{"id":106388,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/cegid\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"cegid","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/cegid\/","title":{"rendered":"SkyPlanner APS para Cegid: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ Cegid<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para Cegid: <span class=\"hl\">programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O SkyPlanner APS complementa os ERP industriais da Cegid com programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e das pessoas. Destina-se, em primeiro lugar, ao Cegid PMI, mas tamb\u00e9m ao Cegid Primavera e ao Cegid Ekon. Programa cada m\u00e1quina, operador, ferramenta e material. Permite ver onde e quando \u00e9 executada cada opera\u00e7\u00e3o de cada ordem de fabrico, e o Autopilot reprograma automaticamente quando a produ\u00e7\u00e3o muda.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Marcar uma demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner integra-se com a Cegid nos dois sentidos. Recebe do Cegid PMI as ordens de fabrico (OF) com os respetivos roteiros, listas de materiais, centros de trabalho e m\u00e1quinas, bem como artigos, exist\u00eancias e encomendas a fornecedores. Devolve as datas de in\u00edcio e fim previstas para cada opera\u00e7\u00e3o da OF, juntamente com os tempos registados como apontamentos. Durante a implementa\u00e7\u00e3o inicial, a equipa SkyPlanner configura a integra\u00e7\u00e3o de acordo com a configura\u00e7\u00e3o do seu Cegid.<\/p>\n\n\n<p>Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O teste gratuito dura 30 dias e permite utilizar at\u00e9 20 centros de trabalho, sem cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Uma sequ\u00eancia execut\u00e1vel em cada m\u00e1quina.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner atribui cada opera\u00e7\u00e3o da OF a uma m\u00e1quina e a um hor\u00e1rio espec\u00edficos. A capacidade \u00e9 definida pelos turnos reais, pelas aus\u00eancias e pelas horas extraordin\u00e1rias, para que a sua f\u00e1brica consiga executar o plano.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Menos custos nas mudan\u00e7as de produ\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner guarda o tempo de prepara\u00e7\u00e3o entre cada par de produtos, nos dois sentidos. A passagem de um material macio para um material duro pode exigir apenas uma troca r\u00e1pida de ferramenta, enquanto a passagem inversa exige uma limpeza completa. O motor ordena as tarefas de forma a perder o m\u00ednimo de tempo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">As pessoas e as ferramentas tamb\u00e9m t\u00eam limites.<\/p>\n\n\n<p class=\"fx-pain__b\">A uma opera\u00e7\u00e3o que exige tr\u00eas operadores s\u00e3o atribu\u00eddas tr\u00eas pessoas com disponibilidade nos respetivos turnos. Um molde ou dispositivo de fixa\u00e7\u00e3o em utiliza\u00e7\u00e3o numa m\u00e1quina nunca \u00e9 reservado para outra. Quando uma m\u00e1quina est\u00e1 ocupada, o trabalho passa para outra m\u00e1quina ou pessoa.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">O material determina o in\u00edcio.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner verifica as exist\u00eancias e as encomendas em aberto a fornecedores para cada componente. Uma tarefa que aguarda uma entrega \u00e9 programada para depois da data dessa entrega, em vez de arrancar e ficar parada no ch\u00e3o de f\u00e1brica.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprograma\u00e7\u00e3o autom\u00e1tica face a encomendas urgentes e avarias.<\/p>\n\n\n<p class=\"fx-pain__b\">Quando uma m\u00e1quina para ou chega uma encomenda urgente, o Autopilot reprograma a produ\u00e7\u00e3o. Os bloqueios e as prioridades que definiu continuam a ser respeitados, e as novas datas s\u00e3o enviadas para a Cegid.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cada operador v\u00ea a sua fila de tarefas.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada operador v\u00ea as pr\u00f3ximas tarefas num telem\u00f3vel ou tablet e regista o trabalho \u00e0 medida que o executa. O escrit\u00f3rio acompanha o progresso em tempo real, e cabe-lhe decidir se os tempos s\u00e3o enviados para a Cegid.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Opini\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento na UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, o nosso planeamento da produ\u00e7\u00e3o passou das folhas de c\u00e1lculo Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o permite poupar 2 horas de trabalho por semana, e uma nova lista de tarefas chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Leia o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestu\u00e1rio de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Produ\u00e7\u00e3o farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e criar um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Leia o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Um soldador da KJH-Comp a rebarbar uma estrutura de a\u00e7o soldada na f\u00e1brica de Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>de fiabilidade das entregas, face a cerca de 50% anteriormente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner desempenha um papel decisivo na manuten\u00e7\u00e3o da fiabilidade das nossas entregas.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, Diretor-geral<\/b><br>KJH-Comp \u00b7 Transforma\u00e7\u00e3o de chapa e fabrico por contrato<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas passou de cerca de 50% para valores que chegaram aos 98%, e a programa\u00e7\u00e3o precisa agora de um supervisor em vez de dois.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/kjh-comp\/\">Ler o testemunho da KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, diretor executivo da Mamec, na nave de produ\u00e7\u00e3o da empresa em Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Mais de 1.000<\/b><span>ordens de fabrico programadas automaticamente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cControlamos a produ\u00e7\u00e3o de outra forma e a nossa compreens\u00e3o da capacidade est\u00e1 num n\u00edvel completamente diferente.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, diretor executivo<\/b><br>Mamec \u00b7 Misturadores industriais, bombas e fabrico por contrato de alta tecnologia<\/p>\n\n\n<p class=\"ind-cust__result\">Milhares de ordens de fabrico s\u00e3o programadas automaticamente, com uma vis\u00e3o da produ\u00e7\u00e3o em tempo real para toda a organiza\u00e7\u00e3o.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/mamec\/\">Ler o testemunho da Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-cegid-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona a integra\u00e7\u00e3o com a Cegid<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>A Cegid envia o trabalho.<\/strong> O SkyPlanner recebe as OF com as respetivas opera\u00e7\u00f5es, roteiros, listas de materiais, centros de trabalho e m\u00e1quinas, bem como artigos, exist\u00eancias e encomendas a fornecedores.<\/li>\n\n\n<li><strong>O SkyPlanner cria o programa de produ\u00e7\u00e3o e mant\u00e9m-no atualizado.<\/strong> O motor Arcturus programa todas as opera\u00e7\u00f5es em segundos e reprograma-as \u00e0 medida que a produ\u00e7\u00e3o muda.<\/li>\n\n\n<li><strong>As datas e o trabalho registado regressam \u00e0 Cegid.<\/strong> As datas de in\u00edcio e fim previstas s\u00e3o devolvidas a cada opera\u00e7\u00e3o da OF, e os tempos registados podem ser enviados como apontamentos.<\/li>\n\n<\/ol>\n\n\n<p>A Cegid continua a ser o sistema de refer\u00eancia dos seus dados. Artigos, listas de materiais, roteiros, CBN (necessidades l\u00edquidas), compras, exist\u00eancias, custeio e finan\u00e7as mant\u00eam-se onde est\u00e3o. O SkyPlanner fica respons\u00e1vel por uma coisa: a sequ\u00eancia e os hor\u00e1rios de cada opera\u00e7\u00e3o em cada recurso.<\/p>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cegid PMI.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner l\u00ea e escreve dados atrav\u00e9s da Web API que a Cegid disponibiliza para o PMI. A Cegid descreve-a como uma troca segura de dados com aplica\u00e7\u00f5es externas que mant\u00e9m intactas as regras de neg\u00f3cio do Manufacturing PMI (<a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Cegid PMI<\/a>).<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cegid Primavera.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner utiliza a PRIMAVERA ERP V10 API, que permite ler e escrever dados em todos os m\u00f3dulos. Recebe ordens de fabrico, opera\u00e7\u00f5es, centros de trabalho, roteiros e fichas t\u00e9cnicas. Devolve as datas previstas das opera\u00e7\u00f5es atrav\u00e9s do servi\u00e7o Planeamento (ActualizaPlaneamentoOperacao) e os tempos registados atrav\u00e9s de Di\u00e1rios de Trabalho (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/api-documentation\/\">V10 API<\/a>).<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cegid Ekon.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner recebe ordens de fabrico, roteiros e listas de materiais e devolve as datas previstas e as imputa\u00e7\u00f5es. Na defini\u00e7\u00e3o do \u00e2mbito, a equipa SkyPlanner estabelece a via de integra\u00e7\u00e3o para a sua instala\u00e7\u00e3o Ekon.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Os webhooks do SkyPlanner enviam cada altera\u00e7\u00e3o ao programa de produ\u00e7\u00e3o assim que ocorre, e a frequ\u00eancia de sincroniza\u00e7\u00e3o com a Cegid \u00e9 definida por f\u00e1brica. Cada f\u00e1brica utiliza a Cegid de forma diferente, pelo que a equipa SkyPlanner configura a integra\u00e7\u00e3o \u00e0 sua medida durante a implementa\u00e7\u00e3o inicial e assegura o suporte ap\u00f3s a entrada em funcionamento. A integra\u00e7\u00e3o \u00e9 or\u00e7amentada antecipadamente, de acordo com o seu processo e as suas necessidades. O seu parceiro Cegid ou os seus pr\u00f3prios programadores tamb\u00e9m podem desenvolver a integra\u00e7\u00e3o com base na API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">Refer\u00eancia da API<\/a>).<\/p>\n\n\n<p>As interfaces, o mapeamento de dados e as regras de escrita na Cegid est\u00e3o descritos no <a href=\"\/pt-pt\/integracoes\/erp\/cegid\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o com a Cegid para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>. Utiliza o Cegid XRP Flex? Como \u00e9 baseado no Acumatica, consulte o <a href=\"\/pt-pt\/integracoes\/erp\/acumatica\/\">SkyPlanner para Acumatica<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-cegid-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que a Cegid programa e o que o SkyPlanner acrescenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O Cegid PMI gere todo o ciclo de produ\u00e7\u00e3o: OF geradas a partir da encomenda do cliente ou do CBN, planeamento, acompanhamento no ch\u00e3o de f\u00e1brica por centro de trabalho e registo de tempos por c\u00f3digo de barras. A <a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">p\u00e1gina do Cegid PMI<\/a> descreve o planeamento em duas etapas e indica como ir mais longe:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Primeiro, capacidade infinita.<\/strong> O PMI disponibiliza &#8220;des OF planifi\u00e9s \u00e0 capacit\u00e9 infinie pour vous permettre de g\u00e9rer rapidement les charges et surcharges, la file d&#8217;attente&#8221; (OF planeadas com capacidade infinita, para gerir rapidamente as cargas, as sobrecargas e a fila de espera).<\/li>\n\n\n<li><strong>Depois, os limites dos recursos e das exist\u00eancias.<\/strong> A etapa seguinte \u00e9 &#8220;la planification \u00e0 capacit\u00e9 finie tenant compte des contraintes de vos ressources et des stocks.&#8221; (programa\u00e7\u00e3o que respeita os limites dos recursos e das exist\u00eancias).<\/li>\n\n\n<li><strong>A Cegid recomenda um APS para ir mais longe.<\/strong> &#8220;Connectez des outils de planification avanc\u00e9e pour aller plus loin dans la gestion des contraintes de planification.&#8221; (Ligue ferramentas de planeamento avan\u00e7ado para ir mais longe na gest\u00e3o das restri\u00e7\u00f5es de planeamento.)<\/li>\n\n<\/ul>\n\n\n<p>O <strong>Cegid Primavera<\/strong> permite planear graficamente: o respons\u00e1vel pelo planeamento distribui as opera\u00e7\u00f5es pelos centros de trabalho, e &#8220;o algoritmo de planeamento que sugere a melhor alternativa de escalonamento&#8221; prop\u00f5e uma sequ\u00eancia. O respons\u00e1vel simula planos alternativos e decide (<a href=\"https:\/\/pt.primaverabss.com\/pt\/software\/solucoes-setoriais\/industria\/manufacturing\/\">Cegid Primavera Manufacturing<\/a>).<\/p>\n\n\n<p>O <strong>Cegid Ekon XRP Industria<\/strong> gera roteiros, listas de materiais e ordens de trabalho a partir das ordens de fabrico e recolhe imputa\u00e7\u00f5es no ch\u00e3o de f\u00e1brica ou no escrit\u00f3rio (<a href=\"https:\/\/www.cegid.com\/ib\/es\/productos\/software-gestion-produccion-industrial\/\">Cegid Ekon<\/a>).<\/p>\n\n\n<p>O SkyPlanner \u00e9 precisamente o tipo de ferramenta de planeamento avan\u00e7ado que a Cegid recomenda integrar. Cada etapa \u00e9 explicada em <a href=\"\/pt-pt\/integracoes\/erp\/cegid\/programacao-producao\/\">A Cegid permite programar a produ\u00e7\u00e3o com capacidade real?<\/a> Para conhecer os conceitos, consulte <a href=\"\/pt-pt\/recursos-pt-pt\/capacidade-finita\/\">programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"cegid-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">A Cegid hoje e com o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Planeamento no Cegid PMI<\/th><th>Cegid com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Capacidade<\/td><td>OF planeadas com capacidade infinita, seguidas de programa\u00e7\u00e3o que respeita os limites dos recursos e das exist\u00eancias<\/td><td>Capacidade real de cada m\u00e1quina, pessoa e ferramenta, com os turnos reais<\/td><\/tr><tr><td>Programa de produ\u00e7\u00e3o<\/td><td>Pr\u00f3ximas OF por centro de trabalho para as horas ou dias seguintes<\/td><td>Sequ\u00eancia detalhada para cada opera\u00e7\u00e3o das OF, criada em segundos<\/td><\/tr><tr><td>Mudan\u00e7as de s\u00e9rie<\/td><td>Planeadas dentro dos limites dos recursos e das exist\u00eancias<\/td><td>Matriz de tempos de prepara\u00e7\u00e3o: menor tempo total de prepara\u00e7\u00e3o<\/td><\/tr><tr><td>Pessoas e ferramentas<\/td><td>Trabalhadores e m\u00e1quinas nos dados mestre<\/td><td>Operadores identificados com os respetivos turnos; ferramentas como recursos partilhados de capacidade limitada; tarefas com v\u00e1rios operadores<\/td><\/tr><tr><td>Materiais<\/td><td>O CBN sugere OF e encomendas a fornecedores<\/td><td>As tarefas come\u00e7am quando h\u00e1 exist\u00eancias dispon\u00edveis ou chegam as encomendas a fornecedores<\/td><\/tr><tr><td>Altera\u00e7\u00f5es<\/td><td>O respons\u00e1vel pelo planeamento gere cargas, sobrecargas e a fila de espera<\/td><td>O Autopilot reprograma toda a f\u00e1brica respeitando as suas prioridades<\/td><\/tr><tr><td>Trabalho iniciado<\/td><td>Apontamentos por c\u00f3digo de barras na OF<\/td><td>O progresso registado atualiza o plano; o Running Time Lock fixa a programa\u00e7\u00e3o das pr\u00f3ximas horas<\/td><\/tr><tr><td>Vista do respons\u00e1vel pelo planeamento<\/td><td>Carga, sobrecargas e fila de espera por centro de trabalho<\/td><td>Gantt interativo: mova tarefas sem perder a coer\u00eancia do plano<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Terminais de c\u00f3digo de barras e interface MES<\/td><td>Os operadores consultam a sua fila de tarefas e registam o trabalho num telem\u00f3vel ou tablet<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-cegid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como escolher uma ferramenta de programa\u00e7\u00e3o para a Cegid<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O planeamento do Cegid PMI \u00e9 adequado a uma f\u00e1brica com roteiros est\u00e1veis, poucos centros de trabalho cr\u00edticos e um plano semanal revisto por um respons\u00e1vel pelo planeamento. O planeamento gr\u00e1fico do Cegid Primavera \u00e9 adequado a quem define a sequ\u00eancia no quadro, usando o algoritmo como sugest\u00e3o. Quando as m\u00e1quinas, as pessoas, as ferramentas e os materiais limitam a produ\u00e7\u00e3o e o plano muda diariamente, a solu\u00e7\u00e3o \u00e9 integrar um APS, como a pr\u00f3pria Cegid sugere.<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Op\u00e7\u00e3o<\/th><th>O que \u00e9<\/th><th>Quando \u00e9 adequada<\/th><\/tr><\/thead><tbody><tr><td>Planeamento integrado da Cegid<\/td><td>PMI: planeamento com capacidade infinita, seguido de programa\u00e7\u00e3o com capacidade real; Primavera: planeamento gr\u00e1fico com sugest\u00f5es de um algoritmo<\/td><td>O respons\u00e1vel pelo planeamento define manualmente a sequ\u00eancia das opera\u00e7\u00f5es em alguns recursos que s\u00e3o pontos de estrangulamento<\/td><\/tr><tr><td>APS e ferramentas de planeamento para a Cegid<\/td><td>Ferramentas de programa\u00e7\u00e3o com restri\u00e7\u00f5es, de planeamento geral de recursos e MES com planeamento, ligadas \u00e0 Cegid<\/td><td>Uma equipa dedicada ao planeamento utiliza uma ferramenta de programa\u00e7\u00e3o separada<\/td><\/tr><tr><td>APS na nuvem com execu\u00e7\u00e3o no ch\u00e3o de f\u00e1brica<\/td><td>SkyPlanner APS: capacidade real de cada recurso, reprograma\u00e7\u00e3o autom\u00e1tica, aplica\u00e7\u00e3o para operadores e integra\u00e7\u00e3o bidirecional com a Cegid<\/td><td>Pretende ter, em semanas, um plano operacional que respeite a capacidade real e se mantenha atualizado automaticamente<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Escolha o SkyPlanner em vez do planeamento integrado da Cegid quando:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>As restri\u00e7\u00f5es v\u00e3o al\u00e9m dos recursos e das exist\u00eancias.<\/strong> A Cegid descreve a etapa de programa\u00e7\u00e3o com capacidade real do PMI como um planeamento baseado nos recursos e nas exist\u00eancias e recomenda ferramentas de planeamento avan\u00e7ado para lidar com outras restri\u00e7\u00f5es (<a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Cegid PMI<\/a>). O SkyPlanner programa m\u00e1quinas, operadores, ferramentas, prepara\u00e7\u00f5es e materiais a receber numa \u00fanica execu\u00e7\u00e3o.<\/li>\n\n\n<li><strong>O plano tem de se manter atualizado.<\/strong> O algoritmo do Primavera sugere um plano e o planeador simula e decide (<a href=\"https:\/\/pt.primaverabss.com\/pt\/software\/solucoes-setoriais\/industria\/manufacturing\/\">Cegid Primavera<\/a>). O Autopilot reprograma automaticamente sempre que h\u00e1 uma altera\u00e7\u00e3o relevante, e as datas s\u00e3o devolvidas ao Cegid.<\/li>\n\n\n<li><strong>As mudan\u00e7as de s\u00e9rie determinam quanto produz.<\/strong> A matriz de tempos de prepara\u00e7\u00e3o guarda os tempos de transi\u00e7\u00e3o entre produtos, tendo em conta o sentido da mudan\u00e7a, e a op\u00e7\u00e3o &#8220;Allow similarity&#8221; agrupa tarefas por uma caracter\u00edstica, como a ferramenta utilizada.<\/li>\n\n\n<li><strong>As equipas e as ferramentas condicionam o plano.<\/strong> As tarefas que exigem v\u00e1rios operadores s\u00e3o atribu\u00eddas de acordo com os turnos reais, cada ferramenta fica reservada para uma m\u00e1quina de cada vez e o trabalho \u00e9 transferido para m\u00e1quinas ou pessoas alternativas.<\/li>\n\n\n<li><strong>Todos os operadores devem trabalhar de acordo com o plano.<\/strong> O Mobile Confirmations disponibiliza a lista de tarefas atualizada em cada telem\u00f3vel ou tablet. O n\u00famero de utilizadores \u00e9 ilimitado: o pre\u00e7o depende dos centros de trabalho, n\u00e3o das licen\u00e7as de utilizador.<\/li>\n\n\n<li><strong>O que pretende \u00e9 um pre\u00e7o mensal \u00fanico.<\/strong> A partir de 199 \u20ac por m\u00eas, com a integra\u00e7\u00e3o bidirecional configurada pela equipa SkyPlanner e com suporte assegurado pela mesma equipa.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie o teste gratuito.<\/strong> 30 dias, at\u00e9 20 centros de trabalho, todas as funcionalidades do Basic, sem cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Modele a sua produ\u00e7\u00e3o.<\/strong> Crie m\u00e1quinas, pessoas e turnos no SkyPlanner ou importe os seus centros de carga e m\u00e1quinas do Cegid. Est\u00e1 dispon\u00edvel apoio \u00e0 configura\u00e7\u00e3o inicial.<\/li>\n\n\n<li><strong>Carregue as suas OF.<\/strong> Exporte as OF em aberto e as respetivas opera\u00e7\u00f5es do Cegid para Excel, por exemplo com o gerador de relat\u00f3rios do PMI. Importe-as e compare a programa\u00e7\u00e3o do SkyPlanner com o seu plano atual.<\/li>\n\n\n<li><strong>Ligue ao Cegid.<\/strong> A equipa SkyPlanner configura a integra\u00e7\u00e3o bidirecional e assegura o suporte ap\u00f3s a entrada em produ\u00e7\u00e3o.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> Os planos s\u00e3o faturados mensalmente por centro de trabalho. Pode adicionar ou remover centros de trabalho ou cancelar a qualquer momento. Consulte os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a> para saber mais ou explore <a href=\"\/pt-pt\/integracoes\/erp\/\">todas as integra\u00e7\u00f5es com ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Falar com a equipa comercial<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 o melhor complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o Cegid?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e das equipas, com integra\u00e7\u00e3o bidirecional com o Cegid PMI, o Cegid Primavera e o Cegid Ekon. Recebe OF com gamas operat\u00f3rias, listas de materiais, centros de carga, m\u00e1quinas, artigos, stocks e encomendas a fornecedores, e devolve as datas planeadas das opera\u00e7\u00f5es e os tempos registados. A disponibilidade de cada m\u00e1quina, operador, ferramenta e material \u00e9 limitada, e uma matriz de tempos de prepara\u00e7\u00e3o que distingue o sentido de cada mudan\u00e7a sequencia as tarefas para minimizar a prepara\u00e7\u00e3o. O Autopilot reprograma automaticamente quando h\u00e1 altera\u00e7\u00f5es na produ\u00e7\u00e3o. O pre\u00e7o come\u00e7a nos 199 \u20ac por m\u00eas e o teste gratuito dura 30 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Cegid permite programar a produ\u00e7\u00e3o respeitando a capacidade real?<\/summary>\n<p class=\"sp-faq__a\">Em parte. O Cegid PMI come\u00e7a por planear as OF sem limitar a capacidade e depois ajusta o plano \u00e0 capacidade real dos recursos e ao stock dispon\u00edvel. Para outras restri\u00e7\u00f5es, a Cegid recomenda ferramentas de planeamento avan\u00e7ado. O Cegid Primavera permite planear graficamente, com um algoritmo que sugere uma sequ\u00eancia. Como complemento ao Cegid, o SkyPlanner APS programa a produ\u00e7\u00e3o respeitando a disponibilidade real de cada m\u00e1quina, pessoa, ferramenta e material, e reprograma automaticamente.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Que software de programa\u00e7\u00e3o da produ\u00e7\u00e3o se integra com o Cegid?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS integra-se com o Cegid nos dois sentidos. No Cegid PMI, l\u00ea e escreve atrav\u00e9s da PMI Web API: recebe OF e opera\u00e7\u00f5es e devolve datas planeadas e registos de tempos. No Cegid Primavera, utiliza a PRIMAVERA V10 API: recebe ordens de fabrico, devolve as datas planeadas das opera\u00e7\u00f5es atrav\u00e9s do servi\u00e7o Planeamento e os tempos atrav\u00e9s dos Di\u00e1rios de Trabalho.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devemos usar o planeamento do Cegid PMI ou o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner, quando as restri\u00e7\u00f5es v\u00e3o al\u00e9m das m\u00e1quinas e do stock e o plano muda com frequ\u00eancia. A Cegid explica que o planeamento do PMI respeita a capacidade dos recursos e o stock dispon\u00edvel e remete para ferramentas de planeamento avan\u00e7ado quando h\u00e1 outras restri\u00e7\u00f5es. O SkyPlanner \u00e9 essa ferramenta: planeia em conjunto operadores, ferramentas, prepara\u00e7\u00f5es e materiais a receber, reprograma automaticamente e disponibiliza a cada operador a sua lista de tarefas, sem limite de utilizadores. Pode comprov\u00e1-lo com as suas pr\u00f3prias OF durante o teste gratuito.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner substitui a gest\u00e3o da produ\u00e7\u00e3o do Cegid?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o, complementa-a. O Cegid continua a gerir artigos, listas de materiais, gamas operat\u00f3rias, o CBN, a cria\u00e7\u00e3o de OF, as compras, os stocks, o custeio e as finan\u00e7as. O SkyPlanner programa as suas OF de acordo com a capacidade real e devolve as datas ao Cegid.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Com que ERP da Cegid funciona o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Cegid PMI em Fran\u00e7a, Cegid Primavera Manufacturing em Portugal e Cegid Ekon XRP Industria em Espanha. O Cegid XRP Flex assenta no Acumatica, pelo que se aplica a <a href=\"\/pt-pt\/integracoes\/erp\/acumatica\/\">integra\u00e7\u00e3o com o Acumatica<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa o SkyPlanner para uma f\u00e1brica que utiliza Cegid?<\/summary>\n<p class=\"sp-faq__a\">A partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas por cada centro de trabalho adicional. Um centro de trabalho \u00e9 um recurso de produ\u00e7\u00e3o com a sua pr\u00f3pria lista de tarefas programadas. A integra\u00e7\u00e3o \u00e9 or\u00e7amentada antecipadamente de acordo com o seu processo e as suas necessidades, em conjunto com o plano escolhido, para que conhe\u00e7a o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo demora a implementa\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em semanas ap\u00f3s o in\u00edcio do processo de configura\u00e7\u00e3o e acompanhamento. A equipa mapeia os seus centros de carga, m\u00e1quinas e gamas operat\u00f3rias, liga as OF e as encomendas a fornecedores e devolve as datas planeadas. Tudo \u00e9 testado face ao seu plano atual antes da entrada em produ\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de o integrar com o Cegid?<\/summary>\n<p class=\"sp-faq__a\">Sim. O teste de 30 dias utiliza uma exporta\u00e7\u00e3o para Excel das suas OF em aberto no Cegid. Pode ver uma <a href=\"\/pt-pt\/recursos-pt-pt\/capacidade-finita\/\">programa\u00e7\u00e3o da sua produ\u00e7\u00e3o que respeita a capacidade real<\/a> antes de se iniciar qualquer trabalho de integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ Cegid SkyPlanner APS para Cegid: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas O SkyPlanner APS complementa os ERP industriais da Cegid com programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e das pessoas. Destina-se, em primeiro lugar, ao Cegid PMI, mas tamb\u00e9m ao Cegid Primavera e &#8230; <a title=\"SkyPlanner APS para Cegid: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/cegid\/\" aria-label=\"Leia mais sobre SkyPlanner APS para Cegid: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100684,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106388","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integra\u00e7\u00e3o Cegid: APS para programa\u00e7\u00e3o com capacidade real<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS para Cegid: integra\u00e7\u00e3o bidirecional e programa\u00e7\u00e3o com capacidade real de m\u00e1quinas, operadores, ferramentas e materiais. Desde 199 \u20ac por m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/cegid\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para Cegid: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS para Cegid: integra\u00e7\u00e3o bidirecional e programa\u00e7\u00e3o com capacidade real de m\u00e1quinas, operadores, ferramentas e materiais. Desde 199 \u20ac por m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/cegid\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/cegid\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/cegid\\\/\",\"name\":\"Integra\u00e7\u00e3o Cegid: APS para programa\u00e7\u00e3o com capacidade real\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS para Cegid: integra\u00e7\u00e3o bidirecional e programa\u00e7\u00e3o com capacidade real de m\u00e1quinas, operadores, ferramentas e materiais. Desde 199 \u20ac por m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/cegid\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/cegid\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/cegid\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para Cegid: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integra\u00e7\u00e3o Cegid: APS para programa\u00e7\u00e3o com capacidade real","description":"SkyPlanner APS para Cegid: integra\u00e7\u00e3o bidirecional e programa\u00e7\u00e3o com capacidade real de m\u00e1quinas, operadores, ferramentas e materiais. Desde 199 \u20ac por m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/cegid\/","og_locale":"pt_PT","og_type":"article","og_title":"SkyPlanner APS para Cegid: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas","og_description":"SkyPlanner APS para Cegid: integra\u00e7\u00e3o bidirecional e programa\u00e7\u00e3o com capacidade real de m\u00e1quinas, operadores, ferramentas e materiais. Desde 199 \u20ac por m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/cegid\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"16 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/cegid\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/cegid\/","name":"Integra\u00e7\u00e3o Cegid: APS para programa\u00e7\u00e3o com capacidade real","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS para Cegid: integra\u00e7\u00e3o bidirecional e programa\u00e7\u00e3o com capacidade real de m\u00e1quinas, operadores, ferramentas e materiais. Desde 199 \u20ac por m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/cegid\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/cegid\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/cegid\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para Cegid: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ Cegid SkyPlanner APS para Cegid: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas O SkyPlanner APS complementa os ERP industriais da Cegid com programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e das pessoas. Destina-se, em primeiro lugar, ao Cegid PMI, mas tamb\u00e9m ao Cegid Primavera e&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106388","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=106388"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106388\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/100684"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=106388"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}