{"id":107461,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/helios\/guia-de-integracao\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"guia-de-integracao","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/helios\/guia-de-integracao\/","title":{"rendered":"Guia de integra\u00e7\u00e3o do HELIOS para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ HELIOS<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Guia de integra\u00e7\u00e3o do HELIOS <span class=\"hl\">para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Este guia de integra\u00e7\u00e3o do HELIOS mostra aos parceiros e \u00e0s equipas de TI como ligar o HELIOS iNuvio e o HELIOS Nephrite ao SkyPlanner APS. O SkyPlanner integra-se com o HELIOS nos dois sentidos, atrav\u00e9s das interfaces do pr\u00f3prio HELIOS:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>S\u00e3o importadas as ordens de fabrico (v\u00fdrobn\u00ed p\u0159\u00edkazy) com as respetivas opera\u00e7\u00f5es, pe\u00e7as fabricadas, listas de materiais, gamas operat\u00f3rias, postos de trabalho, m\u00e1quinas, profiss\u00f5es, recursos humanos, exist\u00eancias e encomendas de compra.<\/li>\n\n\n<li>As datas previstas de in\u00edcio e fim s\u00e3o enviadas de volta para as ordens de fabrico.<\/li>\n\n\n<li>Se assim o pretender, os registos de tempos dos operadores podem ser enviados de volta como registos de opera\u00e7\u00f5es (evidence v\u00fdrobn\u00edch operac\u00ed).<\/li>\n\n\n<li>Os webhooks do SkyPlanner enviam as altera\u00e7\u00f5es \u00e0 programa\u00e7\u00e3o assim que ocorrem.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Cronograma de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Durante a implementa\u00e7\u00e3o inicial, a equipa SkyPlanner configura a integra\u00e7\u00e3o de acordo com a sua instala\u00e7\u00e3o HELIOS e assegura o suporte ap\u00f3s a entrada em produ\u00e7\u00e3o. Este guia destina-se aos parceiros e programadores HELIOS que pretendem participar ou desenvolver a integra\u00e7\u00e3o por conta pr\u00f3pria com base na REST API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"helios-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Interfaces de integra\u00e7\u00e3o do HELIOS<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>Helios Inuvio Server (Inuvio REST API).<\/strong> A Asseco descreve-o como um componente separado do HELIOS iNuvio que permite aceder \u00e0s \u00e1reas funcionais do HELIOS iNuvio atrav\u00e9s de uma REST API (<a href=\"https:\/\/public.helios.eu\/inuvio\/doc\/cs\/index.php?title=Helios_Inuvio_Server\">ajuda do Helios Inuvio Server<\/a>). \u00c9 fornecido com a distribui\u00e7\u00e3o iNuvio e a especifica\u00e7\u00e3o OpenAPI est\u00e1 publicada nos formatos Rapidoc e Redoc. A API trabalha com as vistas do HELIOS (browses), cada uma com o seu pr\u00f3prio ID e permiss\u00f5es:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>GET \/browses\/list<\/strong> e <strong>GET \/browses\/meta<\/strong> listam as vistas dispon\u00edveis e as respetivas colunas.<\/li>\n\n\n<li><strong>\/browses\/data<\/strong> l\u00ea as linhas de uma vista e permite escrev\u00ea-las quando a vista admite cria\u00e7\u00e3o, atualiza\u00e7\u00e3o e elimina\u00e7\u00e3o.<\/li>\n\n\n<li><strong>\/api\/v1\/actions\/meta<\/strong> e <strong>\/api\/v1\/actions\/execute\/{dbName}\/{browseIdent}\/{actionIdent}<\/strong> executam a\u00e7\u00f5es externas numa vista. Atualmente, s\u00e3o suportadas a\u00e7\u00f5es externas dos tipos Procedure, Browse e Plugin.<\/li>\n\n<\/ul>\n\n\n<p>As vistas de produ\u00e7\u00e3o utilizadas por quem programa a produ\u00e7\u00e3o incluem o plano de produ\u00e7\u00e3o (v\u00fdrobn\u00ed pl\u00e1n), as ordens de fabrico (v\u00fdrobn\u00ed p\u0159\u00edkazy), as pe\u00e7as das ordens de fabrico, os materiais e produtos semiacabados para produ\u00e7\u00e3o, as profiss\u00f5es, os recursos humanos, as predefini\u00e7\u00f5es das opera\u00e7\u00f5es das gamas operat\u00f3rias e os registos de opera\u00e7\u00f5es. As exist\u00eancias, as entradas, as sa\u00eddas e as encomendas de compra emitidas (vydan\u00e9 objedn\u00e1vky) est\u00e3o dispon\u00edveis da mesma forma.<\/p>\n\n\n<p><strong>HELIOS Nephrite REST API.<\/strong> O plano de evolu\u00e7\u00e3o do Nephrite inclui o desenvolvimento da REST API (<a href=\"https:\/\/www.helios.eu\/files\/road-to-2025-nephrite.pdf\">plano de evolu\u00e7\u00e3o do HELIOS Nephrite<\/a>). Durante a defini\u00e7\u00e3o do \u00e2mbito, a equipa SkyPlanner confirma consigo e com o seu parceiro HELIOS os endpoints Nephrite da sua instala\u00e7\u00e3o. Os fluxos de dados apresentados abaixo mant\u00eam-se.<\/p>\n\n\n<p><strong>Excel e CSV.<\/strong> Todas as vistas do HELIOS permitem exportar para Microsoft Office, o que \u00e9 suficiente para carregar os dados do per\u00edodo de avalia\u00e7\u00e3o.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentica\u00e7\u00e3o e licenciamento<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Duas op\u00e7\u00f5es de autentica\u00e7\u00e3o.<\/strong> O iNuvio disponibiliza uma API de autentica\u00e7\u00e3o propriet\u00e1ria mais antiga (\/api\/token) e uma API OAuth2 mais recente, baseada no RFC 6749 (\/oauth\/token, \/oauth\/revoke). Os tokens s\u00e3o renovados atrav\u00e9s de POST \/oauth\/token ou GET \/api\/token.<\/li>\n\n\n<li><strong>Licenciamento.<\/strong> O Helios Inuvio Server \u00e9 gratuito, mas a REST API est\u00e1 sujeita a licenciamento. A partir da vers\u00e3o 3.0.2026.0301, as APIs de sistema e das \u00e1reas funcionais est\u00e3o reunidas numa \u00fanica Inuvio REST API e o acesso \u00e0 API deixa de estar limitado pelo n\u00famero de utilizadores.<\/li>\n\n\n<li><strong>Permiss\u00f5es.<\/strong> O utilizador da integra\u00e7\u00e3o precisa de permiss\u00f5es de leitura nas vistas de produ\u00e7\u00e3o e de exist\u00eancias, bem como de permiss\u00e3o para executar as a\u00e7\u00f5es externas acordadas.<\/li>\n\n<\/ul>\n\n\n<p>Do lado do SkyPlanner, a REST API utiliza um token de API no cabe\u00e7alho Authorization-Token para autentica\u00e7\u00e3o (SkyPlanner Settings &gt; API) e est\u00e1 documentada em Swagger\/OpenAPI. O <a href=\"\/pt-pt\/docs\/tutorial-de-integracao\/\">tutorial de integra\u00e7\u00e3o<\/a> explica passo a passo as primeiras chamadas.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Eventos e consultas peri\u00f3dicas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner l\u00ea os dados do HELIOS a intervalos definidos. As chamadas a \/browses\/data, filtradas pelas ordens de fabrico abertas e pelas altera\u00e7\u00f5es recentes, recolhem os novos trabalhos. A frequ\u00eancia \u00e9 definida por f\u00e1brica: de poucos em poucos minutos para as ordens de fabrico e de hora a hora para as exist\u00eancias.<\/p>\n\n\n<p>O SkyPlanner envia webhooks quando h\u00e1 altera\u00e7\u00f5es no estado ou na programa\u00e7\u00e3o, pelo que a escrita de dados de volta no HELIOS \u00e9 desencadeada por eventos.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapeamento de dados<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objeto HELIOS (vista)<\/th><th>Objeto do SkyPlanner<\/th><th>Sentido<\/th><th>Frequ\u00eancia<\/th><\/tr><\/thead><tbody><tr><td>Fichas de artigos e pe\u00e7as fabricadas (vyr\u00e1b\u011bn\u00e9 d\u00edlce), unidades<\/td><td>Produtos e materiais<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>Carregamento inicial, seguido de consultas peri\u00f3dicas<\/td><\/tr><tr><td>Listas de materiais (kusovn\u00edk, kusovn\u00edkov\u00e9 vazby) com datas de validade<\/td><td>Estrutura do produto, subprodutos, materiais por produto<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>Carga inicial e, depois, a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Gamas operat\u00f3rias (technologick\u00fd postup): opera\u00e7\u00e3o, posto de trabalho, tempo de prepara\u00e7\u00e3o da m\u00e1quina e do operador, tempo unit\u00e1rio, tempo de finaliza\u00e7\u00e3o e tempo entre opera\u00e7\u00f5es<\/td><td>Etapas do processo com dura\u00e7\u00f5es e tempos de prepara\u00e7\u00e3o e desmontagem<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>Carga inicial e, depois, a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Postos de trabalho (pracovi\u0161t\u011b), m\u00e1quinas (stroje), postos de trabalho alternativos<\/td><td>Centros de trabalho, grupos de centros de trabalho, centros de trabalho alternativos<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>Carga inicial e, depois, raramente<\/td><\/tr><tr><td>Profiss\u00f5es (v\u00fdrobn\u00ed profese), recursos humanos (v\u00fdrobn\u00ed person\u00e1ln\u00ed zdroje)<\/td><td>Pessoal e n\u00famero de operadores por tarefa<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>Carregamento inicial, depois a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Calend\u00e1rios de planeamento (pl\u00e1novac\u00ed kalend\u00e1\u0159e)<\/td><td>Turnos e dias n\u00e3o \u00fateis<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>Diariamente, ou turnos pr\u00f3prios no SkyPlanner<\/td><\/tr><tr><td>Ordens de fabrico (v\u00fdrobn\u00ed p\u0159\u00edkazy), pe\u00e7as e opera\u00e7\u00f5es das ordens, materiais para produ\u00e7\u00e3o<\/td><td>Ordens e tarefas com datas-limite e necessidades de materiais<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>Consultas de poucos em poucos minutos<\/td><\/tr><tr><td>Exist\u00eancias (stav skladu)<\/td><td>Saldos de exist\u00eancias<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>Consultas de hora a hora ou ao executar a programa\u00e7\u00e3o<\/td><\/tr><tr><td>Encomendas de compra emitidas (vydan\u00e9 objedn\u00e1vky) com datas de entrega<\/td><td>Encomendas de compra, materiais a receber por data de entrega<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>Consultas de hora a hora ou ao executar a programa\u00e7\u00e3o<\/td><\/tr><tr><td>In\u00edcio e fim previstos por opera\u00e7\u00e3o da ordem de fabrico (a\u00e7\u00e3o externa)<\/td><td>In\u00edcio e fim previstos por tarefa<\/td><td>SkyPlanner \u2192 HELIOS<\/td><td>A cada altera\u00e7\u00e3o da programa\u00e7\u00e3o, atrav\u00e9s de um webhook do SkyPlanner<\/td><\/tr><tr><td>Registos de opera\u00e7\u00f5es (evidence v\u00fdrobn\u00edch operac\u00ed)<\/td><td>Registos de tempos e confirma\u00e7\u00f5es dos operadores<\/td><td>SkyPlanner \u2192 HELIOS<\/td><td>Por confirma\u00e7\u00e3o ou por turno, se optar por esta funcionalidade<\/td><\/tr><tr><td>N\u00e3o existe no HELIOS<\/td><td>Matriz de tempos de prepara\u00e7\u00e3o, ferramentas como recursos de capacidade limitada, tarefas com v\u00e1rios operadores<\/td><td>Gerido no SkyPlanner<\/td><td>Configurado durante a implementa\u00e7\u00e3o inicial<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Modelos de integra\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Carregamento inicial dos dados mestre.<\/strong> Leia as pe\u00e7as fabricadas, listas de materiais, gamas operat\u00f3rias, postos de trabalho, m\u00e1quinas, profiss\u00f5es, recursos humanos e calend\u00e1rios a partir das vistas TPV. Cada recurso do HELIOS tem um indicador que permite inclu\u00ed-lo no planeamento da capacidade. Decida, por isso, quais os recursos que o SkyPlanner ir\u00e1 programar. Um posto de trabalho com quatro m\u00e1quinas d\u00e1 origem a um grupo de centros de trabalho ou a quatro centros de trabalho.<\/p>\n\n\n<p><strong>2. Sincroniza\u00e7\u00e3o das ordens.<\/strong> Leia as ordens de fabrico com as respetivas pe\u00e7as, opera\u00e7\u00f5es e materiais, bem como as encomendas de compra emitidas. O SkyPlanner considera que o material encomendado fica dispon\u00edvel na data de entrega da encomenda de compra e atualiza as exist\u00eancias quando esta \u00e9 marcada como Delivered. Programe as ordens de fabrico lan\u00e7adas. As quantidades previstas no plano de produ\u00e7\u00e3o permanecem no HELIOS at\u00e9 se tornarem ordens de fabrico.<\/p>\n\n\n<p><strong>3. Escrita da programa\u00e7\u00e3o no HELIOS.<\/strong> Quando o motor posiciona ou desloca uma tarefa, um webhook do SkyPlanner desencadeia uma a\u00e7\u00e3o externa na vista de ordens de fabrico atrav\u00e9s de \/api\/v1\/actions\/execute. A a\u00e7\u00e3o \u00e9 um procedimento HELIOS, acordado durante a defini\u00e7\u00e3o do \u00e2mbito, que define o in\u00edcio e o fim previstos da opera\u00e7\u00e3o da ordem. O HELIOS valida a altera\u00e7\u00e3o segundo a sua pr\u00f3pria l\u00f3gica.<\/p>\n\n\n<p><strong>4. Confirma\u00e7\u00f5es na f\u00e1brica.<\/strong> Os operadores registam o trabalho com SkyPlanner Mobile Confirmations ou Production Timer, e os registos de tempos mant\u00eam a programa\u00e7\u00e3o atualizada. Pode optar por enviar ou n\u00e3o os tempos reais de volta para o HELIOS. Se optar pelo envio, uma a\u00e7\u00e3o externa grava-os como registos de opera\u00e7\u00f5es, por opera\u00e7\u00e3o da ordem. Caso contr\u00e1rio, os operadores continuam a registar o trabalho nos terminais HELIOS e o SkyPlanner l\u00ea esses registos.<\/p>\n\n\n<p><strong>5. Responsabilidade pelos dados e regras de resolu\u00e7\u00e3o de conflitos.<\/strong> Documente estas regras antes da entrada em produ\u00e7\u00e3o:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dados<\/th><th>Sistema respons\u00e1vel<\/th><\/tr><\/thead><tbody><tr><td>Artigos, listas de materiais, gamas operat\u00f3rias, quantidades, estado das ordens<\/td><td>HELIOS<\/td><\/tr><tr><td>Sequ\u00eancia das opera\u00e7\u00f5es, horas de in\u00edcio e fim, atribui\u00e7\u00e3o de m\u00e1quinas<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matriz de tempos de prepara\u00e7\u00e3o, necessidades de ferramentas e operadores, recursos alternativos<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Turnos e dias n\u00e3o \u00fateis<\/td><td>Um \u00fanico sistema, escolhido na defini\u00e7\u00e3o do \u00e2mbito<\/td><\/tr><tr><td>Registos de opera\u00e7\u00f5es, sa\u00eddas e entradas de materiais<\/td><td>HELIOS, com introdu\u00e7\u00e3o direta ou envio a partir dos registos de tempos do SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Escolha um \u00fanico sistema para escrever as datas das ordens. Se o planeamento da capacidade do HELIOS ou o Nephrite APS ainda escrever datas, desative essa fun\u00e7\u00e3o para as ordens programadas pelo SkyPlanner ou mantenha o plano do HELIOS apenas como plano de teste.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapas habituais do projeto<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio do acompanhamento inicial. Antes disso, valide a programa\u00e7\u00e3o durante o per\u00edodo de avalia\u00e7\u00e3o gratuita de 30 dias, com postos de trabalho, gamas operat\u00f3rias e ordens de fabrico abertas exportados do HELIOS em CSV ou Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapeamento.<\/strong> Defina a tabela de mapeamento, as regras de responsabilidade pelos dados, as frequ\u00eancias de sincroniza\u00e7\u00e3o e se os registos de opera\u00e7\u00f5es ser\u00e3o enviados de volta para o HELIOS.<\/li>\n\n\n<li><strong>Acesso ao HELIOS.<\/strong> Configure o Helios Inuvio Server, o utilizador da integra\u00e7\u00e3o, as credenciais OAuth2 e o licenciamento da REST API. Teste primeiro numa c\u00f3pia da base de dados.<\/li>\n\n\n<li><strong>Carregamento inicial.<\/strong> Pe\u00e7as fabricadas, listas de materiais, gamas operat\u00f3rias, postos de trabalho, m\u00e1quinas, profiss\u00f5es e calend\u00e1rios.<\/li>\n\n\n<li><strong>Sincroniza\u00e7\u00e3o de ordens de fabrico e encomendas de compra.<\/strong> Consultas peri\u00f3dicas com filtros, pagina\u00e7\u00e3o e novas tentativas.<\/li>\n\n\n<li><strong>Configura\u00e7\u00e3o de restri\u00e7\u00f5es no SkyPlanner.<\/strong> Matriz de tempos de prepara\u00e7\u00e3o, ferramentas, n\u00famero de operadores por tarefa e m\u00e1quinas ou pessoal alternativos.<\/li>\n\n\n<li><strong>Escrita da programa\u00e7\u00e3o no HELIOS.<\/strong> Crie e teste as a\u00e7\u00f5es externas para as datas previstas e, se optar por essa funcionalidade, para os registos de opera\u00e7\u00f5es.<\/li>\n\n\n<li><strong>Testes em paralelo.<\/strong> Execute o SkyPlanner em paralelo com o plano atual, compare as datas e corrija os dados mestre.<\/li>\n\n\n<li><strong>Entrada em produ\u00e7\u00e3o.<\/strong> Ative a grava\u00e7\u00e3o dos dados no HELIOS quando os dados coincidirem.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-helios-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que prever numa integra\u00e7\u00e3o com o HELIOS<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Indicadores de planeamento.<\/strong> Apenas os recursos assinalados para planeamento da capacidade t\u00eam dados de capacidade fi\u00e1veis. Verifique esses indicadores nos postos de trabalho, m\u00e1quinas, profiss\u00f5es e subcontrata\u00e7\u00f5es antes do primeiro carregamento.<\/li>\n\n\n<li><strong>Unidades de tempo.<\/strong> Os tempos de prepara\u00e7\u00e3o, unit\u00e1rios e de finaliza\u00e7\u00e3o podem ser introduzidos em horas, minutos ou segundos. Converta-os durante a importa\u00e7\u00e3o; caso contr\u00e1rio, todas as dura\u00e7\u00f5es ficar\u00e3o erradas.<\/li>\n\n\n<li><strong>Tempo entre opera\u00e7\u00f5es.<\/strong> O tempo constante entre opera\u00e7\u00f5es \u00e9 tempo de espera, n\u00e3o tempo de m\u00e1quina. Modele-o como espera, n\u00e3o como capacidade.<\/li>\n\n\n<li><strong>Opera\u00e7\u00f5es subcontratadas (kooperace).<\/strong> O tempo de transporte aplica-se tanto \u00e0 ida como \u00e0 volta. Modele as opera\u00e7\u00f5es subcontratadas como etapas que apenas consomem tempo.<\/li>\n\n\n<li><strong>Vistas com permiss\u00e3o de escrita.<\/strong> Todas as vistas permitem a leitura, mas s\u00f3 algumas permitem criar, atualizar e eliminar registos. GET \/browses\/list com o filtro browseCreateImplemented=1 mostra quais. As vistas das ordens de produ\u00e7\u00e3o s\u00e3o apenas de leitura, pelo que as datas planeadas s\u00e3o enviadas de volta atrav\u00e9s da a\u00e7\u00e3o externa acordada.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-helios-integrati\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quem configura e d\u00e1 suporte \u00e0 integra\u00e7\u00e3o com o HELIOS<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>A equipa SkyPlanner configura a integra\u00e7\u00e3o durante a implementa\u00e7\u00e3o e d\u00e1 suporte ap\u00f3s a entrada em produ\u00e7\u00e3o,<\/strong> abrangendo as vistas e as a\u00e7\u00f5es externas acordadas. Cada f\u00e1brica utiliza o HELIOS de forma diferente, e \u00e9 nesta fase que esse conhecimento \u00e9 aplicado.<\/li>\n\n\n<li><strong>O seu parceiro HELIOS pode participar.<\/strong> O parceiro conhece a sua instala\u00e7\u00e3o, os procedimentos personalizados e o licenciamento, e pode configurar o Helios Inuvio Server e as a\u00e7\u00f5es externas em conjunto com a equipa SkyPlanner.<\/li>\n\n\n<li><strong>Os seus pr\u00f3prios programadores podem ampliar esta integra\u00e7\u00e3o<\/strong> utilizando a REST API do SkyPlanner com um token de API. Basta um token de API para come\u00e7ar, e a equipa SkyPlanner presta apoio quando necess\u00e1rio. Consulte a <a href=\"\/pt-pt\/docs\/tutorial-de-integracao\/\">documenta\u00e7\u00e3o de integra\u00e7\u00e3o do SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>O SkyPlanner est\u00e1 dispon\u00edvel a partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos e fatura\u00e7\u00e3o mensal. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, juntamente com o seu plano, de acordo com os seus processos e necessidades. Consulte os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a>, a <a href=\"\/pt-pt\/integracoes\/erp\/helios\/programacao-producao\/\">programa\u00e7\u00e3o da produ\u00e7\u00e3o com HELIOS que respeita a capacidade real de m\u00e1quinas e equipas<\/a>, a <a href=\"\/pt-pt\/integracoes\/erp\/helios\/\">p\u00e1gina HELIOS<\/a> e a <a href=\"\/pt-pt\/integracoes\/erp\/\">\u00e1rea de integra\u00e7\u00f5es ERP<\/a>. Para conhecer os conceitos b\u00e1sicos, consulte a p\u00e1gina sobre <a href=\"\/pt-pt\/recursos-pt-pt\/o-que-e-planeamento-da-producao\/\">programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Experimentar gr\u00e1tis<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Testemunhos de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento na UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, pass\u00e1mos de planear a produ\u00e7\u00e3o em folhas de Excel para otimizar a produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o permite poupar 2 horas de trabalho por semana, e uma nova fila de tarefas chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Ler o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestu\u00e1rio de sala limpa numa linha de enchimento de frascos da f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied, em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Produ\u00e7\u00e3o farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e criar um plano otimizado para tr\u00eas meses que abrange todos os centros de trabalho demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Ler o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, diretor executivo da Mamec, no pavilh\u00e3o de produ\u00e7\u00e3o da empresa em Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000s<\/b><span>ordens de fabrico programadas automaticamente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTemos um controlo diferente sobre a produ\u00e7\u00e3o, e a nossa compreens\u00e3o da capacidade est\u00e1 num n\u00edvel completamente diferente.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, diretor executivo<\/b><br>Mamec \u00b7 Misturadores industriais, bombas e fabrico por contrato de alta tecnologia<\/p>\n\n\n<p class=\"ind-cust__result\">Milhares de ordens de fabrico s\u00e3o programadas automaticamente, com uma vis\u00e3o da produ\u00e7\u00e3o em tempo real para toda a organiza\u00e7\u00e3o.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/mamec\/\">Ler o testemunho da Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>de fiabilidade das entregas desde 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner d\u00e1-nos visibilidade sobre a capacidade e torna o planeamento previs\u00edvel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Ind\u00fastria qu\u00edmica e alimentar<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas tem sido de 100% desde que o SkyPlanner come\u00e7ou a ser utilizado, em 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/opes-corporation\/\">Ler o testemunho da Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O HELIOS tem uma API para ordens de produ\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">Sim. O Helios Inuvio Server permite aceder via REST \u00e0s vistas do HELIOS iNuvio, incluindo o plano de produ\u00e7\u00e3o, as ordens de produ\u00e7\u00e3o, as pe\u00e7as das ordens, os materiais para produ\u00e7\u00e3o e os registos de opera\u00e7\u00f5es. No caso do HELIOS Nephrite, a equipa SkyPlanner define a abordagem para a sua instala\u00e7\u00e3o consigo e com o seu parceiro HELIOS, durante a defini\u00e7\u00e3o do \u00e2mbito da implementa\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Como \u00e9 que o SkyPlanner deteta as altera\u00e7\u00f5es no HELIOS?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner consulta periodicamente as vistas do HELIOS, com uma frequ\u00eancia definida para cada f\u00e1brica e filtros para ordens de produ\u00e7\u00e3o em aberto e altera\u00e7\u00f5es recentes. Os webhooks do pr\u00f3prio SkyPlanner enviam as altera\u00e7\u00f5es \u00e0 programa\u00e7\u00e3o assim que estas ocorrem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Como s\u00e3o enviadas e gravadas no HELIOS as datas planeadas?<\/summary>\n<p class=\"sp-faq__a\">Atrav\u00e9s de uma a\u00e7\u00e3o externa na vista das ordens de produ\u00e7\u00e3o, executada com \/api\/v1\/actions\/execute. Esta a\u00e7\u00e3o \u00e9 um procedimento do HELIOS acordado durante a defini\u00e7\u00e3o do \u00e2mbito, pelo que o HELIOS aplica a sua pr\u00f3pria l\u00f3gica a cada data que recebe.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Que autentica\u00e7\u00e3o utiliza a REST API do Inuvio?<\/summary>\n<p class=\"sp-faq__a\">OAuth2 segundo a RFC 6749 em \/oauth\/token, ou o mecanismo propriet\u00e1rio mais antigo em \/api\/token. A API do pr\u00f3prio SkyPlanner utiliza um token de API no cabe\u00e7alho Authorization-Token.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Um parceiro HELIOS deve propor o HELIOS APS ou o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner, quando o plano do cliente muda frequentemente e \u00e9 necess\u00e1rio respeitar os limites reais de capacidade. O planeamento do HELIOS baseia-se em c\u00e1lculos sobre um \u00fanico plano ativo, pode passar a capacidade ilimitada para cumprir as datas e deixa a resolu\u00e7\u00e3o dos conflitos ao respons\u00e1vel pelo planeamento (<a href=\"https:\/\/public.helios.eu\/inuvio\/doc\/cs\/index.php?title=Z%C3%A1kladn%C3%AD_kapacitn%C3%AD_pl%C3%A1nov%C3%A1n%C3%AD_-_V%C3%BDroba\">ajuda do HELIOS<\/a>). O SkyPlanner liga-se atrav\u00e9s da REST API, replaneia automaticamente, planeia mudan\u00e7as de s\u00e9rie, ferramentas, equipas e materiais, e inclui utilizadores ilimitados, a partir de 199 \u20ac por m\u00eas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de desenvolver a integra\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">Sim. O per\u00edodo experimental gratuito de 30 dias permite utilizar at\u00e9 20 centros de trabalho, com importa\u00e7\u00f5es de ficheiros CSV ou Excel do HELIOS, sem necessidade de cart\u00e3o de cr\u00e9dito. <a href=\"\/pt-pt\/avaliacao\/\">Experimente gr\u00e1tis<\/a> ou <a href=\"\/pt-pt\/vendas-de-contacto\/\">fale com a equipa comercial<\/a> para definir o \u00e2mbito da integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ HELIOS Guia de integra\u00e7\u00e3o do HELIOS para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS Este guia de integra\u00e7\u00e3o do HELIOS mostra aos parceiros e \u00e0s equipas de TI como ligar o HELIOS iNuvio e o HELIOS Nephrite ao SkyPlanner APS. O SkyPlanner integra-se com o HELIOS nos dois sentidos, atrav\u00e9s das interfaces &#8230; <a title=\"Guia de integra\u00e7\u00e3o do HELIOS para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/helios\/guia-de-integracao\/\" aria-label=\"Leia mais sobre Guia de integra\u00e7\u00e3o do HELIOS para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106446,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107461","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integra\u00e7\u00e3o HELIOS APS: guia de programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/title>\n<meta name=\"description\" content=\"Ligue HELIOS ao SkyPlanner APS: Inuvio REST API, OAuth2, vistas de ordens de fabrico, a\u00e7\u00f5es externas de escrita, mapeamento de dados e dicas para o projeto.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/helios\/guia-de-integracao\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Guia de integra\u00e7\u00e3o do HELIOS para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Ligue HELIOS ao SkyPlanner APS: Inuvio REST API, OAuth2, vistas de ordens de fabrico, a\u00e7\u00f5es externas de escrita, mapeamento de dados e dicas para o projeto.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/helios\/guia-de-integracao\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/helios\\\/guia-de-integracao\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/helios\\\/guia-de-integracao\\\/\",\"name\":\"Integra\u00e7\u00e3o HELIOS APS: guia de programa\u00e7\u00e3o da produ\u00e7\u00e3o\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Ligue HELIOS ao SkyPlanner APS: Inuvio REST API, OAuth2, vistas de ordens de fabrico, a\u00e7\u00f5es externas de escrita, mapeamento de dados e dicas para o projeto.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/helios\\\/guia-de-integracao\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/helios\\\/guia-de-integracao\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/helios\\\/guia-de-integracao\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para HELIOS: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/helios\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Guia de integra\u00e7\u00e3o do HELIOS para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integra\u00e7\u00e3o HELIOS APS: guia de programa\u00e7\u00e3o da produ\u00e7\u00e3o","description":"Ligue HELIOS ao SkyPlanner APS: Inuvio REST API, OAuth2, vistas de ordens de fabrico, a\u00e7\u00f5es externas de escrita, mapeamento de dados e dicas para o projeto.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/helios\/guia-de-integracao\/","og_locale":"pt_PT","og_type":"article","og_title":"Guia de integra\u00e7\u00e3o do HELIOS para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS","og_description":"Ligue HELIOS ao SkyPlanner APS: Inuvio REST API, OAuth2, vistas de ordens de fabrico, a\u00e7\u00f5es externas de escrita, mapeamento de dados e dicas para o projeto.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/helios\/guia-de-integracao\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"15 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/helios\/guia-de-integracao\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/helios\/guia-de-integracao\/","name":"Integra\u00e7\u00e3o HELIOS APS: guia de programa\u00e7\u00e3o da produ\u00e7\u00e3o","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Ligue HELIOS ao SkyPlanner APS: Inuvio REST API, OAuth2, vistas de ordens de fabrico, a\u00e7\u00f5es externas de escrita, mapeamento de dados e dicas para o projeto.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/helios\/guia-de-integracao\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/helios\/guia-de-integracao\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/helios\/guia-de-integracao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para HELIOS: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/helios\/"},{"@type":"ListItem","position":5,"name":"Guia de integra\u00e7\u00e3o do HELIOS para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ HELIOS Guia de integra\u00e7\u00e3o do HELIOS para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS Este guia de integra\u00e7\u00e3o do HELIOS mostra aos parceiros e \u00e0s equipas de TI como ligar o HELIOS iNuvio e o HELIOS Nephrite ao SkyPlanner APS. O SkyPlanner integra-se com o HELIOS nos dois sentidos, atrav\u00e9s das interfaces&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/107461","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=107461"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/107461\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106446"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=107461"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}