{"id":100964,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=100964"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"cu-capacitate-finita","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/business-central\/cu-capacitate-finita\/","title":{"rendered":"Business Central ofer\u0103 programare cu capacitate finit\u0103? Capacity Constrained Resources fa\u021b\u0103 de SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ Microsoft Dynamics 365 Business Central<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Business Central ofer\u0103 programare cu capacitate finit\u0103? <span class=\"hl\">Capacity Constrained Resources fa\u021b\u0103 de SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Microsoft Dynamics 365 Business Central aplic\u0103 programarea cu capacitate finit\u0103 doar centrelor de lucru \u0219i centrelor ma\u0219in\u0103 pe care le \u00eenregistra\u021bi \u00een Capacity Constrained Resources. Toate celelalte resurse, inclusiv \u00een MRP, sunt planificate cu capacitate infinit\u0103, iar Microsoft nume\u0219te rezultatul un program orientativ. Fabricile care au nevoie de <a href=\"\/ro\/resurse\/capacitate-finita\/\">programare cu capacitate finit\u0103<\/a> pentru \u00eentreaga sec\u021bie de produc\u021bie folosesc SkyPlanner APS al\u0103turi de Business Central.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Func\u021bia Microsoft de programare cu capacitate finit\u0103 din Planning Optimization apar\u021bine unui alt produs: Dynamics 365 Supply Chain Management. Nu se aplic\u0103 \u00een Business Central.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-business-central-plans-capacity-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum planific\u0103 Business Central capacitatea, pas cu pas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Func\u021bionalitatea de produc\u021bie este vizibil\u0103 doar \u00een experien\u021ba <strong>Premium<\/strong>. Premium \u201eshows all actions and fields for all business functionality, including Manufacturing and Service Management.\u201d (afi\u0219eaz\u0103 toate ac\u021biunile \u0219i c\u00e2mpurile pentru toate func\u021bionalit\u0103\u021bile de business, inclusiv produc\u021bia \u0219i gestionarea serviciilor). \u00cen Essentials, niciunul dintre ecranele de mai jos nu exist\u0103.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Nomenclatoare pentru capacitate<\/h3>\n\n\n<p>Capacitatea este modelat\u0103 pe trei niveluri: <strong>Work Center Group<\/strong>, <strong>Work Center<\/strong> \u0219i <strong>Machine Center<\/strong>. Fiecare centru de lucru \u0219i centru ma\u0219in\u0103 are c\u00e2mpurile <strong>Shop Calendar Code<\/strong>, <strong>Capacity<\/strong>, <strong>Efficiency<\/strong>, <strong>Queue Time<\/strong> \u0219i <strong>Unit of Measure Code<\/strong>. Calendarul sec\u021biei de produc\u021bie con\u021bine <strong>Work Shifts<\/strong>, zilele lucr\u0103toare \u0219i zilele libere. \u00cenregistr\u0103rile <strong>Absence<\/strong> reduc capacitatea zilei respective.<\/p>\n\n\n<p>Nu pute\u021bi programa nimic p\u00e2n\u0103 nu rula\u021bi <strong>Calculate Work Center Calendar<\/strong> (\u0219i <strong>Calculate Machine Center Calendar<\/strong>) pentru un interval de date.<\/p>\n\n\n<p>Astfel se creeaz\u0103 \u00eenregistr\u0103rile din calendar care controleaz\u0103, dup\u0103 cum spune Microsoft, \u201ethe detailed scheduling of operations performed at the work center.\u201d (programarea detaliat\u0103 a opera\u021biilor executate la centrul de lucru). C\u00e2mpul <strong>Calendar Entries Available Until<\/strong> arat\u0103 p\u00e2n\u0103 la ce dat\u0103 sunt disponibile aceste \u00eenregistr\u0103ri. C\u00e2nd data respectiv\u0103 devine anterioar\u0103 datei de lucru, c\u00e2mpul este afi\u0219at \u00een stil de avertizare. (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/business-central\/production-how-to-create-work-center-calendars\">surs\u0103<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Fluxuri tehnologice \u0219i BOM-uri<\/h3>\n\n\n<p>Un <strong>Routing<\/strong> este de tip Serial sau Parallel \u0219i trebuie s\u0103 aib\u0103 starea Certified. Fiecare opera\u021bie are:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Operation No.<\/strong> \u0219i <strong>Type<\/strong> (Work Center sau Machine Center)<\/li>\n\n\n<li><strong>Setup Time<\/strong>, <strong>Run Time<\/strong>, <strong>Wait Time<\/strong> \u0219i <strong>Move Time<\/strong><\/li>\n\n\n<li><strong>Concurrent Capacities<\/strong>, <strong>Send-Ahead Quantity<\/strong> \u0219i <strong>Routing Link Code<\/strong><\/li>\n\n<\/ul>\n\n\n<p>\u0218i <strong>Production BOM<\/strong> trebuie s\u0103 aib\u0103 starea Certified pentru a putea fi utilizat la planificare.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. MPS \u0219i MRP \u00een Planning Worksheet<\/h3>\n\n\n<p>Din <strong>Planning Worksheet<\/strong> se ruleaz\u0103 <strong>Calculate Regenerative Plan<\/strong> sau <strong>Calculate Net Change Plan<\/strong>. Aceste func\u021bii echilibreaz\u0103 cererea cu aprovizionarea pe baza politicii de reaprovizionare a fiec\u0103rui articol \u0219i propun comenzi de achizi\u021bie, transfer, asamblare \u0219i produc\u021bie prin mesaje de ac\u021biune.<\/p>\n\n\n<p>Microsoft precizeaz\u0103 clar cum este tratat\u0103 capacitatea aici: \u201eWith each planned method, Business Central generates worksheet entries that assume infinite capacity. When you develop schedules, work center and machine center capacity isn&#8217;t considered.\u201d (La fiecare metod\u0103 de planificare, Business Central genereaz\u0103 \u00eenregistr\u0103ri \u00een foaia de lucru presupun\u00e2nd o capacitate infinit\u0103. La elaborarea programelor, capacitatea centrelor de lucru \u0219i a centrelor ma\u0219in\u0103 nu este luat\u0103 \u00een calcul.) (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/business-central\/production-how-to-run-mps-and-mrp\">surs\u0103<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Comenzi de produc\u021bie, Refresh \u0219i Replan<\/h3>\n\n\n<p>Comenzile de produc\u021bie trec prin st\u0103rile <strong>Simulated<\/strong>, <strong>Planned<\/strong>, <strong>Firm Planned<\/strong>, <strong>Released<\/strong> \u0219i <strong>Finished<\/strong>. <strong>Refresh<\/strong> calculeaz\u0103 liniile, fluxurile tehnologice \u0219i necesarul de componente, folosind o <strong>Scheduling Direction<\/strong> de tip Forward sau Backward. <strong>Replan<\/strong> face acela\u0219i lucru, dar acoper\u0103 \u0219i nivelurile inferioare ale BOM-ului. Datele opera\u021biilor din <strong>Prod. Order Routing<\/strong> sunt stabilite pe baza calendarelor centrelor de lucru.<\/p>\n\n\n<p>Implicit, programarea se face cu capacitate infinit\u0103: \u201eBy default, Business Central uses infinite capacity scheduling.\u201d (Implicit, Business Central utilizeaz\u0103 programarea cu capacitate infinit\u0103.) (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/business-central\/production-how-to-view-the-load-on-work-centers\">surs\u0103<\/a>) Dou\u0103 comenzi pot fi programate pe aceea\u0219i ma\u0219in\u0103 la aceea\u0219i or\u0103.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Capacity Constrained Resources: unde se aplic\u0103 capacitatea finit\u0103<\/h3>\n\n\n<p>Aceasta este func\u021bia nativ\u0103 de \u00eenc\u0103rcare cu capacitate finit\u0103. Pe pagina <strong>Capacity Constrained Resources<\/strong>, ad\u0103uga\u021bi o resurs\u0103 complet\u00e2nd urm\u0103toarele c\u00e2mpuri:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>C\u00e2mp<\/th><th>Rol<\/th><\/tr><\/thead><tbody><tr><td>Capacity Type<\/td><td>Work Center sau Machine Center<\/td><\/tr><tr><td>Capacity No.<\/td><td>Resursa a c\u0103rei capacitate trebuie limitat\u0103<\/td><\/tr><tr><td>Critical Load %<\/td><td>Nivelul de \u00eenc\u0103rcare pe care func\u021bia de programare nu trebuie s\u0103 \u00eel dep\u0103\u0219easc\u0103<\/td><\/tr><tr><td>Dampener (% of Total Capacity)<\/td><td>O toleran\u021b\u0103 care permite dep\u0103\u0219irea u\u0219oar\u0103 a \u00eenc\u0103rc\u0103rii critice pentru a evita \u00eemp\u0103r\u021birea unei opera\u021bii<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Pentru o resurs\u0103 cu capacitate limitat\u0103, func\u021bia de programare plaseaz\u0103 fiecare opera\u021bie \u00een cel mai apropiat interval liber. Dac\u0103 un interval este prea scurt, \u00eemparte opera\u021bia \u00een dou\u0103 sau mai multe p\u0103r\u021bi. Timpul de reglaj este alocat o singur\u0103 dat\u0103 unei opera\u021bii \u00eemp\u0103r\u021bite, \u201ebecause it&#8217;s assumed that some manual adjustment is done to optimize the schedule.\u201d (deoarece se presupune c\u0103 se fac ajust\u0103ri manuale pentru optimizarea programului). (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/business-central\/production-how-to-set-up-work-and-machine-centers#to-set-up-a-capacity-constrained-machine-or-work-center\">surs\u0103<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Verificarea \u00eenc\u0103rc\u0103rii \u0219i mutarea manual\u0103 a comenzilor<\/h3>\n\n\n<p>Planificatorul verific\u0103 rezultatul \u00een trei locuri:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>\u00een vizualizarea <strong>Load<\/strong> a unui centru de lucru (View by: Day, Week, Month, Quarter, Year sau Accounting Period; View as: Net Change sau Balance at Date)<\/li>\n\n\n<li>\u00een <strong>Work Center Task List<\/strong><\/li>\n\n\n<li>\u00een matricea <strong>Work Center Calendar<\/strong><\/li>\n\n<\/ul>\n\n\n<p>Cu <strong>Manual Scheduling<\/strong> activat\u0103 \u00een <strong>Manufacturing Setup<\/strong>, planificatorul poate muta data de \u00eenceput sau data scadent\u0103 a unei comenzi, cu o marj\u0103 de siguran\u021b\u0103 stabilit\u0103 prin <strong>Safety Lead Time for Manual Scheduling<\/strong>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-business-central-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Limitele Business Central<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Un program orientativ, prin concep\u021bie.<\/strong> \u201eBusiness Central doesn&#8217;t support detailed shop floor control. It plans for a feasible utilization of resources by providing a rough-cut schedule, but doesn&#8217;t automatically create and maintain detailed schedules based on priorities or optimization rules.\u201d (Business Central nu ofer\u0103 control detaliat al sec\u021biei de produc\u021bie. Ofer\u0103 un program orientativ pentru o utilizare fezabil\u0103 a resurselor, dar nu creeaz\u0103 \u0219i nu actualizeaz\u0103 automat programe detaliate pe baza priorit\u0103\u021bilor sau a regulilor de optimizare.) (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/business-central\/production-how-to-set-up-work-and-machine-centers\">surs\u0103<\/a>)<\/li>\n\n\n<li><strong>MRP ignor\u0103 capacitatea.<\/strong> Planning Worksheet presupune capacitate infinit\u0103 la fiecare rulare, indiferent dac\u0103 exist\u0103 sau nu resurse cu capacitate limitat\u0103 (conform citatului de mai sus).<\/li>\n\n\n<li><strong>Capacitate finit\u0103 doar unde o indica\u021bi.<\/strong> Orice centru de lucru care nu apare pe pagina Capacity Constrained Resources r\u0103m\u00e2ne cu capacitate infinit\u0103, iar opera\u021biile de pe acea resurs\u0103 se pot suprapune.<\/li>\n\n\n<li><strong>Planificare \u00een serie.<\/strong> \u201eOperations on work centers or machine centers that are set up as constrained resources are always planned serially.\u201d (Opera\u021biile de pe centrele de lucru sau centrele ma\u0219in\u0103 configurate ca resurse cu capacitate limitat\u0103 sunt \u00eentotdeauna planificate \u00een serie.) A\u0219adar, un centru de lucru cu capacitate limitat\u0103 \u0219i Capacity 3 nu va avea trei opera\u021bii \u00een paralel \u00een program.<\/li>\n\n\n<li><strong>F\u0103r\u0103 selectarea automat\u0103 a unui centru alternativ.<\/strong> \u201eThe alternate work center is for information only, and isn&#8217;t automatically included in planning processes.\u201d (Centrul de lucru alternativ are doar rol informativ \u0219i nu este inclus automat \u00een procesele de planificare.)<\/li>\n\n\n<li><strong>Centrele ma\u0219in\u0103 pot disp\u0103rea din planificare.<\/strong> \u201eIf you turn off the Consolidated Calendar toggle, only the capacity of the work center is assigned in the planning. The machine center capacity is excluded.\u201d (Dac\u0103 dezactiva\u021bi op\u021biunea Consolidated Calendar, la planificare este alocat\u0103 doar capacitatea centrului de lucru. Capacitatea centrului ma\u0219in\u0103 este exclus\u0103.)<\/li>\n\n\n<li><strong>Comenzile planificate nu p\u0103streaz\u0103 programul.<\/strong> Pentru comenzile de produc\u021bie cu starea Planned, Microsoft precizeaz\u0103: \u201eBusiness Central deletes them the next time you run planning.\u201d (Business Central le \u0219terge la urm\u0103toarea rulare a planific\u0103rii.) (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/business-central\/production-about-production-orders\">surs\u0103<\/a>)<\/li>\n\n\n<li><strong>Replanificarea implic\u0103 reprogramarea opera\u021biilor.<\/strong> \u201eChanges implemented with the Replan action probably change the capacity need of the production order. You might have to reschedule operations afterwards.\u201d (Modific\u0103rile efectuate prin ac\u021biunea Replan vor schimba probabil necesarul de capacitate al comenzii de produc\u021bie. Ulterior, poate fi necesar s\u0103 reprograma\u021bi opera\u021biile.) (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/business-central\/production-how-to-replan-refresh-production-orders\">surs\u0103<\/a>)<\/li>\n\n\n<li><strong>Reglajele nu depind de succesiunea opera\u021biilor.<\/strong> Setup Time are o valoare fix\u0103 pe fiecare linie a fluxului tehnologic, calculat\u0103 pentru fiecare comand\u0103 de produc\u021bie. Trecerea de la produsul A la B are acela\u0219i cost ca trecerea de la C la B, deci func\u021bia de programare nu are niciun motiv s\u0103 ordoneze opera\u021biile pentru a reduce reglajele. Logica de \u00eemp\u0103r\u021bire a opera\u021biilor pentru a \u00eenc\u0103pea \u00een intervalele disponibile umple golurile, dar nu stabile\u0219te succesiunea. Microsoft se a\u0219teapt\u0103 ca planificatorul s\u0103 ajusteze manual opera\u021biile \u00eemp\u0103r\u021bite.<\/li>\n\n\n<li><strong>Sculele \u0219i persoanele nominalizate nu au capacitate definit\u0103 \u00een sistem.<\/strong> Liniile Routing Tool \u0219i Routing Personnel \u00eenregistreaz\u0103 ce necesit\u0103 o opera\u021bie, dar nu au calendar sau capacitate. Nimic nu \u00eempiedic\u0103 dou\u0103 opera\u021bii s\u0103 solicite acela\u0219i dispozitiv de fixare sau acela\u0219i specialist. <strong>Concurrent Capacities<\/strong> permite mai multor unit\u0103\u021bi ale aceluia\u0219i centru de lucru sau centru ma\u0219in\u0103 s\u0103 execute \u00eempreun\u0103 o opera\u021bie \u0219i \u00eei scurteaz\u0103 timpul de execu\u021bie. Nu rezerv\u0103 persoane distincte, fiecare cu propriile schimburi de lucru.<\/li>\n\n<\/ul>\n\n\n<p>\u00cen practic\u0103: ma\u0219ini care nu sunt puncte de strangulare, dar sunt supra\u00eenc\u0103rcate, reordonarea manual\u0103 a opera\u021biilor \u0219i un program paralel \u00een Excel.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-business-central-s-native-scheduling-is-eno\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">C\u00e2nd sunt suficiente func\u021biile native de programare din Business Central<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Capacity Constrained Resources \u00eempreun\u0103 cu vizualizarea Load sunt suficiente c\u00e2nd:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Ave\u021bi unul sau dou\u0103 puncte reale de strangulare, iar restul sec\u021biei de produc\u021bie are capacitate disponibil\u0103.<\/li>\n\n\n<li>Fluxurile tehnologice sunt scurte \u0219i stabile, iar produc\u021bia este \u00een principal pe stoc sau promite\u021bi termene lungi de livrare.<\/li>\n\n\n<li>Planifica\u021bi s\u0103pt\u0103m\u00e2nal, iar planificatorul are nevoie doar de o verificare orientativ\u0103 a fezabilit\u0103\u021bii.<\/li>\n\n\n<li>Succesiunea opera\u021biilor este suficient de simpl\u0103 pentru a fi stabilit\u0103 de un \u0219ef de echip\u0103 direct la ma\u0219in\u0103.<\/li>\n\n\n<li>Sculele comune, disponibilitatea operatorilor \u0219i sosirea materialelor nu limiteaz\u0103 succesiunea opera\u021biilor.<\/li>\n\n\n<li>Produc\u021bia reprezint\u0103 o mic\u0103 parte din activitate \u0219i dori\u021bi s\u0103 lucra\u021bi \u00eentr-un singur sistem.<\/li>\n\n<\/ul>\n\n\n<p>Dac\u0103 fabrica dumneavoastr\u0103 se \u00eencadreaz\u0103 \u00een aceast\u0103 descriere, configura\u021bi cu aten\u021bie resursele cu capacitate limitat\u0103, asigura\u021bi-v\u0103 c\u0103 ave\u021bi calendare calculate pentru o perioad\u0103 care dep\u0103\u0219e\u0219te cu mult orizontul de planificare \u0219i activa\u021bi Consolidated Calendar acolo unde conteaz\u0103 centrele ma\u0219in\u0103. At\u00e2t este necesar.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">C\u00e2nd ave\u021bi nevoie de un sistem de programare cu capacitate finit\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Func\u021bionalitatea nativ\u0103 nu mai este suficient\u0103 c\u00e2nd v\u0103 reg\u0103si\u021bi \u00een mai multe dintre situa\u021biile urm\u0103toare:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Mai mult de dou\u0103 resurse devin locuri \u00eenguste, \u00een func\u021bie de mixul de produse.<\/li>\n\n\n<li>Termenele de livrare sunt dep\u0103\u0219ite, de\u0219i \u00een vizualizarea Load \u00eenc\u0103rcarea pare \u00een regul\u0103 la nivel de s\u0103pt\u0103m\u00e2n\u0103.<\/li>\n\n\n<li>Timpul de schimbare de fabrica\u021bie depinde de produsul executat anterior, astfel c\u0103 ordinea opera\u021biilor influen\u021beaz\u0103 volumul produs.<\/li>\n\n\n<li>Personalul, schimburile \u0219i absen\u021bele limiteaz\u0103 programul la fel de mult ca utilajele, iar unele opera\u021bii necesit\u0103 doi sau trei operatori simultan.<\/li>\n\n\n<li>\u0218tan\u021bele, matri\u021bele sau dispozitivele de fixare sunt utilizate \u00een comun de mai multe utilaje.<\/li>\n\n\n<li>Disponibilitatea materialelor determin\u0103 ce opera\u021bie poate \u00eencepe.<\/li>\n\n\n<li>Ave\u021bi utilaje care pot prelua efectiv acelea\u0219i opera\u021bii \u0219i dori\u021bi ca programul s\u0103 le foloseasc\u0103.<\/li>\n\n\n<li>Comenzile urgente \u0219i defec\u021biunile v\u0103 oblig\u0103 s\u0103 reprograma\u021bi produc\u021bia de mai multe ori pe s\u0103pt\u0103m\u00e2n\u0103.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Ce s\u0103 urm\u0103ri\u021bi la alegerea unui sistem<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Capacitate finit\u0103 pentru toate resursele simultan<\/strong>, nu doar pentru un subset marcat explicit.<\/li>\n\n\n<li><strong>Secven\u021biere la nivel de opera\u021bie<\/strong>, \u021bin\u00e2nd cont de priorit\u0103\u021bi \u0219i termene.<\/li>\n\n\n<li><strong>O matrice a timpilor de reglaj<\/strong>: timpi de schimbare de fabrica\u021bie \u00eentre produse care depind de secven\u021b\u0103 \u0219i difer\u0103 \u00een func\u021bie de sensul trecerii, folosi\u021bi de motor pentru a minimiza timpul total de reglaj.<\/li>\n\n\n<li><strong>Scule tratate ca resurse comune cu capacitate finit\u0103<\/strong>, astfel \u00eenc\u00e2t acela\u0219i dispozitiv de fixare s\u0103 nu fie niciodat\u0103 alocat simultan la dou\u0103 utilaje.<\/li>\n\n\n<li><strong>Opera\u021bii cu mai mul\u021bi operatori<\/strong>: unei opera\u021bii care necesit\u0103 mai multe persoane la acela\u0219i centru de lucru i se aloc\u0103 personalul necesar, \u021bin\u00e2nd cont de schimbul fiec\u0103rei persoane.<\/li>\n\n\n<li><strong>Constr\u00e2ngeri legate de personal \u0219i schimburi<\/strong>, inclusiv absen\u021be \u0219i ore suplimentare.<\/li>\n\n\n<li><strong>Programare \u00een func\u021bie de disponibilitatea materialelor<\/strong>, cu verificarea stocurilor \u0219i a aprovizion\u0103rilor a\u0219teptate.<\/li>\n\n\n<li><strong>Utilaje alternative \u0219i personal de \u00eenlocuire<\/strong> pe care motorul le folose\u0219te efectiv c\u00e2nd resursa principal\u0103 nu este disponibil\u0103.<\/li>\n\n\n<li><strong>Editare vizual\u0103 \u00een diagrama Gantt<\/strong>, \u00een care mutarea unei opera\u021bii p\u0103streaz\u0103 coeren\u021ba restului programului.<\/li>\n\n\n<li><strong>Reprogramare automat\u0103<\/strong> c\u00e2nd se modific\u0103 progresul produc\u021biei sau comenzile.<\/li>\n\n\n<li><strong>Responsabilitate clar\u0103 pentru date \u00een rela\u021bia cu Business Central.<\/strong> Scrie\u021bi programul \u00een comenzile cu starea Firm Planned sau Released, niciodat\u0103 \u00een cele cu starea Planned, \u0219i stabili\u021bi care sistem gestioneaz\u0103 datele opera\u021biilor.<\/li>\n\n\n<li><strong>Un mecanism concret de scriere a datelor \u00eenapoi, prin interfe\u021be standard.<\/strong> API v2.0 standard din Business Central nu are entit\u0103\u021bi pentru comenzi de produc\u021bie, fluxuri tehnologice, liste de materiale sau centre de lucru. Business Central \u00ee\u0219i public\u0103 propriile pagini de produc\u021bie ca servicii web OData v4 f\u0103r\u0103 cod, iar o pagin\u0103 publicat\u0103 care permite editarea accept\u0103 actualiz\u0103ri. \u00centreba\u021bi fiecare furnizor cum ajung datele de \u00eenceput \u0219i de sf\u00e2r\u0219it ale opera\u021biilor \u00een Prod. Order Routing Line. \u00centreba\u021bi dac\u0103 acest lucru necesit\u0103 cod personalizat \u00een Business Central \u0219i cine asigur\u0103 suportul dup\u0103 punerea \u00een produc\u021bie.<\/li>\n\n<\/ul>\n\n\n<p>Op\u021biunile se \u00eempart \u00een patru categorii:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Planificarea nativ\u0103 din Business Central<\/strong> acoper\u0103 un set de locuri \u00eenguste marcate explicit, \u00eentr-un singur sistem.<\/li>\n\n\n<li><strong>Panourile de planificare din clientul Business Central<\/strong> afi\u0219eaz\u0103 comenzile de produc\u021bie pe un panou vizual pe care planificatorul \u00eel gestioneaz\u0103.<\/li>\n\n\n<li><strong>Suitele APS pentru companii mari<\/strong> sunt conectate printr-un proiect de implementare \u0219i utilizate de o echip\u0103 dedicat\u0103 de planificare.<\/li>\n\n\n<li><strong>Sistemele APS \u00een cloud cu func\u021bii de execu\u021bie \u00een sec\u021bia de produc\u021bie<\/strong>, categorie din care face parte SkyPlanner, programeaz\u0103 automat fiecare resurs\u0103, al\u0103turi de Business Central. Acestea reprogrameaz\u0103 continuu pe m\u0103sur\u0103 ce produc\u021bia se schimb\u0103 \u0219i pun programul la dispozi\u021bia operatorilor.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Rolul SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS acoper\u0103 toate lipsurile enumerate mai sus. Programarea \u021bine cont de capacitatea finit\u0103 a fiec\u0103rui centru de lucru, nu doar a celor marcate explicit. Motorul Arcturus AI creeaz\u0103 \u00een c\u00e2teva secunde programul la nivel de opera\u021bie \u0219i stabile\u0219te secven\u021ba \u00een func\u021bie de priorit\u0103\u021bile \u0219i termenele dumneavoastr\u0103. Planificatorul nu mai trebuie s\u0103 \u00eempart\u0103 \u0219i s\u0103 rearanjeze manual opera\u021biile.<\/p>\n\n\n<p>Matricea timpilor de reglaj stocheaz\u0103 timpul de schimbare de fabrica\u021bie pentru fiecare pereche de produse, \u00een ambele sensuri, iar motorul alege secven\u021ba cu cel mai mic timp total de reglaj. Sculele sunt resurse comune cu capacitate finit\u0103, iar o opera\u021bie poate necesita mai mul\u021bi operatori simultan. C\u00e2nd un utilaj sau o persoan\u0103 nu este disponibil\u0103, motorul mut\u0103 opera\u021biile pe resursele alternative pe care le defini\u021bi.<\/p>\n\n\n<p>Programarea \u00een func\u021bie de materiale simuleaz\u0103 stocurile viitoare pornind de la stocul existent \u0219i comenzile de achizi\u021bie cu livr\u0103ri a\u0219teptate. Materialul comandat este considerat disponibil la data livr\u0103rii, astfel c\u0103 opera\u021biile sunt programate doar c\u00e2nd materialul este disponibil.<\/p>\n\n\n<p>Sistemul modeleaz\u0103 grupurile de centre de lucru \u0219i eficien\u021ba acestora, iar o opera\u021bie poate fi \u00eemp\u0103r\u021bit\u0103 \u00eentre mai multe centre de lucru. Priorit\u0103\u021bile sunt stabilite pe baza priorit\u0103\u021bii opera\u021biei, a datei de finalizare, a priorit\u0103\u021bii clientului, a Fast Track \u0219i a Dynamic Priorities, iar Running Time Lock men\u021bine opera\u021biile \u00een curs pe pozi\u021biile lor.<\/p>\n\n\n<p>Autopilot reprogrameaz\u0103 automat c\u00e2nd produc\u021bia se schimb\u0103, respect\u00e2nd bloc\u0103rile \u0219i priorit\u0103\u021bile stabilite. Astfel, o ac\u021biune Replan, o defec\u021biune sau o comand\u0103 urgent\u0103 nu mai \u00eenseamn\u0103 reprogramarea manual\u0103 a opera\u021biilor. Planificatorii ajusteaz\u0103 opera\u021biile pe o diagram\u0103 Gantt interactiv\u0103. Operatorii \u00ee\u0219i v\u0103d lista de opera\u021bii \u0219i \u00eenregistreaz\u0103 activitatea de pe telefon sau tablet\u0103 cu Mobile Confirmations, Production Timer \u0219i Quick Log Mode, astfel \u00eenc\u00e2t programarea \u0219i execu\u021bia \u00een sec\u021bia de produc\u021bie sunt reunite \u00eentr-un singur instrument.<\/p>\n\n\n<p><strong>Alege\u021bi SkyPlanner c\u00e2nd<\/strong> locurile \u00eenguste se schimb\u0103 odat\u0103 cu mixul de produse, iar Capacity Constrained Resources ar trebui s\u0103 acopere jum\u0103tate din sec\u021bia de produc\u021bie.<\/p>\n\n\n<p><strong>Alege\u021bi SkyPlanner c\u00e2nd<\/strong> schimb\u0103rile de fabrica\u021bie depind de secven\u021b\u0103 sau c\u00e2nd sculele comune \u0219i opera\u021biile cu mai mul\u021bi operatori determin\u0103 ce poate fi executat \u00een continuare.<\/p>\n\n\n<p><strong>Alege\u021bi SkyPlanner c\u00e2nd<\/strong> reprograma\u021bi produc\u021bia de mai multe ori pe s\u0103pt\u0103m\u00e2n\u0103 \u0219i dori\u021bi un program utilizabil pentru propria produc\u021bie \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni, nu dup\u0103 un proiect \u00eendelungat.<\/p>\n\n\n<p>\u00cencepe\u021bi cu un export CSV sau Excel \u00een <a href=\"\/ro\/proba\/\">perioada de testare gratuit\u0103 de 30 de zile<\/a> (p\u00e2n\u0103 la 20 de centre de lucru, f\u0103r\u0103 card de credit). Ulterior, pre\u021bul porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, facturare lunar\u0103 \u0219i posibilitatea de a anula oric\u00e2nd. Primi\u021bi de la \u00eenceput o ofert\u0103 pentru integrare, adaptat\u0103 procesului \u0219i nevoilor dumneavoastr\u0103, \u00eempreun\u0103 cu oferta pentru abonament, astfel \u00eenc\u00e2t s\u0103 cunoa\u0219te\u021bi costul total \u00eenainte de a \u00eencepe. Implementarea se finalizeaz\u0103 de regul\u0103 \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea procesului de configurare \u0219i instruire.<\/p>\n\n\n<p>SkyPlanner se integreaz\u0103 bidirec\u021bional cu Business Central prin serviciile web proprii ale Business Central. Momentele de \u00eenceput \u0219i de sf\u00e2r\u0219it programate sunt scrise \u00een Prod. Order Routing Lines, iar \u00eenregistr\u0103rile de timp ale operatorilor sunt trimise \u00eenapoi pentru raportarea produc\u021biei realizate. Echipa SkyPlanner configureaz\u0103 integrarea \u00een etapa de configurare \u0219i instruire \u0219i asigur\u0103 suportul dup\u0103 punerea \u00een produc\u021bie. Partenerul dumneavoastr\u0103 sau dezvoltatorii interni pot utiliza interfa\u021ba REST API documentat\u0103 (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia API<\/a>) doar cu o cheie API, iar documenta\u021bia produsului este disponibil\u0103 public \u00een <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">documenta\u021bia SkyPlanner<\/a>.<\/p>\n\n\n<p>Afla\u021bi cum se conecteaz\u0103 componentele pe pagina <a href=\"\/ro\/integrari\/erp\/business-central\/\">SkyPlanner pentru Business Central<\/a> sau accesa\u021bi direct <a href=\"\/ro\/integrari\/erp\/business-central\/ghid-de-integrare\/\">ghidul de integrare cu Business Central<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/22-d7d6bcdf-ecf7-48d2-9750-66253ccf9aa7-crop.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een sec\u021bia de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi m\u0103rturia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor, \u00een fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar crearea unui program optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi m\u0103rturia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Vedere aerian\u0103 a fabricii Piristeel din Kauhava, care produce sisteme de siguran\u021b\u0103 pentru acoperi\u0219uri\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>respectarea termenelor de livrare<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ne-a oferit vizibilitatea necesar\u0103 pentru a identifica locurile \u00eenguste \u0219i a adus mai mult\u0103 claritate \u00een gestionarea produc\u021biei.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, director de produc\u021bie<\/b><br>Piristeel \u00b7 Sisteme de siguran\u021b\u0103 pentru acoperi\u0219uri \u0219i sisteme pluviale<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a ajuns la 99,2% anul acesta, iar programarea economise\u0219te p\u00e2n\u0103 la patru ore de lucru pe zi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/piristeel\/\">Citi\u021bi m\u0103rturia Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, director general al Mamec, \u00een hala de produc\u021bie a companiei din Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000+<\/b><span> de ordine de fabrica\u021bie programate automat<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eAvem un alt nivel de control asupra produc\u021biei \u0219i ne \u00een\u021belegem capacitatea de produc\u021bie cu totul altfel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, director general<\/b><br>Mamec \u00b7 Mixere industriale, pompe \u0219i produc\u021bie sub contract de \u00eenalt\u0103 tehnologie<\/p>\n\n\n<p class=\"ind-cust__result\">Mii de ordine de fabrica\u021bie sunt programate automat, iar \u00eentreaga organiza\u021bie are o imagine \u00een timp real a produc\u021biei.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/mamec\/\">Citi\u021bi m\u0103rturia Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Business Central are un instrument de programare a produc\u021biei?<\/summary>\n<p class=\"sp-faq__a\">Da. Comenzile de produc\u021bie sunt programate \u00eenainte sau \u00eenapoi \u00een timp, pe baza calendarelor centrelor de lucru, iar Capacity Constrained Resources adaug\u0103 \u00eenc\u0103rcare cu capacitate finit\u0103 pentru locurile \u00eenguste selectate. Microsoft descrie rezultatul ca pe un program orientativ, nu ca pe un control detaliat al sec\u021biei de produc\u021bie.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>MRP din Business Central \u021bine cont de capacitate?<\/summary>\n<p class=\"sp-faq__a\">Nu. Calculate Regenerative Plan \u0219i Calculate Net Change Plan din Planning Worksheet genereaz\u0103 \u00eenregistr\u0103ri care presupun o capacitate infinit\u0103. Constr\u00e2ngerile de capacitate se aplic\u0103 doar la programarea comenzilor de produc\u021bie.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ce licen\u021b\u0103 Business Central include func\u021bionalit\u0103\u021bile de produc\u021bie?<\/summary>\n<p class=\"sp-faq__a\">Premium. Paginile \u0219i c\u00e2mpurile pentru produc\u021bie sunt disponibile doar \u00een experien\u021ba Premium, iar utilizatorii cu licen\u021b\u0103 Essentials nu se pot conecta la o companie care o folose\u0219te. Pre\u021bul de list\u0103 Microsoft pentru Premium este de $110 per utilizator pe lun\u0103, fa\u021b\u0103 de $80 pentru Essentials (pre\u021buri de list\u0103 pentru SUA, cu plat\u0103 anual\u0103).<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ce rol au Critical Load % \u0219i Dampener?<\/summary>\n<p class=\"sp-faq__a\">Critical Load % stabile\u0219te propor\u021bia maxim\u0103 din capacitatea unei resurse cu restric\u021bii pe care o poate aloca sistemul de programare; valoarea 90 las\u0103 o rezerv\u0103 de 10%. Dampener (% of Total Capacity) permite sistemului s\u0103 dep\u0103\u0219easc\u0103 u\u0219or aceast\u0103 limit\u0103 dac\u0103 astfel evit\u0103 divizarea unei opera\u021bii. Opera\u021biile care tot nu \u00eencap sunt \u00eemp\u0103r\u021bite \u00eentre cele mai apropiate intervale libere.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum se conecteaz\u0103 SkyPlanner APS la Business Central?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner se integreaz\u0103 bidirec\u021bional cu Business Central, iar echipa SkyPlanner configureaz\u0103 integrarea \u00een etapa de implementare. Comenzile, fluxurile tehnologice, centrele de lucru, articolele \u0219i comenzile de achizi\u021bie sunt preluate prin API v2.0 \u0219i prin paginile standard de produc\u021bie publicate ca servicii web OData v4, f\u0103r\u0103 a scrie cod. Datele calendaristice ale opera\u021biilor sunt trimise \u00eenapoi \u00een Prod. Order Routing Line prin pagina publicat\u0103, iar webhook-urile transmit modific\u0103rile programului pe m\u0103sur\u0103 ce apar. Orele \u00eenregistrate sunt trimise \u00eenapoi pentru raportarea produc\u021biei realizate, iar produc\u021bia realizat\u0103 \u0219i consumurile pot fi \u00eenregistrate automat, dac\u0103 dori\u021bi.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Business Central gestioneaz\u0103 timpii de reglaj care depind de succesiunea opera\u021biilor?<\/summary>\n<p class=\"sp-faq__a\">Nu. Setup Time este o valoare fix\u0103 pentru fiecare linie a fluxului tehnologic, calculat\u0103 o singur\u0103 dat\u0103 pentru fiecare comand\u0103 de produc\u021bie, indiferent de ce s-a prelucrat anterior pe utilaj. SkyPlanner APS folose\u0219te \u00een schimb o matrice a timpilor de reglaj. Aceasta stocheaz\u0103 timpii de schimbare de fabrica\u021bie pentru fiecare pereche de produse (de la albastru la ro\u0219u 30 de minute, de la ro\u0219u la albastru 60) \u0219i stabile\u0219te succesiunea opera\u021biilor astfel \u00eenc\u00e2t s\u0103 reduc\u0103 la minimum ace\u0219ti timpi.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Pot testa SkyPlanner \u00eenainte de a-l integra cu Business Central?<\/summary>\n<p class=\"sp-faq__a\">Da. Exporta\u021bi comenzile de produc\u021bie, fluxurile tehnologice \u0219i centrele de lucru din Business Central \u00een Excel, importa\u021bi-le \u00een SkyPlanner \u00een perioada de prob\u0103 de 30 de zile \u0219i compara\u021bi programul rezultat cu planul actual. Nu ave\u021bi nevoie de card bancar. Consulta\u021bi <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a>, <a href=\"\/ro\/proba\/\">\u00eencepe\u021bi perioada de prob\u0103<\/a> sau <a href=\"\/ro\/contact-vanzari\/\">discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ Microsoft Dynamics 365 Business Central Business Central ofer\u0103 programare cu capacitate finit\u0103? Capacity Constrained Resources fa\u021b\u0103 de SkyPlanner APS Microsoft Dynamics 365 Business Central aplic\u0103 programarea cu capacitate finit\u0103 doar centrelor de lucru \u0219i centrelor ma\u0219in\u0103 pe care le \u00eenregistra\u021bi \u00een Capacity Constrained Resources. Toate celelalte resurse, inclusiv \u00een MRP, sunt &#8230; <a title=\"Business Central ofer\u0103 programare cu capacitate finit\u0103? Capacity Constrained Resources fa\u021b\u0103 de SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/business-central\/cu-capacitate-finita\/\" aria-label=\"Read more about Business Central ofer\u0103 programare cu capacitate finit\u0103? Capacity Constrained Resources fa\u021b\u0103 de SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100726,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-100964","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Business Central ofer\u0103 programare cu capacitate finit\u0103?<\/title>\n<meta name=\"description\" content=\"Business Central: capacitate finit\u0103 doar pentru Capacity Constrained Resources, plan orientativ. Ce face, ce limite are \u0219i c\u00e2nd ave\u021bi nevoie de APS.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/business-central\/cu-capacitate-finita\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Business Central ofer\u0103 programare cu capacitate finit\u0103? Capacity Constrained Resources fa\u021b\u0103 de SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Business Central: capacitate finit\u0103 doar pentru Capacity Constrained Resources, plan orientativ. Ce face, ce limite are \u0219i c\u00e2nd ave\u021bi nevoie de APS.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/business-central\/cu-capacitate-finita\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"19 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/business-central\\\/cu-capacitate-finita\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/business-central\\\/cu-capacitate-finita\\\/\",\"name\":\"Business Central ofer\u0103 programare cu capacitate finit\u0103?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Business Central: capacitate finit\u0103 doar pentru Capacity Constrained Resources, plan orientativ. Ce face, ce limite are \u0219i c\u00e2nd ave\u021bi nevoie de APS.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/business-central\\\/cu-capacitate-finita\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/business-central\\\/cu-capacitate-finita\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/business-central\\\/cu-capacitate-finita\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru sistemul dumneavoastr\u0103 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru Business Central: programarea produc\u021biei cu capacitate finit\u0103\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/business-central\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Business Central ofer\u0103 programare cu capacitate finit\u0103? Capacity Constrained Resources fa\u021b\u0103 de SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Business Central ofer\u0103 programare cu capacitate finit\u0103?","description":"Business Central: capacitate finit\u0103 doar pentru Capacity Constrained Resources, plan orientativ. Ce face, ce limite are \u0219i c\u00e2nd ave\u021bi nevoie de APS.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/business-central\/cu-capacitate-finita\/","og_locale":"ro_RO","og_type":"article","og_title":"Business Central ofer\u0103 programare cu capacitate finit\u0103? Capacity Constrained Resources fa\u021b\u0103 de SkyPlanner APS","og_description":"Business Central: capacitate finit\u0103 doar pentru Capacity Constrained Resources, plan orientativ. Ce face, ce limite are \u0219i c\u00e2nd ave\u021bi nevoie de APS.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/business-central\/cu-capacitate-finita\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"19 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/business-central\/cu-capacitate-finita\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/business-central\/cu-capacitate-finita\/","name":"Business Central ofer\u0103 programare cu capacitate finit\u0103?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Business Central: capacitate finit\u0103 doar pentru Capacity Constrained Resources, plan orientativ. Ce face, ce limite are \u0219i c\u00e2nd ave\u021bi nevoie de APS.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/business-central\/cu-capacitate-finita\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/business-central\/cu-capacitate-finita\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/business-central\/cu-capacitate-finita\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru sistemul dumneavoastr\u0103 ERP","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru Business Central: programarea produc\u021biei cu capacitate finit\u0103","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/business-central\/"},{"@type":"ListItem","position":5,"name":"Business Central ofer\u0103 programare cu capacitate finit\u0103? Capacity Constrained Resources fa\u021b\u0103 de SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ Microsoft Dynamics 365 Business Central Business Central ofer\u0103 programare cu capacitate finit\u0103? Capacity Constrained Resources fa\u021b\u0103 de SkyPlanner APS Microsoft Dynamics 365 Business Central aplic\u0103 programarea cu capacitate finit\u0103 doar centrelor de lucru \u0219i centrelor ma\u0219in\u0103 pe care le \u00eenregistra\u021bi \u00een Capacity Constrained Resources. Toate celelalte resurse, inclusiv \u00een MRP, sunt&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/100964","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=100964"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/100964\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/100726"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=100964"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}