{"id":101083,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101083"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"cu-capacitate-finita","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sap-business-one\/cu-capacitate-finita\/","title":{"rendered":"SAP Business One ofer\u0103 programare cu capacitate finit\u0103? Resurse, MRP \u0219i rolul SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ SAP Business One<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SAP Business One ofer\u0103 programare cu capacitate finit\u0103? <span class=\"hl\">Resurse, MRP \u0219i rolul SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Nu. Versiunea standard SAP Business One include MRP, resurse cu capacitate zilnic\u0103 \u0219i o fereastr\u0103 Resource Capacity care arat\u0103 c\u00e2nd o resurs\u0103 este supra\u00eenc\u0103rcat\u0103. Nu are un motor care s\u0103 stabileasc\u0103 ordinea comenzilor de produc\u021bie ce concureaz\u0103 pentru acea capacitate, a\u0219a c\u0103 planificatorul modific\u0103 manual datele comenzilor. Produc\u0103torii care au nevoie de <a href=\"\/ro\/resurse\/capacitate-finita\/\">programare cu capacitate finit\u0103<\/a> pentru \u00eentreaga sec\u021bie de produc\u021bie folosesc SkyPlanner APS al\u0103turi de SAP Business One.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-sap-business-one-plans-production-step-by-st\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum planific\u0103 SAP Business One produc\u021bia, pas cu pas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Datele de planificare ale articolelor \u0219i MRP Wizard<\/h3>\n\n\n<p>Set\u0103rile MRP se afl\u0103 \u00een fila <strong>Planning Data<\/strong> din Item Master Data:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Planning Method (MRP sau None) \u0219i Procurement Method (Buy sau Make)<\/li>\n\n\n<li>Order Interval, Order Multiple \u0219i Minimum Order Quantity<\/li>\n\n\n<li>Lead Time \u0219i Tolerance Days<\/li>\n\n<\/ul>\n\n\n<p><strong>MRP Wizard<\/strong> parcurge \u0219ase pa\u0219i: scenariul, set\u0103rile pentru orizontul de planificare \u0219i lead time, articolele, nivelul Company sau Warehouse, sursele de date \u0219i recomand\u0103rile. Rezultatele apar \u00een fereastra MRP Results \u0219i \u00een fereastra <strong>Order Recommendations<\/strong>, unde transforma\u021bi recomand\u0103rile \u00een comenzi de achizi\u021bie, comenzi de produc\u021bie sau cereri de transfer de stoc.<\/p>\n\n\n<p>Rularea verific\u0103 materialele. Cursul SAP explic\u0103 astfel: &#8220;the system checks if all the components are available for making the item&#8221; (sistemul verific\u0103 dac\u0103 toate componentele sunt disponibile pentru fabricarea articolului) (<a href=\"https:\/\/learning.sap.com\/courses\/managing-logistics-in-sap-business-one\/exploring-the-materials-requirements-planning-mrp-process\">SAP Learning<\/a>). Datele de intrare documentate sunt cererea, aprovizionarea, stocul \u0219i lead time-ul. Capacitatea resurselor nu se num\u0103r\u0103 printre ele.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Resursele \u0219i capacitatea zilnic\u0103<\/h3>\n\n\n<p>Resursele sunt \u00eenregistr\u0103ri \u00een nomenclatoare, cu Resource Type setat la <strong>Machine<\/strong>, <strong>Labor<\/strong> sau <strong>Other<\/strong>. O resurs\u0103 Machine este asociat\u0103 cu unul sau mai multe mijloace fixe, iar o resurs\u0103 Labor, cu angaja\u021bi. Resursele sunt gestionate pe baza capacit\u0103\u021bii, nu a cantit\u0103\u021bii. Pentru a asocia utilajele cu mijloace fixe, trebuie mai \u00eent\u00e2i activat\u0103 func\u021bionalitatea Fixed Assets.<\/p>\n\n\n<p>Capacitatea se stabile\u0219te pe zile. \u00cen fila Planning Data a resursei, defini\u021bi patru factori de capacitate pentru fiecare zi a s\u0103pt\u0103m\u00e2nii, de exemplu ore pe schimb, schimburi pe zi \u0219i num\u0103r de utilaje. B1 \u00eei \u00eenmul\u021be\u0219te pentru a ob\u021bine valoarea Daily Capacity. Apoi genera\u021bi o perioad\u0103 \u00een fereastra <strong>Set Daily Internal Capacities<\/strong>. Exist\u0103 dou\u0103 tipuri de capacitate: <strong>Daily Internal Capacity<\/strong> \u0219i <strong>Single Run Capacity<\/strong>. Al doilea se activeaz\u0103 prin bifarea op\u021biunii Relevant for Single Run Capacity. SAP precizeaz\u0103 clar nivelul de detaliu: &#8220;These capacities are defined on a daily basis&#8221; (aceste capacit\u0103\u021bi sunt definite pe zile) (<a href=\"https:\/\/learning.sap.com\/courses\/managing-logistics-in-sap-business-one\/working-with-resources-in-sap-business-one\">SAP Learning<\/a>).<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Fluxul tehnologic definit prin Route Stages \u00een BOM<\/h3>\n\n\n<p>SAP Business One nu are un nomenclator separat pentru fluxurile tehnologice. Un flux tehnologic este un set de linii <strong>Route Stage<\/strong> din Bill of Materials (Product Tree), fiecare cu o valoare Route Sequence \u0219i un num\u0103r de <strong>Waiting Days<\/strong> introduse manual. Liniile de resurse sunt plasate sub etape. Pentru comenzile de produc\u021bie cu flux tehnologic, sistemul calculeaz\u0103 <strong>Required Days<\/strong> \u0219i <strong>Total Days<\/strong> pentru fiecare etap\u0103, unde Total Days = Required Days + Waiting Days.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Comenzile de produc\u021bie \u0219i alocarea resurselor<\/h3>\n\n\n<p>Fiec\u0103rei linii de resurs\u0103 dintr-o comand\u0103 de produc\u021bie i se atribuie una dintre cele patru metode de alocare:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Metod\u0103 de alocare<\/th><th>Cum func\u021bioneaz\u0103<\/th><\/tr><\/thead><tbody><tr><td>On Start Date<\/td><td>Aloc\u0103 tot timpul resursei la data de \u00eenceput<\/td><\/tr><tr><td>On End Date<\/td><td>Aloc\u0103 tot timpul resursei la data de sf\u00e2r\u0219it<\/td><\/tr><tr><td>Start Date Forwards<\/td><td>\u00cencarc\u0103 fiecare zi \u00eencep\u00e2nd de la data de \u00eenceput, p\u00e2n\u0103 la limita Single Run Capacity<\/td><\/tr><tr><td>End Date Backwards<\/td><td>\u00cencarc\u0103 fiecare zi merg\u00e2nd \u00eenapoi de la data de sf\u00e2r\u0219it, p\u00e2n\u0103 la limita Single Run Capacity<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Fiecare metod\u0103 distribuie timpul de utilizare a resursei pentru o singur\u0103 comand\u0103. Alocarea \u00eenainte \u0219i cea \u00eenapoi sunt limitate de Single Run Capacity, adic\u0103 de num\u0103rul de ore pe care o comand\u0103 de produc\u021bie le poate consuma \u00eentr-o zi, nu de capacitatea deja ocupat\u0103 de alte comenzi pe acea resurs\u0103.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Fereastra Resource Capacity<\/h3>\n\n\n<p>Fereastra <strong>Resource Capacity<\/strong> ofer\u0103 vizualiz\u0103rile Internal, Available \u0219i Single Run. \u00cen fila Capacity Data, Available = Internal &#8211; Committed &#8211; Consumed. Committed reprezint\u0103 capacitatea alocat\u0103 comenzilor de produc\u021bie, dar \u00eenc\u0103 ne\u00eenregistrat\u0103 ca utilizat\u0103 \u00een produc\u021bie, iar Consumed reprezint\u0103 capacitatea deja \u00eenregistrat\u0103 ca utilizat\u0103 \u00een produc\u021bie. C\u00e2nd comenzile angajeaz\u0103 mai mult\u0103 capacitate dec\u00e2t are resursa, Available scade sub zero.<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Corectarea manual\u0103 a supra\u00eenc\u0103rc\u0103rilor<\/h3>\n\n\n<p>O valoare Available negativ\u0103 semnaleaz\u0103 o problem\u0103, nu o corecteaz\u0103. Materialul de instruire SAP pentru versiunea 9.1 prezint\u0103 modulul de resurse ca pe un mijloc prin care planificatorii pot vedea dac\u0103 produc\u021bia poate continua conform planului. Alternativa indicat\u0103 este: &#8220;manual scheduling adjustments need to be made to meet deadlines&#8221; (programul trebuie ajustat manual pentru a respecta termenele) (<a href=\"https:\/\/help.sap.com\/doc\/saphelpiis_hc_b1_image_repository_consultant_training_additional_b1_91_prod_enh_pdf\/9.1\/en-US\/B1_91_Prod_Enh.pdf\">\u00cembun\u0103t\u0103\u021biri ale func\u021bionalit\u0103\u021bilor de produc\u021bie \u00een SAP B1 9.1<\/a>). Ajust\u0103rile \u00eei revin planificatorului: modific\u0103 datele sau alocarea comenzii, apoi verific\u0103 din nou fereastra.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-sap-business-one-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Limitele SAP Business One<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Limitare<\/th><th>Ce spune documenta\u021bia SAP<\/th><th>Ce \u00eenseamn\u0103 \u00een sec\u021bia de produc\u021bie<\/th><\/tr><\/thead><tbody><tr><td>F\u0103r\u0103 reprogramare automat\u0103<\/td><td>Modulul arat\u0103 &#8220;if manual scheduling adjustments need to be made&#8221; (dac\u0103 programul trebuie ajustat manual) (<a href=\"https:\/\/help.sap.com\/doc\/saphelpiis_hc_b1_image_repository_consultant_training_additional_b1_91_prod_enh_pdf\/9.1\/en-US\/B1_91_Prod_Enh.pdf\">PDF<\/a>)<\/td><td>Fiecare supra\u00eenc\u0103rcare se rezolv\u0103 prin modificarea manual\u0103 a datelor<\/td><\/tr><tr><td>O comand\u0103, un utilaj<\/td><td>&#8220;The calculation algorithm of Required Days is set up based on the assumption that a single production order can be produced on a single machine.&#8221; (Algoritmul de calcul pentru Required Days porne\u0219te de la ipoteza c\u0103 o comand\u0103 de produc\u021bie poate fi executat\u0103 pe un singur utilaj.) (<a href=\"https:\/\/help.sap.com\/doc\/08da4f4af99f4fc5a4fbb0249a6698a6\/9.3\/en-US\/How%20to%20Work%20with%20Resources%20and%20Production%20in%20SAP%20Business%20One.pdf\">Ghid practic<\/a>)<\/td><td>Nu stabile\u0219te ordinea comenzilor care concureaz\u0103 pentru aceea\u0219i resurs\u0103 \u0219i nu le \u00eemparte \u00eentre utilaje<\/td><\/tr><tr><td>Capacitate pe zile<\/td><td>&#8220;These capacities are defined on a daily basis.&#8221; (Aceste capacit\u0103\u021bi sunt definite pe zile.) (<a href=\"https:\/\/learning.sap.com\/courses\/managing-logistics-in-sap-business-one\/working-with-resources-in-sap-business-one\">SAP Learning<\/a>)<\/td><td>Schimburile sunt doar un factor \u00een calculul totalului zilnic, a\u0219a c\u0103 planificarea se face pe zile, nu pe ore.<\/td><\/tr><tr><td>MRP verific\u0103 materialele<\/td><td>La rulare, sistemul &#8220;checks if all the components are available&#8221; (verific\u0103 dac\u0103 toate componentele sunt disponibile) (<a href=\"https:\/\/learning.sap.com\/courses\/managing-logistics-in-sap-business-one\/exploring-the-materials-requirements-planning-mrp-process\">SAP Learning<\/a>)<\/td><td>Datele recomandate se bazeaz\u0103 pe lead time, nu pe \u00eenc\u0103rcarea utilajelor<\/td><\/tr><tr><td>Timpi de a\u0219teptare introdu\u0219i manual<\/td><td>Valoarea Waiting Days se introduce manual pentru fiecare Route Stage<\/td><td>Timpul de a\u0219teptare la coad\u0103 este o estimare fix\u0103, nu rezultatul \u00eenc\u0103rc\u0103rii reale<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Timpul de reglaj exist\u0103 \u00eentr-o singur\u0103 form\u0103: <strong>Additional Quantity<\/strong> pe o linie de resurs\u0103 din BOM. SAP \u00eel adaug\u0103 la timpul planificat &#8220;regardless of the quantity of the parent item produced&#8221; (indiferent de cantitatea produs\u0103 din articolul p\u0103rinte) (<a href=\"https:\/\/help.sap.com\/doc\/08da4f4af99f4fc5a4fbb0249a6698a6\/9.3\/en-US\/How%20to%20Work%20with%20Resources%20and%20Production%20in%20SAP%20Business%20One.pdf\">Ghid practic<\/a>). Este un timp fix pentru fiecare comand\u0103. Nu variaz\u0103 \u00een func\u021bie de produsul fabricat anterior, deci planificatorul este \u00een continuare cel care decide ordinea de execu\u021bie pentru a reduce schimb\u0103rile de fabrica\u021bie. Sculele pot fi configurate ca resurse de tip Other, cu o capacitate zilnic\u0103. Sistemul nu verific\u0103 dac\u0103 o matri\u021b\u0103 sau un dispozitiv de fixare este disponibil la o anumit\u0103 or\u0103. O linie de resurs\u0103 nu trece la un utilaj alternativ c\u00e2nd primul este complet \u00eenc\u0103rcat.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-sap-business-one-s-native-planning-is-enoug\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">C\u00e2nd este suficient\u0103 planificarea standard din SAP Business One<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Planificarea standard din B1 este suficient\u0103 \u00een urm\u0103toarele situa\u021bii:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pu\u021bine utilaje \u0219i varietate redus\u0103.<\/strong> Cu doar c\u00e2teva resurse \u0219i unul sau dou\u0103 fluxuri tehnologice pentru fiecare produs, planificatorul verific\u0103 fereastra Resource Capacity \u00een fiecare diminea\u021b\u0103. Valorile negative care apar ocazional se corecteaz\u0103 \u00een c\u00e2teva minute.<\/li>\n\n\n<li><strong>Produc\u021bie pe stoc stabil\u0103.<\/strong> C\u00e2nd cererea este constant\u0103, valorile de lead time din MRP corespund realit\u0103\u021bii \u0219i blocajul r\u0103m\u00e2ne \u00een acela\u0219i loc, datele stabilite pe baza lead time-ului sunt fiabile.<\/li>\n\n\n<li><strong>Precizia la nivel de zi este suficient\u0103.<\/strong> Dac\u0103 pentru clien\u021bii dumneavoastr\u0103 conteaz\u0103 ziua, nu ora, capacitatea definit\u0103 pe zile ofer\u0103 nivelul potrivit de detaliu.<\/li>\n\n\n<li><strong>Schimb\u0103rile de fabrica\u021bie sunt scurte, iar sculele nu sunt comune mai multor utilaje.<\/strong> Dac\u0103 timpul de reglaj nu depinde de opera\u021bia anterioar\u0103 \u0219i fiecare utilaj are propriile scule, timpul fix pe comand\u0103 definit prin Additional Quantity este o aproximare suficient de bun\u0103.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">C\u00e2nd ave\u021bi nevoie de un sistem de programare cu capacitate finit\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Semnele sunt concrete:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Available devine negativ pentru mai multe resurse \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar corectarea supra\u00eenc\u0103rc\u0103rilor dureaz\u0103 ore.<\/li>\n\n\n<li>Mai multe comenzi concureaz\u0103 pentru acela\u0219i utilaj, iar ordinea de execu\u021bie stabile\u0219te care dintre ele se livreaz\u0103 la timp.<\/li>\n\n\n<li>Reglajele sau schimb\u0103rile de fabrica\u021bie consum\u0103 o parte important\u0103 din capacitate, iar executarea consecutiv\u0103 a opera\u021biilor similare ar economisi ore.<\/li>\n\n\n<li>Ave\u021bi nevoie ca planul s\u0103 \u021bin\u0103 cont de schimburi, ore suplimentare, absen\u021be sau disponibilitatea operatorilor, nu doar de o valoare zilnic\u0103.<\/li>\n\n\n<li>Sose\u0219te o comand\u0103 urgent\u0103 \u0219i nimeni nu poate spune ce alte comenzi va \u00eent\u00e2rzia.<\/li>\n\n\n<li>Planul folosit efectiv este \u00een Excel, \u00een paralel cu B1, iar p\u00e2n\u0103 miercuri cele dou\u0103 nu mai corespund.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Ce s\u0103 c\u0103uta\u021bi<\/h3>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Cite\u0219te obiectele standard din B1.<\/strong> Comenzi de produc\u021bie, Product Trees cu Route Stages, Resources \u0219i Items, astfel \u00eenc\u00e2t s\u0103 p\u0103stra\u021bi modulul de produc\u021bie a\u0219a cum este.<\/li>\n\n\n<li><strong>Capacitate finit\u0103 real\u0103.<\/strong> Pentru fiecare centru de lucru, cu schimburi, personal \u0219i absen\u021be, nu doar capacitate pe zile.<\/li>\n\n\n<li><strong>Secven\u021biere \u0219i reglaje.<\/strong> Timpi de schimbare de fabrica\u021bie \u00eentre produse care depind de succesiunea lor, nu doar un timp fix de reglaj pentru fiecare comand\u0103.<\/li>\n\n\n<li><strong>Resurse comune.<\/strong> Scule tratate ca resurse cu capacitate finit\u0103, care nu pot fi folosite simultan pe dou\u0103 utilaje. Opera\u021bii care necesit\u0103 mai mul\u021bi operatori \u00een acela\u0219i timp. Utilaje sau personal alternativ c\u00e2nd resursa principal\u0103 este ocupat\u0103.<\/li>\n\n\n<li><strong>Disponibilitatea materialelor.<\/strong> O opera\u021bie nu ar trebui s\u0103 \u00eenceap\u0103 \u00eenainte ca toate componentele necesare s\u0103 fie disponibile, \u021bin\u00e2nd cont at\u00e2t de stoc, c\u00e2t \u0219i de comenzile de achizi\u021bie deschise care urmeaz\u0103 s\u0103 fie recep\u021bionate.<\/li>\n\n\n<li><strong>Reprogramare la apari\u021bia schimb\u0103rilor.<\/strong> Planul se actualizeaz\u0103 pe m\u0103sur\u0103 ce produc\u021bia avanseaz\u0103 sau comenzile se modific\u0103, f\u0103r\u0103 ca un planificator s\u0103 \u00eel refac\u0103.<\/li>\n\n\n<li><strong>Flux de date bidirec\u021bional.<\/strong> Datele planificate sunt transmise \u00eenapoi c\u0103tre <code>ProductionOrders<\/code>, iar produc\u021bia realizat\u0103 \u00een sec\u021bia de produc\u021bie este \u00eenregistrat\u0103 \u00een B1 prin documente Receipt and Issue for Production.<\/li>\n\n\n<li><strong>Testare cu propriile date.<\/strong> Ar trebui s\u0103 vede\u021bi cum sunt programate propriile comenzi \u00eenainte de a se realiza integrarea.<\/li>\n\n<\/ol>\n\n\n<h3 class=\"wp-block-heading\">Patru tipuri de solu\u021bii de programare pentru B1<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Planificarea nativ\u0103 din B1.<\/strong> MRP Wizard, Resource Capacity \u0219i cele patru metode de alocare. Suficiente c\u00e2t timp dep\u0103\u0219irile de capacitate sunt rare.<\/li>\n\n\n<li><strong>Panouri de planificare \u0219i extensii pentru produc\u021bie \u00een clientul B1.<\/strong> Un panou de planificare afi\u0219eaz\u0103 vizual comenzile, iar planificatorul le organizeaz\u0103. O extensie pentru produc\u021bie aduce propriile obiecte pentru ordinele de lucru, astfel \u00eenc\u00e2t gestionarea produc\u021biei trece la un nou model de date.<\/li>\n\n\n<li><strong>Suite APS pentru companii mari.<\/strong> Concepute pentru o echip\u0103 dedicat\u0103 de planificare, care modeleaz\u0103 \u0219i ajusteaz\u0103 sistemul. Implementarea se face printr-un proiect de consultan\u021b\u0103.<\/li>\n\n\n<li><strong>APS \u00een cloud cu func\u021bii de execu\u021bie \u00een sec\u021bia de produc\u021bie.<\/strong> Programeaz\u0103 comenzile de produc\u021bie standard din B1 cu capacitate finit\u0103 \u0219i le afi\u0219eaz\u0103 operatorilor lista de opera\u021bii pe telefon sau tablet\u0103. Acesta este SkyPlanner.<\/li>\n\n<\/ul>\n\n\n<p>Dac\u0103 ceea ce lipse\u0219te este programarea comenzilor de produc\u021bie standard, un APS \u00een cloud presupune cele mai pu\u021bine schimb\u0103ri, deoarece B1 r\u0103m\u00e2ne a\u0219a cum este.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Unde se \u00eencadreaz\u0103 SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS este solu\u021bia de programare cu capacitate finit\u0103 \u00een cloud pentru produc\u0103torii care folosesc B1 \u0219i vor s\u0103 p\u0103streze comenzile de produc\u021bie standard, f\u0103r\u0103 s\u0103 mai corecteze manual valorile negative din Available. Acoper\u0103 fiecare dintre lipsurile de mai sus:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>De la capacitate agregat\u0103 pe zile la un model real de capacitate.<\/strong> Capacitate finit\u0103 pentru fiecare centru de lucru, cu schimburi, personal, concedii, absen\u021be \u0219i schimburi suplimentare.<\/li>\n\n\n<li><strong>De la o comand\u0103 pe un utilaj la secven\u021biere complet\u0103.<\/strong> Motorul Arcturus stabile\u0219te \u00een c\u00e2teva secunde succesiunea tuturor opera\u021biilor pe toate centrele de lucru, folosind \u0219i centre alternative \u0219i \u00eemp\u0103r\u021bind opera\u021biile \u00eentre utilaje. Planificatorii pot modifica programul \u00eentr-o diagram\u0103 Gantt interactiv\u0103, iar motorul \u00eei men\u021bine coeren\u021ba.<\/li>\n\n\n<li><strong>De la un timp fix de reglaj la o matrice a schimb\u0103rilor de fabrica\u021bie.<\/strong> Matricea timpilor de preg\u0103tire con\u021bine timpii de schimbare de fabrica\u021bie \u00eentre produse \u00een func\u021bie de succesiunea lor (de la albastru la ro\u0219u 30 de minute, de la ro\u0219u la albastru 60), iar motorul alege succesiunea cu cel mai mic timp total de reglaj. Timpii de reglaj \u0219i de demontare sunt modela\u021bi pentru fiecare opera\u021bie.<\/li>\n\n\n<li><strong>Sculele \u0219i echipele devin resurse cu capacitate finit\u0103.<\/strong> Sculele sunt resurse cu capacitate finit\u0103, care nu pot fi programate simultan pe dou\u0103 centre de lucru. O opera\u021bie poate necesita mai mul\u021bi operatori \u00een acela\u0219i timp. Motorul mut\u0103 lucr\u0103rile pe utilaje sau la personal alternativ c\u00e2nd resursa principal\u0103 nu este disponibil\u0103.<\/li>\n\n\n<li><strong>De la date bazate pe lead time la date dictate de disponibilitatea materialelor.<\/strong> Pentru fiecare opera\u021bie se verific\u0103 stocul \u0219i comenzile de achizi\u021bie din B1 care urmeaz\u0103 s\u0103 fie recep\u021bionate. Cantitatea r\u0103mas\u0103 deschis\u0103 din comanda de achizi\u021bie este considerat\u0103 disponibil\u0103 la data de livrare a liniei respective. Un document Goods Receipt PO \u00een B1 o trece \u00een stoc \u00een SkyPlanner, inclusiv \u00een cazul recep\u021biilor par\u021biale.<\/li>\n\n\n<li><strong>Termenele devin priorit\u0103\u021bi reale.<\/strong> Prioritatea opera\u021biei, prioritizarea dup\u0103 data de finalizare, prioritatea clientului, Fast Track \u0219i Dynamic Priorities stabilesc ce opera\u021bie se execut\u0103 prima.<\/li>\n\n\n<li><strong>Ajust\u0103rile manuale devin automate.<\/strong> Autopilot reprogrameaz\u0103 automat c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie, respect\u00e2nd bloc\u0103rile \u0219i priorit\u0103\u021bile stabilite de dumneavoastr\u0103.<\/li>\n\n\n<li><strong>Programarea \u0219i execu\u021bia din sec\u021bia de produc\u021bie, \u00eentr-un singur instrument.<\/strong> Operatorii \u00ee\u0219i v\u0103d lista de opera\u021bii \u0219i \u00eenregistreaz\u0103 lucr\u0103rile pe telefon sau tablet\u0103 cu Mobile Confirmations, Production Timer \u0219i Quick Log Mode.<\/li>\n\n<\/ul>\n\n\n<p><strong>Alege\u021bi SkyPlanner c\u00e2nd<\/strong> fereastra Resource Capacity arat\u0103 dep\u0103\u0219iri de capacitate \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar corectarea lor dureaz\u0103 ore \u00eentregi.<\/p>\n\n\n<p><strong>Alege\u021bi SkyPlanner c\u00e2nd<\/strong> schimb\u0103rile de fabrica\u021bie depind de succesiunea produselor sau c\u00e2nd sculele comune \u0219i opera\u021biile care necesit\u0103 mai mul\u021bi operatori determin\u0103 ce se poate executa \u00een continuare.<\/p>\n\n\n<p><strong>Alege\u021bi SkyPlanner c\u00e2nd<\/strong> dori\u021bi programare cu capacitate finit\u0103 pentru comenzile de produc\u021bie standard din B1, nu un nou modul de produc\u021bie.<\/p>\n\n\n<p>Lista complet\u0103 este disponibil\u0103 pe <a href=\"\/ro\/functionalitati\/\">pagina de func\u021bionalit\u0103\u021bi<\/a>.<\/p>\n\n\n<p>SkyPlanner se integreaz\u0103 bidirec\u021bional cu SAP Business One. Comenzile de produc\u021bie, etapele fluxului tehnologic, resursele \u0219i comenzile de achizi\u021bie deschise sunt preluate prin Service Layer. Datele planificate sunt transmise \u00eenapoi c\u0103tre <code>ProductionOrders<\/code>, iar cantit\u0103\u021bile produse \u0219i orele raportate sunt \u00eenregistrate prin documente Receipt and Issue for Production. Webhook-urile SkyPlanner transmit fiecare modificare a programului de produc\u021bie imediat ce aceasta are loc.<\/p>\n\n\n<p>Fiecare fabric\u0103 folose\u0219te B1 diferit, de la etapele fluxului tehnologic din BOM p\u00e2n\u0103 la grupurile de resurse \u0219i extensii. Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 \u00een etapa ini\u021bial\u0103 de implementare \u0219i asigur\u0103 suport dup\u0103 punerea \u00een func\u021biune. Partenerul dumneavoastr\u0103 B1 sau dezvoltatorii proprii pot realiza integrarea \u0219i prin REST API-ul documentat al SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia de referin\u021b\u0103 API<\/a>), folosind doar o cheie API. Documenta\u021bia produsului \u0219i a API-ului este public\u0103 \u0219i se g\u0103se\u0219te \u00een <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">documenta\u021bia SkyPlanner<\/a>.<\/p>\n\n\n<p>Laboratory &amp; Allied, un produc\u0103tor farmaceutic din Nairobi, folose\u0219te SAP Business One pe HANA \u00eempreun\u0103 cu Power BI. Compania are aproximativ 1.000 de angaja\u021bi, dintre care circa 800 \u00een produc\u021bie, \u0219i utilizeaz\u0103 SkyPlanner din 2025. Echipa IT intern\u0103 a realizat integrarea cu SAP \u00een mare parte pe cont propriu, cu ajutorul SkyPlanner. Compania raporteaz\u0103 o cre\u0219tere de 50% a livr\u0103rilor la timp \u0219i a raport\u0103rilor la termen c\u0103tre clien\u021bi.<\/p>\n\n\n<p>\u00cencepe\u021bi cu un export CSV sau Excel din B1 \u00een <a href=\"\/ro\/proba\/\">perioada de testare gratuit\u0103 de 30 de zile<\/a>, cu p\u00e2n\u0103 la 20 de centre de lucru \u0219i f\u0103r\u0103 card de credit. Vede\u021bi cum sunt programate propriile comenzi \u00eenainte de orice lucrare de integrare. Dup\u0103 aceea, <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a> pornesc de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, facturare lunar\u0103 \u0219i posibilitatea de a anula oric\u00e2nd. Primi\u021bi de la \u00eenceput o ofert\u0103 pentru integrare, adaptat\u0103 procesului \u0219i nevoilor dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul, astfel \u00eenc\u00e2t s\u0103 cunoa\u0219te\u021bi costul total \u00eenainte de a \u00eencepe. Implementarea se finalizeaz\u0103 \u00een mod normal \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea etapei ini\u021biale.<\/p>\n\n\n<p>Citi\u021bi prezentarea general\u0103 pe pagina <a href=\"\/ro\/integrari\/erp\/sap-business-one\/\">SkyPlanner pentru SAP Business One<\/a> sau vede\u021bi ce date se transfer\u0103 \u00eentre sisteme \u00een <a href=\"\/ro\/integrari\/erp\/sap-business-one\/ghid-de-integrare\/\">ghidul de integrare cu SAP Business One<\/a>. Celelalte sisteme ERP sunt enumerate \u00een sec\u021biunea <a href=\"\/ro\/integrari\/erp\/\">Integr\u0103ri ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui plan optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/customers\/laboratory-allied\/\">Citi\u021bi opinia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een sec\u021bia de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite s\u0103pt\u0103m\u00e2nal<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/customers\/utu\/\">Citi\u021bi opinia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Un sudor KJH-Comp polizeaz\u0103 o structur\u0103 sudat\u0103 din o\u021bel la fabrica din Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>respectarea termenelor de livrare, fa\u021b\u0103 de aproximativ 50% anterior<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner joac\u0103 un rol decisiv \u00een asigurarea respect\u0103rii termenelor noastre de livrare.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, director general<\/b><br>KJH-Comp \u00b7 Prelucrarea tablei \u0219i fabrica\u021bie pe baz\u0103 de contract<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a crescut de la aproximativ 50% p\u00e2n\u0103 la 98%, iar pentru programare este nevoie acum de un singur supervizor \u00een loc de doi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/customers\/kjh-comp\/\">Citi\u021bi opinia KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Vedere aerian\u0103 a fabricii Piristeel de sisteme de siguran\u021b\u0103 pentru acoperi\u0219uri din Kauhava\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>respectarea termenelor de livrare<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ne-a oferit vizibilitatea necesar\u0103 pentru a identifica blocajele \u0219i a adus mai mult\u0103 claritate \u00een gestionarea produc\u021biei.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, director de produc\u021bie<\/b><br>Piristeel \u00b7 Sisteme de siguran\u021b\u0103 pentru acoperi\u0219uri \u0219i sisteme pluviale<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a ajuns la 99,2% anul acesta, iar programarea economise\u0219te p\u00e2n\u0103 la patru ore de lucru pe zi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/customers\/piristeel\/\">Citi\u021bi opinia Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SAP Business One are un instrument de programare a produc\u021biei?<\/summary>\n<p class=\"sp-faq__a\">Are comenzi de produc\u021bie cu patru metode de alocare a resurselor \u0219i o fereastr\u0103 Resource Capacity care arat\u0103 dep\u0103\u0219irile de capacitate. Nu stabile\u0219te succesiunea comenzilor \u021bin\u00e2nd cont de capacitatea finit\u0103 a resurselor. Dep\u0103\u0219irile se corecteaz\u0103 prin modificarea manual\u0103 a datelor comenzilor de produc\u021bie.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>MRP din SAP Business One \u021bine cont de capacitatea resurselor?<\/summary>\n<p class=\"sp-faq__a\">Nu, conform documenta\u021biei SAP. Aceasta arat\u0103 c\u0103, la rulare, MRP verific\u0103 cererea, aprovizionarea, stocul, disponibilitatea componentelor \u0219i valorile de lead time. Capacitatea resurselor nu se num\u0103r\u0103 printre aceste date de intrare, a\u0219a c\u0103 recomand\u0103rile MRP nu reflect\u0103 \u00eenc\u0103rcarea utilajelor.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Care este diferen\u021ba dintre Daily Internal Capacity \u0219i Single Run Capacity?<\/summary>\n<p class=\"sp-faq__a\">Daily Internal Capacity reprezint\u0103 timpul total disponibil zilnic pentru o resurs\u0103. Single Run Capacity reprezint\u0103 timpul pe care o singur\u0103 comand\u0103 de produc\u021bie \u00eel poate utiliza zilnic pe resursa respectiv\u0103. Aceast\u0103 valoare determin\u0103 calculul Required Days pentru comenzile cu flux tehnologic, calcul pe care SAP \u00eel bazeaz\u0103 pe executarea unei singure comenzi pe un singur utilaj.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SAP Business One gestioneaz\u0103 timpi de reglaj care depind de succesiunea produselor?<\/summary>\n<p class=\"sp-faq__a\">Nu. Additional Quantity de pe o linie de resurs\u0103 din BOM adaug\u0103 un timp fix pentru fiecare comand\u0103, indiferent de ce s-a executat anterior. Matricea timpilor de preg\u0103tire din SkyPlanner con\u021bine timpii de schimbare de fabrica\u021bie \u00eentre produse \u00een ambele sensuri \u0219i stabile\u0219te succesiunea opera\u021biilor astfel \u00eenc\u00e2t timpul total de reglaj s\u0103 r\u0103m\u00e2n\u0103 redus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Avem nevoie de o extensie pentru produc\u021bie \u00een B1 pentru programare cu capacitate finit\u0103?<\/summary>\n<p class=\"sp-faq__a\">Nu. SkyPlanner programeaz\u0103 comenzile de produc\u021bie standard din B1 cu capacitate finit\u0103 \u0219i adaug\u0103 \u00eenregistrarea timpului de lucru \u00een sec\u021bia de produc\u021bie, f\u0103r\u0103 migrarea BOM-urilor sau a comenzilor \u00eentr-un nou model de date.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum se conecteaz\u0103 SkyPlanner APS la SAP Business One?<\/summary>\n<p class=\"sp-faq__a\">Conexiunea este bidirec\u021bional\u0103, prin Service Layer din B1 \u0219i prin API-ul REST \u0219i webhook-urile SkyPlanner. Comenzile de produc\u021bie, listele de materiale (BOM), resursele \u0219i comenzile de achizi\u021bie sunt transferate \u00een SkyPlanner. Datele programate, precum \u0219i cantit\u0103\u021bile produse \u0219i orele de lucru \u00eenregistrate sunt transferate \u00eenapoi \u00een B1. Echipa SkyPlanner adapteaz\u0103 integrarea la configura\u021bia dumneavoastr\u0103 B1 \u00een etapa de implementare \u0219i ofer\u0103 asisten\u021b\u0103 \u0219i dup\u0103 punerea \u00een func\u021biune. Partenerul dumneavoastr\u0103 B1 sau propriii dezvoltatori pot, de asemenea, s\u0103 creeze integrarea folosind API-ul REST documentat. Pentru a \u00eencepe, este suficient\u0103 o cheie API.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de a-l integra cu SAP Business One?<\/summary>\n<p class=\"sp-faq__a\">Da. Perioada de testare gratuit\u0103 de 30 de zile include p\u00e2n\u0103 la 20 de centre de lucru \u0219i nu necesit\u0103 card de credit. Exporta\u021bi comenzile de produc\u021bie \u0219i resursele din B1, importa\u021bi-le \u00een format CSV sau Excel \u0219i vede\u021bi mai \u00eent\u00e2i propriul program de produc\u021bie. <a href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a> sau <a href=\"\/ro\/contact-vanzari\/\">discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ SAP Business One SAP Business One ofer\u0103 programare cu capacitate finit\u0103? Resurse, MRP \u0219i rolul SkyPlanner APS Nu. Versiunea standard SAP Business One include MRP, resurse cu capacitate zilnic\u0103 \u0219i o fereastr\u0103 Resource Capacity care arat\u0103 c\u00e2nd o resurs\u0103 este supra\u00eenc\u0103rcat\u0103. Nu are un motor care s\u0103 stabileasc\u0103 ordinea comenzilor de &#8230; <a title=\"SAP Business One ofer\u0103 programare cu capacitate finit\u0103? Resurse, MRP \u0219i rolul SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sap-business-one\/cu-capacitate-finita\/\" aria-label=\"Read more about SAP Business One ofer\u0103 programare cu capacitate finit\u0103? Resurse, MRP \u0219i rolul SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100786,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101083","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>SAP Business One ofer\u0103 programare cu capacitate finit\u0103?<\/title>\n<meta name=\"description\" content=\"SAP Business One: MRP, capacitate zilnic\u0103 a resurselor, patru metode de alocare, f\u0103r\u0103 programare cu capacitate finit\u0103. Func\u021bii, limite \u0219i c\u00e2nd este suficient.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sap-business-one\/cu-capacitate-finita\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SAP Business One ofer\u0103 programare cu capacitate finit\u0103? Resurse, MRP \u0219i rolul SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"SAP Business One: MRP, capacitate zilnic\u0103 a resurselor, patru metode de alocare, f\u0103r\u0103 programare cu capacitate finit\u0103. Func\u021bii, limite \u0219i c\u00e2nd este suficient.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sap-business-one\/cu-capacitate-finita\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"18 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/sap-business-one\\\/cu-capacitate-finita\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/sap-business-one\\\/cu-capacitate-finita\\\/\",\"name\":\"SAP Business One ofer\u0103 programare cu capacitate finit\u0103?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"SAP Business One: MRP, capacitate zilnic\u0103 a resurselor, patru metode de alocare, f\u0103r\u0103 programare cu capacitate finit\u0103. Func\u021bii, limite \u0219i c\u00e2nd este suficient.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/sap-business-one\\\/cu-capacitate-finita\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/sap-business-one\\\/cu-capacitate-finita\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/sap-business-one\\\/cu-capacitate-finita\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru SAP Business One: programarea produc\u021biei cu capacitate finit\u0103\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/sap-business-one\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"SAP Business One ofer\u0103 programare cu capacitate finit\u0103? Resurse, MRP \u0219i rolul SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"SAP Business One ofer\u0103 programare cu capacitate finit\u0103?","description":"SAP Business One: MRP, capacitate zilnic\u0103 a resurselor, patru metode de alocare, f\u0103r\u0103 programare cu capacitate finit\u0103. Func\u021bii, limite \u0219i c\u00e2nd este suficient.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sap-business-one\/cu-capacitate-finita\/","og_locale":"ro_RO","og_type":"article","og_title":"SAP Business One ofer\u0103 programare cu capacitate finit\u0103? Resurse, MRP \u0219i rolul SkyPlanner APS","og_description":"SAP Business One: MRP, capacitate zilnic\u0103 a resurselor, patru metode de alocare, f\u0103r\u0103 programare cu capacitate finit\u0103. Func\u021bii, limite \u0219i c\u00e2nd este suficient.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sap-business-one\/cu-capacitate-finita\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"18 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sap-business-one\/cu-capacitate-finita\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sap-business-one\/cu-capacitate-finita\/","name":"SAP Business One ofer\u0103 programare cu capacitate finit\u0103?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"SAP Business One: MRP, capacitate zilnic\u0103 a resurselor, patru metode de alocare, f\u0103r\u0103 programare cu capacitate finit\u0103. Func\u021bii, limite \u0219i c\u00e2nd este suficient.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sap-business-one\/cu-capacitate-finita\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sap-business-one\/cu-capacitate-finita\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sap-business-one\/cu-capacitate-finita\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru SAP Business One: programarea produc\u021biei cu capacitate finit\u0103","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/sap-business-one\/"},{"@type":"ListItem","position":5,"name":"SAP Business One ofer\u0103 programare cu capacitate finit\u0103? Resurse, MRP \u0219i rolul SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ SAP Business One SAP Business One ofer\u0103 programare cu capacitate finit\u0103? Resurse, MRP \u0219i rolul SkyPlanner APS Nu. Versiunea standard SAP Business One include MRP, resurse cu capacitate zilnic\u0103 \u0219i o fereastr\u0103 Resource Capacity care arat\u0103 c\u00e2nd o resurs\u0103 este supra\u00eenc\u0103rcat\u0103. Nu are un motor care s\u0103 stabileasc\u0103 ordinea comenzilor de&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/101083","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=101083"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/101083\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/100786"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=101083"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}