{"id":99672,"date":"2026-10-16T05:16:05","date_gmt":"2026-10-16T05:16:05","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99672"},"modified":"2026-10-16T05:17:08","modified_gmt":"2026-10-16T05:17:08","slug":"configuracao-por-encomenda","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/configuracao-por-encomenda\/","title":{"rendered":"Configura\u00e7\u00e3o por encomenda: da escolha do cliente \u00e0 entrega"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Configura\u00e7\u00e3o por encomenda: da escolha do cliente \u00e0 entrega<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/pt-pt\/\">In\u00edcio<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos\/\">Recursos<\/a> &raquo; Configura\u00e7\u00e3o por encomenda: da escolha do cliente \u00e0 entrega<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tempo de leitura estimado: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> minutos<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>A configura\u00e7\u00e3o por encomenda (CTO) consiste em fabricar um produto de acordo com as escolhas do cliente, a partir de op\u00e7\u00f5es predefinidas e compat\u00edveis entre si. O cliente obt\u00e9m uma combina\u00e7\u00e3o adequada \u00e0s suas necessidades; o fabricante reutiliza projetos e regras de produto j\u00e1 estabelecidos, em vez de desenvolver cada encomenda de raiz.<\/p>\n\n\n<p>A vantagem est\u00e1 em oferecer escolha sem voltar a pagar pelas mesmas decis\u00f5es de projeto. Mas uma combina\u00e7\u00e3o aprovada continua a precisar dos materiais certos, das opera\u00e7\u00f5es de fabrico necess\u00e1rias e de tempo na produ\u00e7\u00e3o. O facto de um produto poder ser vendido n\u00e3o significa que esteja automaticamente dispon\u00edvel para entrega na pr\u00f3xima sexta-feira.<\/p>\n\n\n<p>O SkyPlanner APS ajuda a gerir este segundo desafio. A sua IA de programa\u00e7\u00e3o da produ\u00e7\u00e3o, Arcturus, calcula quando \u00e9 poss\u00edvel executar o trabalho necess\u00e1rio em conjunto com as restantes encomendas. Pode ver o resultado num diagrama de Gantt e definir as prioridades, em vez de refazer a fila de trabalho de cada centro sempre que muda a combina\u00e7\u00e3o de produtos.<\/p>\n\n\n<h2 class=\"wp-block-heading\">O que caracteriza um produto configurado por encomenda?<\/h2>\n\n\n<p>O CTO come\u00e7a antes de o cliente fazer a encomenda. A engenharia define os elementos que comp\u00f5em o produto, as op\u00e7\u00f5es permitidas e as regras que garantem a sua compatibilidade. A equipa comercial faz depois a sele\u00e7\u00e3o dentro desse conjunto aprovado.<\/p>\n\n\n<p>Imagine um fabricante de transportadores modulares. Os clientes escolhem uma largura e um comprimento normalizados, o tipo de tapete, o material da estrutura, o acionamento e o conjunto de sensores. As regras definem os acionamentos adequados a cada carga e velocidade, os tapetes indicados para cada aplica\u00e7\u00e3o e as configura\u00e7\u00f5es de sensores dispon\u00edveis. Uma sele\u00e7\u00e3o v\u00e1lida corresponde a uma solu\u00e7\u00e3o j\u00e1 estabelecida, n\u00e3o a uma quest\u00e3o de engenharia ainda por resolver.<\/p>\n\n\n<p>Estas escolhas podem, ainda assim, gerar um volume consider\u00e1vel de trabalho de fabrico. Uma estrutura em a\u00e7o inoxid\u00e1vel pode ter de ser fabricada e polida antes da montagem do transportador. O CTO n\u00e3o significa que todas as pe\u00e7as j\u00e1 estejam em stock, nem que a encomenda exija apenas a montagem final.<\/p>\n\n\n<p>O limite \u00e9 o conjunto de solu\u00e7\u00f5es de projeto aprovadas. Se o cliente pedir uma carga ou uma inclina\u00e7\u00e3o fora desses limites, a engenharia tem de avaliar o pedido. Pode propor uma alternativa normalizada ou tratar a exce\u00e7\u00e3o como trabalho de engenharia, em vez de a fazer passar pelo processo de configura\u00e7\u00e3o sem a devida an\u00e1lise.<\/p>\n\n\n<h3 class=\"wp-block-heading\">CTO, ETO, MTO e ATO descrevem aspetos diferentes<\/h3>\n\n\n<p>Estes termos ajudam a caracterizar uma encomenda, mas nem sempre se excluem mutuamente:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Configura\u00e7\u00e3o por encomenda:<\/strong> O que pode o cliente escolher? O produto \u00e9 definido a partir de op\u00e7\u00f5es predefinidas e compat\u00edveis entre si.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/engineer-to-order\/\">Conce\u00e7\u00e3o e fabrico por encomenda (ETO)<\/a>:<\/strong> O pedido exige novo trabalho de engenharia? \u00c9 necess\u00e1rio desenvolver uma solu\u00e7\u00e3o espec\u00edfica para o cliente, que tamb\u00e9m pode recorrer a pe\u00e7as normalizadas.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/producao-por-encomenda\/\">Produ\u00e7\u00e3o por encomenda (MTO)<\/a>:<\/strong> O que desencadeia o fabrico? A produ\u00e7\u00e3o come\u00e7a ap\u00f3s a encomenda do cliente e pode recorrer a um projeto j\u00e1 estabelecido.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/montagem-por-encomenda\/\">Montagem por encomenda (ATO)<\/a>:<\/strong> O que \u00e9 preparado antecipadamente? Os componentes ou subconjuntos ficam prontos antes da encomenda; o produto final escolhido \u00e9 montado depois.<\/li><\/ul>\n\n\n<p>O transportador pode ser configurado por encomenda e depois fabricado por encomenda. Outra fam\u00edlia de produtos pode seguir o mesmo princ\u00edpio de configura\u00e7\u00e3o, mas montar por encomenda m\u00f3dulos mantidos em stock. A configura\u00e7\u00e3o descreve a escolha; a estrat\u00e9gia de produ\u00e7\u00e3o determina o trabalho que falta fazer depois dessa escolha.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Quando compensa a configura\u00e7\u00e3o por encomenda?<\/h2>\n\n\n<p>O CTO \u00e9 particularmente adequado quando os clientes precisam de op\u00e7\u00f5es variadas que respondam \u00e0s suas necessidades, mas grande parte do trabalho de engenharia se repete. As melhores candidatas s\u00e3o fam\u00edlias de produtos em que um conjunto ger\u00edvel de m\u00f3dulos e regras consegue dar resposta a uma parte significativa da procura.<\/p>\n\n\n<p>Analise as encomendas recentes. Que diferen\u00e7as criam realmente valor para o cliente? Quais fazem regressar sempre as mesmas perguntas \u00e0 engenharia? As escolhas recorrentes de dimens\u00f5es, material, desempenho ou acess\u00f3rios podem ser normalizadas, desde que seja poss\u00edvel validar antecipadamente as suas combina\u00e7\u00f5es.<\/p>\n\n\n<p>Os ganhos resultam da elimina\u00e7\u00e3o de trabalho repetido. A equipa comercial pode propor combina\u00e7\u00f5es aprovadas com menos trocas de informa\u00e7\u00e3o. A engenharia pode dedicar mais tempo a novas solu\u00e7\u00f5es e a verdadeiras exce\u00e7\u00f5es. As compras e a produ\u00e7\u00e3o passam a receber requisitos mais consistentes entre encomendas. Assim, \u00e9 poss\u00edvel oferecer uma gama mais ampla sem tratar cada venda como um novo projeto de desenvolvimento.<\/p>\n\n\n<p>Estes ganhos exigem investimento. \u00c9 preciso conceber os m\u00f3dulos, manter as regras de compatibilidade e atualizar a informa\u00e7\u00e3o de produ\u00e7\u00e3o quando as pe\u00e7as ou os projetos mudam. Uma op\u00e7\u00e3o que raramente se vende, mas exige uma cadeia de abastecimento espec\u00edfica e uma rota de produ\u00e7\u00e3o pr\u00f3pria, pode custar mais do que rende. Mais escolha n\u00e3o significa necessariamente uma oferta melhor.<\/p>\n\n\n<p>Comece por uma fam\u00edlia de produtos em que a repeti\u00e7\u00e3o seja clara. Defina as op\u00e7\u00f5es dispon\u00edveis e o procedimento para as exce\u00e7\u00f5es; depois, confirme que as equipas comercial, de engenharia e de produ\u00e7\u00e3o interpretam a mesma sele\u00e7\u00e3o da mesma forma. Normalize aquilo que os clientes compram repetidamente, n\u00e3o todos os pedidos especiais que alguma vez recebeu.<\/p>\n\n\n<p>O CTO \u00e9 menos interessante quando a maioria das encomendas exige trabalho de conce\u00e7\u00e3o verdadeiramente novo ou quando os clientes n\u00e3o aceitam esperar pelo fabrico que ainda falta realizar. Para produtos muito procurados e necess\u00e1rios de imediato, pode ser prefer\u00edvel fornecer a partir de stock de produto acabado. Fam\u00edlias diferentes podem seguir abordagens diferentes sem comprometer a coer\u00eancia da estrat\u00e9gia global da f\u00e1brica.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Transforme as op\u00e7\u00f5es escolhidas numa encomenda pronta para produ\u00e7\u00e3o<\/h2>\n\n\n<p>Uma configura\u00e7\u00e3o deve indicar \u00e0 produ\u00e7\u00e3o o que fabricar, sem obrigar o planeador a reconstruir essa informa\u00e7\u00e3o a partir de uma proposta comercial. A informa\u00e7\u00e3o transmitida deve incluir a especifica\u00e7\u00e3o escolhida e as respetivas necessidades de materiais, sequ\u00eancia de opera\u00e7\u00f5es, dura\u00e7\u00f5es e recursos aptos a executar o trabalho.<\/p>\n\n\n<p>Um configurador de produto valida as escolhas. O software de configura\u00e7\u00e3o, c\u00e1lculo de pre\u00e7os e elabora\u00e7\u00e3o de propostas (CPQ) tamb\u00e9m pode apoiar a defini\u00e7\u00e3o de pre\u00e7os e a prepara\u00e7\u00e3o de propostas comerciais. O ERP pode registar a encomenda aceite e os dados de produ\u00e7\u00e3o. A programa\u00e7\u00e3o detalhada distribui depois o trabalho necess\u00e1rio pelo tempo dispon\u00edvel. S\u00e3o tarefas interligadas: validar uma combina\u00e7\u00e3o n\u00e3o reserva, por si s\u00f3, capacidade de fabrico.<\/p>\n\n\n<p>No exemplo hipot\u00e9tico do fabricante de transportadores, o impacto no planeamento poderia ser o seguinte:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Escolha do cliente<\/th><th>Impacto no trabalho ou no aprovisionamento<\/th><th>O que a programa\u00e7\u00e3o precisa de considerar<\/th><\/tr><\/thead><tbody><tr><td>Estrutura em a\u00e7o inoxid\u00e1vel<\/td><td>Material diferente, fabrico e polimento<\/td><td>Disponibilidade do material correto e opera\u00e7\u00f5es necess\u00e1rias<\/td><\/tr><tr><td>Estrutura em a\u00e7o revestido<\/td><td>Fabrico seguido do processo de revestimento aprovado<\/td><td>Tempos de processamento, prepara\u00e7\u00e3o e eventuais esperas necess\u00e1rias<\/td><\/tr><tr><td>Acionamento de maior dimens\u00e3o aprovado<\/td><td>Componente comprado diferente e requisitos de montagem espec\u00edficos<\/td><td>Disponibilidade do componente e dura\u00e7\u00f5es adequadas das opera\u00e7\u00f5es<\/td><\/tr><tr><td>Conjunto opcional de sensores<\/td><td>Trabalho adicional de instala\u00e7\u00e3o e verifica\u00e7\u00e3o<\/td><td>Trabalho e recursos adicionais necess\u00e1rios antes da conclus\u00e3o<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Reflita na encomenda as consequ\u00eancias de cada op\u00e7\u00e3o. Alterar a descri\u00e7\u00e3o sem ajustar a rota de produ\u00e7\u00e3o predefinida deixa por registar o trabalho que acabou de vender.<\/p>\n\n\n<p>Mantenha a configura\u00e7\u00e3o escolhida identific\u00e1vel na liberta\u00e7\u00e3o para produ\u00e7\u00e3o e nas altera\u00e7\u00f5es posteriores. Defina quem atualiza as necessidades de materiais e de trabalho se o cliente alterar uma op\u00e7\u00e3o. Uma mudan\u00e7a de tapete ou de estrutura pode afetar as pe\u00e7as compradas, o trabalho j\u00e1 iniciado e a data de conclus\u00e3o. Trate-a como uma altera\u00e7\u00e3o \u00e0 encomenda que exige avalia\u00e7\u00e3o, n\u00e3o apenas como uma nova linha na proposta comercial.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Programe a variante, n\u00e3o um produto m\u00e9dio<\/h2>\n\n\n<p>Voltemos ao fabricante de transportadores. A equipa comercial recebe v\u00e1rias encomendas da vers\u00e3o em a\u00e7o inoxid\u00e1vel. A quantidade de transportadores \u00e9 a habitual, mas agora h\u00e1 mais unidades a precisar de polimento. O lead time padr\u00e3o da f\u00e1brica n\u00e3o mudou; o que mudou foi a carga de trabalho do recurso de polimento.<\/p>\n\n\n<p>Se o planeador programar cada transportador como uma unidade m\u00e9dia, essas opera\u00e7\u00f5es adicionais podem passar despercebidas at\u00e9 a produ\u00e7\u00e3o chegar a essa fase. O fabrico pode terminar rapidamente, mas as estruturas ficam \u00e0 espera de polimento. Come\u00e7ar a fabricar mais estruturas n\u00e3o aumenta a capacidade de polimento.<\/p>\n\n\n<p>A pergunta \u00fatil para avaliar a entrega \u00e9, portanto: quando pode terminar o trabalho efetivamente necess\u00e1rio para esta encomenda, tendo em conta os materiais e a <a href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/capacidade-finita\/\">capacidade j\u00e1 comprometida com outros clientes<\/a>?<\/p>\n\n\n<p>O SkyPlanner integra esse trabalho num plano de produ\u00e7\u00e3o que interliga todas as opera\u00e7\u00f5es. \u00c9 o utilizador que define as etapas do processo, as dura\u00e7\u00f5es, os centros de trabalho, os turnos e os requisitos de recursos. Os produtos reutiliz\u00e1veis podem ter rotas de produ\u00e7\u00e3o j\u00e1 estabelecidas, e as linhas de encomenda representam o trabalho a programar. A encomenda configurada tem de chegar ao planeamento com as opera\u00e7\u00f5es e os materiais correspondentes \u00e0 variante escolhida.<\/p>\n\n\n<p>O Arcturus calcula a sequ\u00eancia de trabalho das v\u00e1rias encomendas com base na capacidade, nas depend\u00eancias e nas regras de programa\u00e7\u00e3o que definiu. Na vista de Gantt, pode acompanhar o trabalho nos diferentes recursos e ver o efeito das encomendas que disputam a mesma capacidade. Assim, a fila de polimento entra na avalia\u00e7\u00e3o da entrega antes de se tornar uma surpresa no ch\u00e3o de f\u00e1brica.<\/p>\n\n\n<p>Quando est\u00e1 ativa a programa\u00e7\u00e3o que considera os materiais, a sua disponibilidade tamb\u00e9m entra no c\u00e1lculo. Um acionamento comprado cuja chegada est\u00e1 prevista para mais tarde n\u00e3o pode ser tratado como outro j\u00e1 dispon\u00edvel. Mantenha a informa\u00e7\u00e3o de aprovisionamento atualizada e recalcule a programa\u00e7\u00e3o quando houver altera\u00e7\u00f5es.<\/p>\n\n\n<p>\u00c9 o utilizador que decide as prioridades e aplica bloqueios para preservar as decis\u00f5es de programa\u00e7\u00e3o. Se um transportador urgente tiver preced\u00eancia, o Arcturus recalcula de acordo com essas instru\u00e7\u00f5es; cabe-lhe tamb\u00e9m rever as datas resultantes para as restantes encomendas. A vantagem \u00e9 ter menos trabalho manual a atualizar filas e uma base mais clara para escolher os compromissos a preservar.<\/p>\n\n\n<p>O SkyPlanner integra-se com qualquer ERP ou MES atrav\u00e9s da sua <a href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/\">REST API aberta<\/a>. Ligue os dados de encomendas, produtos e produ\u00e7\u00e3o que j\u00e1 utiliza \u00e0 programa\u00e7\u00e3o detalhada, em vez de come\u00e7ar por substituir o ERP. Numa implementa\u00e7\u00e3o de CTO, defina como a variante escolhida se traduz nos dados corretos de materiais e opera\u00e7\u00f5es ao longo desse fluxo. \u00c9 essa a liga\u00e7\u00e3o pr\u00e1tica entre o produto vendido e o trabalho que o Arcturus programa.<\/p>\n\n\n<h2 class=\"wp-block-heading\">O que mudou na UTU com uma programa\u00e7\u00e3o integrada<\/h2>\n\n\n<p>A UTU fabrica quadros el\u00e9tricos e aparelhagem de comuta\u00e7\u00e3o. Antes do SkyPlanner, os departamentos mantinham planos separados em Excel, e as altera\u00e7\u00f5es de sequ\u00eancia no ERP nem sempre chegavam ao ch\u00e3o de f\u00e1brica. Era dif\u00edcil ter uma vis\u00e3o realista da capacidade, pelo que cumprir as entregas prometidas exigia reorganiza\u00e7\u00f5es constantes.<\/p>\n\n\n<p>Com o SkyPlanner integrado com o Oracle NetSuite e o sistema de processamento salarial, a UTU reuniu as linhas e os departamentos da f\u00e1brica num \u00fanico sistema de planeamento. A equipa destaca a combina\u00e7\u00e3o da programa\u00e7\u00e3o autom\u00e1tica com a vista de Gantt, que permite visualizar em conjunto a capacidade, a carga e a sequ\u00eancia de trabalho.<\/p>\n\n\n<p>No <a href=\"https:\/\/skyplanner.ai\/pt-pt\/historias-de-clientes\/utu\/\">testemunho da UTU sobre o SkyPlanner<\/a>, a empresa refere que poupa cerca de duas horas por semana que antes dedicava \u00e0 atualiza\u00e7\u00e3o de folhas de c\u00e1lculo. Descreve tamb\u00e9m uma programa\u00e7\u00e3o mais precisa das entregas dos projetos e filas de trabalho atualizadas que chegam \u00e0 linha de produ\u00e7\u00e3o em segundos. \u00c9 esta a vantagem de ligar a encomenda ao trabalho que as pessoas efetivamente executam: menos esfor\u00e7o para manter planos separados e uma coordena\u00e7\u00e3o mais clara quando a sequ\u00eancia muda.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Facilite a entrega das op\u00e7\u00f5es escolhidas pelo cliente<\/h2>\n\n\n<p>O valor do CTO est\u00e1 em transformar necessidades recorrentes dos clientes em op\u00e7\u00f5es que podem ser escolhidas repetidamente. Preserve essa vantagem ao longo de toda a produ\u00e7\u00e3o: considere os requisitos de trabalho adequados \u00e0 variante selecionada e avalie a viabilidade da entrega tendo em conta os recursos partilhados com outras encomendas.<\/p>\n\n\n<p>Escolha o SkyPlanner quando essa coordena\u00e7\u00e3o passar a exigir um esfor\u00e7o di\u00e1rio de reprograma\u00e7\u00e3o. O Arcturus faz os c\u00e1lculos de programa\u00e7\u00e3o, a vista de Gantt mostra as consequ\u00eancias e o controlo das prioridades continua nas suas m\u00e3os. Assim, pode dedicar mais tempo a resolver a verdadeira restri\u00e7\u00e3o e menos a deslocar trabalhos para manter as v\u00e1rias filas alinhadas.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/pt-pt\/vendas-de-contacto\/\">Agende uma demonstra\u00e7\u00e3o do SkyPlanner<\/a> e traga dois exemplos de configura\u00e7\u00f5es habituais, as opera\u00e7\u00f5es que diferem entre elas e um recurso que ambas partilham. S\u00e3o pontos de partida \u00fateis para perceber como as op\u00e7\u00f5es dos seus produtos se enquadrariam num plano de produ\u00e7\u00e3o realista. Se preferir explorar primeiro, <a href=\"https:\/\/skyplanner.ai\/pt-pt\/avaliacao\/\">experimente o SkyPlanner com dados de demonstra\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Configura\u00e7\u00e3o por encomenda: da escolha do cliente \u00e0 entrega In\u00edcio &raquo; Recursos &raquo; Configura\u00e7\u00e3o por encomenda: da escolha do cliente \u00e0 entrega A configura\u00e7\u00e3o por encomenda (CTO) consiste em fabricar um produto de acordo com as escolhas do cliente, a partir de op\u00e7\u00f5es predefinidas e compat\u00edveis entre si. O cliente obt\u00e9m uma combina\u00e7\u00e3o adequada \u00e0s &#8230; <a title=\"Configura\u00e7\u00e3o por encomenda: da escolha do cliente \u00e0 entrega\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/configuracao-por-encomenda\/\" aria-label=\"Leia mais sobre Configura\u00e7\u00e3o por encomenda: da escolha do cliente \u00e0 entrega\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":99687,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2536,315],"tags":[],"class_list":["post-99672","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-e-programacao-pt-pt","category-recursos-pt-pt","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Configura\u00e7\u00e3o por encomenda: da escolha do cliente \u00e0 entrega<\/title>\n<meta name=\"description\" content=\"Ofere\u00e7a op\u00e7\u00f5es sem reprojetar cada encomenda. Saiba quando usar CTO e como o SkyPlanner programa o trabalho de cada configura\u00e7\u00e3o.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/configuracao-por-encomenda\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Configura\u00e7\u00e3o por encomenda: da escolha do cliente \u00e0 entrega\" \/>\n<meta property=\"og:description\" content=\"Ofere\u00e7a op\u00e7\u00f5es sem reprojetar cada encomenda. Saiba quando usar CTO e como o SkyPlanner programa o trabalho de cada configura\u00e7\u00e3o.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/configuracao-por-encomenda\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T05:16:05+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T05:17:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/configuracao-por-encomenda\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/configuracao-por-encomenda\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Configura\u00e7\u00e3o por encomenda: da escolha do cliente \u00e0 entrega\",\"datePublished\":\"2026-10-16T05:16:05+00:00\",\"dateModified\":\"2026-10-16T05:17:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/configuracao-por-encomenda\\\/\"},\"wordCount\":2324,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/configuracao-por-encomenda\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"articleSection\":[\"APS e programa\u00e7\u00e3o\",\"recursos\"],\"inLanguage\":\"pt-PT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/configuracao-por-encomenda\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/configuracao-por-encomenda\\\/\",\"name\":\"Configura\u00e7\u00e3o por encomenda: da escolha do cliente \u00e0 entrega\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/configuracao-por-encomenda\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/configuracao-por-encomenda\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"datePublished\":\"2026-10-16T05:16:05+00:00\",\"dateModified\":\"2026-10-16T05:17:08+00:00\",\"description\":\"Ofere\u00e7a op\u00e7\u00f5es sem reprojetar cada encomenda. Saiba quando usar CTO e como o SkyPlanner programa o trabalho de cada configura\u00e7\u00e3o.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/configuracao-por-encomenda\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/configuracao-por-encomenda\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/configuracao-por-encomenda\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A modular conveyor with alternative belts, drive modules and a sensor bracket for predefined product choices.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/configuracao-por-encomenda\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Configura\u00e7\u00e3o por encomenda: da escolha do cliente \u00e0 entrega\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Configura\u00e7\u00e3o por encomenda: da escolha do cliente \u00e0 entrega","description":"Ofere\u00e7a op\u00e7\u00f5es sem reprojetar cada encomenda. Saiba quando usar CTO e como o SkyPlanner programa o trabalho de cada configura\u00e7\u00e3o.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/configuracao-por-encomenda\/","og_locale":"pt_PT","og_type":"article","og_title":"Configura\u00e7\u00e3o por encomenda: da escolha do cliente \u00e0 entrega","og_description":"Ofere\u00e7a op\u00e7\u00f5es sem reprojetar cada encomenda. Saiba quando usar CTO e como o SkyPlanner programa o trabalho de cada configura\u00e7\u00e3o.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/configuracao-por-encomenda\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T05:16:05+00:00","article_modified_time":"2026-10-16T05:17:08+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Jussi M\u00e4ntyl\u00e4","Tempo estimado de leitura":"12 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/configuracao-por-encomenda\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/configuracao-por-encomenda\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Configura\u00e7\u00e3o por encomenda: da escolha do cliente \u00e0 entrega","datePublished":"2026-10-16T05:16:05+00:00","dateModified":"2026-10-16T05:17:08+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/configuracao-por-encomenda\/"},"wordCount":2324,"publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/configuracao-por-encomenda\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","articleSection":["APS e programa\u00e7\u00e3o","recursos"],"inLanguage":"pt-PT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/configuracao-por-encomenda\/","url":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/configuracao-por-encomenda\/","name":"Configura\u00e7\u00e3o por encomenda: da escolha do cliente \u00e0 entrega","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/configuracao-por-encomenda\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/configuracao-por-encomenda\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","datePublished":"2026-10-16T05:16:05+00:00","dateModified":"2026-10-16T05:17:08+00:00","description":"Ofere\u00e7a op\u00e7\u00f5es sem reprojetar cada encomenda. Saiba quando usar CTO e como o SkyPlanner programa o trabalho de cada configura\u00e7\u00e3o.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/configuracao-por-encomenda\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/configuracao-por-encomenda\/"]}]},{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/configuracao-por-encomenda\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","width":1672,"height":941,"caption":"A modular conveyor with alternative belts, drive modules and a sensor bracket for predefined product choices."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/configuracao-por-encomenda\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Configura\u00e7\u00e3o por encomenda: da escolha do cliente \u00e0 entrega"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Configura\u00e7\u00e3o por encomenda: da escolha do cliente \u00e0 entrega In\u00edcio &raquo; Recursos &raquo; Configura\u00e7\u00e3o por encomenda: da escolha do cliente \u00e0 entrega A configura\u00e7\u00e3o por encomenda (CTO) consiste em fabricar um produto de acordo com as escolhas do cliente, a partir de op\u00e7\u00f5es predefinidas e compat\u00edveis entre si. O cliente obt\u00e9m uma combina\u00e7\u00e3o adequada \u00e0s&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/posts\/99672","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=99672"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/posts\/99672\/revisions"}],"predecessor-version":[{"id":99730,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/posts\/99672\/revisions\/99730"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media\/99687"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=99672"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/categories?post=99672"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/tags?post=99672"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}