{"id":102531,"date":"2026-10-20T13:56:48","date_gmt":"2026-10-20T13:56:48","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=102531"},"modified":"2026-10-20T13:57:52","modified_gmt":"2026-10-20T13:57:52","slug":"producao-em-curso","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/producao-em-curso\/","title":{"rendered":"Produ\u00e7\u00e3o em curso: contagem, custo e controlo"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Produ\u00e7\u00e3o em curso: contagem, custo e controlo<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/pt-pt\/\">In\u00edcio<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos\/\">Recursos<\/a> &raquo; Produ\u00e7\u00e3o em curso: contagem, custo e controlo<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tempo de leitura estimado: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minutos<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>A produ\u00e7\u00e3o em curso (WIP) abrange os bens que j\u00e1 entraram em produ\u00e7\u00e3o, mas ainda n\u00e3o est\u00e3o conclu\u00eddos. Inclui tanto as pe\u00e7as em processamento como os produtos inacabados que aguardam entre opera\u00e7\u00f5es. Na contabilidade, a produ\u00e7\u00e3o em curso tamb\u00e9m designa os custos de fabrico acumulados nesses bens inacabados.<\/p>\n\n\n<p>Estas duas perspetivas respondem a perguntas diferentes. A contagem indica a quantidade que falta concluir. O valor do custo indica os custos de fabrico j\u00e1 incorporados nessa produ\u00e7\u00e3o. Por si s\u00f3, nenhuma delas explica por que raz\u00e3o um lote est\u00e1 \u00e0 espera desde segunda-feira ou quando poder\u00e1 finalmente sair da produ\u00e7\u00e3o.<\/p>\n\n\n<p>Para um respons\u00e1vel de produ\u00e7\u00e3o, \u00e9 essa a pergunta que importa fazer a seguir. O SkyPlanner APS articula as opera\u00e7\u00f5es por concluir com a capacidade, a disponibilidade dos materiais e as prioridades, ajudando a concluir o trabalho em vez de continuar a aumentar as filas de espera. Uma melhor coordena\u00e7\u00e3o dos tempos reduz a produ\u00e7\u00e3o em curso desnecess\u00e1ria e o capital nela imobilizado.<\/p>\n\n\n<h2 class=\"wp-block-heading\">O que se considera produ\u00e7\u00e3o em curso?<\/h2>\n\n\n<p>Considere os invent\u00e1rios em tr\u00eas momentos do fluxo de fabrico:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Mat\u00e9rias-primas:<\/strong> materiais e componentes comprados que aguardam utiliza\u00e7\u00e3o na produ\u00e7\u00e3o.<\/li><li><strong>Produ\u00e7\u00e3o em curso:<\/strong> bens cujo fabrico j\u00e1 come\u00e7ou, mas que ainda necessitam de opera\u00e7\u00f5es de fabrico, montagem ou verifica\u00e7\u00f5es finais obrigat\u00f3rias.<\/li><li><strong>Produtos acabados:<\/strong> produtos conclu\u00eddos, mesmo que ainda n\u00e3o tenham sido vendidos ou expedidos.<\/li><\/ul>\n\n\n<p>Uma carca\u00e7a maquinada que aguarda revestimento \u00e9 produ\u00e7\u00e3o em curso. O mesmo se aplica a uma unidade montada que aguarda a inspe\u00e7\u00e3o final necess\u00e1ria para ser dada como conclu\u00edda. J\u00e1 uma unidade conclu\u00edda e aceite, \u00e0 espera do cami\u00e3o de entrega, \u00e9 um produto acabado, n\u00e3o produ\u00e7\u00e3o em curso.<\/p>\n\n\n<p>Uma pe\u00e7a inacabada n\u00e3o deixa de entrar na contagem por estar \u00e0 espera. As filas de espera, as transfer\u00eancias e as reten\u00e7\u00f5es podem representar grande parte do tempo que um produto passa na produ\u00e7\u00e3o, mesmo sem estar a ser trabalhado por qualquer m\u00e1quina nesse momento.<\/p>\n\n\n<p>Tamb\u00e9m poder\u00e1 encontrar a express\u00e3o <strong>trabalhos em curso<\/strong>. A utiliza\u00e7\u00e3o varia entre empresas e setores; neste guia, WIP refere-se aos bens de fabrico ainda por concluir, n\u00e3o a um c\u00e1lculo de fatura\u00e7\u00e3o de projetos nem ao n\u00famero de tarefas no quadro de uma equipa de software.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Como medir a quantidade f\u00edsica de produ\u00e7\u00e3o em curso<\/h2>\n\n\n<p>Comece por definir claramente o \u00e2mbito da contagem: por exemplo, uma fam\u00edlia de produtos, desde a primeira opera\u00e7\u00e3o de fabrico at\u00e9 \u00e0 aceita\u00e7\u00e3o final. Conte as pe\u00e7as inacabadas dentro desse \u00e2mbito num momento definido. Na produ\u00e7\u00e3o a granel, a unidade adequada poder\u00e1 ser o quilograma ou o litro, em vez do n\u00famero de pe\u00e7as.<\/p>\n\n\n<p>Imagine uma f\u00e1brica que acompanha uma fam\u00edlia de carca\u00e7as id\u00eanticas. No final do turno de sexta-feira, regista a seguinte situa\u00e7\u00e3o:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Situa\u00e7\u00e3o atual<\/th><th>Carca\u00e7as inacabadas<\/th><th>Trabalho por concluir<\/th><\/tr><\/thead><tbody><tr><td>Em maquina\u00e7\u00e3o<\/td><td>20<\/td><td>Concluir a maquina\u00e7\u00e3o, efetuar o acabamento e inspecionar<\/td><\/tr><tr><td>\u00c0 espera de acabamento<\/td><td>60<\/td><td>Efetuar o acabamento e inspecionar<\/td><\/tr><tr><td>A aguardar inspe\u00e7\u00e3o final<\/td><td>20<\/td><td>Inspecionar e aceitar<\/td><\/tr><tr><td><strong>Total em curso<\/strong><\/td><td><strong>100<\/strong><\/td><td><strong>A quantidade de trabalho por concluir varia<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Conte cada carca\u00e7a uma \u00fanica vez, na situa\u00e7\u00e3o em que se encontra. N\u00e3o volte a contar o mesmo lote por cada opera\u00e7\u00e3o que ainda falta na sua rota de produ\u00e7\u00e3o.<\/p>\n\n\n<p>Tamb\u00e9m pode reconciliar as entradas e sa\u00eddas do \u00e2mbito definido. Suponha que a semana come\u00e7ou com 120 carca\u00e7as inacabadas, que outras 480 entraram em produ\u00e7\u00e3o e que 500 passaram a produtos acabados. Sem abates por sucata nem outros movimentos:<\/p>\n\n\n<p><strong>Produ\u00e7\u00e3o em curso no final = 120 + 480 \u2212 500 = 100 carca\u00e7as<\/strong><\/p>\n\n\n<p>Se o resultado n\u00e3o coincidir com a contagem f\u00edsica, investigue conclus\u00f5es de produ\u00e7\u00e3o por registar, transfer\u00eancias n\u00e3o registadas, abates por sucata ou a hora de corte dos registos antes de tirar conclus\u00f5es sobre o desempenho da produ\u00e7\u00e3o.<\/p>\n\n\n<h3 class=\"wp-block-heading\">O n\u00famero de pe\u00e7as n\u00e3o \u00e9 a carga de trabalho restante<\/h3>\n\n\n<p>A tabela apresenta 100 pe\u00e7as inacabadas, mas as 20 que aguardam inspe\u00e7\u00e3o exigem muito menos trabalho do que as 20 ainda em maquina\u00e7\u00e3o. Duas filas de espera com o mesmo n\u00famero de pe\u00e7as podem, por isso, exigir capacidades muito diferentes.<\/p>\n\n\n<p>Numa f\u00e1brica com produtos variados, contar ordens de trabalho diz ainda menos: uma pode exigir apenas uma inspe\u00e7\u00e3o breve, enquanto outra pode ocupar v\u00e1rios recursos durante v\u00e1rios dias. Registe as quantidades por produto ou por fam\u00edlia relevante e use a dura\u00e7\u00e3o das opera\u00e7\u00f5es por concluir para compreender a carga. Expresse essa carga em horas; n\u00e3o a confunda com a quantidade ou o valor da produ\u00e7\u00e3o em curso.<\/p>\n\n\n<h2 class=\"wp-block-heading\">F\u00f3rmula do custo da produ\u00e7\u00e3o em curso<\/h2>\n\n\n<p>Para uma reconcilia\u00e7\u00e3o simplificada dos custos de um per\u00edodo:<\/p>\n\n\n<p><strong>Custo final da produ\u00e7\u00e3o em curso = custo inicial da produ\u00e7\u00e3o em curso + custos de fabrico incorporados \u2212 custo da produ\u00e7\u00e3o acabada<\/strong><\/p>\n\n\n<p>Os custos de fabrico incorporados incluem os materiais diretos consumidos, a m\u00e3o de obra direta e os gastos gerais de fabrico imputados. O <strong>custo da produ\u00e7\u00e3o acabada (COGM)<\/strong> \u00e9 o custo transferido quando a produ\u00e7\u00e3o fica conclu\u00edda. N\u00e3o corresponde ao pre\u00e7o de venda nem ao custo dos produtos vendidos durante o per\u00edodo.<\/p>\n\n\n<p>Imagine agora um exemplo independente de custos mensais. A produ\u00e7\u00e3o em curso inicial tem um custo de $18.000, o fabrico incorpora $72.000 e os produtos conclu\u00eddos, com um custo de $65.000, passam para o invent\u00e1rio de produtos acabados. Sem outros ajustamentos:<\/p>\n\n\n<p><strong>$18.000 + $72.000 \u2212 $65.000 = $25.000 de custo final da produ\u00e7\u00e3o em curso<\/strong><\/p>\n\n\n<p>Este \u00e9 um saldo de custos, n\u00e3o 25.000 unidades nem $25.000 de lucro futuro. Este exemplo \u00e9 independente da contagem de carca\u00e7as apresentada acima.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Porque \u00e9 que contar unidades n\u00e3o permite apurar o valor<\/h3>\n\n\n<p>Um produto inacabado apenas acumula os custos que lhe foram atribu\u00eddos at\u00e9 ao momento. Multiplicar cada pe\u00e7a inacabada pelo custo total do produto acabado pode sobreavaliar o saldo. Estar \u00aba meio da rota de produ\u00e7\u00e3o\u00bb tamb\u00e9m n\u00e3o significa necessariamente ter acumulado metade do custo total: um material caro pode ser incorporado logo no in\u00edcio, enquanto os custos de m\u00e3o de obra e de processamento se acumulam mais tarde.<\/p>\n\n\n<p>Use os registos de custeio e a pol\u00edtica contabil\u00edstica adotados pela sua equipa financeira. A reconcilia\u00e7\u00e3o entre o saldo inicial e o saldo final explica os movimentos de custos; o relato financeiro pode tamb\u00e9m exigir ajustamentos de valoriza\u00e7\u00e3o ao abrigo do referencial contabil\u00edstico aplic\u00e1vel.<\/p>\n\n\n<p>Para as decis\u00f5es de produ\u00e7\u00e3o, a distin\u00e7\u00e3o essencial \u00e9 mais simples: o custo acumulado indica o que j\u00e1 foi incorporado no trabalho. A parte da rota ainda por executar indica o que falta para o concluir. Precisa das duas perspetivas; uma n\u00e3o substitui a outra.<\/p>\n\n\n<h2 class=\"wp-block-heading\">O que revela realmente um n\u00edvel elevado ou baixo de produ\u00e7\u00e3o em curso<\/h2>\n\n\n<p>Um n\u00edvel elevado de produ\u00e7\u00e3o em curso justifica uma an\u00e1lise, mas n\u00e3o constitui um diagn\u00f3stico completo. Pode refletir maior procura, uma combina\u00e7\u00e3o diferente de produtos, capacidade deliberadamente reservada ou trabalho que se acumula devido a uma interrup\u00e7\u00e3o. Um n\u00edvel baixo pode indicar um fluxo regular, mas tamb\u00e9m pode significar que um recurso cr\u00edtico tem pouco trabalho pronto a executar.<\/p>\n\n\n<p>O objetivo n\u00e3o \u00e9 eliminar toda a produ\u00e7\u00e3o inacabada. \u00c9 ter trabalho suficiente, e do tipo certo, para permitir concluir os trabalhos de forma fi\u00e1vel, sem arranques antecipados, esperas ou movimenta\u00e7\u00f5es desnecess\u00e1rios.<\/p>\n\n\n<p>Voltemos \u00e0s 60 carca\u00e7as \u00e0 espera de acabamento. Se foram maquinadas esta manh\u00e3 para um per\u00edodo de acabamento previsto para esta tarde, a fila pode ser perfeitamente razo\u00e1vel. Se est\u00e3o ali h\u00e1 uma semana enquanto o recurso de acabamento processa outras ordens, a mesma contagem descreve um problema diferente.<\/p>\n\n\n<p>Para compreender essa fila de espera, determine:<\/p>\n\n\n<p>1. <strong>O tempo decorrido:<\/strong> quando entrou o lote em produ\u00e7\u00e3o e h\u00e1 quanto tempo est\u00e1 \u00e0 espera neste ponto?<\/p>\n\n\n<p>2. <strong>A opera\u00e7\u00e3o seguinte:<\/strong> de que recurso, material ou aprova\u00e7\u00e3o precisa para avan\u00e7ar?<\/p>\n\n\n<p>3. <strong>A conclus\u00e3o prevista:<\/strong> quando \u00e9 poss\u00edvel encaixar as opera\u00e7\u00f5es restantes no plano, e essa programa\u00e7\u00e3o permite cumprir o prazo acordado para a encomenda?<\/p>\n\n\n<p>4. <strong>O motivo da espera:<\/strong> trata-se de uma reserva planeada de trabalho, de ordens a disputar a mesma capacidade, de falta de material, de uma reten\u00e7\u00e3o por motivos de qualidade ou de outra interrup\u00e7\u00e3o?<\/p>\n\n\n<p>Assim, a constata\u00e7\u00e3o de que \u00abtemos demasiada produ\u00e7\u00e3o em curso\u00bb permite tomar decis\u00f5es concretas e agir. A falta de um componente comprado exige uma resposta diferente da sobrecarga de um posto de acabamento. Passar mais um lote pela maquina\u00e7\u00e3o n\u00e3o resolve nenhum dos dois problemas.<\/p>\n\n\n<p>Analise a produ\u00e7\u00e3o em curso em conjunto com a <a href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/taxa-de-producao\/\">produ\u00e7\u00e3o conclu\u00edda<\/a> e o cumprimento dos prazos de entrega. Se entrar mais trabalho em produ\u00e7\u00e3o do que aquele que sai como produto acabado, sem outras sa\u00eddas, a produ\u00e7\u00e3o inacabada est\u00e1 a acumular-se. Se a produ\u00e7\u00e3o em curso diminuir apenas porque a f\u00e1brica deixa de receber encomendas, isso n\u00e3o demonstra uma melhoria do processo. Compare per\u00edodos e fam\u00edlias de produtos semelhantes, para n\u00e3o confundir uma altera\u00e7\u00e3o na combina\u00e7\u00e3o de produtos com uma melhoria.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Use o SkyPlanner para planear a conclus\u00e3o do trabalho em curso<\/h2>\n\n\n<p>Depois de identificar onde o trabalho est\u00e1 \u00e0 espera, a quest\u00e3o de programa\u00e7\u00e3o \u00e9 concreta: como encaixar as opera\u00e7\u00f5es restantes com tudo o que a f\u00e1brica tamb\u00e9m precisa de concluir?<\/p>\n\n\n<p>O SkyPlanner re\u00fane postos de trabalho, turnos, operadores, etapas do processo e dura\u00e7\u00f5es num <a href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/o-que-e-planeamento-da-producao\/\">plano de produ\u00e7\u00e3o partilhado<\/a>. O Arcturus, o seu motor de programa\u00e7\u00e3o com IA, programa as opera\u00e7\u00f5es de acordo com a capacidade, as depend\u00eancias e as prioridades configuradas. A vista Gantt mostra a sequ\u00eancia resultante nos v\u00e1rios recursos, em vez de deixar cada departamento gerir a sua pr\u00f3pria fila de espera.<\/p>\n\n\n<p>No caso das carca\u00e7as em espera, pode analisar a opera\u00e7\u00e3o de acabamento em conjunto com o trabalho que a precede e o que se segue. O recurso est\u00e1 ocupado com um compromisso anterior? \u00c9 poss\u00edvel encaixar a inspe\u00e7\u00e3o a seguir? Iniciar agora outro lote de carca\u00e7as iria apenas criar mais trabalho em espera?<\/p>\n\n\n<p>Com a op\u00e7\u00e3o de programa\u00e7\u00e3o que tem em conta os materiais ativada, o Arcturus tamb\u00e9m considera o stock e a disponibilidade dos materiais a receber. Isto \u00e9 importante quando uma opera\u00e7\u00e3o posterior exige um componente comprado: n\u00e3o basta que a primeira m\u00e1quina esteja dispon\u00edvel se a ordem n\u00e3o puder prosseguir pelas opera\u00e7\u00f5es de montagem.<\/p>\n\n\n<p>A informa\u00e7\u00e3o sobre o progresso da produ\u00e7\u00e3o mant\u00e9m o plano \u00fatil. O Timer do SkyPlanner regista os in\u00edcios e as paragens do trabalho, bem como as quantidades produzidas, enquanto a sua REST API aberta permite a liga\u00e7\u00e3o a qualquer ERP ou MES. \u00c0 medida que o progresso, a disponibilidade ou as prioridades mudam, o Arcturus pode recalcular o plano com base na informa\u00e7\u00e3o atualizada. O utilizador define as prioridades; a IA trata dos c\u00e1lculos da programa\u00e7\u00e3o.<\/p>\n\n\n<p>O resultado \u00e9 menos trabalho di\u00e1rio a corrigir as filas de trabalho de cada m\u00e1quina e uma base mais clara para decidir o que deve avan\u00e7ar. Pode evitar afetar mais materiais e esfor\u00e7o \u00e0s ordens antes do momento adequado, concentrando a aten\u00e7\u00e3o na produ\u00e7\u00e3o em curso que precisa de ser conclu\u00edda para cumprir as entregas.<\/p>\n\n\n<p>A conclus\u00e3o do fabrico, por si s\u00f3, n\u00e3o liberta capital: a passagem da produ\u00e7\u00e3o em curso para produtos acabados altera o estado dos bens, mas estes continuam a fazer parte dos invent\u00e1rios. O benef\u00edcio financeiro resulta de reduzir os invent\u00e1rios desnecess\u00e1rios e fazer avan\u00e7ar a produ\u00e7\u00e3o certa para responder \u00e0 procura dos clientes, n\u00e3o apenas de reduzir o valor da rubrica de produ\u00e7\u00e3o em curso.<\/p>\n\n\n<h2 class=\"wp-block-heading\">O que mudou na Mamec ao iniciar os trabalhos no momento certo<\/h2>\n\n\n<p>A Mamec, fabricante finland\u00eas de equipamento de mistura industrial e de produtos de alta tecnologia em regime de subcontrata\u00e7\u00e3o, definia anteriormente as prioridades de milhares de ordens de trabalho interdependentes com base nas datas de entrega indicadas nas ordens em papel. O planeamento no ERP n\u00e3o proporcionava uma vis\u00e3o global, e a gest\u00e3o baseava-se em estimativas subjetivas para avaliar a carga de produ\u00e7\u00e3o.<\/p>\n\n\n<p>Com o SkyPlanner integrado no seu ambiente Oscar ERP, a Mamec passou a dispor de programa\u00e7\u00e3o com capacidade finita e de uma vis\u00e3o partilhada do estado das ordens e da respetiva programa\u00e7\u00e3o. Os colaboradores podiam consultar uma ordem, em vez de dependerem de diferentes interpreta\u00e7\u00f5es da situa\u00e7\u00e3o.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/pt-pt\/historias-de-clientes\/mamec\/\">A Mamec refere<\/a> lead times mais ajustados, menos trabalho de planeamento e menos fundo de maneio desnecessariamente imobilizado em produ\u00e7\u00e3o em curso, porque os trabalhos come\u00e7am no momento certo. \u00c9 esta a liga\u00e7\u00e3o pr\u00e1tica entre a produ\u00e7\u00e3o em curso e a programa\u00e7\u00e3o: a f\u00e1brica continua a ter trabalho em produ\u00e7\u00e3o, mas disp\u00f5e de uma base melhor para decidir quando esse trabalho deve l\u00e1 estar.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Comece por um lote que est\u00e1 \u00e0 espera h\u00e1 demasiado tempo<\/h2>\n\n\n<p>Escolha uma ordem por concluir cujo atraso a sua equipa conhe\u00e7a bem. Traga para uma demonstra\u00e7\u00e3o do SkyPlanner os dados sobre o ponto em que se encontra, as opera\u00e7\u00f5es que faltam, as necessidades de materiais e o prazo de entrega acordado. O teste \u00fatil \u00e9 perceber se consegue visualizar um plano articulado para a concluir, que tenha tamb\u00e9m em conta as outras ordens que disputam os mesmos recursos.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/pt-pt\/vendas-de-contacto\/\">Marque uma demonstra\u00e7\u00e3o do SkyPlanner<\/a> para explorar esse plano com base na sua realidade de produ\u00e7\u00e3o ou, se preferir, comece por <a href=\"https:\/\/skyplanner.ai\/pt-pt\/avaliacao\/\">experimentar o SkyPlanner com dados de demonstra\u00e7\u00e3o<\/a>. Melhorar os n\u00edveis de produ\u00e7\u00e3o em curso come\u00e7a por compreender o trabalho ainda por concluir. Um plano de produ\u00e7\u00e3o melhor ajuda-o a agir sobre essa realidade.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Produ\u00e7\u00e3o em curso: contagem, custo e controlo In\u00edcio &raquo; Recursos &raquo; Produ\u00e7\u00e3o em curso: contagem, custo e controlo A produ\u00e7\u00e3o em curso (WIP) abrange os bens que j\u00e1 entraram em produ\u00e7\u00e3o, mas ainda n\u00e3o est\u00e3o conclu\u00eddos. Inclui tanto as pe\u00e7as em processamento como os produtos inacabados que aguardam entre opera\u00e7\u00f5es. Na contabilidade, a produ\u00e7\u00e3o em &#8230; <a title=\"Produ\u00e7\u00e3o em curso: contagem, custo e controlo\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/producao-em-curso\/\" aria-label=\"Leia mais sobre Produ\u00e7\u00e3o em curso: contagem, custo e controlo\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":102580,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2564,315],"tags":[],"class_list":["post-102531","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eficiencia-industrial","category-recursos-pt-pt","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Produ\u00e7\u00e3o em curso: contagem, custo e controlo<\/title>\n<meta name=\"description\" content=\"Conhe\u00e7a a produ\u00e7\u00e3o em curso, calcule o custo e identifique o que impede a conclus\u00e3o. Veja como o SkyPlanner ajuda a reduzir a produ\u00e7\u00e3o em curso desnecess\u00e1ria.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/producao-em-curso\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Produ\u00e7\u00e3o em curso: contagem, custo e controlo\" \/>\n<meta property=\"og:description\" content=\"Conhe\u00e7a a produ\u00e7\u00e3o em curso, calcule o custo e identifique o que impede a conclus\u00e3o. Veja como o SkyPlanner ajuda a reduzir a produ\u00e7\u00e3o em curso desnecess\u00e1ria.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/producao-em-curso\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T13:56:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T13:57:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1984\" \/>\n\t<meta property=\"og:image:height\" content=\"1116\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/producao-em-curso\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/producao-em-curso\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Produ\u00e7\u00e3o em curso: contagem, custo e controlo\",\"datePublished\":\"2026-10-20T13:56:48+00:00\",\"dateModified\":\"2026-10-20T13:57:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/producao-em-curso\\\/\"},\"wordCount\":2422,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/producao-em-curso\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"articleSection\":[\"Efici\u00eancia industrial\",\"recursos\"],\"inLanguage\":\"pt-PT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/producao-em-curso\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/producao-em-curso\\\/\",\"name\":\"Produ\u00e7\u00e3o em curso: contagem, custo e controlo\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/producao-em-curso\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/producao-em-curso\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"datePublished\":\"2026-10-20T13:56:48+00:00\",\"dateModified\":\"2026-10-20T13:57:52+00:00\",\"description\":\"Conhe\u00e7a a produ\u00e7\u00e3o em curso, calcule o custo e identifique o que impede a conclus\u00e3o. Veja como o SkyPlanner ajuda a reduzir a produ\u00e7\u00e3o em curso desnecess\u00e1ria.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/producao-em-curso\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/producao-em-curso\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/producao-em-curso\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"width\":1984,\"height\":1116,\"caption\":\"Unfinished metal housings wait between machining and finishing, illustrating work-in-process inventory.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/producao-em-curso\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Produ\u00e7\u00e3o em curso: contagem, custo e controlo\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Produ\u00e7\u00e3o em curso: contagem, custo e controlo","description":"Conhe\u00e7a a produ\u00e7\u00e3o em curso, calcule o custo e identifique o que impede a conclus\u00e3o. Veja como o SkyPlanner ajuda a reduzir a produ\u00e7\u00e3o em curso desnecess\u00e1ria.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/producao-em-curso\/","og_locale":"pt_PT","og_type":"article","og_title":"Produ\u00e7\u00e3o em curso: contagem, custo e controlo","og_description":"Conhe\u00e7a a produ\u00e7\u00e3o em curso, calcule o custo e identifique o que impede a conclus\u00e3o. Veja como o SkyPlanner ajuda a reduzir a produ\u00e7\u00e3o em curso desnecess\u00e1ria.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/producao-em-curso\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T13:56:48+00:00","article_modified_time":"2026-10-20T13:57:52+00:00","og_image":[{"width":1984,"height":1116,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Jussi M\u00e4ntyl\u00e4","Tempo estimado de leitura":"12 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/producao-em-curso\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/producao-em-curso\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Produ\u00e7\u00e3o em curso: contagem, custo e controlo","datePublished":"2026-10-20T13:56:48+00:00","dateModified":"2026-10-20T13:57:52+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/producao-em-curso\/"},"wordCount":2422,"publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/producao-em-curso\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","articleSection":["Efici\u00eancia industrial","recursos"],"inLanguage":"pt-PT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/producao-em-curso\/","url":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/producao-em-curso\/","name":"Produ\u00e7\u00e3o em curso: contagem, custo e controlo","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/producao-em-curso\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/producao-em-curso\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","datePublished":"2026-10-20T13:56:48+00:00","dateModified":"2026-10-20T13:57:52+00:00","description":"Conhe\u00e7a a produ\u00e7\u00e3o em curso, calcule o custo e identifique o que impede a conclus\u00e3o. Veja como o SkyPlanner ajuda a reduzir a produ\u00e7\u00e3o em curso desnecess\u00e1ria.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/producao-em-curso\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/producao-em-curso\/"]}]},{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/producao-em-curso\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","width":1984,"height":1116,"caption":"Unfinished metal housings wait between machining and finishing, illustrating work-in-process inventory."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/producao-em-curso\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Produ\u00e7\u00e3o em curso: contagem, custo e controlo"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png",1984,1116,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png",1984,1116,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Produ\u00e7\u00e3o em curso: contagem, custo e controlo In\u00edcio &raquo; Recursos &raquo; Produ\u00e7\u00e3o em curso: contagem, custo e controlo A produ\u00e7\u00e3o em curso (WIP) abrange os bens que j\u00e1 entraram em produ\u00e7\u00e3o, mas ainda n\u00e3o est\u00e3o conclu\u00eddos. Inclui tanto as pe\u00e7as em processamento como os produtos inacabados que aguardam entre opera\u00e7\u00f5es. Na contabilidade, a produ\u00e7\u00e3o em&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/posts\/102531","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=102531"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/posts\/102531\/revisions"}],"predecessor-version":[{"id":102650,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/posts\/102531\/revisions\/102650"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media\/102580"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=102531"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/categories?post=102531"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/tags?post=102531"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}