{"id":107345,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/cegid\/guia-de-integracao\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"guia-de-integracao","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/cegid\/guia-de-integracao\/","title":{"rendered":"Guia de integra\u00e7\u00e3o Cegid para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ Cegid<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Guia de integra\u00e7\u00e3o Cegid <span class=\"hl\">para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Este guia de integra\u00e7\u00e3o Cegid mostra aos parceiros e \u00e0s equipas de TI como ligar os ERP de produ\u00e7\u00e3o da Cegid ao SkyPlanner APS: primeiro o Cegid PMI, depois o Cegid Primavera e o Cegid Ekon. O SkyPlanner integra-se com o Cegid nos dois sentidos, atrav\u00e9s das interfaces do pr\u00f3prio Cegid:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>S\u00e3o importadas as OF (ordres de fabrication, ordens de fabrico, \u00f3rdenes de fabricaci\u00f3n), com as respetivas opera\u00e7\u00f5es, gammes, nomenclatures, postes de charge e m\u00e1quinas, bem como artigos, stocks e encomendas a fornecedores.<\/li>\n\n\n<li>As datas de in\u00edcio e fim previstas s\u00e3o enviadas de volta para cada opera\u00e7\u00e3o da OF.<\/li>\n\n\n<li>Se assim o pretender, os tempos dos operadores podem ser enviados de volta como pointages (PMI), Di\u00e1rios de Trabalho (Primavera) ou imputaciones (Ekon).<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Cronograma de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens por baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"cegid-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Interfaces de integra\u00e7\u00e3o do Cegid<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>Cegid PMI.<\/strong> A Cegid disponibiliza uma Web API para o PMI: &#8220;Facilitez les \u00e9changes s\u00e9curis\u00e9s avec vos applications externes gr\u00e2ce \u00e0 la mise \u00e0 disposition de Web API depuis votre gestion de production Cegid.&#8221; (Facilite as trocas seguras com as suas aplica\u00e7\u00f5es externas atrav\u00e9s das Web API disponibilizadas pela sua solu\u00e7\u00e3o de gest\u00e3o da produ\u00e7\u00e3o Cegid.) A Web API mant\u00e9m as regras de neg\u00f3cio do Manufacturing PMI nas aplica\u00e7\u00f5es externas (<a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Cegid PMI<\/a>). O PMI tamb\u00e9m disponibiliza EDI, ficheiros XML normalizados para dados t\u00e9cnicos provenientes de CAD e um gerador de relat\u00f3rios com exporta\u00e7\u00e3o para Excel. A exporta\u00e7\u00e3o para Excel \u00e9 a forma mais r\u00e1pida de obter dados para o teste.<\/p>\n\n\n<p><strong>Cegid Primavera.<\/strong> A PRIMAVERA ERP V10 API &#8220;allows third party applications to perform both data query and writing operations&#8221; (permite que aplica\u00e7\u00f5es de terceiros consultem e escrevam dados) e abrange todos os m\u00f3dulos do produto (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/api-documentation\/\">documenta\u00e7\u00e3o da V10 API<\/a>). A Web API est\u00e1 documentada e pode ser chamada atrav\u00e9s do Swagger, com organiza\u00e7\u00e3o por m\u00f3dulo (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/resources\/web-api-en\/article\/swagger-na-web-api\/\">Swagger da Web API<\/a>). O m\u00f3dulo Produ\u00e7\u00e3o (GPR) abrange fichas t\u00e9cnicas, necessidades l\u00edquidas, lan\u00e7amento de OF, Planeamento, registos de produ\u00e7\u00e3o e Di\u00e1rios de Trabalho (<a href=\"https:\/\/v10api.primaverabss.com\/html\/api\/producao\/toc.html\">refer\u00eancia de Produ\u00e7\u00e3o<\/a>). Os principais servi\u00e7os para a programa\u00e7\u00e3o s\u00e3o:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>IGprBSOrdensFabrico<\/strong> l\u00ea as ordens de fabrico e as respetivas opera\u00e7\u00f5es (GprBEOFOperacao).<\/li>\n\n\n<li><strong>IGprBSPlaneamento<\/strong> carrega as OF para planeamento e atualiza as opera\u00e7\u00f5es planeadas atrav\u00e9s de <strong>ActualizaPlaneamentoOperacao<\/strong>.<\/li>\n\n\n<li><strong>IGprBSCentrosTrabalho<\/strong>, <strong>IGprBSPostosTrabalho<\/strong>, <strong>IGprBSOperadores<\/strong> e <strong>IGprBSRoteiros<\/strong> leem os centros de trabalho, postos, operadores e roteiros.<\/li>\n\n\n<li><strong>IGprBSDiariosTrabalho<\/strong> regista o trabalho atrav\u00e9s de <strong>IniciaPicagem<\/strong> e <strong>TerminaPicagem<\/strong>.<\/li>\n\n<\/ul>\n\n\n<p><strong>Cegid Ekon XRP Industria.<\/strong> A Cegid afirma que o Ekon se liga a outros sistemas de gest\u00e3o da empresa (<a href=\"https:\/\/www.cegid.com\/ib\/es\/productos\/software-gestion-produccion-industrial\/erp-fabricacion\/\">Cegid Ekon<\/a>). A equipa do SkyPlanner define a interface para a sua instala\u00e7\u00e3o Ekon durante a defini\u00e7\u00e3o do \u00e2mbito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentica\u00e7\u00e3o e licenciamento<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Cegid PMI.<\/strong> O acesso \u00e0 Web API para a integra\u00e7\u00e3o \u00e9 ativado na sua instala\u00e7\u00e3o PMI durante a defini\u00e7\u00e3o do \u00e2mbito, em conjunto com o seu parceiro Cegid.<\/li>\n\n\n<li><strong>Cegid Primavera.<\/strong> Cada entidade da Web API disponibiliza um m\u00e9todo Login que devolve um token Bearer com uma chave de sess\u00e3o. O token \u00e9 renovado atrav\u00e9s do endpoint token (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/resources\/web-api-en\/article\/swagger-na-web-api\/\">Swagger da Web API<\/a>). O utilizador da integra\u00e7\u00e3o precisa das licen\u00e7as de Produ\u00e7\u00e3o correspondentes \u00e0s \u00e1reas a que acede.<\/li>\n\n\n<li><strong>No SkyPlanner.<\/strong> A autentica\u00e7\u00e3o na REST API \u00e9 feita com um token de API no cabe\u00e7alho Authorization-Token (SkyPlanner Settings &gt; API). A API est\u00e1 documentada em Swagger\/OpenAPI. O <a href=\"\/pt-pt\/docs\/tutorial-de-integracao\/\">tutorial de integra\u00e7\u00e3o<\/a> explica as primeiras chamadas passo a passo.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Eventos e consultas peri\u00f3dicas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Os dados do Cegid s\u00e3o consultados periodicamente. As consultas, filtradas pelas OF em aberto e pelas altera\u00e7\u00f5es recentes, detetam novo trabalho. A frequ\u00eancia \u00e9 definida por f\u00e1brica: de poucos em poucos minutos para as OF e de hora a hora para os stocks.<\/p>\n\n\n<p>O SkyPlanner envia webhooks quando h\u00e1 altera\u00e7\u00f5es de estado ou da programa\u00e7\u00e3o. Assim, a escrita de dados no Cegid \u00e9 acionada por eventos.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapeamento de dados<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objeto Cegid (PMI \/ Primavera)<\/th><th>Objeto SkyPlanner<\/th><th>Sentido<\/th><th>Frequ\u00eancia<\/th><\/tr><\/thead><tbody><tr><td>Articles \/ artigos<\/td><td>Produtos e materiais<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Carga inicial, depois consultas peri\u00f3dicas<\/td><\/tr><tr><td>Nomenclatures \/ fichas t\u00e9cnicas, componentes<\/td><td>Estrutura do produto, subprodutos, materiais por produto<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Carga inicial, depois sempre que houver altera\u00e7\u00f5es<\/td><\/tr><tr><td>Gammes e opera\u00e7\u00f5es \/ roteiros, opera\u00e7\u00f5es<\/td><td>Etapas do processo com dura\u00e7\u00f5es e tempos de prepara\u00e7\u00e3o e desmontagem<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Carga inicial, depois sempre que houver altera\u00e7\u00f5es<\/td><\/tr><tr><td>Postes de charge e m\u00e1quinas \/ centros de trabalho, postos de trabalho<\/td><td>Centros de trabalho, grupos de centros de trabalho, efici\u00eancias<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Carga inicial, raramente depois<\/td><\/tr><tr><td>Salari\u00e9s \/ operadores<\/td><td>Pessoal<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Carga inicial, depois sempre que houver altera\u00e7\u00f5es<\/td><\/tr><tr><td>Calend\u00e1rios \/ exce\u00e7\u00f5es de capacidade<\/td><td>Turnos e dias n\u00e3o \u00fateis<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Diariamente, ou turnos pr\u00f3prios no SkyPlanner<\/td><\/tr><tr><td>Ferramentas e moldes (Primavera)<\/td><td>Ferramentas como recursos de capacidade limitada<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Carga inicial, depois sempre que houver altera\u00e7\u00f5es<\/td><\/tr><tr><td>OF fermes e pr\u00e9visionnels \/ ordens de fabrico com opera\u00e7\u00f5es<\/td><td>Ordens e tarefas com prazos de entrega e necessidades de materiais<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Consultas de poucos em poucos minutos<\/td><\/tr><tr><td>Stock por artigo e armaz\u00e9m<\/td><td>Saldos de stock<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Consultas de hora a hora ou em cada execu\u00e7\u00e3o da programa\u00e7\u00e3o<\/td><\/tr><tr><td>Encomendas a fornecedores com datas de entrega<\/td><td>Encomendas de compra, materiais a receber por data de entrega<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Consultas de hora a hora ou em cada execu\u00e7\u00e3o da programa\u00e7\u00e3o<\/td><\/tr><tr><td>In\u00edcio e fim previstos da opera\u00e7\u00e3o da OF \/ GprBEOFOperacao DataIniPrevista, DataFimPrevista atrav\u00e9s de ActualizaPlaneamentoOperacao<\/td><td>In\u00edcio e fim previstos por etapa, centro de trabalho atribu\u00eddo<\/td><td>SkyPlanner \u2192 Cegid<\/td><td>Quando a programa\u00e7\u00e3o muda, atrav\u00e9s de um webhook do SkyPlanner<\/td><\/tr><tr><td>Pointages \/ Di\u00e1rios de Trabalho (IniciaPicagem, TerminaPicagem)<\/td><td>Registos de tempos e confirma\u00e7\u00f5es dos operadores<\/td><td>SkyPlanner \u2192 Cegid<\/td><td>Por confirma\u00e7\u00e3o ou por turno, se essa op\u00e7\u00e3o for escolhida<\/td><\/tr><tr><td>N\u00e3o existe no Cegid<\/td><td>Matriz de tempos de prepara\u00e7\u00e3o, ferramentas como recursos de capacidade limitada (PMI), m\u00e1quinas e pessoal alternativos<\/td><td>Gerido no SkyPlanner<\/td><td>Configurado durante a configura\u00e7\u00e3o inicial<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Modelos de integra\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Carga inicial de dados mestre.<\/strong> Leia artigos, nomenclatures, gammes, postes de charge, m\u00e1quinas, operadores e calend\u00e1rios. Defina cuidadosamente o mapeamento dos postes: um poste de charge com quatro m\u00e1quinas corresponde a um grupo de centros de trabalho com quatro centros de trabalho.<\/p>\n\n\n<p><strong>2. Sincroniza\u00e7\u00e3o de OF.<\/strong> Leia as OF firmes com as respetivas opera\u00e7\u00f5es e componentes, bem como as encomendas a fornecedores em aberto. O SkyPlanner considera o material encomendado dispon\u00edvel na data de entrega da encomenda de compra e atualiza o stock quando esta \u00e9 marcada como Delivered. Durante a defini\u00e7\u00e3o do \u00e2mbito, decida se tamb\u00e9m ser\u00e3o programadas as OF previsionais (OF pr\u00e9visionnels) ou apenas as OF firmes.<\/p>\n\n\n<p><strong>3. Escrita da programa\u00e7\u00e3o no Cegid.<\/strong> Quando o motor agenda ou desloca uma tarefa, um webhook do SkyPlanner aciona a escrita no Cegid. No PMI, as datas de in\u00edcio e fim previstas s\u00e3o escritas nas opera\u00e7\u00f5es das OF atrav\u00e9s da Web API, respeitando as regras de neg\u00f3cio do PMI. No Primavera, a integra\u00e7\u00e3o chama IGprBSPlaneamento.ActualizaPlaneamentoOperacao com a opera\u00e7\u00e3o, o centro de trabalho e o in\u00edcio e fim previstos. Esta chamada atualiza DataIniPrevista e DataFimPrevista na opera\u00e7\u00e3o da ordem de fabrico.<\/p>\n\n\n<p><strong>4. Confirma\u00e7\u00f5es na produ\u00e7\u00e3o.<\/strong> Os operadores registam o trabalho com o SkyPlanner Mobile Confirmations ou o Production Timer, e os registos de tempos mant\u00eam a programa\u00e7\u00e3o atualizada. Cabe-lhe decidir se os tempos s\u00e3o enviados de volta para o Cegid. Se optar pelo envio, os tempos s\u00e3o registados como pointages no PMI ou atrav\u00e9s de IniciaPicagem e TerminaPicagem nos Di\u00e1rios de Trabalho do Primavera. Caso contr\u00e1rio, os tempos continuam a ser registados no Cegid por c\u00f3digo de barras, como at\u00e9 aqui.<\/p>\n\n\n<p><strong>5. Responsabilidade pelos dados e regras de conflito.<\/strong> Documente estas regras antes da entrada em produ\u00e7\u00e3o:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dados<\/th><th>Sistema respons\u00e1vel<\/th><\/tr><\/thead><tbody><tr><td>Artigos, nomenclatures, gammes, quantidades e estado das OF<\/td><td>Cegid<\/td><\/tr><tr><td>Sequ\u00eancia das opera\u00e7\u00f5es, horas de in\u00edcio e fim, atribui\u00e7\u00e3o de m\u00e1quinas<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matriz de tempos de prepara\u00e7\u00e3o, necessidades de ferramentas e operadores, recursos alternativos<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Turnos e dias n\u00e3o \u00fateis<\/td><td>Um \u00fanico sistema, escolhido durante a defini\u00e7\u00e3o do \u00e2mbito<\/td><\/tr><tr><td>Tempos, consumos e conclus\u00f5es<\/td><td>Cegid, com introdu\u00e7\u00e3o direta ou envio a partir dos registos de tempos do SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Escolha um \u00fanico sistema para escrever as datas das OF. O SkyPlanner substitui as execu\u00e7\u00f5es de planeamento do PMI e o algoritmo de planeamento do Primavera na escrita das datas previstas. Deixe de executar esses planeamentos para as OF programadas pelo SkyPlanner, para que os dois sistemas n\u00e3o substituam as datas um do outro.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapas t\u00edpicas do projeto<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio do acompanhamento inicial. Antes disso, valide a programa\u00e7\u00e3o durante o per\u00edodo de teste gratuito de 30 dias, com postes, gammes e OF em aberto exportados do Cegid em CSV ou Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapeamento.<\/strong> Defina a tabela de mapeamento, as regras de responsabilidade pelos dados, as frequ\u00eancias de sincroniza\u00e7\u00e3o e se os tempos ser\u00e3o enviados de volta ao Cegid.<\/li>\n\n\n<li><strong>Acesso ao Cegid.<\/strong> Crie o utilizador de integra\u00e7\u00e3o e confirme as permiss\u00f5es e licen\u00e7as para os objetos de produ\u00e7\u00e3o. Fa\u00e7a primeiro os testes numa empresa de teste.<\/li>\n\n\n<li><strong>Carregamento inicial.<\/strong> Articles, nomenclatures, gammes, postes de charge, m\u00e1quinas, operadores e calend\u00e1rios.<\/li>\n\n\n<li><strong>Sincroniza\u00e7\u00e3o de OF e encomendas a fornecedores.<\/strong> Consultas peri\u00f3dicas com filtros, pagina\u00e7\u00e3o e novas tentativas em caso de falha.<\/li>\n\n\n<li><strong>Configura\u00e7\u00e3o das restri\u00e7\u00f5es no SkyPlanner.<\/strong> Matriz de tempos de prepara\u00e7\u00e3o, ferramentas, n\u00famero de operadores por tarefa e m\u00e1quinas ou pessoal alternativos.<\/li>\n\n\n<li><strong>Grava\u00e7\u00e3o da programa\u00e7\u00e3o no Cegid.<\/strong> Datas planeadas das opera\u00e7\u00f5es enviadas pelos webhooks do SkyPlanner, bem como registos de tempos, se essa op\u00e7\u00e3o for escolhida.<\/li>\n\n\n<li><strong>Testes em paralelo.<\/strong> Utilize o SkyPlanner em paralelo com o plano atual, compare as datas e corrija os dados mestre.<\/li>\n\n\n<li><strong>Entrada em produ\u00e7\u00e3o.<\/strong> Ative a grava\u00e7\u00e3o de dados no Cegid quando os dados coincidirem.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-to-plan-for-in-a-cegid-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que prever numa integra\u00e7\u00e3o com o Cegid<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>OF firmes e planeadas.<\/strong> O PMI cria ambas a partir do CBN. Programar as OF planeadas permite visualizar a carga futura, mas as datas s\u00f3 devem ser gravadas nas OF firmes.<\/li>\n\n\n<li><strong>Opera\u00e7\u00f5es exclu\u00eddas do planeamento.<\/strong> No Primavera, uma opera\u00e7\u00e3o pode ser marcada como n\u00e3o sujeita a planeamento (NaoSujeitaPlaneamento). Exclua essas opera\u00e7\u00f5es da grava\u00e7\u00e3o de dados no Cegid.<\/li>\n\n\n<li><strong>Tempos de m\u00e1quina e de operador.<\/strong> O Primavera guarda separadamente o tempo de m\u00e1quina e o tempo de operador em cada opera\u00e7\u00e3o. Mapeie ambos para atribuir a equipa certa \u00e0s tarefas que exigem v\u00e1rios operadores.<\/li>\n\n\n<li><strong>Sobreposi\u00e7\u00e3o de opera\u00e7\u00f5es.<\/strong> As opera\u00e7\u00f5es do Primavera t\u00eam um coeficiente de sobreposi\u00e7\u00e3o. Mapeie-o para a temporiza\u00e7\u00e3o das etapas no SkyPlanner; caso contr\u00e1rio, a programa\u00e7\u00e3o prev\u00ea esperas mais longas do que as praticadas na f\u00e1brica.<\/li>\n\n\n<li><strong>Qual o ERP Cegid.<\/strong> O PMI, o Primavera e o Ekon utilizam interfaces diferentes. Confirme primeiro o produto e a vers\u00e3o. Para o Cegid XRP Flex, utilize o <a href=\"\/pt-pt\/integracoes\/erp\/acumatica\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o com o Acumatica<\/a>.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"who-configures-and-supports-the-cegid-integratio\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quem configura e d\u00e1 suporte \u00e0 integra\u00e7\u00e3o com o Cegid<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>A equipa SkyPlanner configura a integra\u00e7\u00e3o durante o acompanhamento inicial e d\u00e1 suporte ap\u00f3s a entrada em produ\u00e7\u00e3o,<\/strong> abrangendo as chamadas \u00e0 API do Cegid acordadas. Cada f\u00e1brica utiliza o Cegid de forma diferente, e \u00e9 aqui que esse conhecimento \u00e9 aplicado.<\/li>\n\n\n<li><strong>O seu parceiro Cegid pode participar.<\/strong> O parceiro conhece a sua configura\u00e7\u00e3o, personaliza\u00e7\u00f5es e licen\u00e7as e pode configurar o utilizador de integra\u00e7\u00e3o e o acesso \u00e0 API em conjunto com a equipa SkyPlanner.<\/li>\n\n\n<li><strong>Os seus programadores podem desenvolver a integra\u00e7\u00e3o<\/strong> com a REST API do SkyPlanner, utilizando um token de API. Basta um token de API para come\u00e7ar, e a equipa SkyPlanner presta apoio sempre que necess\u00e1rio. Consulte a <a href=\"\/pt-pt\/docs\/tutorial-de-integracao\/\">documenta\u00e7\u00e3o de integra\u00e7\u00e3o do SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>O SkyPlanner est\u00e1 dispon\u00edvel a partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos e fatura\u00e7\u00e3o mensal. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, juntamente com o seu plano, de acordo com o seu processo e as suas necessidades. Consulte os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a>, a <a href=\"\/pt-pt\/integracoes\/erp\/cegid\/programacao-producao\/\">programa\u00e7\u00e3o da produ\u00e7\u00e3o com o Cegid, respeitando a capacidade real das m\u00e1quinas e do pessoal<\/a>, a <a href=\"\/pt-pt\/integracoes\/erp\/cegid\/\">p\u00e1gina do Cegid<\/a> e a <a href=\"\/pt-pt\/integracoes\/erp\/\">\u00e1rea de integra\u00e7\u00f5es com ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Opini\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento da UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, pass\u00e1mos de planear a produ\u00e7\u00e3o em folhas de c\u00e1lculo Excel para otimizar a produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de comuta\u00e7\u00e3o<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o poupa 2 horas de trabalho por semana, e uma nova fila de tarefas chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Ler o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestu\u00e1rio de sala limpa numa linha de enchimento de frascos da f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Ind\u00fastria farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e criar um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Ler o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, diretora de produ\u00e7\u00e3o da Fredman Operations, junto a uma c\u00e9lula robotizada de paletiza\u00e7\u00e3o em Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 meses<\/b><span>de capacidade dispon\u00edvel vis\u00edvel para a equipa comercial<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner d\u00e1 uma base s\u00f3lida e fiabilidade a todo o planeamento da produ\u00e7\u00e3o.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, diretora de produ\u00e7\u00e3o<\/b><br>Fredman Operations \u00b7 Pap\u00e9is de embalagem aptos para contacto alimentar<\/p>\n\n\n<p class=\"ind-cust__result\">A equipa comercial v\u00ea a capacidade dispon\u00edvel com seis meses de anteced\u00eancia, e os pedidos de altera\u00e7\u00e3o \u00e0 programa\u00e7\u00e3o que demoravam uma hora ou mais recebem agora resposta em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/fredman-operations\/\">Ler o testemunho da Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>de fiabilidade das entregas desde 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner d\u00e1-nos visibilidade sobre a capacidade e torna o planeamento previs\u00edvel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Ind\u00fastria qu\u00edmica e alimentar<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas tem sido de 100% durante todo o per\u00edodo de utiliza\u00e7\u00e3o do SkyPlanner, desde 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/opes-corporation\/\">Ler o testemunho da Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Cegid PMI tem uma API?<\/summary>\n<p class=\"sp-faq__a\">Sim. A Cegid disponibiliza uma Web API para o PMI que permite a troca segura de dados com aplica\u00e7\u00f5es externas, mantendo intactas as regras de neg\u00f3cio do Manufacturing PMI. O SkyPlanner utiliza-a para ler OF e gravar datas planeadas e pointages.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Cegid Primavera tem uma API para ordens de fabrico?<\/summary>\n<p class=\"sp-faq__a\">Sim. A API do PRIMAVERA V10 permite ler e gravar dados em todos os m\u00f3dulos. O m\u00f3dulo Produ\u00e7\u00e3o disponibiliza ordens de fabrico, Planeamento com ActualizaPlaneamentoOperacao e Di\u00e1rios de Trabalho.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Como s\u00e3o gravadas as datas planeadas no Cegid?<\/summary>\n<p class=\"sp-faq__a\">No PMI, atrav\u00e9s da Web API, em cada opera\u00e7\u00e3o da OF. No Primavera, atrav\u00e9s de IGprBSPlaneamento.ActualizaPlaneamentoOperacao, que define o in\u00edcio e o fim planeados da opera\u00e7\u00e3o da ordem de fabrico.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Cegid suporta webhooks?<\/summary>\n<p class=\"sp-faq__a\">A integra\u00e7\u00e3o consulta o Cegid com uma periodicidade definida para cada f\u00e1brica. Os webhooks do pr\u00f3prio SkyPlanner enviam as altera\u00e7\u00f5es \u00e0 programa\u00e7\u00e3o assim que ocorrem, pelo que as datas chegam ao Cegid logo ap\u00f3s cada reprograma\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Um parceiro Cegid deve propor o planeamento integrado do Cegid ou o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner, quando as restri\u00e7\u00f5es do cliente v\u00e3o al\u00e9m das m\u00e1quinas e das exist\u00eancias. A pr\u00f3pria Cegid recomenda a liga\u00e7\u00e3o a ferramentas de planeamento avan\u00e7ado para lidar com outras restri\u00e7\u00f5es (<a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Cegid PMI<\/a>). O SkyPlanner planeia operadores, ferramentas, prepara\u00e7\u00f5es e materiais, reprograma automaticamente e permite um n\u00famero ilimitado de utilizadores, a partir de 199 \u20ac por m\u00eas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de desenvolver a integra\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">Sim. O teste gratuito de 30 dias permite utilizar at\u00e9 20 centros de trabalho, com importa\u00e7\u00f5es do Cegid em CSV ou Excel, sem necessidade de cart\u00e3o de cr\u00e9dito. <a href=\"\/pt-pt\/avaliacao\/\">Inicie o teste<\/a> ou <a href=\"\/pt-pt\/vendas-de-contacto\/\">fale com a equipa comercial<\/a> para definir o \u00e2mbito da integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ Cegid Guia de integra\u00e7\u00e3o Cegid para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS Este guia de integra\u00e7\u00e3o Cegid mostra aos parceiros e \u00e0s equipas de TI como ligar os ERP de produ\u00e7\u00e3o da Cegid ao SkyPlanner APS: primeiro o Cegid PMI, depois o Cegid Primavera e o Cegid Ekon. O SkyPlanner integra-se &#8230; <a title=\"Guia de integra\u00e7\u00e3o Cegid para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/cegid\/guia-de-integracao\/\" aria-label=\"Leia mais sobre Guia de integra\u00e7\u00e3o Cegid para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106388,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107345","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integra\u00e7\u00e3o Cegid APS: guia de programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/title>\n<meta name=\"description\" content=\"Ligue Cegid PMI e Cegid Primavera ao SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, escrita em Planeamento, mapeamento, polling e dicas de projeto.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/cegid\/guia-de-integracao\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Guia de integra\u00e7\u00e3o Cegid para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Ligue Cegid PMI e Cegid Primavera ao SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, escrita em Planeamento, mapeamento, polling e dicas de projeto.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/cegid\/guia-de-integracao\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/cegid\\\/guia-de-integracao\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/cegid\\\/guia-de-integracao\\\/\",\"name\":\"Integra\u00e7\u00e3o Cegid APS: guia de programa\u00e7\u00e3o da produ\u00e7\u00e3o\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Ligue Cegid PMI e Cegid Primavera ao SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, escrita em Planeamento, mapeamento, polling e dicas de projeto.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/cegid\\\/guia-de-integracao\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/cegid\\\/guia-de-integracao\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/cegid\\\/guia-de-integracao\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para Cegid: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/cegid\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Guia de integra\u00e7\u00e3o Cegid para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integra\u00e7\u00e3o Cegid APS: guia de programa\u00e7\u00e3o da produ\u00e7\u00e3o","description":"Ligue Cegid PMI e Cegid Primavera ao SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, escrita em Planeamento, mapeamento, polling e dicas de projeto.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/cegid\/guia-de-integracao\/","og_locale":"pt_PT","og_type":"article","og_title":"Guia de integra\u00e7\u00e3o Cegid para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS","og_description":"Ligue Cegid PMI e Cegid Primavera ao SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, escrita em Planeamento, mapeamento, polling e dicas de projeto.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/cegid\/guia-de-integracao\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"13 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/cegid\/guia-de-integracao\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/cegid\/guia-de-integracao\/","name":"Integra\u00e7\u00e3o Cegid APS: guia de programa\u00e7\u00e3o da produ\u00e7\u00e3o","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Ligue Cegid PMI e Cegid Primavera ao SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, escrita em Planeamento, mapeamento, polling e dicas de projeto.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/cegid\/guia-de-integracao\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/cegid\/guia-de-integracao\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/cegid\/guia-de-integracao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para Cegid: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/cegid\/"},{"@type":"ListItem","position":5,"name":"Guia de integra\u00e7\u00e3o Cegid para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ Cegid Guia de integra\u00e7\u00e3o Cegid para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS Este guia de integra\u00e7\u00e3o Cegid mostra aos parceiros e \u00e0s equipas de TI como ligar os ERP de produ\u00e7\u00e3o da Cegid ao SkyPlanner APS: primeiro o Cegid PMI, depois o Cegid Primavera e o Cegid Ekon. O SkyPlanner integra-se&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/107345","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=107345"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/107345\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106388"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=107345"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}