{"id":101202,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101202"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"cu-capacitate-finita","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/odoo\/cu-capacitate-finita\/","title":{"rendered":"Odoo ofer\u0103 programare cu capacitate finit\u0103? Cum func\u021bioneaz\u0103 butonul Plan \u0219i c\u00e2nd s\u0103 ad\u0103uga\u021bi SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ Odoo<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Odoo ofer\u0103 programare cu capacitate finit\u0103? <span class=\"hl\">Cum func\u021bioneaz\u0103 butonul Plan \u0219i c\u00e2nd s\u0103 ad\u0103uga\u021bi SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Odoo ofer\u0103 func\u021bii de baz\u0103 pentru programarea cu capacitate finit\u0103. Butonul <strong>Plan<\/strong> din Odoo Manufacturing aloc\u0103 fiecare comand\u0103 de produc\u021bie primului interval liber din calendarul centrului s\u0103u de lucru. Astfel, dou\u0103 comenzi de produc\u021bie programate nu se suprapun niciodat\u0103 pe acela\u0219i centru de lucru. \u00cens\u0103 planific\u0103 un singur ordin de fabrica\u021bie odat\u0103, \u021bin\u00e2nd cont de o singur\u0103 constr\u00e2ngere, f\u0103r\u0103 s\u0103 reordoneze, s\u0103 optimizeze sau s\u0103 replanifice ansamblul ordinelor. Fabricile care au nevoie s\u0103 ordoneze toate comenzile \u00een func\u021bie de termen \u0219i de reglaje folosesc SkyPlanner APS al\u0103turi de Odoo.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u00cen propriile materiale de marketing, Odoo afirm\u0103 c\u0103 pute\u021bi \u201eplan resources with finite capacity planning\u201d (planifica resursele \u021bin\u00e2nd cont de capacitatea finit\u0103) (<a href=\"https:\/\/www.odoo.com\/app\/manufacturing\">odoo.com\/app\/manufacturing<\/a>). Mai jos explic\u0103m ce \u00eenseamn\u0103 acest lucru \u00een Odoo 19.0, pe baza documenta\u021biei oficiale \u0219i a codului-surs\u0103: cum func\u021bioneaz\u0103 Plan, ce limite are \u0219i c\u00e2nd este suficient pentru nevoile dumneavoastr\u0103.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-odoo-plans-work-orders-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum planific\u0103 Odoo comenzile de produc\u021bie, pas cu pas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Activa\u021bi comenzile de produc\u021bie \u0219i configura\u021bi centrele de lucru<\/h3>\n\n\n<p>Accesa\u021bi <strong>Produc\u021bie &gt; Configurare &gt; Set\u0103ri<\/strong> \u0219i activa\u021bi <strong>Comenzi de produc\u021bie<\/strong>. Apoi, \u00een meniul <strong>Configurare<\/strong> apare op\u021biunea <strong>Centre de lucru<\/strong>. Fiecare centru de lucru (<code>mrp.workcenter<\/code>) con\u021bine c\u00e2mpurile folosite la planificare:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>C\u00e2mp<\/th><th>Rol \u00een planificare<\/th><\/tr><\/thead><tbody><tr><td>Working Hours<\/td><td>Calendarul dup\u0103 care func\u021bioneaz\u0103 centrul de lucru. Implicit: \u201eStandard 40 de ore\/s\u0103pt\u0103m\u00e2n\u0103\u201d, de luni p\u00e2n\u0103 vineri<\/td><\/tr><tr><td>Time Efficiency<\/td><td>Procent care scurteaz\u0103 sau prelunge\u0219te durata fiec\u0103rei comenzi de produc\u021bie din acest centru de lucru<\/td><\/tr><tr><td>Setup Time \/ Cleanup Time<\/td><td>Minute ad\u0103ugate \u00eenainte \u0219i dup\u0103 fiecare comand\u0103 de produc\u021bie<\/td><\/tr><tr><td>Alternative Workcenters<\/td><td>Alte centre de lucru pe care func\u021bia Planificare le poate folosi \u00een locul celui principal<\/td><\/tr><tr><td>Fila Capacit\u0103\u021bi pe produs<\/td><td>Num\u0103rul de piese pe ciclu \u0219i minutele de reglaj \u0219i cur\u0103\u021bare specifice fiec\u0103rui produs (<code>mrp.workcenter.capacity<\/code>)<\/td><\/tr><tr><td>OEE Target<\/td><td>\u021aint\u0103 de performan\u021b\u0103 pentru raportare, nu un parametru de planificare<\/td><\/tr><tr><td>Allowed Employees<\/td><td>Cine poate lucra aici. Este un filtru, nu o capacitate de produc\u021bie<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h3 class=\"wp-block-heading\">2. Opera\u021biile din lista de materiale<\/h3>\n\n\n<p>Nu exist\u0103 un nomenclator comun de fluxuri tehnologice. Opera\u021biile sunt definite \u00een fiecare list\u0103 de materiale (BoM), \u00een fila <strong>Opera\u021bii<\/strong> (<code>mrp.routing.workcenter<\/code>). Fiecare opera\u021bie are un <strong>Work Center<\/strong> \u0219i o metod\u0103 de calcul al duratei, <strong>Duration Computation<\/strong>: un timp fix introdus manual sau un timp calculat pe baza ultimelor comenzi de produc\u021bie (implicit, 10). Durata estimat\u0103 este suma timpilor de reglaj \u0219i cur\u0103\u021bare, la care se adaug\u0103 num\u0103rul de cicluri \u00eenmul\u021bit cu timpul pe ciclu, aceast\u0103 ultim\u0103 component\u0103 fiind \u00eemp\u0103r\u021bit\u0103 la valoarea din c\u00e2mpul Time Efficiency (<a href=\"https:\/\/github.com\/odoo\/odoo\/blob\/19.0\/addons\/mrp\/models\/mrp_routing.py\">mrp_routing.py<\/a>).<\/p>\n\n\n<p>Dac\u0103 activa\u021bi <strong>Work Order Dependencies<\/strong>, o opera\u021bie poate fi blocat\u0103 de alta prin <strong>Blocked By<\/strong>. Documenta\u021bia Odoo precizeaz\u0103: \u201eA blocked work order is scheduled at the end of the time period specified in the Expected Duration field of the work order that precedes it.\u201d (O comand\u0103 de produc\u021bie blocat\u0103 este programat\u0103 la sf\u00e2r\u0219itul perioadei indicate \u00een c\u00e2mpul Expected Duration al comenzii de produc\u021bie precedente.) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/advanced_configuration\/work_order_dependencies.html\">surs\u0103<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Confirma\u021bi ordinul de fabrica\u021bie (MO), apoi ap\u0103sa\u021bi Plan<\/h3>\n\n\n<p>Confirmarea unui ordin de fabrica\u021bie (<code>mrp.production<\/code>) creeaz\u0103 comenzile de produc\u021bie aferente (<code>mrp.workorder<\/code>). La ap\u0103sarea butonului <strong>Planificare<\/strong> din ordinul de fabrica\u021bie, sistemul porne\u0219te de la comenzile finale \u0219i programeaz\u0103 recursiv, mai \u00eent\u00e2i, fiecare comand\u0103 de care acestea depind. Programarea se face \u00een sens cronologic, fiecare comand\u0103 de produc\u021bie fiind plasat\u0103 dup\u0103 \u00eencheierea comenzilor precedente. Pentru fiecare comand\u0103 de produc\u021bie, Odoo:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li>Alege momentul cel mai t\u00e2rziu dintre \u00eenceputul MO, momentul curent \u0219i sf\u00e2r\u0219itul comenzilor de produc\u021bie de care depinde opera\u021bia.<\/li>\n\n\n<li>Verific\u0103 centrul de lucru principal \u0219i fiecare centru definit ca Alternative Workcenter.<\/li>\n\n\n<li>Caut\u0103 \u00een viitor, \u00een fiecare calendar, primul interval liber suficient de lung pentru durata estimat\u0103.<\/li>\n\n\n<li>Alege centrul de lucru care termin\u0103 cel mai devreme \u0219i rezerv\u0103 intervalul \u00een calendarul acestuia printr-o \u00eenregistrare <code>resource.calendar.leaves<\/code>.<\/li>\n\n<\/ol>\n\n\n<p>Codul-surs\u0103 al versiunii 19.0 enun\u021b\u0103 clar regula: \u201eThe available interval is disjoinct with all other workorders planned on this workcenter\u201d (Intervalul disponibil nu se suprapune cu nicio alt\u0103 comand\u0103 de produc\u021bie planificat\u0103 pe acest centru de lucru) (<a href=\"https:\/\/github.com\/odoo\/odoo\/blob\/19.0\/addons\/mrp\/models\/mrp_workcenter.py\">mrp_workcenter.py<\/a>). Aici intervine limita de capacitate. O comand\u0103 de produc\u021bie care ajunge la o perioad\u0103 nelucr\u0103toare continu\u0103 \u00een urm\u0103torul interval de lucru. Dac\u0103 nu g\u0103se\u0219te niciun interval potrivit \u00een 700 de zile, orizontul implicit de c\u0103utare, Plan se opre\u0219te cu mesajul \u201eImpossible to plan the workorder.\u201d (Comanda de produc\u021bie nu poate fi planificat\u0103.)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Perioade nelucr\u0103toare \u0219i centre alternative<\/h3>\n\n\n<p>Cu aplica\u021bia <strong>Time Off<\/strong> \u0219i modul dezvoltator pute\u021bi bloca un centru de lucru pentru mentenan\u021b\u0103 sau pentru o s\u0103rb\u0103toare. Plan trimite apoi comenzile de produc\u021bie c\u0103tre Alternative Workcenters. Dac\u0103 nu exist\u0103 o alternativ\u0103, documenta\u021bia Odoo precizeaz\u0103 c\u0103 \u201ework orders begin to pile up at the work center until it is operational again\u201d (comenzile de produc\u021bie \u00eencep s\u0103 se acumuleze la centrul de lucru p\u00e2n\u0103 c\u00e2nd acesta redevine opera\u021bional) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/workflows\/work_center_time_off.html\">surs\u0103<\/a>).<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Verifica\u021bi \u0219i ajusta\u021bi<\/h3>\n\n\n<p><strong>Manufacturing &gt; Planning &gt; Planning by Production<\/strong> \u0219i <strong>Planning by Workcenter<\/strong> deschid vizualiz\u0103rile pentru planificarea comenzilor de produc\u021bie. Enterprise afi\u0219eaz\u0103 o diagram\u0103 Gantt \u00een care pute\u021bi muta elementele prin glisare. Community ofer\u0103 vizualiz\u0103ri de tip list\u0103, calendar, tabel pivot \u0219i grafic. Documenta\u021bia descrie ajustarea ca pe o interven\u021bie manual\u0103: \u201eTimes and planned work centers can be changed by clicking to access the individual work order.\u201d (Orele \u0219i centrele de lucru planificate pot fi modificate printr-un clic care deschide comanda de produc\u021bie respectiv\u0103.) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/advanced_configuration\/using_work_centers.html\">surs\u0103<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-odoo-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Limitele Odoo<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Primul venit, primul servit.<\/strong> Plan lucreaz\u0103 cu c\u00e2te un MO, iar cel planificat primul ocup\u0103 primele intervale disponibile. Dac\u0103 selecta\u021bi mai multe MO, acestea sunt planificate \u00een ordinea implicit\u0103 din Odoo: mai \u00eent\u00e2i dup\u0103 prioritate, apoi dup\u0103 data de \u00eenceput. Sistemul nu pune \u00een balan\u021b\u0103 termenele \u0219i schimb\u0103rile de fabrica\u021bie \u0219i nu mut\u0103 un MO deja planificat pentru a face loc unuia mai urgent.<\/li>\n\n\n<li><strong>F\u0103r\u0103 ordonare \u00een func\u021bie de reglaje.<\/strong> Setup Time adaug\u0103 un timp fix fiec\u0103rei comenzi de produc\u021bie: acela\u0219i num\u0103r de minute, indiferent de ce s-a executat \u00eenainte. Odoo nu are o matrice pentru schimb\u0103rile de fabrica\u021bie \u0219i nu grupeaz\u0103 opera\u021biile similare pentru a evita aceste schimb\u0103ri.<\/li>\n\n\n<li><strong>O singur\u0103 constr\u00e2ngere.<\/strong> Doar calendarul centrului de lucru limiteaz\u0103 planul. Operatorii sunt gestiona\u021bi prin filtrul Allowed Employees. C\u00e2nd Plan rezerv\u0103 un interval, nu verific\u0103 disponibilitatea sculelor \u0219i a materialelor. Rezerv\u0103rile de componente \u0219i datele comenzilor de achizi\u021bie sunt folosite doar pentru reaprovizionare.<\/li>\n\n\n<li><strong>MRP ignor\u0103 capacitatea.<\/strong> Regulile de reaprovizionare \u0219i MTO creeaz\u0103 MO pe baza c\u00e2mpului <strong>Manuf. Lead Time<\/strong> din BoM, exprimat \u00een zile calendaristice. Documenta\u021bia precizeaz\u0103: \u201eLead times do not consider weekends, holidays, or work center capacity\u201d (Valorile de lead time nu \u021bin cont de weekenduri, s\u0103rb\u0103tori sau capacitatea centrului de lucru) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/inventory\/warehouses_storage\/replenishment\/lead_times.html\">surs\u0103<\/a>). Termenele MO \u0219i datele de livrare promise sunt calculate \u00een zile calendaristice, nu pe baza cozii reale de comenzi.<\/li>\n\n\n<li><strong>MPS este o list\u0103 de sugestii.<\/strong> Nici Master Production Schedule (Enterprise) nu ia \u00een calcul \u00eenc\u0103rcarea. \u201eThe MPS only suggests the amount of product to be replenished, requiring the user to actually create the replenishing POs\/MOs.\u201d (MPS sugereaz\u0103 doar cantitatea de produs de reaprovizionat; utilizatorul trebuie s\u0103 creeze efectiv comenzile de achizi\u021bie sau ordinele de fabrica\u021bie aferente.) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/workflows\/use_mps.html\">surs\u0103<\/a>)<\/li>\n\n\n<li><strong>F\u0103r\u0103 replanificare automat\u0103.<\/strong> O avarie sau o comand\u0103 urgent\u0103 nu mut\u0103 nimic automat. Dup\u0103 \u00eenceperea unei comenzi de produc\u021bie, Odoo refuz\u0103 anularea planific\u0103rii MO: \u201eSome work orders have already started, so you cannot unplan this manufacturing order.\u201d (Unele comenzi de produc\u021bie au \u00eenceput deja, deci nu pute\u021bi anula planificarea acestui ordin de fabrica\u021bie.) (<a href=\"https:\/\/github.com\/odoo\/odoo\/blob\/19.0\/addons\/mrp\/models\/mrp_production.py\">mrp_production.py<\/a>)<\/li>\n\n\n<li><strong>Subansamble planificate separat.<\/strong> Listele de materiale pe mai multe niveluri creeaz\u0103 MO subordonate distincte, fiecare planificat separat. Planificatorul trebuie s\u0103 le planifice \u00een ordinea corect\u0103, astfel \u00eenc\u00e2t subansamblul s\u0103 fie gata c\u00e2nd opera\u021bia de nivel superior are nevoie de el.<\/li>\n\n\n<li><strong>Gantt \u0219i MPS sunt disponibile \u00een Enterprise.<\/strong> Pagina de compara\u021bie a edi\u021biilor indic\u0103 func\u021biile \u201eScheduling\u201d (programare) \u0219i \u201eShopfloor\u201d (sec\u021bia de produc\u021bie) din Manufacturing ca fiind disponibile exclusiv \u00een Enterprise (<a href=\"https:\/\/www.odoo.com\/page\/editions\">odoo.com\/page\/editions<\/a>). \u00cen Community, planificatorii lucreaz\u0103 cu liste \u0219i un calendar.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-odoo-s-native-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">C\u00e2nd sunt suficiente func\u021biile de planificare din Odoo<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Butonul Plan din Odoo este suficient atunci c\u00e2nd:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Pentru fiecare opera\u021bie exist\u0103 un singur centru de lucru potrivit \u00een mod evident, iar volumele sunt moderate.<\/li>\n\n\n<li>Pu\u021bine comenzi concureaz\u0103 pentru aceea\u0219i resurs\u0103 care constituie un blocaj, astfel \u00eenc\u00e2t regula \u201eprimul venit, primul servit\u201d ofer\u0103 termene acceptabile.<\/li>\n\n\n<li>Utilajele alternative sunt identice, astfel \u00eenc\u00e2t Alternative Workcenters \u00eempreun\u0103 cu Time Off acoper\u0103 majoritatea perturb\u0103rilor.<\/li>\n\n\n<li>Reglajele sunt scurte sau nu depind de opera\u021bia anterioar\u0103.<\/li>\n\n\n<li>Un planificator poate verifica Planning by Workcenter o dat\u0103 pe zi \u0219i poate rezolva manual pu\u021binele conflicte.<\/li>\n\n<\/ul>\n\n\n<p>Dac\u0103 fabrica dumneavoastr\u0103 se \u00eencadreaz\u0103 \u00een acest profil, concentra\u021bi-v\u0103 pe calitatea datelor. Aloca\u021bi fiec\u0103rui centru de lucru un calendar \u0219i introduce\u021bi valori realiste pentru Setup \u0219i Cleanup Time. Folosi\u021bi durate fixe acolo unde datele istorice sunt neconcludente, activa\u021bi dependen\u021bele \u0219i planifica\u021bi MO \u00een ordinea priorit\u0103\u021bii.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">C\u00e2nd ave\u021bi nevoie de un sistem de programare cu capacitate finit\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Plan nu mai este suficient c\u00e2nd v\u0103 reg\u0103si\u021bi \u00een mai multe dintre situa\u021biile urm\u0103toare:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Multe comenzi concureaz\u0103 pentru dou\u0103 sau mai multe resurse care constituie blocaje, iar termenele trebuie s\u0103 dicteze ordinea de execu\u021bie.<\/li>\n\n\n<li>Reglajul depinde de ce s-a executat \u00eenainte, astfel \u00eenc\u00e2t ordinea opera\u021biilor influen\u021beaz\u0103 volumul produs.<\/li>\n\n\n<li>Personalul \u0219i schimburile limiteaz\u0103 planul la fel de mult ca utilajele.<\/li>\n\n\n<li>Sosirea materialelor determin\u0103 momentul \u00een care poate \u00eencepe o opera\u021bie.<\/li>\n\n\n<li>Comenzile urgente, avariile \u0219i livr\u0103rile \u00eent\u00e2rziate impun replanificarea de mai multe ori pe s\u0103pt\u0103m\u00e2n\u0103.<\/li>\n\n\n<li>Echipa de v\u00e2nz\u0103ri are nevoie de date de livrare bazate pe coada real\u0103 de comenzi, nu pe Manuf. Lead Time.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Ce s\u0103 c\u0103uta\u021bi<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Capacitate finit\u0103 luat\u0103 \u00een calcul simultan pentru toate centrele de lucru<\/strong>, \u021bin\u00e2nd cont de schimburi, personal \u0219i absen\u021be.<\/li>\n\n\n<li><strong>Ordonarea tuturor comenzilor \u00eempreun\u0103<\/strong>, dup\u0103 termen \u0219i prioritate, nu separat pentru fiecare MO.<\/li>\n\n\n<li><strong>O matrice a timpilor de reglaj<\/strong> pentru schimb\u0103rile de fabrica\u021bie dependente de succesiunea opera\u021biilor, astfel \u00eenc\u00e2t motorul s\u0103 aleag\u0103 ordinea cu cel mai mic timp de reglaj.<\/li>\n\n\n<li><strong>Scule \u0219i echipe tratate ca restric\u021bii:<\/strong> o scul\u0103 comun\u0103 folosit\u0103 pe un utilaj nu este disponibil\u0103 pentru altul, iar o opera\u021bie poate necesita mai mul\u021bi operatori simultan.<\/li>\n\n\n<li><strong>Programare care \u021bine cont de materiale<\/strong>, verific\u00e2nd stocul \u0219i comenzile de achizi\u021bie care urmeaz\u0103 s\u0103 fie recep\u021bionate.<\/li>\n\n\n<li><strong>Centre de lucru alternative<\/strong> pe care motorul le alege pentru \u00eentregul plan, nu pentru c\u00e2te o singur\u0103 comand\u0103 de produc\u021bie.<\/li>\n\n\n<li><strong>Produse cu structur\u0103 pe mai multe niveluri<\/strong>, astfel \u00eenc\u00e2t subansamblele s\u0103 fie finalizate \u00eenainte de a fi necesare la nivelul superior.<\/li>\n\n\n<li><strong>Reprogramare automat\u0103<\/strong> pe m\u0103sur\u0103 ce produc\u021bia avanseaz\u0103 sau comenzile se modific\u0103.<\/li>\n\n\n<li><strong>O diagram\u0103 Gantt pentru planificatori \u0219i o coad\u0103 de opera\u021bii pentru operatori<\/strong>, inclusiv \u00een Community.<\/li>\n\n\n<li><strong>O regul\u0103 clar\u0103 privind cine stabile\u0219te programul \u00een rela\u021bia cu Odoo.<\/strong> Datele comenzilor de produc\u021bie din Odoo sunt calculate pe baza rezerv\u0103rilor din calendar, iar o nou\u0103 ap\u0103sare a butonului Planificare le suprascrie. Stabili\u021bi c\u0103 aplica\u021bia de programare decide succesiunea, trimite\u021bi datele \u0219i centrele de lucru \u00eenapoi \u00een Odoo prin <code>mrp.workorder<\/code> \u0219i exclude\u021bi comenzile de produc\u021bie deja \u00een curs.<\/li>\n\n\n<li><strong>API-ul potrivit pentru versiunea \u0219i planul dumneavoastr\u0103.<\/strong> Odoo 19 ofer\u0103 External JSON-2 API. XML-RPC \u0219i JSON-RPC <a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/developer\/reference\/external_rpc_api.html\">urmeaz\u0103 s\u0103 fie eliminate<\/a> \u00een Odoo 22 (Odoo Online 21.1). Accesul la API-ul extern este disponibil doar \u00een planurile tarifare Custom, nu \u0219i \u00een One App Free sau Standard (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/developer\/reference\/external_api.html\">documenta\u021bia API-ului extern<\/a>). Modulele personalizate necesit\u0103 Odoo.sh sau g\u0103zduire pe infrastructura proprie (<a href=\"https:\/\/www.odoo.com\/pricing-plan\">tarife Odoo<\/a>).<\/li>\n\n<\/ul>\n\n\n<p>Op\u021biunile se \u00eempart \u00een patru categorii:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Func\u021biile proprii de planificare din Odoo<\/strong> includ butonul Plan \u0219i, \u00een Enterprise, vizualizarea Gantt.<\/li>\n\n\n<li><strong>Modulele suplimentare din clientul Odoo<\/strong> \u00eembun\u0103t\u0103\u021besc panoul de planificare sau logica de alocare a intervalelor \u0219i sunt \u00eentre\u021binute de un partener Odoo.<\/li>\n\n\n<li><strong>Motoarele pentru lan\u021bul de aprovizionare \u0219i suitele APS pentru companii mari<\/strong> sunt conectate printr-un proiect de implementare \u0219i gestionate de o echip\u0103 dedicat\u0103 planific\u0103rii.<\/li>\n\n\n<li><strong>Sistemele APS \u00een cloud cu func\u021bii de execu\u021bie \u00een sec\u021bia de produc\u021bie<\/strong>, categorie din care face parte SkyPlanner, programeaz\u0103 automat fiecare resurs\u0103 al\u0103turi de Odoo. Replanific\u0103 pe m\u0103sur\u0103 ce produc\u021bia se schimb\u0103 \u0219i pun programul de produc\u021bie la dispozi\u021bia operatorilor.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Rolul SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS r\u0103spunde fiec\u0103rei limit\u0103ri enumerate mai sus:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Regula \u201eprimul venit, primul servit\u201d las\u0103 loc unei ordini reale de execu\u021bie.<\/strong> Motorul Arcturus AI programeaz\u0103 \u00eempreun\u0103 toate comenzile deschise, \u00een c\u00e2teva secunde, respect\u00e2nd capacitatea finit\u0103. Le ordoneaz\u0103 dup\u0103 data de finalizare, prioritate, prioritatea clientului, Fast Track \u0219i Dynamic Priorities.<\/li>\n\n\n<li><strong>Timpi de reglaj mai scur\u021bi, nu fic\u0219i.<\/strong> O matrice a timpilor de reglaj p\u0103streaz\u0103 durata schimb\u0103rii de fabrica\u021bie pentru fiecare pereche de produse. Durata poate diferi \u00een func\u021bie de sens: de la albastru la ro\u0219u 30 de minute, de la ro\u0219u la albastru 60. Sistemul de programare alege ordinea cu cel mai mic timp de reglaj \u0219i programeaz\u0103 consecutiv opera\u021biile similare.<\/li>\n\n\n<li><strong>De la o singur\u0103 constr\u00e2ngere la toate.<\/strong> Centrele de lucru, schimburile, personalul, absen\u021bele, sculele \u0219i materialele sunt verificate \u00een acela\u0219i program de produc\u021bie. Sculele au disponibilitate limitat\u0103, astfel c\u0103 un dispozitiv folosit pe o ma\u0219in\u0103 nu este rezervat simultan pe alta. O opera\u021bie poate necesita mai mul\u021bi operatori \u00een acela\u0219i timp, iar motorul apeleaz\u0103 la ma\u0219ini sau personal alternativ c\u00e2nd resursa principal\u0103 nu este disponibil\u0103. Acela\u0219i model include grupurile de centre de lucru, eficien\u021bele \u0219i \u00eemp\u0103r\u021birea unei opera\u021bii \u00eentre mai multe centre de lucru. Verificarea materialelor ia \u00een calcul stocul disponibil \u0219i liniile deschise din <code>purchase.order<\/code>: componentele comandate sunt considerate disponibile la data de livrare a comenzii de achizi\u021bie, iar stocul se actualizeaz\u0103 c\u00e2nd aceasta este marcat\u0103 ca livrat\u0103.<\/li>\n\n\n<li><strong>Subansambluri gata la timp.<\/strong> Produsele intermediare \u0219i produsele cu structur\u0103 pe mai multe niveluri sunt programate astfel \u00eenc\u00e2t piesele s\u0103 fie gata c\u00e2nd sunt necesare la asamblare.<\/li>\n\n\n<li><strong>Autopilot \u00een locul reprogram\u0103rii manuale.<\/strong> Autopilot reprogrameaz\u0103 automat c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie, respect\u00e2nd bloc\u0103rile stabilite, Running Time Lock \u0219i priorit\u0103\u021bile dumneavoastr\u0103.<\/li>\n\n\n<li><strong>Gantt \u0219i instrumente pentru sec\u021bia de produc\u021bie \u00een Community.<\/strong> Planificatorii modific\u0103 programul \u00eentr-o diagram\u0103 Gantt interactiv\u0103. Operatorii \u00ee\u0219i v\u0103d lista de opera\u021bii \u0219i \u00eenregistreaz\u0103 activitatea pe telefon sau tablet\u0103 cu Mobile Confirmations, Production Timer \u0219i Quick Log Mode.<\/li>\n\n<\/ul>\n\n\n<p>Odoo r\u0103m\u00e2ne sistemul de referin\u021b\u0103 pentru produse, liste de materiale, stocuri, achizi\u021bii \u0219i contabilitate. SkyPlanner se integreaz\u0103 bidirec\u021bional cu acesta prin External JSON-2 API sau, pentru versiunile mai vechi, prin XML-RPC \u0219i JSON-RPC:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Date primite:<\/strong> <code>mrp.production<\/code>, <code>mrp.workorder<\/code>, <code>mrp.workcenter<\/code>, <code>mrp.bom<\/code> \u0219i liniile deschise din <code>purchase.order<\/code>.<\/li>\n\n\n<li><strong>Date trimise \u00eenapoi:<\/strong> \u00eenceputul \u0219i sf\u00e2r\u0219itul planificate \u0219i centrul de lucru ales, printr-o opera\u021bie <code>write<\/code> pentru fiecare <code>mrp.workorder<\/code> (<code>date_start<\/code>, <code>date_finished<\/code>, <code>workcenter_id<\/code>). Astfel se mut\u0103 rezervarea din calendarul Odoo, iar vizualiz\u0103rile de planificare din Odoo afi\u0219eaz\u0103 datele stabilite de SkyPlanner.<\/li>\n\n\n<li><strong>Sec\u021bia de produc\u021bie:<\/strong> confirm\u0103rile operatorilor sunt create ca \u00eenregistr\u0103ri Time Logs de tip <code>mrp.workcenter.productivity<\/code>.<\/li>\n\n<\/ul>\n\n\n<p>Webhook-urile SkyPlanner transmit modific\u0103rile programului pe m\u0103sur\u0103 ce apar. Fiecare fabric\u0103 folose\u0219te Odoo diferit, cu propriile opera\u021bii, calendare \u0219i module personalizate. \u00cen etapa de ini\u021biere, echipa SkyPlanner adapteaz\u0103 integrarea la modul \u00een care folosi\u021bi Odoo \u0219i asigur\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een func\u021biune. Partenerul dumneavoastr\u0103 Odoo sau dezvoltatorii interni pot construi, de asemenea, integrarea folosind REST API documentat al SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia de referin\u021b\u0103 API<\/a>). Pentru a \u00eencepe, este suficient\u0103 o cheie API. Detaliile despre API \u0219i func\u021bionalit\u0103\u021bi se g\u0103sesc \u00een <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">documenta\u021bia SkyPlanner<\/a>.<\/p>\n\n\n<p><strong>Alege\u021bi SkyPlanner c\u00e2nd<\/strong> multe comenzi concureaz\u0103 pentru acelea\u0219i resurse care constituie blocaje, iar termenele de finalizare trebuie s\u0103 stabileasc\u0103 ordinea tuturor comenzilor.<\/p>\n\n\n<p><strong>Alege\u021bi SkyPlanner c\u00e2nd<\/strong> schimb\u0103rile de fabrica\u021bie depind de ordinea opera\u021biilor sau c\u00e2nd sculele partajate \u0219i opera\u021biile care necesit\u0103 mai mul\u021bi operatori determin\u0103 ce se poate executa \u00een continuare.<\/p>\n\n\n<p><strong>Alege\u021bi SkyPlanner c\u00e2nd<\/strong> reprograma\u021bi de mai multe ori pe s\u0103pt\u0103m\u00e2n\u0103 \u0219i dori\u021bi un program func\u021bional pentru propria produc\u021bie \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni, nu dup\u0103 un proiect \u00eendelungat.<\/p>\n\n\n<p>\u00cencepe\u021bi cu un export CSV sau XLSX \u00een <a href=\"\/ro\/proba\/\">perioada de prob\u0103 gratuit\u0103 de 30 de zile<\/a> (p\u00e2n\u0103 la 20 de centre de lucru, f\u0103r\u0103 card de credit) \u0219i compara\u021bi programul SkyPlanner cu rezultatele butonului Plan. Dup\u0103 aceea, pre\u021bul porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse \u0219i facturare lunar\u0103. Pute\u021bi anula oric\u00e2nd. Primi\u021bi de la \u00eenceput o ofert\u0103 pentru integrare, adaptat\u0103 procesului \u0219i nevoilor dumneavoastr\u0103, \u00eempreun\u0103 cu oferta pentru abonament, astfel \u00eenc\u00e2t s\u0103 cunoa\u0219te\u021bi costul total \u00eenainte de a \u00eencepe. \u00cen mod normal, implementarea se \u00eencheie \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea etapei de ini\u021biere. Consulta\u021bi <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a> \u0219i <a href=\"\/ro\/functionalitati\/\">func\u021bionalit\u0103\u021bile<\/a>.<\/p>\n\n\n<p>Afla\u021bi mai multe despre <a href=\"\/ro\/integrari\/erp\/odoo\/\">SkyPlanner pentru Odoo<\/a>, consulta\u021bi <a href=\"\/ro\/integrari\/erp\/odoo\/ghid-de-integrare\/\">ghidul de integrare cu Odoo<\/a> \u0219i descoperi\u021bi alte <a href=\"\/ro\/integrari\/erp\/\">integr\u0103ri ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi proba gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een sec\u021bia de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi opinia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui plan optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi opinia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, manager de produc\u021bie la Fredman Operations, l\u00e2ng\u0103 o celul\u0103 robotizat\u0103 de paletizare din Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 luni<\/b><span>\u00een avans: echipa de v\u00e2nz\u0103ri vede capacitatea disponibil\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ofer\u0103 o baz\u0103 solid\u0103 \u0219i siguran\u021b\u0103 pentru \u00eentreaga planificare a produc\u021biei.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, manager de produc\u021bie<\/b><br>Fredman Operations \u00b7 H\u00e2rtie pentru ambalaje destinate contactului cu alimentele<\/p>\n\n\n<p class=\"ind-cust__result\">Echipa de v\u00e2nz\u0103ri vede capacitatea disponibil\u0103 cu \u0219ase luni \u00eenainte, iar solicit\u0103rile de modificare a programului, care necesitau o or\u0103 sau mai mult, primesc acum r\u0103spuns \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/fredman-operations\/\">Citi\u021bi opinia Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Un sudor KJH-Comp polizeaz\u0103 o structur\u0103 sudat\u0103 din o\u021bel la fabrica din Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>respectarea termenelor de livrare, fa\u021b\u0103 de aproximativ 50% anterior<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner joac\u0103 un rol decisiv \u00een men\u021binerea nivelului nostru de respectare a termenelor de livrare.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, director general<\/b><br>KJH-Comp \u00b7 Prelucrarea tablei \u0219i produc\u021bie la comand\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a crescut de la aproximativ 50% p\u00e2n\u0103 la 98%, iar pentru programare este acum nevoie de un singur supervizor \u00een loc de doi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/kjh-comp\/\">Citi\u021bi opinia KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Odoo Community permite programarea produc\u021biei?<\/summary>\n<p class=\"sp-faq__a\">Da, la un nivel de baz\u0103. Community include ordine de fabrica\u021bie, comenzi de produc\u021bie, centre de lucru \u0219i butonul Plan, cu vizualiz\u0103ri sub form\u0103 de liste, calendar, tabel pivot \u0219i grafic. Vizualizarea Gantt pentru programare, Shop Floor \u0219i Master Production Schedule sunt func\u021bionalit\u0103\u021bi Enterprise. SkyPlanner ofer\u0103 fabricilor care folosesc Community o diagram\u0103 Gantt \u0219i o list\u0103 de opera\u021bii pentru operatori.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Odoo MRP \u021bine cont de capacitatea centrelor de lucru?<\/summary>\n<p class=\"sp-faq__a\">Nu. Reaprovizionarea folose\u0219te valori de lead time exprimate \u00een zile calendaristice, iar documenta\u021bia Odoo precizeaz\u0103 c\u0103 acestea &#8220;do not consider weekends, holidays, or work center capacity&#8221; (nu iau \u00een calcul weekendurile, s\u0103rb\u0103torile sau capacitatea centrelor de lucru). Capacitatea este luat\u0103 \u00een calcul doar c\u00e2nd ap\u0103sa\u021bi Plan pe un ordin de fabrica\u021bie (MO).<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Poate Odoo s\u0103 execute simultan mai multe opera\u021bii pe acela\u0219i centru de lucru?<\/summary>\n<p class=\"sp-faq__a\">\u00cen modulul de programare, nu. Codul versiunii 19.0 rezerv\u0103 pentru fiecare comand\u0103 de produc\u021bie un interval care nu se suprapune cu nicio alt\u0103 comand\u0103 de pe acel centru de lucru. Fila Product Capacities stabile\u0219te num\u0103rul de piese pe ciclu \u00een cadrul unei singure comenzi de produc\u021bie, nu execu\u021bia \u00een paralel a mai multor comenzi de produc\u021bie.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Odoo gestioneaz\u0103 timpi de reglaj care depind de ordinea opera\u021biilor?<\/summary>\n<p class=\"sp-faq__a\">Nu. Setup Time \u0219i Cleanup Time sunt durate fixe \u00een minute, definite pentru fiecare centru de lucru sau pentru fiecare produs \u00een fila Product Capacities. Odoo le adaug\u0103 la fiecare comand\u0103 de produc\u021bie, indiferent de opera\u021bia executat\u0103 anterior. Matricea timpilor de reglaj din SkyPlanner p\u0103streaz\u0103 duratele schimb\u0103rilor de fabrica\u021bie pentru fiecare pereche de produse \u0219i sens de trecere, apoi stabile\u0219te ordinea opera\u021biilor pentru a le minimiza.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum se conecteaz\u0103 SkyPlanner APS la Odoo?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner se integreaz\u0103 bidirec\u021bional cu Odoo prin API-ul extern JSON-2 sau, pentru versiunile 16.0 p\u00e2n\u0103 la 18.0, prin <code>execute_kw<\/code> folosind XML-RPC sau JSON-RPC. Datele planificate \u0219i centrele de lucru sunt scrise \u00een fiecare <code>mrp.workorder<\/code>, iar timpul \u00eenregistrat este transferat \u00een Time Logs din Odoo. Echipa SkyPlanner configureaz\u0103 integrarea \u00een etapa de implementare \u0219i ofer\u0103 suport dup\u0103 punerea \u00een func\u021biune. Detaliile sunt disponibile \u00een <a href=\"\/ro\/integrari\/erp\/odoo\/ghid-de-integrare\/\">ghidul de integrare cu Odoo<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Pot testa SkyPlanner \u00eenainte de a-l integra cu Odoo?<\/summary>\n<p class=\"sp-faq__a\">Da. \u00cen perioada de prob\u0103 de 30 de zile, pute\u021bi folosi exporturi CSV sau XLSX din vizualiz\u0103rile de tip list\u0103 ale Odoo, cu p\u00e2n\u0103 la 20 de centre de lucru \u0219i f\u0103r\u0103 card de credit. Compara\u021bi programul SkyPlanner cu rezultatele butonului Plan \u00eenainte de a conecta sistemele. <a href=\"\/ro\/proba\/\">\u00cencepe\u021bi proba gratuit\u0103<\/a> sau <a href=\"\/ro\/contact-vanzari\/\">discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ Odoo Odoo ofer\u0103 programare cu capacitate finit\u0103? Cum func\u021bioneaz\u0103 butonul Plan \u0219i c\u00e2nd s\u0103 ad\u0103uga\u021bi SkyPlanner APS Odoo ofer\u0103 func\u021bii de baz\u0103 pentru programarea cu capacitate finit\u0103. Butonul Plan din Odoo Manufacturing aloc\u0103 fiecare comand\u0103 de produc\u021bie primului interval liber din calendarul centrului s\u0103u de lucru. Astfel, dou\u0103 comenzi de produc\u021bie &#8230; <a title=\"Odoo ofer\u0103 programare cu capacitate finit\u0103? Cum func\u021bioneaz\u0103 butonul Plan \u0219i c\u00e2nd s\u0103 ad\u0103uga\u021bi SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/odoo\/cu-capacitate-finita\/\" aria-label=\"Read more about Odoo ofer\u0103 programare cu capacitate finit\u0103? Cum func\u021bioneaz\u0103 butonul Plan \u0219i c\u00e2nd s\u0103 ad\u0103uga\u021bi SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100845,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101202","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Odoo: programare cu capacitate finit\u0103? Butonul Plan<\/title>\n<meta name=\"description\" content=\"Butonul Plan din Odoo aloc\u0103 fiec\u0103rei comenzi primul interval liber din centrul de lucru. Ce face, ce limite are \u0219i c\u00e2nd ave\u021bi nevoie de un APS.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/odoo\/cu-capacitate-finita\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Odoo ofer\u0103 programare cu capacitate finit\u0103? Cum func\u021bioneaz\u0103 butonul Plan \u0219i c\u00e2nd s\u0103 ad\u0103uga\u021bi SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Butonul Plan din Odoo aloc\u0103 fiec\u0103rei comenzi primul interval liber din centrul de lucru. Ce face, ce limite are \u0219i c\u00e2nd ave\u021bi nevoie de un APS.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/odoo\/cu-capacitate-finita\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"19 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/odoo\\\/cu-capacitate-finita\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/odoo\\\/cu-capacitate-finita\\\/\",\"name\":\"Odoo: programare cu capacitate finit\u0103? Butonul Plan\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Butonul Plan din Odoo aloc\u0103 fiec\u0103rei comenzi primul interval liber din centrul de lucru. Ce face, ce limite are \u0219i c\u00e2nd ave\u021bi nevoie de un APS.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/odoo\\\/cu-capacitate-finita\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/odoo\\\/cu-capacitate-finita\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/odoo\\\/cu-capacitate-finita\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru Odoo: programarea produc\u021biei cu capacitate finit\u0103 \u0219i integrare\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/odoo\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Odoo ofer\u0103 programare cu capacitate finit\u0103? Cum func\u021bioneaz\u0103 butonul Plan \u0219i c\u00e2nd s\u0103 ad\u0103uga\u021bi SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Odoo: programare cu capacitate finit\u0103? Butonul Plan","description":"Butonul Plan din Odoo aloc\u0103 fiec\u0103rei comenzi primul interval liber din centrul de lucru. Ce face, ce limite are \u0219i c\u00e2nd ave\u021bi nevoie de un APS.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/odoo\/cu-capacitate-finita\/","og_locale":"ro_RO","og_type":"article","og_title":"Odoo ofer\u0103 programare cu capacitate finit\u0103? Cum func\u021bioneaz\u0103 butonul Plan \u0219i c\u00e2nd s\u0103 ad\u0103uga\u021bi SkyPlanner APS","og_description":"Butonul Plan din Odoo aloc\u0103 fiec\u0103rei comenzi primul interval liber din centrul de lucru. Ce face, ce limite are \u0219i c\u00e2nd ave\u021bi nevoie de un APS.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/odoo\/cu-capacitate-finita\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"19 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/odoo\/cu-capacitate-finita\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/odoo\/cu-capacitate-finita\/","name":"Odoo: programare cu capacitate finit\u0103? Butonul Plan","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Butonul Plan din Odoo aloc\u0103 fiec\u0103rei comenzi primul interval liber din centrul de lucru. Ce face, ce limite are \u0219i c\u00e2nd ave\u021bi nevoie de un APS.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/odoo\/cu-capacitate-finita\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/odoo\/cu-capacitate-finita\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/odoo\/cu-capacitate-finita\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru Odoo: programarea produc\u021biei cu capacitate finit\u0103 \u0219i integrare","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/odoo\/"},{"@type":"ListItem","position":5,"name":"Odoo ofer\u0103 programare cu capacitate finit\u0103? Cum func\u021bioneaz\u0103 butonul Plan \u0219i c\u00e2nd s\u0103 ad\u0103uga\u021bi SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ Odoo Odoo ofer\u0103 programare cu capacitate finit\u0103? Cum func\u021bioneaz\u0103 butonul Plan \u0219i c\u00e2nd s\u0103 ad\u0103uga\u021bi SkyPlanner APS Odoo ofer\u0103 func\u021bii de baz\u0103 pentru programarea cu capacitate finit\u0103. Butonul Plan din Odoo Manufacturing aloc\u0103 fiecare comand\u0103 de produc\u021bie primului interval liber din calendarul centrului s\u0103u de lucru. Astfel, dou\u0103 comenzi de produc\u021bie&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/101202","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=101202"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/101202\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/100845"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=101202"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}