{"id":107229,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/e2-shop-system\/guia-de-integracao\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"guia-de-integracao","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/e2-shop-system\/guia-de-integracao\/","title":{"rendered":"Guia de integra\u00e7\u00e3o do E2 Shop System para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ E2 Shop System<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Guia de integra\u00e7\u00e3o do E2 Shop System <span class=\"hl\">para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Este guia de integra\u00e7\u00e3o do E2 Shop System mostra aos parceiros e \u00e0s equipas de TI como ligar o E2 Shop System (E2 SHOP) ou o E2 MFG ao SkyPlanner APS. O SkyPlanner integra-se com o E2 nos dois sentidos:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>S\u00e3o importadas encomendas e tarefas com as respetivas opera\u00e7\u00f5es da gama operat\u00f3ria, centros de trabalho, colaboradores e turnos, listas de materiais, necessidades de materiais e encomendas de compra.<\/li>\n\n\n<li>As horas de in\u00edcio e fim planeadas s\u00e3o enviadas de volta para cada opera\u00e7\u00e3o da tarefa, juntamente com a m\u00e1quina e o colaborador atribu\u00eddos pelo SkyPlanner.<\/li>\n\n\n<li>Se assim o pretender, as opera\u00e7\u00f5es conclu\u00eddas e os tempos registados podem ser enviados de volta para a tarefa.<\/li>\n\n\n<li>Os webhooks do SkyPlanner enviam as altera\u00e7\u00f5es \u00e0 programa\u00e7\u00e3o assim que ocorrem.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Cronograma de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Durante a implementa\u00e7\u00e3o inicial, a equipa SkyPlanner configura a integra\u00e7\u00e3o para a sua instala\u00e7\u00e3o do E2 e presta suporte ap\u00f3s a entrada em produ\u00e7\u00e3o. Este guia destina-se a parceiros e programadores que queiram participar ou desenvolver a integra\u00e7\u00e3o por conta pr\u00f3pria com base na REST API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"which-e2-do-you-run\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Que E2 utiliza?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Esclare\u00e7a primeiro este ponto, pois determina a via de integra\u00e7\u00e3o:<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Sistema utilizado<\/th><th>O que \u00e9 atualmente<\/th><th>Via de integra\u00e7\u00e3o<\/th><\/tr><\/thead><tbody><tr><td>E2 Shop System (aplica\u00e7\u00e3o de desktop, no seu servidor)<\/td><td>O E2 original da Shoptech para empresas de produ\u00e7\u00e3o por encomenda<\/td><td>Liga\u00e7\u00e3o direta ao seu servidor E2, complementada com ficheiros quando \u00fatil<\/td><\/tr><tr><td>E2 MFG (E2 Manufacturing System)<\/td><td>A edi\u00e7\u00e3o do E2 para produ\u00e7\u00e3o repetitiva, discreta e mista, apresentada pela ECI como &#8220;for existing customers&#8221; (para clientes existentes)<\/td><td>A mesma do E2 Shop System instalado localmente<\/td><\/tr><tr><td>E2 SHOP alojado<\/td><td>A plataforma web que a ECI reformulou como JobBOSS\u00b2<\/td><td>Se utiliza agora o JobBOSS\u00b2, consulte o <a href=\"\/pt-pt\/integracoes\/erp\/jobboss\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o do JobBOSS\u00b2<\/a><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>A ECI descreve o JobBOSS\u00b2 como &#8220;formerly E2 Shop&#8221; (anteriormente E2 Shop) e afirma que &#8220;combines E2 SHOP&#8217;s cloud-native, user-friendly platform with JobBOSS&#8217; depth of functionality&#8221; (combina a plataforma do E2 SHOP, nativa da nuvem e f\u00e1cil de utilizar, com a riqueza de funcionalidades do JobBOSS) (<a href=\"https:\/\/www.ecisolutions.com\/news\/eci-launches-jobboss2-a-new-cloud-native-erp-for-small-and-medium-manufacturers\/\">ECI<\/a>). O restante guia abrange as empresas que utilizam o E2 Shop System ou o E2 MFG.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"e2-s-integration-routes\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Vias de integra\u00e7\u00e3o do E2<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>As API para a ind\u00fastria publicadas pela ECI no site <a href=\"https:\/\/integrations.ecimanufacturing.com\/\">Documenta\u00e7\u00e3o das API de produ\u00e7\u00e3o da ECI<\/a> servem o JobBOSS\u00b2, o M1, o Macola e o Deacom. No E2, a liga\u00e7\u00e3o \u00e9 feita diretamente \u00e0 instala\u00e7\u00e3o, o que se adequa bem ao E2 instalado localmente: os dados est\u00e3o num servidor gerido pela sua pr\u00f3pria equipa de TI. A via exata de leitura e escrita para a sua instala\u00e7\u00e3o \u00e9 acordada na defini\u00e7\u00e3o do \u00e2mbito da implementa\u00e7\u00e3o inicial.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Liga\u00e7\u00e3o direta ao servidor (instala\u00e7\u00e3o local).<\/strong> Um servi\u00e7o de integra\u00e7\u00e3o na sua rede l\u00ea as tarefas em aberto, opera\u00e7\u00f5es das gamas operat\u00f3rias, centros de trabalho, colaboradores, materiais e encomendas de compra da base de dados do E2 e escreve as horas de in\u00edcio e fim planeadas nas opera\u00e7\u00f5es das tarefas. A sua equipa de TI aprova o acesso, uma conta de servi\u00e7o dedicada e os campos exatos a escrever. Esta \u00e9 a principal via para uma integra\u00e7\u00e3o bidirecional em funcionamento cont\u00ednuo.<\/li>\n\n\n<li><strong>Exporta\u00e7\u00f5es e importa\u00e7\u00f5es agendadas.<\/strong> Os relat\u00f3rios do E2 e as exporta\u00e7\u00f5es das grelhas geram ficheiros CSV ou Excel com tarefas, gamas operat\u00f3rias e centros de trabalho. A funcionalidade de importa\u00e7\u00e3o de dados do SkyPlanner l\u00ea esses ficheiros. Esta \u00e9 a via utilizada durante o per\u00edodo de teste e abrange tamb\u00e9m os dados mestre que s\u00f3 carrega ocasionalmente.<\/li>\n\n\n<li><strong>Instala\u00e7\u00f5es alojadas.<\/strong> Se o E2 estiver alojado pela ECI, o acesso aos dados \u00e9 acordado com a ECI. Contacte o seu gestor de conta da ECI logo no in\u00edcio.<\/li>\n\n<\/ol>\n\n\n<p>Do lado do SkyPlanner, a REST API l\u00ea e escreve encomendas, produtos, materiais, etapas do processo, registos de tempo e encomendas de compra. A autentica\u00e7\u00e3o \u00e9 feita com um token de API no cabe\u00e7alho <code>Authorization-Token<\/code> (SkyPlanner Settings &gt; API), e a API est\u00e1 documentada em Swagger\/OpenAPI. O <a href=\"\/pt-pt\/docs\/tutorial-de-integracao\/\">tutorial de integra\u00e7\u00e3o<\/a> explica as primeiras chamadas passo a passo.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Eventos e consultas peri\u00f3dicas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O E2 \u00e9 consultado periodicamente. O servi\u00e7o de integra\u00e7\u00e3o l\u00ea as tarefas e as opera\u00e7\u00f5es das gamas operat\u00f3rias alteradas desde a \u00faltima execu\u00e7\u00e3o: de poucos em poucos minutos para as tarefas e de hora a hora para as exist\u00eancias e encomendas de compra, conforme acordado com cada empresa.<\/p>\n\n\n<p>O SkyPlanner envia webhooks quando h\u00e1 altera\u00e7\u00f5es de estado ou da programa\u00e7\u00e3o. O servi\u00e7o recebe-os e escreve imediatamente as novas datas no E2, pelo que o envio de dados de volta \u00e9 acionado por eventos. Os eventos do ch\u00e3o de f\u00e1brica tamb\u00e9m podem ser lidos periodicamente atrav\u00e9s do endpoint <code>\/timelogs<\/code> do SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapeamento de dados<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objeto do E2<\/th><th>Objeto do SkyPlanner<\/th><th>Sentido<\/th><th>Frequ\u00eancia<\/th><\/tr><\/thead><tbody><tr><td>Pe\u00e7as e or\u00e7amentos, listas de materiais multin\u00edvel<\/td><td>Produtos, materiais, estrutura do produto<\/td><td>E2 \u2192 SkyPlanner<\/td><td>Carregamento inicial e, depois, a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Opera\u00e7\u00f5es da gama operat\u00f3ria: centro de trabalho, tempo de prepara\u00e7\u00e3o, tempo de execu\u00e7\u00e3o<\/td><td>Etapas do processo com dura\u00e7\u00f5es e tempos de prepara\u00e7\u00e3o<\/td><td>E2 \u2192 SkyPlanner<\/td><td>Carregamento inicial e, depois, a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Centros de trabalho e m\u00e1quinas<\/td><td>Centros de trabalho, grupos de centros de trabalho, efici\u00eancias<\/td><td>E2 \u2192 SkyPlanner<\/td><td>Carregamento inicial; raramente depois disso<\/td><\/tr><tr><td>Colaboradores, turnos, departamentos, dias n\u00e3o \u00fateis<\/td><td>Pessoal, turnos, calend\u00e1rios<\/td><td>E2 \u2192 SkyPlanner<\/td><td>Diariamente, ou gest\u00e3o dos turnos no SkyPlanner<\/td><\/tr><tr><td>Encomendas e tarefas: n\u00famero da tarefa, pe\u00e7a, quantidade, data de entrega, prioridade, indicador de urg\u00eancia<\/td><td>Encomendas com datas de entrega e prioridades<\/td><td>E2 \u2192 SkyPlanner<\/td><td>Consulta de poucos em poucos minutos<\/td><\/tr><tr><td>Opera\u00e7\u00f5es da gama operat\u00f3ria da tarefa: estado, quantidade produzida, horas restantes<\/td><td>Tarefas por etapa do processo<\/td><td>E2 \u2192 SkyPlanner<\/td><td>Consulta de poucos em poucos minutos<\/td><\/tr><tr><td>Necessidades de materiais, encomendas de compra com datas de entrega<\/td><td>Necessidades de materiais, encomendas de compra por data de entrega<\/td><td>E2 \u2192 SkyPlanner<\/td><td>Consulta de hora a hora ou a cada execu\u00e7\u00e3o da programa\u00e7\u00e3o<\/td><\/tr><tr><td>In\u00edcio e fim programados da opera\u00e7\u00e3o da tarefa, centro de trabalho, colaborador<\/td><td>In\u00edcio e fim planeados, m\u00e1quina e operador por etapa<\/td><td>SkyPlanner \u2192 E2<\/td><td>A cada altera\u00e7\u00e3o da programa\u00e7\u00e3o, atrav\u00e9s de um webhook do SkyPlanner<\/td><\/tr><tr><td>Tempo da tarefa e quantidades conclu\u00eddas por opera\u00e7\u00e3o<\/td><td>Registos de tempo e confirma\u00e7\u00f5es dos operadores<\/td><td>SkyPlanner \u2192 E2<\/td><td>A cada confirma\u00e7\u00e3o ou por turno, se essa op\u00e7\u00e3o for escolhida<\/td><\/tr><tr><td>N\u00e3o existe no E2<\/td><td>Matriz de tempos de mudan\u00e7a, ferramentas como recursos de capacidade limitada, m\u00e1quinas e pessoal alternativos<\/td><td>Gerido no SkyPlanner<\/td><td>Configurado durante a implementa\u00e7\u00e3o inicial<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Modelos de integra\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Carregamento inicial dos dados mestre.<\/strong> Leia pe\u00e7as, listas de materiais, gamas operat\u00f3rias, centros de trabalho, colaboradores e turnos. Mapeie os centros de trabalho de forma criteriosa: um centro de trabalho com tr\u00eas fresadoras passa a ser um grupo de centros de trabalho ou tr\u00eas centros de trabalho, para que o SkyPlanner sequencie o trabalho de cada m\u00e1quina.<\/p>\n\n\n<p><strong>2. Sincroniza\u00e7\u00e3o de tarefas.<\/strong> Leia as tarefas em aberto com as respetivas opera\u00e7\u00f5es da gama operat\u00f3ria, necessidades de materiais e encomendas de compra em aberto. O SkyPlanner considera o material encomendado dispon\u00edvel na data de entrega da encomenda de compra e atualiza as exist\u00eancias quando esta \u00e9 marcada como Delivered. Exclua as tarefas encerradas e suspensas. Transfira o indicador de urg\u00eancia como prioridade no SkyPlanner.<\/p>\n\n\n<p><strong>3. Envio da programa\u00e7\u00e3o para o E2.<\/strong> Quando o motor programa ou desloca uma etapa, um webhook do SkyPlanner aciona o servi\u00e7o. Este escreve as horas de in\u00edcio e fim planeadas nessa opera\u00e7\u00e3o da tarefa no E2, bem como o centro de trabalho e o colaborador se o SkyPlanner tiver transferido a etapa para outra m\u00e1quina ou pessoa. O Whiteboard e o Planning Board passam ent\u00e3o a mostrar as datas do SkyPlanner.<\/p>\n\n\n<p><strong>4. Confirma\u00e7\u00f5es no ch\u00e3o de f\u00e1brica.<\/strong> Os operadores registam o trabalho com o SkyPlanner Mobile Confirmations ou o Production Timer, e os registos de tempo mant\u00eam a programa\u00e7\u00e3o atualizada. Cabe-lhe decidir se os tempos reais s\u00e3o enviados de volta para o E2. Se optar por envi\u00e1-los, cada confirma\u00e7\u00e3o \u00e9 registada como tempo e quantidade na opera\u00e7\u00e3o da tarefa. Caso contr\u00e1rio, o E2 Data Collection mant\u00e9m-se como est\u00e1 e o SkyPlanner l\u00ea o progresso nas opera\u00e7\u00f5es das tarefas.<\/p>\n\n\n<p><strong>5. Responsabilidade pelos dados e regras de conflito.<\/strong> Documente estas regras antes da entrada em produ\u00e7\u00e3o:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dados<\/th><th>Sistema respons\u00e1vel<\/th><\/tr><\/thead><tbody><tr><td>Or\u00e7amentos, gamas operat\u00f3rias, quantidades, datas de entrega, estado das tarefas<\/td><td>E2<\/td><\/tr><tr><td>Sequ\u00eancia das etapas, horas de in\u00edcio e fim, m\u00e1quina e operador por etapa<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matriz de tempos de mudan\u00e7a, requisitos de ferramentas e operadores, recursos alternativos<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Turnos e dias n\u00e3o \u00fateis<\/td><td>Um sistema, escolhido na defini\u00e7\u00e3o do \u00e2mbito<\/td><\/tr><tr><td>Tempos, sa\u00eddas de materiais, rece\u00e7\u00f5es, apuramento de custos<\/td><td>E2, com introdu\u00e7\u00e3o direta ou envio a partir dos registos de tempo do SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Escolha um \u00fanico sistema para escrever as datas das opera\u00e7\u00f5es das tarefas. Os respons\u00e1veis pela programa\u00e7\u00e3o deslocam o trabalho no SkyPlanner e as datas s\u00e3o enviadas para o E2. \u00c9 necess\u00e1rio deixar de arrastar cart\u00f5es no Planning Board para tarefas programadas pelo SkyPlanner; caso contr\u00e1rio, os dois planos deixam de coincidir.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapas habituais do projeto<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio do acompanhamento inicial. Antes disso, valide a programa\u00e7\u00e3o durante o per\u00edodo de teste gratuito de 30 dias, com centros de trabalho, gamas operat\u00f3rias e tarefas em aberto exportados do E2 em CSV ou Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Defini\u00e7\u00e3o do \u00e2mbito.<\/strong> Confirme a edi\u00e7\u00e3o e a vers\u00e3o do E2, o servidor, a tabela de correspond\u00eancias, as regras sobre que sistema gere cada dado e se os tempos ser\u00e3o enviados de volta para o E2.<\/li>\n\n\n<li><strong>Acesso.<\/strong> A sua equipa de TI cria a conta de servi\u00e7o e aprova o acesso de leitura e escrita. Fa\u00e7a uma c\u00f3pia de seguran\u00e7a completa do E2 e teste primeiro numa c\u00f3pia dos dados da empresa.<\/li>\n\n\n<li><strong>Carregamento inicial.<\/strong> Pe\u00e7as, listas de materiais, gamas operat\u00f3rias, centros de trabalho, funcion\u00e1rios e turnos.<\/li>\n\n\n<li><strong>Sincroniza\u00e7\u00e3o de tarefas e encomendas de compra.<\/strong> Consulta peri\u00f3dica das altera\u00e7\u00f5es, com novas tentativas em caso de falha e registo das opera\u00e7\u00f5es.<\/li>\n\n\n<li><strong>Configura\u00e7\u00e3o de restri\u00e7\u00f5es no SkyPlanner.<\/strong> Matriz de tempos de prepara\u00e7\u00e3o, ferramentas, n\u00famero de operadores por tarefa e m\u00e1quinas ou pessoal alternativos.<\/li>\n\n\n<li><strong>Envio da programa\u00e7\u00e3o para o E2.<\/strong> Grava\u00e7\u00e3o de datas nas opera\u00e7\u00f5es das tarefas, acionada por webhooks, incluindo tamb\u00e9m tempos e quantidades, se assim o escolher.<\/li>\n\n\n<li><strong>Testes em paralelo.<\/strong> Utilize o SkyPlanner em paralelo com o Whiteboard atual, compare datas e corrija os dados mestre.<\/li>\n\n\n<li><strong>Entrada em produ\u00e7\u00e3o.<\/strong> Ative o envio de dados para o E2 quando os dados coincidirem.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-an-e2-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que deve prever numa integra\u00e7\u00e3o com o E2<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Edi\u00e7\u00e3o e vers\u00e3o.<\/strong> As instala\u00e7\u00f5es do E2 Shop System e do E2 MFG diferem consoante a vers\u00e3o. Confirme a sua durante a defini\u00e7\u00e3o do \u00e2mbito e volte a testar a integra\u00e7\u00e3o ap\u00f3s qualquer atualiza\u00e7\u00e3o do E2.<\/li>\n\n\n<li><strong>O seu servidor, as suas regras.<\/strong> O E2 instalado localmente funciona na sua rede. Defina com a equipa de TI onde ser\u00e1 executado o servi\u00e7o de integra\u00e7\u00e3o, que conta utilizar\u00e1 e em que campos poder\u00e1 escrever.<\/li>\n\n\n<li><strong>M\u00e1quinas agrupadas em centros de trabalho.<\/strong> Um centro de trabalho pode ser uma m\u00e1quina, um grupo ou uma c\u00e9lula. Antes do primeiro carregamento, decida como mapear cada centro de trabalho para os centros de trabalho do SkyPlanner.<\/li>\n\n\n<li><strong>Servi\u00e7os externos.<\/strong> As opera\u00e7\u00f5es realizadas num fornecedor contam para o lead time, n\u00e3o para a sua capacidade. Modele-as como opera\u00e7\u00f5es que apenas consomem tempo.<\/li>\n\n\n<li><strong>Unidades de tempo.<\/strong> Os tempos de prepara\u00e7\u00e3o e de execu\u00e7\u00e3o podem ser definidos por pe\u00e7a, por lote ou por hora. Converta-os durante a importa\u00e7\u00e3o; caso contr\u00e1rio, todas as dura\u00e7\u00f5es ficar\u00e3o erradas.<\/li>\n\n\n<li><strong>Tarefas urgentes.<\/strong> O E2 assinala as tarefas de alta prioridade. Associe essa indica\u00e7\u00e3o \u00e0 prioridade do SkyPlanner ou ao Fast Track para que as tarefas urgentes mantenham o seu lugar.<\/li>\n\n\n<li><strong>Est\u00e1 a planear mudar para o JobBOSS\u00b2?<\/strong> Prepare a parte do SkyPlanner uma \u00fanica vez. No JobBOSS\u00b2, a liga\u00e7\u00e3o desse mesmo plano \u00e9 feita atrav\u00e9s da JobBOSS\u00b2 API da ECI (alojada) ou da ERP API, descritas no <a href=\"\/pt-pt\/integracoes\/erp\/jobboss\/guia-de-integracao\/\">guia do JobBOSS\u00b2<\/a>.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-e2-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quem configura e d\u00e1 suporte \u00e0 integra\u00e7\u00e3o com o E2<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>A equipa do SkyPlanner configura a integra\u00e7\u00e3o durante a implementa\u00e7\u00e3o inicial e d\u00e1 suporte ap\u00f3s a entrada em produ\u00e7\u00e3o,<\/strong> de acordo com os objetos e as regras de sincroniza\u00e7\u00e3o acordados. Cada f\u00e1brica utiliza o E2 de forma diferente, e \u00e9 aqui que se aplica esse conhecimento.<\/li>\n\n\n<li><strong>O seu parceiro E2 ou prestador de servi\u00e7os de TI pode participar.<\/strong> Conhece o seu servidor e a configura\u00e7\u00e3o do E2 e pode tratar dos acessos e da conta de servi\u00e7o em conjunto com a equipa do SkyPlanner.<\/li>\n\n\n<li><strong>Os seus pr\u00f3prios programadores podem desenvolver a integra\u00e7\u00e3o<\/strong> com a REST API do SkyPlanner, utilizando um token de API. Basta um token de API para come\u00e7ar, e a equipa do SkyPlanner ajuda sempre que necess\u00e1rio. Consulte a <a href=\"\/pt-pt\/docs\/tutorial-de-integracao\/\">documenta\u00e7\u00e3o de integra\u00e7\u00e3o do SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>O SkyPlanner est\u00e1 dispon\u00edvel a partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos e fatura\u00e7\u00e3o mensal. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, em conjunto com o seu plano, de acordo com o seu processo e as suas necessidades. Consulte os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a>, a <a href=\"\/pt-pt\/integracoes\/erp\/e2-shop-system\/programacao-producao\/\">programa\u00e7\u00e3o da produ\u00e7\u00e3o para o E2 Shop System, respeitando a capacidade real das m\u00e1quinas e do pessoal<\/a>, a <a href=\"\/pt-pt\/integracoes\/erp\/e2-shop-system\/\">p\u00e1gina do E2 Shop System<\/a>, as <a href=\"\/pt-pt\/funcionalidades\/\">funcionalidades do SkyPlanner<\/a> e a <a href=\"\/pt-pt\/integracoes\/erp\/\">p\u00e1gina de integra\u00e7\u00f5es com ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Empresas industriais que utilizam o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento da UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, pass\u00e1mos de planear a produ\u00e7\u00e3o em folhas de c\u00e1lculo Excel para otimizar a produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o poupa 2 horas de trabalho por semana, e uma nova fila de tarefas chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Ler o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestu\u00e1rio de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied, em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Produ\u00e7\u00e3o farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e a cria\u00e7\u00e3o de um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Ler o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, diretor executivo da Mamec, no pavilh\u00e3o de produ\u00e7\u00e3o da empresa em Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000s<\/b><span>de ordens de fabrico programadas automaticamente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTemos outro controlo sobre a produ\u00e7\u00e3o, e o nosso conhecimento da capacidade est\u00e1 num n\u00edvel completamente diferente.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, diretor executivo<\/b><br>Mamec \u00b7 Misturadores industriais, bombas e fabrico por contrato de alta tecnologia<\/p>\n\n\n<p class=\"ind-cust__result\">Milhares de ordens de fabrico s\u00e3o programadas automaticamente, com uma vis\u00e3o da produ\u00e7\u00e3o em tempo real para toda a organiza\u00e7\u00e3o.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/mamec\/\">Ler o testemunho da Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Um soldador da KJH-Comp a rebarbar uma estrutura de a\u00e7o soldada na f\u00e1brica de Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>de fiabilidade das entregas, face a cerca de 50% anteriormente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner tem um papel decisivo na manuten\u00e7\u00e3o da fiabilidade das nossas entregas.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, diretor-geral<\/b><br>KJH-Comp \u00b7 Metalomec\u00e2nica de chapa e fabrico por contrato<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas passou de cerca de 50% para valores que chegam aos 98%, e a programa\u00e7\u00e3o precisa agora de um supervisor em vez de dois.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/kjh-comp\/\">Ler o testemunho da KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O E2 Shop System tem uma API?<\/summary>\n<p class=\"sp-faq__a\">As APIs para a ind\u00fastria publicadas pela ECI servem o JobBOSS\u00b2, o M1, o Macola e o Deacom. No caso do E2 Shop System e do E2 MFG instalados localmente, a liga\u00e7\u00e3o \u00e9 feita na pr\u00f3pria instala\u00e7\u00e3o: um servi\u00e7o de integra\u00e7\u00e3o na sua rede l\u00ea e grava dados do E2 com os acessos aprovados pela sua equipa de TI. As exporta\u00e7\u00f5es de ficheiros cobrem o restante.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Como s\u00e3o enviadas as datas planeadas para o E2?<\/summary>\n<p class=\"sp-faq__a\">Por opera\u00e7\u00e3o de cada tarefa. Um webhook do SkyPlanner aciona o servi\u00e7o de integra\u00e7\u00e3o, que grava o in\u00edcio e o fim planeados na opera\u00e7\u00e3o da tarefa no E2, bem como o centro de trabalho e o funcion\u00e1rio quando o SkyPlanner tiver deslocado a opera\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner pode enviar os tempos registados na f\u00e1brica para o E2?<\/summary>\n<p class=\"sp-faq__a\">Sim, se assim o escolher. Cada confirma\u00e7\u00e3o no SkyPlanner d\u00e1 origem a registos de tempo e quantidade na opera\u00e7\u00e3o da tarefa. As f\u00e1bricas que preferem o E2 Data Collection continuam a utiliz\u00e1-lo, e o SkyPlanner l\u00ea o progresso a partir do E2.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Utilizamos o E2 SHOP alojado. Que guia se aplica?<\/summary>\n<p class=\"sp-faq__a\">O E2 SHOP alojado passou a ser o JobBOSS\u00b2. Se agora inicia sess\u00e3o no JobBOSS\u00b2, utilize o <a href=\"\/pt-pt\/integracoes\/erp\/jobboss\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o do JobBOSS\u00b2<\/a>. Se ainda utiliza o E2 alojado, o acesso aos dados \u00e9 acordado com a ECI durante a defini\u00e7\u00e3o do \u00e2mbito.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>A integra\u00e7\u00e3o mant\u00e9m-se se mudarmos mais tarde para o JobBOSS\u00b2?<\/summary>\n<p class=\"sp-faq__a\">A parte do SkyPlanner mant\u00e9m-se: centros de trabalho, restri\u00e7\u00f5es, matriz de tempos de prepara\u00e7\u00e3o e programa\u00e7\u00e3o. Apenas a liga\u00e7\u00e3o ao E2 \u00e9 substitu\u00edda pela JobBOSS\u00b2 API ou pela ERP API da ECI.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de desenvolver a integra\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">Sim. O teste gratuito de 30 dias permite utilizar at\u00e9 20 centros de trabalho, com importa\u00e7\u00f5es do E2 em CSV ou Excel, sem necessidade de cart\u00e3o de cr\u00e9dito. <a href=\"\/pt-pt\/avaliacao\/\">Inicie o teste<\/a> ou <a href=\"\/pt-pt\/vendas-de-contacto\/\">fale com a equipa comercial<\/a> para definir o \u00e2mbito da integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ E2 Shop System Guia de integra\u00e7\u00e3o do E2 Shop System para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS Este guia de integra\u00e7\u00e3o do E2 Shop System mostra aos parceiros e \u00e0s equipas de TI como ligar o E2 Shop System (E2 SHOP) ou o E2 MFG ao SkyPlanner APS. O SkyPlanner integra-se &#8230; <a title=\"Guia de integra\u00e7\u00e3o do E2 Shop System para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/e2-shop-system\/guia-de-integracao\/\" aria-label=\"Leia mais sobre Guia de integra\u00e7\u00e3o do E2 Shop System para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106330,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107229","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integra\u00e7\u00e3o E2 Shop APS: guia de programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/title>\n<meta name=\"description\" content=\"Ligue E2 Shop System ao SkyPlanner APS: servidor local, ficheiros, reenvio de datas por opera\u00e7\u00e3o, Data Collection, mapeamento de dados e dicas de projeto.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/e2-shop-system\/guia-de-integracao\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Guia de integra\u00e7\u00e3o do E2 Shop System para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Ligue E2 Shop System ao SkyPlanner APS: servidor local, ficheiros, reenvio de datas por opera\u00e7\u00e3o, Data Collection, mapeamento de dados e dicas de projeto.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/e2-shop-system\/guia-de-integracao\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/e2-shop-system\\\/guia-de-integracao\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/e2-shop-system\\\/guia-de-integracao\\\/\",\"name\":\"Integra\u00e7\u00e3o E2 Shop APS: guia de programa\u00e7\u00e3o da produ\u00e7\u00e3o\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Ligue E2 Shop System ao SkyPlanner APS: servidor local, ficheiros, reenvio de datas por opera\u00e7\u00e3o, Data Collection, mapeamento de dados e dicas de projeto.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/e2-shop-system\\\/guia-de-integracao\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/e2-shop-system\\\/guia-de-integracao\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/e2-shop-system\\\/guia-de-integracao\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para E2 Shop System: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/e2-shop-system\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Guia de integra\u00e7\u00e3o do E2 Shop System para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integra\u00e7\u00e3o E2 Shop APS: guia de programa\u00e7\u00e3o da produ\u00e7\u00e3o","description":"Ligue E2 Shop System ao SkyPlanner APS: servidor local, ficheiros, reenvio de datas por opera\u00e7\u00e3o, Data Collection, mapeamento de dados e dicas de projeto.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/e2-shop-system\/guia-de-integracao\/","og_locale":"pt_PT","og_type":"article","og_title":"Guia de integra\u00e7\u00e3o do E2 Shop System para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS","og_description":"Ligue E2 Shop System ao SkyPlanner APS: servidor local, ficheiros, reenvio de datas por opera\u00e7\u00e3o, Data Collection, mapeamento de dados e dicas de projeto.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/e2-shop-system\/guia-de-integracao\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"15 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/e2-shop-system\/guia-de-integracao\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/e2-shop-system\/guia-de-integracao\/","name":"Integra\u00e7\u00e3o E2 Shop APS: guia de programa\u00e7\u00e3o da produ\u00e7\u00e3o","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Ligue E2 Shop System ao SkyPlanner APS: servidor local, ficheiros, reenvio de datas por opera\u00e7\u00e3o, Data Collection, mapeamento de dados e dicas de projeto.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/e2-shop-system\/guia-de-integracao\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/e2-shop-system\/guia-de-integracao\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/e2-shop-system\/guia-de-integracao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para E2 Shop System: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/e2-shop-system\/"},{"@type":"ListItem","position":5,"name":"Guia de integra\u00e7\u00e3o do E2 Shop System para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ E2 Shop System Guia de integra\u00e7\u00e3o do E2 Shop System para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS Este guia de integra\u00e7\u00e3o do E2 Shop System mostra aos parceiros e \u00e0s equipas de TI como ligar o E2 Shop System (E2 SHOP) ou o E2 MFG ao SkyPlanner APS. O SkyPlanner integra-se&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/107229","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=107229"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/107229\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106330"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=107229"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}