bia cuiva sau o nou\u0103 rulare.<\/strong> Programul se schimb\u0103 c\u00e2nd cineva ruleaz\u0103 Global Scheduling, reprogrameaz\u0103 o comand\u0103 \u00een Job Entry sau mut\u0103 lucr\u0103rile prin glisare pe un panou. C\u00e2nd un utilaj se opre\u0219te, un planificator trebuie s\u0103 ini\u021bieze una dintre aceste ac\u021biuni. (<a href=\"https:\/\/www.epiusers.help\/t\/global-scheduling-order\/82411\">forum<\/a>)<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-epicor-kinetic-s-native-scheduling-is-enoug\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">C\u00e2nd este suficient\u0103 programarea nativ\u0103 din Epicor Kinetic<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>R\u0103m\u00e2ne\u021bi la Kinetic Scheduling sau achizi\u021biona\u021bi o licen\u021b\u0103 APS dac\u0103 majoritatea condi\u021biilor de mai jos sunt \u00eendeplinite:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Ave\u021bi o singur\u0103 unitate de produc\u021bie sau c\u00e2teva, cu resurse organizate \u00een grupuri \u0219i calendare care reflect\u0103 schimburile reale.<\/li>\n\n\n<li>Fluxurile tehnologice sunt \u00een mare parte standard, iar planificatorii accept\u0103 rezultatele generate de Global Scheduling pe baza regulilor de prioritate \u0219i le ajusteaz\u0103 \u00een Job Scheduling Board.<\/li>\n\n\n<li>Exist\u0103 presiune asupra capacit\u0103\u021bii la c\u00e2teva resurse care constituie blocaje. Programa\u021bi-le cu capacitate finit\u0103, iar pe celelalte cu capacitate infinit\u0103. Bluesky ERP recomand\u0103 exact aceast\u0103 abordare dup\u0103 ce func\u021biile de baz\u0103 merg corect. (<a href=\"https:\/\/www.blueskyerp.co.uk\/blog\/a-brief-overview-of-epicor-erp-advanced-planning-scheduling\/\">Bluesky ERP<\/a>)<\/li>\n\n\n<li>Ave\u021bi deja licen\u021b\u0103 APS, men\u021bine\u021bi corecte lead time-urile \u0219i normele de timp, \u00eenchide\u021bi comenzile de produc\u021bie la timp \u0219i ave\u021bi un administrator care cunoa\u0219te motorul de programare.<\/li>\n\n\n<li>Ave\u021bi nevoie de func\u021bia capable-to-promise \u00een Order Management.<\/li>\n\n<\/ul>\n\n\n<p>Dac\u0103 v\u0103 reg\u0103si\u021bi \u00een aceast\u0103 situa\u021bie, configura\u021bi corect toate nivelurile program\u0103rii cu capacitate finit\u0103 \u0219i men\u021bine\u021bi datele corecte.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">C\u00e2nd ave\u021bi nevoie de o solu\u021bie de programare cu capacitate finit\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Lua\u021bi \u00een calcul \u0219i alte solu\u021bii dec\u00e2t instrumentele native atunci c\u00e2nd:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Nu a\u021bi achizi\u021bionat niciodat\u0103 licen\u021b\u0103 pentru Scheduling and Resource Management sau APS ori nu le-a\u021bi configurat niciodat\u0103, iar planificatorii lucreaz\u0103 \u00een Excel pornind de la datele calendaristice generate de MRP.<\/li>\n\n\n<li>Ave\u021bi nevoie de mai mult de dou\u0103 constr\u00e2ngeri, dar nu dori\u021bi un proiect de implementare APS.<\/li>\n\n\n<li>Programul se schimb\u0103 de mai multe ori pe schimb \u0219i dori\u021bi s\u0103 se refac\u0103 automat, f\u0103r\u0103 s\u0103 a\u0219tepte urm\u0103toarea rulare sau ca un planificator s\u0103 mute lucr\u0103rile pe panou.<\/li>\n\n\n<li>Timpul de schimbare de fabrica\u021bie depinde de ce s-a produs anterior \u0219i dori\u021bi ca succesiunea s\u0103 fie aleas\u0103 pe baza unei matrice a timpilor de reglaj.<\/li>\n\n\n<li>Opera\u021biile necesit\u0103 o echip\u0103 de operatori sau un dispozitiv de fixare comun mai multor utilaje.<\/li>\n\n\n<li>Operatorii trebuie s\u0103 \u00ee\u0219i vad\u0103 lista de lucr\u0103ri pe o tablet\u0103 \u0219i s\u0103 confirme lucr\u0103rile efectuate, astfel \u00eenc\u00e2t programul s\u0103 se actualizeze.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Patru moduri de a programa produc\u021bia cu Kinetic<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Panourile de programare din Kinetic.<\/strong> Planificatorii ajusteaz\u0103 un program generat de Kinetic. Aceast\u0103 abordare se potrive\u0219te unei fabrici cu pu\u021bine blocaje \u0219i cu un program care se schimb\u0103 rar.<\/li>\n\n\n<li><strong>Kinetic Scheduling \u00eempreun\u0103 cu APS.<\/strong> Global Scheduling ruleaz\u0103 periodic. Aceast\u0103 abordare se potrive\u0219te fabricilor care au licen\u021b\u0103 APS \u0219i un administrator care ajusteaz\u0103 motorul de programare.<\/li>\n\n\n<li><strong>Suite APS pentru companii mari.<\/strong> Un sistem de planificare separat, implementat printr-un proiect de lung\u0103 durat\u0103. Potrivit pentru echipe mari de planificare care coordoneaz\u0103 mai multe unit\u0103\u021bi de produc\u021bie \u0219i au speciali\u0219ti proprii.<\/li>\n\n\n<li><strong>APS \u00een cloud, cu execu\u021bie \u00een sec\u021bia de produc\u021bie.<\/strong> SkyPlanner APS: programare automat\u0103 cu capacitate finit\u0103 pentru fiecare resurs\u0103, reprogramare prin Autopilot \u0219i confirm\u0103ri de pe dispozitive mobile. Potrivit pentru fabricile mici \u0219i mijlocii care folosesc Kinetic \u0219i vor un program actualizat \u00een permanen\u021b\u0103, dup\u0103 care s\u0103 lucreze sec\u021bia de produc\u021bie.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Ce s\u0103 urm\u0103ri\u021bi<\/h3>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Un model compatibil cu Kinetic.<\/strong> Comenzi de produc\u021bie, opera\u021bii, grupuri de resurse, resurse \u0219i capabilit\u0103\u021bi. O solu\u021bie care ignor\u0103 c\u00e2mpul Capability programeaz\u0103 resursa gre\u0219it\u0103.<\/li>\n\n\n<li><strong>Gestionarea detaliat\u0103 a constr\u00e2ngerilor.<\/strong> Schimburi, absen\u021be \u0219i ore suplimentare pentru fiecare resurs\u0103; mai mul\u021bi operatori la aceea\u0219i opera\u021bie; scule care nu pot fi \u00een dou\u0103 locuri simultan; timpi de reglaj care depind de succesiunea opera\u021biilor; resurse alternative c\u00e2nd cea principal\u0103 nu este disponibil\u0103.<\/li>\n\n\n<li><strong>Verificarea disponibilit\u0103\u021bii materialelor.<\/strong> Materialele necesare comenzilor de produc\u021bie, cantit\u0103\u021bile de articole din depozit \u0219i tran\u0219ele comenzilor de achizi\u021bie sunt verificate \u00een raport cu momentul de \u00eencepere al fiec\u0103rei opera\u021bii.<\/li>\n\n\n<li><strong>Reprogramare \u00een timp real.<\/strong> Planul se actualizeaz\u0103 c\u00e2nd apar modific\u0103ri \u00een produc\u021bie sau \u00een comenzi, nu la urm\u0103toarea rulare complet\u0103.<\/li>\n\n\n<li><strong>Scrierea datelor \u00eenapoi prin motorul de programare propriu al Kinetic.<\/strong> Datele calendaristice ale opera\u021biilor trebuie transmise prin <strong>Erp.BO.ScheduleEngineSvc<\/strong> (MoveJobItem, ChangeResource), cu blocarea ulterioar\u0103 a comenzii de produc\u021bie. Confirm\u0103rile trebuie \u00eenregistrate ca manoper\u0103 prin <strong>Erp.BO.LaborSvc<\/strong>.<\/li>\n\n\n<li><strong>O cale clar\u0103 de integrare.<\/strong> <a href=\"https:\/\/www.epicor.com\/en\/products\/enterprise-resource-planning-erp\/epicor-kinetic\/tools-and-technology\/open-rest-api\/\">API-ul REST al Kinetic<\/a> controleaz\u0103 fiecare integrare prin chei API \u0219i domenii de acces, a\u0219adar domeniul de acces trebuie s\u0103 includ\u0103 toate serviciile \u0219i metodele apelate de solu\u021bia de programare. Citirile uzuale folosesc <strong>Erp.BO.JobEntrySvc<\/strong>, <strong>Erp.BO.ResourceGroupSvc<\/strong> \u0219i Business Activity Queries (BAQs).<\/li>\n\n\n<li><strong>Reguli clare de responsabilitate.<\/strong> Stabili\u021bi care sistem gestioneaz\u0103 datele calendaristice ale opera\u021biilor, astfel \u00eenc\u00e2t Global Scheduling s\u0103 nu suprascrie planul extern.<\/li>\n\n\n<li><strong>O testare cu propriile date<\/strong> \u00eenainte de orice lucrare de integrare.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Unde se \u00eencadreaz\u0103 SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS ruleaz\u0103 \u00een cloud, al\u0103turi de Epicor Kinetic, \u0219i acoper\u0103 fiecare dintre lipsurile enumerate mai sus. Kinetic p\u0103streaz\u0103 MRP, comenzile de produc\u021bie \u0219i calcula\u021bia costurilor. SkyPlanner preia programarea detaliat\u0103 a opera\u021biilor \u0219i o men\u021bine la zi, astfel \u00eenc\u00e2t planificatorul nu mai trebuie s\u0103 refac\u0103 manual succesiunea acestora.<\/p>\n\n\n<p>Alege\u021bi SkyPlanner c\u00e2nd:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Limita de dou\u0103 constr\u00e2ngeri v\u0103 blocheaz\u0103.<\/strong> Motorul Arcturus include centrele de lucru, personalul, sculele \u0219i materialele \u00eentr-un singur program cu capacitate finit\u0103, generat \u00een c\u00e2teva secunde. O scul\u0103 folosit\u0103 la un centru de lucru este blocat\u0103 pentru toate celelalte.<\/li>\n\n\n<li><strong>Set\u0103rile de capacitate finit\u0103 de la diferite niveluri nu r\u0103m\u00e2n corelate.<\/strong> \u00cen SkyPlanner, fiecare centru de lucru are capacitate finit\u0103, conform schimburilor sale. Nu exist\u0103 casete de bifat \u00een fiecare instrument sau orizonturi de programare care trebuie corelate.<\/li>\n\n\n<li><strong>Opera\u021biile au nevoie de o echip\u0103.<\/strong> La o opera\u021bie pot lucra simultan mai mul\u021bi operatori, la acela\u0219i centru de lucru, fiecare cu propriile schimburi, concedii, absen\u021be \u0219i ore suplimentare. C\u00e2nd o persoan\u0103 sau un utilaj nu este disponibil, motorul mut\u0103 lucr\u0103rile c\u0103tre centre de lucru \u0219i personal alternativ.<\/li>\n\n\n<li><strong>Comenzile urgente trebuie s\u0103 treac\u0103 \u00een fa\u021b\u0103.<\/strong> Fast Track, Dynamic Priorities \u0219i prioritatea clientului aduc lucr\u0103rile urgente mai devreme \u00een program. Running Time Lock men\u021bine pe pozi\u021bie o opera\u021bie \u00een curs, iar Bulldozer decaleaz\u0103 opera\u021biile din aval. Planificatorii pot muta \u00een continuare opera\u021biile pe o diagram\u0103 Gantt interactiv\u0103, iar motorul men\u021bine coeren\u021ba restului programului.<\/li>\n\n\n<li><strong>Planul nu poate a\u0219tepta urm\u0103toarea rulare.<\/strong> Autopilot reface automat programul c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie \u0219i recalculeaz\u0103 planul doar c\u00e2nd este necesar. Regulile, bloc\u0103rile \u0219i priorit\u0103\u021bile dumneavoastr\u0103 r\u0103m\u00e2n decisive.<\/li>\n\n\n<li><strong>Piesele achizi\u021bionate stabilesc data de \u00eencepere.<\/strong> La programare se verific\u0103 stocul \u0219i comenzile de achizi\u021bie care urmeaz\u0103 s\u0103 soseasc\u0103. Materialul dintr-o comand\u0103 de achizi\u021bie deschis\u0103 \u00een Kinetic este considerat disponibil la data de livrare prev\u0103zut\u0103, iar stocul se actualizeaz\u0103 c\u00e2nd comanda este marcat\u0103 Delivered.<\/li>\n\n\n<li><strong>Schimb\u0103rile de fabrica\u021bie depind de succesiune.<\/strong> Matricea timpilor de preg\u0103tire stocheaz\u0103 timpul de schimbare a fabrica\u021biei pentru fiecare pereche de produse, cu valori diferite pe sensuri acolo unde este necesar (de la albastru la ro\u0219u 30 de minute, de la ro\u0219u la albastru 60). Solu\u021bia de programare alege succesiunea cu cel mai mic timp total de reglaj, f\u0103r\u0103 un proiect de optimizare APS.<\/li>\n\n\n<li><strong>Planul trebuie s\u0103 ajung\u0103 \u00een sec\u021bia de produc\u021bie.<\/strong> Operatorii \u00ee\u0219i v\u0103d lista de opera\u021bii \u0219i \u00eenregistreaz\u0103 lucrul pe telefon sau tablet\u0103 cu Mobile Confirmations, Production Timer \u0219i Quick Log Mode. Lucrul \u00eenregistrat este transmis \u00eenapoi \u00een Kinetic ca manoper\u0103.<\/li>\n\n\n<li><strong>Vre\u021bi s\u0103 \u00eencepe\u021bi utilizarea \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni.<\/strong> Implementarea se finalizeaz\u0103 \u00een mod normal \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea procesului de configurare \u0219i instruire.<\/li>\n\n<\/ul>\n\n\n<p>\u00cencepe\u021bi cu un export CSV al opera\u021biilor \u0219i resurselor dumneavoastr\u0103 \u00een cadrul <a href=\"\/ro\/proba\/\">perioadei de testare gratuit\u0103 de 30 de zile<\/a> (p\u00e2n\u0103 la 20 de centre de lucru, f\u0103r\u0103 card bancar). Vede\u021bi propriul program cu capacitate finit\u0103 \u00eenainte de orice lucrare de integrare. Dup\u0103 aceea, pre\u021bul porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, facturare lunar\u0103 \u0219i posibilitatea de a anula oric\u00e2nd. Primi\u021bi de la \u00eenceput o ofert\u0103 pentru integrare, adaptat\u0103 procesului \u0219i nevoilor dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul, ca s\u0103 cunoa\u0219te\u021bi costul total \u00eenainte de a \u00eencepe.<\/p>\n\n\n<p>SkyPlanner se integreaz\u0103 bidirec\u021bional cu Kinetic. Comenzile de produc\u021bie, opera\u021biile, resursele \u0219i lans\u0103rile comenzilor de achizi\u021bie sunt preluate prin API-ul REST Kinetic \u0219i prin BAQ-uri. Datele planificate ale opera\u021biilor sunt trimise \u00eenapoi prin motorul de programare Kinetic (<code>ScheduleEngineSvc.MoveJobItem<\/code>), iar orele de munc\u0103 \u00eenregistrate, prin <code>LaborSvc<\/code>. Webhook-urile transmit modific\u0103rile programului pe m\u0103sur\u0103 ce apar. Fiecare fabric\u0103 folose\u0219te Kinetic diferit, de la fluxuri tehnologice bazate pe capabilit\u0103\u021bi p\u00e2n\u0103 la personaliz\u0103ri BPM. De aceea, echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 \u00een etapa de implementare \u0219i ofer\u0103 asisten\u021b\u0103 \u0219i dup\u0103 punerea \u00een func\u021biune. Partenerul dumneavoastr\u0103 Epicor sau dezvoltatorii proprii pot, de asemenea, s\u0103 dezvolte integrarea folosind API-ul REST documentat al SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia API<\/a>), av\u00e2nd nevoie doar de o cheie API. Documenta\u021bia produsului este disponibil\u0103 public \u00een <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">documenta\u021bia SkyPlanner<\/a>.<\/p>\n\n\n<p>Afla\u021bi cum se conecteaz\u0103 componentele pe <a href=\"\/ro\/integrari\/erp\/epicor-kinetic\/\">pagina Epicor Kinetic<\/a> sau consulta\u021bi direct detaliile tehnice din <a href=\"\/ro\/integrari\/erp\/epicor-kinetic\/ghid-de-integrare\/\">ghidul de integrare<\/a>. Pentru a analiza \u00eempreun\u0103 resursele \u0219i comenzile dumneavoastr\u0103 de produc\u021bie din Kinetic, <a href=\"\/ro\/contact-vanzari\/\">programa\u021bi o demonstra\u021bie<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een sec\u021bia de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite s\u0103pt\u0103m\u00e2nal<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi opinia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate, la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar generarea unui plan optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi opinia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Un sudor KJH-Comp polizeaz\u0103 o structur\u0103 sudat\u0103 din o\u021bel \u00een fabrica din Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>respectarea termenelor de livrare, \u00een cre\u0219tere de la aproximativ 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner are un rol decisiv \u00een men\u021binerea ratei noastre de respectare a termenelor de livrare.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, director general<\/b><br>KJH-Comp \u00b7 Confec\u021bii metalice din tabl\u0103 \u0219i produc\u021bie \u00een subcontractare<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a crescut de la aproximativ 50% p\u00e2n\u0103 la 98%, iar de programare se ocup\u0103 acum un singur supervizor \u00een loc de doi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/kjh-comp\/\">Citi\u021bi opinia KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, director de produc\u021bie la Fredman Operations, l\u00e2ng\u0103 o celul\u0103 robotizat\u0103 de paletizare din Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 luni<\/b><span>de capacitate disponibil\u0103, vizibil\u0103 echipei de v\u00e2nz\u0103ri<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ofer\u0103 o baz\u0103 solid\u0103 \u0219i siguran\u021b\u0103 \u00eentregului proces de planificare a produc\u021biei.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, director de produc\u021bie<\/b><br>Fredman Operations \u00b7 H\u00e2rtie pentru ambalaje destinate contactului cu alimentele<\/p>\n\n\n<p class=\"ind-cust__result\">Echipa de v\u00e2nz\u0103ri vede capacitatea disponibil\u0103 cu \u0219ase luni \u00eenainte, iar solicit\u0103rile de modificare a programului care necesitau o or\u0103 sau mai mult primesc acum r\u0103spuns \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/fredman-operations\/\">Citi\u021bi opinia Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Epicor Kinetic ofer\u0103 programare cu capacitate finit\u0103?<\/summary>\n<p class=\"sp-faq__a\">Da. Modulul Scheduling and Resource Management programeaz\u0103 fiecare resurs\u0103 cu capacitate finit\u0103 \u00een cadrul unui orizont de programare cu capacitate finit\u0103. APS este o extensie separat\u0103 pentru mai mult de dou\u0103 constr\u00e2ngeri \u0219i pentru optimizare.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Am nevoie de modulul APS pentru programare cu capacitate finit\u0103 \u00een Kinetic?<\/summary>\n<p class=\"sp-faq__a\">Nu. Programarea cu capacitate finit\u0103 \u0219i o constr\u00e2ngere secundar\u0103 func\u021bioneaz\u0103 \u00een Scheduling and Resource Management. Ave\u021bi nevoie de APS pentru mai mult de dou\u0103 constr\u00e2ngeri, programare pe baza capabilit\u0103\u021bilor, Minimum WIP \u0219i confirmarea termenelor \u00een func\u021bie de capacitatea disponibil\u0103. Epicor nu public\u0103 un pre\u021b de list\u0103 pentru niciunul dintre cele dou\u0103 module.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>De ce programeaz\u0103 Kinetic cu capacitate infinit\u0103 c\u00e2nd am setat capacitate finit\u0103?<\/summary>\n<p class=\"sp-faq__a\">De obicei, lipse\u0219te o setare la unul dintre niveluri. Verifica\u021bi indicatorul Finite al resursei \u0219i caseta pentru capacitate finit\u0103 din instrumentul pe care l-a\u021bi rulat. Apoi verifica\u021bi orizontul de programare cu capacitate finit\u0103 la nivelul resursei, al grupului de resurse \u0219i \u00een fila Site Maintenance Planning.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Epicor Kinetic are o diagram\u0103 Gantt pentru programare?<\/summary>\n<p class=\"sp-faq__a\">Da. Panourile Job Scheduling Board, Resource Scheduling Board \u0219i Multi-Resource Scheduling Board sunt de tip Gantt, cu func\u021bii de glisare \u0219i fixare, simulare de scenarii \u0219i blocare a comenzilor de produc\u021bie.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ce constr\u00e2ngeri poate ad\u0103uga SkyPlanner pe l\u00e2ng\u0103 cele dou\u0103 din Kinetic?<\/summary>\n<p class=\"sp-faq__a\">Mai mul\u021bi operatori la aceea\u0219i opera\u021bie, scule tratate ca resurse partajate cu capacitate finit\u0103 \u0219i materiale din stoc \u0219i din comenzile de achizi\u021bie care urmeaz\u0103 s\u0103 soseasc\u0103. Folose\u0219te \u0219i centre de lucru \u0219i personal alternativ, precum \u0219i o matrice a timpilor de preg\u0103tire pentru schimb\u0103rile de fabrica\u021bie care depind de succesiune, toate \u00een acela\u0219i program cu capacitate finit\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Poate SkyPlanner APS s\u0103 func\u021bioneze \u00eempreun\u0103 cu Epicor Kinetic?<\/summary>\n<p class=\"sp-faq__a\">Da. SkyPlanner se integreaz\u0103 bidirec\u021bional cu Kinetic: preia comenzile de produc\u021bie, opera\u021biile \u0219i resursele \u0219i trimite \u00eenapoi datele planificate prin <code>ScheduleEngineSvc<\/code>, iar orele de munc\u0103, prin <code>LaborSvc<\/code>. Echipa SkyPlanner configureaz\u0103 integrarea REST v2 \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 Kinetic \u00een etapa de implementare. Consulta\u021bi <a href=\"\/ro\/integrari\/erp\/epicor-kinetic\/ghid-de-integrare\/\">ghidul de integrare<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>C\u00e2t dureaz\u0103 punerea \u00een func\u021biune a SkyPlanner APS \u00eempreun\u0103 cu Kinetic?<\/summary>\n<p class=\"sp-faq__a\">Implementarea se finalizeaz\u0103 \u00een mod normal \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea procesului de configurare \u0219i instruire. \u00cenainte de aceasta, \u00een perioada de testare de 30 de zile, pute\u021bi programa opera\u021biile reale pe baza unui export CSV sau Excel. <a href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a> sau <a href=\"\/ro\/contact-vanzari\/\">discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ Epicor Kinetic Epicor Kinetic ofer\u0103 programare cu capacitate finit\u0103? Programarea nativ\u0103, APS \u0219i SkyPlanner APS explicate Da, Epicor Kinetic include programarea cu capacitate finit\u0103. Modulul Scheduling and Resource Management programeaz\u0103 cu capacitate finit\u0103, iar modulul separat Advanced Planning and Scheduling (APS) permite utilizarea a mai mult de dou\u0103 constr\u00e2ngeri \u0219i adaug\u0103 &#8230; <a title=\"Epicor Kinetic ofer\u0103 programare cu capacitate finit\u0103? Programarea nativ\u0103, APS \u0219i SkyPlanner APS explicate\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/epicor-kinetic\/cu-capacitate-finita\/\" aria-label=\"Read more about Epicor Kinetic ofer\u0103 programare cu capacitate finit\u0103? Programarea nativ\u0103, APS \u0219i SkyPlanner APS explicate\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100875,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101262","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Epicor Kinetic ofer\u0103 programare cu capacitate finit\u0103?<\/title>\n<meta name=\"description\" content=\"Da, cu capacitate finit\u0103 \u00een Scheduling and Resource Management. APS e o extensie separat\u0103. Cum func\u021bioneaz\u0103 programarea, ce limite are \u0219i c\u00e2nd este suficient\u0103.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/epicor-kinetic\/cu-capacitate-finita\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Epicor Kinetic ofer\u0103 programare cu capacitate finit\u0103? Programarea nativ\u0103, APS \u0219i SkyPlanner APS explicate\" \/>\n<meta property=\"og:description\" content=\"Da, cu capacitate finit\u0103 \u00een Scheduling and Resource Management. APS e o extensie separat\u0103. Cum func\u021bioneaz\u0103 programarea, ce limite are \u0219i c\u00e2nd este suficient\u0103.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/epicor-kinetic\/cu-capacitate-finita\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"18 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/epicor-kinetic\\\/cu-capacitate-finita\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/epicor-kinetic\\\/cu-capacitate-finita\\\/\",\"name\":\"Epicor Kinetic ofer\u0103 programare cu capacitate finit\u0103?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Da, cu capacitate finit\u0103 \u00een Scheduling and Resource Management. APS e o extensie separat\u0103. Cum func\u021bioneaz\u0103 programarea, ce limite are \u0219i c\u00e2nd este suficient\u0103.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/epicor-kinetic\\\/cu-capacitate-finita\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/epicor-kinetic\\\/cu-capacitate-finita\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/epicor-kinetic\\\/cu-capacitate-finita\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru Epicor Kinetic: programarea produc\u021biei cu capacitate finit\u0103\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/epicor-kinetic\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Epicor Kinetic ofer\u0103 programare cu capacitate finit\u0103? Programarea nativ\u0103, APS \u0219i SkyPlanner APS explicate\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Epicor Kinetic ofer\u0103 programare cu capacitate finit\u0103?","description":"Da, cu capacitate finit\u0103 \u00een Scheduling and Resource Management. APS e o extensie separat\u0103. Cum func\u021bioneaz\u0103 programarea, ce limite are \u0219i c\u00e2nd este suficient\u0103.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/epicor-kinetic\/cu-capacitate-finita\/","og_locale":"ro_RO","og_type":"article","og_title":"Epicor Kinetic ofer\u0103 programare cu capacitate finit\u0103? Programarea nativ\u0103, APS \u0219i SkyPlanner APS explicate","og_description":"Da, cu capacitate finit\u0103 \u00een Scheduling and Resource Management. APS e o extensie separat\u0103. Cum func\u021bioneaz\u0103 programarea, ce limite are \u0219i c\u00e2nd este suficient\u0103.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/epicor-kinetic\/cu-capacitate-finita\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"18 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/epicor-kinetic\/cu-capacitate-finita\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/epicor-kinetic\/cu-capacitate-finita\/","name":"Epicor Kinetic ofer\u0103 programare cu capacitate finit\u0103?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Da, cu capacitate finit\u0103 \u00een Scheduling and Resource Management. APS e o extensie separat\u0103. Cum func\u021bioneaz\u0103 programarea, ce limite are \u0219i c\u00e2nd este suficient\u0103.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/epicor-kinetic\/cu-capacitate-finita\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/epicor-kinetic\/cu-capacitate-finita\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/epicor-kinetic\/cu-capacitate-finita\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru Epicor Kinetic: programarea produc\u021biei cu capacitate finit\u0103","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/epicor-kinetic\/"},{"@type":"ListItem","position":5,"name":"Epicor Kinetic ofer\u0103 programare cu capacitate finit\u0103? Programarea nativ\u0103, APS \u0219i SkyPlanner APS explicate"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ Epicor Kinetic Epicor Kinetic ofer\u0103 programare cu capacitate finit\u0103? Programarea nativ\u0103, APS \u0219i SkyPlanner APS explicate Da, Epicor Kinetic include programarea cu capacitate finit\u0103. Modulul Scheduling and Resource Management programeaz\u0103 cu capacitate finit\u0103, iar modulul separat Advanced Planning and Scheduling (APS) permite utilizarea a mai mult de dou\u0103 constr\u00e2ngeri \u0219i adaug\u0103&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/101262","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=101262"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/101262\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/100875"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=101262"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}