{"id":106156,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/oracle-fusion-cloud\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"oracle-fusion-cloud","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/oracle-fusion-cloud\/","title":{"rendered":"SkyPlanner APS para Oracle Fusion Cloud: programa\u00e7\u00e3o da produ\u00e7\u00e3o com a capacidade real de m\u00e1quinas e pessoas"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ Oracle Fusion Cloud<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para Oracle Fusion Cloud: <span class=\"hl\">programa\u00e7\u00e3o da produ\u00e7\u00e3o com a capacidade real de m\u00e1quinas e pessoas<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O SkyPlanner APS complementa o Oracle Fusion Cloud com programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real de m\u00e1quinas e pessoas. Programa cada m\u00e1quina, operador, ferramenta e material em todas as suas f\u00e1bricas. Pode ver em que recurso e a que horas \u00e9 executada cada opera\u00e7\u00e3o de uma ordem de fabrico. Quando a produ\u00e7\u00e3o muda, o Autopilot reprograma automaticamente.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Marcar uma demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner integra-se com o Oracle Fusion Cloud nos dois sentidos. Recebe ordens de fabrico com as respetivas opera\u00e7\u00f5es, defini\u00e7\u00f5es de fabrico, centros de trabalho, recursos de produ\u00e7\u00e3o, artigos, estruturas de artigos, saldos de exist\u00eancias e encomendas de compra. As datas previstas de in\u00edcio e conclus\u00e3o das opera\u00e7\u00f5es s\u00e3o enviadas de volta para as ordens de fabrico, e o trabalho registado \u00e9 lan\u00e7ado como transa\u00e7\u00f5es de opera\u00e7\u00f5es e de recursos. Durante a implementa\u00e7\u00e3o, a equipa SkyPlanner adapta a integra\u00e7\u00e3o \u00e0 sua configura\u00e7\u00e3o do Oracle Fusion Cloud.<\/p>\n\n\n<p>Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O teste gratuito dura 30 dias e permite utilizar at\u00e9 20 centros de trabalho, sem cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Uma sequ\u00eancia ajustada \u00e0 capacidade de cada recurso.<\/p>\n\n\n<p class=\"fx-pain__b\">O Oracle Fusion Cloud Manufacturing atribui datas a cada ordem de fabrico de forma isolada. O SkyPlanner atribui cada opera\u00e7\u00e3o a uma m\u00e1quina ou pessoa espec\u00edfica, numa hora concreta, tendo em conta os turnos reais, as aus\u00eancias e a carga de todas as outras ordens de fabrico.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">V\u00e1rias f\u00e1bricas num \u00fanico plano.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada f\u00e1brica corresponde a um grupo de centros de trabalho, e os tempos de transfer\u00eancia entre f\u00e1bricas fazem parte da programa\u00e7\u00e3o. O SkyPlanner mostra em que f\u00e1brica e em que centros de trabalho deve ser executado o trabalho. Assim, os planeadores t\u00eam uma vis\u00e3o de toda a rede, em vez de analisarem uma organiza\u00e7\u00e3o de cada vez.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Menos custos nas mudan\u00e7as de produ\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner guarda o tempo de mudan\u00e7a de produ\u00e7\u00e3o entre cada par de produtos, nos dois sentidos. Passar de azul para vermelho pode demorar 30 minutos, enquanto passar de vermelho para azul demora 60. O motor ordena as tarefas de forma a perder o m\u00ednimo de tempo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Pessoas e ferramentas tamb\u00e9m t\u00eam limites.<\/p>\n\n\n<p class=\"fx-pain__b\">Uma tarefa que precisa de tr\u00eas operadores recebe tr\u00eas pessoas com disponibilidade nos respetivos turnos. Uma matriz ou um molde em utiliza\u00e7\u00e3o numa m\u00e1quina nunca \u00e9 reservado para outra ao mesmo tempo. Quando um recurso est\u00e1 ocupado, o trabalho passa para uma m\u00e1quina ou pessoa alternativa.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">O material determina o in\u00edcio.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner verifica as exist\u00eancias dispon\u00edveis e as encomendas de compra por receber de cada artigo. Uma ordem de fabrico que aguarda uma entrega do fornecedor \u00e9 programada para depois dessa data, em vez de arrancar e depois ficar parada no ch\u00e3o de f\u00e1brica.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cada operador v\u00ea a sua fila de tarefas.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada operador consulta as pr\u00f3ximas tarefas num telem\u00f3vel ou tablet e regista o trabalho \u00e0 medida que o executa. No escrit\u00f3rio, o progresso \u00e9 vis\u00edvel em tempo real, e os registos de conclus\u00e3o do trabalho s\u00e3o enviados de volta para o Oracle Fusion Cloud.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Opini\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento na UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, o nosso planeamento da produ\u00e7\u00e3o passou das folhas de c\u00e1lculo Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o permite poupar 2 horas de trabalho por semana, e uma nova lista de tarefas chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Leia o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestu\u00e1rio de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Produ\u00e7\u00e3o farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e criar um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Leia o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, diretor executivo da Mamec, na nave de produ\u00e7\u00e3o da empresa em Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Mais de 1.000<\/b><span>ordens de fabrico programadas automaticamente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cControlamos a produ\u00e7\u00e3o de outra forma e o nosso conhecimento da capacidade est\u00e1 num patamar completamente diferente.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, diretor executivo<\/b><br>Mamec \u00b7 Misturadores industriais, bombas e fabrico por contrato de alta tecnologia<\/p>\n\n\n<p class=\"ind-cust__result\">Milhares de ordens de fabrico s\u00e3o programadas automaticamente, e toda a organiza\u00e7\u00e3o tem uma vis\u00e3o da produ\u00e7\u00e3o em tempo real.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/mamec\/\">Ler o testemunho da Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, Diretora de Produ\u00e7\u00e3o da Fredman Operations, junto a uma c\u00e9lula robotizada de paletiza\u00e7\u00e3o em Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 meses<\/b><span>de anteced\u00eancia para a equipa comercial consultar a capacidade dispon\u00edvel<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner d\u00e1 a base e a fiabilidade necess\u00e1rias a todo o planeamento da produ\u00e7\u00e3o.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, Diretora de Produ\u00e7\u00e3o<\/b><br>Fredman Operations \u00b7 Pap\u00e9is de embalagem pr\u00f3prios para contacto alimentar<\/p>\n\n\n<p class=\"ind-cust__result\">A equipa comercial v\u00ea a capacidade dispon\u00edvel com seis meses de anteced\u00eancia. Os pedidos de altera\u00e7\u00e3o \u00e0 programa\u00e7\u00e3o, que demoravam uma hora ou mais, recebem agora resposta em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/fredman-operations\/\">Ler o testemunho da Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-oracle-fusion-cloud-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona a integra\u00e7\u00e3o com o Oracle Fusion Cloud<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>O Oracle Fusion Cloud envia o trabalho.<\/strong> O SkyPlanner recebe as ordens de fabrico e as respetivas opera\u00e7\u00f5es, defini\u00e7\u00f5es de fabrico, centros de trabalho, recursos de produ\u00e7\u00e3o, calend\u00e1rios e turnos, artigos, estruturas de artigos, saldos de exist\u00eancias e encomendas de compra.<\/li>\n\n\n<li><strong>O SkyPlanner cria a programa\u00e7\u00e3o e mant\u00e9m-na atualizada.<\/strong> O motor Arcturus otimiza todo o plano em segundos e volta a planear \u00e0 medida que a produ\u00e7\u00e3o muda.<\/li>\n\n\n<li><strong>As datas e o trabalho registado s\u00e3o enviados de volta.<\/strong> As datas previstas de in\u00edcio e conclus\u00e3o s\u00e3o devolvidas a cada opera\u00e7\u00e3o da ordem de fabrico atrav\u00e9s do recurso <code>workOrders<\/code>. As confirma\u00e7\u00f5es dos operadores s\u00e3o lan\u00e7adas como transa\u00e7\u00f5es de opera\u00e7\u00f5es e de recursos.<\/li>\n\n<\/ol>\n\n\n<p>O Oracle Fusion Cloud continua a ser o seu sistema de refer\u00eancia. Os artigos, as defini\u00e7\u00f5es de fabrico, o Supply Planning, o c\u00e1lculo de custos, as exist\u00eancias e a gest\u00e3o financeira mant\u00eam-se onde est\u00e3o. O SkyPlanner fica respons\u00e1vel por uma \u00fanica coisa: a sequ\u00eancia e os hor\u00e1rios de cada opera\u00e7\u00e3o em cada recurso.<\/p>\n\n\n<p>O SkyPlanner l\u00ea os dados do Oracle Fusion Cloud atrav\u00e9s da REST API do Oracle Fusion Cloud SCM: <code>workOrders<\/code>, <code>workDefinitions<\/code>, <code>workCenters<\/code>, <code>productionResources<\/code>, <code>itemsV2<\/code>, <code>itemStructures<\/code> e <code>inventoryOnhandBalances<\/code>. Para devolver os dados, efetua um PATCH na ordem de fabrico e no respetivo elemento subordinado <code>WorkOrderOperation<\/code>, que cont\u00e9m <code>PlannedStartDate<\/code> e <code>PlannedCompletionDate<\/code>, e envia o progresso para <code>operationTransactions<\/code> e <code>resourceTransactions<\/code>. Os webhooks do SkyPlanner enviam cada altera\u00e7\u00e3o \u00e0 programa\u00e7\u00e3o assim que ocorre.<\/p>\n\n\n<p>Cada f\u00e1brica utiliza o Oracle Fusion Cloud de forma diferente. Por isso, a equipa SkyPlanner adapta a integra\u00e7\u00e3o \u00e0 sua configura\u00e7\u00e3o durante a implementa\u00e7\u00e3o e presta apoio ap\u00f3s a entrada em produ\u00e7\u00e3o. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, de acordo com o seu processo e as suas necessidades. O seu parceiro Oracle ou os seus pr\u00f3prios programadores tamb\u00e9m podem desenvolver a integra\u00e7\u00e3o com base na API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>).<\/p>\n\n\n<p>Os recursos, o mapeamento de dados e as regras de escrita no Oracle est\u00e3o descritos no <a href=\"\/pt-pt\/integracoes\/erp\/oracle-fusion-cloud\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o com o Oracle Fusion Cloud para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-oracle-fusion-cloud-schedules-and-what-skyp\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que o Oracle Fusion Cloud programa e o que o SkyPlanner acrescenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O Oracle Fusion Cloud Manufacturing atribui datas a cada ordem de fabrico. A Oracle disponibiliza tamb\u00e9m programa\u00e7\u00e3o que respeita a capacidade dos recursos, numa \u00e1rea de trabalho separada. A <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/faumf\/how-work-orders-are-scheduled.html\">documenta\u00e7\u00e3o da pr\u00f3pria Oracle<\/a> descreve estes n\u00edveis:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>A programa\u00e7\u00e3o das ordens de fabrico n\u00e3o considera restri\u00e7\u00f5es.<\/strong> &#8220;Oracle Manufacturing uses unconstrained scheduling engine in the background to schedule work orders during create and certain update actions.&#8221; (O Oracle Manufacturing utiliza, em segundo plano, um motor sem restri\u00e7\u00f5es para programar ordens de fabrico durante a cria\u00e7\u00e3o e determinadas atualiza\u00e7\u00f5es.)<\/li>\n\n\n<li><strong>As outras ordens de fabrico s\u00e3o ignoradas.<\/strong> Ao programar uma ordem de fabrico, &#8220;resources are assumed to have infinite capacity and the scheduling engine disregards loads on the resources from other work orders.&#8221; (Pressup\u00f5e-se que os recursos t\u00eam capacidade infinita, e o motor de programa\u00e7\u00e3o ignora a carga que outras ordens de fabrico colocam nesses recursos.)<\/li>\n\n\n<li><strong>As ordens de fabrico podem sobrepor-se no mesmo recurso.<\/strong> A aplica\u00e7\u00e3o de fabrico &#8220;assumes that your resources have unlimited capacity; it then potentially plans to execute production for multiple work orders simultaneously.&#8221; (Pressup\u00f5e que os recursos t\u00eam capacidade ilimitada e pode, por isso, planear a execu\u00e7\u00e3o simult\u00e2nea de v\u00e1rias ordens de fabrico.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/why-you-use-production-scheduling.html\">fonte<\/a>)<\/li>\n\n\n<li><strong>O Supply Planning trabalha por per\u00edodos de tempo.<\/strong> Um plano de abastecimento com restri\u00e7\u00f5es desloca as ordens &#8220;to earlier time buckets,&#8221; (para per\u00edodos de tempo anteriores) e &#8220;as a last resort, overloads resource and supplier capacity to meet demands on time.&#8221; (em \u00faltimo recurso, excede a capacidade dos recursos e dos fornecedores para satisfazer a procura dentro do prazo.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fausp\/overview-of-constraint-based-supply-planning.html\">fonte<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>A sequencia\u00e7\u00e3o que respeita a capacidade dos recursos \u00e9 feita no Oracle Production Scheduling, uma \u00e1rea de trabalho ativada na oferta Supply Chain Planning, e n\u00e3o no Fusion Manufacturing (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/how-to-enable-the-production-scheduling-work-area.html\">configura\u00e7\u00e3o Oracle<\/a>). O planeador cria uma programa\u00e7\u00e3o por organiza\u00e7\u00e3o de programa\u00e7\u00e3o e executa as etapas Refresh, Solve, Repair e Release.<\/p>\n\n\n<p>Todas as etapas e limita\u00e7\u00f5es s\u00e3o explicadas em <a href=\"\/pt-pt\/integracoes\/erp\/oracle-fusion-cloud\/programacao-producao\/\">O Oracle Fusion Cloud permite programar a produ\u00e7\u00e3o respeitando a capacidade real dos recursos?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"oracle-fusion-cloud-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Oracle Fusion Cloud: como funciona hoje e com o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Programa\u00e7\u00e3o no Oracle Fusion Cloud Manufacturing<\/th><th>Oracle Fusion Cloud com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Capacidade<\/td><td>Infinita: cada ordem de fabrico recebe datas sem considerar a carga das restantes<\/td><td>Capacidade limitada para cada m\u00e1quina, pessoa e ferramenta, com os turnos reais<\/td><\/tr><tr><td>Sequ\u00eancia<\/td><td>Datas por ordem de fabrico, com base na utiliza\u00e7\u00e3o dos recursos e nos calend\u00e1rios<\/td><td>Sequ\u00eancia de opera\u00e7\u00f5es em cada recurso calculada em segundos<\/td><\/tr><tr><td>F\u00e1bricas<\/td><td>O Production Scheduling calcula a programa\u00e7\u00e3o de uma organiza\u00e7\u00e3o de cada vez<\/td><td>V\u00e1rias f\u00e1bricas num \u00fanico plano, com os tempos de transfer\u00eancia entre elas<\/td><\/tr><tr><td>Mudan\u00e7as de produ\u00e7\u00e3o<\/td><td>Regras de mudan\u00e7a de produ\u00e7\u00e3o no Production Scheduling apenas para equipamentos com capacidade para uma unidade de cada vez<\/td><td>Matriz de tempos de prepara\u00e7\u00e3o em cada centro de trabalho, para minimizar o tempo total de prepara\u00e7\u00e3o<\/td><\/tr><tr><td>Pessoas e ferramentas<\/td><td>M\u00e3o de obra e equipamentos como recursos da opera\u00e7\u00e3o<\/td><td>Operadores identificados com os respetivos turnos, tarefas com v\u00e1rios operadores e ferramentas partilhadas com disponibilidade limitada<\/td><\/tr><tr><td>Materiais<\/td><td>Supply Planning por per\u00edodos de tempo<\/td><td>As tarefas come\u00e7am quando h\u00e1 exist\u00eancias dispon\u00edveis ou chegam as encomendas de compra<\/td><\/tr><tr><td>Altera\u00e7\u00f5es<\/td><td>O planeador executa Refresh, Solve, Repair e Release<\/td><td>O Autopilot volta a planear de acordo com as suas prioridades; o Running Time Lock fixa a programa\u00e7\u00e3o das pr\u00f3ximas horas<\/td><\/tr><tr><td>Escrita de dados no Oracle<\/td><td>A a\u00e7\u00e3o Release atualiza as ordens de fabrico dentro do horizonte de liberta\u00e7\u00e3o<\/td><td>Datas previstas das opera\u00e7\u00f5es gravadas em cada ordem de fabrico programada<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Lista de trabalho no Oracle<\/td><td>Os operadores consultam a sua fila de tarefas e registam o trabalho num telem\u00f3vel ou tablet<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"oracle-fusion-cloud-scheduling-software-and-add\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Compara\u00e7\u00e3o de software e complementos de programa\u00e7\u00e3o para Oracle Fusion Cloud<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Op\u00e7\u00e3o<\/th><th>O que \u00e9<\/th><th>Quando se adequa<\/th><\/tr><\/thead><tbody><tr><td>Oracle Production Scheduling e Supply Planning<\/td><td>\u00c1reas de trabalho de planeamento da Oracle inclu\u00eddas na oferta Supply Chain Planning<\/td><td>J\u00e1 utiliza o Supply Chain Planning e uma equipa central de planeamento \u00e9 respons\u00e1vel por cada organiza\u00e7\u00e3o de programa\u00e7\u00e3o<\/td><\/tr><tr><td>MES e aplica\u00e7\u00f5es para operadores ligadas ao Fusion (por exemplo, Accevo, Tulip)<\/td><td>Aplica\u00e7\u00f5es de execu\u00e7\u00e3o e recolha de dados no ch\u00e3o de f\u00e1brica que leem e enviam dados das ordens de fabrico do Fusion<\/td><td>O projeto centra-se na execu\u00e7\u00e3o e na recolha de dados no ch\u00e3o de f\u00e1brica<\/td><\/tr><tr><td>APS e ferramentas de planeamento independentes (por exemplo, PlanetTogether, b2wise)<\/td><td>Software de planeamento ligado ao Oracle atrav\u00e9s de um projeto de integra\u00e7\u00e3o<\/td><td>Uma equipa de planeamento vai gerir um modelo de otimiza\u00e7\u00e3o separado<\/td><\/tr><tr><td>APS na nuvem ligado por REST (SkyPlanner APS)<\/td><td>Uma ferramenta de programa\u00e7\u00e3o no navegador que respeita a capacidade real dos recursos e sincroniza as ordens de fabrico do Fusion nos dois sentidos<\/td><td>A programa\u00e7\u00e3o deve manter-se atualizada automaticamente, abranger todas as f\u00e1bricas e chegar a todos os operadores<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Escolha o SkyPlanner em vez do Oracle Production Scheduling quando:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Utiliza o Fusion Manufacturing sem Supply Chain Planning.<\/strong> A Oracle disponibiliza o Production Scheduling em &#8220;Offering: Supply Chain Planning&#8221; (oferta: Supply Chain Planning). O SkyPlanner programa as suas ordens de fabrico do Fusion respeitando a capacidade real das m\u00e1quinas e das equipas, em complemento ao Manufacturing que j\u00e1 utiliza.<\/li>\n\n\n<li><strong>O trabalho \u00e9 repartido por v\u00e1rias f\u00e1bricas.<\/strong> O Production Scheduling cria um programa por organiza\u00e7\u00e3o de programa\u00e7\u00e3o. O SkyPlanner re\u00fane todas as f\u00e1bricas num \u00fanico programa e indica em que f\u00e1brica deve ser executado o trabalho.<\/li>\n\n\n<li><strong>As mudan\u00e7as de produ\u00e7\u00e3o n\u00e3o se limitam a m\u00e1quinas individuais.<\/strong> A Oracle aplica regras de mudan\u00e7a de produ\u00e7\u00e3o &#8220;only on resources that have resource type set to equipment and default units available set to 1&#8221; (apenas em recursos do tipo equipamento com disponibilidade predefinida de uma \u00fanica unidade) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/changeover-rules.html\">fonte<\/a>). A matriz de tempos de prepara\u00e7\u00e3o do SkyPlanner guarda, para cada centro de trabalho, os tempos de mudan\u00e7a de produ\u00e7\u00e3o em fun\u00e7\u00e3o do sentido da transi\u00e7\u00e3o.<\/li>\n\n\n<li><strong>O plano tem de se manter atualizado por si s\u00f3.<\/strong> A Oracle avisa que &#8220;if the schedule isn&#8217;t refreshed after the previous release, changes to the schedule for some work orders might not be released&#8221; (se o programa n\u00e3o for atualizado ap\u00f3s a publica\u00e7\u00e3o anterior, as altera\u00e7\u00f5es ao programa de algumas ordens de fabrico poder\u00e3o n\u00e3o ser publicadas) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/release-analysis-and-actions.html\">fonte<\/a>). O Autopilot reprograma a produ\u00e7\u00e3o sempre que ocorre uma altera\u00e7\u00e3o relevante, e as novas datas s\u00e3o enviadas de volta para as ordens de fabrico.<\/li>\n\n\n<li><strong>Todos os operadores devem trabalhar com base no plano.<\/strong> O Mobile Confirmations disponibiliza a fila de tarefas atualizada num telem\u00f3vel ou tablet, sem limite de utilizadores: o pre\u00e7o depende dos centros de trabalho, n\u00e3o do n\u00famero de utilizadores.<\/li>\n\n\n<li><strong>Quer ter um programa de produ\u00e7\u00e3o em funcionamento em poucas semanas.<\/strong> Durante o per\u00edodo experimental de 30 dias, testa o SkyPlanner com as suas pr\u00f3prias ordens de fabrico do Fusion. A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio do acompanhamento inicial.<\/li>\n\n<\/ul>\n\n\n<p><strong>Utiliza antes o Oracle NetSuite?<\/strong> O NetSuite \u00e9 o ERP da Oracle para empresas em crescimento, enquanto o Oracle Fusion Cloud se destina a grandes fabricantes com v\u00e1rias f\u00e1bricas. Conhe\u00e7a o <a href=\"\/pt-pt\/integracoes\/erp\/netsuite\/\">SkyPlanner para NetSuite<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie o per\u00edodo experimental gratuito.<\/strong> 30 dias, at\u00e9 20 centros de trabalho, todas as funcionalidades Basic, sem cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Modele a sua produ\u00e7\u00e3o.<\/strong> Crie m\u00e1quinas, pessoas e turnos no SkyPlanner ou importe os seus centros de trabalho e recursos de produ\u00e7\u00e3o do Oracle. Pode contar com apoio na configura\u00e7\u00e3o inicial.<\/li>\n\n\n<li><strong>Carregue as suas ordens de fabrico.<\/strong> Exporte as ordens de fabrico em aberto e as respetivas opera\u00e7\u00f5es do Oracle Fusion Cloud para Excel, importe-as para o SkyPlanner e compare a programa\u00e7\u00e3o obtida com o seu plano atual.<\/li>\n\n\n<li><strong>Ligue o Oracle Fusion Cloud.<\/strong> A equipa do SkyPlanner configura a integra\u00e7\u00e3o bidirecional atrav\u00e9s da SCM REST API e assegura o apoio ap\u00f3s a entrada em funcionamento.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> Os planos s\u00e3o faturados mensalmente por centro de trabalho. Pode adicionar ou remover centros de trabalho ou cancelar a qualquer momento. Consulte os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a> para saber mais, leia o <a href=\"\/pt-pt\/recursos-pt-pt\/planeamento-e-escalonamento-avancado-aps\/\">guia de APS<\/a> ou explore <a href=\"\/pt-pt\/integracoes\/erp\/\">todas as integra\u00e7\u00f5es com ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar per\u00edodo experimental gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Falar com a equipa comercial<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 o melhor complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o Oracle Fusion Cloud?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e das equipas e se integra com o Oracle Fusion Cloud nos dois sentidos. Recebe ordens de fabrico, defini\u00e7\u00f5es de trabalho, centros de trabalho, recursos de produ\u00e7\u00e3o, artigos e encomendas de compra, e devolve as datas planeadas das opera\u00e7\u00f5es e o trabalho registado. Considera os limites de cada m\u00e1quina, operador, ferramenta e material. Uma matriz de tempos de prepara\u00e7\u00e3o que distingue o sentido de cada transi\u00e7\u00e3o sequencia as tarefas para minimizar a prepara\u00e7\u00e3o. O Autopilot reprograma automaticamente quando h\u00e1 altera\u00e7\u00f5es na produ\u00e7\u00e3o. O pre\u00e7o come\u00e7a nos 199 \u20ac por m\u00eas e o per\u00edodo experimental gratuito dura 30 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Oracle Fusion Cloud permite programar a produ\u00e7\u00e3o respeitando a capacidade real dos recursos?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o no pr\u00f3prio Fusion Manufacturing. A Oracle afirma que o seu motor de programa\u00e7\u00e3o de ordens de fabrico n\u00e3o tem restri\u00e7\u00f5es e pressup\u00f5e capacidade infinita. A programa\u00e7\u00e3o com restri\u00e7\u00f5es de capacidade est\u00e1 dispon\u00edvel no Oracle Production Scheduling, uma \u00e1rea de trabalho da oferta Supply Chain Planning. O SkyPlanner APS complementa o Fusion Manufacturing, programando a produ\u00e7\u00e3o de acordo com os limites reais de cada m\u00e1quina, pessoa, ferramenta e material.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Que software de programa\u00e7\u00e3o da produ\u00e7\u00e3o se integra com o Oracle Fusion Cloud?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS integra-se com o Oracle Fusion Cloud nos dois sentidos atrav\u00e9s da REST API do Oracle Fusion Cloud SCM. L\u00ea <code>workOrders<\/code>, <code>workDefinitions<\/code>, <code>workCenters<\/code>, <code>productionResources<\/code>, <code>itemsV2<\/code> e as quantidades em stock, grava <code>PlannedStartDate<\/code> e <code>PlannedCompletionDate<\/code> em cada <code>WorkOrderOperation<\/code> e envia confirma\u00e7\u00f5es para <code>operationTransactions<\/code> e <code>resourceTransactions<\/code>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devemos usar o Oracle Production Scheduling ou o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner, se pretende um \u00fanico programa para todas as f\u00e1bricas, que respeite a capacidade real dos recursos e se mantenha atualizado por si s\u00f3. O Oracle Production Scheduling faz parte da oferta Supply Chain Planning, calcula o programa de uma organiza\u00e7\u00e3o de programa\u00e7\u00e3o de cada vez, aplica regras de mudan\u00e7a de produ\u00e7\u00e3o apenas a equipamentos com uma \u00fanica unidade e publica datas apenas dentro do horizonte de publica\u00e7\u00e3o. O SkyPlanner reprograma automaticamente e planeia mudan\u00e7as de produ\u00e7\u00e3o, ferramentas, equipas e materiais em cada centro de trabalho. Cada operador tem acesso \u00e0 sua fila de tarefas no telem\u00f3vel, sem limite de utilizadores.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner substitui o Oracle Supply Planning ou o Fusion Manufacturing?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o, complementa-os. O Oracle mant\u00e9m a gest\u00e3o dos artigos, das defini\u00e7\u00f5es de trabalho, do Supply Planning, dos stocks, dos custos e das finan\u00e7as. O SkyPlanner programa as suas ordens de fabrico de acordo com a capacidade real e devolve as datas das opera\u00e7\u00f5es.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa o SkyPlanner para uma f\u00e1brica que utiliza o Oracle Fusion Cloud?<\/summary>\n<p class=\"sp-faq__a\">A partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas por cada centro de trabalho adicional. Um centro de trabalho \u00e9 um recurso de produ\u00e7\u00e3o com a sua pr\u00f3pria fila de tarefas programadas. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, em conjunto com o plano escolhido e de acordo com o seu processo e as suas necessidades, para que conhe\u00e7a o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo demora a implementa\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio do acompanhamento inicial, mesmo em grandes empresas. A equipa estabelece a correspond\u00eancia entre os seus centros de trabalho, recursos de produ\u00e7\u00e3o e defini\u00e7\u00f5es de trabalho, liga as ordens de fabrico e as encomendas de compra e devolve as datas planeadas. Tudo \u00e9 testado por compara\u00e7\u00e3o com o seu plano atual antes da entrada em funcionamento.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de o integrar com o Oracle Fusion Cloud?<\/summary>\n<p class=\"sp-faq__a\">Sim. Durante o per\u00edodo experimental de 30 dias, pode utilizar uma exporta\u00e7\u00e3o para Excel das suas ordens de fabrico em aberto no Oracle. Assim, v\u00ea a <a href=\"\/pt-pt\/recursos-pt-pt\/capacidade-finita\/\">programa\u00e7\u00e3o da sua produ\u00e7\u00e3o<\/a> de acordo com a capacidade real dos recursos antes de come\u00e7ar qualquer trabalho de integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ Oracle Fusion Cloud SkyPlanner APS para Oracle Fusion Cloud: programa\u00e7\u00e3o da produ\u00e7\u00e3o com a capacidade real de m\u00e1quinas e pessoas O SkyPlanner APS complementa o Oracle Fusion Cloud com programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real de m\u00e1quinas e pessoas. Programa cada m\u00e1quina, operador, ferramenta e material em todas as &#8230; <a title=\"SkyPlanner APS para Oracle Fusion Cloud: programa\u00e7\u00e3o da produ\u00e7\u00e3o com a capacidade real de m\u00e1quinas e pessoas\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/oracle-fusion-cloud\/\" aria-label=\"Leia mais sobre SkyPlanner APS para Oracle Fusion Cloud: programa\u00e7\u00e3o da produ\u00e7\u00e3o com a capacidade real de m\u00e1quinas e pessoas\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100684,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106156","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Oracle Fusion: integra\u00e7\u00e3o APS e programa\u00e7\u00e3o com capacidade real<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS para Oracle Fusion Cloud: programa\u00e7\u00e3o com capacidade real; integra\u00e7\u00e3o bidirecional: m\u00e1quinas, pessoas, ferramentas, materiais. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/oracle-fusion-cloud\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para Oracle Fusion Cloud: programa\u00e7\u00e3o da produ\u00e7\u00e3o com a capacidade real de m\u00e1quinas e pessoas\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS para Oracle Fusion Cloud: programa\u00e7\u00e3o com capacidade real; integra\u00e7\u00e3o bidirecional: m\u00e1quinas, pessoas, ferramentas, materiais. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/oracle-fusion-cloud\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/oracle-fusion-cloud\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/oracle-fusion-cloud\\\/\",\"name\":\"Oracle Fusion: integra\u00e7\u00e3o APS e programa\u00e7\u00e3o com capacidade real\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS para Oracle Fusion Cloud: programa\u00e7\u00e3o com capacidade real; integra\u00e7\u00e3o bidirecional: m\u00e1quinas, pessoas, ferramentas, materiais. Desde 199 \u20ac\\\/m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/oracle-fusion-cloud\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/oracle-fusion-cloud\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/oracle-fusion-cloud\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para Oracle Fusion Cloud: programa\u00e7\u00e3o da produ\u00e7\u00e3o com a capacidade real de m\u00e1quinas e pessoas\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Oracle Fusion: integra\u00e7\u00e3o APS e programa\u00e7\u00e3o com capacidade real","description":"SkyPlanner APS para Oracle Fusion Cloud: programa\u00e7\u00e3o com capacidade real; integra\u00e7\u00e3o bidirecional: m\u00e1quinas, pessoas, ferramentas, materiais. Desde 199 \u20ac\/m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/oracle-fusion-cloud\/","og_locale":"pt_PT","og_type":"article","og_title":"SkyPlanner APS para Oracle Fusion Cloud: programa\u00e7\u00e3o da produ\u00e7\u00e3o com a capacidade real de m\u00e1quinas e pessoas","og_description":"SkyPlanner APS para Oracle Fusion Cloud: programa\u00e7\u00e3o com capacidade real; integra\u00e7\u00e3o bidirecional: m\u00e1quinas, pessoas, ferramentas, materiais. Desde 199 \u20ac\/m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/oracle-fusion-cloud\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"17 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/oracle-fusion-cloud\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/oracle-fusion-cloud\/","name":"Oracle Fusion: integra\u00e7\u00e3o APS e programa\u00e7\u00e3o com capacidade real","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS para Oracle Fusion Cloud: programa\u00e7\u00e3o com capacidade real; integra\u00e7\u00e3o bidirecional: m\u00e1quinas, pessoas, ferramentas, materiais. Desde 199 \u20ac\/m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/oracle-fusion-cloud\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/oracle-fusion-cloud\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/oracle-fusion-cloud\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para Oracle Fusion Cloud: programa\u00e7\u00e3o da produ\u00e7\u00e3o com a capacidade real de m\u00e1quinas e pessoas"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ Oracle Fusion Cloud SkyPlanner APS para Oracle Fusion Cloud: programa\u00e7\u00e3o da produ\u00e7\u00e3o com a capacidade real de m\u00e1quinas e pessoas O SkyPlanner APS complementa o Oracle Fusion Cloud com programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real de m\u00e1quinas e pessoas. Programa cada m\u00e1quina, operador, ferramenta e material em todas as&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106156","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=106156"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106156\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/100684"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=106156"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}