{"id":106098,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/xero\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"xero","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/xero\/","title":{"rendered":"SkyPlanner APS para Xero: programa\u00e7\u00e3o da produ\u00e7\u00e3o para fabricantes"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ Xero<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para Xero: <span class=\"hl\">programa\u00e7\u00e3o da produ\u00e7\u00e3o para fabricantes<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o Xero que respeita a capacidade real das m\u00e1quinas e das pessoas. Transforma os or\u00e7amentos aceites num programa para cada m\u00e1quina, operador, ferramenta e material. O Xero mant\u00e9m os contactos, artigos, faturas e registos contabil\u00edsticos. O SkyPlanner acrescenta o plano de produ\u00e7\u00e3o que o software de contabilidade n\u00e3o tem, e o Autopilot reprograma automaticamente quando h\u00e1 altera\u00e7\u00f5es na produ\u00e7\u00e3o.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Marcar uma demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A integra\u00e7\u00e3o entre o SkyPlanner e o Xero \u00e9 bidirecional. O SkyPlanner recebe contactos, artigos com controlo de stock, or\u00e7amentos aceites e encomendas a fornecedores com as respetivas datas de entrega. Devolve ao Xero a data prevista de conclus\u00e3o, rascunhos de faturas para encomendas conclu\u00eddas e o tempo registado nos projetos. Durante a implementa\u00e7\u00e3o, a equipa SkyPlanner configura a integra\u00e7\u00e3o com a sua organiza\u00e7\u00e3o no Xero.<\/p>\n\n\n<p>Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O teste gratuito dura 30 dias e permite utilizar at\u00e9 20 centros de trabalho, sem cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Um plano para cada m\u00e1quina, n\u00e3o uma lista de or\u00e7amentos aceites.<\/p>\n\n\n<p class=\"fx-pain__b\">No Xero, um or\u00e7amento aceite fica \u00e0 espera de ser faturado. O motor Arcturus do SkyPlanner transforma cada or\u00e7amento em tarefas atribu\u00eddas aos centros de trabalho que as v\u00e3o executar, com hor\u00e1rios concretos num diagrama de Gantt interativo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Datas de entrega que pode cumprir.<\/p>\n\n\n<p class=\"fx-pain__b\">A data de conclus\u00e3o de cada encomenda \u00e9 calculada a partir da carga de cada m\u00e1quina e pessoa. Antes de enviar um or\u00e7amento, pode ver que a CNC est\u00e1 ocupada durante duas semanas, enquanto a montagem est\u00e1 livre.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Turnos \u00e0 medida da sua f\u00e1brica.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada centro de trabalho e cada pessoa t\u00eam os seus pr\u00f3prios turnos, f\u00e9rias, aus\u00eancias e turnos extraordin\u00e1rios. Acrescente um turno ao fim do dia no gargalo e as datas ajustam-se de imediato.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Menos mudan\u00e7as de produ\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner guarda o tempo de prepara\u00e7\u00e3o entre cada par de produtos, nos dois sentidos. Passar de azul para vermelho pode demorar 30 minutos, e de vermelho para azul, 60. O motor ordena as tarefas de forma a perder o m\u00ednimo de tempo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ferramentas e equipas partilhadas sem conflitos.<\/p>\n\n\n<p class=\"fx-pain__b\">Um molde em utiliza\u00e7\u00e3o numa m\u00e1quina nunca \u00e9 reservado para outra ao mesmo tempo. A cada tarefa que exige tr\u00eas operadores s\u00e3o atribu\u00eddas tr\u00eas pessoas com disponibilidade nos turnos.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprograma\u00e7\u00e3o autom\u00e1tica perante encomendas urgentes e avarias.<\/p>\n\n\n<p class=\"fx-pain__b\">Atribua Fast Track ou uma prioridade mais alta a uma ordem, e o motor abre espa\u00e7o para ela. Quando uma m\u00e1quina para, o Autopilot reprograma a produ\u00e7\u00e3o, e o Running Time Lock mant\u00e9m as tarefas j\u00e1 iniciadas no seu lugar.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Material verificado antes de come\u00e7ar o trabalho.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner l\u00ea o stock dos artigos com controlo de stock e a data prevista de chegada de cada encomenda a fornecedores no Xero. Uma tarefa que dependa de uma entrega de um fornecedor \u00e9 programada para depois da chegada da mercadoria.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Trabalho conclu\u00eddo, pronto a faturar.<\/p>\n\n\n<p class=\"fx-pain__b\">Os operadores registam o trabalho num telem\u00f3vel ou tablet com Mobile Confirmations ou Production Timer. Quando uma encomenda fica conclu\u00edda, um rascunho de fatura com as linhas do or\u00e7amento fica no Xero a aguardar aprova\u00e7\u00e3o.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que dizem os fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento na UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, pass\u00e1mos de planear a produ\u00e7\u00e3o em folhas de Excel para otimizar a produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o poupa 2 horas de trabalho por semana, e uma nova fila de tarefas chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Ler o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com fatos de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied, em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Ind\u00fastria farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e criar um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Ler o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>de fiabilidade das entregas desde 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner d\u00e1-nos visibilidade sobre a capacidade e torna o planeamento previs\u00edvel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Ind\u00fastria qu\u00edmica e alimentar<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas manteve-se nos 100% durante todo o per\u00edodo de utiliza\u00e7\u00e3o do SkyPlanner, desde 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/opes-corporation\/\">Leia o testemunho da Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Vista a\u00e9rea da f\u00e1brica de equipamentos de seguran\u00e7a para coberturas da Piristeel, em Kauhava\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>fiabilidade das entregas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner tornou mais f\u00e1cil identificar gargalos e trouxe clareza \u00e0 gest\u00e3o da produ\u00e7\u00e3o.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, Diretor de Produ\u00e7\u00e3o<\/b><br>Piristeel \u00b7 Sistemas de seguran\u00e7a para coberturas e de drenagem de \u00e1guas pluviais<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas atingiu 99,2% este ano, e a programa\u00e7\u00e3o da produ\u00e7\u00e3o permite poupar at\u00e9 quatro horas de trabalho por dia.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/piristeel\/\">Ler o testemunho da Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-xero-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona a integra\u00e7\u00e3o com o Xero<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>O Xero envia o trabalho.<\/strong> O SkyPlanner recebe contactos, artigos com controlo de stock e respetivas quantidades em exist\u00eancias, or\u00e7amentos aceites e encomendas a fornecedores com as datas previstas de chegada. Cada or\u00e7amento aceite d\u00e1 origem a uma ordem de produ\u00e7\u00e3o.<\/li>\n\n\n<li><strong>O SkyPlanner cria o programa de produ\u00e7\u00e3o e mant\u00e9m-no atualizado.<\/strong> Basta definir uma vez as etapas do processo, os centros de trabalho e os tempos de prepara\u00e7\u00e3o de cada produto no SkyPlanner. O motor Arcturus programa depois todas as tarefas em todas as m\u00e1quinas em segundos e reprograma \u00e0 medida que a produ\u00e7\u00e3o muda.<\/li>\n\n\n<li><strong>O trabalho conclu\u00eddo regressa ao Xero.<\/strong> O SkyPlanner acrescenta a data prevista de conclus\u00e3o ao hist\u00f3rico do or\u00e7amento. Quando a encomenda fica conclu\u00edda, cria um rascunho de fatura de venda com as linhas e a refer\u00eancia do or\u00e7amento e passa o or\u00e7amento para o estado Invoiced. Nos trabalhos por projeto, as horas registadas s\u00e3o enviadas para o Xero Projects como registos de tempo.<\/li>\n\n<\/ol>\n\n\n<p>A integra\u00e7\u00e3o utiliza a Xero Accounting API e a Projects API com OAuth 2.0, pelo que n\u00e3o \u00e9 necess\u00e1rio instalar nada no Xero. Os webhooks do Xero comunicam os contactos e as faturas novos ou alterados. O SkyPlanner l\u00ea os or\u00e7amentos, artigos e encomendas a fornecedores alterados desde a \u00faltima sincroniza\u00e7\u00e3o, e os seus webhooks enviam as altera\u00e7\u00f5es ao programa de produ\u00e7\u00e3o \u00e0 medida que ocorrem. Cada f\u00e1brica configura os artigos, or\u00e7amentos e stocks de forma diferente no Xero. Por isso, a equipa SkyPlanner faz o mapeamento dos seus dados durante a implementa\u00e7\u00e3o e presta apoio \u00e0 integra\u00e7\u00e3o ap\u00f3s a entrada em funcionamento.<\/p>\n\n\n<p>O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, de acordo com o seu processo e as suas necessidades. O seu consultor Xero, parceiro de integra\u00e7\u00e3o ou a sua pr\u00f3pria equipa de desenvolvimento tamb\u00e9m podem criar uma integra\u00e7\u00e3o com a API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>). Os endpoints, o mapeamento de campos e as regras de escrita de dados no Xero est\u00e3o no <a href=\"\/pt-pt\/integracoes\/erp\/xero\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o com o Xero para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-xero-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que o Xero programa e o que o SkyPlanner acrescenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O Xero \u00e9 um software de contabilidade. Gere or\u00e7amentos, faturas de venda, encomendas a fornecedores, faturas de fornecedores e reconcilia\u00e7\u00e3o banc\u00e1ria, e controla as exist\u00eancias dos artigos com controlo de stock. Nas palavras do Xero, &#8220;If an item is tracked it means Xero tracks the available quantity and value of the item.&#8221; (Se um artigo tiver controlo de stock, o Xero acompanha a quantidade dispon\u00edvel e o valor desse artigo.) (<a href=\"https:\/\/developer.xero.com\/documentation\/api\/accounting\/items\">fonte<\/a>)<\/p>\n\n\n<p>O Xero n\u00e3o guarda listas de materiais, roteiros de fabrico, m\u00e1quinas nem ordens de produ\u00e7\u00e3o. Atualmente, n\u00e3o permite produzir artigos acabados a partir de componentes. No seu f\u00f3rum de sugest\u00f5es de produto, a equipa Xero escreveu em 2026 que a funcionalidade de stock de conjuntos &#8220;hasn&#8217;t been roadmapped at this stage.&#8221; (ainda n\u00e3o est\u00e1 prevista no plano de desenvolvimento.) (<a href=\"https:\/\/productideas.xero.com\/forums\/967139-purchase-orders-bills-inventory\/suggestions\/45048400-advanced-inventory-assembly-inventory\">fonte<\/a>)<\/p>\n\n\n<p>Na sua pr\u00f3pria p\u00e1gina de gest\u00e3o de stocks, o Xero remete as empresas que precisam de mais funcionalidades para aplica\u00e7\u00f5es: &#8220;Apps include Cin7 Core, Unleashed, and ZapInventory&#8221; (As aplica\u00e7\u00f5es incluem Cin7 Core, Unleashed e ZapInventory). (<a href=\"https:\/\/www.xero.com\/us\/accounting-software\/manage-inventory\/\">fonte<\/a>) Estas aplica\u00e7\u00f5es gerem stocks e encomendas. O SkyPlanner acrescenta o plano para as m\u00e1quinas e as pessoas. Cada etapa \u00e9 explicada em <a href=\"\/pt-pt\/integracoes\/erp\/xero\/programacao-producao\/\">O Xero permite programar a produ\u00e7\u00e3o?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"xero-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O Xero hoje e com o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Xero<\/th><th>Xero com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Carteira de encomendas<\/td><td>Or\u00e7amentos aceites e faturas de venda<\/td><td>Cada encomenda desdobrada em tarefas no cronograma dos centros de trabalho<\/td><\/tr><tr><td>Capacidade<\/td><td>N\u00e3o modelada<\/td><td>Cada m\u00e1quina, pessoa e ferramenta com os seus pr\u00f3prios turnos<\/td><\/tr><tr><td>Roteiros de fabrico<\/td><td>N\u00e3o registados<\/td><td>Etapas do processo, centros de trabalho e tempos de prepara\u00e7\u00e3o por produto<\/td><\/tr><tr><td>Sequencia\u00e7\u00e3o<\/td><td>O planeador decide num quadro branco ou numa folha de c\u00e1lculo<\/td><td>O motor sequencia todas as encomendas em aberto por prioridade e prazo de entrega<\/td><\/tr><tr><td>Mudan\u00e7as de s\u00e9rie<\/td><td>N\u00e3o modeladas<\/td><td>Matriz de tempos de mudan\u00e7a, com o menor tempo total de prepara\u00e7\u00e3o<\/td><\/tr><tr><td>Altera\u00e7\u00f5es<\/td><td>Telefonemas e replaneamento manual<\/td><td>O Autopilot replaneia toda a f\u00e1brica<\/td><\/tr><tr><td>Materiais<\/td><td>Quantidade em exist\u00eancias por artigo com controlo de stock<\/td><td>Verifica\u00e7\u00e3o do stock e das datas de chegada das encomendas a fornecedores a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Fichas de trabalho em papel<\/td><td>Fila de tarefas com hor\u00e1rios, Mobile Confirmations, Production Timer<\/td><\/tr><tr><td>Fatura\u00e7\u00e3o<\/td><td>Introdu\u00e7\u00e3o manual da fatura ap\u00f3s a conclus\u00e3o da tarefa<\/td><td>Rascunho de fatura criado a partir do trabalho conclu\u00eddo<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-xero-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Que dados circulam entre o Xero e o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Xero<\/th><th>SkyPlanner<\/th><th>Sentido<\/th><\/tr><\/thead><tbody><tr><td>Contact (cliente)<\/td><td>Cliente, prioridade de entrega<\/td><td>Entrada<\/td><\/tr><tr><td>Item (com e sem controlo de stock) com QuantityOnHand<\/td><td>Produtos e materiais, stock<\/td><td>Entrada<\/td><\/tr><tr><td>Quote (Accepted) com linhas de artigos<\/td><td>Encomenda com prazo de entrega, tarefas por linha<\/td><td>Entrada<\/td><\/tr><tr><td>PurchaseOrder com ExpectedArrivalDate e DeliveryDate<\/td><td>Material a receber com data de chegada<\/td><td>Entrada<\/td><\/tr><tr><td>Nota no hist\u00f3rico de Quote<\/td><td>Data prevista de conclus\u00e3o<\/td><td>Retorno<\/td><\/tr><tr><td>Invoice (ACCREC, Draft) com as linhas e a refer\u00eancia do or\u00e7amento<\/td><td>Encomenda conclu\u00edda<\/td><td>Retorno<\/td><\/tr><tr><td>Quote com estado Invoiced<\/td><td>Encomenda conclu\u00edda<\/td><td>Retorno<\/td><\/tr><tr><td>Registo de tempo em Projects<\/td><td>Mobile Confirmations, registos de tempo<\/td><td>Retorno<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"xero-scheduling-software-and-add-ons-compared\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Compara\u00e7\u00e3o de software e complementos de programa\u00e7\u00e3o para o Xero<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Op\u00e7\u00e3o<\/th><th>O que \u00e9<\/th><th>Quando se adequa<\/th><\/tr><\/thead><tbody><tr><td>Apenas Xero<\/td><td>Or\u00e7amentos, faturas, encomendas a fornecedores e controlo de stock no Xero, com o plano num quadro branco<\/td><td>Uma ou duas m\u00e1quinas, com uma pessoa que conhece a sequ\u00eancia do trabalho<\/td><\/tr><tr><td>Aplica\u00e7\u00f5es de gest\u00e3o de stocks e MRP que sincronizam com o Xero (por exemplo, Katana, MRPeasy, Fishbowl Manufacturing, Cin7 Core, Unleashed)<\/td><td>Um segundo sistema para stocks, listas de materiais e encomendas, que envia faturas de venda, faturas de fornecedores e custos para o Xero<\/td><td>Pretende passar a gerir stocks e encomendas fora do Xero<\/td><\/tr><tr><td>APS na nuvem ligado por API (SkyPlanner APS)<\/td><td>Uma ferramenta que programa a produ\u00e7\u00e3o respeitando a capacidade real das m\u00e1quinas e das equipas, l\u00ea os or\u00e7amentos do Xero e devolve os dados do trabalho conclu\u00eddo<\/td><td>O Xero continua a ser o seu sistema, mas as m\u00e1quinas e as equipas precisam de um plano realista<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Se j\u00e1 utiliza um MRP em conjunto com o Xero, o SkyPlanner programa a produ\u00e7\u00e3o com base nos dados desse sistema. Consulte as p\u00e1ginas do <a href=\"\/pt-pt\/integracoes\/erp\/katana\/\">Katana<\/a> e do <a href=\"\/pt-pt\/integracoes\/erp\/mrpeasy\/\">MRPeasy<\/a>.<\/p>\n\n\n<p><strong>Escolha o SkyPlanner para Xero quando:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Quer manter o Xero tal como est\u00e1.<\/strong> O SkyPlanner acrescenta o plano de produ\u00e7\u00e3o e mant\u00e9m a contabilidade, os artigos e a fatura\u00e7\u00e3o onde est\u00e3o.<\/li>\n\n\n<li><strong>V\u00e1rias m\u00e1quinas disputam as mesmas encomendas,<\/strong> e a sequ\u00eancia de trabalho s\u00f3 existe na cabe\u00e7a de algu\u00e9m.<\/li>\n\n\n<li><strong>As mudan\u00e7as de produto determinam quanto consegue produzir.<\/strong> A matriz de tempos de prepara\u00e7\u00e3o guarda um tempo para cada par de produtos, em ambos os sentidos, e escolhe a sequ\u00eancia com o menor tempo de prepara\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Os operadores, os dispositivos de fixa\u00e7\u00e3o e os materiais condicionam o plano tanto como as m\u00e1quinas.<\/strong> Os limites de todos os recursos s\u00e3o considerados em simult\u00e2neo, e as tarefas que exigem v\u00e1rios operadores recebem as pessoas de que precisam.<\/li>\n\n\n<li><strong>Quer faturar o trabalho conclu\u00eddo sem voltar a introduzir dados.<\/strong> Assim que a conclus\u00e3o da encomenda \u00e9 confirmada, \u00e9 enviado um rascunho de fatura para o Xero.<\/li>\n\n\n<li><strong>Quer um pre\u00e7o claro.<\/strong> A partir de 199 \u20ac por m\u00eas, com or\u00e7amento pr\u00e9vio para a integra\u00e7\u00e3o bidirecional e suporte da equipa SkyPlanner.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie o per\u00edodo de teste gratuito.<\/strong> 30 dias, at\u00e9 20 centros de trabalho, todas as funcionalidades do plano Basic, sem cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Configure a sua produ\u00e7\u00e3o.<\/strong> Crie centros de trabalho, pessoas, turnos e etapas do processo no SkyPlanner ou importe esses dados. Pode contar com apoio na configura\u00e7\u00e3o inicial.<\/li>\n\n\n<li><strong>Carregue as suas encomendas.<\/strong> Exporte do Xero os contactos, os produtos e servi\u00e7os e os or\u00e7amentos em aberto para CSV. Importe esses dados e compare a programa\u00e7\u00e3o do SkyPlanner com o seu plano atual.<\/li>\n\n\n<li><strong>Estabele\u00e7a a liga\u00e7\u00e3o ao Xero.<\/strong> A equipa SkyPlanner configura a integra\u00e7\u00e3o bidirecional e assegura o suporte ap\u00f3s a entrada em funcionamento.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> Os planos s\u00e3o faturados mensalmente por centro de trabalho. Pode adicionar ou remover centros de trabalho ou cancelar a qualquer momento. Consulte os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a> para saber mais ou leia o <a href=\"\/pt-pt\/recursos-pt-pt\/capacidade-finita\/\">guia de programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real<\/a>. Utiliza tamb\u00e9m outro sistema? Consulte <a href=\"\/pt-pt\/integracoes\/erp\/\">todas as integra\u00e7\u00f5es<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Falar com a equipa comercial<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 o melhor complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o Xero?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real dos recursos e se integra com o Xero nos dois sentidos. Recebe contactos, artigos com controlo de stock, or\u00e7amentos aceites e encomendas de compra. Devolve a data de conclus\u00e3o prevista, rascunhos de faturas de encomendas conclu\u00eddas e registos de tempo dos projetos. Tem em conta os limites de cada m\u00e1quina, operador, ferramenta e material. Uma matriz de tempos de prepara\u00e7\u00e3o, que distingue o sentido de cada mudan\u00e7a de produto, ordena as tarefas para minimizar a prepara\u00e7\u00e3o. O Autopilot reprograma automaticamente quando h\u00e1 altera\u00e7\u00f5es na produ\u00e7\u00e3o. Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas e o per\u00edodo de avalia\u00e7\u00e3o gratuita dura 30 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Que software de programa\u00e7\u00e3o da produ\u00e7\u00e3o se integra com o Xero?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS integra-se com o Xero atrav\u00e9s da Xero Accounting API e da Projects API, com OAuth 2.0 e webhooks do Xero. A equipa SkyPlanner configura a integra\u00e7\u00e3o durante a configura\u00e7\u00e3o inicial. Aplica\u00e7\u00f5es de gest\u00e3o de stocks e MRP, como Katana, MRPeasy e Fishbowl, tamb\u00e9m sincronizam dados com o Xero. Se utilizar uma destas aplica\u00e7\u00f5es, o SkyPlanner pode programar a produ\u00e7\u00e3o com base nos respetivos dados.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Xero permite programar a produ\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O Xero n\u00e3o disp\u00f5e de listas de materiais, roteiros de fabrico, m\u00e1quinas ou ordens de produ\u00e7\u00e3o, e a gest\u00e3o de stocks de conjuntos montados n\u00e3o est\u00e1 nos seus planos de desenvolvimento. O SkyPlanner APS complementa-o com a <a href=\"\/pt-pt\/recursos-pt-pt\/capacidade-finita\/\">programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real dos recursos<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Temos de substituir o Xero por um ERP para programar a produ\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O SkyPlanner funciona em conjunto com o Xero. Os contactos, artigos, or\u00e7amentos, faturas, compras e contabilidade continuam no Xero. O SkyPlanner programa o trabalho de acordo com a capacidade real e devolve os dados do trabalho conclu\u00eddo para fatura\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa utilizar o SkyPlanner em conjunto com o Xero?<\/summary>\n<p class=\"sp-faq__a\">A partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas por cada centro de trabalho adicional. Uma oficina com 10 centros de trabalho paga 299 \u20ac por m\u00eas. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, de acordo com os seus processos e necessidades, juntamente com o plano escolhido. Assim, conhece o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u00c9 necess\u00e1rio instalar alguma coisa no Xero?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O SkyPlanner funciona na nuvem, em conjunto com o Xero. Um administrador do Xero inicia sess\u00e3o uma \u00fanica vez e autoriza o acesso no ecr\u00e3 OAuth 2.0 do Xero.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo demora a implementa\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio da configura\u00e7\u00e3o. A equipa configura os centros de trabalho e as etapas do processo, liga os or\u00e7amentos e as encomendas de compra e ativa o envio de faturas para o Xero. Tudo \u00e9 testado com base no seu plano atual antes da entrada em funcionamento.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar primeiro o SkyPlanner com os nossos dados do Xero?<\/summary>\n<p class=\"sp-faq__a\">Sim. Durante o per\u00edodo de avalia\u00e7\u00e3o, importe os seus produtos e or\u00e7amentos em aberto a partir de uma exporta\u00e7\u00e3o CSV do Xero. Antes de se iniciar qualquer trabalho de integra\u00e7\u00e3o, pode ver a sua pr\u00f3pria produ\u00e7\u00e3o programada de acordo com a capacidade real dos recursos.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ Xero SkyPlanner APS para Xero: programa\u00e7\u00e3o da produ\u00e7\u00e3o para fabricantes O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o Xero que respeita a capacidade real das m\u00e1quinas e das pessoas. Transforma os or\u00e7amentos aceites num programa para cada m\u00e1quina, operador, ferramenta e material. O Xero mant\u00e9m os contactos, &#8230; <a title=\"SkyPlanner APS para Xero: programa\u00e7\u00e3o da produ\u00e7\u00e3o para fabricantes\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/xero\/\" aria-label=\"Leia mais sobre SkyPlanner APS para Xero: programa\u00e7\u00e3o da produ\u00e7\u00e3o para fabricantes\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100684,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106098","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integra\u00e7\u00e3o Xero: complemento APS de programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para Xero, integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, operador, ferramenta e material. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/xero\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para Xero: programa\u00e7\u00e3o da produ\u00e7\u00e3o para fabricantes\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para Xero, integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, operador, ferramenta e material. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/xero\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/xero\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/xero\\\/\",\"name\":\"Integra\u00e7\u00e3o Xero: complemento APS de programa\u00e7\u00e3o da produ\u00e7\u00e3o\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS: complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para Xero, integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, operador, ferramenta e material. Desde 199 \u20ac\\\/m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/xero\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/xero\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/xero\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para Xero: programa\u00e7\u00e3o da produ\u00e7\u00e3o para fabricantes\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integra\u00e7\u00e3o Xero: complemento APS de programa\u00e7\u00e3o da produ\u00e7\u00e3o","description":"SkyPlanner APS: complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para Xero, integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, operador, ferramenta e material. Desde 199 \u20ac\/m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/xero\/","og_locale":"pt_PT","og_type":"article","og_title":"SkyPlanner APS para Xero: programa\u00e7\u00e3o da produ\u00e7\u00e3o para fabricantes","og_description":"SkyPlanner APS: complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para Xero, integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, operador, ferramenta e material. Desde 199 \u20ac\/m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/xero\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"14 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/xero\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/xero\/","name":"Integra\u00e7\u00e3o Xero: complemento APS de programa\u00e7\u00e3o da produ\u00e7\u00e3o","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS: complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para Xero, integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, operador, ferramenta e material. Desde 199 \u20ac\/m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/xero\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/xero\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/xero\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para Xero: programa\u00e7\u00e3o da produ\u00e7\u00e3o para fabricantes"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ Xero SkyPlanner APS para Xero: programa\u00e7\u00e3o da produ\u00e7\u00e3o para fabricantes O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o Xero que respeita a capacidade real das m\u00e1quinas e das pessoas. Transforma os or\u00e7amentos aceites num programa para cada m\u00e1quina, operador, ferramenta e material. O Xero mant\u00e9m os contactos,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106098","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=106098"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106098\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/100684"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=106098"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}