{"id":106475,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/comarch-erp-xl\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"comarch-erp-xl","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/","title":{"rendered":"SkyPlanner APS para Comarch ERP XL: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ Comarch ERP XL<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para Comarch ERP XL: <span class=\"hl\">programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O SkyPlanner APS complementa o Comarch ERP XL com programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e das equipas, programando cada m\u00e1quina, operador, ferramenta e material. Veja onde e quando \u00e9 executada cada opera\u00e7\u00e3o de cada ordem de produ\u00e7\u00e3o (zlecenie produkcyjne). Quando h\u00e1 altera\u00e7\u00f5es na produ\u00e7\u00e3o, o Autopilot reprograma automaticamente.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Marcar uma demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner integra-se com o Comarch ERP XL nos dois sentidos: recebe ordens de produ\u00e7\u00e3o, tecnologias com as respetivas opera\u00e7\u00f5es, centros de trabalho e recursos, artigos, exist\u00eancias e encomendas de compra. Devolve as datas previstas das opera\u00e7\u00f5es e os registos de trabalho. Durante a implementa\u00e7\u00e3o inicial, a equipa SkyPlanner configura a integra\u00e7\u00e3o de acordo com a configura\u00e7\u00e3o do seu Comarch ERP XL.<\/p>\n\n\n<p>Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O teste gratuito dura 30 dias e permite utilizar at\u00e9 20 centros de trabalho, sem cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">A capacidade resulta da programa\u00e7\u00e3o, n\u00e3o de um n\u00famero introduzido \u00e0 m\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada m\u00e1quina, pessoa e ferramenta tem um calend\u00e1rio limitado \u00e0 sua disponibilidade real, com turnos, aus\u00eancias e horas extraordin\u00e1rias. Cada opera\u00e7\u00e3o tem uma hora de in\u00edcio, uma hora de fim e um centro de trabalho. Deixa de ter de estimar a capacidade por per\u00edodo e de acrescentar uma margem percentual para mudan\u00e7as de produ\u00e7\u00e3o.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Mudan\u00e7as de produ\u00e7\u00e3o programadas entre produtos.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner guarda o tempo de mudan\u00e7a entre cada par de produtos, nos dois sentidos. Passar de azul para vermelho pode demorar 30 minutos e de vermelho para azul, 60. O motor ordena as tarefas de forma a perder o m\u00ednimo de tempo em prepara\u00e7\u00f5es.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">As equipas e as ferramentas tamb\u00e9m t\u00eam limites.<\/p>\n\n\n<p class=\"fx-pain__b\">Uma tarefa que exige tr\u00eas operadores \u00e9 atribu\u00edda a tr\u00eas pessoas com disponibilidade nos respetivos turnos. Um molde ou dispositivo de fixa\u00e7\u00e3o em uso numa m\u00e1quina nunca \u00e9 reservado para outra ao mesmo tempo. Quando uma m\u00e1quina est\u00e1 ocupada, o trabalho passa para uma m\u00e1quina ou pessoa alternativa.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materiais verificados antes de come\u00e7ar.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner l\u00ea as exist\u00eancias e as encomendas de compra em aberto (zam\u00f3wienia zakupu) do Comarch ERP XL. Uma ordem de produ\u00e7\u00e3o que aguarda uma entrega de um fornecedor \u00e9 programada para depois dessa data de entrega.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprograma\u00e7\u00e3o autom\u00e1tica face a encomendas urgentes e avarias.<\/p>\n\n\n<p class=\"fx-pain__b\">Quando uma m\u00e1quina para ou chega uma encomenda urgente, o Autopilot reprograma a produ\u00e7\u00e3o. O Arcturus otimiza todo o plano em segundos, respeitando sempre os bloqueios e as prioridades que definiu.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cada operador v\u00ea a sua fila de tarefas.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada operador v\u00ea as pr\u00f3ximas tarefas num telem\u00f3vel ou tablet e regista o trabalho \u00e0 medida que o executa. O escrit\u00f3rio acompanha o progresso em tempo real e os registos de trabalho s\u00e3o enviados de volta para a ordem de produ\u00e7\u00e3o como registos de execu\u00e7\u00e3o das opera\u00e7\u00f5es.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Opini\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento na UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, o nosso planeamento da produ\u00e7\u00e3o passou das folhas de c\u00e1lculo Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o permite poupar 2 horas de trabalho por semana, e uma nova lista de tarefas chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Leia o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestu\u00e1rio de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Produ\u00e7\u00e3o farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e criar um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Leia o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Um soldador da KJH-Comp a rebarbar uma estrutura de a\u00e7o soldada na f\u00e1brica de Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>de fiabilidade das entregas, face a cerca de 50% anteriormente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner desempenha um papel decisivo na manuten\u00e7\u00e3o da fiabilidade das nossas entregas.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, Diretor-geral<\/b><br>KJH-Comp \u00b7 Transforma\u00e7\u00e3o de chapa e fabrico por contrato<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas passou de cerca de 50% para valores que chegaram aos 98%, e a programa\u00e7\u00e3o precisa agora de um supervisor em vez de dois.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/kjh-comp\/\">Ler o testemunho da KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, diretor executivo da Mamec, na nave de produ\u00e7\u00e3o da empresa em Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Mais de 1.000<\/b><span>ordens de fabrico programadas automaticamente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cControlamos a produ\u00e7\u00e3o de outra forma e a nossa compreens\u00e3o da capacidade est\u00e1 num n\u00edvel completamente diferente.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, diretor executivo<\/b><br>Mamec \u00b7 Misturadores industriais, bombas e fabrico por contrato de alta tecnologia<\/p>\n\n\n<p class=\"ind-cust__result\">Milhares de ordens de fabrico s\u00e3o programadas automaticamente, com uma vis\u00e3o da produ\u00e7\u00e3o em tempo real para toda a organiza\u00e7\u00e3o.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/mamec\/\">Ler o testemunho da Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-comarch-erp-xl-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona a integra\u00e7\u00e3o com o Comarch ERP XL<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>O Comarch ERP XL envia o trabalho.<\/strong> O SkyPlanner recebe ordens de produ\u00e7\u00e3o com os respetivos processos e opera\u00e7\u00f5es, tecnologias, centros de trabalho (gniazda robocze) e recursos (zasoby), artigos, exist\u00eancias e encomendas de compra.<\/li>\n\n\n<li><strong>O SkyPlanner cria a programa\u00e7\u00e3o e mant\u00e9m-na atualizada.<\/strong> O motor Arcturus programa todas as opera\u00e7\u00f5es em segundos e reprograma-as quando h\u00e1 altera\u00e7\u00f5es na produ\u00e7\u00e3o. Os webhooks do SkyPlanner enviam cada altera\u00e7\u00e3o \u00e0 programa\u00e7\u00e3o assim que ocorre.<\/li>\n\n\n<li><strong>As datas e os registos de trabalho s\u00e3o devolvidos.<\/strong> As datas e horas previstas de in\u00edcio e fim s\u00e3o devolvidas a cada opera\u00e7\u00e3o da ordem de produ\u00e7\u00e3o atrav\u00e9s da fun\u00e7\u00e3o XLDodajTerminDoProcesuProd da XL API. Os registos de tempos dos operadores s\u00e3o enviados como execu\u00e7\u00f5es de opera\u00e7\u00f5es atrav\u00e9s de XLDodajRealizacjeOperacjiProd.<\/li>\n\n<\/ol>\n\n\n<p>O Comarch ERP XL continua a ser o seu sistema de registo de refer\u00eancia. Artigos, tecnologias, MRP, compras, exist\u00eancias, documentos RW e PW e apuramento de custos mant\u00eam-se onde est\u00e3o. O SkyPlanner gere a sequ\u00eancia e os hor\u00e1rios de todas as opera\u00e7\u00f5es em cada recurso.<\/p>\n\n\n<p>A Comarch indica tr\u00eas formas de liga\u00e7\u00e3o ao ERP XL: DCOM, liga\u00e7\u00e3o direta \u00e0 base de dados (SQL Client) e REST API (<a href=\"https:\/\/www.comarch.pl\/erp\/xl\/\">Comarch<\/a>). O SkyPlanner l\u00ea os dados de produ\u00e7\u00e3o atrav\u00e9s da REST API do Comarch ERP XL Web ou de uma liga\u00e7\u00e3o de leitura \u00e0 base de dados do ERP XL. Para devolver os dados, utiliza a XL API (CDN_API.DLL), a biblioteca da Comarch que permite adicionar tecnologias, ordens de produ\u00e7\u00e3o, datas de opera\u00e7\u00f5es e execu\u00e7\u00f5es a partir de sistemas externos (<a href=\"https:\/\/pomoc.comarch.pl\/xl\/index.php\/dokumentacja\/xl128-przyklady-zastosowania-api-w-produkcji\/\">Ajuda da Comarch<\/a>).<\/p>\n\n\n<p>Cada f\u00e1brica utiliza o Comarch ERP XL de forma diferente. Por isso, a equipa SkyPlanner configura a integra\u00e7\u00e3o de acordo com o seu sistema durante a implementa\u00e7\u00e3o inicial e presta suporte ap\u00f3s a entrada em produ\u00e7\u00e3o. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, em fun\u00e7\u00e3o do seu processo e das suas necessidades. O seu parceiro Comarch ou os seus pr\u00f3prios programadores tamb\u00e9m podem desenvolver a integra\u00e7\u00e3o com base na API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">Refer\u00eancia da API<\/a>).<\/p>\n\n\n<p>As fun\u00e7\u00f5es, o mapeamento de dados e as regras de devolu\u00e7\u00e3o de dados est\u00e3o descritos no <a href=\"\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o com o Comarch ERP XL para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-comarch-erp-xl-schedules-and-what-skyplanne\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que o Comarch ERP XL programa e o que o SkyPlanner acrescenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O m\u00f3dulo Produkcja do Comarch ERP XL planeia ordens de produ\u00e7\u00e3o com base nas tecnologias e nos calend\u00e1rios dos recursos. Assinala conflitos e permite ao planeador arrastar opera\u00e7\u00f5es num gr\u00e1fico de Gantt. A ajuda da Comarch mostra em que situa\u00e7\u00f5es o plano continua a depender do crit\u00e9rio do planeador:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>A capacidade do centro de trabalho \u00e9 um n\u00famero introduzido pelo utilizador.<\/strong> Na ficha do centro de trabalho, a Comarch explica que a capacidade &#8220;cannot always be stated so unambiguously&#8221; (nem sempre pode ser indicada de forma t\u00e3o inequ\u00edvoca), pelo que &#8220;this field is left for the user to define.&#8221; (cabe ao utilizador definir este campo). (<a href=\"https:\/\/pomoc.comarch.pl\/xl\/index.php\/dokumentacja\/plan-obciazenia-gniazd-roboczych\/\">Ajuda da Comarch, traduzida<\/a>)<\/li>\n\n\n<li><strong>As mudan\u00e7as de produ\u00e7\u00e3o s\u00e3o uma percentagem.<\/strong> O par\u00e2metro de carga permitida permite reservar &#8220;some % of time for downtime, changeovers etc.&#8221; (uma determinada % de tempo para paragens, mudan\u00e7as de produ\u00e7\u00e3o, etc.) dentro dessa capacidade. (<a href=\"https:\/\/pomoc.comarch.pl\/xl\/index.php\/dokumentacja\/plan-obciazenia-gniazd-roboczych\/\">mesma fonte<\/a>)<\/li>\n\n\n<li><strong>O planeamento agregado pode sobrecarregar um per\u00edodo.<\/strong> Uma das variantes de planeamento programa opera\u00e7\u00f5es no per\u00edodo atual mesmo quando &#8220;the resource availability limit is exceeded&#8221; (o limite de disponibilidade do recurso \u00e9 excedido). (<a href=\"https:\/\/pomoc.comarch.pl\/xl\/index.php\/dokumentacja\/zlecenia-produkcyjne\/\">Ajuda da Comarch<\/a>)<\/li>\n\n\n<li><strong>As mudan\u00e7as de recursos ocorrem entre centros de trabalho.<\/strong> A defini\u00e7\u00e3o de mudan\u00e7a estabelece &#8220;the changeover time of the resource&#8217;s work center and the cost of that change&#8221; (o tempo de mudan\u00e7a de centro de trabalho do recurso e o custo dessa mudan\u00e7a), n\u00e3o a passagem de um produto para o seguinte. (<a href=\"https:\/\/pomoc.comarch.pl\/xl\/index.php\/dokumentacja\/gniazda-robocze-i-zasoby-kalendarze-i-okresy-przestoje-i-awarie\/\">Ajuda da Comarch<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Para a sequencia\u00e7\u00e3o detalhada, a Comarch comercializa o Comarch APS, &#8220;a standalone application with its own interface and its own database (PSQL)&#8221; (uma aplica\u00e7\u00e3o aut\u00f3noma com interface pr\u00f3pria e base de dados pr\u00f3pria (PSQL)) (<a href=\"https:\/\/pomoc.comarch.pl\/aps\/index.php\/dokumentacja\/dokumentacja-uzytkownika-wersja-2026-3\/\">Ajuda do Comarch APS<\/a>). \u00c9 instalado no seu servidor, com uma chave de licen\u00e7a pr\u00f3pria e um servi\u00e7o de integra\u00e7\u00e3o.<\/p>\n\n\n<p>Todas as op\u00e7\u00f5es e limita\u00e7\u00f5es s\u00e3o explicadas em <a href=\"\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/programacao-producao\/\">O Comarch ERP XL permite programar a produ\u00e7\u00e3o respeitando a capacidade real?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"comarch-erp-xl-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Comarch ERP XL: como funciona hoje e com o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Comarch ERP XL Produkcja<\/th><th>Comarch ERP XL com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Capacidade<\/td><td>Capacidade definida pelo utilizador por centro de trabalho e per\u00edodo, com uma % de carga permitida<\/td><td>Programa\u00e7\u00e3o de cada m\u00e1quina, pessoa e ferramenta segundo a sua disponibilidade real<\/td><\/tr><tr><td>Conflitos<\/td><td>S\u00e3o assinalados; depois, o planeador reprograma ou arrasta as opera\u00e7\u00f5es<\/td><td>O motor s\u00f3 atribui trabalho onde existe capacidade<\/td><\/tr><tr><td>Mudan\u00e7as de produ\u00e7\u00e3o<\/td><td>Margem percentual; tempo fixo quando um recurso muda de centro de trabalho<\/td><td>Matriz de tempos de prepara\u00e7\u00e3o e mudan\u00e7a: tempo total m\u00ednimo de prepara\u00e7\u00e3o entre produtos<\/td><\/tr><tr><td>Pessoas e ferramentas<\/td><td>Recursos associados \u00e0 opera\u00e7\u00e3o da tecnologia<\/td><td>Operadores identificados com turnos, tarefas com v\u00e1rios operadores e ferramentas como recursos partilhados de disponibilidade limitada<\/td><\/tr><tr><td>Materiais<\/td><td>Reservas de mat\u00e9rias-primas e sugest\u00f5es do MRP<\/td><td>As tarefas come\u00e7am quando h\u00e1 exist\u00eancias ou quando chegam as encomendas de compra<\/td><\/tr><tr><td>Altera\u00e7\u00f5es<\/td><td>Repetir o planeamento ou replanear para resolver conflitos<\/td><td>O Autopilot reprograma toda a f\u00e1brica, respeitando as suas prioridades<\/td><\/tr><tr><td>Vista do planeador<\/td><td>Gantt por recurso ou centro de trabalho e plano de carga (PLZ)<\/td><td>Gantt interativo: mova uma tarefa e o plano mant\u00e9m-se coerente<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Registo da execu\u00e7\u00e3o de opera\u00e7\u00f5es no ERP XL ou no Comarch MES<\/td><td>Os operadores veem a sua fila de tarefas e registam o trabalho no telem\u00f3vel ou tablet<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"comarch-erp-xl-scheduling-software-and-add-ons-c\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Compara\u00e7\u00e3o de software e complementos de programa\u00e7\u00e3o da produ\u00e7\u00e3o para Comarch ERP XL<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Op\u00e7\u00e3o<\/th><th>O que \u00e9<\/th><th>Adequado quando<\/th><\/tr><\/thead><tbody><tr><td>Comarch ERP XL Produkcja<\/td><td>M\u00e9todos de planeamento, relat\u00f3rios de conflitos, plano de carga e Gantt no ERP XL<\/td><td>A capacidade por centro de trabalho e per\u00edodo oferece precis\u00e3o suficiente<\/td><\/tr><tr><td>Comarch APS<\/td><td>Aplica\u00e7\u00e3o aut\u00f3noma de programa\u00e7\u00e3o da Comarch, instalada no seu servidor, com base de dados PostgreSQL e chave de licen\u00e7a pr\u00f3prias<\/td><td>Pretende manter-se na gama de produtos Comarch e implementar uma solu\u00e7\u00e3o nas suas instala\u00e7\u00f5es<\/td><\/tr><tr><td>Quadros de programa\u00e7\u00e3o polacos e alem\u00e3es (dFLEX Gantt, proMExS Leitstand)<\/td><td>Software de planeamento com Gantt ou quadro de controlo de fornecedores terceiros que incluem a Comarch nas suas liga\u00e7\u00f5es a ERP<\/td><td>Um planeador gere o quadro, muitas vezes em conjunto com a recolha de dados do ch\u00e3o de f\u00e1brica<\/td><\/tr><tr><td>APS na nuvem ligado por API (SkyPlanner APS)<\/td><td>Ferramenta de programa\u00e7\u00e3o da produ\u00e7\u00e3o no navegador que respeita a capacidade real, com sincroniza\u00e7\u00e3o bidirecional das ordens de produ\u00e7\u00e3o do ERP XL<\/td><td>A programa\u00e7\u00e3o deve manter-se atualizada automaticamente e chegar a todos os operadores<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Escolha o SkyPlanner em vez do Comarch APS quando:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pretende ter a programa\u00e7\u00e3o operacional em semanas, sem um projeto de instala\u00e7\u00e3o em servidor.<\/strong> O Comarch APS exige uma base de dados PostgreSQL pr\u00f3pria, um instalador, um servi\u00e7o de integra\u00e7\u00e3o junto da base de dados do ERP XL e uma chave de licen\u00e7a no Comarch ERP Menad\u017cer Kluczy (<a href=\"https:\/\/pomoc.comarch.pl\/aps\/index.php\/dokumentacja\/comarch-aps-instalacja-2026-3\/\">Instala\u00e7\u00e3o do Comarch APS<\/a>). O SkyPlanner \u00e9 software na nuvem e a implementa\u00e7\u00e3o fica normalmente conclu\u00edda em semanas ap\u00f3s o in\u00edcio do acompanhamento inicial.<\/li>\n\n\n<li><strong>O plano tem de se manter atualizado.<\/strong> No Comarch APS, o respons\u00e1vel pelo planeamento atualiza os dados com &#8220;Aktualizuj dane z ERP&#8221; (atualizar dados do ERP) e devolve a variante escolhida com &#8220;Wy\u015blij do ERP&#8221; (enviar para o ERP) (<a href=\"https:\/\/pomoc.comarch.pl\/aps\/index.php\/dokumentacja\/dokumentacja-uzytkownika-wersja-2026-3\/\">ajuda do Comarch APS<\/a>). O Autopilot reprograma automaticamente sempre que h\u00e1 uma altera\u00e7\u00e3o relevante, e os webhooks do SkyPlanner enviam as novas datas.<\/li>\n\n\n<li><strong>As mudan\u00e7as de produ\u00e7\u00e3o dependem do produto anterior.<\/strong> O Comarch APS considera o tempo de prepara\u00e7\u00e3o como &#8220;a fixed value taken from the technology&#8221; (um valor fixo retirado da tecnologia) (<a href=\"https:\/\/pomoc.comarch.pl\/aps\/index.php\/dokumentacja\/dokumentacja-uzytkownika-wersja-2026-3\/\">mesma fonte<\/a>). A matriz de tempos de prepara\u00e7\u00e3o do SkyPlanner guarda um tempo diferente para cada par de produtos, em cada sentido, e ordena as tarefas pela sequ\u00eancia com o menor tempo total de prepara\u00e7\u00e3o.<\/li>\n\n\n<li><strong>O motor deve otimizar, n\u00e3o escolher uma regra.<\/strong> A Comarch apresenta os seus m\u00e9todos predefinidos como regras, por exemplo programar &#8220;the longest processes first&#8221; (os processos mais longos primeiro), com um algoritmo guloso (<a href=\"https:\/\/www.comarch.pl\/erp\/system-aps\/\">Comarch<\/a>). O Arcturus otimiza todo o plano em segundos, tendo em conta prioridades, prazos, prepara\u00e7\u00f5es e a capacidade limitada de cada recurso.<\/li>\n\n\n<li><strong>As equipas, as ferramentas e os materiais condicionam o plano.<\/strong> A programa\u00e7\u00e3o respeita em simult\u00e2neo os limites de cada m\u00e1quina, pessoa, ferramenta e material. As tarefas que exigem v\u00e1rios operadores recebem a equipa necess\u00e1ria. As tarefas come\u00e7am quando o material fica dispon\u00edvel em stock ou \u00e9 entregue atrav\u00e9s de encomendas de compra.<\/li>\n\n\n<li><strong>Todos os operadores devem trabalhar de acordo com o plano.<\/strong> O Mobile Confirmations apresenta a fila de tarefas atualizada num telem\u00f3vel ou tablet, e os tempos registados regressam ao ERP XL como registos de execu\u00e7\u00e3o das opera\u00e7\u00f5es.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie o per\u00edodo experimental gratuito.<\/strong> 30 dias, at\u00e9 20 centros de trabalho, todas as funcionalidades do Basic, sem cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Modele a sua produ\u00e7\u00e3o.<\/strong> Crie m\u00e1quinas, pessoas e turnos no SkyPlanner ou importe os centros de trabalho e os recursos do ERP XL. Est\u00e1 dispon\u00edvel apoio na configura\u00e7\u00e3o inicial.<\/li>\n\n\n<li><strong>Carregue as suas ordens de produ\u00e7\u00e3o.<\/strong> Exporte do Comarch ERP XL as ordens de produ\u00e7\u00e3o em aberto e as respetivas opera\u00e7\u00f5es para Excel ou CSV, importe-as e compare a programa\u00e7\u00e3o do SkyPlanner com o seu plano atual.<\/li>\n\n\n<li><strong>Ligue o Comarch ERP XL.<\/strong> A equipa do SkyPlanner configura a integra\u00e7\u00e3o bidirecional e presta apoio ap\u00f3s a entrada em funcionamento.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> Os planos s\u00e3o faturados mensalmente por centro de trabalho. Pode adicionar ou remover centros de trabalho ou cancelar a qualquer momento. Consulte os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a> para saber mais ou veja <a href=\"\/pt-pt\/integracoes\/erp\/\">todas as integra\u00e7\u00f5es com ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar per\u00edodo experimental gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Falar com a equipa comercial<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 o melhor complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o Comarch ERP XL?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e das equipas e se integra com o Comarch ERP XL nos dois sentidos. Recebe ordens de produ\u00e7\u00e3o, tecnologias, centros de trabalho, recursos, artigos, stocks e encomendas de compra e devolve as datas previstas das opera\u00e7\u00f5es e os registos de trabalho. A programa\u00e7\u00e3o respeita os limites de cada m\u00e1quina, operador, ferramenta e material, e uma matriz de tempos de prepara\u00e7\u00e3o por sentido de mudan\u00e7a ordena as tarefas para minimizar a prepara\u00e7\u00e3o. O Autopilot reprograma automaticamente quando h\u00e1 altera\u00e7\u00f5es na produ\u00e7\u00e3o. Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas e a avalia\u00e7\u00e3o gratuita dura 30 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Comarch ERP XL permite programar a produ\u00e7\u00e3o respeitando a capacidade real dos recursos?<\/summary>\n<p class=\"sp-faq__a\">Em parte. O m\u00f3dulo Produkcja verifica a ocupa\u00e7\u00e3o dos recursos, assinala conflitos e permite ao respons\u00e1vel pelo planeamento arrastar opera\u00e7\u00f5es num diagrama de Gantt. A capacidade dos centros de trabalho \u00e9 um valor definido pelo utilizador para cada per\u00edodo, e as mudan\u00e7as de produ\u00e7\u00e3o s\u00e3o contabilizadas como uma margem percentual. Em complemento ao ERP XL, o SkyPlanner APS programa a produ\u00e7\u00e3o respeitando os limites de cada m\u00e1quina, pessoa, ferramenta e material.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Que software de programa\u00e7\u00e3o da produ\u00e7\u00e3o se integra com o Comarch ERP XL?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS integra-se com o Comarch ERP XL nos dois sentidos. L\u00ea ordens de produ\u00e7\u00e3o, tecnologias, recursos, stocks e encomendas de compra atrav\u00e9s da ERP XL Web REST API ou de uma liga\u00e7\u00e3o de leitura \u00e0 base de dados e devolve as datas e os registos de execu\u00e7\u00e3o das opera\u00e7\u00f5es atrav\u00e9s da XL API. A Comarch tamb\u00e9m comercializa o seu pr\u00f3prio Comarch APS, e fornecedores externos de solu\u00e7\u00f5es Gantt e Leitstand anunciam liga\u00e7\u00f5es ao Comarch.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devemos usar o Comarch APS ou o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner, se pretende ter em funcionamento, em semanas, uma programa\u00e7\u00e3o que respeita a capacidade real dos recursos e se mant\u00e9m atualizada. O Comarch APS \u00e9 uma aplica\u00e7\u00e3o separada, instalada no seu servidor, com base de dados e chave de licen\u00e7a pr\u00f3prias. O respons\u00e1vel pelo planeamento obt\u00e9m os dados e devolve os planos manualmente, e o tempo de prepara\u00e7\u00e3o \u00e9 um valor fixo por opera\u00e7\u00e3o. O SkyPlanner funciona na cloud, reprograma automaticamente, ordena as mudan\u00e7as de produ\u00e7\u00e3o por par de produtos e planeia equipas, ferramentas e materiais em conjunto. Pode comprov\u00e1-lo com as suas pr\u00f3prias ordens de produ\u00e7\u00e3o durante a avalia\u00e7\u00e3o gratuita.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner substitui o m\u00f3dulo Produkcja?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner complementa esse m\u00f3dulo. O Comarch ERP XL mant\u00e9m as tecnologias, as ordens de produ\u00e7\u00e3o, o MRP, as reservas, os documentos RW e PW e o c\u00e1lculo de custos. O SkyPlanner programa as opera\u00e7\u00f5es de acordo com a capacidade real e devolve as datas \u00e0s ordens de produ\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>A integra\u00e7\u00e3o funciona com o Comarch ERP XL na cloud?<\/summary>\n<p class=\"sp-faq__a\">Sim. O ERP XL da Comarch pode funcionar nos seus servidores ou na cloud, com acesso remoto. Durante a configura\u00e7\u00e3o inicial, a equipa do SkyPlanner configura a liga\u00e7\u00e3o de leitura e escrita para o seu ambiente.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa o SkyPlanner para uma f\u00e1brica que utiliza o Comarch ERP XL?<\/summary>\n<p class=\"sp-faq__a\">A partir de 199 \u20ac por m\u00eas com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas por cada centro de trabalho adicional. Um centro de trabalho \u00e9 um recurso de produ\u00e7\u00e3o com a sua pr\u00f3pria fila de tarefas programadas. A integra\u00e7\u00e3o \u00e9 or\u00e7amentada antecipadamente, de acordo com o seu processo e as suas necessidades, juntamente com o plano, para que conhe\u00e7a o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de o integrar com o Comarch ERP XL?<\/summary>\n<p class=\"sp-faq__a\">Sim. A avalia\u00e7\u00e3o de 30 dias utiliza uma exporta\u00e7\u00e3o em Excel ou CSV das suas ordens de produ\u00e7\u00e3o em aberto. Antes de come\u00e7ar qualquer trabalho de integra\u00e7\u00e3o, pode ver uma <a href=\"\/pt-pt\/recursos-pt-pt\/capacidade-finita\/\">programa\u00e7\u00e3o da sua produ\u00e7\u00e3o que respeita a capacidade real dos recursos<\/a>. A implementa\u00e7\u00e3o fica depois normalmente conclu\u00edda em semanas ap\u00f3s o in\u00edcio do processo de configura\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ Comarch ERP XL SkyPlanner APS para Comarch ERP XL: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real O SkyPlanner APS complementa o Comarch ERP XL com programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e das equipas, programando cada m\u00e1quina, operador, ferramenta e material. Veja onde e quando \u00e9 executada cada &#8230; <a title=\"SkyPlanner APS para Comarch ERP XL: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/\" aria-label=\"Leia mais sobre SkyPlanner APS para Comarch ERP XL: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100684,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106475","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Comarch ERP XL: integra\u00e7\u00e3o APS para programar com capacidade real<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS para Comarch ERP XL: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional de m\u00e1quinas, pessoas, ferramentas e materiais. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para Comarch ERP XL: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS para Comarch ERP XL: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional de m\u00e1quinas, pessoas, ferramentas e materiais. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/comarch-erp-xl\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/comarch-erp-xl\\\/\",\"name\":\"Comarch ERP XL: integra\u00e7\u00e3o APS para programar com capacidade real\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS para Comarch ERP XL: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional de m\u00e1quinas, pessoas, ferramentas e materiais. Desde 199 \u20ac\\\/m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/comarch-erp-xl\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/comarch-erp-xl\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/comarch-erp-xl\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para Comarch ERP XL: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Comarch ERP XL: integra\u00e7\u00e3o APS para programar com capacidade real","description":"SkyPlanner APS para Comarch ERP XL: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional de m\u00e1quinas, pessoas, ferramentas e materiais. Desde 199 \u20ac\/m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/","og_locale":"pt_PT","og_type":"article","og_title":"SkyPlanner APS para Comarch ERP XL: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real","og_description":"SkyPlanner APS para Comarch ERP XL: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional de m\u00e1quinas, pessoas, ferramentas e materiais. Desde 199 \u20ac\/m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"16 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/","name":"Comarch ERP XL: integra\u00e7\u00e3o APS para programar com capacidade real","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS para Comarch ERP XL: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional de m\u00e1quinas, pessoas, ferramentas e materiais. Desde 199 \u20ac\/m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/comarch-erp-xl\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para Comarch ERP XL: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ Comarch ERP XL SkyPlanner APS para Comarch ERP XL: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real O SkyPlanner APS complementa o Comarch ERP XL com programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e das equipas, programando cada m\u00e1quina, operador, ferramenta e material. Veja onde e quando \u00e9 executada cada&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106475","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=106475"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106475\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/100684"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=106475"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}