{"id":20523,"date":"2023-09-21T11:08:56","date_gmt":"2023-09-21T11:08:56","guid":{"rendered":"https:\/\/skyplanner.ai\/recursos-pt-pt\/salario-de-diretor-de-producao-em-franca-2023\/"},"modified":"2026-10-03T09:51:01","modified_gmt":"2026-10-03T09:51:01","slug":"salario-de-diretor-de-producao-em-franca-2026","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/salario-de-diretor-de-producao-em-franca-2026\/","title":{"rendered":"Sal\u00e1rio de diretor de produ\u00e7\u00e3o em Fran\u00e7a 2026"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Sal\u00e1rio de diretor de produ\u00e7\u00e3o em Fran\u00e7a 2026<\/h1>\n\n\n\n<p>40.000 \u20ac brutos por ano no in\u00edcio da carreira de diretor de produ\u00e7\u00e3o em Fran\u00e7a, aumentando para cerca de 90.000 \u20ac com experi\u00eancia. Compare os valores mensais e a Alemanha.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Sal\u00e1rio de diretor de produ\u00e7\u00e3o em Fran\u00e7a: mensal e anual<\/h2>\n\n\n\n<p>Para a fun\u00e7\u00e3o francesa de responsable de production, a <a href=\"https:\/\/www.randstad.fr\/metiers\/responsable-de-production\/\">Randstad<\/a> (consultada em 3 de outubro de 2026) indica sal\u00e1rios anuais brutos aproximados por fase da carreira: cerca de 40.000 \u20ac no in\u00edcio, potencialmente 70.000 \u20ac ap\u00f3s v\u00e1rios anos de experi\u00eancia e at\u00e9 cerca de 90.000 \u20ac no final da carreira.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Fase da carreira<\/th><th>Sal\u00e1rio anual bruto<\/th><th>Equivalente mensal bruto calculado (anual \u00f7 12)<\/th><\/tr><\/thead><tbody><tr><td>In\u00edcio da carreira<\/td><td>Aproximadamente 40.000 \u20ac<\/td><td>Aproximadamente 3.333 \u20ac<\/td><\/tr><tr><td>Ap\u00f3s v\u00e1rios anos de experi\u00eancia<\/td><td>Pode aumentar para aproximadamente 70.000 \u20ac<\/td><td>Aproximadamente 5.833 \u20ac<\/td><\/tr><tr><td>Final da carreira<\/td><td>Pode atingir aproximadamente 90.000 \u20ac<\/td><td>Aproximadamente 7.500 \u20ac<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Os equivalentes mensais baseiam-se em doze pagamentos iguais, arredondados ao euro mais pr\u00f3ximo. O sal\u00e1rio bruto \u00e9 o valor antes dos descontos do trabalhador; o sal\u00e1rio l\u00edquido \u00e9 o valor recebido ap\u00f3s os descontos.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">O que afeta o sal\u00e1rio de um diretor de produ\u00e7\u00e3o em Fran\u00e7a?<\/h2>\n\n\n\n<p>A experi\u00eancia e os conhecimentos especializados podem aumentar o potencial de remunera\u00e7\u00e3o. A localiza\u00e7\u00e3o e o setor tamb\u00e9m influenciam o sal\u00e1rio, tal como a amplitude das responsabilidades e a exist\u00eancia de um adjunto. Os pr\u00e9mios associados ao desempenho podem aumentar a remunera\u00e7\u00e3o total quando as metas de produ\u00e7\u00e3o s\u00e3o cumpridas.<\/p>\n\n\n\n<p>A fun\u00e7\u00e3o abrange o planeamento da produ\u00e7\u00e3o, materiais, qualidade, or\u00e7amentos e supervis\u00e3o de equipas, conforme descrito na <a href=\"\/pt-pt\/recursos-pt-pt\/descricao-das-funcoes-do-diretor-de-producao\/\">descri\u00e7\u00e3o de fun\u00e7\u00f5es de diretor de produ\u00e7\u00e3o<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Como se compara Fran\u00e7a com a Alemanha?<\/h2>\n\n\n\n<p>Na vizinha Alemanha, a <a href=\"https:\/\/www.hays.de\/jobprofile\/produktionsleiter\">Hays<\/a> (consultada em 3 de outubro de 2026) indica um sal\u00e1rio m\u00e9dio anual bruto de 64.000 \u20ac para diretores de produ\u00e7\u00e3o, com cerca de 46.000 \u20ac para gestores juniores e mais de 77.000 \u20ac para gestores seniores. O valor de cerca de 40.000 \u20ac no in\u00edcio de carreira em Fran\u00e7a \u00e9 inferior ao valor para juniores na Alemanha, enquanto o sal\u00e1rio no final da carreira em Fran\u00e7a pode atingir cerca de 90.000 \u20ac.<\/p>\n\n\n\n<p>A m\u00e9dia anual de 64.000 \u20ac na Alemanha corresponde a um equivalente mensal calculado de cerca de 5.333 \u20ac. Consulte o <a href=\"\/pt-pt\/recursos-pt-pt\/salario-de-diretor-de-producao-na-alemanha-2026\/\">sal\u00e1rio de diretor de produ\u00e7\u00e3o na Alemanha<\/a> para conhecer os n\u00edveis de experi\u00eancia e os fatores que afetam a remunera\u00e7\u00e3o no pa\u00eds.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS<\/h2>\n\n\n\n<p>SkyPlanner APS \u00e9 um software de Advanced Planning and Scheduling que programa automaticamente o trabalho da f\u00e1brica entre postos de trabalho, tendo em conta a disponibilidade de materiais, os turnos, as prioridades e as datas de entrega. A sua cronologia Gantt interativa permite \u00e0 sua equipa trabalhar com a programa\u00e7\u00e3o. O SkyPlanner integra-se com qualquer sistema ERP ou MES atrav\u00e9s da sua REST API aberta.<\/p>\n\n\n\n<p>Conhe\u00e7a as <a href=\"\/pt-pt\/funcionalidades\/\">funcionalidades de programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a> do SkyPlanner ou <a href=\"\/pt-pt\/vendas-de-contacto\/\">marque uma demonstra\u00e7\u00e3o<\/a> para a sua equipa de produ\u00e7\u00e3o.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Quanto ganha por m\u00eas um diretor de produ\u00e7\u00e3o em Fran\u00e7a?<\/h3>\n\n\n\n<p>Para a fun\u00e7\u00e3o francesa de responsable de production, os equivalentes mensais brutos aproximados, calculados como sal\u00e1rio anual \u00f7 12, s\u00e3o 3.333 \u20ac no in\u00edcio da carreira (40.000 \u20ac por ano), 5.833 \u20ac ap\u00f3s v\u00e1rios anos de experi\u00eancia (70.000 \u20ac por ano) e 7.500 \u20ac no final da carreira (90.000 \u20ac por ano). Os dois \u00faltimos sal\u00e1rios anuais podem ser atingidos com experi\u00eancia.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Quanto ganha por ano um diretor de produ\u00e7\u00e3o em Fran\u00e7a?<\/h3>\n\n\n\n<p>Os sal\u00e1rios anuais brutos s\u00e3o de aproximadamente 40.000 \u20ac no in\u00edcio da carreira, podem aumentar para cerca de 70.000 \u20ac ap\u00f3s v\u00e1rios anos de experi\u00eancia e podem atingir cerca de 90.000 \u20ac no final da carreira.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Os valores salariais de um diretor de produ\u00e7\u00e3o s\u00e3o brutos ou l\u00edquidos?<\/h3>\n\n\n\n<p>Os valores anuais e os equivalentes mensais calculados s\u00e3o brutos, antes dos descontos do trabalhador. O sal\u00e1rio l\u00edquido \u00e9 o valor recebido ap\u00f3s os descontos.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">O que pode aumentar o sal\u00e1rio de um diretor de produ\u00e7\u00e3o em Fran\u00e7a?<\/h3>\n\n\n\n<p>A experi\u00eancia, os conhecimentos especializados, a localiza\u00e7\u00e3o, o setor, a amplitude das fun\u00e7\u00f5es, o apoio de um adjunto e os pr\u00e9mios associados ao desempenho influenciam a remunera\u00e7\u00e3o.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Como se compara o sal\u00e1rio de um diretor de produ\u00e7\u00e3o em Fran\u00e7a com o da Alemanha?<\/h3>\n\n\n\n<p>Os sal\u00e1rios anuais brutos aproximados por fase da carreira em Fran\u00e7a s\u00e3o 40.000 \u20ac no in\u00edcio, potencialmente 70.000 \u20ac ap\u00f3s v\u00e1rios anos e at\u00e9 cerca de 90.000 \u20ac no final da carreira; a m\u00e9dia anual bruta na Alemanha \u00e9 de 64.000 \u20ac, com cerca de 46.000 \u20ac para gestores juniores e mais de 77.000 \u20ac para gestores seniores.<\/p>\n\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Sal\u00e1rio de diretor de produ\u00e7\u00e3o em Fran\u00e7a 2026 40.000 \u20ac brutos por ano no in\u00edcio da carreira de diretor de produ\u00e7\u00e3o em Fran\u00e7a, aumentando para cerca de 90.000 \u20ac com experi\u00eancia. Compare os valores mensais e a Alemanha. Sal\u00e1rio de diretor de produ\u00e7\u00e3o em Fran\u00e7a: mensal e anual Para a fun\u00e7\u00e3o francesa de responsable de &#8230; <a title=\"Sal\u00e1rio de diretor de produ\u00e7\u00e3o em Fran\u00e7a 2026\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/salario-de-diretor-de-producao-em-franca-2026\/\" aria-label=\"Leia mais sobre Sal\u00e1rio de diretor de produ\u00e7\u00e3o em Fran\u00e7a 2026\">Ler mais<\/a><\/p>\n","protected":false},"author":6,"featured_media":20820,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2702,315],"tags":[],"class_list":["post-20523","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-carreiras-e-salarios","category-recursos-pt-pt","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Sal\u00e1rio de diretor de produ\u00e7\u00e3o em Fran\u00e7a 2026 &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"40.000 \u20ac brutos por ano no in\u00edcio da carreira de diretor de produ\u00e7\u00e3o em Fran\u00e7a, at\u00e9 cerca de 90.000 \u20ac com experi\u00eancia. Compare valores mensais e a Alemanha.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/salario-de-diretor-de-producao-em-franca-2026\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sal\u00e1rio de diretor de produ\u00e7\u00e3o em Fran\u00e7a 2026\" \/>\n<meta property=\"og:description\" content=\"40.000 \u20ac brutos por ano no in\u00edcio da carreira de diretor de produ\u00e7\u00e3o em Fran\u00e7a, at\u00e9 cerca de 90.000 \u20ac com experi\u00eancia. Compare valores mensais e a Alemanha.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/salario-de-diretor-de-producao-em-franca-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-09-21T11:08:56+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-03T09:51:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/salario-de-diretor-de-producao-em-franca-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/salario-de-diretor-de-producao-em-franca-2026\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Sal\u00e1rio de diretor de produ\u00e7\u00e3o em Fran\u00e7a 2026\",\"datePublished\":\"2023-09-21T11:08:56+00:00\",\"dateModified\":\"2026-10-03T09:51:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/salario-de-diretor-de-producao-em-franca-2026\\\/\"},\"wordCount\":797,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/salario-de-diretor-de-producao-em-franca-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-France.png\",\"articleSection\":[\"Carreiras e sal\u00e1rios\",\"recursos\"],\"inLanguage\":\"pt-PT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/salario-de-diretor-de-producao-em-franca-2026\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/salario-de-diretor-de-producao-em-franca-2026\\\/\",\"name\":\"Sal\u00e1rio de diretor de produ\u00e7\u00e3o em Fran\u00e7a 2026 &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/salario-de-diretor-de-producao-em-franca-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/salario-de-diretor-de-producao-em-franca-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-France.png\",\"datePublished\":\"2023-09-21T11:08:56+00:00\",\"dateModified\":\"2026-10-03T09:51:01+00:00\",\"description\":\"40.000 \u20ac brutos por ano no in\u00edcio da carreira de diretor de produ\u00e7\u00e3o em Fran\u00e7a, at\u00e9 cerca de 90.000 \u20ac com experi\u00eancia. Compare valores mensais e a Alemanha.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/salario-de-diretor-de-producao-em-franca-2026\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/salario-de-diretor-de-producao-em-franca-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/salario-de-diretor-de-producao-em-franca-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-France.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-France.png\",\"width\":4990,\"height\":3327,\"caption\":\"Production Manager Salary in France\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/salario-de-diretor-de-producao-em-franca-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Sal\u00e1rio de diretor de produ\u00e7\u00e3o em Fran\u00e7a 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Sal\u00e1rio de diretor de produ\u00e7\u00e3o em Fran\u00e7a 2026 &#8211; SkyPlanner","description":"40.000 \u20ac brutos por ano no in\u00edcio da carreira de diretor de produ\u00e7\u00e3o em Fran\u00e7a, at\u00e9 cerca de 90.000 \u20ac com experi\u00eancia. Compare valores mensais e a Alemanha.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/salario-de-diretor-de-producao-em-franca-2026\/","og_locale":"pt_PT","og_type":"article","og_title":"Sal\u00e1rio de diretor de produ\u00e7\u00e3o em Fran\u00e7a 2026","og_description":"40.000 \u20ac brutos por ano no in\u00edcio da carreira de diretor de produ\u00e7\u00e3o em Fran\u00e7a, at\u00e9 cerca de 90.000 \u20ac com experi\u00eancia. Compare valores mensais e a Alemanha.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/salario-de-diretor-de-producao-em-franca-2026\/","og_site_name":"SkyPlanner","article_published_time":"2023-09-21T11:08:56+00:00","article_modified_time":"2026-10-03T09:51:01+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"SkyPlanner","Tempo estimado de leitura":"6 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/salario-de-diretor-de-producao-em-franca-2026\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/salario-de-diretor-de-producao-em-franca-2026\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Sal\u00e1rio de diretor de produ\u00e7\u00e3o em Fran\u00e7a 2026","datePublished":"2023-09-21T11:08:56+00:00","dateModified":"2026-10-03T09:51:01+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/salario-de-diretor-de-producao-em-franca-2026\/"},"wordCount":797,"publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/salario-de-diretor-de-producao-em-franca-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France.png","articleSection":["Carreiras e sal\u00e1rios","recursos"],"inLanguage":"pt-PT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/salario-de-diretor-de-producao-em-franca-2026\/","url":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/salario-de-diretor-de-producao-em-franca-2026\/","name":"Sal\u00e1rio de diretor de produ\u00e7\u00e3o em Fran\u00e7a 2026 &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/salario-de-diretor-de-producao-em-franca-2026\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/salario-de-diretor-de-producao-em-franca-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France.png","datePublished":"2023-09-21T11:08:56+00:00","dateModified":"2026-10-03T09:51:01+00:00","description":"40.000 \u20ac brutos por ano no in\u00edcio da carreira de diretor de produ\u00e7\u00e3o em Fran\u00e7a, at\u00e9 cerca de 90.000 \u20ac com experi\u00eancia. Compare valores mensais e a Alemanha.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/salario-de-diretor-de-producao-em-franca-2026\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/salario-de-diretor-de-producao-em-franca-2026\/"]}]},{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/salario-de-diretor-de-producao-em-franca-2026\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France.png","width":4990,"height":3327,"caption":"Production Manager Salary in France"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/salario-de-diretor-de-producao-em-franca-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Sal\u00e1rio de diretor de produ\u00e7\u00e3o em Fran\u00e7a 2026"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Sal\u00e1rio de diretor de produ\u00e7\u00e3o em Fran\u00e7a 2026 40.000 \u20ac brutos por ano no in\u00edcio da carreira de diretor de produ\u00e7\u00e3o em Fran\u00e7a, aumentando para cerca de 90.000 \u20ac com experi\u00eancia. Compare os valores mensais e a Alemanha. Sal\u00e1rio de diretor de produ\u00e7\u00e3o em Fran\u00e7a: mensal e anual Para a fun\u00e7\u00e3o francesa de responsable de&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/posts\/20523","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=20523"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/posts\/20523\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media\/20820"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=20523"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/categories?post=20523"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/tags?post=20523"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}