{"id":101173,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101173"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"ghid-de-integrare","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sap-s4hana\/ghid-de-integrare\/","title":{"rendered":"Ghid de integrare SAP S\/4HANA pentru programarea produc\u021biei cu SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ SAP S\/4HANA<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Ghid de integrare SAP S\/4HANA <span class=\"hl\">pentru programarea produc\u021biei cu SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Acest ghid le arat\u0103 partenerilor SAP, echipelor IT \u0219i cump\u0103r\u0103torilor tehnici cum se conecteaz\u0103 SkyPlanner APS la SAP S\/4HANA. SkyPlanner se integreaz\u0103 bidirec\u021bional cu S\/4HANA prin API-urile OData publicate de SAP:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Sunt importate comenzile de produc\u021bie, opera\u021biile, capacitatea centrelor de lucru, stocurile \u0219i comenzile de achizi\u021bie deschise.<\/li>\n\n\n<li>Datele de \u00eenceput planificate sunt trimise \u00eenapoi pentru fiecare opera\u021bie a comenzilor de produc\u021bie.<\/li>\n\n\n<li>Pontajele operatorilor sunt \u00eenregistrate drept confirm\u0103ri ale comenzilor de produc\u021bie.<\/li>\n\n\n<li>Webhook-urile SkyPlanner transmit modific\u0103rile programului pe m\u0103sur\u0103 ce apar.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu lucr\u0103ri programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Materialele, listele BOM, fluxurile tehnologice, comenzile de produc\u021bie, stocurile \u0219i calculul costurilor r\u0103m\u00e2n \u00een S\/4HANA. Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 S\/4HANA \u00een etapa de implementare ini\u021bial\u0103 \u0219i asigur\u0103 suport dup\u0103 punerea \u00een func\u021biune. Pentru justificarea investi\u021biei, consulta\u021bi <a href=\"\/ro\/integrari\/erp\/sap-s4hana\/\">pagina despre programarea produc\u021biei cu SAP S\/4HANA<\/a>. Pentru a afla ce poate programa S\/4HANA singur, citi\u021bi <a href=\"\/ro\/integrari\/erp\/sap-s4hana\/cu-capacitate-finita\/\">Ofer\u0103 SAP S\/4HANA programare cu capacitate finit\u0103?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-s-4hana-integration-options\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Op\u021biuni de integrare cu SAP S\/4HANA<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>S\/4HANA pune la dispozi\u021bie interfe\u021be de integrare sub form\u0103 de servicii OData publicate, listate \u00een SAP Business Accelerator Hub (api.sap.com). Integrarea pentru programarea produc\u021biei folose\u0219te servicii OData V2. IDoc \u0219i BAPI exist\u0103 \u00een continuare, dar acest ghid folose\u0219te API-urile OData publicate.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Autentificare \u00een func\u021bie de edi\u021bie<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>On-premise \u0219i Private Edition.<\/strong> Serviciile se activeaz\u0103 \u00een SAP Gateway prin tranzac\u021bia <code>\/IWFND\/MAINT_SERVICE<\/code>. Utilizatorul de integrare are nevoie de obiectele de autorizare corespunz\u0103toare, de exemplu <code>C_AFRU_AWK<\/code> pentru confirm\u0103ri, <code>C_AFKO_AWK<\/code> pentru pozi\u021biile mi\u0219c\u0103rilor de stoc \u00eenregistrate odat\u0103 cu acestea \u0219i <code>M_PLAF_ORG<\/code> pentru ordinele planificate.<\/li>\n\n\n<li><strong>Public Edition.<\/strong> Serviciile sunt expuse numai prin acorduri de comunicare. Urm\u00e2nd <a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_CLOUD\/55a7cb346519450cb9e6d21c1ecd6ec1\/36ea4658c0c51f60e10000000a44147b.html\">instruc\u021biunile SAP pentru configurarea comunica\u021biilor de intrare<\/a>, crea\u021bi un utilizator de comunicare, un sistem de comunicare \u0219i un acord de comunicare \u00een aplica\u021bia <strong>Communication Arrangements<\/strong>, pe baza unui scenariu de comunicare SAP (<code>SAP_COM_xxxx<\/code>). Scenariul stabile\u0219te ce servicii sunt expuse \u0219i ce metode de autentificare sunt disponibile:<\/li>\n\n<\/ul>\n\n\n<p>&#8211; pe baz\u0103 de token: fluxuri bearer OAuth, SAML sau OpenID Connect, cu propagarea identit\u0103\u021bii c\u0103tre un utilizator de business &#8211; certificat de client &#8211; autentificare de baz\u0103 cu un utilizator tehnic de comunicare<\/p>\n\n\n<p>SAP recomand\u0103 autentificarea prin token sau certificat.<\/p>\n\n\n<p>Pe partea SkyPlanner, integrarea se face printr-un REST API cu autentificare prin token API, documentat \u00een Swagger\/OpenAPI (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia API<\/a>). Astfel, middleware-ul gestioneaz\u0103 autentificarea SAP pe de o parte \u0219i tokenul API SkyPlanner pe de cealalt\u0103.<\/p>\n\n\n<h3 class=\"wp-block-heading\">API-uri pentru programarea produc\u021biei<\/h3>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Serviciu<\/th><th>Entit\u0103\u021bi \u0219i ac\u021biuni utilizate<\/th><th>Scop<\/th><\/tr><\/thead><tbody><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/ed408e9ecb144e6eb09e6883d25a7262.html\"><code>API_PRODUCTION_ORDER_2_SRV<\/code><\/a> (Production Order, Version 2)<\/td><td><code>A_ProductionOrder_2<\/code>, <code>A_ProductionOrderItem_2<\/code>, <code>A_ProductionOrderOperation_2<\/code>, <code>A_ProductionOrderComponent_2<\/code>, <code>A_ProductionOrderStatus_2<\/code>, <code>A_ProductionRsceTools_2<\/code>; ac\u021biunile <code>ReleaseOrder<\/code>, <code>ReleaseOperation<\/code>, <code>ScheduleProductionOrderOperation<\/code><\/td><td>Ordine, opera\u021bii, componente, PRT-uri, stare, retransmiterea programului \u00een SAP<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/62ec4758c3f90a02e10000000a44147b.html\"><code>API_WORK_CENTERS<\/code><\/a><\/td><td><code>A_WorkCenters<\/code>, <code>A_WorkCenterAllCapacity_2<\/code>, <code>A_WorkCenterCapacity<\/code>, <code>A_WorkCenterCapacityInterval_2<\/code>, <code>A_WorkCenterCapacityShift_2<\/code>, <code>A_WorkCenterCapPerBucket<\/code><\/td><td>Centre de lucru, categorii de capacitate, intervale \u0219i schimburi<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/2dd233df3bc947d6b402d246ed887b5a.html\"><code>API_PRODUCTION_ROUTING<\/code><\/a><\/td><td><code>ProductionRoutingHeader<\/code>, <code>ProductionRoutingSequence<\/code>, <code>ProductionRoutingOperation<\/code>, <code>ProductionRoutingSubOperation<\/code>, <code>ProductionRoutingMatlAssgmt<\/code>, <code>ProductionRoutingOpCompAlloc<\/code><\/td><td>Fluxuri tehnologice standard pentru planificare \u00eenainte de crearea ordinelor<\/td><\/tr><tr><td><code>API_BILL_OF_MATERIAL_SRV;v=2<\/code><\/td><td><code>MaterialBOM<\/code>, <code>MaterialBOMItem<\/code>, <code>MaterialBOMSubItem<\/code><\/td><td>Structura produsului pe mai multe niveluri<\/td><\/tr><tr><td><code>API_PRODUCT_SRV<\/code> (Product Master A2X)<\/td><td><code>A_Product<\/code><\/td><td>Materiale (denumite Product \u00een API). SAP recomand\u0103 acum API-ul Product (Version 2) pentru majoritatea entit\u0103\u021bilor de produs<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/43ae2e5876b4a107e10000000a441470.html\"><code>API_PLANNED_ORDERS<\/code><\/a><\/td><td><code>A_PlannedOrder<\/code>, <code>A_PlannedOrderComponent<\/code>, <code>A_PlannedOrderCapacity<\/code><\/td><td>Rezultatele MRP Live \u00eenainte de conversie<\/td><\/tr><tr><td><code>API_MATERIAL_STOCK_SRV<\/code><\/td><td><code>A_MaterialStock<\/code>, <code>A_MatlStkInAcctMod<\/code><\/td><td>Stoc pe unitate de produc\u021bie \u0219i loca\u021bie de depozitare, pentru disponibilitatea materialelor<\/td><\/tr><tr><td><code>API_PURCHASEORDER_PROCESS_SRV<\/code><\/td><td><code>A_PurchaseOrder<\/code>, <code>A_PurchaseOrderItem<\/code><\/td><td>Comenzi de achizi\u021bie deschise pentru materialele care urmeaz\u0103 s\u0103 soseasc\u0103<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/e77b762e243b4045ad1f1f048f6aab87.html\"><code>API_PROD_ORDER_CONFIRMATION_2_SRV<\/code><\/a><\/td><td><code>ProdnOrdConf2<\/code>, <code>ProdnOrdConfMatlDocItm<\/code>; ac\u021biunile <code>GetConfProposal<\/code>, <code>GetGdsMvtProposal<\/code>, <code>CancelProdnOrdConf<\/code><\/td><td>Confirm\u0103ri \u0219i mi\u0219c\u0103ri de stoc din sec\u021bia de produc\u021bie<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u00cen API-ul pentru ordine de produc\u021bie, opera\u021biile sunt identificate prin combina\u021bia <code>OrderInternalBillOfOperations<\/code> \u0219i <code>OrderIntBillOfOperationsItem<\/code>, nu prin num\u0103rul opera\u021biei afi\u0219at planificatorului. Ac\u021biunea <code>GetConfProposal<\/code> din API-ul de confirmare identific\u0103 aceea\u0219i opera\u021bie prin <code>OrderID<\/code> \u0219i <code>OrderOperation<\/code>. Stoca\u021bi \u00een SkyPlanner at\u00e2t cheile interne, c\u00e2t \u0219i num\u0103rul opera\u021biei \u00eenc\u0103 de la prima \u00eenc\u0103rcare.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Evenimente<\/h3>\n\n\n<p>S\/4HANA genereaz\u0103 <a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/1d609d0a1ecb48c7b46831a3d473288f.html\">evenimentele de business<\/a> <strong>Production Order Created<\/strong> \u0219i <strong>Production Order Changed<\/strong>, al c\u0103ror payload con\u021bine <code>ManufacturingOrder<\/code>, <code>ProductionOrder<\/code>, <code>ProductionOrderType<\/code> \u0219i <code>ProductionPlant<\/code>. Payload-ul con\u021bine doar chei, a\u0219a c\u0103 integrarea recite\u0219te ordinul \u0219i opera\u021biile acestuia. Evenimentul Changed se declan\u0219eaz\u0103 la fiecare modificare a ordinului; aplica\u021bi un mecanism de debounce pentru a grupa notific\u0103rile succesive. \u00cen sens invers, webhook-urile SkyPlanner trimit notific\u0103ri \u00een timp real c\u00e2nd se modific\u0103 programul sau starea unei opera\u021bii.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00cencepe\u021bi cu fi\u0219iere<\/h3>\n\n\n<p>Pentru testare, exporta\u021bi comenzile de produc\u021bie \u0219i centrele de lucru din rapoartele de tip list\u0103 S\/4HANA \u00een Excel sau CSV \u0219i importa\u021bi-le \u00een SkyPlanner. Astfel valida\u021bi programul \u00eenainte de a interveni \u00een Gateway sau \u00een configur\u0103rile de comunicare.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping-sap-s-4hana-to-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Maparea datelor din SAP S\/4HANA \u00een SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Entitate \/ endpoint S\/4HANA<\/th><th>Obiect SkyPlanner<\/th><th>Direc\u021bie<\/th><th>Frecven\u021b\u0103<\/th><\/tr><\/thead><tbody><tr><td><code>A_Product<\/code> (material)<\/td><td>Produs sau material<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi actualiz\u0103ri incrementale la intervale programate<\/td><\/tr><tr><td><code>MaterialBOM<\/code>, <code>MaterialBOMItem<\/code><\/td><td>Structura produsului, produse componente<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la intervale programate<\/td><\/tr><tr><td><code>A_WorkCenters<\/code><\/td><td>Centru de lucru<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td><code>A_WorkCenterCapacity<\/code>, <code>A_WorkCenterCapacityInterval_2<\/code>, <code>A_WorkCenterCapacityShift_2<\/code><\/td><td>Capacitate \u0219i schimburi<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la intervale programate<\/td><\/tr><tr><td><code>ProductionRoutingHeader<\/code>, <code>ProductionRoutingOperation<\/code><\/td><td>Etape de proces \u0219i timpi standard<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la intervale programate<\/td><\/tr><tr><td><code>A_ProductionOrder_2<\/code> (lansat sau creat)<\/td><td>Ordin cu termen de finalizare<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Aproape \u00een timp real, la evenimentul Created\/Changed, sau prin interogare la intervale programate<\/td><\/tr><tr><td><code>A_ProductionOrderOperation_2<\/code><\/td><td>Opera\u021bie (etap\u0103 de proces executat\u0103 la un centru de lucru)<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Odat\u0103 cu ordinul<\/td><\/tr><tr><td><code>A_ProductionRsceTools_2<\/code> (resurse\/scule de produc\u021bie)<\/td><td>Scule, programate ca resurse comune cu capacitate finit\u0103<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Odat\u0103 cu ordinul<\/td><\/tr><tr><td><code>A_ProductionOrderComponent_2<\/code>, <code>A_MaterialStock<\/code><\/td><td>Necesar de materiale \u0219i stoc<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>La intervale programate, convenite la definirea domeniului proiectului<\/td><\/tr><tr><td><code>A_PurchaseOrder<\/code>, <code>A_PurchaseOrderItem<\/code> (<code>API_PURCHASEORDER_PROCESS_SRV<\/code>): cantitatea r\u0103mas\u0103 de livrat \u0219i data de livrare din linia de e\u0219alonare<\/td><td>Comenzi de achizi\u021bie \/ materiale care urmeaz\u0103 s\u0103 soseasc\u0103, cu data estimat\u0103 de livrare<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>La intervale programate, convenite la definirea domeniului proiectului<\/td><\/tr><tr><td><code>A_PlannedOrder<\/code> (op\u021bional)<\/td><td>Ordine planificate \u00eenainte de conversie<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Dup\u0103 fiecare rulare MRP Live<\/td><\/tr><tr><td><code>ScheduleProductionOrderOperation<\/code> (\u00eenceputul opera\u021biei, programare \u00eenainte)<\/td><td>Program de produc\u021bie<\/td><td>SkyPlanner \u2192 S\/4HANA<\/td><td>La modificarea programului, prin webhook<\/td><\/tr><tr><td><code>ProdnOrdConf2<\/code> (cantitate bun\u0103, rebuturi, activit\u0103\u021bi)<\/td><td>\u00cenregistr\u0103ri de timp \u0219i cantit\u0103\u021bi<\/td><td>SkyPlanner \u2192 S\/4HANA<\/td><td>La fiecare \u00eenregistrare sau \u00een loturi<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Modele de integrare<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00cenc\u0103rcarea nomenclatoarelor.<\/strong> \u00cenc\u0103rca\u021bi materialele, listele BOM, centrele de lucru cu intervalele de capacitate \u0219i schimburile aferente, precum \u0219i fluxurile tehnologice. Stabili\u021bi acum \u00een ce sistem se gestioneaz\u0103 schimburile. O \u00eemp\u0103r\u021bire care func\u021bioneaz\u0103: calendarul fabricii r\u0103m\u00e2ne \u00een S\/4HANA, iar programele detaliate ale schimburilor, absen\u021bele \u0219i orele suplimentare se gestioneaz\u0103 \u00een SkyPlanner, unde planificatorii le modific\u0103 zilnic.<\/p>\n\n\n<p><strong>2. Sincronizarea ordinelor.<\/strong> Abona\u021bi-v\u0103 la evenimentele Production Order Created\/Changed sau, dac\u0103 evenimentele de business nu sunt configurate, interoga\u021bi periodic <code>A_ProductionOrder_2<\/code> pe baza marcajului temporal al modific\u0103rii. Filtra\u021bi dup\u0103 unitatea de produc\u021bie, tipul ordinului \u0219i stare. Trimite\u021bi ordinele la creare, astfel \u00eenc\u00e2t SkyPlanner s\u0103 poat\u0103 planifica \u00een avans, \u0219i lansa\u021bi-le \u00een S\/4HANA (<code>ReleaseOrder<\/code> sau <code>ReleaseOperation<\/code>) dup\u0103 ce SkyPlanner le-a programat.<\/p>\n\n\n<p><strong>3. Retransmiterea programului \u00een SAP.<\/strong> C\u00e2nd un webhook SkyPlanner semnaleaz\u0103 o modificare a programului, integrarea apeleaz\u0103 <a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/fcab73a7730e4f88b40134fe4c719f56.html\"><code>ScheduleProductionOrderOperation<\/code><\/a> din <code>API_PRODUCTION_ORDER_2_SRV<\/code> pentru fiecare opera\u021bie modificat\u0103. Sunt trimise:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><code>ManufacturingOrder<\/code>, <code>OrderInternalBillOfOperations<\/code> \u0219i <code>OrderIntBillOfOperationsItem<\/code> drept chei<\/li>\n\n\n<li><code>OpSchedulingMode<\/code> cu valoarea F (programare \u00eenainte), cu data \u0219i ora de \u00eenceput din SkyPlanner \u00een <code>OpSchedldStartDate<\/code> \u0219i <code>OpSchedldStartTime<\/code><\/li>\n\n\n<li><code>OpSchedulingStatus<\/code> cu valoarea DISP (dispecerizare) \u0219i c\u00e2mpul obligatoriu <code>OpSchedulingStrategy<\/code> cu valoarea M<\/li>\n\n\n<li>ETag-ul \u00een <code>if-match<\/code><\/li>\n\n<\/ul>\n\n\n<p>Toate opera\u021biile unei comenzi sunt incluse \u00eentr-un singur set de modific\u0103ri, \u00een succesiunea stabilit\u0103 de SkyPlanner, astfel \u00eenc\u00e2t S\/4HANA s\u0103 aloce \u00eentregul program al comenzii printr-un singur apel. Modul K nu este folosit niciodat\u0103: p\u0103streaz\u0103 datele ini\u021biale ale opera\u021biilor \u0219i ignor\u0103 datele trimise.<\/p>\n\n\n<p>SkyPlanner calculeaz\u0103 duratele opera\u021biilor folosind acelea\u0219i valori standard din fluxurile tehnologice \u0219i acelea\u0219i formule de capacitate ale centrelor de lucru ca S\/4HANA. Prin urmare, data de \u00eencheiere calculat\u0103 de S\/4HANA pe baza datei de \u00eenceput transmise corespunde programului SkyPlanner. Dup\u0103 fiecare set de modific\u0103ri, integrarea recite\u0219te opera\u021biile \u0219i semnaleaz\u0103 orice dat\u0103 care difer\u0103, iar planificatorul vede diferen\u021ba \u00eenainte de schimbul urm\u0103tor.<\/p>\n\n\n<p><strong>4. Confirm\u0103ri din sec\u021bia de produc\u021bie.<\/strong> Fiecare \u00eenregistrare de timp din Mobile Confirmations sau Production Timer devine o confirmare \u00een S\/4HANA. Webhook-ul SkyPlanner declan\u0219eaz\u0103 o cerere POST c\u0103tre <code>ProdnOrdConf2<\/code>, cu cantitatea bun\u0103, rebuturile \u0219i timpii activit\u0103\u021bilor. Integrarea apeleaz\u0103 mai \u00eent\u00e2i <code>GetConfProposal<\/code>, astfel \u00eenc\u00e2t S\/4HANA s\u0103 propun\u0103 cantit\u0103\u021bi, activit\u0103\u021bi, date calendaristice \u0219i date despre personal. <code>GetGdsMvtProposal<\/code> propune mi\u0219c\u0103rile de stoc.<\/p>\n\n\n<p><strong>Materiale \u00een curs de aprovizionare.<\/strong> Comenzile de achizi\u021bie deschise fac parte din sincronizarea datelor c\u0103tre SkyPlanner. SkyPlanner consider\u0103 materialul comandat disponibil la data de livrare estimat\u0103 a comenzii de achizi\u021bie. Lucr\u0103rile care a\u0219teapt\u0103 componente achizi\u021bionate sunt programate pentru ziua sosirii materialului, nu sunt blocate de stocul disponibil ast\u0103zi.<\/p>\n\n\n<p>S\/4HANA r\u0103m\u00e2ne sursa de referin\u021b\u0103 pentru recep\u021bii: la \u00eenregistrarea unei recep\u021bii de marf\u0103, stocul cre\u0219te, iar cantitatea deschis\u0103 a pozi\u021biei din comanda de achizi\u021bie scade. Urm\u0103toarea sincronizare actualizeaz\u0103 stocul \u00een SkyPlanner \u0219i marcheaz\u0103 o comand\u0103 de achizi\u021bie recep\u021bionat\u0103 integral ca Delivered; dup\u0103 o recep\u021bie par\u021bial\u0103, cantitatea r\u0103mas\u0103 deschis\u0103 figureaz\u0103 \u00een continuare ca aprovizionare viitoare, la data din linia de programare. Gestionarea comenzilor de achizi\u021bie \u00een SkyPlanner este descris\u0103 \u00een <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">documenta\u021bia SkyPlanner<\/a>.<\/p>\n\n\n<p><strong>5. Reguli de responsabilitate asupra datelor.<\/strong> S\/4HANA gestioneaz\u0103 cantit\u0103\u021bile, BOM, fluxul tehnologic, calculul costurilor \u0219i starea. SkyPlanner gestioneaz\u0103 succesiunea, alocarea la centrele de lucru \u0219i datele opera\u021biilor. Nu permite\u021bi niciodat\u0103 ambelor sisteme s\u0103 scrie \u00een acela\u0219i c\u00e2mp. Dac\u0103 planificatorii continu\u0103 s\u0103 mute opera\u021bii \u00een Capacity Scheduling Board, stabili\u021bi ce are prioritate. Fie urm\u0103toarea sincronizare a comenzilor preia modificarea lor \u00een SkyPlanner, fie centrul de lucru respectiv r\u0103m\u00e2ne \u00een afara domeniului gestionat de SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-the-project-contains\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce include proiectul<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementarea se finalizeaz\u0103 de regul\u0103 \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea procesului, chiar \u0219i \u00een companiile mari. Majoritatea fabricilor \u00eencep cu testarea gratuit\u0103 de 30 de zile, folosind exporturi CSV sau Excel, astfel \u00eenc\u00e2t programul este validat pe datele proprii \u00eenainte de \u00eenceperea lucr\u0103rilor la API. Proiectul S\/4HANA include apoi:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Definirea domeniului:<\/strong> fabricile, tipurile de comenzi, edi\u021bia \u0219i modelul de autentificare, precum \u0219i sistemul responsabil pentru fiecare c\u00e2mp.<\/li>\n\n\n<li><strong>Accesul SAP:<\/strong> activarea serviciului Gateway sau o configurare de comunicare, plus utilizatorii tehnici \u0219i obiectele de autorizare.<\/li>\n\n\n<li><strong>Maparea nomenclatoarelor:<\/strong> categoriile de capacitate ale centrelor de lucru, intervalele \u0219i schimburile, coresponden\u021ba dintre valorile standard ale fluxurilor tehnologice \u0219i duratele SkyPlanner, unit\u0103\u021bile de m\u0103sur\u0103.<\/li>\n\n\n<li><strong>\u00cenc\u0103rcarea ini\u021bial\u0103:<\/strong> materialele, listele BOM, fluxurile tehnologice \u0219i centrele de lucru cu capacit\u0103\u021bile aferente.<\/li>\n\n\n<li><strong>Sincronizarea comenzilor de produc\u021bie \u0219i de achizi\u021bie:<\/strong> comenzile de produc\u021bie \u0219i opera\u021biile, la evenimente Created\/Changed sau prin interogare periodic\u0103; stocurile \u0219i comenzile de achizi\u021bie deschise, la intervale programate.<\/li>\n\n\n<li><strong>Retransmiterea programului \u00een SAP:<\/strong> <code>ScheduleProductionOrderOperation<\/code>, cu gestionarea ETag-urilor \u0219i o coad\u0103 pentru re\u00eencerc\u0103ri.<\/li>\n\n\n<li><strong>Confirm\u0103ri din sec\u021bia de produc\u021bie:<\/strong> \u00eenregistr\u0103rile de timp sunt transmise sub form\u0103 de confirm\u0103ri <code>ProdnOrdConf2<\/code>.<\/li>\n\n\n<li><strong>Testarea \u00een paralel cu programul actual:<\/strong> programul SkyPlanner este folosit \u00een paralel cu programul rezultat din nivelarea actual\u0103 a capacit\u0103\u021bii, p\u00e2n\u0103 c\u00e2nd planificatorii cap\u0103t\u0103 \u00eencredere \u00een el.<\/li>\n\n\n<li><strong>Punerea \u00een func\u021biune.<\/strong><\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-s-4hana-pitfalls\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Capcane \u00een integrarea cu SAP S\/4HANA<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Retransmiterea se face prin apelarea unei ac\u021biuni cu un ETag.<\/strong> Metoda documentat\u0103 pentru programarea unei opera\u021bii este <code>ScheduleProductionOrderOperation<\/code>, nu o cerere PATCH c\u0103tre <code>A_ProductionOrderOperation_2<\/code>. Modul F programeaz\u0103 \u00eenainte pornind de la un moment de \u00eenceput, iar B \u00eenapoi pornind de la un moment de sf\u00e2r\u0219it; K \u0219i S p\u0103streaz\u0103 datele existente \u0219i le ignor\u0103 pe cele trimise. ETag-ul din <code>if-match<\/code> este construit din <code>LastChangeDateTime<\/code> al ordinului (YYYYMMDDHHMMSS), deci orice modificare a ordinului \u00eel invalideaz\u0103. Implementa\u021bi citirea \u00eenainte de scriere \u0219i o coad\u0103 pentru re\u00eencerc\u0103ri.<\/li>\n\n\n<li><strong>Capacitatea nu se afl\u0103 \u00een antetul centrului de lucru.<\/strong> Capacitatea disponibil\u0103 rezult\u0103 din categoria de capacitate (001 utilaje, 002 for\u021b\u0103 de munc\u0103), calendarul fabricii \u0219i intervalele \u0219i schimburile care au prioritate fa\u021b\u0103 de acesta. Formulele de capacitate transform\u0103 valorile standard din fluxul tehnologic \u00een necesar de capacitate pentru preg\u0103tire, prelucrare \u0219i demontare. Citi\u021bi <code>A_WorkCenterCapacityInterval_2<\/code> \u0219i entit\u0103\u021bile pentru schimburi \u0219i conveni\u021bi cum se transpun formulele \u00een durate \u00een SkyPlanner.<\/li>\n\n\n<li><strong>Valorile standard trebuie corectate.<\/strong> Fluxurile tehnologice \u00eentre\u021binute pentru calculul costurilor con\u021bin adesea timpi medii de preg\u0103tire sau timpi de preg\u0103tire \u00eenregistra\u021bi la o categorie de capacitate gre\u0219it\u0103.<\/li>\n\n\n<li><strong>Regulile de confirmare sunt stricte.<\/strong> SAP recomand\u0103 apeluri \u00een lot pentru \u00eenregistr\u0103rile \u00een mas\u0103. Un set de modific\u0103ri se aplic\u0103 integral sau deloc, a\u0219a c\u0103 o singur\u0103 fi\u0219\u0103 de timp incorect\u0103 blocheaz\u0103 restul setului. Anul\u0103rile dintr-un lot trebuie executate \u00een ordinea invers\u0103 a valorilor <code>ConfirmationCount<\/code>. Nu pute\u021bi combina tipuri de confirmare pentru acela\u0219i ordin, \u00eenregistra mi\u0219c\u0103ri de stoc f\u0103r\u0103 o confirmare sau confirma opera\u021bii ale c\u0103ror puncte de declan\u0219are necesit\u0103 o caset\u0103 de dialog.<\/li>\n\n\n<li><strong>Verifica\u021bi dac\u0103 PP\/DS este activ.<\/strong> PP\/DS \u00eencorporat necesit\u0103 activitatea de Customizing <strong>Activate Advanced Planning and Scheduling<\/strong> \u0219i SAP HANA integrated liveCache. SAP \u00eel comercializeaz\u0103 ca produs separat, <a href=\"https:\/\/www.sap.com\/products\/scm\/manufacturing-for-planning-and-scheduling.html\">SAP S\/4HANA Manufacturing for planning and scheduling<\/a>. Acolo unde este activ, stabili\u021bi pentru fiecare material cine face programarea: materialele marcate pentru planificare avansat\u0103 sunt gestionate de PP\/DS. SAP precizeaz\u0103 \u0219i pentru API-ul comenzilor planificate: &#8220;Automatic integration to PP\/DS is not enabled from this API.&#8221; (Integrarea automat\u0103 cu acest sistem nu este activat\u0103 prin acest API.)<\/li>\n\n\n<li><strong>Unit\u0103\u021bi de m\u0103sur\u0103.<\/strong> Cantit\u0103\u021bile opera\u021biilor, cantit\u0103\u021bile de baz\u0103 ale fluxurilor tehnologice \u0219i unit\u0103\u021bile de confirmare pot diferi. Face\u021bi conversia explicit, folosind unitatea opera\u021biei, nu unitatea de baz\u0103 a materialului.<\/li>\n\n\n<li><strong>Diferen\u021be \u00eentre edi\u021bii.<\/strong> <a href=\"https:\/\/learning.sap.com\/courses\/exploring-the-capacity-planning-in-sap-s-4hana\/outlining-sap-s-4hana-capacity-planning\">SAP Learning<\/a> arat\u0103 c\u0103 tabelul clasic de planificare CM21\/CM22 este \u00eenlocuit de Manage Work Center Capacity, Capacity Scheduling Table \u0219i Capacity Scheduling Board. Public Edition ofer\u0103 acces la API-uri numai prin scenarii de comunicare, iar versiunile serviciilor disponibile pot diferi de cele din instal\u0103rile locale. API-ul pentru fluxuri tehnologice nu poate \u0219terge fluxuri tehnologice sau actualiza aloc\u0103rile de materiale. \u00cen etapa de definire a domeniului, echipa SkyPlanner fixeaz\u0103 versiunile serviciilor pentru sistemul fiec\u0103rui client, folosind intrarea din API Business Accelerator Hub corespunz\u0103toare versiunii respective.<\/li>\n\n\n<li><strong>Constr\u00e2ngeri care nu sunt cuprinse \u00een fluxurile tehnologice.<\/strong> Gestiona\u021bi \u00een SkyPlanner schimb\u0103rile de fabrica\u021bie dependente de succesiune, conflictele de utilizare a sculelor \u0219i opera\u021biile cu mai mul\u021bi operatori, nu \u00een valorile standard ale fluxurilor tehnologice. Matricea timpilor de preg\u0103tire con\u021bine timpii de schimbare de fabrica\u021bie pentru fiecare pereche de produse. Sculele din PRT-urile comenzii sunt resurse cu capacitate finit\u0103, utilizabile la un singur centru de lucru la un moment dat, iar o opera\u021bie poate necesita mai multe persoane simultan.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-the-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cine configureaz\u0103 integrarea<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Din cauza capcanelor de mai sus, configurarea reprezint\u0103 munca propriu-zis\u0103. Fiecare fabric\u0103 folose\u0219te S\/4HANA diferit: tipurile de comenzi, categoriile de capacitate, valorile standard ale fluxurilor tehnologice, extensiile user exit \u0219i edi\u021bia influen\u021beaz\u0103 toate maparea.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Echipa SkyPlanner configureaz\u0103 integrarea<\/strong> \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 S\/4HANA \u00een etapa de implementare ini\u021bial\u0103, folosind API-urile S\/4HANA publicate, precum \u0219i REST API \u0219i webhook-urile SkyPlanner. Echipa asigur\u0103 suportul integr\u0103rii dup\u0103 punerea \u00een func\u021biune. Aceasta este varianta implicit\u0103 \u0219i v\u0103 ofer\u0103 un singur responsabil pentru sistemul de programare \u0219i conexiunea cu S\/4HANA.<\/li>\n\n\n<li><strong>Partenerul dumneavoastr\u0103 SAP<\/strong> poate realiza integrarea \u00een schimb, pe baza documenta\u021biei Swagger\/OpenAPI SkyPlanner \u0219i a cuno\u0219tin\u021belor despre tipurile dumneavoastr\u0103 de comenzi \u0219i configura\u021bia Basis.<\/li>\n\n\n<li><strong>Dezvoltatorii dumneavoastr\u0103<\/strong> pot realiza integrarea direct sau prin SAP Integration Suite ori SAP BTP, folosind interfa\u021ba REST API documentat\u0103, autentificarea prin token API \u0219i webhookuri (<a href=\"\/ro\/docs\/tutorial-de-integrare\/\">tutorial de integrare<\/a>). O cheie API este suficient\u0103 pentru a \u00eencepe, iar echipa SkyPlanner intervine atunci c\u00e2nd dezvoltatorii au nevoie de ajutor.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner func\u021bioneaz\u0103 deja al\u0103turi de SAP: echipa IT intern\u0103 a Laboratory &amp; Allied a conectat SAP Business One on HANA la SkyPlanner, cu ajutorul echipei SkyPlanner. Documenta\u021bia func\u021bionalit\u0103\u021bilor este disponibil\u0103 public \u00een <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">documenta\u021bia SkyPlanner<\/a>.<\/p>\n\n\n<p>Indiferent de varianta aleas\u0103, valida\u021bi mai \u00eent\u00e2i programul \u00een perioada de testare gratuit\u0103 de 30 de zile (p\u00e2n\u0103 la 20 de centre de lucru, f\u0103r\u0103 card bancar). Integrarea este apoi construit\u0103 pentru un program \u00een care planificatorii dumneavoastr\u0103 au deja \u00eencredere. Dup\u0103 testare, pre\u021burile pornesc de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse \u0219i facturare lunar\u0103. Oferta pentru integrare este stabilit\u0103 de la \u00eenceput \u00een func\u021bie de procesele \u0219i nevoile dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul, astfel \u00eenc\u00e2t s\u0103 cunoa\u0219te\u021bi costul total \u00eenainte de a \u00eencepe.<\/p>\n\n\n<p>Consulta\u021bi <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a>, <a href=\"\/ro\/functionalitati\/\">func\u021bionalit\u0103\u021bile<\/a> \u0219i <a href=\"\/ro\/povesti-ale-clientilor\/\">recenziile clien\u021bilor<\/a> pentru o imagine complet\u0103.<\/p>\n\n\n<p><a href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a> <a href=\"\/ro\/contact-vanzari\/\">Discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Recenzii SkyPlanner de la produc\u0103tori<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een hala de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de lucr\u0103ri ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/customers\/utu\/\">Citi\u021bi recenzia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021ba produc\u021biei<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar elaborarea unui plan optimizat pe trei luni pentru toate centrele de lucru dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/customers\/laboratory-allied\/\">Citi\u021bi recenzia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Vedere aerian\u0103 a fabricii Piristeel din Kauhava, unde se produc sisteme de siguran\u021b\u0103 pentru acoperi\u0219uri\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>respectarea termenelor de livrare<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ne-a oferit vizibilitatea necesar\u0103 pentru a identifica blocajele \u0219i a adus mai mult\u0103 claritate \u00een gestionarea produc\u021biei.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, director de produc\u021bie<\/b><br>Piristeel \u00b7 Sisteme de siguran\u021b\u0103 pentru acoperi\u0219uri \u0219i sisteme pluviale<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a ajuns la 99,2% anul acesta, iar programarea produc\u021biei economise\u0219te p\u00e2n\u0103 la patru ore de lucru pe zi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/customers\/piristeel\/\">Citi\u021bi recenzia Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Un sudor KJH-Comp \u0219lefuie\u0219te o structur\u0103 sudat\u0103 din o\u021bel la fabrica din Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>respectarea termenelor de livrare, \u00een cre\u0219tere de la aproximativ 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner joac\u0103 un rol decisiv \u00een men\u021binerea ratei noastre de respectare a termenelor de livrare.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, director general<\/b><br>KJH-Comp \u00b7 Prelucrarea tablei \u0219i produc\u021bie pe baz\u0103 de contract<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a crescut de la aproximativ 50% p\u00e2n\u0103 la 98%, iar programarea produc\u021biei necesit\u0103 acum un singur responsabil \u00een loc de doi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/customers\/kjh-comp\/\">Citi\u021bi recenzia KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum se conecteaz\u0103 SkyPlanner APS la SAP S\/4HANA?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS se integreaz\u0103 bidirec\u021bional cu SAP S\/4HANA. Ordinele de produc\u021bie, opera\u021biile, fluxurile tehnologice, centrele de lucru, stocurile \u0219i comenzile de achizi\u021bie sunt preluate prin API-urile OData publicate de SAP. Datele calendaristice ale opera\u021biilor sunt retransmise prin <code>ScheduleProductionOrderOperation<\/code>, iar orele \u00eenregistrate sub form\u0103 de confirm\u0103ri <code>ProdnOrdConf2<\/code>, la declan\u0219area webhook-urilor SkyPlanner.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cine dezvolt\u0103 \u0219i \u00eentre\u021bine integrarea?<\/summary>\n<p class=\"sp-faq__a\">Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 S\/4HANA \u00een etapa de ini\u021biere \u0219i ofer\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een func\u021biune. Primi\u021bi \u00een avans o ofert\u0103 pentru integrare, adaptat\u0103 procesului \u0219i nevoilor dumneavoastr\u0103. Dac\u0103 partenerul SAP sau dezvoltatorii dumneavoastr\u0103 realizeaz\u0103 integrarea prin REST API, responsabilitatea le revine, iar echipa SkyPlanner ofer\u0103 ajutor la nevoie.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum sunt transmise \u00eenapoi datele opera\u021biilor \u0219i p\u0103streaz\u0103 S\/4HANA succesiunea acestora?<\/summary>\n<p class=\"sp-faq__a\">Prin ac\u021biunea <code>ScheduleProductionOrderOperation<\/code> din <code>API_PRODUCTION_ORDER_2_SRV<\/code>, \u00een modul de programare \u00eenainte, cu starea de dispecerizare \u0219i data \u0219i ora de \u00eenceput din SkyPlanner. Opera\u021biile fiec\u0103rui ordin sunt trimise \u00eentr-un singur set de modific\u0103ri, \u00een succesiunea stabilit\u0103 de SkyPlanner. Duratele sunt calculate din acelea\u0219i valori standard ale fluxului tehnologic pe care le utilizeaz\u0103 S\/4HANA, iar integrarea recite\u0219te fiecare opera\u021bie \u0219i semnaleaz\u0103 orice diferen\u021b\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum ajung confirm\u0103rile \u00een S\/4HANA?<\/summary>\n<p class=\"sp-faq__a\">Operatorii \u00eenregistreaz\u0103 munca \u00een SkyPlanner, ceea ce declan\u0219eaz\u0103 un webhook. Integrarea transmite apoi o confirmare prin <code>API_PROD_ORDER_CONFIRMATION_2_SRV<\/code>, cu cantitatea bun\u0103, rebuturile \u0219i timpii activit\u0103\u021bilor.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Func\u021bioneaz\u0103 integrarea cu S\/4HANA Cloud Public Edition?<\/summary>\n<p class=\"sp-faq__a\">Da. Accesul se realizeaz\u0103 printr-o configurare de comunicare pentru scenariile de comunicare relevante. \u00cen etapa de definire a domeniului, echipa SkyPlanner alege versiunea API-ului pentru comenzile de produc\u021bie care corespunde versiunii dumneavoastr\u0103 Public Edition. Pentru instal\u0103rile locale \u0219i Private Edition se folose\u0219te \u00een schimb activarea serviciului Gateway.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Avem deja PP\/DS. Mai avem nevoie de SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner acoper\u0103 fabricile \u0219i punctele de lucru pentru care nu exist\u0103 licen\u021b\u0103 PP\/DS sau personal dedicat acestuia. Nu necesit\u0103 activ\u0103ri \u00een Customizing, liveCache sau un server de optimizare, ci doar API-uri OData publicate pentru utilizare pe partea SAP. Motorul Arcturus creeaz\u0103 \u00een c\u00e2teva secunde un program cu capacitate finit\u0103, iar Autopilot reprogrameaz\u0103 automat atunci c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa \u00eenainte de a \u00eencepe integrarea \u0219i c\u00e2t dureaz\u0103 proiectul?<\/summary>\n<p class=\"sp-faq__a\">Da. Importa\u021bi ordinele de produc\u021bie \u0219i centrele de lucru din exporturile S\/4HANA \u00een perioada de prob\u0103 gratuit\u0103 de 30 de zile, apoi realiza\u021bi integrarea prin API dup\u0103 ce programul de produc\u021bie func\u021bioneaz\u0103. Implementarea se finalizeaz\u0103, de regul\u0103, \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea etapei de ini\u021biere. Pentru a stabili domeniul integr\u0103rii \u00een mediul dumneavoastr\u0103, <a href=\"\/ro\/contact-vanzari\/\">discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a> sau <a href=\"\/ro\/proba\/\">\u00eencepe\u021bi perioada de prob\u0103 gratuit\u0103<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ SAP S\/4HANA Ghid de integrare SAP S\/4HANA pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid le arat\u0103 partenerilor SAP, echipelor IT \u0219i cump\u0103r\u0103torilor tehnici cum se conecteaz\u0103 SkyPlanner APS la SAP S\/4HANA. SkyPlanner se integreaz\u0103 bidirec\u021bional cu S\/4HANA prin API-urile OData publicate de SAP: skyplanner.ai \u00b7 Programarea produc\u021biei Materialele, listele BOM, &#8230; <a title=\"Ghid de integrare SAP S\/4HANA pentru programarea produc\u021biei cu SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sap-s4hana\/ghid-de-integrare\/\" aria-label=\"Read more about Ghid de integrare SAP S\/4HANA pentru programarea produc\u021biei cu SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100816,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101173","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integrare SAP S\/4HANA pentru programare APS | SkyPlanner<\/title>\n<meta name=\"description\" content=\"Integra\u021bi SkyPlanner APS cu SAP S\/4HANA: API OData, configur\u0103ri de comunicare, retur prin ScheduleProductionOrderOperation, maparea datelor \u0219i capcane.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sap-s4hana\/ghid-de-integrare\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ghid de integrare SAP S\/4HANA pentru programarea produc\u021biei cu SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Integra\u021bi SkyPlanner APS cu SAP S\/4HANA: API OData, configur\u0103ri de comunicare, retur prin ScheduleProductionOrderOperation, maparea datelor \u0219i capcane.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sap-s4hana\/ghid-de-integrare\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"18 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/sap-s4hana\\\/ghid-de-integrare\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/sap-s4hana\\\/ghid-de-integrare\\\/\",\"name\":\"Integrare SAP S\\\/4HANA pentru programare APS | SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Integra\u021bi SkyPlanner APS cu SAP S\\\/4HANA: API OData, configur\u0103ri de comunicare, retur prin ScheduleProductionOrderOperation, maparea datelor \u0219i capcane.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/sap-s4hana\\\/ghid-de-integrare\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/sap-s4hana\\\/ghid-de-integrare\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/sap-s4hana\\\/ghid-de-integrare\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru SAP S\\\/4HANA: programarea produc\u021biei cu capacitate finit\u0103\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/sap-s4hana\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Ghid de integrare SAP S\\\/4HANA pentru programarea produc\u021biei cu SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integrare SAP S\/4HANA pentru programare APS | SkyPlanner","description":"Integra\u021bi SkyPlanner APS cu SAP S\/4HANA: API OData, configur\u0103ri de comunicare, retur prin ScheduleProductionOrderOperation, maparea datelor \u0219i capcane.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sap-s4hana\/ghid-de-integrare\/","og_locale":"ro_RO","og_type":"article","og_title":"Ghid de integrare SAP S\/4HANA pentru programarea produc\u021biei cu SkyPlanner APS","og_description":"Integra\u021bi SkyPlanner APS cu SAP S\/4HANA: API OData, configur\u0103ri de comunicare, retur prin ScheduleProductionOrderOperation, maparea datelor \u0219i capcane.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sap-s4hana\/ghid-de-integrare\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"18 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sap-s4hana\/ghid-de-integrare\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sap-s4hana\/ghid-de-integrare\/","name":"Integrare SAP S\/4HANA pentru programare APS | SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Integra\u021bi SkyPlanner APS cu SAP S\/4HANA: API OData, configur\u0103ri de comunicare, retur prin ScheduleProductionOrderOperation, maparea datelor \u0219i capcane.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sap-s4hana\/ghid-de-integrare\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sap-s4hana\/ghid-de-integrare\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sap-s4hana\/ghid-de-integrare\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru SAP S\/4HANA: programarea produc\u021biei cu capacitate finit\u0103","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sap-s4hana\/"},{"@type":"ListItem","position":5,"name":"Ghid de integrare SAP S\/4HANA pentru programarea produc\u021biei cu SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ SAP S\/4HANA Ghid de integrare SAP S\/4HANA pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid le arat\u0103 partenerilor SAP, echipelor IT \u0219i cump\u0103r\u0103torilor tehnici cum se conecteaz\u0103 SkyPlanner APS la SAP S\/4HANA. SkyPlanner se integreaz\u0103 bidirec\u021bional cu S\/4HANA prin API-urile OData publicate de SAP: skyplanner.ai \u00b7 Programarea produc\u021biei Materialele, listele BOM,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/101173","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=101173"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/101173\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/100816"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=101173"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}