{"id":74486,"date":"2025-03-17T05:45:49","date_gmt":"2025-03-17T05:45:49","guid":{"rendered":"https:\/\/skyplanner.ai\/docs\/utilizarea-importului-csv\/"},"modified":"2025-10-07T12:11:11","modified_gmt":"2025-10-07T12:11:11","password":"","slug":"utilizarea-importului-csv","status":"publish","type":"docs","link":"https:\/\/skyplanner.ai\/ro\/docs\/utilizarea-importului-csv\/","title":{"rendered":"Utilizarea importului CSV"},"content":{"rendered":"\n<p>Importul datelor dvs. \u00een SkyPlanner este simplu cu ajutorul func\u021biei noastre de <strong>import CSV<\/strong><strong>.<\/strong> Fie c\u0103 testa\u021bi platforma sau configura\u021bi opera\u021biuni reale, pute\u021bi \u00eenc\u0103rca rapid datele existente \u0219i pute\u021bi \u00eencepe imediat planificarea.<\/p>\n\n<p>\u00cen acest ghid, v\u0103 vom ar\u0103ta cum s\u0103 utiliza\u021bi <strong>importul CSV<\/strong> pas cu pas. \u0218i dac\u0103 ave\u021bi nevoie de integr\u0103ri mai profunde, v\u0103 acoperim &#8211; <strong>SkyPlanner<\/strong> se conecteaz\u0103 perfect cu ERP, MES \u0219i alte sisteme, iar echipa noastr\u0103 ofer\u0103 servicii de integrare pentru a v\u0103 ajuta cu configura\u021bii mai complexe. <\/p>\n\n<p>Trimite\u021bi un mesaj la support@skyplanner.ai pentru a afla mai multe.<\/p>\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe title=\"Using the CSV import tool in SkyPlanner\" width=\"1200\" height=\"675\" src=\"https:\/\/www.youtube.com\/embed\/rxVGi7WMGE8?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Importul datelor dvs. \u00een SkyPlanner este simplu cu ajutorul func\u021biei noastre de import CSV. Fie c\u0103 testa\u021bi platforma sau configura\u021bi opera\u021biuni reale, pute\u021bi \u00eenc\u0103rca rapid datele existente \u0219i pute\u021bi \u00eencepe imediat planificarea. \u00cen acest ghid, v\u0103 vom ar\u0103ta cum s\u0103 utiliza\u021bi importul CSV pas cu pas. \u0218i dac\u0103 ave\u021bi nevoie de integr\u0103ri mai profunde, v\u0103 &#8230; <a title=\"Utilizarea importului CSV\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/docs\/utilizarea-importului-csv\/\" aria-label=\"Read more about Utilizarea importului CSV\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"doc_category":[1562,2370],"doc_tag":[],"class_list":["post-74486","docs","type-docs","status-publish","hentry","doc_category-ghiduri-video","doc_category-import-de-date"],"acf":[],"year_month":"2026-11","word_count":115,"total_views":"198","reactions":{"happy":"0","normal":"0","sad":"0"},"author_info":{"name":"SkyPlanner","author_nicename":"bettina","author_url":"https:\/\/skyplanner.ai\/ro\/author\/bettina\/"},"doc_category_info":[{"term_name":"Ghiduri video","term_url":"https:\/\/skyplanner.ai\/ro\/docs-category\/ghiduri-video\/"},{"term_name":"Import de date","term_url":"https:\/\/skyplanner.ai\/ro\/docs-category\/import-de-date\/"}],"doc_tag_info":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Utilizarea importului CSV &#8211; SkyPlanner<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/docs\/utilizarea-importului-csv\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Utilizarea importului CSV\" \/>\n<meta property=\"og:description\" content=\"Importul datelor dvs. \u00een SkyPlanner este simplu cu ajutorul func\u021biei noastre de import CSV. Fie c\u0103 testa\u021bi platforma sau configura\u021bi opera\u021biuni reale, pute\u021bi \u00eenc\u0103rca rapid datele existente \u0219i pute\u021bi \u00eencepe imediat planificarea. \u00cen acest ghid, v\u0103 vom ar\u0103ta cum s\u0103 utiliza\u021bi importul CSV pas cu pas. \u0218i dac\u0103 ave\u021bi nevoie de integr\u0103ri mai profunde, v\u0103 ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/docs\/utilizarea-importului-csv\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-07T12:11:11+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/docs\\\/utilizarea-importului-csv\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/docs\\\/utilizarea-importului-csv\\\/\",\"name\":\"Utilizarea importului CSV &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2025-03-17T05:45:49+00:00\",\"dateModified\":\"2025-10-07T12:11:11+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/docs\\\/utilizarea-importului-csv\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/docs\\\/utilizarea-importului-csv\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/docs\\\/utilizarea-importului-csv\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Docs\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/docs\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Utilizarea importului CSV\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Utilizarea importului CSV &#8211; SkyPlanner","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/docs\/utilizarea-importului-csv\/","og_locale":"ro_RO","og_type":"article","og_title":"Utilizarea importului CSV","og_description":"Importul datelor dvs. \u00een SkyPlanner este simplu cu ajutorul func\u021biei noastre de import CSV. Fie c\u0103 testa\u021bi platforma sau configura\u021bi opera\u021biuni reale, pute\u021bi \u00eenc\u0103rca rapid datele existente \u0219i pute\u021bi \u00eencepe imediat planificarea. \u00cen acest ghid, v\u0103 vom ar\u0103ta cum s\u0103 utiliza\u021bi importul CSV pas cu pas. \u0218i dac\u0103 ave\u021bi nevoie de integr\u0103ri mai profunde, v\u0103 ... Read more","og_url":"https:\/\/skyplanner.ai\/ro\/docs\/utilizarea-importului-csv\/","og_site_name":"SkyPlanner","article_modified_time":"2025-10-07T12:11:11+00:00","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/docs\/utilizarea-importului-csv\/","url":"https:\/\/skyplanner.ai\/ro\/docs\/utilizarea-importului-csv\/","name":"Utilizarea importului CSV &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2025-03-17T05:45:49+00:00","dateModified":"2025-10-07T12:11:11+00:00","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/docs\/utilizarea-importului-csv\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/docs\/utilizarea-importului-csv\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/docs\/utilizarea-importului-csv\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Docs","item":"https:\/\/skyplanner.ai\/ro\/docs\/"},{"@type":"ListItem","position":3,"name":"Utilizarea importului CSV"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/ro\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Importul datelor dvs. \u00een SkyPlanner este simplu cu ajutorul func\u021biei noastre de import CSV. Fie c\u0103 testa\u021bi platforma sau configura\u021bi opera\u021biuni reale, pute\u021bi \u00eenc\u0103rca rapid datele existente \u0219i pute\u021bi \u00eencepe imediat planificarea. \u00cen acest ghid, v\u0103 vom ar\u0103ta cum s\u0103 utiliza\u021bi importul CSV pas cu pas. \u0218i dac\u0103 ave\u021bi nevoie de integr\u0103ri mai profunde, v\u0103&hellip;","knowledge_base_info":[],"knowledge_base_slug":[],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/docs\/74486","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/docs"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=74486"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/docs\/74486\/revisions"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=74486"}],"wp:term":[{"taxonomy":"doc_category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/doc_category?post=74486"},{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/doc_tag?post=74486"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}