{"id":106243,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/applus\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"applus","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/applus\/","title":{"rendered":"SkyPlanner APS para APplus: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoal"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ APplus<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para APplus: <span class=\"hl\">programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoal<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O SkyPlanner APS complementa o APplus com programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e do pessoal e programa cada m\u00e1quina, operador, ferramenta e material. Permite ver onde e quando \u00e9 executada cada opera\u00e7\u00e3o de cada ordem de produ\u00e7\u00e3o. Quando a produ\u00e7\u00e3o muda, o Autopilot reprograma automaticamente.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Marcar uma demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner integra-se com o APplus nos dois sentidos. Recebe ordens de produ\u00e7\u00e3o (Fertigungsauftr\u00e4ge) com as respetivas opera\u00e7\u00f5es (Arbeitsg\u00e4nge), gamas operat\u00f3rias (Arbeitspl\u00e4ne), listas de materiais (St\u00fccklisten), unidades de capacidade (Kapazit\u00e4tsstellen e Kapazit\u00e4tseinheiten), ferramentas (Betriebsmittel), exist\u00eancias e encomendas de compra. Devolve o in\u00edcio, o fim e a unidade de capacidade previstos para cada opera\u00e7\u00e3o, e os tempos dos operadores podem ser enviados como mensagens BDE associadas \u00e0 ordem. Durante a entrada em funcionamento, a equipa SkyPlanner adapta a integra\u00e7\u00e3o \u00e0 configura\u00e7\u00e3o do seu APplus.<\/p>\n\n\n<p>O pre\u00e7o come\u00e7a nos 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O per\u00edodo de avalia\u00e7\u00e3o gratuita dura 30 dias e inclui at\u00e9 20 centros de trabalho e todas as funcionalidades do plano Basic, sem necessidade de cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cada unidade \u00e9 programada com capacidade limitada, por defeito.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner atribui cada opera\u00e7\u00e3o a uma m\u00e1quina e a um hor\u00e1rio espec\u00edficos, tendo em conta os turnos reais, as aus\u00eancias e as horas extraordin\u00e1rias. Nenhum recurso \u00e9 programado como se tivesse capacidade ilimitada, pelo que a f\u00e1brica consegue executar o plano.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Menos custos nas mudan\u00e7as de produ\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner guarda o tempo de mudan\u00e7a entre cada par de produtos, nos dois sentidos. A passagem de azul para vermelho pode demorar 30 minutos e a de vermelho para azul 60. O motor Arcturus sequencia as tarefas de forma a perder o m\u00ednimo de tempo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">As pessoas e as ferramentas tamb\u00e9m t\u00eam limites.<\/p>\n\n\n<p class=\"fx-pain__b\">A uma tarefa que exige tr\u00eas operadores s\u00e3o atribu\u00eddas tr\u00eas pessoas com disponibilidade nos respetivos turnos. Um dispositivo de fixa\u00e7\u00e3o ou uma ferramenta do Betriebsmittel do APplus nunca \u00e9 reservado para duas m\u00e1quinas ao mesmo tempo. Quando uma m\u00e1quina est\u00e1 ocupada, o trabalho passa para outra m\u00e1quina ou pessoa.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Os atrasos de material deixam de comprometer o plano.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner verifica as exist\u00eancias dispon\u00edveis e as encomendas de compra por receber. Uma opera\u00e7\u00e3o que aguarda uma entrega de fornecedor \u00e9 programada para depois dessa data de entrega, em vez de arrancar e ficar parada no ch\u00e3o de f\u00e1brica.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">O quadro de planeamento atualiza-se automaticamente.<\/p>\n\n\n<p class=\"fx-pain__b\">Quando uma m\u00e1quina para ou chega uma encomenda urgente, o Autopilot reprograma a produ\u00e7\u00e3o. Os bloqueios e as prioridades que definiu continuam a ser respeitados, e o Running Time Lock fixa as pr\u00f3ximas horas de produ\u00e7\u00e3o.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cada operador v\u00ea a sua fila de tarefas.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada operador consulta as pr\u00f3ximas tarefas num telem\u00f3vel ou tablet e regista o trabalho \u00e0 medida que o executa. O escrit\u00f3rio acompanha o progresso em tempo real, e cabe-lhe decidir se os tempos registados s\u00e3o enviados para o APplus.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Opini\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento na UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, o nosso planeamento da produ\u00e7\u00e3o passou das folhas de c\u00e1lculo Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o permite poupar 2 horas de trabalho por semana, e uma nova lista de tarefas chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Leia o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestu\u00e1rio de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Produ\u00e7\u00e3o farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e criar um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Leia o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>de fiabilidade das entregas desde 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner d\u00e1-nos visibilidade sobre a capacidade e torna o planeamento previs\u00edvel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Ind\u00fastria qu\u00edmica e alimentar<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas tem sido de 100% durante todo o per\u00edodo de utiliza\u00e7\u00e3o do SkyPlanner, desde 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/opes-corporation\/\">Ler o testemunho da Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Vista a\u00e9rea da f\u00e1brica de sistemas de seguran\u00e7a para coberturas da Piristeel em Kauhava\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>fiabilidade das entregas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner permitiu-nos identificar os gargalos com mais clareza e tornou a gest\u00e3o da produ\u00e7\u00e3o mais clara.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, Diretor de Produ\u00e7\u00e3o<\/b><br>Piristeel \u00b7 Sistemas de seguran\u00e7a para coberturas e de drenagem de \u00e1guas pluviais<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas atingiu 99,2% este ano, e a programa\u00e7\u00e3o permite poupar at\u00e9 quatro horas de trabalho por dia.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/piristeel\/\">Ler o testemunho da Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-applus-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona a integra\u00e7\u00e3o com o APplus<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>O APplus envia o trabalho.<\/strong> O SkyPlanner recebe ordens de produ\u00e7\u00e3o com as respetivas opera\u00e7\u00f5es, gamas operat\u00f3rias, listas de materiais, unidades de capacidade, ferramentas, exist\u00eancias e encomendas de compra.<\/li>\n\n\n<li><strong>O SkyPlanner cria e mant\u00e9m a programa\u00e7\u00e3o atualizada.<\/strong> O motor Arcturus programa cada opera\u00e7\u00e3o em segundos e reprograma \u00e0 medida que a produ\u00e7\u00e3o muda.<\/li>\n\n\n<li><strong>As datas e os registos de trabalho s\u00e3o devolvidos.<\/strong> O in\u00edcio, o fim e a unidade de capacidade previstos s\u00e3o enviados para cada opera\u00e7\u00e3o da ordem de produ\u00e7\u00e3o no APplus. Os registos de tempos dos operadores podem ser enviados como mensagens BDE associadas \u00e0 ordem.<\/li>\n\n<\/ol>\n\n\n<p>O APplus continua a ser o sistema de refer\u00eancia para os seus dados. Os artigos, as listas de materiais, as gamas operat\u00f3rias, o planeamento de materiais (Disposition), as compras, o c\u00e1lculo de custos e a gest\u00e3o financeira mant\u00eam-se onde est\u00e3o. O respons\u00e1vel pelo planeamento continua a lan\u00e7ar as ordens de fabrico no APplus. O SkyPlanner fica respons\u00e1vel por uma coisa: a sequ\u00eancia e os hor\u00e1rios de cada opera\u00e7\u00e3o em cada recurso.<\/p>\n\n\n<p>O APplus assenta numa arquitetura de servi\u00e7os web. Segundo a Asseco, os sistemas inform\u00e1ticos de clientes e fornecedores podem aceder diretamente pela Internet a todas as fun\u00e7\u00f5es de programa\u00e7\u00e3o necess\u00e1rias (<a href=\"https:\/\/www.applus-erp.de\/en\/solutions\/erp-features\/e-business\/\">Asseco<\/a>). O Business Integration Framework liga sistemas de terceiros sem programa\u00e7\u00e3o, atrav\u00e9s de estruturas de dados adapt\u00e1veis (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/it-business-2016-asseco-stellt-neue-produktversion-applus-63-vor\/\">Asseco<\/a>), e o Universal Cloud Connector liga solu\u00e7\u00f5es de parceiros e ofertas SaaS ao APplus (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/asseco-veroeffentlicht-applus-71\/\">Asseco<\/a>). O SkyPlanner l\u00ea os dados de produ\u00e7\u00e3o e devolve o in\u00edcio, o fim e a unidade de capacidade previstos para cada opera\u00e7\u00e3o atrav\u00e9s destas interfaces. A via exata a utilizar na sua instala\u00e7\u00e3o \u00e9 estabelecida na defini\u00e7\u00e3o do \u00e2mbito da implementa\u00e7\u00e3o. Os webhooks do SkyPlanner enviam cada altera\u00e7\u00e3o \u00e0 programa\u00e7\u00e3o assim que ocorre.<\/p>\n\n\n<p>Cada f\u00e1brica utiliza o APplus de forma diferente. Por isso, a equipa SkyPlanner adapta a integra\u00e7\u00e3o \u00e0 sua configura\u00e7\u00e3o durante a entrada em funcionamento e presta assist\u00eancia ap\u00f3s o arranque. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, de acordo com os seus processos e necessidades. O seu parceiro APplus ou os seus pr\u00f3prios programadores tamb\u00e9m podem desenvolver a integra\u00e7\u00e3o com base na API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u00e7\u00e3o da API<\/a>).<\/p>\n\n\n<p>Consulte as interfaces, o mapeamento de dados e as regras de escrita no APplus no <a href=\"\/pt-pt\/integracoes\/erp\/applus\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o do APplus para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-applus-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que o APplus programa e o que o SkyPlanner acrescenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O APplus planeia a produ\u00e7\u00e3o em tr\u00eas n\u00edveis:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Programa\u00e7\u00e3o PPS e quadro de planeamento.<\/strong> Uma \u00fanica execu\u00e7\u00e3o programa m\u00e1quinas, materiais, capacidade do pessoal e, se necess\u00e1rio, ferramentas. Segundo a Asseco, no caso mais simples, a programa\u00e7\u00e3o considera capacidade ilimitada. \u00c9 poss\u00edvel calcular os gargalos ou todas as unidades de capacidade com recursos limitados. Os ajustes e as desloca\u00e7\u00f5es de opera\u00e7\u00f5es s\u00e3o feitos manualmente no quadro de planeamento (Plantafel) (<a href=\"https:\/\/www.applus-erp.de\/loesungen\/erp-funktionsbereiche\/pps\/\">Asseco PPS<\/a>).<\/li>\n\n\n<li><strong>APplus Feinplanung (planeamento detalhado).<\/strong> Um m\u00f3dulo integrado que otimiza os tempos de prepara\u00e7\u00e3o, a sequ\u00eancia, a carga e a atribui\u00e7\u00e3o a postos de trabalho, com cen\u00e1rios de otimiza\u00e7\u00e3o predefinidos (<a href=\"https:\/\/www.applus-erp.de\/loesungen\/erp-funktionsbereiche\/feinplanung\/\">Asseco Feinplanung<\/a>).<\/li>\n\n\n<li><strong>APplus APS.<\/strong> Para os casos complexos, a Asseco integrou o produto APS de um parceiro sob o nome APplus APS. Segundo a Asseco, o planeamento detalhado do ERP cobre a maioria das necessidades do mercado. As restantes exigem solu\u00e7\u00f5es espec\u00edficas: uma matriz detalhada de tempos de prepara\u00e7\u00e3o para v\u00e1rias ferramentas e dispositivos de fixa\u00e7\u00e3o, e planeamento de m\u00faltiplos recursos (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/multiressourcenplanung-asseco-solutions-schliesst-partnerschaft-mit-dualis\/\">Asseco<\/a>).<\/li>\n\n<\/ul>\n\n\n<p>A tabela de pre\u00e7os e licen\u00e7as da Asseco determina se uma funcionalidade est\u00e1 inclu\u00edda no pacote de base ou se exige uma licen\u00e7a separada (<a href=\"https:\/\/www.applus-erp.de\/en\/facts\/\">Informa\u00e7\u00f5es sobre o APplus<\/a>).<\/p>\n\n\n<p>O SkyPlanner acrescenta uma programa\u00e7\u00e3o \u00fanica na nuvem que conjuga, em cada recurso, a matriz de tempos de prepara\u00e7\u00e3o e mudan\u00e7a, a disponibilidade limitada das ferramentas, as tarefas com v\u00e1rios operadores e os materiais por receber. O Autopilot mant\u00e9m a programa\u00e7\u00e3o atualizada, e cada operador pode consultar a sua fila de tarefas no telem\u00f3vel.<\/p>\n\n\n<p>Cada n\u00edvel e os seus limites s\u00e3o explicados em <a href=\"\/pt-pt\/integracoes\/erp\/applus\/programacao-producao\/\">O APplus permite programar a produ\u00e7\u00e3o com capacidade limitada?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"applus-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O APplus hoje e com o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>APplus PPS e Feinplanung<\/th><th>APplus com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Capacidade<\/td><td>Capacidade ilimitada no caso mais simples; capacidade limitada nos gargalos ou em todas as unidades de capacidade, se assim configurado<\/td><td>Capacidade limitada de cada m\u00e1quina, pessoa e ferramenta, com turnos reais<\/td><\/tr><tr><td>Programa\u00e7\u00e3o<\/td><td>Quadro de planeamento com ajustes manuais<\/td><td>Sequ\u00eancia de opera\u00e7\u00f5es em cada recurso definida em segundos<\/td><\/tr><tr><td>Mudan\u00e7as de produ\u00e7\u00e3o<\/td><td>O Feinplanung otimiza as prepara\u00e7\u00f5es; matriz de prepara\u00e7\u00e3o para v\u00e1rias ferramentas atrav\u00e9s do APplus APS<\/td><td>Matriz de tempos de prepara\u00e7\u00e3o e mudan\u00e7a: tempo total m\u00ednimo, considerando ambos os sentidos<\/td><\/tr><tr><td>Pessoas e ferramentas<\/td><td>Capacidade do pessoal e ferramentas inclu\u00eddas na execu\u00e7\u00e3o PPS<\/td><td>Operadores identificados com turnos, tarefas com v\u00e1rios operadores e ferramentas como recursos partilhados de disponibilidade limitada<\/td><\/tr><tr><td>Materiais<\/td><td>Planeamento de materiais (Disposition) com propostas de compra<\/td><td>As opera\u00e7\u00f5es come\u00e7am quando h\u00e1 exist\u00eancias dispon\u00edveis ou chegam os materiais encomendados<\/td><\/tr><tr><td>Altera\u00e7\u00f5es<\/td><td>O respons\u00e1vel pelo planeamento desloca as opera\u00e7\u00f5es no quadro de planeamento<\/td><td>O Autopilot reprograma toda a f\u00e1brica de acordo com as suas prioridades<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Mensagens BDE registadas na ordem por leitura de c\u00f3digo de barras<\/td><td>Os operadores consultam a fila de tarefas e registam o trabalho no telem\u00f3vel ou tablet; os tempos podem ser enviados como mensagens BDE<\/td><\/tr><tr><td>Licenciamento<\/td><td>De acordo com a tabela de pre\u00e7os e licen\u00e7as da Asseco<\/td><td>Desde 199 \u20ac por m\u00eas, sem limite de utilizadores<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-applus\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como escolher uma solu\u00e7\u00e3o de programa\u00e7\u00e3o para o APplus<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A programa\u00e7\u00e3o PPS adequa-se a uma f\u00e1brica onde a capacidade dos gargalos e os ajustes no quadro de planeamento permitem obter datas fi\u00e1veis. Uma f\u00e1brica que reordena manualmente o quadro todos os dias, ou onde as prepara\u00e7\u00f5es dependem das ferramentas e da sequ\u00eancia, precisa de mais. Nesse caso, a escolha \u00e9 entre o APplus Feinplanung com o APplus APS e o SkyPlanner APS.<\/p>\n\n\n<p><strong>Escolha o SkyPlanner em vez do APplus Feinplanung e do APplus APS quando:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>As suas prepara\u00e7\u00f5es dependem da sequ\u00eancia e das ferramentas.<\/strong> Segundo a Asseco, uma matriz detalhada de tempos de prepara\u00e7\u00e3o para v\u00e1rias ferramentas e o planeamento de m\u00faltiplos recursos exigem solu\u00e7\u00f5es espec\u00edficas para al\u00e9m do planeamento do seu ERP (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/multiressourcenplanung-asseco-solutions-schliesst-partnerschaft-mit-dualis\/\">Asseco<\/a>). No SkyPlanner, a matriz de tempos de prepara\u00e7\u00e3o e mudan\u00e7a, as ferramentas com disponibilidade limitada e as tarefas com v\u00e1rios operadores s\u00e3o funcionalidades de base de uma \u00fanica programa\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Pretende uma programa\u00e7\u00e3o operacional em semanas, em vez de mais um projeto de implementa\u00e7\u00e3o de um m\u00f3dulo.<\/strong> O APplus APS \u00e9 um produto de um parceiro integrado no APplus, e o licenciamento segue a tabela de pre\u00e7os da Asseco (<a href=\"https:\/\/www.applus-erp.de\/en\/facts\/\">Informa\u00e7\u00f5es sobre o APplus<\/a>). O SkyPlanner \u00e9 um software na nuvem que pode testar com as suas pr\u00f3prias ordens de produ\u00e7\u00e3o durante o per\u00edodo de avalia\u00e7\u00e3o de 30 dias. A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio do processo de entrada em funcionamento.<\/li>\n\n\n<li><strong>O plano tem de se manter atualizado automaticamente.<\/strong> No APplus, os ajustes e as desloca\u00e7\u00f5es de opera\u00e7\u00f5es s\u00e3o feitos no quadro de planeamento (<a href=\"https:\/\/www.applus-erp.de\/loesungen\/erp-funktionsbereiche\/pps\/\">Asseco PPS<\/a>). O Autopilot reprograma automaticamente a cada altera\u00e7\u00e3o relevante, e as novas datas s\u00e3o enviadas para o APplus.<\/li>\n\n\n<li><strong>Os operadores, as ferramentas e a chegada de materiais condicionam o plano.<\/strong> Um \u00fanico programa de produ\u00e7\u00e3o respeita os limites de cada m\u00e1quina, pessoa, ferramenta e material. S\u00e3o utilizadas m\u00e1quinas alternativas, e as opera\u00e7\u00f5es come\u00e7am quando o material est\u00e1 dispon\u00edvel em stock ou \u00e9 recebido atrav\u00e9s de encomendas de compra.<\/li>\n\n\n<li><strong>Todos os operadores devem trabalhar com base no plano.<\/strong> Com Mobile Confirmations, a fila de trabalho atualizada fica dispon\u00edvel num telem\u00f3vel ou tablet. O n\u00famero de utilizadores \u00e9 ilimitado: o pre\u00e7o depende dos centros de trabalho, n\u00e3o das licen\u00e7as de utilizador.<\/li>\n\n\n<li><strong>O pre\u00e7o mensal deve ser p\u00fablico.<\/strong> A partir de 199 \u20ac por m\u00eas, com or\u00e7amento pr\u00e9vio para a integra\u00e7\u00e3o bidirecional, configurada e assistida pela equipa SkyPlanner.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie o per\u00edodo experimental gratuito.<\/strong> 30 dias, at\u00e9 20 centros de trabalho, todas as funcionalidades do Basic, sem cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Configure a sua produ\u00e7\u00e3o.<\/strong> Crie m\u00e1quinas, pessoas e turnos no SkyPlanner ou importe as unidades de capacidade do APplus. Est\u00e1 dispon\u00edvel apoio \u00e0 configura\u00e7\u00e3o inicial.<\/li>\n\n\n<li><strong>Carregue as suas ordens de produ\u00e7\u00e3o.<\/strong> Exporte do APplus para Excel as ordens de produ\u00e7\u00e3o em aberto e as respetivas opera\u00e7\u00f5es. Importe-as e compare o programa do SkyPlanner com o seu quadro de planeamento atual.<\/li>\n\n\n<li><strong>Ligue o APplus.<\/strong> A equipa SkyPlanner configura a integra\u00e7\u00e3o bidirecional e presta assist\u00eancia ap\u00f3s a entrada em funcionamento.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> Os planos s\u00e3o faturados mensalmente por centro de trabalho. Pode adicionar ou remover centros de trabalho, ou cancelar, a qualquer momento. Consulte os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a> para saber mais ou explore <a href=\"\/pt-pt\/integracoes\/erp\/\">todas as integra\u00e7\u00f5es com ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar per\u00edodo experimental gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Falar com a equipa comercial<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 o melhor complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o APplus?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e dos operadores e se integra com o APplus nos dois sentidos. Recebe ordens de produ\u00e7\u00e3o, opera\u00e7\u00f5es, gamas operat\u00f3rias, listas de materiais, unidades de capacidade, ferramentas, stocks e encomendas de compra. Devolve o in\u00edcio e o fim previstos e a unidade de capacidade de cada opera\u00e7\u00e3o. Os tempos dos operadores podem ser registados como mensagens BDE. A programa\u00e7\u00e3o respeita os limites de cada m\u00e1quina, operador, ferramenta e material. Uma matriz de tempos de prepara\u00e7\u00e3o que tem em conta a ordem das transi\u00e7\u00f5es sequencia as tarefas para minimizar as prepara\u00e7\u00f5es, e o Autopilot reprograma automaticamente quando h\u00e1 altera\u00e7\u00f5es na produ\u00e7\u00e3o. Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas, e o per\u00edodo de teste gratuito dura 30 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O APplus permite programar a produ\u00e7\u00e3o respeitando a capacidade real dos recursos?<\/summary>\n<p class=\"sp-faq__a\">Em parte. Na sua forma mais simples, a programa\u00e7\u00e3o no APplus PPS n\u00e3o imp\u00f5e limites de capacidade, sendo poss\u00edvel definir os gargalos ou todas as unidades de capacidade como recursos limitados. O Feinplanung otimiza as prepara\u00e7\u00f5es e a sequ\u00eancia. Para prepara\u00e7\u00f5es complexas e planeamento com m\u00faltiplos recursos, a Asseco disponibiliza o APplus APS, um produto de um parceiro integrado no APplus. O SkyPlanner APS funciona em paralelo com o APplus e programa a produ\u00e7\u00e3o respeitando os limites de cada m\u00e1quina, pessoa, ferramenta e material.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Que software de programa\u00e7\u00e3o da produ\u00e7\u00e3o se integra com o APplus?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS integra-se com o APplus nos dois sentidos. Obt\u00e9m ordens de produ\u00e7\u00e3o, opera\u00e7\u00f5es, gamas operat\u00f3rias, listas de materiais, unidades de capacidade, ferramentas, stocks e encomendas de compra atrav\u00e9s dos servi\u00e7os web do APplus, do Business Integration Framework ou do Universal Cloud Connector. O in\u00edcio e o fim previstos e a unidade de capacidade de cada opera\u00e7\u00e3o s\u00e3o enviados de volta pelo canal acordado na defini\u00e7\u00e3o do \u00e2mbito da implementa\u00e7\u00e3o. Os tempos dos operadores s\u00e3o registados na ordem como mensagens BDE.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner substitui o APplus PPS?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o, funciona como complemento. O APplus continua a gerir os artigos, as listas de materiais, as gamas operat\u00f3rias, o planeamento de materiais, as compras, a liberta\u00e7\u00e3o de ordens de fabrico, o c\u00e1lculo de custos e a gest\u00e3o financeira. O SkyPlanner programa as suas ordens de produ\u00e7\u00e3o de acordo com a capacidade real e devolve as datas ao APplus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devemos usar o APplus APS ou o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner, se pretende ter, em poucas semanas, um programa de produ\u00e7\u00e3o que respeita a capacidade real dos recursos e se mant\u00e9m atualizado. O APplus APS \u00e9 um produto de um parceiro integrado no APplus para os casos complexos que a Asseco identifica: matrizes de prepara\u00e7\u00e3o que abrangem v\u00e1rias ferramentas e planeamento com m\u00faltiplos recursos. O SkyPlanner cobre esses casos com a sua matriz de tempos de prepara\u00e7\u00e3o, a programa\u00e7\u00e3o que respeita a disponibilidade das ferramentas e tarefas com v\u00e1rios operadores. Reprograma automaticamente e permite a cada operador consultar a sua fila de trabalho num telem\u00f3vel, sem limite de utilizadores. Pode comprov\u00e1-lo com as suas pr\u00f3prias ordens de produ\u00e7\u00e3o durante o teste gratuito.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa o SkyPlanner para uma f\u00e1brica que utiliza o APplus?<\/summary>\n<p class=\"sp-faq__a\">A partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas por cada centro de trabalho adicional. Um centro de trabalho \u00e9 um recurso de produ\u00e7\u00e3o com a sua pr\u00f3pria fila de tarefas programadas. Recebe antecipadamente um or\u00e7amento para a integra\u00e7\u00e3o, adaptado aos seus processos e necessidades, juntamente com o seu plano. Assim, conhece o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo demora a implementa\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio do processo de configura\u00e7\u00e3o. A equipa mapeia as suas unidades de capacidade, ferramentas e gamas operat\u00f3rias, liga as ordens de produ\u00e7\u00e3o e as encomendas de compra e envia as datas previstas de volta ao APplus. Tudo \u00e9 testado face ao seu plano atual antes da entrada em funcionamento.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de o integrar com o APplus?<\/summary>\n<p class=\"sp-faq__a\">Sim. O teste de 30 dias utiliza uma exporta\u00e7\u00e3o para Excel das suas ordens de produ\u00e7\u00e3o em aberto no APplus. Antes de come\u00e7ar qualquer trabalho de integra\u00e7\u00e3o, pode ver um <a href=\"\/pt-pt\/recursos-pt-pt\/capacidade-finita\/\">programa da sua pr\u00f3pria produ\u00e7\u00e3o que respeita a capacidade real dos recursos<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ APplus SkyPlanner APS para APplus: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoal O SkyPlanner APS complementa o APplus com programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e do pessoal e programa cada m\u00e1quina, operador, ferramenta e material. Permite ver onde e quando \u00e9 executada cada &#8230; <a title=\"SkyPlanner APS para APplus: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoal\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/applus\/\" aria-label=\"Leia mais sobre SkyPlanner APS para APplus: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoal\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100684,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106243","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>APplus: integra\u00e7\u00e3o APS para programa\u00e7\u00e3o com capacidade real<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS para APplus: programa\u00e7\u00e3o com capacidade real de m\u00e1quinas, operadores, ferramentas e materiais. Integra\u00e7\u00e3o bidirecional. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/applus\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para APplus: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoal\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS para APplus: programa\u00e7\u00e3o com capacidade real de m\u00e1quinas, operadores, ferramentas e materiais. Integra\u00e7\u00e3o bidirecional. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/applus\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/applus\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/applus\\\/\",\"name\":\"APplus: integra\u00e7\u00e3o APS para programa\u00e7\u00e3o com capacidade real\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS para APplus: programa\u00e7\u00e3o com capacidade real de m\u00e1quinas, operadores, ferramentas e materiais. Integra\u00e7\u00e3o bidirecional. Desde 199 \u20ac\\\/m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/applus\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/applus\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/applus\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para APplus: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoal\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"APplus: integra\u00e7\u00e3o APS para programa\u00e7\u00e3o com capacidade real","description":"SkyPlanner APS para APplus: programa\u00e7\u00e3o com capacidade real de m\u00e1quinas, operadores, ferramentas e materiais. Integra\u00e7\u00e3o bidirecional. Desde 199 \u20ac\/m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/applus\/","og_locale":"pt_PT","og_type":"article","og_title":"SkyPlanner APS para APplus: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoal","og_description":"SkyPlanner APS para APplus: programa\u00e7\u00e3o com capacidade real de m\u00e1quinas, operadores, ferramentas e materiais. Integra\u00e7\u00e3o bidirecional. Desde 199 \u20ac\/m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/applus\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"16 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/applus\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/applus\/","name":"APplus: integra\u00e7\u00e3o APS para programa\u00e7\u00e3o com capacidade real","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS para APplus: programa\u00e7\u00e3o com capacidade real de m\u00e1quinas, operadores, ferramentas e materiais. Integra\u00e7\u00e3o bidirecional. Desde 199 \u20ac\/m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/applus\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/applus\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/applus\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para APplus: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoal"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ APplus SkyPlanner APS para APplus: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoal O SkyPlanner APS complementa o APplus com programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e do pessoal e programa cada m\u00e1quina, operador, ferramenta e material. Permite ver onde e quando \u00e9 executada cada&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106243","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=106243"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106243\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/100684"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=106243"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}