{"id":106997,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/psipenta\/guia-de-integracao\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"guia-de-integracao","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/psipenta\/guia-de-integracao\/","title":{"rendered":"Guia de integra\u00e7\u00e3o do PSIpenta para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ PSIpenta<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Guia de integra\u00e7\u00e3o do PSIpenta <span class=\"hl\">para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Este guia de integra\u00e7\u00e3o do PSIpenta mostra aos parceiros PSI e \u00e0s equipas de TI como ligar o PSIpenta\/ERP ao SkyPlanner APS. O SkyPlanner integra-se com o PSIpenta nos dois sentidos, atrav\u00e9s das interfaces da pr\u00f3pria PSI:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>S\u00e3o importadas as ordens de produ\u00e7\u00e3o (Fertigungsauftr\u00e4ge) com as respetivas opera\u00e7\u00f5es (Arbeitsg\u00e4nge), gamas operat\u00f3rias (Arbeitspl\u00e4ne), listas de materiais (St\u00fccklisten), centros de trabalho, m\u00e1quinas, ferramentas (Betriebsmittel), exist\u00eancias e encomendas de compra.<\/li>\n\n\n<li>O in\u00edcio, o fim e o centro de trabalho previstos para cada opera\u00e7\u00e3o s\u00e3o enviados de volta para a ordem de produ\u00e7\u00e3o.<\/li>\n\n\n<li>Se assim o pretender, os registos de tempos dos operadores podem ser enviados de volta como confirma\u00e7\u00f5es BDE (R\u00fcckmeldungen).<\/li>\n\n\n<li>Os webhooks do SkyPlanner enviam as altera\u00e7\u00f5es \u00e0 programa\u00e7\u00e3o assim que ocorrem.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Cronograma de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A equipa SkyPlanner configura a integra\u00e7\u00e3o de acordo com a sua instala\u00e7\u00e3o do PSIpenta durante a implementa\u00e7\u00e3o e presta apoio ap\u00f3s a entrada em produ\u00e7\u00e3o. Este guia destina-se a parceiros e programadores que queiram participar ou desenvolver as suas pr\u00f3prias solu\u00e7\u00f5es com a REST API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"psipenta-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Interfaces de integra\u00e7\u00e3o do PSIpenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A PSI disponibiliza tr\u00eas vias para ligar um sistema externo de programa\u00e7\u00e3o da produ\u00e7\u00e3o (<a href=\"https:\/\/www.messe.de\/apollo\/hannover_messe_2020\/obs\/Binary\/A1002706\/1002706_02134036.pdf\">brochura da PSI<\/a>):<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>PSIpenta\/ERP REST API.<\/strong> A PSI refere uma API REST e SOAP para o PSIpenta\/ERP e afirma que todos os componentes do PSIpenta podem ser integrados em arquiteturas existentes atrav\u00e9s de servi\u00e7os web RESTful. Esta \u00e9 a principal via para ler dados de produ\u00e7\u00e3o e escrever datas previstas.<\/li>\n\n\n<li><strong>PSIpenta\/BDE REST and SOAP API.<\/strong> O m\u00f3dulo de recolha de dados de f\u00e1brica tem a sua pr\u00f3pria API. \u00c9 por esta via que se registam as confirma\u00e7\u00f5es dos operadores.<\/li>\n\n\n<li><strong>PSIintegration.<\/strong> \u00c9 a camada de integra\u00e7\u00e3o padr\u00e3o da PSI para os m\u00f3dulos PSIpenta. Usa uma arquitetura em estrela, permite mapear mensagens graficamente nos adaptadores e arquiva todas as mensagens numa base de dados. Utilize-a se a sua instala\u00e7\u00e3o j\u00e1 encaminhar as comunica\u00e7\u00f5es com sistemas externos por esta camada.<\/li>\n\n<\/ol>\n\n\n<p>O PSIpenta\/ERP 10 acrescenta fluxos de trabalho BPMN 2.0, criados no Workflow Developer baseado na web, para integrar sistemas externos (<a href=\"https:\/\/www.psi.de\/en\/trends\/article\/psipenta-erp-10-from-software-upgrade-to-competitve-advantage\">PSI<\/a>). Um fluxo de trabalho pode reagir a uma altera\u00e7\u00e3o no PSIpenta e fazer uma chamada ao SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentica\u00e7\u00e3o e acesso<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>No PSIpenta.<\/strong> A integra\u00e7\u00e3o \u00e9 executada com um utilizador t\u00e9cnico dedicado, cujas permiss\u00f5es se limitam aos objetos que l\u00ea e escreve. O seu parceiro PSI configura esse utilizador e o acesso \u00e0 API na sua instala\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Rede.<\/strong> O PSIpenta funciona normalmente em infraestrutura local. A integra\u00e7\u00e3o acede-lhe pela via autorizada pela sua equipa de TI, por exemplo, um endpoint de API publicado ou um pequeno conector dentro da sua rede.<\/li>\n\n\n<li><strong>No SkyPlanner.<\/strong> A autentica\u00e7\u00e3o na REST API \u00e9 feita com um token de API, criado em Settings &gt; API e enviado no cabe\u00e7alho <code>Authorization-Token<\/code>. A API est\u00e1 documentada em Swagger\/OpenAPI, e o <a href=\"\/pt-pt\/docs\/tutorial-de-integracao\/\">tutorial de integra\u00e7\u00e3o<\/a> explica as primeiras chamadas passo a passo.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Eventos e consultas peri\u00f3dicas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Do lado do PSIpenta, a integra\u00e7\u00e3o consulta periodicamente a REST API para obter ordens de produ\u00e7\u00e3o em aberto e altera\u00e7\u00f5es recentes. Em alternativa, um fluxo de trabalho BPMN ou uma mensagem PSIintegration envia a altera\u00e7\u00e3o para o SkyPlanner. A frequ\u00eancia \u00e9 definida por f\u00e1brica: pode ir de intervalos de poucos minutos para as ordens a intervalos de uma hora para as exist\u00eancias.<\/p>\n\n\n<p>O SkyPlanner envia webhooks quando o estado ou a programa\u00e7\u00e3o se alteram, pelo que o envio de dados de volta \u00e9 desencadeado por eventos.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapeamento de dados<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objeto PSIpenta<\/th><th>Objeto SkyPlanner<\/th><th>Sentido<\/th><th>Frequ\u00eancia<\/th><\/tr><\/thead><tbody><tr><td>Artigos (Artikel), unidades<\/td><td>Produtos e materiais<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>Carga inicial, seguida de consultas peri\u00f3dicas<\/td><\/tr><tr><td>Listas de materiais (St\u00fccklisten) multin\u00edvel<\/td><td>Estrutura do produto, subprodutos, materiais por produto<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>Carga inicial, depois a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Gamas operat\u00f3rias (Arbeitspl\u00e4ne) com opera\u00e7\u00f5es e tempos de prepara\u00e7\u00e3o e execu\u00e7\u00e3o<\/td><td>Etapas do processo com dura\u00e7\u00f5es e tempos de prepara\u00e7\u00e3o e desmontagem<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>Carga inicial, depois a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Centros de trabalho (Arbeitspl\u00e4tze) e m\u00e1quinas<\/td><td>Centros de trabalho, grupos de centros de trabalho e efici\u00eancias<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>Carga inicial, raramente depois<\/td><\/tr><tr><td>Ferramentas e dispositivos de fixa\u00e7\u00e3o (Betriebsmittel)<\/td><td>Ferramentas como recursos partilhados de disponibilidade limitada<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>Carga inicial e, depois, a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Calend\u00e1rios de turnos<\/td><td>Turnos e dias n\u00e3o \u00fateis<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>Diariamente, ou turnos geridos no SkyPlanner<\/td><\/tr><tr><td>Ordens de produ\u00e7\u00e3o (Fertigungsauftr\u00e4ge) com opera\u00e7\u00f5es e materiais<\/td><td>Ordens e tarefas com prazos de entrega e necessidades de materiais<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>Consultas de poucos em poucos minutos<\/td><\/tr><tr><td>Exist\u00eancias em armaz\u00e9m<\/td><td>Saldos de exist\u00eancias<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>Consultas de hora a hora ou ao executar a programa\u00e7\u00e3o<\/td><\/tr><tr><td>Encomendas de compra (Bestellungen) com datas de entrega<\/td><td>Encomendas de compra, materiais a receber por data de entrega<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>Consultas de hora a hora ou ao executar a programa\u00e7\u00e3o<\/td><\/tr><tr><td>In\u00edcio, fim e centro de trabalho previstos para cada opera\u00e7\u00e3o da ordem de produ\u00e7\u00e3o<\/td><td>In\u00edcio e fim programados por tarefa<\/td><td>SkyPlanner \u2192 PSIpenta<\/td><td>A cada altera\u00e7\u00e3o da programa\u00e7\u00e3o, por webhook do SkyPlanner<\/td><\/tr><tr><td>Confirma\u00e7\u00f5es BDE (R\u00fcckmeldungen): tempo e quantidade por opera\u00e7\u00e3o, colaborador<\/td><td>Registos de tempos e confirma\u00e7\u00f5es dos operadores<\/td><td>SkyPlanner \u2192 PSIpenta<\/td><td>Por confirma\u00e7\u00e3o ou por turno, se essa op\u00e7\u00e3o for escolhida<\/td><\/tr><tr><td>Regras de programa\u00e7\u00e3o do SkyPlanner<\/td><td>Matriz de tempos de prepara\u00e7\u00e3o, n\u00famero de operadores por tarefa, m\u00e1quinas e pessoal alternativos<\/td><td>Gerido no SkyPlanner<\/td><td>Configurado durante a implementa\u00e7\u00e3o inicial<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Modelos de integra\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Carga inicial de dados mestre.<\/strong> Leia artigos, listas de materiais, gamas operat\u00f3rias, centros de trabalho, m\u00e1quinas, Betriebsmittel e calend\u00e1rios atrav\u00e9s da PSIpenta\/ERP REST API. Defina criteriosamente o mapeamento dos centros de trabalho: um centro com quatro m\u00e1quinas passa a ser um grupo de centros de trabalho ou quatro centros de trabalho.<\/p>\n\n\n<p><strong>2. Sincroniza\u00e7\u00e3o de ordens.<\/strong> Leia as ordens de produ\u00e7\u00e3o lan\u00e7adas, com as respetivas opera\u00e7\u00f5es e materiais, bem como as encomendas de compra em aberto. O SkyPlanner considera o material encomendado dispon\u00edvel na data de entrega da encomenda de compra e atualiza as exist\u00eancias quando esta \u00e9 marcada como Delivered. As propostas de compra permanecem no PSIpenta at\u00e9 se tornarem encomendas.<\/p>\n\n\n<p><strong>3. Escrita da programa\u00e7\u00e3o no PSIpenta.<\/strong> Quando o motor agenda ou desloca uma opera\u00e7\u00e3o, um webhook do SkyPlanner desencadeia uma chamada \u00e0 PSIpenta\/ERP REST API. Esta atualiza o in\u00edcio previsto, o fim previsto e o centro de trabalho dessa opera\u00e7\u00e3o na ordem de produ\u00e7\u00e3o. As datas da ordem decorrem das suas opera\u00e7\u00f5es. Os recursos e campos da sua instala\u00e7\u00e3o s\u00e3o definidos durante a defini\u00e7\u00e3o do \u00e2mbito da implementa\u00e7\u00e3o.<\/p>\n\n\n<p><strong>4. Confirma\u00e7\u00f5es de f\u00e1brica.<\/strong> Os operadores registam o trabalho com o SkyPlanner Mobile Confirmations ou o Production Timer, e os registos de tempos mant\u00eam a programa\u00e7\u00e3o atualizada. Cabe-lhe decidir se os tempos reais s\u00e3o enviados de volta. Em caso afirmativo, o tempo e a quantidade s\u00e3o registados por opera\u00e7\u00e3o como confirma\u00e7\u00f5es BDE atrav\u00e9s da API PSIpenta\/BDE. Se os terminais BDE continuarem em utiliza\u00e7\u00e3o, o SkyPlanner l\u00ea as confirma\u00e7\u00f5es do PSIpenta em vez de as enviar.<\/p>\n\n\n<p><strong>5. Responsabilidade pelos dados e regras de conflito.<\/strong> Documente estas regras antes da entrada em produ\u00e7\u00e3o:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dados<\/th><th>Sistema respons\u00e1vel<\/th><\/tr><\/thead><tbody><tr><td>Artigos, listas de materiais, gamas operat\u00f3rias, quantidades e estado das ordens<\/td><td>PSIpenta<\/td><\/tr><tr><td>Sequ\u00eancia das opera\u00e7\u00f5es, horas de in\u00edcio e fim, atribui\u00e7\u00e3o de m\u00e1quinas<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matriz de tempos de prepara\u00e7\u00e3o, n\u00famero de operadores e recursos alternativos<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Dados mestre de Betriebsmittel<\/td><td>PSIpenta; disponibilidade ao longo do tempo planeada no SkyPlanner<\/td><\/tr><tr><td>Turnos e dias n\u00e3o \u00fateis<\/td><td>Um sistema, escolhido na defini\u00e7\u00e3o do \u00e2mbito<\/td><\/tr><tr><td>Confirma\u00e7\u00f5es, sa\u00eddas e entradas de materiais<\/td><td>PSIpenta, com introdu\u00e7\u00e3o direta ou envio a partir dos registos de tempos do SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Escolha um \u00fanico sistema para escrever as datas das opera\u00e7\u00f5es. Se o Leitstand, o Adaptive Planung ou o MES Scheduling tamb\u00e9m definir datas previstas, desative essa fun\u00e7\u00e3o para as ordens programadas pelo SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapas t\u00edpicas do projeto<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o seu in\u00edcio. Antes disso, valide a programa\u00e7\u00e3o durante o per\u00edodo de avalia\u00e7\u00e3o gratuita de 30 dias, com centros de trabalho, gamas operat\u00f3rias e ordens de produ\u00e7\u00e3o em aberto exportados do PSIpenta em CSV ou Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapeamento.<\/strong> Defina a tabela de mapeamento, as regras de responsabilidade pelos dados, as frequ\u00eancias de sincroniza\u00e7\u00e3o e se as confirma\u00e7\u00f5es ser\u00e3o enviadas de volta.<\/li>\n\n\n<li><strong>Acesso ao PSIpenta.<\/strong> Crie o utilizador t\u00e9cnico, ative as vias de acesso \u00e0 API com o seu parceiro PSI e teste primeiro numa instala\u00e7\u00e3o de testes.<\/li>\n\n\n<li><strong>Carga inicial.<\/strong> Artigos, listas de materiais, gamas operat\u00f3rias, centros de trabalho, m\u00e1quinas, Betriebsmittel e calend\u00e1rios.<\/li>\n\n\n<li><strong>Sincroniza\u00e7\u00e3o de ordens e encomendas de compra.<\/strong> Consultas peri\u00f3dicas com filtros, pagina\u00e7\u00e3o e novas tentativas, ou mensagens desencadeadas por fluxos de trabalho.<\/li>\n\n\n<li><strong>Configura\u00e7\u00e3o de restri\u00e7\u00f5es no SkyPlanner.<\/strong> Matriz de tempos de prepara\u00e7\u00e3o, ferramentas, n\u00famero de operadores por tarefa e m\u00e1quinas ou pessoal alternativos.<\/li>\n\n\n<li><strong>Escrita da programa\u00e7\u00e3o no PSIpenta.<\/strong> Datas das opera\u00e7\u00f5es a partir dos webhooks do SkyPlanner e, se assim for decidido, confirma\u00e7\u00f5es BDE.<\/li>\n\n\n<li><strong>Testes em paralelo.<\/strong> Execute o SkyPlanner em paralelo com o plano atual, compare datas e corrija os dados mestre.<\/li>\n\n\n<li><strong>Entrada em produ\u00e7\u00e3o.<\/strong> Ative a escrita no PSIpenta quando os dados coincidirem.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-psipenta-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que prever numa integra\u00e7\u00e3o com o PSIpenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>M\u00f3dulos em utiliza\u00e7\u00e3o.<\/strong> Verifique quais os m\u00f3dulos de planeamento PSI licenciados e em produ\u00e7\u00e3o. Cada m\u00f3dulo que escreva datas precisa de uma regra clara.<\/li>\n\n\n<li><strong>Centro de trabalho ou m\u00e1quina.<\/strong> Decida se o SkyPlanner programa ao n\u00edvel do centro de trabalho ou da m\u00e1quina e mantenha o mesmo n\u00edvel nos dois sentidos.<\/li>\n\n\n<li><strong>Betriebsmittel.<\/strong> Os dispositivos de fixa\u00e7\u00e3o e as ferramentas da lista Betriebsmittel passam a ser ferramentas com disponibilidade limitada no SkyPlanner. Assim, cada opera\u00e7\u00e3o tamb\u00e9m reserva a sua ferramenta.<\/li>\n\n\n<li><strong>Unidades dos tempos de prepara\u00e7\u00e3o e execu\u00e7\u00e3o.<\/strong> Na importa\u00e7\u00e3o, converta os tempos de prepara\u00e7\u00e3o e execu\u00e7\u00e3o com a unidade e a base de c\u00e1lculo corretas. Caso contr\u00e1rio, todas as dura\u00e7\u00f5es estar\u00e3o erradas.<\/li>\n\n\n<li><strong>Opera\u00e7\u00f5es externas.<\/strong> As opera\u00e7\u00f5es subcontratadas representam tempo decorrido, n\u00e3o capacidade interna. Modele-as como etapas apenas com dura\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Opera\u00e7\u00f5es iniciadas.<\/strong> Leia o progresso a partir das confirma\u00e7\u00f5es antes de cada execu\u00e7\u00e3o da programa\u00e7\u00e3o, para que esta tenha em conta o trabalho j\u00e1 realizado. O Running Time Lock fixa depois as tarefas das pr\u00f3ximas horas.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-psipenta-integra\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quem configura e presta apoio \u00e0 integra\u00e7\u00e3o com o PSIpenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>A equipa SkyPlanner configura a integra\u00e7\u00e3o durante a implementa\u00e7\u00e3o e presta apoio ap\u00f3s a entrada em produ\u00e7\u00e3o,<\/strong> no \u00e2mbito das chamadas \u00e0 API e das mensagens acordadas. Cada f\u00e1brica utiliza o PSIpenta de forma diferente, e \u00e9 nesta configura\u00e7\u00e3o que se aplica esse conhecimento.<\/li>\n\n\n<li><strong>O seu parceiro PSI pode participar.<\/strong> Conhece os seus m\u00f3dulos, campos personalizados e configura\u00e7\u00e3o do PSIintegration, e pode disponibilizar o acesso \u00e0 API em conjunto com a equipa SkyPlanner.<\/li>\n\n\n<li><strong>Os seus pr\u00f3prios programadores podem desenvolver solu\u00e7\u00f5es sobre a integra\u00e7\u00e3o<\/strong> atrav\u00e9s da REST API do SkyPlanner, com um token de API. Um token de API \u00e9 suficiente para come\u00e7ar, e a equipa SkyPlanner ajuda quando necess\u00e1rio. Consulte a <a href=\"\/pt-pt\/docs\/tutorial-de-integracao\/\">documenta\u00e7\u00e3o de integra\u00e7\u00e3o do SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>O SkyPlanner est\u00e1 dispon\u00edvel a partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos e fatura\u00e7\u00e3o mensal. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, em conjunto com o seu plano, de acordo com o seu processo e as suas necessidades. Consulte os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a>, a <a href=\"\/pt-pt\/integracoes\/erp\/psipenta\/programacao-producao\/\">programa\u00e7\u00e3o da produ\u00e7\u00e3o com o PSIpenta, respeitando a capacidade real das m\u00e1quinas e do pessoal<\/a>, a <a href=\"\/pt-pt\/integracoes\/erp\/psipenta\/\">p\u00e1gina do PSIpenta<\/a> e a <a href=\"\/pt-pt\/integracoes\/erp\/\">\u00e1rea de integra\u00e7\u00f5es ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar avalia\u00e7\u00e3o gratuita<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Opini\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento da UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, pass\u00e1mos do planeamento da produ\u00e7\u00e3o em folhas de c\u00e1lculo Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de comuta\u00e7\u00e3o<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o permite poupar 2 horas de trabalho por semana, e uma nova fila de tarefas chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Ler o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestu\u00e1rio de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Produ\u00e7\u00e3o farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e criar um plano otimizado para tr\u00eas meses que abranja todos os centros de trabalho demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Ler o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>de fiabilidade das entregas desde 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner d\u00e1-nos visibilidade sobre a capacidade e torna o planeamento previs\u00edvel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Produ\u00e7\u00e3o qu\u00edmica e alimentar<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas tem sido de 100% durante todo o per\u00edodo de utiliza\u00e7\u00e3o do SkyPlanner, desde 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/opes-corporation\/\">Ler o testemunho da Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Menos<\/b><span>paragens por falta de materiais<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO valor do SkyPlanner para n\u00f3s est\u00e1 em ser uma ferramenta que funciona no dia a dia, sobretudo para definir datas de entrega.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, respons\u00e1vel pelo planeamento da produ\u00e7\u00e3o<\/b><br>Eskomatic \u00b7 Maquina\u00e7\u00e3o por subcontrata\u00e7\u00e3o<\/p>\n\n\n<p class=\"ind-cust__result\">A programa\u00e7\u00e3o autom\u00e1tica da carga de trabalho permite definir datas de entrega mais precisas, e as paragens de produ\u00e7\u00e3o por falta de materiais diminu\u00edram acentuadamente.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/eskomatic\/\">Ler o testemunho da Eskomatic<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O PSIpenta tem uma API para ordens de produ\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">Sim. A PSI refere uma API REST e SOAP para PSIpenta\/ERP e PSIpenta\/BDE e afirma que todos os componentes PSIpenta podem ser integrados atrav\u00e9s de servi\u00e7os web RESTful. O PSIintegration acrescenta uma camada de integra\u00e7\u00e3o entre m\u00f3dulos baseada em mensagens.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Como s\u00e3o gravadas no PSIpenta as datas planeadas?<\/summary>\n<p class=\"sp-faq__a\">Atrav\u00e9s da REST API do PSIpenta\/ERP. A cada altera\u00e7\u00e3o na programa\u00e7\u00e3o, um webhook do SkyPlanner desencadeia a atualiza\u00e7\u00e3o do in\u00edcio planeado, do fim planeado e do centro de trabalho de cada opera\u00e7\u00e3o da ordem de produ\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner pode enviar confirma\u00e7\u00f5es para o PSIpenta BDE?<\/summary>\n<p class=\"sp-faq__a\">Sim, se optar por essa configura\u00e7\u00e3o. Os registos de tempo dos operadores no SkyPlanner s\u00e3o enviados como confirma\u00e7\u00f5es BDE, com o tempo e a quantidade por opera\u00e7\u00e3o, atrav\u00e9s da API do PSIpenta\/BDE. Nas f\u00e1bricas que mant\u00eam os terminais BDE, o SkyPlanner l\u00ea as confirma\u00e7\u00f5es em vez de as enviar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Um parceiro PSI deve propor o PSIpenta Leitstand ou o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner, quando o cliente pretende ter, em poucas semanas, uma programa\u00e7\u00e3o da produ\u00e7\u00e3o operacional que respeite a capacidade real das m\u00e1quinas e das equipas. O Leitstand, o Adaptive Planung e o MES Scheduling s\u00e3o m\u00f3dulos separados do produto modular da PSI (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/erp\">PSI<\/a>). O SkyPlanner liga-se atrav\u00e9s das APIs do PSIpenta\/ERP e do BDE, reprograma automaticamente quando h\u00e1 altera\u00e7\u00f5es na produ\u00e7\u00e3o e planeia mudan\u00e7as de s\u00e9rie, ferramentas, equipas e materiais. Inclui utilizadores ilimitados, a partir de 199 \u20ac por m\u00eas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>A integra\u00e7\u00e3o requer o PSIpenta\/MES?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O SkyPlanner liga-se ao PSIpenta\/ERP e, para as confirma\u00e7\u00f5es, ao PSIpenta\/BDE. Os operadores podem registar o trabalho no SkyPlanner num telem\u00f3vel ou tablet.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de desenvolver a integra\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">Sim. O per\u00edodo de teste gratuito de 30 dias permite utilizar at\u00e9 20 centros de trabalho, importar dados do PSIpenta em CSV ou Excel e aceder a todas as funcionalidades Basic, sem cart\u00e3o de cr\u00e9dito. <a href=\"\/pt-pt\/avaliacao\/\">Inicie o teste<\/a> ou <a href=\"\/pt-pt\/vendas-de-contacto\/\">fale com a equipa comercial<\/a> para definir o \u00e2mbito da integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ PSIpenta Guia de integra\u00e7\u00e3o do PSIpenta para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS Este guia de integra\u00e7\u00e3o do PSIpenta mostra aos parceiros PSI e \u00e0s equipas de TI como ligar o PSIpenta\/ERP ao SkyPlanner APS. O SkyPlanner integra-se com o PSIpenta nos dois sentidos, atrav\u00e9s das interfaces da pr\u00f3pria PSI: &#8230; <a title=\"Guia de integra\u00e7\u00e3o do PSIpenta para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/psipenta\/guia-de-integracao\/\" aria-label=\"Leia mais sobre Guia de integra\u00e7\u00e3o do PSIpenta para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106214,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106997","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integra\u00e7\u00e3o PSIpenta APS: guia de programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/title>\n<meta name=\"description\" content=\"Ligue PSIpenta ao SkyPlanner APS: PSIpenta\/ERP REST API, PSIintegration, confirma\u00e7\u00f5es BDE, mapeamento de dados, escrita de opera\u00e7\u00f5es no ERP e dicas de projeto.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/psipenta\/guia-de-integracao\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Guia de integra\u00e7\u00e3o do PSIpenta para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Ligue PSIpenta ao SkyPlanner APS: PSIpenta\/ERP REST API, PSIintegration, confirma\u00e7\u00f5es BDE, mapeamento de dados, escrita de opera\u00e7\u00f5es no ERP e dicas de projeto.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/psipenta\/guia-de-integracao\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/psipenta\\\/guia-de-integracao\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/psipenta\\\/guia-de-integracao\\\/\",\"name\":\"Integra\u00e7\u00e3o PSIpenta APS: guia de programa\u00e7\u00e3o da produ\u00e7\u00e3o\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Ligue PSIpenta ao SkyPlanner APS: PSIpenta\\\/ERP REST API, PSIintegration, confirma\u00e7\u00f5es BDE, mapeamento de dados, escrita de opera\u00e7\u00f5es no ERP e dicas de projeto.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/psipenta\\\/guia-de-integracao\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/psipenta\\\/guia-de-integracao\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/psipenta\\\/guia-de-integracao\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para PSIpenta: programa\u00e7\u00e3o da produ\u00e7\u00e3o segundo a capacidade real\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/psipenta\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Guia de integra\u00e7\u00e3o do PSIpenta para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integra\u00e7\u00e3o PSIpenta APS: guia de programa\u00e7\u00e3o da produ\u00e7\u00e3o","description":"Ligue PSIpenta ao SkyPlanner APS: PSIpenta\/ERP REST API, PSIintegration, confirma\u00e7\u00f5es BDE, mapeamento de dados, escrita de opera\u00e7\u00f5es no ERP e dicas de projeto.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/psipenta\/guia-de-integracao\/","og_locale":"pt_PT","og_type":"article","og_title":"Guia de integra\u00e7\u00e3o do PSIpenta para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS","og_description":"Ligue PSIpenta ao SkyPlanner APS: PSIpenta\/ERP REST API, PSIintegration, confirma\u00e7\u00f5es BDE, mapeamento de dados, escrita de opera\u00e7\u00f5es no ERP e dicas de projeto.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/psipenta\/guia-de-integracao\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"13 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/psipenta\/guia-de-integracao\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/psipenta\/guia-de-integracao\/","name":"Integra\u00e7\u00e3o PSIpenta APS: guia de programa\u00e7\u00e3o da produ\u00e7\u00e3o","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Ligue PSIpenta ao SkyPlanner APS: PSIpenta\/ERP REST API, PSIintegration, confirma\u00e7\u00f5es BDE, mapeamento de dados, escrita de opera\u00e7\u00f5es no ERP e dicas de projeto.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/psipenta\/guia-de-integracao\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/psipenta\/guia-de-integracao\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/psipenta\/guia-de-integracao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para PSIpenta: programa\u00e7\u00e3o da produ\u00e7\u00e3o segundo a capacidade real","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/psipenta\/"},{"@type":"ListItem","position":5,"name":"Guia de integra\u00e7\u00e3o do PSIpenta para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ PSIpenta Guia de integra\u00e7\u00e3o do PSIpenta para programa\u00e7\u00e3o da produ\u00e7\u00e3o com o SkyPlanner APS Este guia de integra\u00e7\u00e3o do PSIpenta mostra aos parceiros PSI e \u00e0s equipas de TI como ligar o PSIpenta\/ERP ao SkyPlanner APS. O SkyPlanner integra-se com o PSIpenta nos dois sentidos, atrav\u00e9s das interfaces da pr\u00f3pria PSI:&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106997","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=106997"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106997\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106214"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=106997"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}