{"id":106185,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/qad-adaptive-erp\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"qad-adaptive-erp","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/qad-adaptive-erp\/","title":{"rendered":"SkyPlanner APS para QAD Adaptive ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ QAD Adaptive ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para QAD Adaptive ERP: <span class=\"hl\">programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o QAD Adaptive ERP (anteriormente QAD Enterprise Applications e MFG\/PRO). Programa cada m\u00e1quina, operador, ferramenta e material, respeitando a capacidade real das m\u00e1quinas e das pessoas. Permite ver onde e quando \u00e9 executada cada opera\u00e7\u00e3o de uma ordem de fabrico, e o Autopilot reprograma automaticamente quando a produ\u00e7\u00e3o muda.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Marcar uma demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner integra-se com o QAD Adaptive ERP nos dois sentidos: recebe ordens de fabrico com as respetivas opera\u00e7\u00f5es, artigos, estruturas de produto, gamas operat\u00f3rias, centros de trabalho, exist\u00eancias e encomendas de compra. As datas programadas de lan\u00e7amento e conclus\u00e3o s\u00e3o devolvidas ao Work Order Maintenance atrav\u00e9s do QAD QXtend, e o trabalho registado \u00e9 lan\u00e7ado como apontamentos de m\u00e3o de obra e entradas de ordens de fabrico. Durante a implementa\u00e7\u00e3o inicial, a equipa SkyPlanner adapta a integra\u00e7\u00e3o \u00e0 configura\u00e7\u00e3o do seu QAD.<\/p>\n\n\n<p>Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O teste gratuito dura 30 dias e permite utilizar at\u00e9 20 centros de trabalho, sem cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Uma sequ\u00eancia ajustada \u00e0 capacidade de cada m\u00e1quina.<\/p>\n\n\n<p class=\"fx-pain__b\">O Capacity Requirements Planning do QAD mostra a carga de cada centro de trabalho. O SkyPlanner atribui cada opera\u00e7\u00e3o de uma ordem de fabrico a uma m\u00e1quina ou pessoa espec\u00edfica, num hor\u00e1rio definido, tendo em conta os turnos reais, as aus\u00eancias e as horas extraordin\u00e1rias.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">As datas deixam de mudar a cada passo.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner mant\u00e9m a sequ\u00eancia, e as datas de lan\u00e7amento e conclus\u00e3o das ordens de fabrico no QAD acompanham-na. Os respons\u00e1veis pelo planeamento deixam de ter de voltar a introduzir as datas das opera\u00e7\u00f5es ap\u00f3s cada execu\u00e7\u00e3o do CRP.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Menos custos nas mudan\u00e7as de produ\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner guarda o tempo de mudan\u00e7a de produ\u00e7\u00e3o entre cada par de produtos, nos dois sentidos. A passagem de uma cor clara para uma escura pode exigir apenas uma lavagem r\u00e1pida, enquanto a passagem de uma cor escura para uma clara exige uma limpeza completa. O motor ordena as tarefas de forma a perder o m\u00ednimo de tempo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Pessoas e ferramentas tamb\u00e9m t\u00eam limites.<\/p>\n\n\n<p class=\"fx-pain__b\">A uma tarefa que exige tr\u00eas operadores s\u00e3o atribu\u00eddas tr\u00eas pessoas com disponibilidade nos respetivos turnos. Uma matriz ou um molde em utiliza\u00e7\u00e3o numa prensa nunca \u00e9 reservado noutra. Quando uma m\u00e1quina est\u00e1 ocupada, o trabalho passa para uma m\u00e1quina ou pessoa alternativa.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">O material determina o in\u00edcio.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner verifica as exist\u00eancias e as encomendas de compra por receber de cada artigo. Uma ordem de fabrico que aguarda uma entrega de um fornecedor \u00e9 programada para depois da data dessa entrega, em vez de ser iniciada e depois interrompida no ch\u00e3o de f\u00e1brica.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cada operador v\u00ea a sua fila de tarefas.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada operador v\u00ea as pr\u00f3ximas tarefas num telem\u00f3vel ou tablet e regista o trabalho \u00e0 medida que o executa. O escrit\u00f3rio acompanha o progresso em tempo real, e os apontamentos de m\u00e3o de obra s\u00e3o enviados para o QAD.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Opini\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento na UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, o nosso planeamento da produ\u00e7\u00e3o passou das folhas de c\u00e1lculo Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o permite poupar 2 horas de trabalho por semana, e uma nova lista de tarefas chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Leia o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestu\u00e1rio de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Produ\u00e7\u00e3o farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e criar um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Leia o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>de fiabilidade das entregas desde 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner d\u00e1-nos visibilidade sobre a capacidade e torna o planeamento previs\u00edvel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Ind\u00fastria qu\u00edmica e alimentar<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas tem sido de 100% durante todo o per\u00edodo de utiliza\u00e7\u00e3o do SkyPlanner, desde 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/opes-corporation\/\">Ler o testemunho da Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Um soldador da KJH-Comp a rebarbar uma estrutura de a\u00e7o soldada na f\u00e1brica de Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>de fiabilidade das entregas, face a cerca de 50% anteriormente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner tem um papel decisivo na manuten\u00e7\u00e3o da fiabilidade das nossas entregas.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, Diretor-geral<\/b><br>KJH-Comp \u00b7 Constru\u00e7\u00e3o mec\u00e2nica em chapa e fabrico por contrato<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas passou de cerca de 50% para valores que chegam aos 98%, e a programa\u00e7\u00e3o exige agora um supervisor em vez de dois.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/kjh-comp\/\">Ler o testemunho da KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-qad-adaptive-erp-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona a integra\u00e7\u00e3o com o QAD Adaptive ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>O QAD envia o trabalho.<\/strong> O SkyPlanner recebe as ordens de fabrico e as respetivas opera\u00e7\u00f5es, artigos, estruturas de produto, gamas operat\u00f3rias, centros de trabalho, calend\u00e1rios de produ\u00e7\u00e3o, exist\u00eancias e encomendas de compra.<\/li>\n\n\n<li><strong>O SkyPlanner cria o programa de produ\u00e7\u00e3o e mant\u00e9m-no atualizado.<\/strong> O motor Arcturus otimiza todo o plano em segundos e volta a planear \u00e0 medida que a produ\u00e7\u00e3o muda.<\/li>\n\n\n<li><strong>As datas e o trabalho registado voltam ao QAD.<\/strong> As datas programadas de lan\u00e7amento e conclus\u00e3o s\u00e3o devolvidas a cada ordem de fabrico atrav\u00e9s de um QXtend Inbound QDoc no Work Order Maintenance (16.1). As confirma\u00e7\u00f5es dos operadores s\u00e3o lan\u00e7adas em Labor Feedback by Work Order (16.20.1) e Work Order Receipt (16.11).<\/li>\n\n<\/ol>\n\n\n<p>O QAD continua a ser o sistema de refer\u00eancia para os seus dados. Os artigos, as estruturas de produto, o MRP, as compras, as exist\u00eancias, o apuramento de custos e a gest\u00e3o financeira mant\u00eam-se onde est\u00e3o. O SkyPlanner fica respons\u00e1vel por uma coisa: a sequ\u00eancia e os hor\u00e1rios de cada opera\u00e7\u00e3o em cada recurso.<\/p>\n\n\n<p>O SkyPlanner l\u00ea os dados do QAD atrav\u00e9s dos objetos de neg\u00f3cio do QAD QXtend Outbound (Item, Product Structure, Routing, Work Center, Inventory Transaction) e das APIs REST de consulta de documentos de neg\u00f3cio do QAD. Para devolver dados, utiliza o QAD QXtend Inbound, a interface SOAP e XML do QAD que d\u00e1 acesso aos mesmos programas utilizados pelos respons\u00e1veis pelo planeamento. Os webhooks do SkyPlanner enviam cada altera\u00e7\u00e3o ao programa de produ\u00e7\u00e3o assim que ocorre.<\/p>\n\n\n<p>Cada f\u00e1brica utiliza o QAD de forma diferente. Por isso, a equipa SkyPlanner adapta a integra\u00e7\u00e3o \u00e0 sua configura\u00e7\u00e3o durante a implementa\u00e7\u00e3o inicial e presta assist\u00eancia ap\u00f3s a entrada em produ\u00e7\u00e3o. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, de acordo com o seu processo e as suas necessidades. O seu parceiro QAD ou os seus pr\u00f3prios programadores tamb\u00e9m podem desenvolver a integra\u00e7\u00e3o com base na API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>).<\/p>\n\n\n<p>Os QDocs, o mapeamento de dados e as regras de devolu\u00e7\u00e3o de dados est\u00e3o descritos no <a href=\"\/pt-pt\/integracoes\/erp\/qad-adaptive-erp\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o com o QAD Adaptive ERP para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-qad-adaptive-erp-schedules-and-what-skyplan\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que o QAD Adaptive ERP programa e o que o SkyPlanner acrescenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O QAD faz bem o planeamento de materiais e gere as linhas de produ\u00e7\u00e3o repetitiva com o Line Schedule Workbench. Para as ordens de fabrico de produ\u00e7\u00e3o discreta, a capacidade \u00e9 tratada pelo Capacity Requirements Planning. O <a href=\"https:\/\/connect.qad.com\/documents\/2370665\/207142422\/Manufacturing_UG_v2020EE.pdf\/a61c043d-f21c-631a-4a2e-c0c2d152294c?t=1600374319852&amp;download=true\">guia de utiliza\u00e7\u00e3o de produ\u00e7\u00e3o do QAD<\/a> define as regras:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>O CRP programa para tr\u00e1s a partir da data de conclus\u00e3o.<\/strong> Segundo o guia, &#8220;takes the due date of an order or repetitive schedule and schedules each of its operations from the last operation in the order routing or process backward to the first one.&#8221; (parte da data de conclus\u00e3o de uma ordem ou de um programa de produ\u00e7\u00e3o repetitiva e programa as opera\u00e7\u00f5es da \u00faltima para a primeira, seguindo a gama operat\u00f3ria ou o processo).<\/li>\n\n\n<li><strong>As sobrecargas ficam a cargo do respons\u00e1vel pelo planeamento.<\/strong> &#8220;If a work center or machine is over- or under-loaded, you can modify either its capacity or the timing or amount of the load.&#8221; (Se um centro de trabalho ou uma m\u00e1quina tiver carga a mais ou a menos, pode alterar a capacidade, o momento ou a quantidade da carga.)<\/li>\n\n\n<li><strong>A carga fica toda num s\u00f3 dia.<\/strong> &#8220;The system assigns the entire load for an operation to its scheduled start date.&#8221; (O sistema atribui toda a carga de uma opera\u00e7\u00e3o \u00e0 respetiva data de in\u00edcio programada.)<\/li>\n\n\n<li><strong>Cada nova execu\u00e7\u00e3o do CRP altera as datas.<\/strong> &#8220;When you run CRP, all open operations for selected work orders are rescheduled.&#8221; (Ao executar o CRP, todas as opera\u00e7\u00f5es em aberto das ordens de fabrico selecionadas s\u00e3o reprogramadas.)<\/li>\n\n<\/ul>\n\n\n<p>Nas funcionalidades de base do QAD, a atribui\u00e7\u00e3o de carga que respeita a capacidade dispon\u00edvel est\u00e1 no Advanced Repetitive, onde o Line Schedule Workbench programa as linhas de produ\u00e7\u00e3o. Os Master and Production Scheduling Workbenches s\u00e3o &#8220;.NET UI-only scheduling tools&#8221; (ferramentas de programa\u00e7\u00e3o dispon\u00edveis apenas na interface .NET) e exigem uma licen\u00e7a Maintenance ativa (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/209256556\/PlanningSchedWorkbench_AG_v2021EE.pdf\/7adcba49-8b72-8124-9855-08b01a009d86?t=1632916378957&amp;download=true\">guia QAD<\/a>). A solu\u00e7\u00e3o de programa\u00e7\u00e3o sequenciada da QAD \u00e9 um produto separado, o QAD Advanced Scheduling, lan\u00e7ado em 2024 (<a href=\"https:\/\/www.qad.com\/solutions\/supply-chain-planning\/advanced-scheduling\">QAD<\/a>).<\/p>\n\n\n<p>Cada etapa e cada limita\u00e7\u00e3o s\u00e3o explicadas em <a href=\"\/pt-pt\/integracoes\/erp\/qad-adaptive-erp\/programacao-producao\/\">O QAD Adaptive ERP permite programar a produ\u00e7\u00e3o respeitando a capacidade real?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"qad-adaptive-erp-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O QAD Adaptive ERP hoje e com o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>CRP e ordens de fabrico do QAD<\/th><th>QAD Adaptive ERP com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Capacidade<\/td><td>O CRP programa para tr\u00e1s e apresenta a carga face \u00e0 capacidade<\/td><td>Respeita a capacidade de cada m\u00e1quina, pessoa e ferramenta, com os turnos reais<\/td><\/tr><tr><td>Sobrecargas<\/td><td>O respons\u00e1vel pelo planeamento altera a capacidade ou o per\u00edodo de execu\u00e7\u00e3o da carga<\/td><td>O motor reorganiza a sequ\u00eancia respeitando as suas prioridades<\/td><\/tr><tr><td>Carga<\/td><td>Toda a carga da opera\u00e7\u00e3o fica na data de in\u00edcio<\/td><td>Cada opera\u00e7\u00e3o tem um hor\u00e1rio definido<\/td><\/tr><tr><td>Altera\u00e7\u00f5es<\/td><td>Cada execu\u00e7\u00e3o do CRP reprograma as opera\u00e7\u00f5es em aberto<\/td><td>O Autopilot volta a planear; o Running Time Lock fixa as tarefas das pr\u00f3ximas horas<\/td><\/tr><tr><td>Mudan\u00e7as de produ\u00e7\u00e3o<\/td><td>Um tempo de prepara\u00e7\u00e3o por opera\u00e7\u00e3o da gama operat\u00f3ria; mudan\u00e7a de produ\u00e7\u00e3o nas linhas repetitivas<\/td><td>Matriz de tempos de prepara\u00e7\u00e3o e transi\u00e7\u00e3o em cada centro de trabalho: menor tempo total de prepara\u00e7\u00e3o<\/td><\/tr><tr><td>Pessoas e ferramentas<\/td><td>Capacidade do centro de trabalho calculada a partir das m\u00e1quinas ou do pessoal<\/td><td>Operadores identificados com os respetivos turnos, tarefas com v\u00e1rios operadores e ferramentas partilhadas com disponibilidade limitada<\/td><\/tr><tr><td>Materiais<\/td><td>Ordens planeadas pelo MRP, separadas do tempo de m\u00e1quina<\/td><td>As tarefas come\u00e7am quando h\u00e1 exist\u00eancias dispon\u00edveis ou chegam as encomendas de compra<\/td><\/tr><tr><td>Vista do respons\u00e1vel pelo planeamento<\/td><td>Input\/Output Inquiry e relat\u00f3rios CRP; ferramentas de programa\u00e7\u00e3o na interface .NET<\/td><td>Gantt interativo no navegador: mova as tarefas e o plano mant\u00e9m-se coerente<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Apontamentos de m\u00e3o de obra introduzidos no QAD<\/td><td>Os operadores veem a sua fila de tarefas e registam o trabalho num telem\u00f3vel ou tablet<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"qad-adaptive-erp-scheduling-software-and-add-ons\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Compara\u00e7\u00e3o de software e complementos de programa\u00e7\u00e3o para o QAD Adaptive ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Op\u00e7\u00e3o<\/th><th>O que \u00e9<\/th><th>Quando se adequa<\/th><\/tr><\/thead><tbody><tr><td>QAD Advanced Scheduling (com QAD DSCP Production Planning e QAD Redzone)<\/td><td>Produtos separados da QAD para planeamento e programa\u00e7\u00e3o no seu ERP<\/td><td>Planeia linha a linha e quer manter-se na gama de produtos QAD<\/td><\/tr><tr><td>APS instalado localmente com liga\u00e7\u00e3o ao QAD (por exemplo, Asprova, PlanetTogether)<\/td><td>Solu\u00e7\u00f5es de programa\u00e7\u00e3o em computador ou servidor que recebem dados do QAD atrav\u00e9s de uma liga\u00e7\u00e3o ou de um projeto de integra\u00e7\u00e3o<\/td><td>Uma equipa de planeamento gere um modelo de programa\u00e7\u00e3o separado<\/td><\/tr><tr><td>Plataformas de planeamento e de agentes (por exemplo, b2wise, Zentio)<\/td><td>Ferramentas de planeamento que incluem o QAD entre os ERP aos quais se ligam<\/td><td>Pretende acrescentar an\u00e1lise de exist\u00eancias ou de planeamento ao QAD<\/td><\/tr><tr><td>APS na nuvem ligado ao QAD (SkyPlanner APS)<\/td><td>Uma solu\u00e7\u00e3o de programa\u00e7\u00e3o no navegador que respeita a capacidade real e sincroniza as ordens de fabrico do QAD nos dois sentidos<\/td><td>Precisa de um programa de produ\u00e7\u00e3o que se mantenha atualizado automaticamente e chegue a todos os operadores<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Escolha o SkyPlanner em vez do QAD Advanced Scheduling e das ferramentas de programa\u00e7\u00e3o quando:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Gere ordens de fabrico de produ\u00e7\u00e3o discreta com m\u00e1quinas e pessoas.<\/strong> A QAD descreve o Advanced Scheduling como &#8220;a minute-by-minute, line-by-line optimized production schedule for each plant&#8221; (um programa de produ\u00e7\u00e3o otimizado para cada f\u00e1brica, minuto a minuto e linha a linha) (<a href=\"https:\/\/www.qad.com\/blog\/2024\/11\/supercharge-qad-redzone-with-production-planning-and-advanced-scheduling\">blogue QAD<\/a>). O SkyPlanner define a sequ\u00eancia de cada opera\u00e7\u00e3o das ordens de fabrico em cada m\u00e1quina, operador e ferramenta.<\/li>\n\n\n<li><strong>Quer um programa de produ\u00e7\u00e3o, n\u00e3o um conjunto de aplica\u00e7\u00f5es de planeamento.<\/strong> A QAD apresenta o Advanced Scheduling em conjunto com o DSCP Production Planning e o Redzone. O SkyPlanner \u00e9 um \u00fanico produto que funciona em paralelo com o QAD. Pode test\u00e1-lo com as suas pr\u00f3prias ordens de fabrico durante o per\u00edodo de avalia\u00e7\u00e3o de 30 dias e t\u00ea-lo em funcionamento em poucas semanas ap\u00f3s o in\u00edcio da configura\u00e7\u00e3o inicial.<\/li>\n\n\n<li><strong>As datas n\u00e3o podem continuar a mudar a cada execu\u00e7\u00e3o do CRP.<\/strong> A QAD avisa que as datas das opera\u00e7\u00f5es ajustadas manualmente &#8220;will probably be changed&#8221; (provavelmente ser\u00e3o alteradas) quando o CRP for executado. O SkyPlanner grava as datas de lan\u00e7amento e de conclus\u00e3o das ordens de fabrico de acordo com o seu programa de produ\u00e7\u00e3o, para que o CRP e o plano estejam alinhados.<\/li>\n\n\n<li><strong>As mudan\u00e7as de produ\u00e7\u00e3o determinam quanto produz.<\/strong> A matriz de tempos de prepara\u00e7\u00e3o guarda os tempos de mudan\u00e7a de produ\u00e7\u00e3o em cada centro de trabalho, tendo em conta o sentido da mudan\u00e7a. Assim, organiza as sequ\u00eancias de cores, sabores ou materiais para minimizar o tempo total de prepara\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Os planeadores e os operadores trabalham no navegador.<\/strong> As ferramentas de trabalho do QAD s\u00f3 funcionam na interface .NET. O SkyPlanner funciona no navegador, sem limite de utilizadores, e o Mobile Confirmations permite consultar a fila de tarefas em tempo real num telem\u00f3vel ou tablet.<\/li>\n\n\n<li><strong>Quer um pre\u00e7o mensal \u00fanico.<\/strong> A partir de 199 \u20ac por m\u00eas, com or\u00e7amento pr\u00e9vio para a integra\u00e7\u00e3o bidirecional e suporte da equipa SkyPlanner.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie o per\u00edodo experimental gratuito.<\/strong> 30 dias, at\u00e9 20 centros de trabalho, todas as funcionalidades do Basic, sem cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Configure o modelo da sua produ\u00e7\u00e3o.<\/strong> Crie m\u00e1quinas, pessoas e turnos no SkyPlanner ou importe os seus centros de trabalho do QAD. Est\u00e1 dispon\u00edvel apoio \u00e0 configura\u00e7\u00e3o inicial.<\/li>\n\n\n<li><strong>Carregue as suas ordens de fabrico.<\/strong> Exporte do QAD para Excel as ordens de fabrico em aberto e as respetivas gamas operat\u00f3rias, importe-as e compare o programa de produ\u00e7\u00e3o do SkyPlanner com o seu plano atual.<\/li>\n\n\n<li><strong>Ligue o QAD Adaptive ERP.<\/strong> A equipa SkyPlanner configura a integra\u00e7\u00e3o bidirecional atrav\u00e9s do QXtend e assegura o suporte ap\u00f3s a entrada em produ\u00e7\u00e3o.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> Os planos s\u00e3o faturados mensalmente por centro de trabalho. Pode adicionar ou remover centros de trabalho ou cancelar a qualquer momento. Consulte os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a> para saber mais, leia o <a href=\"\/pt-pt\/recursos-pt-pt\/planeamento-e-escalonamento-avancado-aps\/\">guia de APS<\/a> ou explore <a href=\"\/pt-pt\/integracoes\/erp\/\">todas as integra\u00e7\u00f5es com ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar per\u00edodo experimental gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Falar com a equipa comercial<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 o melhor complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o QAD Adaptive ERP?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e das pessoas e se integra com o QAD Adaptive ERP nos dois sentidos. Recebe ordens de fabrico, artigos, estruturas de produto, gamas operat\u00f3rias, centros de trabalho, exist\u00eancias e encomendas de compra, e devolve as datas programadas das ordens de fabrico e os registos de m\u00e3o de obra. A programa\u00e7\u00e3o respeita os limites de cada m\u00e1quina, operador, ferramenta e material. Uma matriz de tempos de prepara\u00e7\u00e3o que considera o sentido de cada mudan\u00e7a sequencia as tarefas para minimizar a prepara\u00e7\u00e3o. O Autopilot reprograma automaticamente quando h\u00e1 altera\u00e7\u00f5es na produ\u00e7\u00e3o. O pre\u00e7o come\u00e7a nos 199 \u20ac por m\u00eas e o per\u00edodo de avalia\u00e7\u00e3o gratuita dura 30 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O QAD Adaptive ERP permite programar a produ\u00e7\u00e3o respeitando a capacidade dispon\u00edvel?<\/summary>\n<p class=\"sp-faq__a\">Para linhas de produ\u00e7\u00e3o repetitiva, sim: o Line Schedule Workbench do Advanced Repetitive atribui carga \u00e0s linhas respeitando a sua capacidade. Para ordens de fabrico de produ\u00e7\u00e3o discreta, o CRP programa para tr\u00e1s a partir das datas de conclus\u00e3o e deixa a resolu\u00e7\u00e3o das sobrecargas ao planeador. A ferramenta de sequencia\u00e7\u00e3o da QAD \u00e9 um produto separado, o QAD Advanced Scheduling. O SkyPlanner APS funciona em paralelo com o QAD e programa a produ\u00e7\u00e3o respeitando os limites de cada m\u00e1quina, pessoa, ferramenta e material.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Que software de programa\u00e7\u00e3o da produ\u00e7\u00e3o se integra com o QAD Adaptive ERP?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS integra-se com o QAD Adaptive ERP nos dois sentidos. L\u00ea artigos, estruturas de produto, gamas operat\u00f3rias, centros de trabalho, ordens de fabrico e exist\u00eancias atrav\u00e9s do QXtend Outbound e das API REST de documentos de neg\u00f3cio do QAD. As datas programadas de lan\u00e7amento e de conclus\u00e3o s\u00e3o enviadas para o Work Order Maintenance atrav\u00e9s de um QXtend Inbound QDoc, e as confirma\u00e7\u00f5es s\u00e3o registadas como Labor Feedback by Work Order e Work Order Receipt.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devemos usar o QAD Advanced Scheduling ou o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner, se pretende ter em funcionamento, em poucas semanas, um programa de produ\u00e7\u00e3o que respeite a capacidade de cada m\u00e1quina e pessoa. A QAD descreve o Advanced Scheduling como um programa de produ\u00e7\u00e3o por linha para cada f\u00e1brica e apresenta-o em conjunto com o DSCP Production Planning e o Redzone. O SkyPlanner sequencia ordens de fabrico de produ\u00e7\u00e3o discreta, planeia mudan\u00e7as de produ\u00e7\u00e3o, ferramentas, equipas e materiais e replaneia automaticamente. Cada operador pode consultar a sua fila de tarefas num telem\u00f3vel, sem limite de utilizadores.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner funciona com o MFG\/PRO e o QAD Enterprise Edition?<\/summary>\n<p class=\"sp-faq__a\">Sim. QAD Adaptive ERP \u00e9 o nome atual do ERP da QAD, que inclui os anteriores QAD Enterprise Applications Enterprise Edition e QAD Cloud ERP. A integra\u00e7\u00e3o utiliza os mesmos programas de ordens de fabrico, gamas operat\u00f3rias e centros de trabalho, bem como a interface QXtend.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa o SkyPlanner para uma f\u00e1brica que utiliza QAD?<\/summary>\n<p class=\"sp-faq__a\">A partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas por cada centro de trabalho adicional. Um centro de trabalho \u00e9 um recurso de produ\u00e7\u00e3o com a sua pr\u00f3pria fila de tarefas programadas. Recebe antecipadamente um or\u00e7amento para a integra\u00e7\u00e3o, adaptado aos seus processos e necessidades, juntamente com o seu plano. Assim, conhece o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo demora a implementa\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio da configura\u00e7\u00e3o inicial. A equipa mapeia os seus centros de trabalho, gamas operat\u00f3rias e artigos, liga as ordens de fabrico e as encomendas de compra e devolve as datas programadas ao QAD. Antes da entrada em produ\u00e7\u00e3o, tudo \u00e9 testado por compara\u00e7\u00e3o com o seu plano atual.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de o integrar com o QAD?<\/summary>\n<p class=\"sp-faq__a\">Sim. O per\u00edodo de avalia\u00e7\u00e3o de 30 dias utiliza uma exporta\u00e7\u00e3o para Excel das suas ordens de fabrico em aberto no QAD. Antes de iniciar qualquer trabalho de integra\u00e7\u00e3o, pode ver a <a href=\"\/pt-pt\/recursos-pt-pt\/capacidade-finita\/\">programa\u00e7\u00e3o da sua produ\u00e7\u00e3o<\/a> com base na capacidade real das m\u00e1quinas e das pessoas.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ QAD Adaptive ERP SkyPlanner APS para QAD Adaptive ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o QAD Adaptive ERP (anteriormente QAD Enterprise Applications e MFG\/PRO). Programa cada m\u00e1quina, operador, ferramenta e material, respeitando a capacidade real das m\u00e1quinas e das &#8230; <a title=\"SkyPlanner APS para QAD Adaptive ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/qad-adaptive-erp\/\" aria-label=\"Leia mais sobre SkyPlanner APS para QAD Adaptive ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100684,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106185","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>QAD Adaptive ERP: integra\u00e7\u00e3o APS com capacidade real<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS para QAD Adaptive ERP: programa\u00e7\u00e3o com capacidade real; m\u00e1quinas, pessoas, ferramentas e materiais. Integra\u00e7\u00e3o bidirecional. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/qad-adaptive-erp\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para QAD Adaptive ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS para QAD Adaptive ERP: programa\u00e7\u00e3o com capacidade real; m\u00e1quinas, pessoas, ferramentas e materiais. Integra\u00e7\u00e3o bidirecional. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/qad-adaptive-erp\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/qad-adaptive-erp\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/qad-adaptive-erp\\\/\",\"name\":\"QAD Adaptive ERP: integra\u00e7\u00e3o APS com capacidade real\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS para QAD Adaptive ERP: programa\u00e7\u00e3o com capacidade real; m\u00e1quinas, pessoas, ferramentas e materiais. Integra\u00e7\u00e3o bidirecional. Desde 199 \u20ac\\\/m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/qad-adaptive-erp\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/qad-adaptive-erp\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/qad-adaptive-erp\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para QAD Adaptive ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"QAD Adaptive ERP: integra\u00e7\u00e3o APS com capacidade real","description":"SkyPlanner APS para QAD Adaptive ERP: programa\u00e7\u00e3o com capacidade real; m\u00e1quinas, pessoas, ferramentas e materiais. Integra\u00e7\u00e3o bidirecional. Desde 199 \u20ac\/m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/qad-adaptive-erp\/","og_locale":"pt_PT","og_type":"article","og_title":"SkyPlanner APS para QAD Adaptive ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real","og_description":"SkyPlanner APS para QAD Adaptive ERP: programa\u00e7\u00e3o com capacidade real; m\u00e1quinas, pessoas, ferramentas e materiais. Integra\u00e7\u00e3o bidirecional. Desde 199 \u20ac\/m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/qad-adaptive-erp\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"17 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/qad-adaptive-erp\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/qad-adaptive-erp\/","name":"QAD Adaptive ERP: integra\u00e7\u00e3o APS com capacidade real","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS para QAD Adaptive ERP: programa\u00e7\u00e3o com capacidade real; m\u00e1quinas, pessoas, ferramentas e materiais. Integra\u00e7\u00e3o bidirecional. Desde 199 \u20ac\/m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/qad-adaptive-erp\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/qad-adaptive-erp\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/qad-adaptive-erp\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para QAD Adaptive ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ QAD Adaptive ERP SkyPlanner APS para QAD Adaptive ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o QAD Adaptive ERP (anteriormente QAD Enterprise Applications e MFG\/PRO). Programa cada m\u00e1quina, operador, ferramenta e material, respeitando a capacidade real das m\u00e1quinas e das&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106185","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=106185"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106185\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/100684"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=106185"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}