{"id":107055,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/applus\/guia-de-integracao\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"guia-de-integracao","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/applus\/guia-de-integracao\/","title":{"rendered":"Guia de integra\u00e7\u00e3o do APplus para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ APplus<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Guia de integra\u00e7\u00e3o do APplus <span class=\"hl\">para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Este guia de integra\u00e7\u00e3o do APplus mostra aos parceiros APplus e \u00e0s equipas de TI como ligar o APplus ao SkyPlanner APS. O SkyPlanner integra-se com o APplus nos dois sentidos, atrav\u00e9s das interfaces da pr\u00f3pria Asseco:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>S\u00e3o importadas ordens de produ\u00e7\u00e3o (Fertigungsauftr\u00e4ge) com as respetivas opera\u00e7\u00f5es (Arbeitsg\u00e4nge), gamas operat\u00f3rias (Arbeitspl\u00e4ne), listas de materiais (St\u00fccklisten), unidades de capacidade (Kapazit\u00e4tsstellen e Kapazit\u00e4tseinheiten), ferramentas (Betriebsmittel), exist\u00eancias e encomendas de compra.<\/li>\n\n\n<li>O in\u00edcio e o fim planeados e a unidade de capacidade de cada opera\u00e7\u00e3o s\u00e3o enviados de volta para a ordem de produ\u00e7\u00e3o.<\/li>\n\n\n<li>Se assim o pretender, os registos de tempos dos operadores podem ser enviados de volta como mensagens BDE associadas \u00e0 ordem.<\/li>\n\n\n<li>Os webhooks do SkyPlanner enviam as altera\u00e7\u00f5es \u00e0 programa\u00e7\u00e3o assim que ocorrem.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Cronograma de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Durante a implementa\u00e7\u00e3o inicial, a equipa SkyPlanner configura a integra\u00e7\u00e3o de acordo com a sua instala\u00e7\u00e3o APplus e presta suporte ap\u00f3s a entrada em produ\u00e7\u00e3o. Este guia destina-se a parceiros e programadores que queiram participar ou desenvolver as suas pr\u00f3prias solu\u00e7\u00f5es com a REST API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"applus-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Interfaces de integra\u00e7\u00e3o do APplus<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O APplus disponibiliza as seguintes vias de liga\u00e7\u00e3o a um sistema externo de programa\u00e7\u00e3o da produ\u00e7\u00e3o:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Servi\u00e7os web do APplus.<\/strong> O APplus assenta numa arquitetura de servi\u00e7os web. Segundo a Asseco, todas as fun\u00e7\u00f5es necess\u00e1rias \u00e0 programa\u00e7\u00e3o da produ\u00e7\u00e3o podem ser acedidas diretamente pela Internet e utilizadas pelos sistemas inform\u00e1ticos de clientes e fornecedores (<a href=\"https:\/\/www.applus-erp.de\/en\/solutions\/erp-features\/e-business\/\">Asseco<\/a>). Esta \u00e9 a principal via para ler dados de produ\u00e7\u00e3o e gravar datas planeadas.<\/li>\n\n\n<li><strong>Business Integration Framework.<\/strong> Desde o APplus 6.3, este m\u00f3dulo permite ligar sistemas de terceiros sem programa\u00e7\u00e3o, atrav\u00e9s de estruturas de dados adaptativas (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/it-business-2016-asseco-stellt-neue-produktversion-applus-63-vor\/\">Asseco<\/a>). Utilize-o para mapear os objetos do APplus para a REST API do SkyPlanner.<\/li>\n\n\n<li><strong>Universal Cloud Connector.<\/strong> Introduzido no APplus 7.1 para ligar solu\u00e7\u00f5es de parceiros e ofertas SaaS ao APplus, com um elevado n\u00edvel de seguran\u00e7a na transfer\u00eancia de dados (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/asseco-veroeffentlicht-applus-71\/\">Asseco<\/a>).<\/li>\n\n<\/ol>\n\n\n<p>No APplus 10, o Flow Mode inicia processos em momentos definidos ou quando ocorrem determinados eventos, sem interven\u00e7\u00e3o manual (<a href=\"https:\/\/www.applus-erp.de\/en\/new-version\/\">Asseco<\/a>). A via a utilizar para transferir cada objeto \u00e9 acordada na defini\u00e7\u00e3o do \u00e2mbito da implementa\u00e7\u00e3o inicial.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentica\u00e7\u00e3o e acesso<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>No APplus.<\/strong> A integra\u00e7\u00e3o utiliza uma conta t\u00e9cnica dedicada no APplus, com permiss\u00f5es limitadas aos objetos que l\u00ea e grava. O seu parceiro APplus configura a conta e o acesso aos servi\u00e7os web.<\/li>\n\n\n<li><strong>Rede.<\/strong> O APplus pode funcionar nas suas instala\u00e7\u00f5es ou numa vers\u00e3o alojada (<a href=\"https:\/\/www.applus-erp.de\/en\/facts\/\">informa\u00e7\u00f5es sobre o APplus<\/a>). A integra\u00e7\u00e3o acede ao sistema pela via autorizada pela sua equipa de TI ou pelo fornecedor de alojamento.<\/li>\n\n\n<li><strong>No SkyPlanner.<\/strong> A autentica\u00e7\u00e3o na REST API \u00e9 feita com um token de API, criado em Settings &gt; API e enviado no cabe\u00e7alho <code>Authorization-Token<\/code>. A API est\u00e1 documentada em Swagger\/OpenAPI, e o <a href=\"\/pt-pt\/docs\/tutorial-de-integracao\/\">tutorial de integra\u00e7\u00e3o<\/a> explica as primeiras chamadas passo a passo.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Eventos e consultas peri\u00f3dicas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>No APplus, a integra\u00e7\u00e3o consulta periodicamente os servi\u00e7os web para obter ordens de produ\u00e7\u00e3o em aberto e altera\u00e7\u00f5es recentes. Em alternativa, o Business Integration Framework envia as altera\u00e7\u00f5es para o SkyPlanner. A frequ\u00eancia \u00e9 definida por f\u00e1brica: de poucos em poucos minutos para as ordens e de hora a hora para as exist\u00eancias.<\/p>\n\n\n<p>O SkyPlanner envia webhooks quando o estado ou a programa\u00e7\u00e3o se alteram, pelo que a atualiza\u00e7\u00e3o dos dados no APplus \u00e9 desencadeada por eventos.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapeamento de dados<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objeto APplus<\/th><th>Objeto SkyPlanner<\/th><th>Sentido<\/th><th>Frequ\u00eancia<\/th><\/tr><\/thead><tbody><tr><td>Artigos (Artikel), unidades<\/td><td>Produtos e materiais<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Carga inicial, seguida de consultas peri\u00f3dicas<\/td><\/tr><tr><td>Listas de materiais (St\u00fccklisten, Strukturst\u00fccklisten)<\/td><td>Estrutura do produto, subprodutos, materiais por produto<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Carga inicial, depois a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Gamas operat\u00f3rias (Arbeitspl\u00e4ne) com opera\u00e7\u00f5es e tempos de prepara\u00e7\u00e3o e execu\u00e7\u00e3o<\/td><td>Etapas do processo com dura\u00e7\u00f5es e tempos de prepara\u00e7\u00e3o e desmontagem<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Carga inicial, depois a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Pontos e unidades de capacidade (Kapazit\u00e4tsstellen, Kapazit\u00e4tseinheiten)<\/td><td>Grupos de centros de trabalho e centros de trabalho, efici\u00eancias<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Carga inicial, raramente depois<\/td><\/tr><tr><td>Capacidade de pessoal<\/td><td>Pessoal com turnos<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Diariamente, ou turnos pr\u00f3prios no SkyPlanner<\/td><\/tr><tr><td>Ferramentas e dispositivos de fixa\u00e7\u00e3o (Betriebsmittel)<\/td><td>Ferramentas como recursos partilhados de capacidade limitada<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Carga inicial, depois a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Ordens de produ\u00e7\u00e3o (Fertigungsauftr\u00e4ge) com opera\u00e7\u00f5es e materiais<\/td><td>Ordens e tarefas com prazos de entrega e necessidades de materiais<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Consultas de poucos em poucos minutos<\/td><\/tr><tr><td>Exist\u00eancias em armaz\u00e9m<\/td><td>Saldos de exist\u00eancias<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Consultas de hora a hora ou ao executar a programa\u00e7\u00e3o<\/td><\/tr><tr><td>Encomendas de compra (Bestellungen) com datas de entrega<\/td><td>Encomendas de compra, materiais a receber por data de entrega<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Consultas de hora a hora ou ao executar a programa\u00e7\u00e3o<\/td><\/tr><tr><td>In\u00edcio e fim planeados e unidade de capacidade por opera\u00e7\u00e3o da ordem de produ\u00e7\u00e3o<\/td><td>In\u00edcio e fim programados por tarefa<\/td><td>SkyPlanner \u2192 APplus<\/td><td>A cada altera\u00e7\u00e3o da programa\u00e7\u00e3o, por webhook do SkyPlanner<\/td><\/tr><tr><td>Mensagens BDE: tempo e quantidade por opera\u00e7\u00e3o, funcion\u00e1rio<\/td><td>Registos de tempos e confirma\u00e7\u00f5es dos operadores<\/td><td>SkyPlanner \u2192 APplus<\/td><td>Por confirma\u00e7\u00e3o ou por turno, se essa op\u00e7\u00e3o for escolhida<\/td><\/tr><tr><td>N\u00e3o existe no APplus<\/td><td>Matriz de tempos de prepara\u00e7\u00e3o, n\u00famero de operadores por tarefa, m\u00e1quinas e pessoal alternativos<\/td><td>Gerido no SkyPlanner<\/td><td>Configurado durante a implementa\u00e7\u00e3o inicial<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Modelos de integra\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Carga inicial de dados mestre.<\/strong> Leia artigos, listas de materiais, gamas operat\u00f3rias, pontos e unidades de capacidade, Betriebsmittel e capacidade de pessoal atrav\u00e9s dos servi\u00e7os web do APplus. Fa\u00e7a o mapeamento com crit\u00e9rio: uma Kapazit\u00e4tsstelle com quatro Kapazit\u00e4tseinheiten corresponde a um grupo de centros de trabalho com quatro centros de trabalho.<\/p>\n\n\n<p><strong>2. Sincroniza\u00e7\u00e3o de ordens e encomendas.<\/strong> Leia as ordens de produ\u00e7\u00e3o com as respetivas opera\u00e7\u00f5es e materiais, bem como as encomendas de compra em aberto. O SkyPlanner considera o material encomendado dispon\u00edvel na data de entrega da encomenda de compra e atualiza as exist\u00eancias quando esta \u00e9 marcada como Delivered. As propostas de compra permanecem no APplus Disposition at\u00e9 serem convertidas em encomendas.<\/p>\n\n\n<p><strong>3. Envio da programa\u00e7\u00e3o para o APplus.<\/strong> Quando o motor programa ou desloca uma opera\u00e7\u00e3o, um webhook do SkyPlanner desencadeia a atualiza\u00e7\u00e3o no APplus pela via acordada na defini\u00e7\u00e3o do \u00e2mbito (servi\u00e7os web ou Business Integration Framework). Na ordem de produ\u00e7\u00e3o, s\u00e3o definidos o in\u00edcio e o fim planeados e a unidade de capacidade dessa opera\u00e7\u00e3o, para que o quadro de planeamento do APplus apresente a sequ\u00eancia do SkyPlanner.<\/p>\n\n\n<p><strong>4. Liberta\u00e7\u00e3o de ordens de fabrico.<\/strong> O respons\u00e1vel pelo planeamento continua a libertar as ordens de fabrico (Werkstattauftr\u00e4ge) no APplus, agora com as datas do SkyPlanner. As ordens libertadas e o respetivo estado s\u00e3o enviados para o SkyPlanner na sincroniza\u00e7\u00e3o seguinte.<\/p>\n\n\n<p><strong>5. Confirma\u00e7\u00f5es na f\u00e1brica.<\/strong> Os operadores registam o trabalho com SkyPlanner Mobile Confirmations ou Production Timer, e os registos de tempos mant\u00eam a programa\u00e7\u00e3o atualizada. Pode optar por enviar os tempos reais de volta para o APplus. Nesse caso, o tempo e a quantidade de cada opera\u00e7\u00e3o s\u00e3o registados como mensagens BDE associadas \u00e0 ordem. Se continuar a utilizar BDE com c\u00f3digos de barras, o SkyPlanner passa a ler as mensagens do APplus.<\/p>\n\n\n<p><strong>6. Responsabilidade pelos dados e regras de conflito.<\/strong> Documente estas regras antes da entrada em produ\u00e7\u00e3o:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dados<\/th><th>Sistema respons\u00e1vel<\/th><\/tr><\/thead><tbody><tr><td>Artigos, listas de materiais, gamas operat\u00f3rias, quantidades, estado das ordens, liberta\u00e7\u00e3o de ordens de fabrico<\/td><td>APplus<\/td><\/tr><tr><td>Sequ\u00eancia de opera\u00e7\u00f5es, horas de in\u00edcio e fim, atribui\u00e7\u00e3o de unidades de capacidade<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matriz de tempos de prepara\u00e7\u00e3o, n\u00famero de operadores, recursos alternativos<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Dados mestre de Betriebsmittel<\/td><td>APplus; disponibilidade ao longo do tempo planeada no SkyPlanner<\/td><\/tr><tr><td>Turnos e dias n\u00e3o \u00fateis<\/td><td>Um sistema, escolhido na defini\u00e7\u00e3o do \u00e2mbito<\/td><\/tr><tr><td>Mensagens BDE, sa\u00eddas e entradas de materiais<\/td><td>APplus, com introdu\u00e7\u00e3o direta ou envio a partir dos registos de tempos do SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Escolha um \u00fanico sistema para gravar as datas das opera\u00e7\u00f5es. Se a programa\u00e7\u00e3o PPS estiver ativa, ou se Feinplanung ou APplus APS gravarem datas, desative essa fun\u00e7\u00e3o para as ordens programadas pelo SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapas habituais do projeto<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio dos trabalhos. Antes disso, valide a programa\u00e7\u00e3o durante o per\u00edodo de teste gratuito de 30 dias, com unidades de capacidade, gamas operat\u00f3rias e ordens de produ\u00e7\u00e3o em aberto exportadas do APplus em CSV ou Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapeamento.<\/strong> Defina a tabela de mapeamento, as regras de responsabilidade pelos dados, as frequ\u00eancias de sincroniza\u00e7\u00e3o e se as mensagens BDE ser\u00e3o enviadas de volta para o APplus.<\/li>\n\n\n<li><strong>Acesso ao APplus.<\/strong> Crie a conta t\u00e9cnica, ative os servi\u00e7os web com o seu parceiro APplus e fa\u00e7a os primeiros testes num sistema de testes.<\/li>\n\n\n<li><strong>Carga inicial.<\/strong> Artigos, listas de materiais, gamas operat\u00f3rias, pontos e unidades de capacidade, Betriebsmittel, pessoal.<\/li>\n\n\n<li><strong>Sincroniza\u00e7\u00e3o de ordens e encomendas de compra.<\/strong> Consultas peri\u00f3dicas com filtros, pagina\u00e7\u00e3o e novas tentativas, ou envio atrav\u00e9s do Business Integration Framework.<\/li>\n\n\n<li><strong>Configura\u00e7\u00e3o de restri\u00e7\u00f5es no SkyPlanner.<\/strong> Matriz de tempos de prepara\u00e7\u00e3o, ferramentas, n\u00famero de operadores por tarefa e m\u00e1quinas ou pessoal alternativos.<\/li>\n\n\n<li><strong>Escrita da programa\u00e7\u00e3o no APplus.<\/strong> Datas das opera\u00e7\u00f5es recebidas atrav\u00e9s dos webhooks do SkyPlanner e, se optar por isso, mensagens BDE.<\/li>\n\n\n<li><strong>Testes em paralelo.<\/strong> Utilize o SkyPlanner em paralelo com o quadro de planeamento atual, compare as datas e corrija os dados mestre.<\/li>\n\n\n<li><strong>Entrada em produ\u00e7\u00e3o.<\/strong> Ative a escrita no APplus assim que os dados coincidirem.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-an-applus-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que prever numa integra\u00e7\u00e3o com o APplus<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Unidades com capacidade limitada ou ilimitada.<\/strong> No APplus, algumas unidades podem ser planeadas sem limite de capacidade. No SkyPlanner, cada centro de trabalho tem capacidade limitada, pelo que deve verificar os turnos e a efici\u00eancia de cada um durante a importa\u00e7\u00e3o.<\/li>\n\n\n<li><strong>N\u00edveis de planeamento em utiliza\u00e7\u00e3o.<\/strong> Verifique se o Feinplanung ou o APplus APS est\u00e1 licenciado e em utiliza\u00e7\u00e3o e defina um \u00fanico sistema respons\u00e1vel pela escrita das datas.<\/li>\n\n\n<li><strong>Documentos de produ\u00e7\u00e3o e c\u00f3digos de barras.<\/strong> As mensagens BDE s\u00e3o registadas nas ordens que t\u00eam documentos de produ\u00e7\u00e3o impressos. Acorde se a liberta\u00e7\u00e3o das ordens e a impress\u00e3o se mant\u00eam no APplus, como acontece atualmente.<\/li>\n\n\n<li><strong>Unidades dos tempos de prepara\u00e7\u00e3o e execu\u00e7\u00e3o.<\/strong> Converta os tempos de prepara\u00e7\u00e3o e execu\u00e7\u00e3o com a unidade e a base corretas durante a importa\u00e7\u00e3o; caso contr\u00e1rio, todas as dura\u00e7\u00f5es estar\u00e3o erradas.<\/li>\n\n\n<li><strong>Opera\u00e7\u00f5es externas.<\/strong> As opera\u00e7\u00f5es subcontratadas representam tempo decorrido, n\u00e3o capacidade pr\u00f3pria. Modele-as como etapas que apenas t\u00eam dura\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Instala\u00e7\u00f5es alojadas.<\/strong> Na vers\u00e3o alojada, acorde desde o in\u00edcio com o fornecedor de alojamento o percurso de rede para aceder aos servi\u00e7os web.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-applus-integrati\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quem configura e presta suporte \u00e0 integra\u00e7\u00e3o com o APplus<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>A equipa SkyPlanner configura a integra\u00e7\u00e3o durante a implementa\u00e7\u00e3o inicial e presta suporte ap\u00f3s a entrada em produ\u00e7\u00e3o,<\/strong> no \u00e2mbito dos servi\u00e7os web e dos mapeamentos acordados. Cada f\u00e1brica utiliza o APplus de forma diferente, e \u00e9 aqui que esse conhecimento \u00e9 aplicado.<\/li>\n\n\n<li><strong>O seu parceiro APplus pode participar.<\/strong> O parceiro conhece as suas personaliza\u00e7\u00f5es, permiss\u00f5es de utilizador e configura\u00e7\u00e3o do Business Integration Framework e pode disponibilizar os acessos em conjunto com a equipa SkyPlanner.<\/li>\n\n\n<li><strong>Os seus programadores podem desenvolver a partir desta integra\u00e7\u00e3o<\/strong> utilizando a REST API do SkyPlanner com um token de API. Basta um token de API para come\u00e7ar, e a equipa SkyPlanner ajuda sempre que necess\u00e1rio. Consulte a <a href=\"\/pt-pt\/docs\/tutorial-de-integracao\/\">documenta\u00e7\u00e3o de integra\u00e7\u00e3o do SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>O SkyPlanner est\u00e1 dispon\u00edvel a partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos e fatura\u00e7\u00e3o mensal. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, em fun\u00e7\u00e3o do seu processo e das suas necessidades, em conjunto com o plano. Consulte os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a>, a <a href=\"\/pt-pt\/integracoes\/erp\/applus\/programacao-producao\/\">programa\u00e7\u00e3o da produ\u00e7\u00e3o no APplus que respeita a capacidade real das m\u00e1quinas e do pessoal<\/a>, a <a href=\"\/pt-pt\/integracoes\/erp\/applus\/\">p\u00e1gina do APplus<\/a> e a <a href=\"\/pt-pt\/integracoes\/erp\/\">p\u00e1gina de integra\u00e7\u00f5es com ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Opini\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento da UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, pass\u00e1mos de planear a produ\u00e7\u00e3o em folhas de c\u00e1lculo Excel para otimizar a produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o permite poupar 2 horas de trabalho por semana, e uma nova fila de tarefas chega \u00e0 linha de produ\u00e7\u00e3o em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Ler o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com fatos de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied, em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Produ\u00e7\u00e3o farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e a cria\u00e7\u00e3o de um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Ler o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, respons\u00e1vel de produ\u00e7\u00e3o da Fredman Operations, junto a uma c\u00e9lula robotizada de paletiza\u00e7\u00e3o em Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 meses<\/b><span>de visibilidade da capacidade dispon\u00edvel para a equipa comercial<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner d\u00e1 uma base s\u00f3lida e fiabilidade a todo o planeamento da produ\u00e7\u00e3o.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, respons\u00e1vel de produ\u00e7\u00e3o<\/b><br>Fredman Operations \u00b7 Pap\u00e9is para embalagens aptos para contacto alimentar<\/p>\n\n\n<p class=\"ind-cust__result\">A equipa comercial consegue ver a capacidade dispon\u00edvel com seis meses de anteced\u00eancia, e os pedidos de altera\u00e7\u00e3o da programa\u00e7\u00e3o que demoravam uma hora ou mais passam a ter resposta em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/fredman-operations\/\">Ler o testemunho da Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Menos<\/b><span>paragens por falta de materiais<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO valor que o SkyPlanner nos traz \u00e9 ser uma ferramenta que funciona no dia a dia, sobretudo para definir datas de entrega.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, respons\u00e1vel de planeamento da produ\u00e7\u00e3o<\/b><br>Eskomatic \u00b7 Maquina\u00e7\u00e3o em regime de subcontrata\u00e7\u00e3o<\/p>\n\n\n<p class=\"ind-cust__result\">A programa\u00e7\u00e3o autom\u00e1tica da carga permite definir datas de entrega mais precisas, e as paragens de produ\u00e7\u00e3o causadas por falta de materiais diminu\u00edram acentuadamente.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/eskomatic\/\">Ler o testemunho da Eskomatic<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O APplus tem uma API para ordens de produ\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">Sim. O APplus assenta numa arquitetura de servi\u00e7os web, e a Asseco afirma que as suas fun\u00e7\u00f5es de programa\u00e7\u00e3o podem ser utilizadas diretamente pelos sistemas inform\u00e1ticos de clientes e fornecedores. O Business Integration Framework liga sistemas de terceiros atrav\u00e9s de estruturas de dados adaptativas, e o Universal Cloud Connector liga solu\u00e7\u00f5es SaaS ao APplus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Como s\u00e3o gravadas no APplus as datas planeadas?<\/summary>\n<p class=\"sp-faq__a\">A cada altera\u00e7\u00e3o da programa\u00e7\u00e3o, um webhook do SkyPlanner desencadeia a atualiza\u00e7\u00e3o do in\u00edcio planeado, do fim planeado e da unidade de capacidade de cada opera\u00e7\u00e3o da ordem de produ\u00e7\u00e3o. A atualiza\u00e7\u00e3o \u00e9 feita atrav\u00e9s dos servi\u00e7os web do APplus ou do Business Integration Framework. A via a utilizar \u00e9 acordada na defini\u00e7\u00e3o do \u00e2mbito da implementa\u00e7\u00e3o inicial.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner pode enviar mensagens BDE para o APplus?<\/summary>\n<p class=\"sp-faq__a\">Sim, se optar por isso. Os registos de tempos dos operadores no SkyPlanner s\u00e3o enviados como mensagens BDE, com o tempo e a quantidade de cada opera\u00e7\u00e3o da ordem. Nas f\u00e1bricas que mant\u00eam o BDE por c\u00f3digo de barras, o SkyPlanner l\u00ea essas mensagens em vez de as enviar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Um parceiro APplus deve propor o APplus APS ou o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner, quando o cliente pretende ter, em semanas, uma programa\u00e7\u00e3o da produ\u00e7\u00e3o operacional que respeite a capacidade real das m\u00e1quinas e do pessoal. O APplus APS \u00e9 um produto de um parceiro, integrado no APplus, para matrizes de prepara\u00e7\u00e3o que abrangem v\u00e1rias ferramentas e para planeamento de m\u00faltiplos recursos (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/multiressourcenplanung-asseco-solutions-schliesst-partnerschaft-mit-dualis\/\">Asseco<\/a>). O SkyPlanner cobre esses casos, liga-se atrav\u00e9s dos servi\u00e7os web do APplus, reprograma automaticamente e permite um n\u00famero ilimitado de utilizadores, a partir de 199 \u20ac por m\u00eas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>A integra\u00e7\u00e3o funciona com o APplus alojado?<\/summary>\n<p class=\"sp-faq__a\">Sim. O APplus pode funcionar em instala\u00e7\u00f5es pr\u00f3prias ou numa vers\u00e3o alojada, e o SkyPlanner liga-se a ambas atrav\u00e9s dos servi\u00e7os web. O percurso de rede \u00e9 acordado com a sua equipa de TI ou com o fornecedor de alojamento durante a defini\u00e7\u00e3o do \u00e2mbito.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de desenvolver a integra\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">Sim. O teste gratuito de 30 dias permite utilizar at\u00e9 20 centros de trabalho, com importa\u00e7\u00f5es do APplus em CSV ou Excel e todas as funcionalidades Basic, sem cart\u00e3o de cr\u00e9dito. <a href=\"\/pt-pt\/avaliacao\/\">Inicie o teste<\/a> ou <a href=\"\/pt-pt\/vendas-de-contacto\/\">fale com a equipa comercial<\/a> para definir o \u00e2mbito da integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ APplus Guia de integra\u00e7\u00e3o do APplus para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS Este guia de integra\u00e7\u00e3o do APplus mostra aos parceiros APplus e \u00e0s equipas de TI como ligar o APplus ao SkyPlanner APS. O SkyPlanner integra-se com o APplus nos dois sentidos, atrav\u00e9s das interfaces da pr\u00f3pria Asseco: &#8230; <a title=\"Guia de integra\u00e7\u00e3o do APplus para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/applus\/guia-de-integracao\/\" aria-label=\"Leia mais sobre Guia de integra\u00e7\u00e3o do APplus para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106243,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107055","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integra\u00e7\u00e3o APplus APS: guia de programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/title>\n<meta name=\"description\" content=\"Ligue APplus ao SkyPlanner APS: servi\u00e7os web, Business Integration Framework, mensagens BDE, mapeamento de dados, atualiza\u00e7\u00e3o de opera\u00e7\u00f5es e dicas de projeto.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/applus\/guia-de-integracao\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Guia de integra\u00e7\u00e3o do APplus para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Ligue APplus ao SkyPlanner APS: servi\u00e7os web, Business Integration Framework, mensagens BDE, mapeamento de dados, atualiza\u00e7\u00e3o de opera\u00e7\u00f5es e dicas de projeto.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/applus\/guia-de-integracao\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/applus\\\/guia-de-integracao\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/applus\\\/guia-de-integracao\\\/\",\"name\":\"Integra\u00e7\u00e3o APplus APS: guia de programa\u00e7\u00e3o da produ\u00e7\u00e3o\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Ligue APplus ao SkyPlanner APS: servi\u00e7os web, Business Integration Framework, mensagens BDE, mapeamento de dados, atualiza\u00e7\u00e3o de opera\u00e7\u00f5es e dicas de projeto.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/applus\\\/guia-de-integracao\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/applus\\\/guia-de-integracao\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/applus\\\/guia-de-integracao\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para APplus: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoal\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/applus\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Guia de integra\u00e7\u00e3o do APplus para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integra\u00e7\u00e3o APplus APS: guia de programa\u00e7\u00e3o da produ\u00e7\u00e3o","description":"Ligue APplus ao SkyPlanner APS: servi\u00e7os web, Business Integration Framework, mensagens BDE, mapeamento de dados, atualiza\u00e7\u00e3o de opera\u00e7\u00f5es e dicas de projeto.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/applus\/guia-de-integracao\/","og_locale":"pt_PT","og_type":"article","og_title":"Guia de integra\u00e7\u00e3o do APplus para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS","og_description":"Ligue APplus ao SkyPlanner APS: servi\u00e7os web, Business Integration Framework, mensagens BDE, mapeamento de dados, atualiza\u00e7\u00e3o de opera\u00e7\u00f5es e dicas de projeto.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/applus\/guia-de-integracao\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"14 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/applus\/guia-de-integracao\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/applus\/guia-de-integracao\/","name":"Integra\u00e7\u00e3o APplus APS: guia de programa\u00e7\u00e3o da produ\u00e7\u00e3o","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Ligue APplus ao SkyPlanner APS: servi\u00e7os web, Business Integration Framework, mensagens BDE, mapeamento de dados, atualiza\u00e7\u00e3o de opera\u00e7\u00f5es e dicas de projeto.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/applus\/guia-de-integracao\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/applus\/guia-de-integracao\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/applus\/guia-de-integracao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para APplus: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoal","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/applus\/"},{"@type":"ListItem","position":5,"name":"Guia de integra\u00e7\u00e3o do APplus para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ APplus Guia de integra\u00e7\u00e3o do APplus para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS Este guia de integra\u00e7\u00e3o do APplus mostra aos parceiros APplus e \u00e0s equipas de TI como ligar o APplus ao SkyPlanner APS. O SkyPlanner integra-se com o APplus nos dois sentidos, atrav\u00e9s das interfaces da pr\u00f3pria Asseco:&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/107055","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=107055"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/107055\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106243"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=107055"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}