{"id":107519,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"guia-de-integracao","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/","title":{"rendered":"Guia de integra\u00e7\u00e3o do Comarch ERP XL para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ Comarch ERP XL<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Guia de integra\u00e7\u00e3o do Comarch ERP XL <span class=\"hl\">para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Este guia de integra\u00e7\u00e3o do Comarch ERP XL mostra aos parceiros e \u00e0s equipas de TI como ligar o Comarch ERP XL ao SkyPlanner APS. O SkyPlanner integra-se com o Comarch ERP XL nos dois sentidos, atrav\u00e9s das interfaces da pr\u00f3pria Comarch:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>S\u00e3o importadas ordens de produ\u00e7\u00e3o (zlecenia produkcyjne) com processos e opera\u00e7\u00f5es, tecnologias, centros de trabalho, recursos, artigos, exist\u00eancias e encomendas de compra.<\/li>\n\n\n<li>As datas e horas de in\u00edcio e fim planeadas s\u00e3o devolvidas a cada opera\u00e7\u00e3o da ordem de produ\u00e7\u00e3o atrav\u00e9s da XL API.<\/li>\n\n\n<li>Se optar por essa funcionalidade, os registos de tempo dos operadores s\u00e3o devolvidos como registos de execu\u00e7\u00e3o das opera\u00e7\u00f5es.<\/li>\n\n\n<li>Os webhooks do SkyPlanner enviam as altera\u00e7\u00f5es \u00e0 programa\u00e7\u00e3o assim que ocorrem.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Cronograma de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Durante a implementa\u00e7\u00e3o inicial, a equipa do SkyPlanner configura a integra\u00e7\u00e3o de acordo com a sua instala\u00e7\u00e3o do Comarch ERP XL e assegura o suporte ap\u00f3s a entrada em produ\u00e7\u00e3o. Este guia destina-se a parceiros e programadores que pretendam participar ou desenvolver as suas pr\u00f3prias solu\u00e7\u00f5es com a REST API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"comarch-erp-xl-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Interfaces de integra\u00e7\u00e3o do Comarch ERP XL<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A Comarch apresenta tr\u00eas formas de comunicar com o ERP XL: &#8220;DCOM, direct database connection (SQL Client), REST API&#8221; (DCOM, liga\u00e7\u00e3o direta \u00e0 base de dados (SQL Client), REST API) (<a href=\"https:\/\/www.comarch.pl\/erp\/xl\/\">Comarch, tradu\u00e7\u00e3o<\/a>). Para a programa\u00e7\u00e3o da produ\u00e7\u00e3o, duas delas asseguram a integra\u00e7\u00e3o:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>XL API (CDN_API.DLL).<\/strong> &#8220;These functions are collected in the CDN_API.DLL library, installed together with the whole Comarch ERP XL system.&#8221; (Estas fun\u00e7\u00f5es est\u00e3o reunidas na biblioteca CDN_API.DLL, instalada juntamente com todo o sistema Comarch ERP XL.) (<a href=\"https:\/\/pomoc.comarch.pl\/xl\/index.php\/dokumentacja\/xl017-wykorzystanie-api-erp-xl\/\">Ajuda da Comarch, tradu\u00e7\u00e3o<\/a>) Um programa externo inicia sess\u00e3o com XLLogin, chama fun\u00e7\u00f5es que partilham a sess\u00e3o e termina a sess\u00e3o com XLLogout. Cada estrutura tem um campo <strong>Wersja<\/strong> que seleciona a vers\u00e3o do conjunto de par\u00e2metros correspondente \u00e0 sua vers\u00e3o do ERP XL.<\/li>\n\n\n<li><strong>ERP XL Web REST API.<\/strong> O Comarch ERP XL Web 2026.0 disponibiliza microsservi\u00e7os REST: &#8220;Each RestAPI microservice exposes its own interactive documentation at the \/swagger endpoint.&#8221; (Cada microsservi\u00e7o RestAPI disponibiliza a sua pr\u00f3pria documenta\u00e7\u00e3o interativa no endpoint \/swagger.) (<a href=\"https:\/\/pomoc.comarch.pl\/xlweb\/index.php\/dokumentacja\/modyfikacja-systemu\/\">Ajuda da Comarch, tradu\u00e7\u00e3o<\/a>)<\/li>\n\n<\/ol>\n\n\n<p>A liga\u00e7\u00e3o direta por <strong>SQL Client<\/strong> permite ler dados mestre e ordens na base de dados do ERP XL, nos termos acordados com a sua equipa de TI e o parceiro Comarch.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Fun\u00e7\u00f5es da XL API para a produ\u00e7\u00e3o<\/h3>\n\n\n<p>A Comarch documenta as seguintes fun\u00e7\u00f5es de produ\u00e7\u00e3o (<a href=\"https:\/\/pomoc.comarch.pl\/xl\/index.php\/dokumentacja\/xl128-przyklady-zastosowania-api-w-produkcji\/\">XL128<\/a>):<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>\u00c1rea<\/th><th>Fun\u00e7\u00e3o<\/th><th>O que faz<\/th><\/tr><\/thead><tbody><tr><td>Tecnologias<\/td><td>XLNowaTechnologia, XLNowaCzynnoscTechnologia, XLNowaFunkcjaCzynnoscTechnologia, XLNowyZasobCzynnoscTechnologia<\/td><td>Cria uma tecnologia, uma opera\u00e7\u00e3o, um centro de trabalho numa opera\u00e7\u00e3o ou um material ou produto numa opera\u00e7\u00e3o<\/td><\/tr><tr><td>Ordens de produ\u00e7\u00e3o<\/td><td>XLNoweZlecenieProd<\/td><td>Cria uma ordem de produ\u00e7\u00e3o<\/td><\/tr><tr><td>Ordens de produ\u00e7\u00e3o<\/td><td>XLZamknijZlecenieProd<\/td><td>Planeia, replaneia, apura ou encerra uma ordem de produ\u00e7\u00e3o, conforme o c\u00f3digo de a\u00e7\u00e3o escolhido<\/td><\/tr><tr><td>Opera\u00e7\u00f5es<\/td><td>XLDodajCzynnoscDoProcesuProd, XLDodajZasobDoProcesuProd<\/td><td>Adiciona uma opera\u00e7\u00e3o ou um recurso a um processo de produ\u00e7\u00e3o<\/td><\/tr><tr><td>Programa\u00e7\u00e3o<\/td><td>XLDodajTerminDoProcesuProd<\/td><td>Adiciona um intervalo de datas a uma opera\u00e7\u00e3o: IdCzynnosci, TerminOd, TerminDo<\/td><\/tr><tr><td>Execu\u00e7\u00e3o<\/td><td>XLDodajRealizacjeOperacjiProd, XLProdZmienIloscRealizacji<\/td><td>Adiciona um registo de execu\u00e7\u00e3o de uma opera\u00e7\u00e3o \u00e0 ordem e altera a quantidade executada<\/td><\/tr><tr><td>Documentos<\/td><td>XLProdObiektyDoDokumentow, XLProdGenerujDokumentyDlaObiektow<\/td><td>Gera documentos RW e PW para objetos de produ\u00e7\u00e3o<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentica\u00e7\u00e3o e acesso<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>XL API.<\/strong> A integra\u00e7\u00e3o inicia sess\u00e3o numa base de dados como operador do ERP XL atrav\u00e9s de XLLogin e recebe uma sess\u00e3o para as chamadas seguintes. A DLL \u00e9 executada num sistema Windows com o ERP XL instalado, pelo que o servi\u00e7o que devolve os dados funciona na sua rede, junto do ERP XL.<\/li>\n\n\n<li><strong>REST API.<\/strong> O acesso \u00e9 configurado para cada instala\u00e7\u00e3o do ERP XL Web; a p\u00e1gina Swagger de cada microsservi\u00e7o documenta as respetivas chamadas.<\/li>\n\n\n<li><strong>Leitura SQL.<\/strong> Uma conta de acesso \u00e0 base de dados apenas para leitura, aprovada pela sua equipa de TI.<\/li>\n\n<\/ul>\n\n\n<p>No SkyPlanner, a REST API utiliza um token de API no cabe\u00e7alho Authorization-Token para autentica\u00e7\u00e3o (SkyPlanner Settings &gt; API) e est\u00e1 documentada em Swagger\/OpenAPI. O <a href=\"\/pt-pt\/docs\/tutorial-de-integracao\/\">tutorial de integra\u00e7\u00e3o<\/a> orienta-o nas primeiras chamadas.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Eventos e consultas peri\u00f3dicas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Na documenta\u00e7\u00e3o consultada, o Comarch ERP XL n\u00e3o disponibiliza webhooks de sa\u00edda. O pr\u00f3prio APS da Comarch obt\u00e9m os dados quando o respons\u00e1vel pela programa\u00e7\u00e3o prime &#8220;Aktualizuj dane z ERP&#8221; (Atualizar dados do ERP) (<a href=\"https:\/\/pomoc.comarch.pl\/aps\/index.php\/dokumentacja\/dokumentacja-uzytkownika-wersja-2026-3\/\">Ajuda do Comarch APS<\/a>).<\/p>\n\n\n<p>Por isso, os dados do ERP XL s\u00e3o obtidos atrav\u00e9s de consultas peri\u00f3dicas. As leituras, filtradas por ordens de produ\u00e7\u00e3o em aberto e altera\u00e7\u00f5es recentes, detetam novo trabalho. A frequ\u00eancia \u00e9 definida para cada f\u00e1brica: de poucos em poucos minutos para as ordens de produ\u00e7\u00e3o e de hora a hora para as exist\u00eancias.<\/p>\n\n\n<p>O SkyPlanner envia webhooks quando o estado ou a programa\u00e7\u00e3o muda, pelo que a devolu\u00e7\u00e3o dos dados \u00e9 acionada por eventos.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapeamento de dados<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objeto do Comarch ERP XL (interface)<\/th><th>Objeto do SkyPlanner<\/th><th>Sentido<\/th><th>Frequ\u00eancia<\/th><\/tr><\/thead><tbody><tr><td>Karty towar\u00f3w, unidades de medida (REST ou leitura SQL)<\/td><td>Produtos e materiais<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>Carga inicial, seguida de consultas peri\u00f3dicas<\/td><\/tr><tr><td>Technologia: opera\u00e7\u00f5es, materiais, produtos semiacabados e produtos por opera\u00e7\u00e3o<\/td><td>Estrutura do produto, subprodutos e materiais por etapa do processo<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>Carga inicial e, depois, sempre que houver altera\u00e7\u00f5es<\/td><\/tr><tr><td>Opera\u00e7\u00f5es de Technologia: centros de trabalho, recursos e tempos<\/td><td>Etapas do processo com dura\u00e7\u00f5es e tempos de prepara\u00e7\u00e3o e desmontagem<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>Carga inicial e, depois, sempre que houver altera\u00e7\u00f5es<\/td><\/tr><tr><td>Gniazda robocze e zasoby (m\u00e1quinas, ferramentas, trabalhadores)<\/td><td>Centros de trabalho, grupos de centros de trabalho, ferramentas e pessoal<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>Carga inicial e, depois, raramente<\/td><\/tr><tr><td>Kalendarze i okresy, przestoje i awarie<\/td><td>Turnos, per\u00edodos n\u00e3o laborais e paragens<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>Diariamente, ou com turnos definidos no SkyPlanner<\/td><\/tr><tr><td>Zlecenia produkcyjne (ZP) com processos, opera\u00e7\u00f5es, materiais, prazo e prioridade<\/td><td>Ordens e tarefas com prazos e necessidades de materiais<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>Consultas de poucos em poucos minutos<\/td><\/tr><tr><td>Exist\u00eancias por armaz\u00e9m<\/td><td>Saldos de exist\u00eancias<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>Consultas de hora a hora ou ao executar a programa\u00e7\u00e3o<\/td><\/tr><tr><td>Zam\u00f3wienia zakupu (ZZ) com datas de entrega<\/td><td>Encomendas de compra e materiais a receber por data de entrega<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>Consultas de hora a hora ou ao executar a programa\u00e7\u00e3o<\/td><\/tr><tr><td>Datas da opera\u00e7\u00e3o: TerminOd, TerminDo (XLDodajTerminDoProcesuProd)<\/td><td>In\u00edcio e fim planeados por tarefa<\/td><td>SkyPlanner \u2192 ERP XL<\/td><td>Quando a programa\u00e7\u00e3o muda, atrav\u00e9s de um webhook do SkyPlanner<\/td><\/tr><tr><td>Realizacja operacji (XLDodajRealizacjeOperacjiProd)<\/td><td>Registos de tempo e confirma\u00e7\u00f5es dos operadores<\/td><td>SkyPlanner \u2192 ERP XL<\/td><td>Por confirma\u00e7\u00e3o ou por turno, se optar por esta funcionalidade<\/td><\/tr><tr><td>N\u00e3o existe no ERP XL<\/td><td>Matriz de tempos de prepara\u00e7\u00e3o e transi\u00e7\u00e3o, ferramentas como recursos de capacidade limitada, tarefas com v\u00e1rios operadores, m\u00e1quinas e pessoal alternativos<\/td><td>Gerido no SkyPlanner<\/td><td>Configurado durante a implementa\u00e7\u00e3o inicial<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Modelos de integra\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Carga inicial de dados mestre.<\/strong> Leia artigos, tecnologias, centros de trabalho, recursos e calend\u00e1rios. Defina cuidadosamente a correspond\u00eancia dos centros de trabalho no SkyPlanner: um centro de trabalho com quatro m\u00e1quinas passa a ser um grupo de centros de trabalho ou quatro centros de trabalho. As ferramentas dos recursos do ERP XL passam a ser ferramentas com capacidade limitada no SkyPlanner, e os trabalhadores passam a ser pessoal com turnos atribu\u00eddos.<\/p>\n\n\n<p><strong>2. Sincroniza\u00e7\u00e3o de ordens e encomendas.<\/strong> Leia as ordens de produ\u00e7\u00e3o com as respetivas opera\u00e7\u00f5es e materiais, bem como as encomendas de compra em aberto. O SkyPlanner considera o material encomendado dispon\u00edvel na data de entrega da encomenda de compra e atualiza as exist\u00eancias quando esta \u00e9 marcada como Delivered.<\/p>\n\n\n<p><strong>3. Grava\u00e7\u00e3o da programa\u00e7\u00e3o no ERP.<\/strong> Quando o motor programa ou desloca uma opera\u00e7\u00e3o, um webhook do SkyPlanner aciona o servi\u00e7o de grava\u00e7\u00e3o no ERP. Este chama XLDodajTerminDoProcesuProd com os valores TerminOd e TerminDo da opera\u00e7\u00e3o, para que cada opera\u00e7\u00e3o ZP tenha o in\u00edcio e o fim planeados pelo SkyPlanner.<\/p>\n\n\n<p><strong>4. Confirma\u00e7\u00f5es na f\u00e1brica.<\/strong> Os operadores registam o trabalho com SkyPlanner Mobile Confirmations ou Production Timer, e os registos de tempo mant\u00eam a programa\u00e7\u00e3o atualizada. Cabe-lhe decidir se os tempos reais s\u00e3o enviados para o ERP. Em caso afirmativo, o servi\u00e7o acrescenta registos de execu\u00e7\u00e3o com XLDodajRealizacjeOperacjiProd, e os documentos RW e PW seguem as regras do seu ERP XL. Se utilizar Comarch MES em alguns centros de trabalho, mantenha uma \u00fanica fonte de registo por opera\u00e7\u00e3o.<\/p>\n\n\n<p><strong>5. Responsabilidade pelos dados e regras de conflito.<\/strong> Documente estas regras antes da entrada em produ\u00e7\u00e3o:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dados<\/th><th>Sistema respons\u00e1vel<\/th><\/tr><\/thead><tbody><tr><td>Artigos, tecnologias, quantidades, estado ZP, c\u00e1lculo de custos<\/td><td>Comarch ERP XL<\/td><\/tr><tr><td>Sequ\u00eancia das opera\u00e7\u00f5es, horas de in\u00edcio e fim, afeta\u00e7\u00e3o de recursos<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matriz de tempos de prepara\u00e7\u00e3o, requisitos de ferramentas e operadores, recursos alternativos<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Turnos, calend\u00e1rios e paragens<\/td><td>Um \u00fanico sistema, escolhido na defini\u00e7\u00e3o do \u00e2mbito<\/td><\/tr><tr><td>Registos de execu\u00e7\u00e3o, documentos RW e PW<\/td><td>Comarch ERP XL, com introdu\u00e7\u00e3o direta ou envio a partir dos registos de tempo do SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Escolha um \u00fanico sistema para gravar as datas das opera\u00e7\u00f5es. Se o replaneamento autom\u00e1tico do ERP XL ou o Comarch APS continuar a gravar datas nas mesmas ordens de produ\u00e7\u00e3o, desative essa fun\u00e7\u00e3o para as ordens programadas pelo SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapas habituais do projeto<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio do processo de integra\u00e7\u00e3o. Antes disso, valide a programa\u00e7\u00e3o durante o per\u00edodo de teste gratuito de 30 dias, com centros de trabalho, tecnologias e ordens de produ\u00e7\u00e3o em aberto exportados do ERP XL em CSV ou Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapeamento.<\/strong> Defina a tabela de correspond\u00eancias, as regras de responsabilidade pelos dados, as frequ\u00eancias de sincroniza\u00e7\u00e3o e se os registos de execu\u00e7\u00e3o s\u00e3o enviados para o ERP.<\/li>\n\n\n<li><strong>Acesso ao ERP XL.<\/strong> Crie o operador de integra\u00e7\u00e3o, configure a liga\u00e7\u00e3o de leitura e instale o servi\u00e7o de grava\u00e7\u00e3o numa m\u00e1quina com o ERP XL instalado. Teste primeiro numa c\u00f3pia da base de dados.<\/li>\n\n\n<li><strong>Carregamento inicial.<\/strong> Artigos, tecnologias, centros de trabalho, recursos e calend\u00e1rios.<\/li>\n\n\n<li><strong>Sincroniza\u00e7\u00e3o de ordens de produ\u00e7\u00e3o e encomendas de compra.<\/strong> Consulta peri\u00f3dica com filtros e novas tentativas em caso de falha.<\/li>\n\n\n<li><strong>Configura\u00e7\u00e3o de restri\u00e7\u00f5es no SkyPlanner.<\/strong> Matriz de tempos de prepara\u00e7\u00e3o, ferramentas, n\u00famero de operadores por tarefa e m\u00e1quinas ou pessoal alternativos.<\/li>\n\n\n<li><strong>Grava\u00e7\u00e3o da programa\u00e7\u00e3o no ERP.<\/strong> Chamadas a XLDodajTerminDoProcesuProd acionadas pelos webhooks do SkyPlanner, al\u00e9m dos registos de execu\u00e7\u00e3o, se essa op\u00e7\u00e3o tiver sido escolhida.<\/li>\n\n\n<li><strong>Testes em paralelo.<\/strong> Execute o SkyPlanner em paralelo com o plano atual, compare datas e corrija os dados mestre.<\/li>\n\n\n<li><strong>Entrada em produ\u00e7\u00e3o.<\/strong> Ative a grava\u00e7\u00e3o no ERP quando os dados coincidirem.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-comarch-erp-xl-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que prever numa integra\u00e7\u00e3o com o Comarch ERP XL<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Capacidade introduzida manualmente.<\/strong> No ERP XL, a capacidade do centro de trabalho \u00e9 um n\u00famero definido pelo utilizador, com uma % de carga permitida. O SkyPlanner determina a capacidade a partir dos turnos e recursos reais. Por isso, configure os turnos com cuidado e deixe de usar a percentagem.<\/li>\n\n\n<li><strong>Recursos ilimitados.<\/strong> Os recursos assinalados como tendo capacidade ilimitada n\u00e3o passam pela verifica\u00e7\u00e3o de ocupa\u00e7\u00e3o no ERP XL. Decida, para cada um, se deve tornar-se um centro de trabalho com capacidade limitada no SkyPlanner.<\/li>\n\n\n<li><strong>Ordens lan\u00e7adas.<\/strong> O ERP XL exclui do replaneamento as opera\u00e7\u00f5es lan\u00e7adas para produ\u00e7\u00e3o, a menos que a op\u00e7\u00e3o &#8220;Przesu\u0144 na zwolnionych&#8221; esteja selecionada. Acorde como se aplicam as datas do SkyPlanner \u00e0s ordens lan\u00e7adas e utilize Running Time Lock para fixar a programa\u00e7\u00e3o das pr\u00f3ximas horas de trabalho.<\/li>\n\n\n<li><strong>Vers\u00f5es das estruturas.<\/strong> As estruturas da XL API incluem um campo Wersja. Defina-o de acordo com a sua vers\u00e3o do ERP XL e volte a testar ap\u00f3s cada atualiza\u00e7\u00e3o anual.<\/li>\n\n\n<li><strong>Unidades e tempos polacos.<\/strong> Os tempos das opera\u00e7\u00f5es e as unidades dos calend\u00e1rios t\u00eam de ser convertidos com exatid\u00e3o na importa\u00e7\u00e3o; caso contr\u00e1rio, todas as dura\u00e7\u00f5es ficam erradas.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-comarch-erp-xl-i\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quem configura e presta suporte \u00e0 integra\u00e7\u00e3o com o Comarch ERP XL<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>A equipa SkyPlanner configura a integra\u00e7\u00e3o durante a implementa\u00e7\u00e3o e presta suporte ap\u00f3s a entrada em produ\u00e7\u00e3o,<\/strong> abrangendo as leituras e chamadas \u00e0 XL API acordadas. Cada f\u00e1brica utiliza o Comarch ERP XL de forma diferente, e \u00e9 aqui que esse conhecimento se aplica.<\/li>\n\n\n<li><strong>O seu parceiro Comarch pode participar.<\/strong> O parceiro conhece a sua configura\u00e7\u00e3o, o licenciamento e a XL API, e pode configurar o operador, a liga\u00e7\u00e3o de leitura e o servidor de grava\u00e7\u00e3o no ERP em conjunto com a equipa SkyPlanner.<\/li>\n\n\n<li><strong>Os seus programadores podem desenvolver funcionalidades adicionais<\/strong> atrav\u00e9s da REST API do SkyPlanner, com um token de API. Basta um token de API para come\u00e7ar, e a equipa SkyPlanner ajuda quando necess\u00e1rio. Consulte a <a href=\"\/pt-pt\/docs\/tutorial-de-integracao\/\">documenta\u00e7\u00e3o de integra\u00e7\u00e3o do SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>O SkyPlanner est\u00e1 dispon\u00edvel a partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos e fatura\u00e7\u00e3o mensal. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, juntamente com o seu plano, de acordo com os seus processos e necessidades. Consulte os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a>, a <a href=\"\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/programacao-producao\/\">programa\u00e7\u00e3o da produ\u00e7\u00e3o com o Comarch ERP XL respeitando a capacidade real de m\u00e1quinas e pessoal<\/a>, a <a href=\"\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/\">p\u00e1gina do Comarch ERP XL<\/a> e a <a href=\"\/pt-pt\/integracoes\/erp\/\">p\u00e1gina de integra\u00e7\u00f5es ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Opini\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento da UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, o nosso planeamento da produ\u00e7\u00e3o passou das folhas de c\u00e1lculo Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o poupa 2 horas de trabalho por semana, e uma nova fila de trabalho chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Ler o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com fatos de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Ind\u00fastria farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e criar um plano otimizado para tr\u00eas meses que abrange todos os centros de trabalho demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Ler o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, diretora de produ\u00e7\u00e3o da Fredman Operations, junto a uma c\u00e9lula robotizada de paletiza\u00e7\u00e3o em Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 meses<\/b><span>de capacidade dispon\u00edvel vis\u00edvel para a equipa comercial<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner d\u00e1 uma base s\u00f3lida e fiabilidade a todo o planeamento da produ\u00e7\u00e3o.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, diretora de produ\u00e7\u00e3o<\/b><br>Fredman Operations \u00b7 Pap\u00e9is para embalagens aptos para contacto alimentar<\/p>\n\n\n<p class=\"ind-cust__result\">A equipa comercial v\u00ea a capacidade dispon\u00edvel com seis meses de anteced\u00eancia, e os pedidos de altera\u00e7\u00e3o da programa\u00e7\u00e3o que demoravam uma hora ou mais recebem resposta em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/fredman-operations\/\">Ler o testemunho da Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>de fiabilidade das entregas desde 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner d\u00e1-nos visibilidade sobre a capacidade e torna o planeamento previs\u00edvel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Ind\u00fastria qu\u00edmica e alimentar<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas mant\u00e9m-se nos 100% desde 2021, durante todo o per\u00edodo de utiliza\u00e7\u00e3o do SkyPlanner.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/opes-corporation\/\">Ler o testemunho da Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Comarch ERP XL tem uma API para ordens de produ\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">Sim. A XL API (CDN_API.DLL) cria ordens de produ\u00e7\u00e3o, planeia-as e replaneia-as com XLZamknijZlecenieProd, acrescenta datas \u00e0s opera\u00e7\u00f5es com XLDodajTerminDoProcesuProd e grava registos de execu\u00e7\u00e3o com XLDodajRealizacjeOperacjiProd. O Comarch ERP XL Web acrescenta microsservi\u00e7os REST documentados no Swagger.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Como s\u00e3o gravadas no Comarch ERP XL as datas planeadas?<\/summary>\n<p class=\"sp-faq__a\">Atrav\u00e9s de XLDodajTerminDoProcesuProd, que acrescenta um intervalo de datas (TerminOd, TerminDo) a cada opera\u00e7\u00e3o da ordem de produ\u00e7\u00e3o. Um webhook do SkyPlanner aciona a chamada sempre que a programa\u00e7\u00e3o muda.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Comarch ERP XL suporta webhooks?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o est\u00e3o documentados webhooks de sa\u00edda, pelo que a integra\u00e7\u00e3o consulta periodicamente o ERP XL com uma frequ\u00eancia definida para cada f\u00e1brica. Os webhooks do pr\u00f3prio SkyPlanner enviam as altera\u00e7\u00f5es \u00e0 programa\u00e7\u00e3o assim que ocorrem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Um parceiro Comarch deve propor o Comarch APS ou o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner, quando o cliente pretende ter, em poucas semanas, uma programa\u00e7\u00e3o que respeita a capacidade real de m\u00e1quinas e pessoal e se mant\u00e9m atualizada automaticamente. O Comarch APS \u00e9 uma aplica\u00e7\u00e3o separada, com a sua pr\u00f3pria base de dados PostgreSQL, integrador e chave de licen\u00e7a. A sincroniza\u00e7\u00e3o depende de um clique do planeador, e o tempo de prepara\u00e7\u00e3o \u00e9 um valor fixo por opera\u00e7\u00e3o (<a href=\"https:\/\/pomoc.comarch.pl\/aps\/index.php\/dokumentacja\/dokumentacja-uzytkownika-wersja-2026-3\/\">ajuda do Comarch APS<\/a>). O SkyPlanner \u00e9 um software na nuvem que replaneia automaticamente e planeia mudan\u00e7as de produ\u00e7\u00e3o, ferramentas, equipas e materiais, a partir de 199 \u20ac por m\u00eas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de desenvolver a integra\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">Sim. O teste gratuito de 30 dias permite utilizar at\u00e9 20 centros de trabalho, com importa\u00e7\u00f5es em CSV ou Excel a partir do ERP XL, sem necessidade de cart\u00e3o de cr\u00e9dito. <a href=\"\/pt-pt\/avaliacao\/\">Inicie o teste<\/a> ou <a href=\"\/pt-pt\/vendas-de-contacto\/\">fale com a equipa comercial<\/a> para definir o \u00e2mbito da integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ Comarch ERP XL Guia de integra\u00e7\u00e3o do Comarch ERP XL para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS Este guia de integra\u00e7\u00e3o do Comarch ERP XL mostra aos parceiros e \u00e0s equipas de TI como ligar o Comarch ERP XL ao SkyPlanner APS. O SkyPlanner integra-se com o Comarch ERP XL &#8230; <a title=\"Guia de integra\u00e7\u00e3o do Comarch ERP XL para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/\" aria-label=\"Leia mais sobre Guia de integra\u00e7\u00e3o do Comarch ERP XL para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106475,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107519","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Comarch XL e APS: guia de integra\u00e7\u00e3o para programar a produ\u00e7\u00e3o<\/title>\n<meta name=\"description\" content=\"Ligue Comarch ERP XL ao SkyPlanner APS: produ\u00e7\u00e3o via XL API, ERP XL Web REST API, retorno de datas de opera\u00e7\u00f5es, mapeamento de dados e sugest\u00f5es para o projeto.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Guia de integra\u00e7\u00e3o do Comarch ERP XL para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Ligue Comarch ERP XL ao SkyPlanner APS: produ\u00e7\u00e3o via XL API, ERP XL Web REST API, retorno de datas de opera\u00e7\u00f5es, mapeamento de dados e sugest\u00f5es para o projeto.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/comarch-erp-xl\\\/guia-de-integracao\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/comarch-erp-xl\\\/guia-de-integracao\\\/\",\"name\":\"Comarch XL e APS: guia de integra\u00e7\u00e3o para programar a produ\u00e7\u00e3o\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Ligue Comarch ERP XL ao SkyPlanner APS: produ\u00e7\u00e3o via XL API, ERP XL Web REST API, retorno de datas de opera\u00e7\u00f5es, mapeamento de dados e sugest\u00f5es para o projeto.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/comarch-erp-xl\\\/guia-de-integracao\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/comarch-erp-xl\\\/guia-de-integracao\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/comarch-erp-xl\\\/guia-de-integracao\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para Comarch ERP XL: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/comarch-erp-xl\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Guia de integra\u00e7\u00e3o do Comarch ERP XL para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Comarch XL e APS: guia de integra\u00e7\u00e3o para programar a produ\u00e7\u00e3o","description":"Ligue Comarch ERP XL ao SkyPlanner APS: produ\u00e7\u00e3o via XL API, ERP XL Web REST API, retorno de datas de opera\u00e7\u00f5es, mapeamento de dados e sugest\u00f5es para o projeto.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/","og_locale":"pt_PT","og_type":"article","og_title":"Guia de integra\u00e7\u00e3o do Comarch ERP XL para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS","og_description":"Ligue Comarch ERP XL ao SkyPlanner APS: produ\u00e7\u00e3o via XL API, ERP XL Web REST API, retorno de datas de opera\u00e7\u00f5es, mapeamento de dados e sugest\u00f5es para o projeto.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"14 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/","name":"Comarch XL e APS: guia de integra\u00e7\u00e3o para programar a produ\u00e7\u00e3o","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Ligue Comarch ERP XL ao SkyPlanner APS: produ\u00e7\u00e3o via XL API, ERP XL Web REST API, retorno de datas de opera\u00e7\u00f5es, mapeamento de dados e sugest\u00f5es para o projeto.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para Comarch ERP XL: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/"},{"@type":"ListItem","position":5,"name":"Guia de integra\u00e7\u00e3o do Comarch ERP XL para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ Comarch ERP XL Guia de integra\u00e7\u00e3o do Comarch ERP XL para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS Este guia de integra\u00e7\u00e3o do Comarch ERP XL mostra aos parceiros e \u00e0s equipas de TI como ligar o Comarch ERP XL ao SkyPlanner APS. O SkyPlanner integra-se com o Comarch ERP XL&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/107519","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=107519"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/107519\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106475"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=107519"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}