{"id":100905,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=100905"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"infor-cloudsuite-industrial","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/","title":{"rendered":"SkyPlanner APS pentru Infor CloudSuite Industrial (SyteLine): programarea produc\u021biei cu capacitate finit\u0103"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ Infor CloudSuite Industrial<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS pentru Infor CloudSuite Industrial (SyteLine): <span class=\"hl\">programarea produc\u021biei cu capacitate finit\u0103<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS le ofer\u0103 produc\u0103torilor care folosesc Infor CloudSuite Industrial (CSI, anterior SyteLine) un program cu capacitate finit\u0103, care \u021bine cont de fiecare centru de lucru, operator, scul\u0103 \u0219i material. Vede\u021bi unde \u0219i c\u00e2nd se execut\u0103 fiecare opera\u021bie, iar Autopilot reface automat programul c\u00e2nd apar schimb\u0103ri \u00een produc\u021bie.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner se integreaz\u0103 bidirec\u021bional cu CloudSuite Industrial: preia comenzile de produc\u021bie, opera\u021biile, articolele, resursele, stocurile \u0219i comenzile de achizi\u021bie \u0219i retrimite datele planificate ale opera\u021biilor \u0219i manopera \u00eenregistrat\u0103. \u00cen etapa de punere \u00een func\u021biune, echipa SkyPlanner adapteaz\u0103 integrarea la configura\u021bia dumneavoastr\u0103 CSI.<\/p>\n\n\n<p>Pre\u021bul porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, iar fiecare centru de lucru suplimentar cost\u0103 20 \u20ac pe lun\u0103. Perioada de testare gratuit\u0103 dureaz\u0103 30 de zile, cu p\u00e2n\u0103 la 20 de centre de lucru, f\u0103r\u0103 card de credit.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce se schimb\u0103 \u00een produc\u021bia dumneavoastr\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M4 18a8 8 0 1 1 16 0\"\/><path d=\"M12 18l4-5\"\/><circle cx=\"12\" cy=\"18\" r=\"1.2\" fill=\"currentColor\" stroke=\"none\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">F\u0103r\u0103 utilaje supra\u00eenc\u0103rcate \u00een program.<\/p>\n\n\n<p class=\"fx-pain__b\">Fiecare utilaj, persoan\u0103 \u0219i scul\u0103 are un program bazat pe capacitatea finit\u0103, care \u021bine cont de schimburile reale, absen\u021be \u0219i ore suplimentare. O matri\u021b\u0103 folosit\u0103 pe un utilaj nu este niciodat\u0103 alocat\u0103 simultan altuia, iar unei opera\u021bii care necesit\u0103 trei operatori i se aloc\u0103 trei persoane disponibile \u00een schimburile respective. C\u00e2nd un utilaj este ocupat, opera\u021bia este mutat\u0103 pe un alt utilaj sau alocat\u0103 altei persoane.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--green\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><circle cx=\"12\" cy=\"12\" r=\"8.5\"\/><path d=\"M12 7.5V12l3 2\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Termene de livrare pe care le pute\u021bi promite.<\/p>\n\n\n<p class=\"fx-pain__b\">Programul arat\u0103 c\u00e2nd se va finaliza cu adev\u0103rat fiecare comand\u0103. Le r\u0103spunde\u021bi clien\u021bilor pe baza planului, nu a presupunerilor.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--purple\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M3 12a9 9 0 0 1 15-6.7L21 8\"\/><path d=\"M21 3v5h-5\"\/><path d=\"M21 12a9 9 0 0 1-15 6.7L3 16\"\/><path d=\"M3 21v-5h5\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Reprogramare automat\u0103 la comenzi urgente \u0219i defec\u021biuni.<\/p>\n\n\n<p class=\"fx-pain__b\">C\u00e2nd un utilaj se opre\u0219te, apare o comand\u0103 urgent\u0103 sau o opera\u021bie se termin\u0103 mai devreme, Autopilot reface automat programul. Bloc\u0103rile \u0219i priorit\u0103\u021bile stabilite de dumneavoastr\u0103 sunt respectate.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--orange\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M4 9h13l-3.5-3.5M20 15H7l3.5 3.5\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Mai pu\u021bine schimb\u0103ri de fabrica\u021bie.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner \u0219tie c\u00e2t dureaz\u0103 trecerea unui utilaj de la un produs la altul, \u00een ambele sensuri. Trecerea de la albastru la ro\u0219u poate dura 30 de minute, iar de la ro\u0219u la albastru, 60. Programul ordoneaz\u0103 opera\u021biile astfel \u00eenc\u00e2t timpul pierdut cu reglajele s\u0103 fie minim.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M3 21V9l9-5 9 5v12\"\/><path d=\"M2 21h20\"\/><rect x=\"8\" y=\"13\" width=\"8\" height=\"8\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Un program care \u021bine cont de materiale.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner verific\u0103 stocurile \u0219i comenzile de achizi\u021bie \u00een a\u0219teptarea livr\u0103rii. O opera\u021bie care depinde de o livrare de la furnizor este programat\u0103 dup\u0103 data acelei livr\u0103ri, \u00een loc s\u0103 se blocheze \u00een sec\u021bia de produc\u021bie.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--green\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><circle cx=\"9\" cy=\"8\" r=\"3\"\/><path d=\"M3 20a6 6 0 0 1 12 0\"\/><path d=\"M16 6a3 3 0 0 1 0 6M21 20a6 6 0 0 0-4-5.7\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Operatorii \u00ee\u0219i v\u0103d lista de opera\u021bii.<\/p>\n\n\n<p class=\"fx-pain__b\">Fiecare operator vede opera\u021biile urm\u0103toare pe telefon sau tablet\u0103 \u0219i \u00ee\u0219i \u00eenregistreaz\u0103 activitatea pe m\u0103sur\u0103 ce lucreaz\u0103. Personalul de la birou urm\u0103re\u0219te progresul \u00een timp real, iar activitatea \u00eenregistrat\u0103 este transmis\u0103 \u00eenapoi \u00een CloudSuite Industrial sub form\u0103 de tranzac\u021bii aferente comenzilor de produc\u021bie.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een sec\u021bia de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/customers\/utu\/\">Citi\u021bi m\u0103rturia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui plan optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/customers\/laboratory-allied\/\">Citi\u021bi m\u0103rturia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, directorul general al Mamec, \u00een hala de produc\u021bie a companiei din Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1,000s<\/b><span>de comenzi de produc\u021bie programate automat<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eAvem un alt nivel de control asupra produc\u021biei, iar \u00een\u021belegerea capacit\u0103\u021bii noastre este la un cu totul alt nivel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, director general<\/b><br>Mamec \u00b7 Mixere industriale, pompe \u0219i produc\u021bie la comand\u0103 de \u00eenalt\u0103 tehnologie<\/p>\n\n\n<p class=\"ind-cust__result\">Mii de comenzi de produc\u021bie sunt programate automat, iar \u00eentreaga organiza\u021bie poate urm\u0103ri produc\u021bia \u00een timp real.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/customers\/mamec\/\">Citi\u021bi recenzia Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Un sudor KJH-Comp polizeaz\u0103 o structur\u0103 sudat\u0103 din o\u021bel la fabrica din Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>rata de respectare a termenelor de livrare, fa\u021b\u0103 de aproximativ 50% anterior<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner joac\u0103 un rol decisiv \u00een men\u021binerea ratei noastre de respectare a termenelor de livrare.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, director general<\/b><br>KJH-Comp \u00b7 Prelucr\u0103ri mecanice din tabl\u0103 \u0219i produc\u021bie la comand\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a crescut de la aproximativ 50% p\u00e2n\u0103 la 98%, iar programarea necesit\u0103 acum un singur supervizor \u00een loc de doi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/customers\/kjh-comp\/\">Citi\u021bi recenzia KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-skyplanner-works-with-cloudsuite-industrial\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum func\u021bioneaz\u0103 SkyPlanner \u00eempreun\u0103 cu CloudSuite Industrial<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-how ind-how\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fxv-how__step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"fxv-how__num\" aria-hidden=\"true\">1<\/div>\n\n\n<h3 class=\"wp-block-heading fxv-how__t\">CloudSuite Industrial transmite lucr\u0103rile de executat.<\/h3>\n\n\n<p class=\"fxv-how__b\">Comenzile de produc\u021bie, opera\u021biile, resursele, stocurile \u0219i comenzile de achizi\u021bie sunt transferate \u00een SkyPlanner.<\/p>\n\n\n<svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-how__step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"fxv-how__num\" aria-hidden=\"true\">2<\/div>\n\n\n<h3 class=\"wp-block-heading fxv-how__t\">SkyPlanner creeaz\u0103 programul \u0219i \u00eel men\u021bine la zi.<\/h3>\n\n\n<p class=\"fxv-how__b\">Motorul Arcturus programeaz\u0103 fiecare opera\u021bie \u00een c\u00e2teva secunde \u0219i reface programul pe m\u0103sur\u0103 ce apar schimb\u0103ri \u00een produc\u021bie.<\/p>\n\n\n<svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-how__step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"fxv-how__num\" aria-hidden=\"true\">3<\/div>\n\n\n<h3 class=\"wp-block-heading fxv-how__t\">Datele planificate \u0219i activitatea raportat\u0103 sunt trimise \u00eenapoi.<\/h3>\n\n\n<p class=\"fxv-how__b\">Datele planificate ale opera\u021biilor sunt retrimise c\u0103tre comenzile de produc\u021bie din CSI, iar manopera \u00eenregistrat\u0103 este transmis\u0103 sub form\u0103 de tranzac\u021bii aferente comenzilor, pe care CSI le \u00eenregistreaz\u0103.<\/p>\n\n\n<svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner ruleaz\u0103 \u00een cloud \u0219i se conecteaz\u0103 prin interfe\u021bele standard Infor, deci nu se instaleaz\u0103 niciun software SkyPlanner \u00een CSI. Fiecare fabric\u0103 folose\u0219te CSI diferit, a\u0219a c\u0103 echipa SkyPlanner adapteaz\u0103 integrarea la configura\u021bia dumneavoastr\u0103 \u00een etapa de punere \u00een func\u021biune \u0219i ofer\u0103 asisten\u021b\u0103 dup\u0103 lansare. Primi\u021bi \u00een avans o ofert\u0103 pentru integrare, \u00een func\u021bie de procesele \u0219i nevoile dumneavoastr\u0103. Partenerul dumneavoastr\u0103 Infor sau propriii dezvoltatori pot, de asemenea, s\u0103 realizeze integrarea folosind API-ul documentat al SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia API<\/a>).<\/p>\n\n\n<p>Detaliile tehnice se g\u0103sesc \u00een <a href=\"\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/ghid-de-integrare\/\">ghidul de integrare cu CloudSuite Industrial pentru programarea produc\u021biei<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-cloudsuite-industrial-s-own-scheduling-fal\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Limitele func\u021biilor de programare din CloudSuite Industrial<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>CloudSuite Industrial planific\u0103 folosind capacit\u0103\u021bi finite prin modulul APS licen\u021biat \u0219i stabile\u0219te succesiunea opera\u021biilor pe termen scurt prin Scheduler. Pentru situa\u021bia f\u0103r\u0103 licen\u021b\u0103, <a href=\"https:\/\/docs.infor.com\/csi\/9.01.x\/en-us\/csbiolh\/lsm1454144402967.html\">documenta\u021bia Infor<\/a> este clar\u0103: &#8220;If the APS module is unlicensed, APS Planning can only be run in Infinite mode.&#8221; (Dac\u0103 modulul APS nu este licen\u021biat, APS Planning poate rula doar \u00een modul Infinite.) Chiar \u0219i cu licen\u021b\u0103, produc\u021bia de zi cu zi arat\u0103 astfel:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Replanificarea depinde de interven\u021bia planificatorului.<\/strong> Dup\u0103 o avarie, programul r\u0103m\u00e2ne neschimbat p\u00e2n\u0103 c\u00e2nd cineva mut\u0103 opera\u021biile sau ruleaz\u0103 din nou Scheduler. O comand\u0103 urgent\u0103 prime\u0219te doar capacitatea r\u0103mas\u0103 liber\u0103.<\/li>\n\n\n<li><strong>Modific\u0103rile se fac pe r\u00e2nd, pentru fiecare opera\u021bie.<\/strong> Fiecare modificare din diagrama Gantt este verificat\u0103 separat, iar planificatorul ajusteaz\u0103 manual opera\u021biile urm\u0103toare.<\/li>\n\n\n<li><strong>Dou\u0103 motoare care trebuie men\u021binute sincronizate.<\/strong> APS planific\u0103 pe termen mai lung, iar Scheduler pentru ziua urm\u0103toare, astfel c\u0103 planificatorii trebuie s\u0103 \u0219tie ce rulare a stabilit fiecare dat\u0103.<\/li>\n\n<\/ul>\n\n\n<p>Fiecare nivel este explicat \u00een articolul <a href=\"\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/cu-capacitate-finita\/\">Infor CloudSuite Industrial ofer\u0103 programare cu capacitate finit\u0103?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"cloudsuite-industrial-alone-vs-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">CloudSuite Industrial f\u0103r\u0103 \u0219i cu SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Doar CloudSuite Industrial<\/th><th>CloudSuite Industrial cu SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Capacitate<\/td><td>Planificare APS cu capacitate finit\u0103 doar cu licen\u021ba APS<\/td><td>Capacitate real\u0103 \u0219i schimburi de lucru pentru fiecare utilaj, persoan\u0103 \u0219i scul\u0103<\/td><\/tr><tr><td>Program de produc\u021bie<\/td><td>Rul\u0103ri APS \u0219i o rulare zilnic\u0103 a Scheduler<\/td><td>Program detaliat pentru fiecare opera\u021bie, \u00een c\u00e2teva secunde<\/td><\/tr><tr><td>Schimb\u0103ri de fabrica\u021bie<\/td><td>Tabele cu timpi de reglaj pentru fiecare grup de resurse<\/td><td>Opera\u021bii ordonate pentru un timp total de reglaj minim, \u021bin\u00e2nd cont de durata schimb\u0103rilor de fabrica\u021bie \u00een ambele sensuri<\/td><\/tr><tr><td>Materiale<\/td><td>MRP planific\u0103 materialele f\u0103r\u0103 a \u021bine cont de capacitate<\/td><td>Opera\u021biile \u00eencep c\u00e2nd materialele sunt disponibile din stoc sau din livr\u0103rile primite<\/td><\/tr><tr><td>Modific\u0103ri<\/td><td>Planificatorul modific\u0103 diagrama Gantt sau ruleaz\u0103 din nou Scheduler<\/td><td>Autopilot replanific\u0103 \u00eentreaga fabric\u0103 respect\u00e2nd priorit\u0103\u021bile dumneavoastr\u0103<\/td><\/tr><tr><td>Sec\u021bia de produc\u021bie<\/td><td>Manopera \u0219i tranzac\u021biile aferente comenzilor de produc\u021bie sunt introduse \u00een CSI<\/td><td>Operatorii \u00ee\u0219i v\u0103d lista de opera\u021bii \u0219i \u00eenregistreaz\u0103 activitatea pe telefon sau tablet\u0103<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-cloudsuite-industr\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum alege\u021bi o solu\u021bie de programare pentru CloudSuite Industrial<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>APS \u0219i Scheduler din CloudSuite Industrial sunt potrivite pentru o fabric\u0103 ce are modulul APS licen\u021biat, fluxuri tehnologice corecte \u0219i pu\u021bine schimb\u0103ri \u00een sec\u021bia de produc\u021bie \u00eentre rul\u0103rile Scheduler.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Alege\u021bi SkyPlanner dac\u0103 planificatorii \u00ee\u0219i petrec dimine\u021bile mut\u00e2nd opera\u021bii \u00een Resource Gantt.<\/strong> Autopilot replanific\u0103, iar Running Time Lock p\u0103streaz\u0103 pozi\u021bia opera\u021biilor \u00eencepute.<\/li>\n\n\n<li><strong>Alege\u021bi SkyPlanner dac\u0103 schimb\u0103rile de fabrica\u021bie determin\u0103 volumul produc\u021biei.<\/strong> SkyPlanner ordoneaz\u0103 opera\u021biile pentru un timp total de reglaj minim.<\/li>\n\n\n<li><strong>Alege\u021bi SkyPlanner dac\u0103 sculele \u0219i echipele folosite \u00een comun determin\u0103 ce opera\u021bii pot fi executate \u00een continuare.<\/strong><\/li>\n\n\n<li><strong>Alege\u021bi SkyPlanner dac\u0103 sosirea materialelor determin\u0103 ce opera\u021bie poate \u00eencepe.<\/strong><\/li>\n\n\n<li><strong>Alege\u021bi SkyPlanner dac\u0103 dori\u021bi programare cu capacitate finit\u0103 f\u0103r\u0103 s\u0103 licen\u021bia\u021bi \u0219i s\u0103 ajusta\u021bi modulul APS.<\/strong><\/li>\n\n\n<li><strong>Alege\u021bi SkyPlanner dac\u0103 dori\u021bi programare \u0219i raportare din sec\u021bia de produc\u021bie \u00eentr-o singur\u0103 aplica\u021bie.<\/strong><\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cum \u00eencepe\u021bi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u00cencepe\u021bi perioada de prob\u0103 gratuit\u0103.<\/strong> 30 de zile, p\u00e2n\u0103 la 20 de centre de lucru, toate func\u021biile Basic, f\u0103r\u0103 card de credit.<\/li>\n\n\n<li><strong>Modela\u021bi produc\u021bia.<\/strong> Crea\u021bi centre de lucru pe baza resurselor \u0219i grupurilor de resurse din CSI, apoi ad\u0103uga\u021bi schimburi, scule \u0219i timpi de schimbare de fabrica\u021bie. Pute\u021bi beneficia de asisten\u021b\u0103 la punerea \u00een func\u021biune.<\/li>\n\n\n<li><strong>\u00cenc\u0103rca\u021bi comenzile de produc\u021bie.<\/strong> Exporta\u021bi comenzile \u0219i opera\u021biile deschise din CSI cu Save to Excel, importa\u021bi-le \u0219i compara\u021bi programul SkyPlanner cu planul dumneavoastr\u0103 actual.<\/li>\n\n\n<li><strong>Conecta\u021bi CloudSuite Industrial.<\/strong> Echipa SkyPlanner configureaz\u0103 integrarea bidirec\u021bional\u0103 \u0219i ofer\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een func\u021biune.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u021buri.<\/strong> Abonamentele se factureaz\u0103 lunar, \u00een func\u021bie de num\u0103rul de centre de lucru. Pute\u021bi ad\u0103uga sau elimina centre de lucru ori pute\u021bi anula abonamentul \u00een orice moment. Consulta\u021bi pagina de <a href=\"\/ro\/preturi\/\">pre\u021buri<\/a> pentru detalii.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi proba gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Infor CloudSuite Industrial ofer\u0103 programare cu capacitate finit\u0103?<\/summary>\n<p class=\"sp-faq__a\">Da, prin dou\u0103 componente. Planificarea cu capacitate finit\u0103 \u00een APS Planning necesit\u0103 licen\u021ba APS, iar Scheduler stabile\u0219te succesiunea opera\u021biilor pe termen scurt, pe care planificatorii le ajusteaz\u0103 \u00eentr-o diagram\u0103 Gantt. SkyPlanner APS adaug\u0103 replanificarea automat\u0103 pentru toate resursele \u0219i reune\u0219te schimb\u0103rile de fabrica\u021bie, sculele, echipele \u0219i materialele \u00eentr-un singur program.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Trebuie s\u0103 instal\u0103m ceva \u00een CloudSuite Industrial?<\/summary>\n<p class=\"sp-faq__a\">Nu. SkyPlanner ruleaz\u0103 \u00een cloud, separat de CSI, \u0219i se conecteaz\u0103 prin interfe\u021bele standard Infor IDO REST API \u0219i ION. SyteLine instalat local se conecteaz\u0103 prin acela\u0219i strat IDO.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner \u00eenlocuie\u0219te func\u021biile de produc\u021bie din CloudSuite Industrial?<\/summary>\n<p class=\"sp-faq__a\">Nu, le completeaz\u0103. CSI gestioneaz\u0103 \u00een continuare articolele, listele de materiale, MRP, achizi\u021biile, stocurile, calculul costurilor \u0219i finan\u021bele. SkyPlanner programeaz\u0103 comenzile ferme \u0219i lansate \u00een produc\u021bie \u00een func\u021bie de capacitatea real\u0103 \u0219i retrimite datele \u0219i manopera.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>C\u00e2t cost\u0103 SkyPlanner pentru o fabric\u0103 ce folose\u0219te CloudSuite Industrial?<\/summary>\n<p class=\"sp-faq__a\">De la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse, plus 20 \u20ac pe lun\u0103 pentru fiecare centru de lucru suplimentar. Un centru de lucru este o resurs\u0103 de produc\u021bie cu propria list\u0103 de opera\u021bii programate. Pre\u021bul nu depinde de abonamentul Infor sau de licen\u021ba APS. Primi\u021bi \u00een avans oferta pentru integrare, adaptat\u0103 proceselor \u0219i nevoilor dumneavoastr\u0103, \u00eempreun\u0103 cu oferta pentru abonament, astfel \u00eenc\u00e2t s\u0103 cunoa\u0219te\u021bi costul total \u00eenainte de a \u00eencepe.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>C\u00e2t dureaz\u0103 implementarea?<\/summary>\n<p class=\"sp-faq__a\">De regul\u0103, implementarea se finalizeaz\u0103 \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea procesului de punere \u00een func\u021biune. Echipa stabile\u0219te coresponden\u021bele pentru resursele \u0219i fluxurile tehnologice, conecteaz\u0103 comenzile de produc\u021bie \u0219i de achizi\u021bie \u0219i configureaz\u0103 retrimiterea datelor planificate \u0219i a manoperei. Totul este testat prin compara\u021bie cu planul dumneavoastr\u0103 actual \u00eenainte de lansare.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de integrarea cu CloudSuite Industrial?<\/summary>\n<p class=\"sp-faq__a\">Da. Perioada de prob\u0103 de 30 de zile folose\u0219te un export Excel din CSI. Vede\u021bi un <a href=\"\/ro\/resurse\/capacitate-finita\/\">program cu capacitate finit\u0103<\/a> pentru propriile comenzi \u0219i resurse \u00eenainte de \u00eenceperea oric\u0103ror lucr\u0103ri de integrare.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Avem nevoie de licen\u021ba APS din CSI pentru a folosi SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Nu. SkyPlanner realizeaz\u0103 independent programarea cu capacitate finit\u0103, pe baza comenzilor de produc\u021bie, opera\u021biilor \u0219i resurselor din CSI. MRP sau Infinite APS pot continua s\u0103 planifice materialele \u00een CSI.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ Infor CloudSuite Industrial SkyPlanner APS pentru Infor CloudSuite Industrial (SyteLine): programarea produc\u021biei cu capacitate finit\u0103 SkyPlanner APS le ofer\u0103 produc\u0103torilor care folosesc Infor CloudSuite Industrial (CSI, anterior SyteLine) un program cu capacitate finit\u0103, care \u021bine cont de fiecare centru de lucru, operator, scul\u0103 \u0219i material. Vede\u021bi unde \u0219i c\u00e2nd se execut\u0103 &#8230; <a title=\"SkyPlanner APS pentru Infor CloudSuite Industrial (SyteLine): programarea produc\u021biei cu capacitate finit\u0103\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/\" aria-label=\"Read more about SkyPlanner APS pentru Infor CloudSuite Industrial (SyteLine): programarea produc\u021biei cu capacitate finit\u0103\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100697,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-100905","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>CloudSuite Industrial: programarea produc\u021biei | SkyPlanner APS<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS programeaz\u0103 opera\u021bii Infor CloudSuite Industrial (SyteLine) la capacitate finit\u0103 \u0219i returneaz\u0103 datele \u0219i manopera. De la 199 \u20ac\/lun\u0103.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS pentru Infor CloudSuite Industrial (SyteLine): programarea produc\u021biei cu capacitate finit\u0103\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS programeaz\u0103 opera\u021bii Infor CloudSuite Industrial (SyteLine) la capacitate finit\u0103 \u0219i returneaz\u0103 datele \u0219i manopera. De la 199 \u20ac\/lun\u0103.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/infor-cloudsuite-industrial\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/infor-cloudsuite-industrial\\\/\",\"name\":\"CloudSuite Industrial: programarea produc\u021biei | SkyPlanner APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"SkyPlanner APS programeaz\u0103 opera\u021bii Infor CloudSuite Industrial (SyteLine) la capacitate finit\u0103 \u0219i returneaz\u0103 datele \u0219i manopera. De la 199 \u20ac\\\/lun\u0103.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/infor-cloudsuite-industrial\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/infor-cloudsuite-industrial\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/infor-cloudsuite-industrial\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru Infor CloudSuite Industrial (SyteLine): programarea produc\u021biei cu capacitate finit\u0103\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"CloudSuite Industrial: programarea produc\u021biei | SkyPlanner APS","description":"SkyPlanner APS programeaz\u0103 opera\u021bii Infor CloudSuite Industrial (SyteLine) la capacitate finit\u0103 \u0219i returneaz\u0103 datele \u0219i manopera. De la 199 \u20ac\/lun\u0103.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/","og_locale":"ro_RO","og_type":"article","og_title":"SkyPlanner APS pentru Infor CloudSuite Industrial (SyteLine): programarea produc\u021biei cu capacitate finit\u0103","og_description":"SkyPlanner APS programeaz\u0103 opera\u021bii Infor CloudSuite Industrial (SyteLine) la capacitate finit\u0103 \u0219i returneaz\u0103 datele \u0219i manopera. De la 199 \u20ac\/lun\u0103.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/","name":"CloudSuite Industrial: programarea produc\u021biei | SkyPlanner APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"SkyPlanner APS programeaz\u0103 opera\u021bii Infor CloudSuite Industrial (SyteLine) la capacitate finit\u0103 \u0219i returneaz\u0103 datele \u0219i manopera. De la 199 \u20ac\/lun\u0103.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/infor-cloudsuite-industrial\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru Infor CloudSuite Industrial (SyteLine): programarea produc\u021biei cu capacitate finit\u0103"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ Infor CloudSuite Industrial SkyPlanner APS pentru Infor CloudSuite Industrial (SyteLine): programarea produc\u021biei cu capacitate finit\u0103 SkyPlanner APS le ofer\u0103 produc\u0103torilor care folosesc Infor CloudSuite Industrial (CSI, anterior SyteLine) un program cu capacitate finit\u0103, care \u021bine cont de fiecare centru de lucru, operator, scul\u0103 \u0219i material. Vede\u021bi unde \u0219i c\u00e2nd se execut\u0103&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/100905","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=100905"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/100905\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/100697"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=100905"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}