{"id":104451,"date":"2026-10-20T17:47:49","date_gmt":"2026-10-20T17:47:49","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=104451"},"modified":"2026-10-20T17:49:14","modified_gmt":"2026-10-20T17:49:14","slug":"lote-economico-de-producao","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/lote-economico-de-producao\/","title":{"rendered":"Lote econ\u00f3mico de produ\u00e7\u00e3o: f\u00f3rmula, exemplo e limites"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Lote econ\u00f3mico de produ\u00e7\u00e3o: f\u00f3rmula, exemplo e limites<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/pt-pt\/\">In\u00edcio<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos\/\">Recursos<\/a> &raquo; Lote econ\u00f3mico de produ\u00e7\u00e3o: f\u00f3rmula, exemplo e limites<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tempo de leitura estimado: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minutos<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>O lote econ\u00f3mico de produ\u00e7\u00e3o (EPQ) \u00e9 a quantidade a produzir por lote que minimiza a soma dos custos de prepara\u00e7\u00e3o e de posse de stock, num modelo em que os artigos s\u00e3o produzidos gradualmente enquanto a procura continua. Ajuda a responder a uma pergunta habitual: <strong>quanto devemos produzir antes de parar e voltar a preparar a produ\u00e7\u00e3o?<\/strong><\/p>\n\n\n<p>Lotes maiores implicam menos prepara\u00e7\u00f5es, mas mais stock a manter. Lotes menores reduzem o stock, mas exigem prepara\u00e7\u00f5es mais frequentes. O EPQ quantifica este equil\u00edbrio em condi\u00e7\u00f5es est\u00e1veis e previs\u00edveis.<\/p>\n\n\n<p>A quest\u00e3o seguinte \u00e9 saber se essa quantidade se adequa \u00e0 sua f\u00e1brica. Um lote economicamente vantajoso do ponto de vista matem\u00e1tico pode, ainda assim, atrasar outro produto numa m\u00e1quina partilhada. O SkyPlanner APS articula as quantidades escolhidas com os materiais, a capacidade e as prioridades de entrega, para que possa avaliar as consequ\u00eancias para o plano de produ\u00e7\u00e3o sem refazer manualmente a fila de trabalho de cada m\u00e1quina.<\/p>\n\n\n<h2 class=\"wp-block-heading\">O que distingue o EPQ do EOQ?<\/h2>\n\n\n<p>O modelo b\u00e1sico do lote econ\u00f3mico de encomenda (EOQ) pressup\u00f5e que toda a quantidade de reposi\u00e7\u00e3o fica dispon\u00edvel de uma s\u00f3 vez. O stock aumenta de imediato quando chega uma entrega e depois diminui \u00e0 medida que \u00e9 consumido.<\/p>\n\n\n<p>O EPQ substitui essa rece\u00e7\u00e3o instant\u00e2nea por uma taxa de produ\u00e7\u00e3o finita. Enquanto a produ\u00e7\u00e3o decorre, parte do que \u00e9 produzido j\u00e1 est\u00e1 a ser consumido. Por isso, o stock acumula-se \u00e0 taxa correspondente \u00e0 diferen\u00e7a entre a produ\u00e7\u00e3o e a procura, e n\u00e3o \u00e0 taxa de produ\u00e7\u00e3o total. Quando a produ\u00e7\u00e3o do lote termina, a procura vai consumindo o stock acumulado at\u00e9 ao ciclo de reposi\u00e7\u00e3o seguinte.<\/p>\n\n\n<p>Por isso, o EPQ \u00e9 \u00fatil para componentes fabricados de forma repetida que podem ser disponibilizados progressivamente para stock ou para uma opera\u00e7\u00e3o a jusante. Neste contexto, tamb\u00e9m se usam as designa\u00e7\u00f5es quantidade econ\u00f3mica de fabrico ou quantidade econ\u00f3mica de produ\u00e7\u00e3o. A diferen\u00e7a decisiva face ao EOQ b\u00e1sico \u00e9 a disponibilidade gradual, e n\u00e3o apenas o facto de uma ordem ser classificada como interna ou externa.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A f\u00f3rmula do lote econ\u00f3mico de produ\u00e7\u00e3o<\/h2>\n\n\n<p>Com a procura e o custo de posse de stock expressos em termos anuais, o c\u00e1lculo \u00e9:<\/p>\n\n\n<p><strong>EPQ = \u221a[2 \u00d7 D \u00d7 S \/ (H \u00d7 (1 \u2212 d\/p))]<\/strong><\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>S\u00edmbolo<\/th><th>Significado<\/th><th>Unidades utilizadas<\/th><\/tr><\/thead><tbody><tr><td>D<\/td><td>Procura total ao longo do ano<\/td><td>Unidades\/ano<\/td><\/tr><tr><td>S<\/td><td>Custo fixo de prepara\u00e7\u00e3o de um lote de produ\u00e7\u00e3o<\/td><td>Unidades monet\u00e1rias\/lote<\/td><\/tr><tr><td>H<\/td><td>Custo de posse de uma unidade durante um ano<\/td><td>Unidades monet\u00e1rias\/unidade\/ano<\/td><\/tr><tr><td>d<\/td><td>Taxa de procura ou de consumo<\/td><td>Unidades\/dia \u00fatil<\/td><\/tr><tr><td>p<\/td><td>Taxa de produ\u00e7\u00e3o enquanto o artigo est\u00e1 a ser produzido<\/td><td>Unidades\/dia \u00fatil<\/td><\/tr><tr><td>Q<\/td><td>Quantidade produzida num lote<\/td><td>Unidades<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Use bases temporais coerentes.<\/strong> D e H referem-se ao mesmo horizonte anual; d e p t\u00eam de ser expressos na mesma unidade de tempo. Se a produ\u00e7\u00e3o for medida por dia \u00fatil, divida a procura anual pelo n\u00famero de dias \u00fateis, e n\u00e3o pelos dias de calend\u00e1rio, para obter d.<\/p>\n\n\n<p>Para p, use a taxa de produ\u00e7\u00e3o do artigo enquanto este est\u00e1 a ser fabricado, e n\u00e3o a m\u00e9dia da sua produ\u00e7\u00e3o anual distribu\u00edda tamb\u00e9m pelas semanas em que a m\u00e1quina fabrica outros produtos. O modelo exige que p seja superior a d.<\/p>\n\n\n<p>S \u00e9 um custo, n\u00e3o uma dura\u00e7\u00e3o. Representa o custo fixo de preparar um lote, independentemente do n\u00famero de unidades desse lote. H \u00e9 um valor monet\u00e1rio por unidade e por ano, n\u00e3o uma simples percentagem de custo de posse de stock. Se o custo de posse de que disp\u00f5e for uma percentagem, converta-a num valor monet\u00e1rio com base no valor unit\u00e1rio relevante e na defini\u00e7\u00e3o de custo utilizada.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Porque importa o fator de produ\u00e7\u00e3o a taxa finita<\/h3>\n\n\n<p>A produ\u00e7\u00e3o de um lote de Q unidades demora Q\/p dias \u00fateis. Durante esse per\u00edodo, a procura continua, pelo que o n\u00edvel m\u00e1ximo de stock de ciclo \u00e9:<\/p>\n\n\n<p><strong>Stock m\u00e1ximo = Q \u00d7 (1 \u2212 d\/p)<\/strong><\/p>\n\n\n<p>No modelo b\u00e1sico, o stock de ciclo m\u00e9dio corresponde a metade desse m\u00e1ximo. Assim, os custos anuais que variam com a dimens\u00e3o do lote s\u00e3o:<\/p>\n\n\n<p><strong>Custo anual de prepara\u00e7\u00e3o = (D\/Q) \u00d7 S<\/strong><\/p>\n\n\n<p><strong>Custo anual de posse de stock = (Q\/2) \u00d7 (1 \u2212 d\/p) \u00d7 H<\/strong><\/p>\n\n\n<p>A soma destes custos d\u00e1 o custo anual relevante para um dado valor de Q. O EPQ minimiza essa soma. No ponto \u00f3timo calculado, os dois custos s\u00e3o iguais.<\/p>\n\n\n<p>Este valor n\u00e3o corresponde ao custo anual total de produ\u00e7\u00e3o do fabricante. Se o custo unit\u00e1rio de produ\u00e7\u00e3o n\u00e3o variar com a quantidade, n\u00e3o altera o melhor valor de Q e pode ser exclu\u00eddo desta compara\u00e7\u00e3o. Descontos de quantidade, acr\u00e9scimos por horas extraordin\u00e1rias ou outros custos que dependam da quantidade alterariam o problema.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Exemplo de c\u00e1lculo do EPQ: a dimens\u00e3o do lote n\u00e3o \u00e9 o stock m\u00e1ximo<\/h2>\n\n\n<p>O <a href=\"https:\/\/biz.libretexts.org\/@go\/page\/129023\">exemplo did\u00e1tico das caixas de velocidades<\/a> apresentado em <em>Fundamentos da Gest\u00e3o de Opera\u00e7\u00f5es<\/em>, de Azim Abbas e Seyed Goosheh, utiliza os seguintes dados:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Procura anual D: 48 000 caixas de velocidades.<\/li><li>Taxa de produ\u00e7\u00e3o p: 800 caixas de velocidades por dia \u00fatil.<\/li><li>Dias \u00fateis: 240 por ano.<\/li><li>Custo de prepara\u00e7\u00e3o S: $45 por lote.<\/li><li>Custo anual de posse de stock H: $1 por caixa de velocidades.<\/li><\/ul>\n\n\n<p>Estes dados destinam-se ao ensino; n\u00e3o s\u00e3o valores de refer\u00eancia para custos de fabrico nem resultados de um cliente SkyPlanner.<\/p>\n\n\n<p>A procura di\u00e1ria \u00e9 de 48 000 \u00f7 240 = <strong>200 caixas de velocidades<\/strong>. O fator de produ\u00e7\u00e3o a taxa finita \u00e9 1 \u2212 200\/800 = <strong>0,75<\/strong>.<\/p>\n\n\n<p><strong>EPQ = \u221a[(2 \u00d7 48 000 \u00d7 45) \/ (1 \u00d7 0,75)] = 2 400 caixas de velocidades<\/strong><\/p>\n\n\n<p>Para essa quantidade, o custo anual de prepara\u00e7\u00e3o \u00e9 (48 000 \/ 2 400) \u00d7 $45 = <strong>$900<\/strong>. O custo anual de posse de stock \u00e9 (2 400 \/ 2) \u00d7 0,75 \u00d7 $1 = <strong>$900<\/strong>, o que d\u00e1 um total de <strong>$1 800 por ano<\/strong> no modelo.<\/p>\n\n\n<p>A produ\u00e7\u00e3o do lote demora <strong>3 dias \u00fateis<\/strong>, sem contar com a prepara\u00e7\u00e3o: 2 400 \/ 800. O ciclo completo de reposi\u00e7\u00e3o dura <strong>12 dias \u00fateis<\/strong>: 2 400 \/ 200. Nos restantes nove dias \u00fateis, a produ\u00e7\u00e3o deste artigo fica parada e a procura \u00e9 satisfeita pelo stock.<\/p>\n\n\n<p>O stock m\u00e1ximo \u00e9 de <strong>1 800 caixas de velocidades<\/strong>, n\u00e3o de 2 400. Durante os tr\u00eas dias de produ\u00e7\u00e3o do lote, a procura j\u00e1 consumiu 600. O stock de ciclo m\u00e9dio \u00e9 de 900.<\/p>\n\n\n<p>Com os mesmos dados, podemos comparar outras quantidades:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Quantidade por lote<\/th><th>Custo anual de prepara\u00e7\u00e3o<\/th><th>Custo anual de posse de stock<\/th><th>Custo anual combinado<\/th><\/tr><\/thead><tbody><tr><td>1 200<\/td><td>$1 800<\/td><td>$450<\/td><td>$2 250<\/td><\/tr><tr><td>2 400<\/td><td>$900<\/td><td>$900<\/td><td>$1 800<\/td><\/tr><tr><td>4 800<\/td><td>$450<\/td><td>$1 800<\/td><td>$2 250<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>A tabela mostra por que raz\u00e3o n\u00e3o basta reduzir o n\u00famero de prepara\u00e7\u00f5es. Duplicar a dimens\u00e3o do lote econ\u00f3mico reduz o custo de prepara\u00e7\u00e3o para metade, mas duplica o custo de posse de stock. Mostra tamb\u00e9m o que o planeador est\u00e1 a comparar quando precisa de um lote menor para cumprir outra entrega: um equil\u00edbrio de custos calculado pelo modelo, e n\u00e3o uma regra que obrigue todas as f\u00e1bricas a produzir sempre 2 400 unidades.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Quando \u00e9 \u00fatil o modelo b\u00e1sico de EPQ?<\/h2>\n\n\n<p>O EPQ \u00e9 uma refer\u00eancia \u00fatil quando a procura do artigo \u00e9 recorrente, a reposi\u00e7\u00e3o ocorre gradualmente e a principal decis\u00e3o sobre a quantidade consiste em equilibrar o custo fixo de prepara\u00e7\u00e3o com o custo de posse do stock de ciclo.<\/p>\n\n\n<p>Verifique estas condi\u00e7\u00f5es antes de utilizar o resultado:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>A procura \u00e9 conhecida e razoavelmente constante.<\/strong> Um total anual pode ocultar picos sazonais ou necessidades de projetos espec\u00edficos. Uma m\u00e9dia anual regular n\u00e3o indica os prazos de entrega dessas encomendas.<\/li><li><strong>A produ\u00e7\u00e3o \u00e9 est\u00e1vel e mais r\u00e1pida do que o consumo.<\/strong> Se p n\u00e3o for superior a d, este modelo n\u00e3o permite acumular o stock necess\u00e1rio para satisfazer a procura entre lotes.<\/li><li><strong>Os custos de prepara\u00e7\u00e3o e de posse de stock s\u00e3o est\u00e1veis.<\/strong> Use defini\u00e7\u00f5es de custo coerentes. Quando as mudan\u00e7as de produ\u00e7\u00e3o dependem da sequ\u00eancia ou os custos de produ\u00e7\u00e3o variam com a quantidade, um \u00fanico valor fixo de prepara\u00e7\u00e3o n\u00e3o \u00e9 suficiente.<\/li><li><strong>As unidades ficam dispon\u00edveis progressivamente durante a reposi\u00e7\u00e3o.<\/strong> Se todo o lote tiver de concluir a cura, a inspe\u00e7\u00e3o ou a liberta\u00e7\u00e3o pela qualidade antes de qualquer unidade poder ser utilizada, a acumula\u00e7\u00e3o de stock pressuposta pelo modelo n\u00e3o representa essa disponibiliza\u00e7\u00e3o.<\/li><li><strong>N\u00e3o h\u00e1 ruturas de stock no ciclo b\u00e1sico.<\/strong> A f\u00f3rmula acima n\u00e3o calcula o custo das encomendas em atraso nem o stock de seguran\u00e7a para situa\u00e7\u00f5es de incerteza na procura e no abastecimento.<\/li><li><strong>N\u00e3o existem restri\u00e7\u00f5es pr\u00e1ticas que limitem a quantidade proposta.<\/strong> A capacidade de armazenamento, o prazo de validade, as dimens\u00f5es dos contentores, as cargas m\u00ednimas do processo e a partilha de equipamentos podem inviabilizar o resultado obtido sem restri\u00e7\u00f5es.<\/li><\/ul>\n\n\n<p>Considerar uma taxa de produ\u00e7\u00e3o finita n\u00e3o significa que o modelo tenha programado a capacidade finita da sua f\u00e1brica. O modelo considera o ciclo de reposi\u00e7\u00e3o de um \u00fanico artigo. N\u00e3o distribui os lotes, as prepara\u00e7\u00f5es e as opera\u00e7\u00f5es seguintes de todos os produtos por um calend\u00e1rio de m\u00e1quinas comum.<\/p>\n\n\n<p>Quando a procura \u00e9 irregular ou o trabalho \u00e9 espec\u00edfico de cada cliente, parta das necessidades reais e das respetivas datas, em vez de lhes impor um ciclo EPQ. Quando o modelo for adequado, use o resultado como refer\u00eancia e avalie quantidades pr\u00f3ximas e vi\u00e1veis face \u00e0s restri\u00e7\u00f5es reais.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Reduzir o custo de prepara\u00e7\u00e3o altera a dimens\u00e3o econ\u00f3mica do lote<\/h2>\n\n\n<p>Aumentar o lote n\u00e3o \u00e9 a \u00fanica forma de diluir o esfor\u00e7o de prepara\u00e7\u00e3o. No modelo, reduzir o custo fixo de prepara\u00e7\u00e3o torna econ\u00f3micos os lotes mais pequenos e mais frequentes. Como o EPQ depende da raiz quadrada de S, reduzir S para metade faz baixar a quantidade calculada para cerca de 71% do valor anterior, mantendo os restantes dados de entrada inalterados.<\/p>\n\n\n<p>Por isso, a redu\u00e7\u00e3o da prepara\u00e7\u00e3o e a pol\u00edtica de dimensionamento dos lotes devem ser discutidas em conjunto. O <a href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/smed\/\">SMED<\/a> ajuda a melhorar a pr\u00f3pria mudan\u00e7a de produ\u00e7\u00e3o; o EPQ ajuda a interpretar o equil\u00edbrio resultante entre custos de prepara\u00e7\u00e3o e de manuten\u00e7\u00e3o de stock. Se uma melhoria reduzir o tempo de prepara\u00e7\u00e3o, mas n\u00e3o todos os custos associados, atualize o custo usado no c\u00e1lculo em conformidade, em vez de assumir que ambos diminuem na mesma percentagem.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Torne vi\u00e1vel a dimens\u00e3o de lote escolhida com o SkyPlanner<\/h2>\n\n\n<p>Imagine que o lote de caixas de velocidades partilha uma m\u00e1quina com outro componente de que a montagem precisa com urg\u00eancia. O c\u00e1lculo do EPQ pode favorecer o lote maior, mas n\u00e3o verificou o prazo do outro componente nem a disponibilidade dos materiais para a opera\u00e7\u00e3o seguinte. \u00c9 preciso perceber essa disputa pela capacidade antes de reservar a m\u00e1quina.<\/p>\n\n\n<p>O SkyPlanner re\u00fane essas interdepend\u00eancias num <a href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/o-que-e-planeamento-da-producao\/\">plano de produ\u00e7\u00e3o comum<\/a>. Defina uma \u00fanica vez as etapas do processo de um produto, as dura\u00e7\u00f5es, os postos de trabalho aptos a execut\u00e1-las, os materiais e a lista de materiais. Depois, cada ordem indica o produto, a quantidade e a data de entrega. O Arcturus, a intelig\u00eancia artificial do SkyPlanner para a programa\u00e7\u00e3o da produ\u00e7\u00e3o, programa as ordens em conjunto, em vez de lhe deixar a tarefa de conciliar um plano separado para cada artigo.<\/p>\n\n\n<p>Quando a programa\u00e7\u00e3o que tem em conta os materiais est\u00e1 ativada, a disponibilidade destes tamb\u00e9m influencia o c\u00e1lculo. O diagrama de Gantt mostra a distribui\u00e7\u00e3o temporal resultante pelos postos de trabalho, facilitando a an\u00e1lise do impacto da quantidade escolhida nos restantes trabalhos e nos compromissos de entrega. O utilizador define as prioridades; o Arcturus calcula a programa\u00e7\u00e3o de acordo com essas orienta\u00e7\u00f5es.<\/p>\n\n\n<p>O benef\u00edcio \u00e9 uma decis\u00e3o mais clara sobre a quantidade a produzir e menos trabalho manual para manter as filas de trabalho atualizadas. Quando um lote escolhido compromete outra entrega, pode decidir alterar a quantidade, ajustar as prioridades ou disponibilizar mais capacidade e, depois, recalcular o plano com base nessa decis\u00e3o. O SkyPlanner integra-se com qualquer ERP ou MES atrav\u00e9s da sua REST API aberta, permitindo que a programa\u00e7\u00e3o se baseie nas ordens e nos dados de produ\u00e7\u00e3o existentes.<\/p>\n\n\n<p>A <a href=\"https:\/\/skyplanner.ai\/pt-pt\/historias-de-clientes\/kjh-comp\/\">experi\u00eancia da KJH-Comp<\/a> mostra a import\u00e2ncia desta vis\u00e3o conjunta. Este fabricante de pe\u00e7as em chapa por subcontrata\u00e7\u00e3o baseava-se anteriormente em estimativas gerais de carga semanal e na atribui\u00e7\u00e3o manual di\u00e1ria dos trabalhos \u00e0s m\u00e1quinas. Com o SkyPlanner, o respons\u00e1vel de produ\u00e7\u00e3o consegue identificar a sobrecarga numa quinadora partilhada e reagir. A empresa descreve tamb\u00e9m como agrupa na sequ\u00eancia de produ\u00e7\u00e3o os trabalhos que usam as mesmas ferramentas e a mesma espessura de material, sem deixar que trabalhos com prazos mais distantes ocupem o lugar dos que t\u00eam de ser entregues mais cedo. Assim, a efici\u00eancia das prepara\u00e7\u00f5es e as prioridades de entrega podem ser consideradas no mesmo plano, em vez de constarem de listas concorrentes.<\/p>\n\n\n<p>Para conhecer os aspetos pr\u00e1ticos da coordena\u00e7\u00e3o de lotes de produ\u00e7\u00e3o e de transfer\u00eancia, consulte o <a href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/producao-por-lotes\/\">guia de produ\u00e7\u00e3o por lotes<\/a>. Aqui, a distin\u00e7\u00e3o essencial \u00e9 mais simples: <strong>o EPQ estima uma quantidade econ\u00f3mica com base em pressupostos definidos; o plano de produ\u00e7\u00e3o mostra como a quantidade escolhida se enquadra nos trabalhos que se comprometeu a entregar.<\/strong><\/p>\n\n\n<p>Para ver esta rela\u00e7\u00e3o na sua pr\u00f3pria produ\u00e7\u00e3o, <a href=\"https:\/\/skyplanner.ai\/pt-pt\/vendas-de-contacto\/\">agende uma demonstra\u00e7\u00e3o do SkyPlanner<\/a> e traga um exemplo de um produto de fabrico recorrente, uma dimens\u00e3o de lote a avaliar e a m\u00e1quina que partilha com outros trabalhos. Analise como estas necessidades se conciliam antes de assumir o pr\u00f3ximo compromisso de entrega. Se preferir explorar primeiro, <a href=\"https:\/\/skyplanner.ai\/pt-pt\/avaliacao\/\">experimente o SkyPlanner com dados de demonstra\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Lote econ\u00f3mico de produ\u00e7\u00e3o: f\u00f3rmula, exemplo e limites In\u00edcio &raquo; Recursos &raquo; Lote econ\u00f3mico de produ\u00e7\u00e3o: f\u00f3rmula, exemplo e limites O lote econ\u00f3mico de produ\u00e7\u00e3o (EPQ) \u00e9 a quantidade a produzir por lote que minimiza a soma dos custos de prepara\u00e7\u00e3o e de posse de stock, num modelo em que os artigos s\u00e3o produzidos gradualmente &#8230; <a title=\"Lote econ\u00f3mico de produ\u00e7\u00e3o: f\u00f3rmula, exemplo e limites\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/lote-economico-de-producao\/\" aria-label=\"Leia mais sobre Lote econ\u00f3mico de produ\u00e7\u00e3o: f\u00f3rmula, exemplo e limites\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":104472,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2564,315],"tags":[],"class_list":["post-104451","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eficiencia-industrial","category-recursos-pt-pt","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Lote econ\u00f3mico de produ\u00e7\u00e3o: f\u00f3rmula, exemplo e limites<\/title>\n<meta name=\"description\" content=\"Calcule o lote com EPQ, saiba quando se aplicam os seus pressupostos e veja no SkyPlanner como a quantidade escolhida afeta outras encomendas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/lote-economico-de-producao\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lote econ\u00f3mico de produ\u00e7\u00e3o: f\u00f3rmula, exemplo e limites\" \/>\n<meta property=\"og:description\" content=\"Calcule o lote com EPQ, saiba quando se aplicam os seus pressupostos e veja no SkyPlanner como a quantidade escolhida afeta outras encomendas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/lote-economico-de-producao\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T17:47:49+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T17:49:14+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/lote-economico-de-producao\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/lote-economico-de-producao\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Lote econ\u00f3mico de produ\u00e7\u00e3o: f\u00f3rmula, exemplo e limites\",\"datePublished\":\"2026-10-20T17:47:49+00:00\",\"dateModified\":\"2026-10-20T17:49:14+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/lote-economico-de-producao\\\/\"},\"wordCount\":2402,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/lote-economico-de-producao\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-production-quantity-hero.png\",\"articleSection\":[\"Efici\u00eancia industrial\",\"recursos\"],\"inLanguage\":\"pt-PT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/lote-economico-de-producao\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/lote-economico-de-producao\\\/\",\"name\":\"Lote econ\u00f3mico de produ\u00e7\u00e3o: f\u00f3rmula, exemplo e limites\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/lote-economico-de-producao\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/lote-economico-de-producao\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-production-quantity-hero.png\",\"datePublished\":\"2026-10-20T17:47:49+00:00\",\"dateModified\":\"2026-10-20T17:49:14+00:00\",\"description\":\"Calcule o lote com EPQ, saiba quando se aplicam os seus pressupostos e veja no SkyPlanner como a quantidade escolhida afeta outras encomendas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/lote-economico-de-producao\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/lote-economico-de-producao\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/lote-economico-de-producao\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-production-quantity-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-production-quantity-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Gears move from production through a stock buffer to assembly, illustrating gradual replenishment and consumption.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/lote-economico-de-producao\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Lote econ\u00f3mico de produ\u00e7\u00e3o: f\u00f3rmula, exemplo e limites\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Lote econ\u00f3mico de produ\u00e7\u00e3o: f\u00f3rmula, exemplo e limites","description":"Calcule o lote com EPQ, saiba quando se aplicam os seus pressupostos e veja no SkyPlanner como a quantidade escolhida afeta outras encomendas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/lote-economico-de-producao\/","og_locale":"pt_PT","og_type":"article","og_title":"Lote econ\u00f3mico de produ\u00e7\u00e3o: f\u00f3rmula, exemplo e limites","og_description":"Calcule o lote com EPQ, saiba quando se aplicam os seus pressupostos e veja no SkyPlanner como a quantidade escolhida afeta outras encomendas.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/lote-economico-de-producao\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T17:47:49+00:00","article_modified_time":"2026-10-20T17:49:14+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Jussi M\u00e4ntyl\u00e4","Tempo estimado de leitura":"12 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/lote-economico-de-producao\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/lote-economico-de-producao\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Lote econ\u00f3mico de produ\u00e7\u00e3o: f\u00f3rmula, exemplo e limites","datePublished":"2026-10-20T17:47:49+00:00","dateModified":"2026-10-20T17:49:14+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/lote-economico-de-producao\/"},"wordCount":2402,"publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/lote-economico-de-producao\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png","articleSection":["Efici\u00eancia industrial","recursos"],"inLanguage":"pt-PT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/lote-economico-de-producao\/","url":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/lote-economico-de-producao\/","name":"Lote econ\u00f3mico de produ\u00e7\u00e3o: f\u00f3rmula, exemplo e limites","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/lote-economico-de-producao\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/lote-economico-de-producao\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png","datePublished":"2026-10-20T17:47:49+00:00","dateModified":"2026-10-20T17:49:14+00:00","description":"Calcule o lote com EPQ, saiba quando se aplicam os seus pressupostos e veja no SkyPlanner como a quantidade escolhida afeta outras encomendas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/lote-economico-de-producao\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/lote-economico-de-producao\/"]}]},{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/lote-economico-de-producao\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png","width":1672,"height":941,"caption":"Gears move from production through a stock buffer to assembly, illustrating gradual replenishment and consumption."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/lote-economico-de-producao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Lote econ\u00f3mico de produ\u00e7\u00e3o: f\u00f3rmula, exemplo e limites"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-production-quantity-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Lote econ\u00f3mico de produ\u00e7\u00e3o: f\u00f3rmula, exemplo e limites In\u00edcio &raquo; Recursos &raquo; Lote econ\u00f3mico de produ\u00e7\u00e3o: f\u00f3rmula, exemplo e limites O lote econ\u00f3mico de produ\u00e7\u00e3o (EPQ) \u00e9 a quantidade a produzir por lote que minimiza a soma dos custos de prepara\u00e7\u00e3o e de posse de stock, num modelo em que os artigos s\u00e3o produzidos gradualmente&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/posts\/104451","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=104451"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/posts\/104451\/revisions"}],"predecessor-version":[{"id":104545,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/posts\/104451\/revisions\/104545"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media\/104472"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=104451"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/categories?post=104451"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/tags?post=104451"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}