{"id":106620,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/sylob\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"sylob","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sylob\/","title":{"rendered":"SkyPlanner APS para Sylob ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ Sylob<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para Sylob ERP: <span class=\"hl\">programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O SkyPlanner APS \u00e9 um complemento para o Sylob ERP que programa a produ\u00e7\u00e3o respeitando a capacidade real das m\u00e1quinas e dos operadores, bem como a disponibilidade de cada ferramenta e material. Permite ver em que centro de trabalho e quando ser\u00e1 executada cada ordem de fabrico (ordre de fabrication, OF). O Autopilot reprograma automaticamente a produ\u00e7\u00e3o sempre que h\u00e1 altera\u00e7\u00f5es.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Marcar uma demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A integra\u00e7\u00e3o entre o SkyPlanner e o Sylob ERP \u00e9 bidirecional: o SkyPlanner recebe as OF com as respetivas opera\u00e7\u00f5es, gamas operat\u00f3rias (gammes), centros de trabalho (centres de charge), exist\u00eancias e encomendas a fornecedores. Devolve as datas previstas das opera\u00e7\u00f5es, os centros de trabalho e as declara\u00e7\u00f5es dos operadores. A equipa SkyPlanner configura a integra\u00e7\u00e3o de acordo com a configura\u00e7\u00e3o do seu Sylob durante a implementa\u00e7\u00e3o inicial.<\/p>\n\n\n<p>Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O teste gratuito dura 30 dias e permite utilizar at\u00e9 20 centros de trabalho, sem cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Capacidade respeitada em todos os recursos, em simult\u00e2neo.<\/p>\n\n\n<p class=\"fx-pain__b\">A programa\u00e7\u00e3o de cada m\u00e1quina, pessoa e ferramenta respeita a sua capacidade, tendo em conta os turnos, as aus\u00eancias e as horas extraordin\u00e1rias reais. Um centro de trabalho com tr\u00eas m\u00e1quinas executa tr\u00eas tarefas em paralelo, sem sobrecarregar nenhuma delas. Quando uma m\u00e1quina est\u00e1 com a capacidade esgotada, o trabalho passa para outra m\u00e1quina ou pessoa.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Datas de entrega que pode prometer.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada OF recebe uma data de conclus\u00e3o prevista com base na capacidade real. A equipa comercial responde aos clientes com base no programa de produ\u00e7\u00e3o, e n\u00e3o numa data de necessidade calculada por programa\u00e7\u00e3o regressiva.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprograma\u00e7\u00e3o autom\u00e1tica perante altera\u00e7\u00f5es.<\/p>\n\n\n<p class=\"fx-pain__b\">Quando uma m\u00e1quina para, chega uma encomenda urgente ou uma tarefa termina mais cedo, o Autopilot reprograma automaticamente. As posi\u00e7\u00f5es que fixou e as prioridades que definiu continuam a ser respeitadas.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Menos mudan\u00e7as de produ\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner conhece o tempo de prepara\u00e7\u00e3o entre cada par de produtos, nos dois sentidos. Passar de azul para vermelho pode demorar 30 minutos e de vermelho para azul, 60. O motor sequencia as tarefas de forma a perder o m\u00ednimo de tempo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ferramentas e equipas partilhadas sem conflitos.<\/p>\n\n\n<p class=\"fx-pain__b\">Um molde ou dispositivo de fixa\u00e7\u00e3o em uso numa m\u00e1quina nunca \u00e9 reservado noutra. A uma tarefa que exige tr\u00eas operadores s\u00e3o atribu\u00eddas tr\u00eas pessoas com disponibilidade nos turnos.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materiais verificados antes do arranque.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner programa a produ\u00e7\u00e3o com base nas exist\u00eancias e nas encomendas a fornecedores em aberto (commandes fournisseurs) do Sylob. Uma tarefa que aguarda uma entrega de um fornecedor fica programada para depois da data de entrega, em vez de ficar parada na m\u00e1quina.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cada operador v\u00ea a sua fila de trabalho.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada operador v\u00ea as pr\u00f3ximas tarefas no telem\u00f3vel ou tablet e regista o trabalho \u00e0 medida que o executa. O escrit\u00f3rio acompanha o progresso em tempo real e as declara\u00e7\u00f5es s\u00e3o enviadas para o Sylob.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que dizem as empresas industriais sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento da UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, pass\u00e1mos de planear a produ\u00e7\u00e3o em folhas de c\u00e1lculo Excel para otimizar a produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o permite poupar 2 horas de trabalho por semana, e uma nova fila de trabalho chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Ler o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestu\u00e1rio de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied, em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Fabrico de produtos farmac\u00eauticos<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e criar um plano otimizado para tr\u00eas meses que abrange todos os centros de trabalho demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Ler o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Um soldador da KJH-Comp a rebarbar uma estrutura de a\u00e7o soldada na f\u00e1brica de Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>de fiabilidade das entregas, face a cerca de 50% anteriormente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner desempenha um papel decisivo para manter a fiabilidade das nossas entregas.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, diretor-geral<\/b><br>KJH-Comp \u00b7 Constru\u00e7\u00e3o met\u00e1lica em chapa e fabrico por contrato<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas subiu de cerca de 50% para valores que chegaram aos 98%, e a programa\u00e7\u00e3o precisa agora de um supervisor em vez de dois.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/kjh-comp\/\">Ler o testemunho da KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Vista a\u00e9rea da f\u00e1brica de equipamentos de seguran\u00e7a para telhados da Piristeel, em Kauhava\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>de fiabilidade das entregas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner tornou os estrangulamentos mais vis\u00edveis e a gest\u00e3o da produ\u00e7\u00e3o mais clara.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, diretor de produ\u00e7\u00e3o<\/b><br>Piristeel \u00b7 Sistemas de seguran\u00e7a para telhados e de drenagem de \u00e1guas pluviais<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas atingiu 99,2% este ano, e a programa\u00e7\u00e3o permite poupar at\u00e9 quatro horas de trabalho por dia.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/piristeel\/\">Ler o testemunho da Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-sylob-erp-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona a integra\u00e7\u00e3o com o Sylob ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>O Sylob envia o trabalho.<\/strong> O SkyPlanner recebe as OF firmes com as respetivas opera\u00e7\u00f5es, centros de trabalho e tempos de prepara\u00e7\u00e3o e execu\u00e7\u00e3o, juntamente com as exist\u00eancias e as encomendas a fornecedores.<\/li>\n\n\n<li><strong>O SkyPlanner cria o programa de produ\u00e7\u00e3o e mant\u00e9m-no atualizado.<\/strong> O motor Arcturus programa cada opera\u00e7\u00e3o em cada centro de trabalho em segundos e reprograma a produ\u00e7\u00e3o \u00e0 medida que surgem altera\u00e7\u00f5es.<\/li>\n\n\n<li><strong>As datas e as declara\u00e7\u00f5es regressam ao Sylob.<\/strong> Os webhooks do SkyPlanner enviam cada altera\u00e7\u00e3o ao programa de produ\u00e7\u00e3o assim que ocorre. Cada opera\u00e7\u00e3o de uma OF no Sylob recebe as datas previstas de in\u00edcio e fim e o centro de trabalho. Os registos de tempo dos operadores passam a declara\u00e7\u00f5es de produ\u00e7\u00e3o (d\u00e9clarations de production).<\/li>\n\n<\/ol>\n\n\n<p>A integra\u00e7\u00e3o utiliza as REST APIs p\u00fablicas do pr\u00f3prio Sylob. O SkyPlanner l\u00ea os dados do Sylob atrav\u00e9s de consultas guardadas na Syst\u00e8me d&#8217;information API e escreve os dados de retorno atrav\u00e9s das a\u00e7\u00f5es do cat\u00e1logo de a\u00e7\u00f5es do Sylob na Action API. Cada f\u00e1brica configura as suas consultas, gammes e centros de trabalho no Sylob de forma diferente. Por isso, a equipa SkyPlanner faz o mapeamento dos seus objetos durante a implementa\u00e7\u00e3o inicial e presta assist\u00eancia \u00e0 integra\u00e7\u00e3o ap\u00f3s a entrada em produ\u00e7\u00e3o. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, de acordo com o seu processo e as suas necessidades. O seu parceiro Sylob ou os seus pr\u00f3prios programadores tamb\u00e9m podem desenvolver a integra\u00e7\u00e3o com base na API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>).<\/p>\n\n\n<p>As consultas, as a\u00e7\u00f5es, a autentica\u00e7\u00e3o e o mapeamento de campos s\u00e3o explicados no <a href=\"\/pt-pt\/integracoes\/erp\/sylob\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o do Sylob ERP para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-sylob-erp-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Que dados s\u00e3o trocados entre o Sylob ERP e o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Sylob ERP<\/th><th>SkyPlanner<\/th><th>Sentido<\/th><\/tr><\/thead><tbody><tr><td>Article (comprado ou fabricado)<\/td><td>Produtos e materiais<\/td><td>Entrada<\/td><\/tr><tr><td>Nomenclature (BOM multin\u00edvel)<\/td><td>Estrutura do produto e materiais por produto<\/td><td>Entrada<\/td><\/tr><tr><td>Gamme: opera\u00e7\u00f5es com tempos de prepara\u00e7\u00e3o e execu\u00e7\u00e3o<\/td><td>Etapas do processo com dura\u00e7\u00f5es e tempos de prepara\u00e7\u00e3o<\/td><td>Entrada<\/td><\/tr><tr><td>Centre de charge: n\u00famero de recursos, hor\u00e1rio semanal padr\u00e3o (semaine type) e exce\u00e7\u00f5es<\/td><td>Centros de trabalho, grupos de centros de trabalho, turnos e aus\u00eancias<\/td><td>Entrada<\/td><\/tr><tr><td>Employ\u00e9s<\/td><td>Pessoal e respetivos turnos<\/td><td>Entrada<\/td><\/tr><tr><td>Ordre de fabrication (OF) com quantidade e data de necessidade<\/td><td>Ordem e tarefas com prazo e prioridade<\/td><td>Entrada<\/td><\/tr><tr><td>Exist\u00eancias por localiza\u00e7\u00e3o<\/td><td>Exist\u00eancias de materiais<\/td><td>Entrada<\/td><\/tr><tr><td>Commande fournisseur com data prevista de rece\u00e7\u00e3o<\/td><td>Material a receber na respetiva data de entrega<\/td><td>Entrada<\/td><\/tr><tr><td>Op\u00e9ration d&#8217;ordre de fabrication: in\u00edcio e fim previstos, centro de trabalho<\/td><td>In\u00edcio, fim e centro de trabalho programados por opera\u00e7\u00e3o<\/td><td>Retorno<\/td><\/tr><tr><td>D\u00e9claration de production: tempo de prepara\u00e7\u00e3o, tempo de execu\u00e7\u00e3o, quantidade produzida, refugo, opera\u00e7\u00e3o conclu\u00edda<\/td><td>Tempos e quantidades registados pelos operadores<\/td><td>Retorno<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>As matrizes de tempos de prepara\u00e7\u00e3o e transi\u00e7\u00e3o, as ferramentas como recursos de capacidade limitada e os centros de trabalho alternativos s\u00e3o geridos no SkyPlanner e configurados durante a implementa\u00e7\u00e3o inicial.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-sylob-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que o Sylob programa e o que o SkyPlanner acrescenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O Sylob 9 abrange v\u00e1rios n\u00edveis de planeamento: PIC, PDP, necessidades l\u00edquidas (CBN), um plano de carga por centro de trabalho e programa\u00e7\u00e3o de curto prazo. A documenta\u00e7\u00e3o do pr\u00f3prio Sylob descreve como funciona a capacidade:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Tipo de capacidade por centro de trabalho.<\/strong> Cada centre de charge \u00e9 configurado com capacidade infinita ou finita. Com capacidade infinita, as opera\u00e7\u00f5es s\u00e3o programadas apenas em fun\u00e7\u00e3o das datas de necessidade e v\u00e1rias podem decorrer em simult\u00e2neo. As sobrecargas ficam vis\u00edveis no plano de carga para que o respons\u00e1vel pelo planeamento as possa nivelar. (<a href=\"https:\/\/forterro-fwe.atlassian.net\/wiki\/spaces\/S9KB\/pages\/31038889\/SUPFOR+-+Centres+de+charge\">Base de conhecimento da Forterro<\/a>)<\/li>\n\n\n<li><strong>Uma opera\u00e7\u00e3o de cada vez com capacidade finita.<\/strong> &#8220;G\u00e9rer \u00e0 capacit\u00e9 finie implique qu&#8217;une seule op\u00e9ration est permise sur le centre de charge.&#8221; (A gest\u00e3o com capacidade finita implica que s\u00f3 \u00e9 permitida uma opera\u00e7\u00e3o de cada vez no centro de trabalho.)<\/li>\n\n\n<li><strong>Come\u00e7ar com capacidade infinita.<\/strong> A forma\u00e7\u00e3o do Sylob aconselha come\u00e7ar com capacidade infinita, porque a capacidade finita exige um respons\u00e1vel dedicado \u00e0 programa\u00e7\u00e3o, dados t\u00e9cnicos fi\u00e1veis e declara\u00e7\u00f5es de produ\u00e7\u00e3o quase em tempo real.<\/li>\n\n\n<li><strong>As altera\u00e7\u00f5es s\u00f3 t\u00eam efeito depois de validadas.<\/strong> Nas atividades de planeamento, &#8220;Les modifications du planning sont r\u00e9percut\u00e9es en production uniquement lorsqu&#8217;elles sont valid\u00e9es.&#8221; (As altera\u00e7\u00f5es ao plano s\u00f3 chegam \u00e0 produ\u00e7\u00e3o quando s\u00e3o validadas pelo respons\u00e1vel pelo planeamento.) (<a href=\"https:\/\/forterro-fwe.atlassian.net\/wiki\/spaces\/S9KB\/pages\/1549041665\/Nouvelle+interface+de+planification\">Forterro<\/a>)<\/li>\n\n\n<li><strong>Otimiza\u00e7\u00e3o num APS separado.<\/strong> Para programar a produ\u00e7\u00e3o respeitando as restri\u00e7\u00f5es de capacidade e simular cen\u00e1rios, o Sylob disponibiliza o CADPLAN, &#8220;qui s&#8217;interface parfaitement \u00e0 l&#8217;ERP Sylob et le compl\u00e8te&#8221; (que se integra perfeitamente com o ERP Sylob e o complementa). (<a href=\"https:\/\/www.sylob.com\/fr\/fonctionnalites\/planification-aps\">Sylob<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Assim, uma f\u00e1brica que queira reunir toda a produ\u00e7\u00e3o num \u00fanico programa que respeite a capacidade real precisa de uma ferramenta de programa\u00e7\u00e3o dedicada a par do Sylob. Cada passo \u00e9 explicado em <a href=\"\/pt-pt\/integracoes\/erp\/sylob\/programacao-producao\/\">O Sylob ERP permite programar a produ\u00e7\u00e3o respeitando a capacidade real?<\/a>. Os fundamentos do m\u00e9todo est\u00e3o no nosso <a href=\"\/pt-pt\/recursos-pt-pt\/capacidade-finita\/\">guia de programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"sylob-erp-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Sylob ERP: como funciona hoje e com o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Planeamento no Sylob (plan de charge e centros de trabalho com capacidade finita)<\/th><th>Sylob ERP com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Capacidade<\/td><td>Infinita por predefini\u00e7\u00e3o; os centros com capacidade finita executam uma opera\u00e7\u00e3o de cada vez<\/td><td>Programa\u00e7\u00e3o que respeita a capacidade de cada m\u00e1quina, pessoa e ferramenta e considera os turnos<\/td><\/tr><tr><td>Programa\u00e7\u00e3o<\/td><td>C\u00e1lculo de carga, seguido de ajuste e valida\u00e7\u00e3o das opera\u00e7\u00f5es pelo respons\u00e1vel pelo planeamento<\/td><td>Programa\u00e7\u00e3o ao n\u00edvel da opera\u00e7\u00e3o em segundos<\/td><\/tr><tr><td>Mudan\u00e7as de produ\u00e7\u00e3o<\/td><td>Tempo de prepara\u00e7\u00e3o por opera\u00e7\u00e3o na gamme<\/td><td>Tarefas sequenciadas para minimizar o tempo total de prepara\u00e7\u00e3o<\/td><\/tr><tr><td>Recursos<\/td><td>N\u00famero de recursos por centro de trabalho<\/td><td>Ferramentas com capacidade limitada; afeta\u00e7\u00e3o de pessoal \u00e0s tarefas que exigem v\u00e1rios operadores<\/td><\/tr><tr><td>Materiais<\/td><td>Restri\u00e7\u00e3o opcional por componentes cr\u00edticos na programa\u00e7\u00e3o com capacidade finita<\/td><td>As tarefas come\u00e7am quando h\u00e1 exist\u00eancias ou quando chegam as entregas das encomendas a fornecedores<\/td><\/tr><tr><td>Altera\u00e7\u00f5es<\/td><td>Rec\u00e1lculo das cargas, seguido de revis\u00e3o e valida\u00e7\u00e3o<\/td><td>O Autopilot reprograma de acordo com as suas prioridades<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Declara\u00e7\u00f5es no Sylob ou nas Sylob Apps<\/td><td>Fila de tarefas e registos do operador no telem\u00f3vel ou tablet, com envio das declara\u00e7\u00f5es para o Sylob<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"choose-skyplanner-over-cadplan-when\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quando escolher o SkyPlanner em vez do CADPLAN<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O CADPLAN \u00e9 o m\u00f3dulo APS do Sylob. A forma\u00e7\u00e3o de utilizadores da Forterro abrange os dados t\u00e9cnicos de fabrico pr\u00f3prios do m\u00f3dulo (refer\u00eancias fabricadas, fases e roteiros de fabrico), a defini\u00e7\u00e3o de simula\u00e7\u00f5es com sele\u00e7\u00e3o de OF e hip\u00f3teses, heur\u00edsticas padr\u00e3o e a edi\u00e7\u00e3o interativa do resultado. (<a href=\"https:\/\/forterro-fwe.atlassian.net\/wiki\/spaces\/S9KB\/pages\/31033777\/Programmes+de+formation\">Programa de forma\u00e7\u00e3o da Forterro<\/a>) O Sylob n\u00e3o publica o pre\u00e7o deste m\u00f3dulo. O SkyPlanner programa toda a f\u00e1brica a partir das suas OF do Sylob, reprograma automaticamente e permite utilizar a programa\u00e7\u00e3o no ch\u00e3o de f\u00e1brica, com um pre\u00e7o p\u00fablico.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Quer ter a programa\u00e7\u00e3o operacional em semanas.<\/strong> O SkyPlanner \u00e9 um software na nuvem que funciona a par do Sylob ERP. Pode test\u00e1-lo com as suas pr\u00f3prias OF durante o per\u00edodo experimental de 30 dias. A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio do acompanhamento inicial.<\/li>\n\n\n<li><strong>O plano muda todos os dias.<\/strong> O Autopilot reprograma automaticamente a produ\u00e7\u00e3o sempre que h\u00e1 uma altera\u00e7\u00e3o relevante, sem que um planeador tenha de definir e executar uma simula\u00e7\u00e3o. As novas datas s\u00e3o enviadas para o Sylob.<\/li>\n\n\n<li><strong>As mudan\u00e7as de produ\u00e7\u00e3o determinam o volume produzido.<\/strong> A matriz de tempos de prepara\u00e7\u00e3o regista os tempos de mudan\u00e7a entre produtos, tendo em conta o sentido da mudan\u00e7a, e ordena as tarefas para minimizar o tempo total de prepara\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Ferramentas, equipas e materiais determinam o que se produz a seguir.<\/strong> A programa\u00e7\u00e3o respeita os limites de cada m\u00e1quina, pessoa, ferramenta e material, atribui os operadores necess\u00e1rios \u00e0s tarefas que exigem v\u00e1rios operadores e utiliza centros de trabalho alternativos. As tarefas s\u00f3 come\u00e7am quando o material est\u00e1 dispon\u00edvel em stock ou \u00e9 recebido atrav\u00e9s de encomendas de compra.<\/li>\n\n\n<li><strong>Os operadores devem trabalhar de acordo com o plano.<\/strong> O Mobile Confirmations disponibiliza a fila de tarefas de cada operador num telem\u00f3vel ou tablet, e os registos de produ\u00e7\u00e3o s\u00e3o enviados para o Sylob.<\/li>\n\n\n<li><strong>Quer conhecer o custo total \u00e0 partida.<\/strong> A partir de 199 \u20ac por m\u00eas, com a integra\u00e7\u00e3o bidirecional configurada e apoiada pela equipa SkyPlanner.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie o teste gratuito.<\/strong> 30 dias, at\u00e9 20 centros de trabalho, todas as funcionalidades do plano Basic, sem cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Modele a sua produ\u00e7\u00e3o.<\/strong> Crie m\u00e1quinas, pessoas e turnos no SkyPlanner ou importe-os. Est\u00e1 dispon\u00edvel apoio \u00e0 configura\u00e7\u00e3o inicial.<\/li>\n\n\n<li><strong>Carregue as suas OFs.<\/strong> Exporte as OFs em aberto e as respetivas opera\u00e7\u00f5es de uma consulta do Sylob para CSV ou Excel. Importe-as e compare a programa\u00e7\u00e3o do SkyPlanner com o seu plano atual.<\/li>\n\n\n<li><strong>Ligue o Sylob ERP.<\/strong> A equipa SkyPlanner configura a integra\u00e7\u00e3o bidirecional de acordo com a sua instala\u00e7\u00e3o do Sylob e assegura o apoio ap\u00f3s a entrada em funcionamento.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> Os planos s\u00e3o faturados mensalmente por centro de trabalho. Pode adicionar ou remover centros de trabalho ou cancelar a qualquer momento. Consulte os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a> para conhecer os detalhes, a p\u00e1gina de <a href=\"\/pt-pt\/recursos-pt-pt\/o-que-e-planeamento-da-producao\/\">programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a> para conhecer o m\u00e9todo e a <a href=\"\/pt-pt\/integracoes\/erp\/\">\u00e1rea de integra\u00e7\u00f5es ERP<\/a> para ver outros ERPs.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Falar com a equipa comercial<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 o melhor complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o Sylob ERP?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e das equipas e se integra com o Sylob ERP nos dois sentidos. Recebe OFs, roteiros de fabrico, centros de trabalho, dados de stock e encomendas de compra e devolve datas previstas das opera\u00e7\u00f5es, centros de trabalho e registos de produ\u00e7\u00e3o. A programa\u00e7\u00e3o respeita os limites de cada m\u00e1quina, operador, ferramenta e material. Uma matriz de tempos de prepara\u00e7\u00e3o, que distingue o sentido de cada mudan\u00e7a de produ\u00e7\u00e3o, ordena as tarefas para minimizar o tempo de prepara\u00e7\u00e3o. O Autopilot reprograma automaticamente a produ\u00e7\u00e3o quando h\u00e1 altera\u00e7\u00f5es. Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas e o teste gratuito dura 30 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Que software de programa\u00e7\u00e3o da produ\u00e7\u00e3o se integra com o Sylob ERP?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS integra-se com o Sylob ERP atrav\u00e9s das REST APIs p\u00fablicas do Sylob. L\u00ea OFs, opera\u00e7\u00f5es, centros de trabalho, dados de stock e encomendas de compra a partir de consultas guardadas e envia as datas previstas e os registos de produ\u00e7\u00e3o atrav\u00e9s do cat\u00e1logo de a\u00e7\u00f5es do Sylob. O m\u00f3dulo APS do pr\u00f3prio Sylob \u00e9 o CADPLAN. A equipa SkyPlanner configura a integra\u00e7\u00e3o durante a configura\u00e7\u00e3o inicial. Em alternativa, o seu parceiro Sylob ou os seus programadores podem desenvolv\u00ea-la com a REST API do SkyPlanner.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Sylob ERP permite programar a produ\u00e7\u00e3o respeitando a capacidade real dos recursos?<\/summary>\n<p class=\"sp-faq__a\">Sim, por centro de trabalho. Um centro de trabalho pode ser configurado com capacidade finita, passando a executar apenas uma opera\u00e7\u00e3o de cada vez. A Sylob aconselha come\u00e7ar com capacidade infinita, porque a programa\u00e7\u00e3o com capacidade finita exige um planeador dedicado, dados t\u00e9cnicos fi\u00e1veis e registos de produ\u00e7\u00e3o quase em tempo real. O SkyPlanner APS funciona em conjunto com o Sylob e programa a produ\u00e7\u00e3o respeitando, em simult\u00e2neo, os limites de cada m\u00e1quina, pessoa, ferramenta e material.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devemos usar o CADPLAN ou o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Use o SkyPlanner se pretende uma programa\u00e7\u00e3o \u00fanica para toda a f\u00e1brica, que respeite a capacidade real dos recursos e se mantenha atualizada automaticamente. O CADPLAN disponibiliza ao planeador simula\u00e7\u00f5es, heur\u00edsticas e edi\u00e7\u00e3o interativa com base nos seus pr\u00f3prios dados de m\u00e9todos de fabrico. O SkyPlanner programa diretamente as suas OFs do Sylob, reprograma automaticamente a cada altera\u00e7\u00e3o, planeia ferramentas, equipas, mudan\u00e7as de produ\u00e7\u00e3o e materiais e disponibiliza a fila de tarefas de cada operador no telem\u00f3vel. Durante o teste, pode ver a programa\u00e7\u00e3o da sua pr\u00f3pria produ\u00e7\u00e3o antes de tomar qualquer decis\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner substitui a gest\u00e3o da produ\u00e7\u00e3o do Sylob?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o, funciona como complemento. O Sylob continua a gerir artigos, listas de materiais, roteiros de fabrico, CBN, compras, stocks, qualidade e finan\u00e7as. O SkyPlanner programa as OFs de acordo com a capacidade real e devolve as datas previstas e os registos de produ\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa o SkyPlanner para uma f\u00e1brica que utiliza o Sylob?<\/summary>\n<p class=\"sp-faq__a\">A partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas por cada centro de trabalho adicional. Um centro de trabalho \u00e9 um recurso de produ\u00e7\u00e3o com a sua pr\u00f3pria fila de tarefas programadas. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado \u00e0 partida, de acordo com o seu processo e as suas necessidades, juntamente com o plano escolhido. Assim, conhece o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo demora a implementa\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio da configura\u00e7\u00e3o. A equipa mapeia os seus roteiros de fabrico e centros de trabalho, liga as OFs e as encomendas de compra e envia as datas previstas de volta para o Sylob. Tudo \u00e9 testado face ao seu plano atual antes da entrada em funcionamento.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes da integra\u00e7\u00e3o com o Sylob ERP?<\/summary>\n<p class=\"sp-faq__a\">Sim. O teste de 30 dias utiliza uma exporta\u00e7\u00e3o das suas OFs do Sylob em CSV ou Excel. Antes de come\u00e7ar qualquer trabalho de integra\u00e7\u00e3o, pode ver a <a href=\"\/pt-pt\/recursos-pt-pt\/capacidade-finita\/\">programa\u00e7\u00e3o da sua pr\u00f3pria produ\u00e7\u00e3o<\/a>, que respeita a capacidade real dos recursos.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ Sylob SkyPlanner APS para Sylob ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real O SkyPlanner APS \u00e9 um complemento para o Sylob ERP que programa a produ\u00e7\u00e3o respeitando a capacidade real das m\u00e1quinas e dos operadores, bem como a disponibilidade de cada ferramenta e material. Permite ver em que centro de trabalho &#8230; <a title=\"SkyPlanner APS para Sylob ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sylob\/\" aria-label=\"Leia mais sobre SkyPlanner APS para Sylob ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100684,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106620","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Sylob ERP: integra\u00e7\u00e3o APS com programa\u00e7\u00e3o por capacidade real<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS para Sylob ERP: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional. Cada m\u00e1quina, operador, ferramenta e material. Desde 199 \u20ac por m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sylob\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para Sylob ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS para Sylob ERP: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional. Cada m\u00e1quina, operador, ferramenta e material. Desde 199 \u20ac por m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sylob\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/sylob\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/sylob\\\/\",\"name\":\"Sylob ERP: integra\u00e7\u00e3o APS com programa\u00e7\u00e3o por capacidade real\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS para Sylob ERP: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional. Cada m\u00e1quina, operador, ferramenta e material. Desde 199 \u20ac por m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/sylob\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/sylob\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/sylob\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para Sylob ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Sylob ERP: integra\u00e7\u00e3o APS com programa\u00e7\u00e3o por capacidade real","description":"SkyPlanner APS para Sylob ERP: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional. Cada m\u00e1quina, operador, ferramenta e material. Desde 199 \u20ac por m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sylob\/","og_locale":"pt_PT","og_type":"article","og_title":"SkyPlanner APS para Sylob ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real","og_description":"SkyPlanner APS para Sylob ERP: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional. Cada m\u00e1quina, operador, ferramenta e material. Desde 199 \u20ac por m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sylob\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"16 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sylob\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sylob\/","name":"Sylob ERP: integra\u00e7\u00e3o APS com programa\u00e7\u00e3o por capacidade real","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS para Sylob ERP: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional. Cada m\u00e1quina, operador, ferramenta e material. Desde 199 \u20ac por m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sylob\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sylob\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sylob\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para Sylob ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ Sylob SkyPlanner APS para Sylob ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real O SkyPlanner APS \u00e9 um complemento para o Sylob ERP que programa a produ\u00e7\u00e3o respeitando a capacidade real das m\u00e1quinas e dos operadores, bem como a disponibilidade de cada ferramenta e material. Permite ver em que centro de trabalho&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106620","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=106620"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106620\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/100684"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=106620"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}