{"id":100527,"date":"2026-10-17T08:56:09","date_gmt":"2026-10-17T08:56:09","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=100527"},"modified":"2026-10-17T08:57:15","modified_gmt":"2026-10-17T08:57:15","slug":"relatorio-de-producao","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/relatorio-de-producao\/","title":{"rendered":"Relat\u00f3rio de produ\u00e7\u00e3o: o que registar e como agir"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Relat\u00f3rio de produ\u00e7\u00e3o: o que registar e como agir<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/pt-pt\/\">In\u00edcio<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos\/\">Recursos<\/a> &raquo; Relat\u00f3rio de produ\u00e7\u00e3o: o que registar e como agir<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tempo de leitura estimado: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minutos<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Um relat\u00f3rio de produ\u00e7\u00e3o regista o que a f\u00e1brica produziu durante um turno, um dia ou outro per\u00edodo definido. Re\u00fane as quantidades produzidas, os tempos de produ\u00e7\u00e3o e as interrup\u00e7\u00f5es, geralmente em conjunto com o trabalho planeado, para que se perceba o que ficou conclu\u00eddo e onde a produ\u00e7\u00e3o ficou aqu\u00e9m do previsto.<\/p>\n\n\n<p>O total \u00e9 apenas o ponto de partida. Se um turno registar 80 pe\u00e7as, a equipa seguinte precisa de saber se s\u00e3o pe\u00e7as utiliz\u00e1veis, pe\u00e7as rejeitadas ou pe\u00e7as ainda \u00e0 espera de inspe\u00e7\u00e3o. Caso contr\u00e1rio, o relat\u00f3rio pode parecer completo, mas o pr\u00f3ximo plano de produ\u00e7\u00e3o pode partir de uma base errada.<\/p>\n\n\n<p>Um relat\u00f3rio \u00fatil mostra com clareza o trabalho que falta fazer e permite agir. O SkyPlanner liga o registo de tempos e os relat\u00f3rios de produ\u00e7\u00e3o \u00e0 programa\u00e7\u00e3o com IA, ajudando a transformar esses dados num plano mais realista, em vez de manter uma folha de c\u00e1lculo separada para os relat\u00f3rios e refazer manualmente as filas de trabalho das m\u00e1quinas.<\/p>\n\n\n<h2 class=\"wp-block-heading\">O que deve incluir um relat\u00f3rio de produ\u00e7\u00e3o?<\/h2>\n\n\n<p>Comece por criar uma linha para cada opera\u00e7\u00e3o de uma tarefa num centro de trabalho, relativa ao per\u00edodo do relat\u00f3rio. Assim, os resultados do corte ficam separados dos da montagem e uma ordem parcialmente executada n\u00e3o aparece como conclu\u00edda. Depois, pode agregar as linhas por m\u00e1quina, departamento ou turno.<\/p>\n\n\n<p>Use a estrutura seguinte para decidir o que incluir no relat\u00f3rio. Trata-se de uma estrutura pr\u00e1tica, n\u00e3o de uma exig\u00eancia de recolher todos os indicadores de produ\u00e7\u00e3o poss\u00edveis.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Informa\u00e7\u00e3o<\/th><th>O que registar<\/th><th>Porque \u00e9 importante<\/th><\/tr><\/thead><tbody><tr><td>Per\u00edodo do relat\u00f3rio<\/td><td>Data, turno, hora de in\u00edcio e hora de fecho do per\u00edodo<\/td><td>Permite comparar resultados e define um limite claro para a passagem de turno<\/td><\/tr><tr><td>Refer\u00eancia do trabalho<\/td><td>Ordem, produto e opera\u00e7\u00e3o; lote, quando aplic\u00e1vel<\/td><td>Associa o resultado ao trabalho que ainda tem de passar pela produ\u00e7\u00e3o<\/td><\/tr><tr><td>Recurso<\/td><td>Centro de trabalho e equipa ou operador respons\u00e1vel<\/td><td>Mostra onde foram registados os tempos e as quantidades produzidas<\/td><\/tr><tr><td>Plano emitido<\/td><td>Quantidade e tempo previstos para a opera\u00e7\u00e3o no per\u00edodo<\/td><td>Fornece a refer\u00eancia para compreender o resultado<\/td><\/tr><tr><td>Produ\u00e7\u00e3o realizada<\/td><td>Quantidade conclu\u00edda utiliz\u00e1vel, quantidade defeituosa e quantidade a aguardar decis\u00e3o, registadas separadamente<\/td><td>Evita que pe\u00e7as rejeitadas ou retidas sejam consideradas prontas<\/td><\/tr><tr><td>Tempo real<\/td><td>Tempo de trabalho registado, distinguindo a prepara\u00e7\u00e3o e as interrup\u00e7\u00f5es quando estes dados forem recolhidos<\/td><td>Ajuda a explicar as diferen\u00e7as face \u00e0 dura\u00e7\u00e3o prevista<\/td><\/tr><tr><td>Estado no final do per\u00edodo<\/td><td>Por iniciar, em curso, conclu\u00eddo ou bloqueado, com indica\u00e7\u00e3o do trabalho restante<\/td><td>Informa a equipa seguinte sobre o trabalho que vai receber<\/td><\/tr><tr><td>Ocorr\u00eancia<\/td><td>O que aconteceu, quando e a causa confirmada, se for conhecida<\/td><td>Distingue uma explica\u00e7\u00e3o de uma suposi\u00e7\u00e3o<\/td><\/tr><tr><td>Acompanhamento<\/td><td>A\u00e7\u00e3o necess\u00e1ria, respons\u00e1vel e pr\u00f3xima verifica\u00e7\u00e3o<\/td><td>Transforma um problema reportado numa quest\u00e3o com algu\u00e9m encarregado de a resolver<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Mantenha as regras de contagem junto do relat\u00f3rio. \u00abConclu\u00eddo\u00bb significa que a pe\u00e7a terminou esta opera\u00e7\u00e3o ou que j\u00e1 \u00e9 um produto pronto para venda? As pe\u00e7as rejeitadas est\u00e3o inclu\u00eddas no total produzido? A coer\u00eancia da resposta \u00e9 mais importante do que o nome da coluna.<\/p>\n\n\n<p>N\u00e3o some as mesmas pe\u00e7as em opera\u00e7\u00f5es sucessivas para apresentar o resultado como produ\u00e7\u00e3o acabada. Um componente que passa pelo corte, pela quinagem e pela soldadura gera tr\u00eas registos de opera\u00e7\u00e3o, n\u00e3o tr\u00eas componentes acabados.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Exemplo: olhar para al\u00e9m do total do turno<\/h2>\n\n\n<p>Imagine uma tarefa de maquinagem que exige 100 pe\u00e7as utiliz\u00e1veis para a montagem. No final do turno, a equipa maquinou 80 pe\u00e7as: 72 foram aceites e oito foram para sucata. As outras 20 ainda n\u00e3o foram maquinadas. O tempo de produ\u00e7\u00e3o registado \u00e9 de sete horas, face \u00e0s seis horas previstas.<\/p>\n\n\n<p>Um resumo que diga \u00ab80 pe\u00e7as produzidas\u00bb esconde tanto a quantidade em falta como a decis\u00e3o a tomar a seguir.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Dado do relat\u00f3rio<\/th><th>O que significa<\/th><th>O que fazer a seguir<\/th><\/tr><\/thead><tbody><tr><td>72 pe\u00e7as aceites, oito para sucata e 20 ainda por maquinar<\/td><td>Ainda faltam 28 pe\u00e7as utiliz\u00e1veis para concluir a tarefa, incluindo as que substituem as pe\u00e7as enviadas para sucata<\/td><td>Confirmar o material de substitui\u00e7\u00e3o e o tempo necess\u00e1rio para concluir; manter este trabalho no pr\u00f3ximo plano<\/td><\/tr><tr><td>Sete horas registadas face a seis previstas<\/td><td>O tempo registado ultrapassou a estimativa, mas a causa ainda n\u00e3o foi apurada<\/td><td>Verificar a prepara\u00e7\u00e3o, as interrup\u00e7\u00f5es e os registos de tempo antes de alterar a dura\u00e7\u00e3o padr\u00e3o<\/td><\/tr><tr><td>72 pe\u00e7as aceites na maquinagem<\/td><td>Estas pe\u00e7as terminaram esta opera\u00e7\u00e3o, mas isso n\u00e3o significa que toda a ordem esteja conclu\u00edda<\/td><td>Verificar se a montagem pode receber um lote parcial e se os restantes componentes est\u00e3o prontos<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>O turno seguinte n\u00e3o deve receber apenas a indica\u00e7\u00e3o \u00abfaltam 20\u00bb. Isso deixaria de fora o trabalho de substitui\u00e7\u00e3o das pe\u00e7as rejeitadas. Tamb\u00e9m n\u00e3o se deve prometer um lote completo \u00e0 montagem s\u00f3 porque a maquinagem registou atividade.<\/p>\n\n\n<p>Suponha que o operador assinala tamb\u00e9m um problema com as ferramentas. O supervisor tem agora duas tarefas interligadas: resolver esse problema e transmitir ao planeamento uma perspetiva cred\u00edvel do trabalho de maquinagem ainda por fazer. O planeamento pode ent\u00e3o avaliar o impacto dessa carga adicional nas outras tarefas que usam a mesma m\u00e1quina e, depois, na montagem.<\/p>\n\n\n<p>\u00c9 este o valor de um relat\u00f3rio de produ\u00e7\u00e3o: tornar concreta a decis\u00e3o seguinte. \u00abMelhorar a produ\u00e7\u00e3o\u00bb passa a ser \u00abprever capacidade e material para mais 28 pe\u00e7as utiliz\u00e1veis e confirmar quando a montagem pode avan\u00e7ar\u00bb.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Como preparar um relat\u00f3rio em que o pr\u00f3ximo turno possa confiar<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Registe os resultados junto da opera\u00e7\u00e3o<\/h3>\n\n\n<p>Registe o progresso durante a opera\u00e7\u00e3o ou numa passagem de turno definida, enquanto os detalhes ainda est\u00e3o dispon\u00edveis. Mantenha a rotina suficientemente simples para ser cumprida: a tarefa correta, as quantidades, o tempo e uma nota \u00fatil quando houver uma ocorr\u00eancia.<\/p>\n\n\n<p>Defina quem fecha o relat\u00f3rio e quem trata dos registos incompletos. Um campo de quantidade em branco n\u00e3o significa automaticamente produ\u00e7\u00e3o nula. Um registo de tempo em aberto n\u00e3o prova que a m\u00e1quina tenha funcionado durante todo o turno. Confirme o registo com a equipa antes de o usar para avaliar o desempenho ou reservar a capacidade de amanh\u00e3.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Concilie quantidades, tempos e estado<\/h3>\n\n\n<p>Analise os tr\u00eas em conjunto. Um estado \u00abconclu\u00eddo\u00bb com uma quantidade utiliz\u00e1vel insuficiente exige uma explica\u00e7\u00e3o. Uma quantidade elevada sem tempo registado pode dever-se \u00e0 falta de um registo, n\u00e3o a uma efici\u00eancia excecional. O trabalho conclu\u00eddo antes do fecho do per\u00edodo, mas registado mais tarde, deve ser atribu\u00eddo de forma consistente ao per\u00edodo em que foi realizado.<\/p>\n\n\n<p>Seja igualmente claro quanto aos tempos. As horas de trabalho dos operadores, as horas de funcionamento da m\u00e1quina e o tempo decorrido entre o in\u00edcio e o fim medem coisas diferentes. Duas pessoas a trabalhar em conjunto podem acumular mais horas de m\u00e3o de obra do que o tempo de funcionamento da m\u00e1quina. Use a medida adequada \u00e0 quest\u00e3o de planeamento, em vez de converter todos os totais de tempo numa percentagem de utiliza\u00e7\u00e3o.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Distinga o plano de refer\u00eancia do plano de execu\u00e7\u00e3o<\/h3>\n\n\n<p>Conserve o plano emitido que serviu de base \u00e0s colunas de valores previstos do relat\u00f3rio. Use a programa\u00e7\u00e3o atualizada para orientar a produ\u00e7\u00e3o por concluir. Se substituir o objetivo de ontem pela quantidade ou data revista de hoje, perde a refer\u00eancia que permite explicar o desvio.<\/p>\n\n\n<p>O relat\u00f3rio pode servir de base a indicadores como o <a href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/taxa-de-cumprimento-do-plano-de-producao\/\">cumprimento do plano de produ\u00e7\u00e3o<\/a>, mas n\u00e3o deve tornar-se uma p\u00e1gina de percentagens que oculta as tarefas afetadas. Na an\u00e1lise di\u00e1ria, as ocorr\u00eancias mais \u00fateis s\u00e3o as que alteram o trabalho que pode ser executado a seguir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Analise as ocorr\u00eancias do dia e os padr\u00f5es recorrentes<\/h3>\n\n\n<p>Na passagem de turno, pergunte o que est\u00e1 por concluir, o que est\u00e1 pronto para a opera\u00e7\u00e3o seguinte e o que mudou na capacidade dispon\u00edvel. Atribua um respons\u00e1vel e uma pr\u00f3xima verifica\u00e7\u00e3o a cada ocorr\u00eancia importante. Uma nota de \u00abfalta de material\u00bb \u00e9 mais \u00fatil quando h\u00e1 algu\u00e9m a confirmar a disponibilidade antes de voltar a libertar a tarefa para execu\u00e7\u00e3o.<\/p>\n\n\n<p>Use a an\u00e1lise semanal para identificar dura\u00e7\u00f5es que excedem repetidamente o previsto, sucata recorrente ou interrup\u00e7\u00f5es frequentes. Compare produtos e opera\u00e7\u00f5es semelhantes: uma altera\u00e7\u00e3o no conjunto de produtos fabricados pode mudar os totais sem significar uma quebra de desempenho. Melhore a estimativa ou o processo de base, em vez de pedir a todos os turnos que expliquem o mesmo desvio.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Use o SkyPlanner para ligar o relat\u00f3rio ao pr\u00f3ximo plano<\/h2>\n\n\n<p>Gerir os relat\u00f3rios torna-se mais simples quando os dados permanecem associados ao trabalho a que dizem respeito. O SkyPlanner disponibiliza registos de produ\u00e7\u00e3o, relat\u00f3rios detalhados e pain\u00e9is configur\u00e1veis a par da programa\u00e7\u00e3o. Pode analisar o resultado e tomar as medidas necess\u00e1rias no planeamento, sem separar a an\u00e1lise dos resultados das decis\u00f5es sobre o plano.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Veja o que foi registado e onde foi gasto o tempo<\/h3>\n\n\n<p>O Timer do SkyPlanner regista o tempo de trabalho e as quantidades produzidas ou defeituosas. O relat\u00f3rio All Timelogs re\u00fane a tarefa, o centro de trabalho, a opera\u00e7\u00e3o, a pessoa, as horas de in\u00edcio e de fim, as quantidades conclu\u00eddas e defeituosas, o tempo registado e as notas. \u00c9 a\u00ed que os registos podem ser revistos, editados e aprovados.<\/p>\n\n\n<p>Num resultado como o do exemplo de maquinagem, estes dados permitem perceber o que est\u00e1 por tr\u00e1s do total do turno. Pode investigar o trabalho em causa, em vez de tentar conciliar n\u00fameros sem identifica\u00e7\u00e3o provenientes de v\u00e1rias folhas de c\u00e1lculo departamentais.<\/p>\n\n\n<p>Os relat\u00f3rios Job e Order Item acrescentam o contexto da ordem de trabalho ou do produto e mostram a dura\u00e7\u00e3o prevista, o tempo registado e a diferen\u00e7a entre ambos. Utilize-os para identificar os trabalhos que merecem uma an\u00e1lise mais atenta. Um desvio de tempo indica o que deve investigar; o registo da opera\u00e7\u00e3o e a equipa ajudam a explic\u00e1-lo.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Crie uma vista centrada no que importa na produ\u00e7\u00e3o<\/h3>\n\n\n<p>Os <a href=\"https:\/\/skyplanner.ai\/pt-pt\/funcionalidades\/\">pain\u00e9is de relat\u00f3rios<\/a> do SkyPlanner permitem organizar widgets arrastando e largando e escolher o intervalo de datas. Pode criar pain\u00e9is diferentes para diferentes utilizadores e apresentar um painel num ecr\u00e3 na \u00e1rea de produ\u00e7\u00e3o.<\/p>\n\n\n<p>Para analisar um turno, centre a vista nos trabalhos em curso, nos atrasos, na carga e na compara\u00e7\u00e3o entre a efici\u00eancia prevista e a real. A vantagem \u00e9 ter uma vis\u00e3o partilhada dos problemas que exigem aten\u00e7\u00e3o, em vez de mais um relat\u00f3rio que algu\u00e9m tem de refazer para a reuni\u00e3o. Mantenha os registos detalhados das opera\u00e7\u00f5es dispon\u00edveis para esclarecer as quest\u00f5es que os dados de s\u00edntese levantam.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Programe de forma realista o trabalho por concluir<\/h3>\n\n\n<p>O relat\u00f3rio mostra o que aconteceu. O plano seguinte tamb\u00e9m tem de ter em conta o que falta fazer e os recursos dispon\u00edveis para o concluir.<\/p>\n\n\n<p>Arcturus, a intelig\u00eancia artificial do SkyPlanner para a programa\u00e7\u00e3o da produ\u00e7\u00e3o, calcula a sequ\u00eancia de trabalho tendo em conta os centros de trabalho, os turnos, os operadores, as depend\u00eancias entre opera\u00e7\u00f5es e as prioridades. O diagrama de Gantt apresenta o plano resultante. Quando a conclus\u00e3o de trabalhos ou as altera\u00e7\u00f5es de capacidade tornam o plano desatualizado, a reprograma\u00e7\u00e3o autom\u00e1tica pode recalcular o trabalho, mantendo as regras e os bloqueios definidos.<\/p>\n\n\n<p>O hist\u00f3rico do trabalho registado tamb\u00e9m serve de base \u00e0 previs\u00e3o da dura\u00e7\u00e3o das etapas do processo. Assim, \u00e0 medida que o hist\u00f3rico de produ\u00e7\u00e3o aumenta, pode melhorar as estimativas de tempo para trabalhos futuros, em vez de continuar a programar com base numa suposi\u00e7\u00e3o inicial otimista.<\/p>\n\n\n<p>No exemplo da maquinagem, o objetivo pr\u00e1tico \u00e9 programar o trabalho restante com dados cred\u00edveis de dura\u00e7\u00e3o e disponibilidade e, em seguida, avaliar as consequ\u00eancias para a montagem e para as outras ordens. As decis\u00f5es sobre prioridades continuam nas suas m\u00e3os; Arcturus trata do <a href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/o-que-e-planeamento-da-producao\/\">c\u00e1lculo da programa\u00e7\u00e3o<\/a>, tendo em conta as interdepend\u00eancias.<\/p>\n\n\n<p>O SkyPlanner integra-se com qualquer ERP ou MES atrav\u00e9s da sua REST API aberta. Se esses sistemas j\u00e1 cont\u00eam as suas ordens ou os dados reais de produ\u00e7\u00e3o, pode lig\u00e1-los \u00e0 programa\u00e7\u00e3o do SkyPlanner, em vez de voltar a introduzir os dados em sistemas separados.<\/p>\n\n\n<h2 class=\"wp-block-heading\">O que mudou na Piristeel com a melhoria dos relat\u00f3rios<\/h2>\n\n\n<p>A Piristeel, fabricante de equipamentos de seguran\u00e7a para coberturas, recorria anteriormente a folhas de c\u00e1lculo e ordens de trabalho impressas. A informa\u00e7\u00e3o n\u00e3o circulava bem entre departamentos, era dif\u00edcil perceber a carga face \u00e0 capacidade dispon\u00edvel e a produ\u00e7\u00e3o gerava poucos dados para apoiar as decis\u00f5es.<\/p>\n\n\n<p>A implementa\u00e7\u00e3o faseada do SkyPlanner, em paralelo com o desenvolvimento do ERP e a integra\u00e7\u00e3o com o Visma Nova, ligou a programa\u00e7\u00e3o detalhada \u00e0 informa\u00e7\u00e3o da produ\u00e7\u00e3o. Segundo a Piristeel, perde-se agora menos tempo no ch\u00e3o de f\u00e1brica a registar trabalho e a elaborar relat\u00f3rios. Os seus planeadores conseguem ver a carga futura, e as insufici\u00eancias de capacidade s\u00e3o tratadas antes de se agravarem.<\/p>\n\n\n<p>\u00c9 esta a mudan\u00e7a que importa num relat\u00f3rio di\u00e1rio de produ\u00e7\u00e3o: menos esfor\u00e7o para manter os registos e uma base mais clara para decidir o que a produ\u00e7\u00e3o pode fazer a seguir. <a href=\"https:\/\/skyplanner.ai\/pt-pt\/historias-de-clientes\/piristeel\/\">A experi\u00eancia da Piristeel com o SkyPlanner<\/a> mostra como os relat\u00f3rios podem servir a gest\u00e3o di\u00e1ria, em vez de se limitarem a uma folha preenchida.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Fa\u00e7a do pr\u00f3ximo relat\u00f3rio de produ\u00e7\u00e3o um ponto de partida<\/h2>\n\n\n<p>Escolha um relat\u00f3rio recente com trabalho por concluir. Consegue identificar as quantidades utiliz\u00e1veis, as opera\u00e7\u00f5es que ainda precisam de tempo e o que o pr\u00f3ximo turno ter\u00e1 de resolver? Se, para responder, for necess\u00e1rio voltar \u00e0s folhas de c\u00e1lculo e aos telefonemas, o processo de elabora\u00e7\u00e3o de relat\u00f3rios ainda n\u00e3o est\u00e1 a dar ao planeamento aquilo de que precisa.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/pt-pt\/vendas-de-contacto\/\">Agende uma demonstra\u00e7\u00e3o do SkyPlanner<\/a> e traga esse relat\u00f3rio, as tarefas afetadas e o problema de capacidade que lhes est\u00e1 associado. Veja como os registos de produ\u00e7\u00e3o, as vistas de relat\u00f3rios e a programa\u00e7\u00e3o com IA podem funcionar em conjunto na sua f\u00e1brica. Se preferir explorar primeiro, <a href=\"https:\/\/skyplanner.ai\/pt-pt\/avaliacao\/\">experimente o SkyPlanner com dados de demonstra\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Relat\u00f3rio de produ\u00e7\u00e3o: o que registar e como agir In\u00edcio &raquo; Recursos &raquo; Relat\u00f3rio de produ\u00e7\u00e3o: o que registar e como agir Um relat\u00f3rio de produ\u00e7\u00e3o regista o que a f\u00e1brica produziu durante um turno, um dia ou outro per\u00edodo definido. Re\u00fane as quantidades produzidas, os tempos de produ\u00e7\u00e3o e as interrup\u00e7\u00f5es, geralmente em conjunto &#8230; <a title=\"Relat\u00f3rio de produ\u00e7\u00e3o: o que registar e como agir\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/relatorio-de-producao\/\" aria-label=\"Leia mais sobre Relat\u00f3rio de produ\u00e7\u00e3o: o que registar e como agir\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":100542,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2564,315],"tags":[],"class_list":["post-100527","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eficiencia-industrial","category-recursos-pt-pt","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Relat\u00f3rio de produ\u00e7\u00e3o: o que registar e como agir<\/title>\n<meta name=\"description\" content=\"Registe produ\u00e7\u00e3o \u00fatil, tempo perdido e trabalho por concluir no relat\u00f3rio de produ\u00e7\u00e3o. Use os resultados para planear o pr\u00f3ximo turno com SkyPlanner.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/relatorio-de-producao\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Relat\u00f3rio de produ\u00e7\u00e3o: o que registar e como agir\" \/>\n<meta property=\"og:description\" content=\"Registe produ\u00e7\u00e3o \u00fatil, tempo perdido e trabalho por concluir no relat\u00f3rio de produ\u00e7\u00e3o. Use os resultados para planear o pr\u00f3ximo turno com SkyPlanner.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/relatorio-de-producao\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-17T08:56:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-17T08:57:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/relatorio-de-producao\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/relatorio-de-producao\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Relat\u00f3rio de produ\u00e7\u00e3o: o que registar e como agir\",\"datePublished\":\"2026-10-17T08:56:09+00:00\",\"dateModified\":\"2026-10-17T08:57:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/relatorio-de-producao\\\/\"},\"wordCount\":2586,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/relatorio-de-producao\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-production-report-hero.png\",\"articleSection\":[\"Efici\u00eancia industrial\",\"recursos\"],\"inLanguage\":\"pt-PT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/relatorio-de-producao\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/relatorio-de-producao\\\/\",\"name\":\"Relat\u00f3rio de produ\u00e7\u00e3o: o que registar e como agir\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/relatorio-de-producao\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/relatorio-de-producao\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-production-report-hero.png\",\"datePublished\":\"2026-10-17T08:56:09+00:00\",\"dateModified\":\"2026-10-17T08:57:15+00:00\",\"description\":\"Registe produ\u00e7\u00e3o \u00fatil, tempo perdido e trabalho por concluir no relat\u00f3rio de produ\u00e7\u00e3o. Use os resultados para planear o pr\u00f3ximo turno com SkyPlanner.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/relatorio-de-producao\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/relatorio-de-producao\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/relatorio-de-producao\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-production-report-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-production-report-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Separate trays of usable parts, faulty pieces and unfinished blanks beside a machine and production report.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/recursos-pt-pt\\\/relatorio-de-producao\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Relat\u00f3rio de produ\u00e7\u00e3o: o que registar e como agir\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Relat\u00f3rio de produ\u00e7\u00e3o: o que registar e como agir","description":"Registe produ\u00e7\u00e3o \u00fatil, tempo perdido e trabalho por concluir no relat\u00f3rio de produ\u00e7\u00e3o. Use os resultados para planear o pr\u00f3ximo turno com SkyPlanner.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/relatorio-de-producao\/","og_locale":"pt_PT","og_type":"article","og_title":"Relat\u00f3rio de produ\u00e7\u00e3o: o que registar e como agir","og_description":"Registe produ\u00e7\u00e3o \u00fatil, tempo perdido e trabalho por concluir no relat\u00f3rio de produ\u00e7\u00e3o. Use os resultados para planear o pr\u00f3ximo turno com SkyPlanner.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/relatorio-de-producao\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-17T08:56:09+00:00","article_modified_time":"2026-10-17T08:57:15+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Jussi M\u00e4ntyl\u00e4","Tempo estimado de leitura":"13 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/relatorio-de-producao\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/relatorio-de-producao\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Relat\u00f3rio de produ\u00e7\u00e3o: o que registar e como agir","datePublished":"2026-10-17T08:56:09+00:00","dateModified":"2026-10-17T08:57:15+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/relatorio-de-producao\/"},"wordCount":2586,"publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/relatorio-de-producao\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero.png","articleSection":["Efici\u00eancia industrial","recursos"],"inLanguage":"pt-PT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/relatorio-de-producao\/","url":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/relatorio-de-producao\/","name":"Relat\u00f3rio de produ\u00e7\u00e3o: o que registar e como agir","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/relatorio-de-producao\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/relatorio-de-producao\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero.png","datePublished":"2026-10-17T08:56:09+00:00","dateModified":"2026-10-17T08:57:15+00:00","description":"Registe produ\u00e7\u00e3o \u00fatil, tempo perdido e trabalho por concluir no relat\u00f3rio de produ\u00e7\u00e3o. Use os resultados para planear o pr\u00f3ximo turno com SkyPlanner.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/relatorio-de-producao\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/relatorio-de-producao\/"]}]},{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/relatorio-de-producao\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero.png","width":1672,"height":941,"caption":"Separate trays of usable parts, faulty pieces and unfinished blanks beside a machine and production report."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/recursos-pt-pt\/relatorio-de-producao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Relat\u00f3rio de produ\u00e7\u00e3o: o que registar e como agir"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Relat\u00f3rio de produ\u00e7\u00e3o: o que registar e como agir In\u00edcio &raquo; Recursos &raquo; Relat\u00f3rio de produ\u00e7\u00e3o: o que registar e como agir Um relat\u00f3rio de produ\u00e7\u00e3o regista o que a f\u00e1brica produziu durante um turno, um dia ou outro per\u00edodo definido. Re\u00fane as quantidades produzidas, os tempos de produ\u00e7\u00e3o e as interrup\u00e7\u00f5es, geralmente em conjunto&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/posts\/100527","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=100527"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/posts\/100527\/revisions"}],"predecessor-version":[{"id":100590,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/posts\/100527\/revisions\/100590"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media\/100542"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=100527"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/categories?post=100527"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/tags?post=100527"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}