{"id":106272,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/visma-l7\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"visma-l7","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/visma-l7\/","title":{"rendered":"SkyPlanner APS para Visma L7: programa\u00e7\u00e3o da produ\u00e7\u00e3o com a capacidade real de m\u00e1quinas e pessoas"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ Visma L7<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para Visma L7: <span class=\"hl\">programa\u00e7\u00e3o da produ\u00e7\u00e3o com a capacidade real de m\u00e1quinas e pessoas<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real de m\u00e1quinas e pessoas e se integra com o Visma L7, o ERP utilizado por grandes e m\u00e9dias empresas finlandesas dos setores industrial, das empreitadas e da energia. Cada m\u00e1quina, operador, ferramenta e material \u00e9 programado com horas definidas, dentro da capacidade dispon\u00edvel. O Autopilot reprograma automaticamente a produ\u00e7\u00e3o sempre que h\u00e1 altera\u00e7\u00f5es.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Marcar uma demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner integra-se com o Visma L7 nos dois sentidos atrav\u00e9s da REST API do Visma L7. Recebe n\u00fameros de obra (ty\u00f6numero), fases de trabalho (ty\u00f6nvaihe), recursos, estruturas de produto, materiais, saldos de stock e linhas de compra. Devolve a cada ficha de trabalho as datas de in\u00edcio programadas, os recursos, as prioridades, as pessoas e as horas por dia. Durante a implementa\u00e7\u00e3o inicial, a equipa SkyPlanner configura a integra\u00e7\u00e3o de acordo com a configura\u00e7\u00e3o do seu L7.<\/p>\n\n\n<p>Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O teste gratuito dura 30 dias e permite utilizar at\u00e9 20 centros de trabalho, sem cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cada fase com hora marcada.<\/p>\n\n\n<p class=\"fx-pain__b\">O L7 planeia cada fase de trabalho em horas por dia. O SkyPlanner atribui cada fase a um centro de trabalho livre, com uma hora definida, tendo em conta turnos, feriados, aus\u00eancias e horas extraordin\u00e1rias. Duas fases nunca ocupam a mesma m\u00e1quina \u00e0 mesma hora.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cada m\u00e1quina com a sua programa\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">Num recurso do L7, o trabalho \u00e9 dividido pelo n\u00famero de m\u00e1quinas. O SkyPlanner cria uma fila de trabalho para cada m\u00e1quina e transfere uma fase para um centro de trabalho alternativo quando a primeira op\u00e7\u00e3o est\u00e1 ocupada. O recurso escolhido \u00e9 enviado para a ficha de trabalho do L7.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">As pessoas e as ferramentas tamb\u00e9m t\u00eam limites.<\/p>\n\n\n<p class=\"fx-pain__b\">Um dispositivo de fixa\u00e7\u00e3o em uso numa m\u00e1quina nunca \u00e9 reservado noutra, e uma tarefa que exige tr\u00eas operadores recebe tr\u00eas pessoas com disponibilidade nos respetivos turnos.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Menos prepara\u00e7\u00f5es.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner guarda na sua matriz de tempos de prepara\u00e7\u00e3o o tempo de mudan\u00e7a de produ\u00e7\u00e3o entre produtos, nos dois sentidos. Passar de azul para vermelho pode demorar 30 minutos e de vermelho para azul 60. O Arcturus programa tarefas semelhantes consecutivamente e escolhe a sequ\u00eancia que exige menos prepara\u00e7\u00e3o, tendo tamb\u00e9m em conta os prazos de entrega.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">As tarefas come\u00e7am quando h\u00e1 material.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner calcula o stock futuro a partir dos saldos de stock e das linhas de compra do L7. Uma fase que aguarda uma entrega de um fornecedor \u00e9 programada para quando o material chegar. Se a entrega se atrasar, a tarefa \u00e9 adiada em conformidade.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Um plano que se mant\u00e9m quando muda de ERP.<\/p>\n\n\n<p class=\"fx-pain__b\">A Visma deixou de desenvolver novas funcionalidades para o L7. Os seus centros de trabalho, etapas do processo, matriz de tempos de prepara\u00e7\u00e3o e regras ficam no SkyPlanner. Assim, quando mudar para um novo ERP, s\u00f3 muda a liga\u00e7\u00e3o.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Opini\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Um soldador da KJH-Comp a rebarbar uma estrutura de a\u00e7o soldada na f\u00e1brica de Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>de fiabilidade das entregas, face a cerca de 50% anteriormente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner tem um papel decisivo na manuten\u00e7\u00e3o da fiabilidade das nossas entregas.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, diretor-geral<\/b><br>KJH-Comp \u00b7 Metalomec\u00e2nica de chapa e fabrico por contrato<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas passou de cerca de 50% para valores que chegam aos 98%, e a programa\u00e7\u00e3o exige agora um supervisor em vez de dois.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/kjh-comp\/\">Ler o testemunho da KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, diretor executivo da Mamec, no pavilh\u00e3o de produ\u00e7\u00e3o da empresa em Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Mais de 1 000<\/b><span> ordens de fabrico programadas automaticamente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTemos um controlo diferente da produ\u00e7\u00e3o e o nosso conhecimento da capacidade est\u00e1 num n\u00edvel completamente diferente.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, diretor executivo<\/b><br>Mamec \u00b7 Misturadores industriais, bombas e fabrico de alta tecnologia por contrato<\/p>\n\n\n<p class=\"ind-cust__result\">Milhares de ordens de fabrico s\u00e3o programadas automaticamente, com uma vis\u00e3o da produ\u00e7\u00e3o em tempo real para toda a organiza\u00e7\u00e3o.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/mamec\/\">Ler o testemunho da Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento da UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas todas as semanas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, o nosso planeamento da produ\u00e7\u00e3o passou das folhas de c\u00e1lculo Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de comuta\u00e7\u00e3o<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o poupa 2 horas de trabalho por semana, e uma nova fila de trabalho chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Ler o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestu\u00e1rio de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Fabrico de produtos farmac\u00eauticos<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e criar um plano otimizado para tr\u00eas meses que abranja todos os centros de trabalho demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Ler o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-visma-l7-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona a integra\u00e7\u00e3o com o Visma L7<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>O L7 envia o trabalho.<\/strong> O SkyPlanner l\u00ea as fases de trabalho com <code>GET \/manufphases\/<\/code>, os recursos com <code>GET \/manufresources\/<\/code>, os componentes e materiais com <code>GET \/manufcomponents\/<\/code> e <code>GET \/manufmaterials\/<\/code>, al\u00e9m de produtos, saldos de stock, linhas de venda e linhas de compra. Ap\u00f3s o carregamento inicial, estas leituras usam <code>modifiedAfter<\/code>, pelo que s\u00f3 s\u00e3o recebidos os registos alterados desde a \u00faltima execu\u00e7\u00e3o.<\/li>\n\n\n<li><strong>O SkyPlanner cria a programa\u00e7\u00e3o e mant\u00e9m-na atualizada.<\/strong> O motor Arcturus otimiza todo o plano em segundos, tendo em conta cada m\u00e1quina, pessoa, ferramenta e material. O Autopilot reprograma a produ\u00e7\u00e3o sempre que h\u00e1 altera\u00e7\u00f5es.<\/li>\n\n\n<li><strong>A programa\u00e7\u00e3o \u00e9 enviada para o L7.<\/strong> <code>PUT \/manufphases\/<\/code> grava na fase de trabalho do L7 o recurso, a data de in\u00edcio, a prioridade, a pessoa e as horas por dia de cada ficha de trabalho. <code>POST \/resourceupdates\/<\/code> mant\u00e9m sincronizada a capacidade do calend\u00e1rio de recursos. As filas de trabalho do L7 passam a apresentar as tarefas pela ordem definida pelo SkyPlanner.<\/li>\n\n\n<li><strong>Os dados de execu\u00e7\u00e3o regressam ao SkyPlanner.<\/strong> Os eventos de produ\u00e7\u00e3o registados nas filas de trabalho do L7 s\u00e3o lidos com <code>GET \/manufevents\/<\/code>. Os operadores tamb\u00e9m podem confirmar o trabalho no SkyPlanner Mobile Confirmations.<\/li>\n\n<\/ol>\n\n\n<p>O SkyPlanner funciona na nuvem e liga-se \u00e0 REST API do L7 no seu servidor Visma LTR, pelo que n\u00e3o \u00e9 instalado nada no L7. A Visma inclui a Skycode com o SkyPlanner na sua <a href=\"https:\/\/vismal7.fi\/integraatiot\/\">p\u00e1gina de integra\u00e7\u00f5es do L7<\/a>. A equipa SkyPlanner configura a integra\u00e7\u00e3o de acordo com a configura\u00e7\u00e3o do seu L7 e presta assist\u00eancia ap\u00f3s a entrada em produ\u00e7\u00e3o.<\/p>\n\n\n<p>A integra\u00e7\u00e3o \u00e9 or\u00e7amentada antecipadamente, em conjunto com o seu plano, de acordo com o seu processo e as suas necessidades. O seu parceiro Visma ou os seus pr\u00f3prios programadores tamb\u00e9m podem desenvolver a integra\u00e7\u00e3o com base na API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>). Os endpoints, o mapeamento de campos e as regras que definem qual o sistema respons\u00e1vel por cada dado est\u00e3o no <a href=\"\/pt-pt\/integracoes\/erp\/visma-l7\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o do Visma L7 para a programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-visma-l7-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que o Visma L7 programa e o que o SkyPlanner acrescenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O controlo da produ\u00e7\u00e3o do L7 (Tuotannonohjaus) faz o planeamento com o c\u00e1lculo de necessidades (Tarvelaskenta), o planeamento detalhado (Hienosuunnittelu) e a grelha de planeamento da produ\u00e7\u00e3o. O planeamento detalhado distribui as fases pelos dias de um recurso e mostra a carga di\u00e1ria. A pr\u00f3pria documenta\u00e7\u00e3o da Visma define os limites:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>O trabalho \u00e9 dividido pelo n\u00famero de m\u00e1quinas.<\/strong> Num recurso com v\u00e1rias m\u00e1quinas, a necessidade de capacidade \u00e9 dividida pelo n\u00famero de m\u00e1quinas (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Perustiedot-resurssit\">fonte<\/a>). O SkyPlanner programa cada m\u00e1quina como um centro de trabalho independente.<\/li>\n\n\n<li><strong>A sobrecarga \u00e9 assinalada, n\u00e3o resolvida.<\/strong> Quando a carga excede a capacidade, o L7 apresenta os valores de carga a vermelho (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Resurssin-paivakohtainen-kuorma\">fonte<\/a>). A programa\u00e7\u00e3o de fases fixas permite sobrecarga e abrange apenas estruturas de um \u00fanico n\u00edvel (<a href=\"https:\/\/vismal7.fi\/app\/uploads\/2024\/05\/L7-LTR-koulutuspaivan-2024-Mathal.pdf\">material de forma\u00e7\u00e3o de 2024<\/a>). O SkyPlanner nunca reserva uma m\u00e1quina, pessoa ou ferramenta para duas tarefas ao mesmo tempo.<\/li>\n\n\n<li><strong>O planeador define a sequ\u00eancia do dia.<\/strong> O trabalho do dia \u00e9 ordenado atrav\u00e9s de uma a\u00e7\u00e3o manual, e uma prioridade definida por um sistema externo mant\u00e9m-se inalterada (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Jarjesta-paivan-tyot-toimi\">fonte<\/a>). O SkyPlanner define essa prioridade por si, e o L7 mant\u00e9m-na.<\/li>\n\n\n<li><strong>As lacunas no calend\u00e1rio exigem aten\u00e7\u00e3o.<\/strong> A falta de dias no calend\u00e1rio da f\u00e1brica pode fazer com que as fases sejam programadas para datas passadas (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Tehdaskalenteri\">fonte<\/a>). O SkyPlanner trabalha com calend\u00e1rios de turnos que incluem feriados e aus\u00eancias.<\/li>\n\n\n<li><strong>Sem l\u00f3gica para as mudan\u00e7as de produ\u00e7\u00e3o.<\/strong> O planeamento detalhado do L7 n\u00e3o tem uma matriz de tempos de prepara\u00e7\u00e3o. A matriz de tempos de prepara\u00e7\u00e3o do SkyPlanner ordena as tarefas de forma a minimizar a prepara\u00e7\u00e3o.<\/li>\n\n<\/ul>\n\n\n<p>Todas as defini\u00e7\u00f5es e limita\u00e7\u00f5es s\u00e3o explicadas em <a href=\"\/pt-pt\/integracoes\/erp\/visma-l7\/programacao-producao\/\">O Visma L7 permite programar a produ\u00e7\u00e3o respeitando a capacidade real?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"visma-l7-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O Visma L7 hoje e com o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Planeamento detalhado do Visma L7<\/th><th>Visma L7 com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Escala temporal<\/td><td>Horas por dia em cada fase de trabalho<\/td><td>Horas definidas para cada fase, m\u00e1quina e pessoa<\/td><\/tr><tr><td>M\u00e1quinas<\/td><td>Um recurso; o trabalho \u00e9 dividido pelo n\u00famero de m\u00e1quinas<\/td><td>Cada m\u00e1quina \u00e9 um centro de trabalho; o Arcturus escolhe entre as alternativas que autorizar<\/td><\/tr><tr><td>Sobrecarga<\/td><td>Os valores de carga ficam a vermelho; o planeador desloca as fases<\/td><td>Sem sobrecargas; respeita a capacidade de cada recurso<\/td><\/tr><tr><td>Sequ\u00eancia<\/td><td>Prioridade e ordena\u00e7\u00e3o manual do trabalho do dia<\/td><td>O Arcturus otimiza todo o plano em segundos<\/td><\/tr><tr><td>Mudan\u00e7as de produ\u00e7\u00e3o<\/td><td>Sem matriz de tempos de prepara\u00e7\u00e3o no planeamento detalhado<\/td><td>A matriz de tempos de prepara\u00e7\u00e3o ordena as tarefas para minimizar a prepara\u00e7\u00e3o<\/td><\/tr><tr><td>Materiais<\/td><td>C\u00e1lculo de necessidades e reservas<\/td><td>O stock previsto e as linhas de compra por receber determinam quando come\u00e7a uma fase<\/td><\/tr><tr><td>Altera\u00e7\u00f5es<\/td><td>O planeador volta a executar o planeamento<\/td><td>O Autopilot reprograma automaticamente a produ\u00e7\u00e3o sempre que h\u00e1 altera\u00e7\u00f5es<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Filas de trabalho do L7 e LTR<\/td><td>Mobile Confirmations e leitura dos eventos de produ\u00e7\u00e3o do L7<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-visma-l7-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Que dados circulam entre o Visma L7 e o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Visma L7<\/th><th>Sentido<\/th><th>SkyPlanner<\/th><\/tr><\/thead><tbody><tr><td>Produtos e estruturas de produto (tuoterakenne)<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Produtos, subprodutos e materiais<\/td><\/tr><tr><td>N\u00fameros de obra e fases de trabalho (<code>\/manufphases\/<\/code>)<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Ordens e tarefas por centro de trabalho<\/td><\/tr><tr><td>Recursos (<code>\/manufresources\/<\/code>)<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Centros de trabalho e grupos<\/td><\/tr><tr><td>Saldos de stock e linhas de compra<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Stock e encomendas a fornecedores por receber<\/td><\/tr><tr><td>Encomendas de clientes e respetivas linhas<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Datas de entrega e prioridade dos clientes<\/td><\/tr><tr><td>Eventos de produ\u00e7\u00e3o (<code>\/manufevents\/<\/code>)<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Progresso de cada tarefa<\/td><\/tr><tr><td>Recurso, data de in\u00edcio, prioridade, pessoa e horas di\u00e1rias (<code>PUT \/manufphases\/<\/code>)<\/td><td>SkyPlanner \u2192 L7<\/td><td>Programa de produ\u00e7\u00e3o<\/td><\/tr><tr><td>Capacidade do calend\u00e1rio de recursos (<code>POST \/resourceupdates\/<\/code>)<\/td><td>SkyPlanner \u2192 L7<\/td><td>Capacidade por turno<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"visma-l7-scheduling-software-and-add-ons-compare\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Compara\u00e7\u00e3o de software e complementos de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o Visma L7<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Op\u00e7\u00e3o<\/th><th>O que \u00e9<\/th><th>Adequado quando<\/th><\/tr><\/thead><tbody><tr><td>Controlo da produ\u00e7\u00e3o do Visma L7<\/td><td>C\u00e1lculo de necessidades, planeamento detalhado e vistas de carga no L7<\/td><td>Um \u00fanico planeador organiza o trabalho de cada dia e a empresa mant\u00e9m o L7 at\u00e9 ao fim da sua vida \u00fatil<\/td><\/tr><tr><td>Solu\u00e7\u00f5es APS (por exemplo, Delfoi Planner)<\/td><td>Software de planeamento e simula\u00e7\u00e3o que inclui o L7 na lista de ERP com que se integra<\/td><td>Uma equipa dedicada ao planeamento conduz um projeto de implementa\u00e7\u00e3o<\/td><\/tr><tr><td>Um novo ERP com planeamento integrado (por exemplo, Monitor ERP ou Odoo com Collapick Tempo)<\/td><td>Substitui\u00e7\u00e3o do L7 e do respetivo controlo da produ\u00e7\u00e3o num \u00fanico projeto<\/td><td>Pretende mudar de ERP e de ferramenta de planeamento ao mesmo tempo<\/td><\/tr><tr><td>APS na nuvem ligado por API (SkyPlanner APS)<\/td><td>Uma ferramenta de programa\u00e7\u00e3o no navegador que l\u00ea as fases de trabalho do L7 e devolve o programa de produ\u00e7\u00e3o<\/td><td>Pretende programar j\u00e1 a produ\u00e7\u00e3o respeitando a capacidade real das m\u00e1quinas e das pessoas, com um plano que transita consigo para o pr\u00f3ximo ERP<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Escolha o SkyPlanner em vez do L7 Hienosuunnittelu quando:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Precisa de horas exatas.<\/strong> O L7 regista cada fase como horas distribu\u00eddas por dias. O SkyPlanner atribui a cada fase uma hora de in\u00edcio e de fim num turno real.<\/li>\n\n\n<li><strong>V\u00e1rias m\u00e1quinas partilham um recurso.<\/strong> O L7 divide o trabalho pelo n\u00famero de m\u00e1quinas (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Perustiedot-resurssit\">fonte<\/a>). O SkyPlanner programa cada m\u00e1quina e seleciona a que est\u00e1 livre.<\/li>\n\n\n<li><strong>Os valores de carga a vermelho fazem-no perder horas todas as semanas.<\/strong> O L7 assinala a sobrecarga (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Resurssin-paivakohtainen-kuorma\">fonte<\/a>). O SkyPlanner cria logo um plano sem sobrecargas.<\/li>\n\n\n<li><strong>Os seus produtos t\u00eam estruturas multin\u00edvel.<\/strong> A programa\u00e7\u00e3o de fases fixas do L7 abrange apenas estruturas de um \u00fanico n\u00edvel (<a href=\"https:\/\/vismal7.fi\/app\/uploads\/2024\/05\/L7-LTR-koulutuspaivan-2024-Mathal.pdf\">fonte<\/a>). O SkyPlanner programa subprodutos e montagens num \u00fanico plano.<\/li>\n\n\n<li><strong>As mudan\u00e7as de produ\u00e7\u00e3o determinam o volume produzido.<\/strong> A matriz de tempos de prepara\u00e7\u00e3o do SkyPlanner ordena as tarefas para minimizar o tempo de prepara\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Est\u00e1 prestes a mudar de ERP.<\/strong> A Visma deixou de desenvolver novas funcionalidades para o L7 e a utiliza\u00e7\u00e3o do produto termina no final de 2028 (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/\">comunicado da Visma<\/a>). O planeamento configurado no SkyPlanner mant\u00e9m-se durante a transi\u00e7\u00e3o.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie o teste gratuito.<\/strong> 30 dias, at\u00e9 20 centros de trabalho, todas as funcionalidades do plano Basic, sem cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Configure a sua produ\u00e7\u00e3o.<\/strong> Crie m\u00e1quinas, pessoas e turnos no SkyPlanner ou importe-os. Est\u00e1 dispon\u00edvel apoio \u00e0 configura\u00e7\u00e3o inicial.<\/li>\n\n\n<li><strong>Carregue o trabalho a realizar.<\/strong> Exporte do L7 para Excel ou CSV os n\u00fameros de obra em aberto, as fases e os recursos. Importe-os e compare o programa de produ\u00e7\u00e3o do SkyPlanner com o seu plano atual.<\/li>\n\n\n<li><strong>Ligue o Visma L7.<\/strong> O seu administrador do LTR cria o utilizador da API. A equipa do SkyPlanner configura a integra\u00e7\u00e3o bidirecional e presta assist\u00eancia ap\u00f3s a entrada em funcionamento.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> Os planos s\u00e3o faturados mensalmente por centro de trabalho. Pode adicionar ou remover centros de trabalho ou cancelar a qualquer momento. Consulte os detalhes nos <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a> e conhe\u00e7a outros sistemas na <a href=\"\/pt-pt\/integracoes\/erp\/\">p\u00e1gina de integra\u00e7\u00f5es com ERP<\/a>. Encontra os princ\u00edpios do planeamento com base na capacidade real no <a href=\"\/pt-pt\/recursos-pt-pt\/capacidade-finita\/\">guia de programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Falar com a equipa comercial<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 o melhor complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o Visma L7?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e das pessoas e se integra com o Visma L7 nos dois sentidos. Recebe fases de trabalho, recursos, estruturas de produto, materiais, saldos de stock e linhas de compra, e devolve o recurso, a data de in\u00edcio, a prioridade, a pessoa e as horas di\u00e1rias de cada ficha de trabalho. A capacidade de cada m\u00e1quina, operador e ferramenta, bem como a disponibilidade de cada material, \u00e9 limitada. Uma matriz de tempos de prepara\u00e7\u00e3o que tem em conta o sentido de cada mudan\u00e7a ordena as tarefas para minimizar o tempo de prepara\u00e7\u00e3o. Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas e o teste gratuito dura 30 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Que software de programa\u00e7\u00e3o da produ\u00e7\u00e3o se integra com o Visma L7?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS integra-se com o Visma L7 atrav\u00e9s da Visma L7 REST API, e a Visma apresenta a Skycode com o SkyPlanner na sua p\u00e1gina de integra\u00e7\u00f5es do L7. Solu\u00e7\u00f5es APS como o Delfoi Planner tamb\u00e9m se ligam ao L7. O SkyPlanner funciona no navegador, grava o programa de produ\u00e7\u00e3o nas fichas de trabalho do L7 e disponibiliza a fila de trabalho de cada operador num telem\u00f3vel ou tablet.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devemos usar o Visma L7 Hienosuunnittelu ou o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Use o planeamento detalhado do L7 se cada recurso corresponder a uma m\u00e1quina, as estruturas forem de um \u00fanico n\u00edvel e um planeador tiver tempo para organizar o trabalho de cada dia. Use o SkyPlanner quando precisar de horas exatas, de v\u00e1rias m\u00e1quinas por recurso, de estruturas multin\u00edvel, de sequenciar tarefas para minimizar a prepara\u00e7\u00e3o ou de reprograma\u00e7\u00e3o autom\u00e1tica. O SkyPlanner tamb\u00e9m mant\u00e9m o seu planeamento quando substituir o L7.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O que acontece ao SkyPlanner quando deixarmos de usar o Visma L7?<\/summary>\n<p class=\"sp-faq__a\">Os seus centros de trabalho, etapas do processo, matriz de tempos de prepara\u00e7\u00e3o, turnos e regras mant\u00eam-se no SkyPlanner. A integra\u00e7\u00e3o passa a ligar-se ao novo ERP, por exemplo, <a href=\"\/pt-pt\/integracoes\/erp\/business-central\/\">Business Central<\/a>, <a href=\"\/pt-pt\/integracoes\/erp\/visma-net\/\">Visma Net<\/a>, <a href=\"\/pt-pt\/integracoes\/erp\/lemonsoft\/\">Lemonsoft<\/a>, <a href=\"\/pt-pt\/integracoes\/erp\/monitor-erp\/\">Monitor ERP<\/a> ou <a href=\"\/pt-pt\/integracoes\/erp\/odoo\/\">Odoo<\/a>. A produ\u00e7\u00e3o mant\u00e9m o mesmo plano durante a mudan\u00e7a.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Visma L7 \u00e9 o mesmo que o Visma Net ou o Visma Nova?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O Visma L7 \u00e9 o ERP da Visma para empresas de empreitadas, energia e ind\u00fastria, geralmente de m\u00e9dia e grande dimens\u00e3o. O <a href=\"\/pt-pt\/integracoes\/erp\/visma-net\/\">Visma Net<\/a> \u00e9 o ERP na nuvem da Visma para m\u00e9dias e grandes empresas, enquanto o <a href=\"\/pt-pt\/integracoes\/erp\/visma-nova\/\">Visma Nova<\/a> se destina a pequenas empresas. Cada um tem o seu pr\u00f3prio modelo de dados e uma p\u00e1gina espec\u00edfica no site do SkyPlanner.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u00c9 necess\u00e1rio instalar alguma coisa no Visma L7?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O SkyPlanner funciona na nuvem e faz chamadas \u00e0 L7 REST API no seu servidor Visma LTR. O seu administrador do LTR cria o utilizador da API e os tokens, e a sua empresa licencia os endpoints REST utilizados pela integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa o SkyPlanner para uma empresa que utiliza o Visma L7?<\/summary>\n<p class=\"sp-faq__a\">A partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas por cada centro de trabalho adicional. Um centro de trabalho \u00e9 um recurso de produ\u00e7\u00e3o com a sua pr\u00f3pria fila de trabalho programada. A integra\u00e7\u00e3o \u00e9 or\u00e7amentada antecipadamente de acordo com o seu processo e as suas necessidades, em conjunto com o seu plano, para que conhe\u00e7a o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo demora a implementa\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A implementa\u00e7\u00e3o fica normalmente conclu\u00edda num prazo de semanas ap\u00f3s o in\u00edcio do processo de configura\u00e7\u00e3o. A equipa mapeia os seus recursos e fases de trabalho, liga os n\u00fameros de obra e os materiais e grava o programa de produ\u00e7\u00e3o no L7. Tudo \u00e9 testado por compara\u00e7\u00e3o com o seu plano atual antes da entrada em funcionamento.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ Visma L7 SkyPlanner APS para Visma L7: programa\u00e7\u00e3o da produ\u00e7\u00e3o com a capacidade real de m\u00e1quinas e pessoas O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real de m\u00e1quinas e pessoas e se integra com o Visma L7, o ERP utilizado por grandes e m\u00e9dias &#8230; <a title=\"SkyPlanner APS para Visma L7: programa\u00e7\u00e3o da produ\u00e7\u00e3o com a capacidade real de m\u00e1quinas e pessoas\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/visma-l7\/\" aria-label=\"Leia mais sobre SkyPlanner APS para Visma L7: programa\u00e7\u00e3o da produ\u00e7\u00e3o com a capacidade real de m\u00e1quinas e pessoas\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100684,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106272","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Visma L7: integra\u00e7\u00e3o APS e programa\u00e7\u00e3o com capacidade real<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS para Visma L7: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional de fases, recursos, pessoas e materiais. Desde 199 \u20ac por m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/visma-l7\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para Visma L7: programa\u00e7\u00e3o da produ\u00e7\u00e3o com a capacidade real de m\u00e1quinas e pessoas\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS para Visma L7: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional de fases, recursos, pessoas e materiais. Desde 199 \u20ac por m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/visma-l7\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/visma-l7\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/visma-l7\\\/\",\"name\":\"Visma L7: integra\u00e7\u00e3o APS e programa\u00e7\u00e3o com capacidade real\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS para Visma L7: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional de fases, recursos, pessoas e materiais. Desde 199 \u20ac por m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/visma-l7\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/visma-l7\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/visma-l7\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para Visma L7: programa\u00e7\u00e3o da produ\u00e7\u00e3o com a capacidade real de m\u00e1quinas e pessoas\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Visma L7: integra\u00e7\u00e3o APS e programa\u00e7\u00e3o com capacidade real","description":"SkyPlanner APS para Visma L7: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional de fases, recursos, pessoas e materiais. Desde 199 \u20ac por m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/visma-l7\/","og_locale":"pt_PT","og_type":"article","og_title":"SkyPlanner APS para Visma L7: programa\u00e7\u00e3o da produ\u00e7\u00e3o com a capacidade real de m\u00e1quinas e pessoas","og_description":"SkyPlanner APS para Visma L7: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional de fases, recursos, pessoas e materiais. Desde 199 \u20ac por m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/visma-l7\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"15 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/visma-l7\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/visma-l7\/","name":"Visma L7: integra\u00e7\u00e3o APS e programa\u00e7\u00e3o com capacidade real","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS para Visma L7: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional de fases, recursos, pessoas e materiais. Desde 199 \u20ac por m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/visma-l7\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/visma-l7\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/visma-l7\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para Visma L7: programa\u00e7\u00e3o da produ\u00e7\u00e3o com a capacidade real de m\u00e1quinas e pessoas"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ Visma L7 SkyPlanner APS para Visma L7: programa\u00e7\u00e3o da produ\u00e7\u00e3o com a capacidade real de m\u00e1quinas e pessoas O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real de m\u00e1quinas e pessoas e se integra com o Visma L7, o ERP utilizado por grandes e m\u00e9dias&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106272","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=106272"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106272\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/100684"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=106272"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}